Attachment D (Permits)~1.pdf
PDF 12 MB Posted
- Attached to
- Wolf Mtn. Communication Site Build
- Solicitation number
- S-73000-00008156
- Issued by
- Lane County, Oregon
About this file
Attachment D (Permits)~1.pdf is a document that outlines the permits required for the Wolf Mtn. Communication Site Build project in the state of Oregon. This project involves the construction of a new radio communications facility for public safety, including a transmission tower and ancillary facilities, on Wolf Mountain in the Willamette National Forest.
The document details the various permits that must be obtained for the project, including permits from the U.S. Forest Service, the Oregon Department of Environmental Quality, and the local county. The document specifies the required permits, the application process, and the timeline for obtaining the necessary approvals. It also outlines the responsibilities of the contractor in terms of securing the permits and ensuring compliance with all applicable regulations.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D – PERMITS
Project: Wolf Mountain Communica�ons Site
Documents provided in the following order:
• Lane County Special Use Permit 509-PA22-05636
• Lane County Special Use Permit 509-PA22-05637
• USFS Lease/Special Use Authoriza�on (as amended) (WIL193 authoriza�on for Private
Mobile Radio Service 3-5-18)
• USDA Decision Memo – Wolf Mountain Tower Replacement Project – USDA Forest
Service (10/20/17) and NTP (7-18-22)
8/22/2022
Caring for the Land and Serving People Printed on Recycled Paper
Logo Department Name Agency Organization Organization Address Information
United States
Department of
Agriculture
Forest
Service
Willamette National Forest
Supervisor's Office
3106 Pierce Parkway Suite D
Springfield, OR 97477
File Code: 2700
Date: July 18, 2022
Oregon Department of Transportation (ODOT)
Wireless Communications Section
455 Airport Road, Building C
Salem, OR 97301
We received your request to construct improvements to the existing communication equipment located at the Wolf Mountain Communication Site under Special Use Authorization ID -
WIL193.
As part of the review of this proposal, a 5-day Harmful Interference Review was conducted with the other authorization holders located at the Wolf Mountain Communication Site. The other authorization holders were given 5-days to respond to this outreach. No responses were received during the allotted timeframe. It has been determined that the Tower Height Increase will not result in any Harmful Interference to any of the authorization holders located at the site. If any signal interference issues are raised during the term of the permit, it is required that each permit holder will do their best to mitigate these situations.
The Scope of Work for this project will include:
• Tower height increase from 80’ to 120’.
• With no substantial increase in the tower foundation size, it was determined that no harmful effects would result as a part of the height increase.
The Decision Memo for the Wolf Mountain Tower Replacement Project was signed in 2017. In
2022, the modified project was reviewed by the NEPA planner and still meets the original purpose and need, as well as the requirements of the 36 CFR 220.6(e)(15). A letter to the file was completed. Please consider this letter to be your Notice To Proceed with the project as described in the Decision Memo listed above.
Design Criteria & Implementation Guidance for the project listed above includes:
• Machinery used will be washed of mud prior to and after working on National Forest
Lands to reduce the spread of noxious weeds. Equipment will be inspected prior to entering National Forest System lands and shall park on existing disturbed areas as much as possible.
• Vegetation cut during installation should be removed from NFS lands or chipped on site as agreed to in advance.
• Will comply with all fire restrictions on NFS lands that are in place during project implementation.
Oregon Department of Transportation (ODOT) 2
• Will follow Best Management Practices (BMPs) for spillage and pollution concerns.
• Any construction debris, unsuitable or excess material must be disposed of properly off
National Forest System lands.
• If cultural material is discovered during construction, work will immediately stop and the
USFS will be notified.
• Advanced timeline/itinerary is required for monitoring.
• The Special Use Administrator and tenants will be notified 10 days prior to the project start date with estimated timelines.
If you have any questions please contact your Permit Administrator, Melynda Beam at
Melynda.Beam@usda.gov or at (458) 600-2120. Thank you.
Sincerely, DUANE BISHOP
Acting Forest Supervisor cc: Molly Juillerat, Melynda Beam
| D1 |
| D2_PA22-05636 DECISION |
| D3_PA22-05637 DECISION |
| D4_USFS Comms Lease FE 2018_WIL193_USFS_2037 |
| D5_USFS Amd 1 FE Wolf Tower Ext |
| D6_USFS Wolf New Decision Memo FE 10202017 |
| D7_Signed Letter to Proceed Tower Ext 8-2022 |
File details come from the government source that posted it. Updated .