This technical specification document is from the Oregon Department of Transportation (ODOT) Facilities Management Section for the Wyeth Scale House Replacement Project located at Westbound Interstate 84, Mile Point 54.5 in Cascade Locks, Oregon. The project involves a comprehensive construction effort to replace an existing scale house, with detailed specifications covering multiple construction divisions including site preparation, concrete work, structural components, architectural finishes, mechanical systems, and electrical infrastructure. The project specifications are dated January 29, 2025, and outline comprehensive requirements for materials, installation methods, testing, and quality control across various building systems and components.
The specifications include specific requirements for materials sourced under the Buy America provisions of House Bill 3332, which mandates that steel, iron, and manufactured products used in the project must be produced in the United States. Materials must meet strict standards, with at least 55% of component costs originating from U.S. manufacturing. The project requires detailed submittals, testing protocols, and documentation for all materials and installation processes, with particular emphasis on quality assurance, thermal performance, and compliance with current building and electrical codes. Contractors will be required to provide extensive documentation, including shop drawings, material certifications, test results, and as-built documentation upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00012708 Prebid.Meeting.Agenda.doc | DOC document | |
| 00012708 Preliminary Results.xlsx | XLSX spreadsheet | |
| Attachment A Plans~7.pdf | ||
| 00012708 PreBidSignInSheet.docx | DOCX document | |
| AttC Proposer certification and information sheet.doc | DOC document | |
| Attachment C Bid Pricing Form~14.xlsx | XLSX spreadsheet | |
| Addendum 1~18.docx | DOCX document | |
| 00012708 Intent To Award.xlsx | XLSX spreadsheet | |
| Attachment D Project Overview~1.docx | DOCX document | |
| Attachment E Description Of Base Bid And Add Alternate~1.docx | DOCX document | |
| Invitation.To.Bid~13.docx | DOCX document | |
| Addendum 2~6.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICTIONS FOR
Oregon Department of Transportation Wyeth
Scale House Replacement Project address:
Oregon Department of Transportation Westbound Interstate 84, Mile Point 54.5
Cascade Locks, Oregon 97014
1/29/25
Owner:
ODOT FACILITES MANAGEMENT SECTION
885 Airport Rd SE Salem, Oregon 97301 Phone (503) 986-5777
Digitally Signed 2025.01.29 13:19:09 -08'00'
Table of Contents Generated by SpecBuilder: 1/25/2025 Division Section Title Pages
SPECIFICATIONS GROUP
General Requirements Subgroup
DIVISION 01 - GENERAL REQUIREMENTS
010010 BUY AMERICA 5
011000 SUMMARY 3
012500 SUBSTITUTION PROCEDURES 1
013100 PROJECT MANAGEMENT AND COORDINATION 6
013300 SUBMITTAL PROCEDURES 4
014000 QUALITY REQUIREMENTS 2
015000 TEMPORARY FACILITIES AND CONTROLS 2
016000 PRODUCT REQUIREMENTS 5
017300 EXECUTION 7
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 2
017700 CLOSEOUT PROCEDURES 4
017823 OPERATION AND MAINTENANCE DATA 2
017839 PROJECT RECORD DOCUMENTS 2
017900 DEMONSTRATION AND TRAINING 1
Facility Construction Subgroup
DIVISION 02 - EXISTING CONDITIONS
024116 STRUCTURE DEMOLITION 2
DIVISION 03 - CONCRETE
031000 CONCRETE FORMING AND ACCESSORIES 5
032000 CONCRETE REINFORCING 3
033000 CAST-IN-PLACE CONCRETE 8
DIVISION 05 - METALS
055000 METAL FABRICATIONS 3
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 ROUGH CARPENTRY 3
061600 SHEATHING 2
061753 SHOP-FABRICATED WOOD TRUSSES 3
061800 GLUED-LAMINATED CONSTRUCTION 2
062013 EXTERIOR FINISH CARPENTRY 3
062023 INTERIOR FINISH CARPENTRY 3
