Attachment D1_ Drawings 1 of 12.pdf
PDF 18 MB Posted
- Attached to
- Z2DZ--644-20-201 EHRM Phoenix Construction Federal contract opportunity
- Solicitation number
- 36C26221B0007_1
About this file
This document provides details for a federal construction solicitation. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is seeking construction services for Project 644-20-201, "Electronic Health Records Modernization (EHRM) Infrastructure Upgrades" at the VA Phoenix Healthcare System located in Phoenix, Arizona. The project scope includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The work must be performed according to applicable local and VA building codes. This requirement is set aside only for Service-Disabled Veteran-Owned Small Businesses listed on the Vendor Information Pages database. The North American Industry Classification Code is 236220 for Commercial and Institutional Building Construction with a size standard of $39.5M. The estimated value of this construction project is between $10,000,000 and $20,000,000. An Invitation for Bid will be issued on June 3, 2021 via sam.gov. A site visit will also be scheduled. Interested parties should contact the contracting specialist Steven J. Covell for additional details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26221B0007 AMENDMENT 0004 7-13-21.pdf | ||
| 36C26221B0007 AMENDMENT 0003 7-07-21.pdf | ||
| AMENDMENT 0003 - ATTACHMENT MI903 - Mechanical and Electrical Schedules.pdf | ||
| 36C26221B0007 AMENDMENT 0002 7-02-21.pdf | ||
| 36C26221B0007 AMENDMENT 0001 6-30-21.pdf | ||
| 36C26221B0007_1.docx | DOCX document | |
| Attachment D6_ Drawings 6 of 12.pdf | ||
| Attachment D7_ Drawings 7 of 12.pdf | ||
| Attachment D8_ Drawings 8 of 12.pdf | ||
| Attachment C_ Specifications.pdf | ||
| Attachment D4_ Drawings 4 of 12.pdf | ||
| Attachment D10_ Drawings 10 of 12.pdf | ||
| Attachment D11_ Drawings 11 of 12.pdf | ||
| Attachment B_ Wage Determination.pdf | ||
| Attachment D2_ Drawings 2 of 12.pdf | ||
| Attachment D3_ Drawings 3 of 12.pdf | ||
| Attachment D5_ Drawings 5 of 12.pdf | ||
| Attachment D9_ Drawings 9 of 12.pdf | ||
| Attachment A_ Campus Map.pptx | PPTX presentation | |
| Attachment D12_ Drawings 12 of 12.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phoenix VA Healthcare System Carl T. Hayden Medical Center
650 E Indian School Rd, Phoenix AZ 85012
Indian School RdIndian School Rd
E Osborn Rd
N C en tr a l A ve
N th S t
N th
S t
N th
S t
E Camelback Rd
E Meadowbrok Ave
Grand Canel
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
DEPARTMENT OF VETERNS AFFAIRS
100% CD SUBMISSION
SITE MAPDESIGN TEAM
SHEET OF
100% CONSTRUCTION
DOCUMENTS
B
IM
/P h o e n ix
E H
R M
/6
-2
-2
S
IT
E
.r v t
/2
/2
:2
:5
P
M
GI000
COVER SHEET
Concourse Federal Group
123 S. Royal Street
Alexandria, VA 22314
EHRM INFRASTRUCTURE
UPGRADES GENERAL
05.26.2021
PVAHCS - Carl T Hayden Medical Center 650 E Indian School Road Phoenix AZ 85012
EHRM INFRASTRUCTURE UPGRADES
MAY 26, 2021
PVAHCS - Carl T Hayden Medical Center
644-20-201
OWNER
Phoenix VA Health Care System, Carl T. Hayden Medical Center James Larson, Contracting Officer Representative james.larson2@va.gov
VA Network 22 Contracting Office, Long Beach, CA Steven Covell, Contracting Officer steve.covell@va.gov
ARCHITECT/PRIME CONTRACT
Concourse Federal Group 123 S. Royal Street Alexandria, Virginia 22314
Tim Hower, PE, PMP, MBA, Project Manager thower@awensolutions.com Ann Turner, Deputy Project Manager aturner@awensolutions.com Gene Klow, Principal Architect gklow@awensolutions.com Clark Garrett, AIA, NCARB, CSI, CDT cgarrett@awensolutions.com Christy Winson, NCIDQ, Interior Designer cwinson@awensolutions.com Matt Shuba, AIA mshuba@awensolutions.com Dawn Harrington dharrington@awensolutions.com Anna Kim akim@awensolutions.com Caz Rebach crebach@awensolutions.com Marshall Contino, Concourse A|E Vice President mcontino@awensolutions.com
STRUCTURAL ENGINEER
Gregory P Luth & Associates, Inc 3350 Scott Blvd, Santa Clara, CA 95054
Greg Luth greg@gplainc.com Trupti Sonavane, AIA trupti@gplainc.com Bala Surampudi bala@gplainc.com
FIRE PROTECTION
Coffman Engineers 8171 Maple Lawn Blvd #250, Fulton, MD 20759
Scott Knight, PE, Engineer scott.knight@coffman.com
MECHANICAL/ELECTRICAL ENGINEER
DHE Engineering 3300 N. Central Ave. 3300 Tower Suite, 1520, Phoenix, AZ 85012
Nate Jones, P.E., Principal, Electrical Engineer njones@dheeng.com Kory Young, EIT, Senior Mechanical Engineer kyoung@dheeng.com Jasper Lim, Electrical Engineer jlim@dheeng.com
LOW-VOLTAGE DESIGN
Olympus Construction Management 4365 E Pecos Rd Ste 120, Gilbert, AZ 85295
Chris Stowers, Project Manager chris.stowers@olympusCM.com
N
Revisions: Date: 05.26.2021 SHEET 1 of 421
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
SHEET OF
100% CONSTRUCTION
DOCUMENTS
B
IM
/P h o e n ix
E H
R M
/6
-2
-2
S
IT
E
.r v t
/2
/2
:3
:1
A
M
GI002
SHEET INDEX
Concourse Federal Group
123 S. Royal Street
