Attachment D (Permits).pdf

PDF 12 MB Posted

Attached to
Wolf Mtn. Communication Site Build
Solicitation number
S-73000-00008156
Issued by
Lane County, Oregon

About this file

This document is Attachment D (Permits) related to the Wolf Mtn. Communication Site Build project in Lane County, Oregon. The project involves the construction of a new radio communications facility, including a transmission tower and ancillary facilities, on Wolf Mountain in the Willamette National Forest. The document provides details on the required permits and approvals necessary for the project, including those from the U.S. Forest Service, the Oregon Department of Environmental Quality, and the Lane Regional Air Protection Agency. The document outlines the specific permits needed, such as a Special Use Permit, an Air Contaminant Discharge Permit, and a Stormwater Discharge Permit, as well as the application process and timeline for obtaining these permits.

The document also addresses funding requirements for the project, noting that it is funded through state and local government sources. There are no set-asides or incumbents mentioned in the document. The overall tone and content suggest a standard public works construction project, with the permits and approvals being a critical component of the project's execution.

View the file

Other files

File Type Posted
35809 Addendum 1.docx DOCX document
35809 Addendum 6_Final.docx DOCX document
Attachment A-2 (Tower Plans).pdf PDF
Attachment A-3 (Communication Shelter Plans).pdf PDF
Attachment F (Communication Site Antenna and Tower Mounted Equipment Installation Standards).pdf PDF
Attachment I (Structural Analysis Report)(For informational purposes only).pdf PDF
35809_ITB_PW dojapprvd.docx DOCX document
Attachment C (Specifications).pdf PDF
Attachment E (GeoTechReport)(For Informational Purposes Only)08192016.pdf PDF
35809 Addendum 3 Revised.docx DOCX document
Attachment A-1 (Site Plans).pdf PDF
Attachment B (Project Description and Scope of Work).docx DOCX document
Attachment G (LMR Antenna System Standard).pdf PDF
35809 Addendum 2.docx DOCX document
Mandatory_Pre-Bid_Sign_In_Roster(For Informational Purposes Only).pdf PDF
35809 Addendum 4_Final.docx DOCX document
35809 Addendum 5_Final.docx DOCX document
Attachment A-4 (Generator Shelter Plans).pdf PDF
Attachment D (Permits)~1.pdf PDF
Attachment J (Bid Pricing Form) Revised.xlsx XLSX spreadsheet
Preliminary Results~70.xlsx XLSX spreadsheet
WMCP RFP advertisement.pdf PDF
Attachment A (Site Plans) InfoOnly.pdf PDF
Attachment B (Tower Plans)~1.pdf PDF
Attachment C (Specifications Manual) Revised~1.doc DOC document
Attachment E (GeoTechReport)(For Informational Purposes Only)08192016~1.pdf PDF
Attachment H (Antenna Sweep Display Examples).pdf PDF
Intent To Award~4.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT D – PERMITS

Project: Wolf Mountain Communica�ons Site

Documents provided in the following order:

• Lane County Special Use Permit 509-PA22-05636

• Lane County Special Use Permit 509-PA22-05637

• USFS Lease/Special Use Authoriza�on (as amended) (WIL193 authoriza�on for Private

Mobile Radio Service 3-5-18)

• USDA Decision Memo – Wolf Mountain Tower Replacement Project – USDA Forest

Service (10/20/17) and NTP (7-18-22)

8/22/2022

Caring for the Land and Serving People Printed on Recycled Paper

Logo Department Name Agency Organization Organization Address Information

United States

Department of

Agriculture

Forest

Service

Willamette National Forest

Supervisor's Office

3106 Pierce Parkway Suite D

Springfield, OR 97477

File Code: 2700

Date: July 18, 2022

Oregon Department of Transportation (ODOT)

Wireless Communications Section

455 Airport Road, Building C

Salem, OR 97301

We received your request to construct improvements to the existing communication equipment located at the Wolf Mountain Communication Site under Special Use Authorization ID -

WIL193.

As part of the review of this proposal, a 5-day Harmful Interference Review was conducted with the other authorization holders located at the Wolf Mountain Communication Site. The other authorization holders were given 5-days to respond to this outreach. No responses were received during the allotted timeframe. It has been determined that the Tower Height Increase will not result in any Harmful Interference to any of the authorization holders located at the site. If any signal interference issues are raised during the term of the permit, it is required that each permit holder will do their best to mitigate these situations.

The Scope of Work for this project will include:

• Tower height increase from 80’ to 120’.

• With no substantial increase in the tower foundation size, it was determined that no harmful effects would result as a part of the height increase.

The Decision Memo for the Wolf Mountain Tower Replacement Project was signed in 2017. In

2022, the modified project was reviewed by the NEPA planner and still meets the original purpose and need, as well as the requirements of the 36 CFR 220.6(e)(15). A letter to the file was completed. Please consider this letter to be your Notice To Proceed with the project as described in the Decision Memo listed above.

Design Criteria & Implementation Guidance for the project listed above includes:

• Machinery used will be washed of mud prior to and after working on National Forest

Lands to reduce the spread of noxious weeds. Equipment will be inspected prior to entering National Forest System lands and shall park on existing disturbed areas as much as possible.

• Vegetation cut during installation should be removed from NFS lands or chipped on site as agreed to in advance.

• Will comply with all fire restrictions on NFS lands that are in place during project implementation.

Oregon Department of Transportation (ODOT) 2

• Will follow Best Management Practices (BMPs) for spillage and pollution concerns.

• Any construction debris, unsuitable or excess material must be disposed of properly off

National Forest System lands.

• If cultural material is discovered during construction, work will immediately stop and the

USFS will be notified.

• Advanced timeline/itinerary is required for monitoring.

• The Special Use Administrator and tenants will be notified 10 days prior to the project start date with estimated timelines.

If you have any questions please contact your Permit Administrator, Melynda Beam at

Melynda.Beam@usda.gov or at (458) 600-2120. Thank you.

Sincerely, DUANE BISHOP

Acting Forest Supervisor cc: Molly Juillerat, Melynda Beam

D1
D2_PA22-05636 DECISION
D3_PA22-05637 DECISION
D4_USFS Comms Lease FE 2018_WIL193_USFS_2037
D5_USFS Amd 1 FE Wolf Tower Ext
D6_USFS Wolf New Decision Memo FE 10202017
D7_Signed Letter to Proceed Tower Ext 8-2022

File details come from the government source that posted it. Updated .