064116 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS 3
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
072100 THERMAL INSULATION 3
072119 FOAMED-IN-PLACE INSULATION 2
072600 VAPOR RETARDERS 2
073113 ASPHALT SHINGLES 4
074646 FIBER-CEMENT SIDING 3
077123 EXTRUDED GUTTERS AND DOWNSPOUTS 3
079200 JOINT SEALANTS 4
DIVISION 08 - OPENINGS
081113 HOLLOW METAL DOORS AND FRAMES 5
085313 VINYL WINDOWS 3
087100 DOOR HARDWARE 4
088000 GLAZING 2
DIVISION 09 - FINISHES
092900 GYPSUM BOARD 3
096513 RESILIENT BASE AND ACCESSORIES 3
096519 RESILIENT TILE FLOORING 3
099114 EXTERIOR PAINTING (MPI STANDARDS) 3
099124 INTERIOR PAINTING (MPI STANDARDS) 3
DIVISION 10 - SPECIALTIES
107113.19 ROLLING EXTERIOR SHUTTERS 5
Facility Services Subgroup
DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING (HVAC)
230000 BASIC MECHANICAL REQUIREMENTS 4
DIVISION 26 - ELECTRICAL
260000 BASIC ELECTRICAL REQUIREMENTS 5
Site and Infrastructure Subgroup
DIVISION 31 - EARTHWORK
311000 SITE CLEARING 2
Non Standard Specification Format Subgroup
00987 TELECOMMUNICATIONS 10
END OF TABLE OF CONTENTS
Wyeth Scale House Replacement SECTION 010010 - BUY
AMERICA
010010 - 1
SECTION 010010 - BUY AMERICA
PART 1 - PART 1 - GENERAL
1.1 1.01 COMPLIANCE
A. This Project is subject to the domestic preference requirements provided under House Bill 3332, Oregon Laws 2023, Chapter 541 (“HB 3332”), as codified in ORS Chapter 279C. Pursuant to HB 3332, steel, iron, coatings for steel and iron and “Manufactured Products” purchased for or used in the project, and that become part of a permanent structure must be “Produced in the United States.” As defined under HB 3332, “Manufactured Product” means a preassembled item that is made of iron or steel and that a contractor brings to a construction project for incorporation into a public improvement or public works or a preassembled item that is made of iron or steel and that the Oregon Department of Administrative Services or the Department of Transportation acquires for a public use. As defined under HB 3332, Produced in the United States means:
1. For Iron and steel products, other than Manufactured Products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred within the United States; and
2. For Manufactured Products, that:
a. The manufacture of the product occurred within the United States; and
b. The cost of the components that are mined, produced or manufactured in the United
States is more than 55 percent of the total cost of all components of the product
B. General Contractor is responsible for full compliance with the HB 3332 requirements, including such compliance by first-tier subcontractors, lower-tier subcontractors, service providers, and materials suppliers.
1.2 APPLICABILITY
A. Pursuant to HB 3332, on June 17, 2024, the Director of the Oregon Department of Transportation issued Final Findings, Conclusions, and an Order, waving the requirements of HB 3332 for materials not included in the specifications listed below. Per the Director's Final Findings, Conclusions and Order, the materials supplied under the following specification sections shall be Produced in the United States, if supplied for and incorporated in the project:
1. 03-Concrete
a. 032000 Concrete Reinforcing
b. 033000 Cast-In-Place Concrete
c. 033300 Architectural Concrete
d. 033816 Unbonded Post-Tensioned Concrete
e. 034100 Precast Structural Concrete
f. 034500 Precast Architectural Concrete
g. 034713 Tilt-Up Concrete
2. 04-Masonry
a. 042000 Unit Masonry
b. 042200 Concrete Unit Masonry
010010 - 2
c. 044200 Exterior Stone Cladding
3. 05-metal
a. 050513 Structural steel Framing
b. 051213 Architecturally Exposed Structural Steel Framing
c. 052100 Steel Joist Framing
d. 053100 Steel Decking
e. 054000 Cold-Formed Metal Framing
f. 054400 Cold-Formed Metal Trusses