Alexandria, VA 22314
EHRM INFRASTRUCTURE
UPGRADES GENERAL
05.26.2021
PVAHCS - Carl T Hayden Medical Center 650 E Indian School Road Phoenix AZ 85012
644-20-201
DRAWING
NUMBER DRAWING TITLE
BLDG 29
01-GENERAL
29-GI001 COVER SHEET
08-ARCHITECTURAL
29-AE101 REFERENCE/SEQUENCING PLAN
29-AE102 REFERENCE PLAN - ROOF
29-AE401 ENLARGED PLANS
29-AE601 MISCELLANEOUS DETAILS AND SCHEDULES
09-FIRE PROTECTION
29-FP101 FIRE PROTECTION PLAN
10-PLUMBING
29-PP401 ENLARGED PLUMBING PIPING PLAN
12-MECHANICAL
29-MH401 ENLARGED MECHANICAL HVAC PLANS
13-ELECTRICAL
29-EP101 ELECTICAL POWER PLAN
29-EP401 ENLARGED ELECTRICAL POWER PLANS
29-EJ601 ELECTRICAL ONE-LINE DIAGRAM - NORMAL
15-TELECOMMUNICATIONS
29-TN101 TELECOM AND SECURITY PLAN
29-TN401 ENLARGED TR PLANS & RACK ELEVATIONS
BLDG 31
01-GENERAL
31-GI001 COVER SHEET
08-ARCHITECTURAL
31-AE101 REFERENCE/SEQUENCING PLAN - 1ST FLOOR
31-AE102 REFERENCE/SEQUENCING PLAN - 2ND FLOOR
31-AE401 ENLARGED PLANS
31-AE601 MISCELLANEOUS DETAILS AND SCHEDULES
09-FIREPROTECTION
31-FP101 FIRE PROTECTION PLAN - 1ST FLOOR
31-FP102 FIRE PROTECTION PLAN - 2ND FLOOR
10-PLUMBING
31-PP101 PLUMBING PIPING PLAN - 1ST FLOOR
31-PP102 PLUMBING PIPING PLAN - 2ND FLOOR
31-PP401 ENLARGED PLUMBING PIPING PLANS
12-MECHANICAL
31-MH101 MECHANICAL HVAC PLAN - 1ST FLOOR
31-MH102 MECHANICAL HVAC PLAN - 2ND FLOOR
31-MH401 ENLARGED MECHANICAL HVAC PLANS
13-ELECTRICAL
31-EP101 ELECTRICAL POWER PLAN - 1ST FLOOR
31-EP102 ELECTRICAL POWER PLAN - 2ND FLOOR
31-EP401 ENLARGED ELECTRICAL POWER PLANS
31-EJ601 ELECTRICAL ONE-LINE DIAGRAM - NORMAL
15-TELECOMMUNICATIONS
31-TN101 TELECOM AND SECURITY PLAN - 1ST FLOOR
31-TN102 TELECOM AND SECURITY PLAN - 2ND FLOOR
31-TN401 ENLARGED TR PLANS & RACK ELEVATIONS
31-TN402 ENLARGED TR PLANS & RACK ELEVATIONS
BLDG 34
01-GENERAL
34-GI001 COVER SHEET
34-GC101 SEQUENCING PLAN - 1ST FLOOR
34-GC102 SEQUENCING PLAN - 2ND FLOOR
08-ARCHITECTURAL
34-AE101 REFERENCE PLAN - 1ST FLOOR
34-AE102 REFERENCE PLAN - 2ND FLOOR
34-AE401 ENLARGED PLANS
34-AE451 INTERIOR ELEVATIONS
34-AE601 MISCELLANEOUS DETAILS AND SCHEDULES
09-FIRE PROTECTION
34-FP101 FIRE PROTECTION PLAN - 1ST FLOOR
34-FP102 FIRE PROTECTION PLAN - 2ND FLOOR
10-PLUMBING
34-PP101 PLUMBING PIPING PLAN - 1ST FLOOR
34-PP102 PLUMBING PIPING PLAN - 2ND FLOOR
34-PP401 ENLARGED PLUMBING PIPING PLANS
12-MECHANICAL
34-MP101 MECHANICAL PIPING PLAN - 1ST FLOOR
34-MP102 MECHANICAL PIPING PLAN - 2ND FLOOR
34-MP401 ENLARGED MECHANICAL PIPING PLANS
13-ELECTRICAL
34-EP401 ENLARGED ELECTRICAL POWER PLANS
34-EJ601 ELECTRICAL ONE-LINE DIAGRAM - NORMAL
15-TELECOMMUNICATIONS
34-TN101 TELECOM AND SECURITY PLAN -1ST FLOOR
34-TN102 TELECOM AND SECURITY PLAN -2ND FLOOR
34-TN401 ENLARGED IDF PLANS & RACK ELEVATIONS
34-TN402 ENLARGED IDF PLANS & RACK ELEVATIONS
BLDG 37
01-GENERAL
37-GI001 COVER SHEET
08-ARCHITECTURAL
37-AE101 REFERENCE FLOOR PLAN - PARKING STRUCTURE
37-AE401 FLOOR/SEQUENCING PLAN - PARKING STRUCTURE
09-FIRE PROTECTION
37-FP101 FIRE PROTECTION PLAN - PARKING STRUCTURE
10-PLUMBING
37-PP401 ENLARGED PLUMBING PIPING PLAN - PARKING STRUCTURE
12-MECHANICAL
37-MP401 ENLARGED MECHANICAL PIPING PLAN - PARKING STRUCTURE
13-ELECTRICAL
37-EP401 ENLARGED ELECTRICAL PLAN - PARKING STRUCTURE
37-EJ601 ELECTRICAL ONE-LINE DIAGRAM
TOTAL NUMBER OF SHEETS: 421
DRAWING
NUMBER DRAWING TITLE
BLDG 21
01-GENERAL
21-GI001 COVER SHEET
21-GC101 SEQUENCING PLAN
08-ARCHITECTURAL
21-AE101 REFERENCE FLOOR PLAN
21-AE102 REFERENCE ROOF PLAN
21-AE401 ENLARGED PLANS
21-AE451 INTERIOR ELEVATIONS
21-AE601 MISCELLANEOUS DETAILS AND SCHEDULES
09-FIRE PROTECTION
21-FP101 FIRE PROTECTION PLAN
10-PLUMBING
21-PP101 PLUMBING PIPING PLAN
21-PP401 ENLARGED PLUMBING PIPING PLAN
12-MECHANICAL
21-MH101 MECHANICAL HVAC PLAN
21-MH401 ENLARGED MECHANICAL HVAC PLANS
13-ELECTRICAL
21-EP101 ELECTRICAL POWER PLAN
21-EP401 ENLARGED ELECTRICAL POWER PLANS
21-EJ601 ELECTRICAL ONE-LINE DIAGRAM
15-TELECOMMUNICATIONS
21-TN101 TELECOM AND SECURITY PLAN
21-TN401 ENLARGED TR PLANS & RACK ELEVATIONS
BLDG 24
01-GENERAL
24-GI001 COVER SHEET
08-ARCHITECTURAL
24-AE101 REFERENCE/SEQUENCING PLANS
24-AE401 ENLARGED PLANS
24-AE601 MISCELLANEOUS DETAILS AND SCHEDULES
09-FIRE PROTECTION
24-FP101 FIRE PROTECTION PLAN
10-PLUMBING
24-PP401 ENLARGED PLUMBING PIPING PLANS
12-MECHANICAL
24-MH401 ENLARGED MECHANICAL HVAC PLAN
13-ELECTRICAL
24-EP101 ELECTRICAL POWER PLAN
24-EP401 ENLARGED ELECTRICAL POWER PLAN
24-EJ601 ELECTRICAL ONE-LINE DIAGRAM - NORMAL
15-TELECOMMUNICATIONS
24-TN101 TELECOM AND SECURITY PLAN
24-TN401 ENLARGED TR PLAN & RACK ELEVATIONS
BLDG 27
01-GENERAL
27-GI001 COVER SHEET
08-ARCHITECTURAL
27-AE101 REFERENCE/SEQUENCING PLANS
27-AE401 ENLARGED PLANS
27-AE601 MISCELLANEOUS DETAIL AND SCHEDULES
09-FIRE PROTECTION
27-FP101 FIRE PROTECTION PLAN
10-PLUMBING
27-PP401 ENLARGED PLUMBING PIPING PLAN
12-MECHANICAL
27-MH401 ENLARGED MECHANICAL HVAC PLAN
13-ELECTRICAL
27-EP101 ELECTRICAL POWER PLAN
27-EP401 ENLARGED ELECTRICAL POWER PLAN
27-EJ601 ELECTRICAL ONE-LINE DIAGRAM
15-TELECOMMUNICATIONS
27-TN101 TELECOM AND SECURITY PLAN
27-TN401 ENLARGED TR PLAN & RACK ELEVATIONS
BLDG 28
01-GENERAL
28-GI001 COVER SHEET
08-ARCHITECTURAL
28-AE101 REFERENCE/SEQUENCING PLAN
28-AE401 ENLARGED PLANS
28-AE601 MISCELLANEOUS DETAIL AND SCHEDULES
09-FIRE PROTECTION
28-FP101 FIRE PROTECTION PLAN
10-PLUMBING
28-PP401 ENLARGED PLUMBING PIPING PLAN
12-MECHANICAL
28-MH401 ENLARGED MECHANICAL HVAC PLAN
13-ELECTRICAL
28-EP101 ELECTRICAL POWER PLAN
28-EP401 ENLARGED ELECTRICAL POWER PLAN
28-EJ601 ELECTRICAL ONE-LINE DIAGRAM - CRITICAL
15-TELECOMMUNICATIONS
28-TN101 TELECOM AND SECURITY PLAN
28-TN401 ENLARGED IDF PLANS & RACK ELEVATIONS
DRAWING
NUMBER DRAWING TITLE
BLDG 08
01-GENERAL
08-GI001 COVER SHEET
08-GC100 SEQUENCING PLAN BASEMENT
08-GC101 SEQUENCING PLAN 1ST FLOOR
08-GC102 SEQUENCING PLAN 2ND FLOOR
08-ARCHITECTURAL
08-AE100 REFERENCE FLOOR PLAN BASEMENT
08-AE101 REFERENCE FLOOR PLAN 1ST FLOOR
08-AE102 REFERENCE FLOOR PLAN 2ND FLOOR
08-AE401 ENLARGED PLANS - BASEMENT
08-AE402 ENLARGED PLANS - 1ST FLOOR
08-AE403 ENLARGED PLANS - 2ND FLOOR
08-AE451 INTERIOR ELEVATIONS
08-AE452 INTERIOR ELEVATIONS
08-AE453 INTERIOR ELEVATIONS
08-AE601 MISCELLANEOUS DETAILS AND SCHEDULES
09-FIRE PROTECTION
08-FP100 FIRE PROTECTION PLAN - BASEMENT
08-FP101 FIRE PROTECTION PLAN - 1ST FLOOR
08-FP102 FIRE PROTECTION PLAN - 2ND FLOOR
10-PLUMBING
08-PP100 PLUMBING PIPING PLAN - BASEMENT
08-PP101 PLUMBING PIPING PLAN - 1ST FLOOR
08-PP102 PLUMBING PIPING PLAN - 2ND FLOOR
08-PP401 ENLARGED PLUMBING PIPING PLANS - BASEMENT
08-PP402 ENLARGED PLUMBING PIPING PLANS - 1ST FLOOR
08-PP403 ENLARGED PLUMBING PIPING PLANS - 2ND FLOOR
12-MECHANICAL
08-MH100 MECHANICAL HVAC PLAN - BASEMENT
08-MH101 MECHANICAL HVAC PLAN - 1ST FLOOR
08-MH102 MECHANICAL HVAC PLAN - 2ND FLOOR
08-MD401 DEMOLITION MECHANICAL HVAC PLAN - 1ST FLOOR
08-MD402 DEMOLITION MECHANICAL HVAC PLAN - 2ND FLOOR
08-MH401 ENLARGED MECHANICAL HVAC PLAN - BASEMENT
08-MH402 ENLARGED MECHANICAL HVAC PLAN - 1ST FLOOR
08-MH403 ENLARGED MECHANICAL HVAC PLAN - 2ND FLOOR
08-MP401 ENLARGED MECHANICAL PIPING PLAN - BASEMENT
08-MP402 ENLARGED MECHANICAL PIPING PLAN - 1ST FLOOR
08-MP403 ENLARGED MECHANICAL PIPING PLAN - 2ND FLOOR
13-ELECTRICAL
08-EP100 ELECTRICAL POWER PLAN - BASEMENT
08-EP101 ELECTRICAL POWER PLAN - 1ST FLOOR
08-EP102 ELECTRICAL POWER PLAN - 2ND FLOOR
08-EP401 ENLARGED ELECTRICAL POWER PLANS
08-EP402 ENLARGED ELECTRICAL POWER PLANS
08-EP403 ENLARGED ELECTRICAL POWER PLANS
08-EK601 ELECTRICAL ONE-LINE DIAGRAMS - CRITICAL
08-EJ601 ELECTRICAL PANEL SCHEDULES
15-TELECOMMUNICATIONS
08-TN100 TELECOM AND SECURITY PLAN - BASEMENT
08-TN101 TELECOM AND SECURITY PLAN - 1ST FLOOR
08-TN102 TELECOM AND SECURITY PLAN - 2ND FLOOR
08-TN401 ENLARGED TR PLANS & RACK ELEVATIONS
08-TN402 ENLARGED TR PLANS
08-TN402.1 ENLARGED TR PLANS
08-TN403 ENLARGED TR PLANS
08-TN403.1 RACK ELEVATIONS
BLDG 13
01-GENERAL
13-GI001 COVER SHEET
08-ARCHITECTURAL
13-AE101 FLOOR/SEQUENCING PLAN
12-MECHANICAL
13-MP101 MECHANICAL PIPING PLAN
13-ELECTRICAL
13-EP101 ELECTRICAL POWER PLAN
13-EJ601 ELECTRICAL ONE-LINE DIAGRAM - CRITICAL
15-TELECOMMUNICATIONS
13-TN101 TELECOM PLAN
BLDG 14
01-GENERAL
14-GI001 COVER SHEET
08-ARCHITECTURAL
14-AE101 FLOOR/SEQUENCING PLANS
14-AE351 WALL SECTIONS
14-AE451 INTERIOR ELEVATIONS
14-AE521 DOOR DETAILS
14-AE531 WALL TYPES
14-AE532 MISCELLANEOUS DETAILS
14-AE601 SCHEDULES
09-FIRE PROTECTION
14-FP101 FIRE PROTECTION PLAN
10-PLUMBING
14-PP101 PLUMBING PIPING PLAN
12-MECHANICAL
14-MP101 MECHANICAL PIPING PLAN
13-ELECTRICAL
14-EP101 ELECTRICAL POWER PLAN
14-EJ601 ELECTRICAL ONE-LINE DIAGRAM
15-TELECOMMUNICATIONS
14-TN101 TELECOM AND SECURITY PLAN
DRAWING
NUMBER DRAWING TITLE
13-ELECTRICAL
01-E100 ELECTRICAL POWER PLAN - BASEMENT
01-E101 ELECTRICAL POWER PLAN - 1ST FLOOR
01-E102 ELECTRICAL POWER PLAN - 2ND FLOOR
01-E103 ELECTRICAL POWER PLAN - 3RD FLOOR
01-E104 ELECTRICAL POWER PLAN - 4TH FLOOR
01-E105 ELECTRICAL POWER PLAN - 5TH FLOOR
01-E106 ELECTRICAL POWER PLAN - 6TH FLOOR
01-E107 ELECTRICAL POWER PLAN - 7TH FLOOR
01-EL401 ENLARGED ELECTRICAL LIGHTING PLANS SOUTH TR TOWER
01-EL402 ENLARGED ELECTRICAL LIGHTING PLANS SOUTH TR TOWER
01-EL403 ENLARGED ELECTRICAL LIGHTING PLANS NORTH TR TOWER
01-EL404 ENLARGED ELECTRICAL LIGHTING PLANS
01-EL405.1 ENLARGED ELECTRICAL LIGHTING PLANS
01-EL406.1 ENLARGED ELECTRICAL LIGHTING PLANS
01-EL406.2 ENLARGED ELECTRICAL LIGHTING PLANS
01-EP401 ENLARGED ELECTRICAL POWER PLANS SOUTH TR TOWER
01-EP402 ENLARGED ELECTRICAL POWER PLANS SOUTH TR TOWER
01-EP403 ENLARGED ELECTRICAL POWER PLANS NORTH TR TOWER
01-EP404 ENLARGED ELECTRICAL POWER PLANS
01-EP405.1 ENLARGED ELECTRICAL POWER PLANS
01-EP405.2 ENLARGED ELECTRICAL POWER PLANS
01-EP405.3 ENLARGED ELECTRICAL POWER PLANS
01-EP406 ENLARGED ELECTRICAL POWER PLANS
01-EP406.1 ELECTRICAL POWER PLANS - 2ND FLOOR
01-EP408 ENLARGED POWER PLANS NORTH AND SOUTH TR TOWERS
01-EK601 ELECTRICAL PANEL SCHEDULES
01-EK602 ELECTRICAL PANEL SCHEDULES
01-EK603 ELECTRICAL PANEL SCHEDULES