g. 055000 Metal Fabrications
h. 055113 Metal Pan Stairs
i. 055116 Metal Floor Plate Stairs
j. 055119 Metal Grating Stairs
k. 055213 Pipe and Tube Railings
l. 055313 Bar Gratings
m. 055316 Plank Gratings
n. 055319 Expanded Metal Gratings
o. 055813 Column Covers
p. 055819 Heating/Cooling Unit Covers
q. 055913 Metal Balconies
r. 055963 Detention Enclosures
s. 057000 Decorative Metal
t. 057100 Decorative Metal Stairs
u. 057113 Fabricated Metal Spiral Stairs
v. 057300 Decorative Metal Railings
w. 057500 Decorative Formed Metal
4. 07-Thermal and Moisture Protection
a. 073116 Metal Shingles
b. 074100 Roof Panels
c. 074116 Insulated Metal Roof Panels
d. 074213 Metal Wall Panels
e. 074293 Soffit Panels
f. 074619 Steel Siding
g. 076100 Sheet Metal Roofing
h. 076100 Sheet Metal Flashing and Trim
i. 077121 Gutters
j. 077129 Manufactured Roof Expansion Joints
k. 077200 Roof Accessories
l. 077253 Snow Guards
5. 08-Openings
a. 081113 Hollow Metal Doors and Frames
b. 081119 Stainless-Steel Doors and Frames
c. 081173 Sliding Metal Fire Doors
d. 081213 Hollow Metal Frames
e. 081713 Integrated Metal Door Opening Assemblies
f. 083113 Access Doors and Frames
g. 083123 Floor Doors
h. 085119 Stainless Steel Windows
i. 085653 Security Windows
j. 086300 Metal-Framed Skylights
k. 089116 Operable Wall Louvers
l. 089119 Fixed Louvers
010010 - 3
m. 089516 Wall Vents
6. 09-Finishes
a. 092216 Non-Structural Metal Framing
b. 095133 Acoustical Metal Pan Ceilings
c. 095423 Linear Metal Ceilings
d. 097773 Metal Louver Wall Systems
e. 097813 Metal Interior Wall Paneling
7. 10-Specialities
a. 102113 Toilet Compartments
b. 102123 Cubicle Curtains and Track
c. 102800 Toilet, Bath, and Laundry Accessories
d. 104413 Fire Protection Cabinets
e. 104416 Fire Extinguishers
f. 105113 Metal Lockers
g. 105143 Wire Mesh Storage Lockers
h. 105613 Metal Storage Shelving
i. 107113 Rolling Metal Shutters
j. 107313 Awnings
k. 107516 Ground-set Flagpoles
l. 107523 Wall-mounted Flagpoles
m. 107526 Roof-mounted Flagpoles
n. 107529 Plaza-mounted Flagpoles
8. 11-Equipment
a. 114000 Foodservice Equipment
b. 115123 Library Stack Systems
c. 115313 Laboratory Fume Hoods
d. 118129 Facility Fall Protection
9. 12-Furnishings
a. 123616 Metal Countertops
10. 13-Special Construction
a. 133419 Metal Building Systems
11. 14-Conveying Equipment
a. 142100 Electric Traction Elevators
b. 142113 Electric Traction Freight Elevators
c. 142400 Hydraulic Elevators
d. 142413 Hydraulic Freight Elevators
e. 142600 Limited-Use/Limited-application Elevators
f. 143100 Escalators
g. 143200 Moving Walks
h. 144200 Wheelchair Lifts
i. 149182 Trash Chutes
12. 21-Fire Suppression
a. 210518 Escutcheons for Fire-suppression Piping
b. 210523 General-Duty Valves for Fire Suppression Piping
c. 210529 Hangers and Supports for Fire Suppression Piping and Equipment
d. 210548 Vibration and Seismic Controls for Fire Suppression Piping and Equipment
e. 211100 Facility Fire-Suppression Water-service Piping
f. 211200 Fire-Suppression Standpipes
g. 211313 Wet-Pipe Sprinkler Systems
h. 211316 Dry-Pipe Sprinkler Systems
i. 213100 Fire Pumps
010010 - 4
13. 22-Plumbing
a. 220518 Escutcheons for Plumbing Piping
b. 220529 Hangers and Supports for Plumbing Piping
c. 220548 Vibration and Seismic Controls for Plumbing Piping and Equipment
d. 221005 Plumbing Piping
e. 221119 Domestic Water Piping
f. 221117 Gray-Water Piping
g. 221316 Sanitary Waste and Vent Piping
h. 221319 Sanitary Drains
i. 221323 Sanitary Sewerage Pumps
j. 221429 Sump Pumps
k. 221513 General-Service Compressed-air Piping
l. 221519 General-Service Packaged Air Compressors and Receivers
m. 223300 Electric, Domestic-Water Heaters
n. 223400 Fuel-Fired, Domestic-Water Heaters
o. 224000 Plumbing Fixtures
14. 23-Heating Ventilating and Air Conditioning
a. 230518 Escutcheons for HVAC Piping