01-EK604 ELECTRICAL PANEL SCHEDULES
01-EK605 ELECTRICAL PANEL SCHEDULES
01-EK606 ELECTRICAL PANEL SCHEDULES
01-EK607 ELECTRICAL PANEL SCHEDULES
01-EK608 ELECTRICAL PANEL SCHEDULES
01-EK609 ELECTRICAL PANEL SCHEDULES
01-EK610 ELECTRICAL PANEL SCHEDULES
01-EK611 ELECTRICAL PANEL SCHEDULES
01-EJ601 ELECTRICAL ONE-LINE DIAGRAM - CRITICAL
01-EJ602 ELECTRICAL ONE-LINE DIAGRAM - NORMAL
15-TELECOMMUNICATIONS
01-TN100 TELECOM AND SECURITY PLAN - BASEMENT
01-TN101 TELECOM AND SECURITY PLAN - 1ST FLOOR
01-TN102 TELECOM AND SECURITY PLAN - 2ND FLOOR
01-TN103 TELECOM AND SECURITY PLAN - 3RD FLOOR
01-TN104 TELECOM AND SECURITY PLAN - 4TH FLOOR
01-TN105 TELECOM AND SECURITY PLAN - 5TH FLOOR
01-TN106 TELECOM AND SECURITY PLAN - 6TH FLOOR
01-TN401 ENLARGED PLANS SOUTH TR TOWER
01-TN402 ENLARGED PLANS SOUTH TR TOWER
01-TN403 ENLARGED PLANS NORTH TR TOWER
01-TN404 ENLARGED PLANS
01-TN405 ENLARGED PLANS
01-TN406 RACK ELEVATIONS
01-TN407 RACK ELEVATIONS
01-TN408 RACK ELEVATIONS
01-TN409 RACK ELEVATIONS
01-TN410 RACK ELEVATIONS
BLDG 02
01.0-GENERAL
02-GI001 COVER SHEET
01.1-GENERAL
02-GC101 SEQUENCING PLAN
08-ARCHITECTURAL
02-AE101 REFERENCE FLOOR PLAN
02-AE102 REFERENCE ROOF PLAN
02-AE401 ENLARGED PLANS AND INTERIOR ELEVATIONS
02-AE601 MISCELLANEOUS DETAILS AND SCHEDULES
09-FIRE PROTECTION
02-FP101 FIRE PROTECTION FLOOR PLAN
10-PLUMBING
02-PP101 PLUMBING PIPING PLAN
02-PP401 ENLARGED PLUMBING PIPING PLAN
02-PP402 ENLARGED PLUMBING PIPING PLAN - WATER SOFTENER SYSTEM
02-PP403 ENLARGED PLUMBING PIPING PLAN - WATER SOFTENER SYSTEM
12-MECHANICAL
02-MH101 MECHANICAL HVAC PLAN
02-MH401 ENLARGED MECHANICAL HVAC PLANS
02-MP401 ENLARGED MECHANICAL PIPING PLAN
13-ELECTRICAL
02-EP101 ELECTRICAL POWER PLAN
02-EP401 ENLARGED ELECTRICAL POWER PLAN
02-EK601 ELECTRICAL ONE-LINE DIAGRAM - NORMAL
15-TELECOMMUNICATIONS
02-TN101 TELECOM AND SECURITY PLAN
02-TN401 ENLARGED TR PLANS & RACK ELEVATIONS
DRAWING
NUMBER DRAWING TITLE
01-AE404 ENLARGED PLANS
01-AE405 ENLARGED PLANS
01-AE406 ENLARGED PLANS
01-AE411 PLAN DETAILS
01-AE451 INTERIOR ELEVATIONS
01-AE452 INTERIOR ELEVATIONS
01-AE453 INTERIOR ELEVATIONS
01-AE454 INTERIOR ELEVATIONS
01-AE511 EXTERIOR DETAILS
01-AE512 EXTERIOR DETAILS
01-AE513 ROOF DETAILS
01-AE521 DOOR DETAILS
01-AE531 WALL TYPES
01-AE532 FIRE PROTECTION DETAILS
01-AE533 INTERIOR DETAILS
01-AE601 SCHEDULES
01-AE901 PERSPECTIVE VIEW
09-FIRE ALARM
01-FA151 FIRE ALARM PLAN - 1ST FLOOR
01-FA152 FIRE ALARM PLAN - 2ND FLOOR
01-FA153 FIRE ALARM PLAN - 3RD FLOOR
01-FA154 FIRE ALARM PLAN - 4TH FLOOR
01-FA155 FIRE ALARM PLAN - 5TH FLOOR
01-FA156 FIRE ALARM PLAN - 6TH FLOOR
09-FIRE PROTECTION
01-FP150 FIRE PROTECTION PLAN - BASEMENT
01-FP151.1 FIRE PROTECTION PLAN - 1ST FLOOR
01-FP151.2 FIRE PROTECTION PLAN - 1ST FLOOR
01-FP151.3 FIRE PROTECTION PLAN - 1ST FLOOR
01-FP151.4 FIRE PROTECTION PLAN - 1ST FLOOR
01-FP152 FIRE PROTECTION PLAN - 2ND FLOOR
01-FP153 FIRE PROTECTION PLAN - 3RD FLOOR
01-FP154 FIRE PROTECTION PLAN - 4TH FLOOR
01-FP155 FIRE PROTECTION PLAN - 5TH FLOOR
01-FP156 FIRE PROTECTION PLAN - 6TH FLOOR
10-PLUMBING
01-P100 PLUMBING PIPING PLAN - BASEMENT
01-P101 PLUMBING PIPING PLAN - 1ST FLOOR
01-P102 PLUMBING PIPING PLAN - 2ND FLOOR
01-P103 PLUMBING PIPING PLAN - 3RD FLOOR
01-P104 PLUMBING PIPING PLAN - 4TH FLOOR
01-P105 PLUMBING PIPING PLAN - 5TH FLOOR
01-P106 PLUMBING PIPING PLAN - 6TH FLOOR
01-P107 PLUMBING PIPING PLAN - 7TH FLOOR
01-PP401 ENLARGED PLUMBING PIPING PLANS SOUTH TR TOWER
01-PP402 ENLARGED PLUMBING PIPING PLANS SOUTH TR TOWER
01-PP403 ENLARGED PLUMBING PIPING PLANS NORTH TR TOWER
01-PP404 ENLARGED PLUMBING PLANS
01-PP405.1 ENLARGED PLUMBING PLANS
01-PP405.2 ENLARGED PLUMBING PLANS
01-PP407 ENLARGED PLUMBING PIPING PLANS
01-PD401 ENLARGED PLUMBING DRAIN AND VENT PLANS SOUTH TR TOWER
01-PD402 ENLARGED PLUMBING DRAIN AND VENT PLANS SOUTH TR TOWER
01-PD403 ENLARGED PLUMBING DRAIN AND VENT PLANS NORTH TR TOWER
12-MECHANICAL
01-M100 MECHANICAL HVAC OVERALL PLAN - BASEMENT
01-M101 MECHANICAL HVAC OVERALL PLAN - 1ST FLOOR
01-M102 MECHANICAL HVAC OVERALL PLAN - 2ND FLOOR
01-M103 MECHANICAL HVAC OVERALL PLAN - 3RD FLOOR
01-M104 MECHANICAL HVAC OVERALL PLAN - 4TH FLOOR
01-M105 MECHANICAL HVAC OVERALL PLAN - 5TH FLOOR
01-M106 MECHANICAL HVAC OVERALL PLAN - 6TH FLOOR
01-M107 MECHANICAL HVAC OVERALL PLAN - 7TH FLOOR
01-MH152 MECHANICAL HVAC PLAN - 2ND FLOOR
01-MD401 ENLARGED DEMOLITION MECHANICAL HVAC PLANS SOUTH TR
TOWER
01-MH401 ENLARGED MECHANICAL HVAC PLANS SOUTH TR TOWER
01-MH402 ENLARGED MECHANICAL HVAC PLANS SOUTH TR TOWER
01-MH403 ENLARGED MECHANICAL HVAC PLANS NORTH TR TOWER
01-MH404 ENLARGED MECHANICAL HVAC PLANS - 1ST FLOOR
01-MH405.1 ENLARGED MECHANICAL HVAC PLANS - 1ST FLOOR
01-MH405.2 ENLARGED MECHANICAL HVAC PLANS - 1ST FLOOR
01-MH405.3 ENLARGED MECHANICAL HVAC PLANS - 1ST FLOOR
01-MP401 ENLARGED MECHANICAL PIPING PLANS SOUTH TR TOWER
01-MP402 ENLARGED MECHANICAL PIPING PLANS SOUTH TR TOWER
01-MP403.1 ENLARGED MECHANICAL PIPING PLANS NORTH TR TOWER
01-MP403.2 ENLARGED DEMOLITION MECHANICAL HVAC PLANS SOUTH TR
TOWER
01-MP404 ENLARGED MECHANICAL PIPING PLANS - 1ST FLOOR
01-MP405.1 ENLARGED MECHANICAL PIPING PLANS - 2ND FLOOR
01-MP405.2 MECHANICAL PIPING PLANS - DATA CENTER
01-MP405.3 MECHANICAL PIPING PLANS - 2ND FLOOR
DRAWING
NUMBER DRAWING TITLE
01 GENERAL
01-GENERAL
GI000 COVER SHEET
GI002 SHEET INDEX
GI003 PROJECT INFORMATION AND SYMBOLS
GI004 ARCHITECTURAL ABBREVIATIONS & SYMBOLS
GI101 CONSTRUCTION SEQUENCE - SITE
GS101 CAMPUS MAP
09.1-FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES
09.2-FIRE PROTECTION
FP001 FIRE PROTECTION GENERAL NOTES AND DETAILS
10-PLUMBING
PI001 PLUMBING SYMBOLS AND LEGEND
PK501 PLUMBING DETAILS
PK601 PLUMBING RISER DIAGRAM
PK602 STORM WATER RISER DIAGRAM
12-MECHANICAL
MI001 MECHANICAL ABBREVIATIONS, SYMBOLS, AND LEGENDS
MK501 MECHANICAL DETAILS
MK502 MECHANICAL DETAILS
MK503 MECHANICAL DETAILS
MK601 MECHANICAL RISER DIAGRAMS
MJ501 CONTROLS
MJ502 RO SKID MONITORING CONTROLS
MJ503 ROOM 0119 CONTROLS SCHEMATIC
MI901 MECHANICAL AND ELECTRICAL SCHEDULES
MI902 MECHANICAL MATERIALS
MI903 MECHANICAL AND ELECTRICAL SCHEDULES
13-ELECTRICAL
EI001 ELECTRICAL ABREVIATIONS, SYMBOLS, AND LEGENDS
15-TELECOMMUNICATIONS
TN501 TYPICAL DETAILS
TN502 TYPICAL DETAILS
TN503 TYPICAL DETAILS
TN504 TYPICAL DETAILS
TN601 FIBER OPTIC BACKBONE RISER DIAGRAM - BUILDING 1
TN602 FIBER OPTIC BACKBONE RISER DIAGRAM - BUILDINGS 2 / 8
BLDG 01
01-GENERAL
01-GI001 COVER SHEET
01-GI002 GENERAL NOTES, CODE REQUIREMENTS, AND SHEET INDEX
01-GC001 SEQUENCING NOTES
01-GC100 SEQUENCING PLAN - BASEMENT
01-GC101 SEQUENCING PLAN - 1ST FLOOR
01-GC102 SEQUENCING PLAN - 2ND FLOOR
01-GC103 SEQUENCING PLAN - 3RD FLOOR
01-GC104 SEQUENCING PLAN - 4TH FLOOR
01-GC105 SEQUENCING PLAN - 5TH FLOOR
01-GC106 SEQUENCING PLAN - 6TH FLOOR
01-GC107 SEQUENCING PLAN - 7TH FLOOR
01-GC121 SMOKE COMPARTMENTALIZATION PLAN - 1ST FLOOR
01-GC122 SMOKE COMPARTMENTALIZATION PLAN - 2ND FLOOR
01-GC123 SMOKE COMPARTMENTALIZATION PLAN - 3RD FLOOR
01-GC124 SMOKE COMPARTMENTALIZATION PLAN - 4TH FLOOR
01-GC125 SMOKE COMPARTMENTALIZATION PLAN - 5TH FLOOR
01-GC126 SMOKE COMPARTMENTALIZATION PLAN - 6TH FLOOR
07-STRUCTURAL
01-SG001 GENERAL NOTES
01-SG002 LEGEND, SHEET LIST & ABBREVIATIONS
01-SG003 LOAD KEY
01-SG004 AXONOMETRIC VIEW
01-SF103 REFERENCE PLAN - 3RD FLOOR
01-SF151 ENLARGED REFERENCE PLAN - 3RD FLOOR
01-SF351 SOUTH TR TOWER SECTIONS AND ELEVATIONS
01-SF352 NORTH TR TOWER SECTIONS AND ELEVATIONS
01-SF401 SOUTH IDF TOWER PLAN
01-SF402 NORTH IDF TOWER PLAN
01-SF501 STEEL POD DETAILS
01-SF502 STEEL STRONGBACK DETAILS
01-SF503 CFS DETAILS
01-SF504 CONCRETE DETAILS
01-SF505 EQUIPMENT ANCHORAGE DETAILS
08-ARCHITECTURAL
01-AE100 REFERENCE PLAN - BASEMENT
01-AE101 REFERENCE PLAN - 1ST FLOOR
01-AE102 REFERENCE PLAN - 2ND FLOOR
01-AE103 REFERENCE PLAN - 3RD FLOOR
01-AE104 REFERENCE PLAN - 4TH FLOOR
01-AE105 REFERENCE PLAN - 5TH FLOOR
01-AE106 REFERENCE PLAN - 6TH FLOOR
01-AE107 REFERENCE PLAN - 7TH FLOOR
01-AE108 REFERENCE PLAN - PENTHOUSE
01-AE201 EXTERIOR ELEVATIONS
01-AE202 EXTERIOR ELEVATIONS
01-AE351 SOUTH TOWER SECTIONS
01-AE352 NORTH TOWER SECTIONS
01-AE361 ENLARGED SECTIONS
01-AE362 ENLARGED SECTIONS
01-AE363 ENLARGED SECTIONS
01-AE371 ENLARGED SECTIONS
01-AD404 ENLARGED DEMOLITION PLANS
01-AD405 ENLARGED DEMOLITION PLANS
01-AE401 ENLARGED PLANS SOUTH TR TOWER
01-AE402 ENLARGED PLANS SOUTH TR TOWER
01-AE403 ENLARGED PLANS NORTH TR TOWER
Revisions: Date: SHEET 2 of 421
CENTER LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
CONTRACT LIMIT LINE
DEMOLITION LINE
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
FIRE BARRIER, 1 HOUR
FIRE BARRIER, 2 HOUR
FIRE-RATED, SMOKE BARRIER, 30 MINUTE
SMOKE PARTITION ENCLOSING HAZARDOUS AREA
HIDDEN FEATURES LINE
NEW LINE
PROPERTY LINE
SMOKE BARRIER LINE
BREAK, ROUND
BREAK, STRAIGHT
DETAIL INDICATOR
DETAIL INDICATOR
DIMENSION LINE
DOOR OPENING/BROWED LIGHT INDICATOR
DRAWING BLOCK TITLE, TYPICAL
ELE`VATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW
ELEVATION INDICATOR, INTERIOR, SINGLE VIEW
BUILDING SECTION INDICATOR
FURNITURE, FIXTURE & EQUIPMENT INDICATOR
GRAPHIC SCALE
ROOM NAME AND NUMBER
COLUMN GRID
KEYNOTE
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
CORNER GUARD
NORTH ARROW
OUT OF SCOPE AREA, REFER TO FIRE PROTECTION,
PLUMBING, MECHANICAL, ELECTRICAL, AND TELECOM
DRAWINGS FOR ADDITIONAL WORK INSIDE
THIS AREA
S
D2
AE512
D2
AE512
6'-0"
DRAWING BLOCK TITLE
1/4"=1'-0"
C4
D2
AE512
D2
AE512
D2
AE512
A
C
D B
D2
AE512
D2
AE512
5 10 15 20
CORRIDOR
C123
A
AA
N
FEC
CG
S
12 34 56.A1
ARCHITECTURAL SYMBOLSGENERAL NOTESINFECTION CONTROL NOTESGENERAL DEMOLITION NOTESCOMPOSITE DOOR SCHEDULE
VIEW NUMBERING EXAMPLE
THE NUMBER OF THE MODULE WHICH
OCCURS IN THE LOWER LEFT CORNER OF A
SINGLE MODULE OR SEVERAL MODULES
GROUPED TOGETHER WILL DEFINE THE
FINAL VIEW NUMBER AS SHOWN IN THE
ILLUSTRATION TO THE LEFT. ALTHOUGH
THE MODULE NUMBERS OCCUR IN
CONSECUTIVE ORDER, NOT ALL NUMBERS
ARE NECESSARILY USED ON EACH SHEET.