b. 230529 Hangers and Supports for HVAC Piping and Equipment
c. 230548 Vibration and Seismic Controls for HVAC
d. 231113 Facility Fuel-Oil Piping
e. 231123 Facility Natural-Gas Piping
f. 231126 Facility Liquified-Petroleum Gas Piping
g. 231213 Facility Fuel-Oil Pumps
h. 231323 Facility Aboveground Fuel-Oil Storage Tanks
i. 232123 Hydronic Pumps
j. 233113 Metal Ducts
k. 233413 Centrifugal HVAC Fans
l. 233713 Registers and Grilles
m. 233813 Commercial-Kitchen Hoods
n. 235123 Insulated Sectional Chimneys
o. 235200 Boilers
p. 235400 Furnaces
q. 235423 Gas-Fired, Radiant Heaters
r. 235533 Unit Heaters
s. 236300 Condensers
t. 236423 Chillers
u. 236514 Cooling Towers
v. 237200 Energy Recovery Units
w. 237300 Air Handling Units
x. 237400 Packaged Units
y. 237433 Dedicated Outdoor-Air Units
15. 26-Electrical
a. 260529 Hanger and Supports for Electrical Systems
b. 260533 Conduits for Electrical Systems
c. 260536 Cable Trays for Electrical Systems
d. 260544 Vibration and Seismic Controls for Electrical Systems
e. 263213 Emergency Generators
16. 27-Communications
a. 270529 Hangers and Supports for Communications Systems
b. 271116 Communications Racks, Frames, and Enclosures
010010 - 5
17. 31-Exterior Improvements
a. 323113 Chain Link Fences and Gates
b. 323116 Welded Wire Fences and Gates
c. 323119 Decorative Metal Fences and Gates
18. 31-Utilities
a. 331115 Site Water Distribution Piping
b. 334100 Storm Utility Drainage Piping
c. 334200 Stormwater Conveyance
B. Contractor shall direct questions related to applicability during bidding as indicated in the Invitation to Bid.
C. Contractor shall direct questions related to applicability after contract award to the Construction Project Manager (CPM).
1.3 REPORTING
A. Before incorporating any of the above listed products or materials into the Project, Contractor shall provide to the CPM:
1. A Certificate of Materials Origin, on a form furnished by ODOT, for each component.
Unless a Certificate of Materials Origin has been provided to the CPM, the component shall be considered of foreign origin. No “de minimis” amount has been established for the applicable products and materials permanently incorporated into the project. Strict compliance is required.
1.4 RECORD KEEPING
A. Contractor shall maintain record documents including the Certificates of Materials Origin and manufacturers’ certificates for each applicable component for a period of three years following the date of final payment for the completed project.
END OF SECTION 010010
Wyeth Scale House Replace-ment
SECTION 011000 -
SUMMARY
011000 - 1
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Time of commencement and completion.
4. Contractor's use of site and premises.
5. Excessive noise.
6. Coordination with occupants.
7. Work restrictions.
8. Specification and Drawing conventions.
B. Related Requirements:
1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
1.2 PROJECT INFORMATION
A. Project Identification: Wyeth Scale House Replacement.
1. Project Location: Westbound Interstate 84, Mile Point 54.5, Cascade Locks, OR 97014.
B. Designer: Oregon Department of Transportation, 885 Airport Rd SE, Bldg. X, Salem, Oregon, 97301.
1. Professional of Record: Jon Doughton.
C. Construction Project Manager (CPM): Oregon Department of Transportation, 885 Airport Rd SE, Bldg. X, Salem, Oregon, 97301. .
1. Construction Project Manager (CPM): Shelby Stout, 541-952-1165.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
1. Wyeth Scale House replacement including demolition, site work, utilities, electrical service, paving, concrete slabs, fencing, construction of new building including walls, windows, doors, siding, roof, electrical, mechanical systems, interior doors, walls, finishes and other Work as indicated in the Contract Documents.