VIEW NUMBERING LAYOUT
VIEWS ARE NUMBERED ACCORDING TO THEIR
LOCATION ON EACH SHEET AND ARE NOT
NUMBERED CONSECUTIVELY. EACH MODULE
MAINTAINS THE ALPHA-NUMERIC VALUE
ASSOCIATED WITH IT. THIS SYSTEM CAN BE
APPLIED TO ANY DRAWING THAT CONTAINS
MULTIPLE IMAGES. THE IMAGES ARE
NUMBERED ACCORDING TO THE MODULE
SYSTEM SHOWN ILLUSTRATED TO THE LEFT.
EACH VIEW MAY OCCUPY ONE OR MORE
WHOLE MODULES. THE VIEW MODULE IS
USED TO ESTABLISH THE IDENTIFYING LABEL
FOR EACH DETAIL NOT TO LIMIT THE SIZE OF
THE DETAIL
B1 B3 B5 B7
C5
D1 D5 D7
E1 E2 E3
F1 F2 F3 F5 F7
A1 A2 A3 A4 A5 A6 A7 A8 A9
B1 B2 B3 B4 B5 B6 B7 B8 B9
C1 C2 C3 C4 C5 C6 C7 C8 C9
D1 D2 D3 D4 D5 D6 D7 D8 D9
E1 E2 E3 E4 E5 E6 E7 E8 E9
F1 F2 F3 F4 F5 F6 F7 F8 F9
A10
B10
C10
D10
E10
F10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
SHEET OF
100% CONSTRUCTION
DOCUMENTS
B
IM
/P h o e n ix
E H
R M
/6
-2
-2
S
IT
E
.r v t
/2
/2
:3
:2
A
M
GI003
PROJECT INFORMATION AND
SYMBOLSConcourse Federal Group
123 S. Royal Street
Alexandria, VA 22314
EHRM INFRASTRUCTURE
UPGRADES GENERAL
04.28.2021
PVAHCS - Carl T Hayden Medical Center 650 E Indian School Road Phoenix AZ 85012
644-20-201
1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED ON GI002, SHEET NDEX.
2. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE DRAWINGS OF
ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE – SEE “SHEET INDEX”.
3. THE COMPLETE SET OF DRAWINGS CONSIST OF ALL DRAWINGS LISTED BY THE “SHEET INDEX”.
THE WORK DESCRIBED IN ONE SHEET MAY BE REFERENCED AND MAY BE AFFECTED BY WORK
DESCRIBED ON ANOTHER SHEET.
4. THE WORK DESCRIBED IN ONE DISCIPLINE MAY BE REFERENCED AND AFFECTED BY WORK OF
ANOTHER DISCIPLINE. PARTIAL SETS OF DRAWINGS ARE INCOMPLETE AND SHOULD NOT BE
REDISTRIBUTED OR UTILIZED BY THE CONTRACTOR.
5. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUBCONTRACTORS, TRADES AND SUPPLIERS WITH REQUIREMENTS OF THE CONTRACT
DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT ALL PARTIES ARE
AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE REQUIREMENTS OCCUR IN THE
CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK OF THAT TRADE.
6. ALL ARCHITECTURAL DRAWINGS ESTABLISH AND COORDINATE THE FINISHED APPEARANCE AND
LOCATION OF ALL EXPOSED ELEMENTS OF THE WORK, INCLUDING THAT WORK WHICH IS
ILLUSTRATED PRIMARILY ON DRAWING OF OTHER DISCIPLINES, UNLESS OTHERWISE NOTED ON
THE DRAWINGS.
7. THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND ELEVATIONS
SHOW THE LOCATION OF MANY-BUT NOT ALL – EXPOSED PARTS OF THE WORK. FOR ITEMS NOT
LOCATED EXACTLY, APPLY THE RULES INDICATED BY THE DRAWING“TYPICAL MOUNTING
HEIGHTS AND CONFIGURATION DIAGRAMS” TO DETERMINE THE EXACT LOCATION OF EACH
EXPOSED PART OF THE WORK.
8. REFER TO THE STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND TELECOMMUNICATION
DRAWINGS FOR THE DETAILED DESIGN OF THE STRUCTURAL, MECHANICAL, ELECTRICAL AND
PLUMBING SYSTEMS, OF WHICH PORTIONS MAY ALSO MAY BE SHOWN ON THE ARCHITECTURAL
DRAWINGS.
9. ALL PARTS OF THE WORK – INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC – SHALL
COMPLY WITH ALL APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND
LAWS OF ALL FEDERAL, STATE DISTRICT, TERRITORIAL AND LOCAL GOVERNMENT AUTHORITIES
HAVING JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,
WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT.
10. NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT
WORK CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE, OR
LAW.
11. IF A CONFLICT EXISTS BETWEEN THE CONTRACT DOCUMENTS AND A REGULATORY
REQUIREMENT, THE CONTRACTOR SHALL COMPLY WITH THE ONE ESTABLISHING THE MORE
STRINGENT OR RESTRICTIVE REQUIREMENT:
A. THE DRAWINGS AND SPECIFICATIONS MAY SET FORTH MORE DETAILED, MORE SPECIFIC,
AND/OR MORERESTRICTIVE REQUIREMENTS THAN THOSE SET FORTH BY THE APPLICABLE
REGULATORY REQUIREMENTS,
B. WHERE THE DRAWINGS AND SPECIFICATIONS PROVIDE MORE DETAILED, MORE SPECIFIC,
AND/OR MORE RESTRICTIVE REQUIREMENTS, THE CONTRACTOR SHALL COMPLY WITH
THOSE REQUIREMENTS. WHERE THE APPLICABLE REQUIREMENTS OF THE REFERENCED
RULES, CODES, REGULATIONS, ORDINANCES, OR LAWS ARE MORE RESTRICTIVE THAN THAT
SET FORTH BY THE DRAWINGS AND SPECIFICATION, THE CONTRACTOR SHALL COMPLY WITH
ALL SUCH MORE RESTRICTIVE REQUIREMENTS. ALTHOUGH SUCH REQUIREMENTS MAY NOT
BE ILLUSTRATED BY THE DRAWINGS AND SPECIFICATIONS.
12. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE ARE
INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND ESTABLISH
MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.
13. PROPRIETARY PRODUCTS OR ASSEMBLIES SUBMITTED FOR APPROVAL AS “BASIS OF DESIGN”.
A. ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT OR
ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE MANUFACTURERS
AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY ILLUSTRATED BY
THE DRAWINGS IS THE “BASIS OF DESIGN” PRODUCT OR ASSEMBLY.
B. THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS OF
SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE “BASIS OF DESIGN” MAY VARY
FROM THAT SHOWN BY THE DRAWINGS.
C. THE CONTRACTOR MAY SUBMIT FOR APPROVAL ANY OTHER SPECIFIED PRODUCT OR
ASSEMBLY IN LIEU OF THE “BASIS OF DESIGN” PRODUCT OR ASSEMBLY. HOWEVER, THE
CONTRACTOR IS RESPONSIBLE (AT NO ADDITIONAL EXPENSE TO THE OWNER) FOR ALL
COORDINATION AND REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE
THE SAME FUNCTIONAL AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE “BASIS OF
DESIGN” SHOWN BY THE CONTRACT DOCUMENTS.
14. THE CONTRACTOR SHALL NOT SCALE DRAWINGS, THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF WORK AND SHALL NOTIFY
THE OWNER’S REPRESENTATIVE OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE
WORK.
1. ALL BUILDINGS WILL REMAIN OPERATIONAL 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR
SHALL ENSURE THAT A PATH OF TRAVEL BETWEEN BUILDINGS IS MAINTAINED AT ALL TIMES.
2. BEFORE STARTING CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE A COMPLETE ACCESS
PATH / ROUTE FROM THE PROPOSED CONSTRUCTION STAGING AREA ON SITE TO THE ARE OF
WORK WITHIN EACH BUILDING.
3. WITH COR APPROVAL THE CONTRACTOR MAY USE DESIGNATED ELEVATORS AND STAIRS TO
TRANSPORT EQUIPMENT AND MATERIALS INTO AND OUT OF THE WORK AREA. MATERIAL AND
CONSTRUCTION DEBRIS TRANSPORTED VIA CORRIDORS AND ELEVATOR/STAIRS SHALL BE
TRANSPORTED AS INDICATED IN NOTE 4, BELOW. CONTRACTOR TO INCLUDE THIS REQUIREMENT
IN THE LOGISTICS PLAN.
4. COVER CONSTRUCTION WASTE IN TIGHTLY SEALED RECEPTACLES OR CARTS BEFORE
TRANSPORTING. TAPE AND SEAL COVERING OVER CONTAINERS UNLESS A SOLID TIGHT
CONTAINER LID IS PROVIDED. DEBRIS REMOVAL, TRAVEL PATH AND SCHEDULE SHALL BE
COORDINATED WITH THE OWNERS OPERATIONAL HOURS.
5. CONTRACTOR SHALL PROVIDE CONSTRUCTION BARRIERS, TEMPORARY ONE HOUR PARTITIONS
AND SMOKE BARRIERS. TEMPORARY WALLS ARE TO BE CONSTRUCTED / MOVED / DEMOLISHED
PER THE PHASING DIAGRAMS.
6. INCLUDE TEMPORARY 20 MINUTE DOORS AT TEMPORARY 1 HOUR WALLS AS REQUIRED FOR
CONSTRUCTION.
7. UPON COMPLETION OF WORK, REMOVE BARRIERS CAREFULLY TO MINIMIZE SPREAD OF DIRT
AND DEBRIS ASSOCIATED WITH THE CONSTRUCTION. DO NOT REMOVE FINAL CONSTRUCTION
BARRIERS UNTIL COMPLETED PROJECT IS INSPECTED AND APPROVED BY THE COR.
8. THE WORK AREAS ARE TO BE KEPT CLEAN, CLEAR AND FREE OF DEBRIS. CONSTRUCTION
MATERIALS AND PARTIALLY INSTALLED WORK CANNOT INTERFERE WITH THE FACILITY
OPERATIONS OR CREATE A SAFETY HAZARD.
9. THE CONTRACTOR SHALL SWEEP, VACUUM, MOP CONSTRUCTION AREAS CLEAN AT THE END OF THE WORKDAY. KEEP NOISE AND DUST TO A MINIMUM AT ALL TIMES. USE FILTERED VACUUMS.
10. WET MOP AREA WITH DISINFECTANT WHERE APPLICABLE.
11. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK AREA. PROVIDE 'AIR SCRUBBERS' AT
CONSTRUCTION AREAS. UST, FUMES, ETC. MUST BE EXHAUSED OUTSIDE AND AWAY FROM ANY
AIR INTAKE EQUIPMENT.
12. ISOLATE HVAC SYSTEMS IN AREAS WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEMS.
13. COMPLETE ALL CRITICAL CONSTRUCTION BARRIERS BEFORE DEMOLITION / CONSTRUCTION
WORK BEGINS. COR AND INFECTION CONTROL DEPARTMENT SHALL INSPECT INFECTION
CONTROL BARRIERS BEFORE DEMOLITION BEGINS.
14. SEAL ALL EXISTING UNUSED DOORS TO PREVENT THE GENEAL PUBLIC FROM ENTERING THE
DEMOLITION /CONSTRUCTION AREAS.
15. ALL CONSTRUCTION PERSONEL ENTERING / EXITING THE WORK AREA VIA PUBLIC PATH OF
TRAVEL MUST WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
16. PLACE DUST MATS AND ENTRANCES / EXITS TO THE WORK AREA. CLEAN MATS FROM DUST
DAILY OR EARLIER AS REQUIRED.
17. IF EXISTING LIFE SAFETY SYSTEM IS SHUT OFF FOR CONSTRUCTION, THE CONTRACTOR IS TO
PROVIDE A 24 HOUR FIRE WATCH UNTIL THE SYSTEM IS BACK ON LINE.
VIEW NUMBERING SCHEME
1. ALL DRAWINGS SHALL BE TAKEN AS PART OF A COMPLETE DOCUMENT SET. CONTRACTOR TO
CONFIRM ALL ITEMS REQUIRED TO BE DEMOLISHED AND EXTENT OF DEMOLITION BASED UPON
THE OVERALL INTENT OF THE ENTIRE DOCUMENT SET.
2. TO MINIMIZE IMPACT TO DELIVERY OF HEALTHCARE WORK IS ANTICIPATED WORK TO OCCUR
AT ALL HOURS/DAYS, DEPENDED ON FEATURE OF WORK. EXTENSIVE AFTER HOURS WORK IS
ANTICIPATED. DETAILS OF SCHEDULING TO BE COORDINATED WITH COR AS CONSTRUCTION
PROGRESSES.
3. COORDINATE WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS PRIOR TO
BEGINNING WORK TO CONFIRM ACCURACY IN THE DRAWINGS. REPORT ANY DISCREPANCIES
TO THE CONTRACTING OFFICER REPRESENTATIVE.
4. THE DEMOLITION DRAWINGS ARE CONSIDERED SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK PRIOR TO SUBMISSION PROPOSAL.
5. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN
AND FREE OF OBSTRUCTIONS AT ALL TIMES. ERECT BARRICADES AND WARNING SIGNS TO
DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK. PROVIDE DUST PROOFING
ENCLOSURES TO SEPARATE WORK AREAS FROM THE EXISTING FACILITIES. VA TO APPROVE
BARRIER LOCATIONS; BARRIERS TO BE CONSTRUCTED PER VA STANDARDS.
6. DURING DEMOLITION, PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS
TO REMAIN IN PLACE DURING THE RENOVATION WORK. SHOULD ANY DAMAGE OCCUR, PATCH
AND REPAIR TO MATCH EXISTING ADJACENT FINISHES. SUBSTANTIAL DAMAGES TO BE
REPORTED TO THE VA PROJECT MANAGER.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR
REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
8. ALL FINISHES INDICATED TO BE DEMOLISHED SHALL BE REMOVED IN THEIR ENTIRETY
INCLUDING RELATED COMPONENTS.
9. PROTECT ADJACENT SURFACES; FOR EXAMPLE, BUT NOT LIMITED TO, SILLS, JAMBS AND HEAD
FRAMES AT WINDOWS AND DOORS TO NAME A FEW.
10. REMOVAL OF MECHANICAL, ELECTRICAL, AND PLUMBING SHOULD BE LIMITED TO WHAT IS
NECESSARY FOR SAFE REMOVAL OF THE INDICATED WALL OR CEILING. APPROPRIATE LIGHT
FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE ADEQUATE LIGHTING LEVELS
FOR CONSTRUCTION.
11. CONTRACTOR SHALL DEMOLISH ALL FIXTURES, CEILINGS, MECHANICAL, PLUMBING, AND
ELECTRICAL AS REQUIRED TO COMPLETE THE SCOPE OF WORK OUTLINED WITHIN THE
CONSTRUCTION DOCUMENTS.
12. REFER TO TELECOM, ELECTRICAL, MECHANICAL DOCUMENTS, FOR ADDITIONAL DEMOLITION
INFORMATION ON TELECOMMUNICATION EQUIPMENT AND WORK.