011000 - 2
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
1.4 TIME OF COMMENCEMENT AND COMPLETION
A. Notice to proceed: A written notice to proceed will be provided by the CPM to the Contractor as indicated in the invitation to bid. The Contractor shall begin the work upon receipt of the notice to proceed. Notwithstanding any other provision of the contract the Owner shall not be obligated to accept or to pay for any work furnished by the Contractor prior to delivery of notice to proceed, whether or not the Owner has knowledge of the furnishing of work.
1.5 CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS
A. Contractor shall be supplied with drawings and specifications in PDF format that can be printed to full size. set half size At least one complete set of contract documents, including one full-size set of drawings shall be kept at the site of construction in good condition, and at all times available to the CPM. reduced drawings and
1.6 PERMITS AND FEES
A. Other than noted below the acquisition of all required permits, and payment of all fees, inspection charges and other similar costs shall be the responsibility of the contractor. ODOT has submitted documents for plan review with the local Authorities Having Jurisdiction. The Contractor shall be responsible for obtaining and paying for all other construction and trades permits as may be required by Federal, State and Local Officials.
B. ODOT will be responsible for the acquisition of required building permits and payment of building permit fees.
1.7 CONTRACTOR'S USE OF SITE AND PREMISES
A. Construction Operating Hours: Operating hours shall be limited to 0600 to 1700 Monday through Friday. Deviations from noted hours shall be with approval by CPM.
B. Limits on Use of Site: Contractors lay down/staging area will be coordinated through CPM. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Driveways, Walkways, and Scale House Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.
1.8 EXCESSIVE NOISE
A. All equipment shall have muffling devices in good working order at all times. Equipment not so equipped will be removed from site.
B. Cooperate with Owner in locating high noise producing equipment in areas least offensive and/or provide sound enclosure or shielding to dampen sound.
011000 - 3
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
1.9 COORDINATION WITH OCCUPANTS
A. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work.
1.10 WORK RESTRICTIONS
A. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Notify CPM not less than two days in advance of proposed utility interruptions.
2. Obtain CPM permission in writing before proceeding with utility interruptions.
B. Smoking and Controlled Substance Restrictions: Use of tobacco products , alcoholic beverages, and other controlled substances on Project site is not permitted.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
SECTION 012500 -
SUBSTITUTION
PROCEDURES
012500 - 1
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
SECTION 012500 - SUBSTITUTION PROCEDURES
1.1 ACTION SUBMITTALS
A. Documentation:
1. Justification.
2. Coordination information.
3. Detailed comparison.
4. Product Data.
5. Samples.
6. Certificates and qualification data.
7. List of similar installations.
8. Material test reports.
9. Research reports.
10. Detailed comparison of Contractor's construction schedule.
11. Cost information.
12. Contractor's certification.
B. CPM Action: If necessary, CPM will request additional information within seven days of receipt of a request for substitution. CPM will notify Contractor of acceptance or rejection within two days of receipt of additional information.
1.2 SUBSTITUTIONS
A. Substitutions for Convenience: Not allowed.
B. Substitution Requests During Bidding:
1. Will only be accepted from project bidders.
2. Must be made a minimum of seven days prior to bid closing.
3. Shall be sent to the Single Point of Contact noted in the Invitation to Bid.
END OF SECTION 012500
SECTION 013100 - PROJECT
MANAGEMENT AND
COORDINATION
013100 - 1
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Description
2. General coordination procedures.
3. Coordination drawings.
4. Requests for Information (RFI's).
5. Project meetings.
6. Terms
1.2 DESCRIPTION
A. The Contractor shall coordinate with the CPM during the duration of the project.
1. The Contractor is responsible for keeping the CPM informed of all activity throughout the project identified in this Contract.
1.3 GENERAL COORDINATION PROCEDURES
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
B. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's construction schedule.
2. Preparation of the schedule of values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
SECTION 013100 - PROJECT
013100 - 2
5. Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
8. Startup and adjustment of systems.
1.4 QUALITY ASSURANCE
A. Throughout the progress of the work, the Contractor shall provide all necessary personnel thoroughly familiar with the Specifications and Drawings, completely trained and experienced in the necessary skills, who shall be present at the site and direct all work performed.
B. Conditions of Surfaces: Surfaces previously prepared or installed by another trade shall be inspected carefully before applying subsequent materials or finishes. If an unsatisfactory condition to that finish exists, notify the General Contractor and CPM in writing immediately.