13. REFER TO FIRE PROTECTION DOCUMENTS FOR ADDITIONAL DEMOLITION INFORMATION ON
FIRE ALARM AND SPRINKLER EQUIPMENT AND WORK.
14. REFER TO TELECOM DOCUMENTS FOR AREAS WHERE NEW DATA JACK WALL OUTLETS WILL BE
PROVIDED IN ROOMS OUTSIDE OF THE TELECOM ROOMS. PREP SURFACES FOR NEW PAINT.
15. NO DEAD LEG PIPING (LENGTH OF PIPE LEADING TO AN OUTLET WHICH HAS BEEN REMOVED)
CAN REMAIN PER VHA DIRECTIVE. ANY ABANDONED AND/OR REMOVED WATER PIPING MUST
BE CUT/CAPPED AT THE MAIN NO FURTHER FROM THE MAIN THAN TWICE THE DIAMETER OF
THE PIPE BEING CUT/CAPPED.
MARK
DOOR
FIRE RATING HW NO
SD TYPE WIDTH HEIGHT
B01 - 1ST FLOOR
1151A A 3' - 0" 7' - 0" NR SD0-218.1
1221 SGL 3' - 0" 7' - 0" NR EX
1221A A 3' - 0" 7' - 0" NR SDO-218.1
1321A A 3' - 0" 7' - 0" NR SD0-218.1
1609 C 6' - 0" 7' - 0" 3/4 HR SDO-218.2
C185 A 4' - 0" 7' - 0" NR SDO-218.1
K132 A 3' - 0" 8' - 0" NR SDO-218
TRS001A A 3' - 0" 7' - 0" NR SDO-218.1
TRS100B C 6' - 0" 7' - 0" NR SDO-104.2
TRS100C C 6' - 0" 7' - 0" NR SDO-218.2
B01 - 2ND FLOOR
K232 A 3' - 0" 8' - 0" NR SDO-218
TRN200A A 3' - 0" 7' - 4" NR SDO-218
TRN200B A 3' - 0" 7' - 4" NR SDO-104
TRN200C A 3' - 0" 7' - 4" NR SDO-218
TRS200A A 3' - 0" 7' - 0" NR SDO-218
TRS200B C 5' - 0" 7' - 0" NR SDO-104.2
TRS200C A 3' - 0" 7' - 0" NR SDO-218
B01 - 3RD FLOOR
TRN300A A 3' - 0" 7' - 4" NR SDO-218
TRN300B A 3' - 0" 7' - 4" NR SDO-104
TRN300C A 3' - 0" 7' - 4" NR SDO-218
TRS300A A 3' - 0" 8' - 0" NR SDO-218
TRS300B C 5' - 8" 7' - 0" NR SDO-104.2
TRS300C A 3' - 0" 7' - 0" NR SDO-218
B01 - 4TH FLOOR
TRN400A A 3' - 0" 7' - 4" NR SDO-218
TRN400B A 3' - 0" 7' - 4" NR SDO-104
TRN400C A 3' - 0" 7' - 4" NR SDO-218
TRS400A A 3' - 0" 8' - 0" NR SDO-218
TRS400B C 5' - 8" 7' - 0" NR SDO-104
TRS400C A 3' - 0" 7' - 0" NR SDO-218
B01 - 5TH FLOOR
D540A SGL 3' - 0" 7' - 0" NR 3F
TRS500A A 3' - 0" 8' - 0" NR SDO-218
TRS500B C 5' - 8" 7' - 0" NR SDO-104.2
TRS500C A 3' - 0" 7' - 0" NR SD0-218
B01 - 6TH FLOOR
TRS600A A 3' - 0" 8' - 0" NR SDO-218
TRS600B C 5' - 8" 7' - 0" NR SDO-104.2
TRS600C A 3' - 0" 7' - 0" NR SDO-218
B01 - BASEMENT
TRS000A A 4' - 0" 7' - 0" NR SDO-218.1
TRS000B A 3' - 0" 7' - 0" NR SDO-104
TRS000C A 3' - 0" 7' - 0" NR SDO-218
B02 - 1ST FLOOR
H124 A 3' - 0" 7' - 0" NR 218.1
B08 - 1ST FLOOR
A1034 A 3' - 0" 7' - 0" NR 218.1
A1218 A 3' - 0" 7' - 0" NR 218.1
A1428 A 3' - 0" 7' - 0" NR 218.1
B08 - 2ND FLOOR
A2021 A 3' - 0" 7' - 0" NR 218.1
A2208 A 3' - 0" 7' - 0" NR 218.1
A2446 A 3' - 0" 7' - 0" NR 218.1
B08 - BASEMENT
A0115 A 3' - 0" 7' - 0" NR 218.1
A0600 A 3' - 0" 7' - 0" NR 218.1
B14 - 1ST FLOOR
14-3 C 6' - 0" 8' - 0" NR 218.2
B21 - 1ST FLOOR
109 A 3' - 0" 7' - 0" NR 218.1
110 A 3' - 0" 7' - 0" NR 218.1
0119 A 3' - 0" 7' - 0" NR 218.1
B24 - 1ST FLOOR
117B A 3' - 0" 7' - 0" 3/4-HR 218.1
B27 - 1ST FLOOR
128 A 3' - 0" 7' - 0" NR 218.1
B28 - 1ST FLOOR
112 A 3' - 0" 7' - 0" NR 218.1
B29 - 1ST FLOOR
1066 A 3' - 6" 7' - 0" NR 218.1
B31 - 1ST FLOOR
1035 A 3' - 0" 7' - 0" NR 218.1
B31 - 2ND FLOOR
2039 A 3' - 0" 7' - 0" NR 218.1
B34 - 1ST FLOOR
1039 A 3' - 0" 7' - 0" NR 218.1
B34 - 2ND FLOOR
2024 A 3' - 0" 7' - 0" NR 218.1
Grand total: 62
Revisions: Date: 05.26.2021 SHEET 3 of 421
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
SHEET OF
100% CONSTRUCTION
DOCUMENTS
B
IM
/P h o e n ix
E H
R M
/6
-2
-2
S
IT
E
.r v t
/2
/2
:3
:2
A
M
GI004
ARCHITECTURAL ABBREVIATIONS
& SYMBOLSConcourse Federal Group
123 S. Royal Street
Alexandria, VA 22314
EHRM INFRASTRUCTURE
UPGRADES GENERAL
04.28.2021
PVAHCS - Carl T Hayden Medical Center 650 E Indian School Road Phoenix AZ 85012
644-20-201
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABAN ABANDONED
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC
CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL
CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING
INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL
C CHANNEL CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER
INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR CORNER
GUARD
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CERTIFICATE
OF OCCUPANCY, CLEANOUT, OR
COMPANY
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING
STEEL INSTITUTE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM,
OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND
EQUIPMENT
FH FLAT HEAD OR FLAT HEAD
SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF
CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR
FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER
OR FIBERGLASS REINFORCED
PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED
CONCRETE
GFRG GLASS-FIBER-REINFORCED
GYPSUM
GFRP GLASS-FIBER-REINFORCED
PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H HIGH
H PLAM HIGH PRESSURE PLASTIC
LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND
FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR
HORSEPOWER
HQ HEADQUARTERS
HS HEAT-STRENGTHENED (GLASS)
OR HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR
MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER, OR INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE
ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX JUNCTION BOX
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE
LHR LEFT HAND REVERSE, LATENT
HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING
CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION
SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM
MED MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S
RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE
MIN MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING
CONTRACTORS ASSOCIATION
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OUTSIDE
DIMENSION
OD OUTSIDE DIMENSION OUTSIDE
DIAMETER
OF/CI OWNER
FURNISHED/CONTRACTOR
INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER
INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE
CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID
CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE
DETECTOR, OR SOAP DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SJI STEEL JOIST INSTITUTE
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL
TEMPERATURE CONTROL PANEL;
TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH OR TUBE
STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION OR VITRIFIED
CLAY…