Otherwise assume full responsibility for resulting appearance, condition and acceptance of finished surfaces.
C. Covering Up: No Contractor or Subcontractor shall cover up work or conceal work of other Contractor/Subcontractor until same has been inspected and/or approved.
1.5 REQUEST FOR INFORMATION (RFI)
A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.
1. CPM will return without response those RFIs submitted by other entities controlled by Contractor.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. Owner name.
2. Owner's Project number.
3. Project Name
4. Name of CPM.
5. ODOT Project number.
6. Date.
7. Name of Contractor.
8. RFI number, numbered sequentially.
9. RFI subject.
10. Specification Section number and title and related paragraphs, as appropriate.
11. Drawing number and detail references, as appropriate.
12. Field dimensions and conditions, as appropriate.
13. Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract
Time or the Contract Sum, Contractor shall state schedule and cost impact in the RFI.
SECTION 013100 - PROJECT
013100 - 3
14. Contractor's signature.
15. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
C. RFI Forms: Electronic format containing information as noted above. Software-generated form with substantially the same content as indicated above, acceptable to the CPM.
D. RFI's will be reviewed to determine action required, and response. Allow five days for CMP response to each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.
1. The following Contractor-generated RFIs will be returned without action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of Contractor's means and methods.
d. Requests for coordination information already indicated in the Contract Documents.
e. Requests for adjustments in the Contract Time or the Contract Sum.
f. Requests for interpretation of review actions on submittals.
g. Incomplete RFIs or inaccurately prepared RFIs.
2. CPM's action may include a request for additional information, in which case CPM's time for response will date from time of receipt.
3. CPM's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal in accordance with General Provisions.
a. If Contractor believes the RFI response warrants change in the Contract Time or the
Contract Sum, notify CPM in writing within three days of receipt of the RFI response.
E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.
Submit log weekly . Software log with not less than the following:
1. Project name.
2. Name and address of Contractor.
3. RFI number including RFIs that were returned without action or withdrawn.
4. RFI description.
5. Date the RFI was submitted.
6. Date response was received.
F. On receipt of an action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify CPM within three days if Contractor disagrees with response.
1.6 DIGITAL PROJECT MANAGEMENT PROCEDURES
A. Use of Owners Digital Data Files: Digital data files will be provided for Contractor's use during construction as approved by the CPM.
1. Digital data files may be used by Contractor in preparing coordination and Shop Drawings.
SECTION 013100 - PROJECT
013100 - 4
2. No representations as to the accuracy or completeness of digital data files as they relate to Contract Drawings.
B. PDF Document Preparation: Where PDFs are required to be submitted, prepare as follows:
1. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item.
2. Name file with submittal number or other unique identifier, including revision identifier.
1.7 PROJECT MEETINGS
A. General: Schedule and conduct meetings and conferences at Project site unless otherwise indicated.
B. Preconstruction Meeting: Participate in a preconstruction meeting, before starting construction, at a time convenient to Owner and CPM, but no later than five business days following NTP.
1. Attendees: Authorized representatives of Owner and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Discuss items of significance that could affect progress, including the following:
a. Responsibilities and personnel assignments.
b. Tentative construction schedule.
c. Coordination between Contractor and CPM.
d. Critical work sequencing and long lead items.
e. Designation of key personnel and their duties.
f. Lines of communications.
g. Procedures for processing field decisions and Change Orders.
h. Procedures for RFIs.
i. Procedures for testing and inspecting.
j. Procedures for processing Applications for Payment.
k. Distribution of the Contract Documents.
l. Submittal procedures.
m. Preparation of Record Documents.
n. Use of the premises.
o. Work restrictions.
p. Working hours.
q. Owner's occupancy requirements.
r. Responsibility for temporary facilities and controls.
s. Construction waste management and recycling.
t. Parking availability.
u. Office, work, and storage areas.
v. Equipment deliveries and priorities.
w. First aid.
x. Security.
y. Progress cleaning.
3. Minutes: Contractor shall record and distribute meeting minutes.
SECTION 013100 - PROJECT
013100 - 5
C. Progress Meetings: Conduct progress meetings at intervals as directed by CPM .
1. Attendees: In addition to representatives of Owner , each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.
a. Contractor's Construction Schedule: Review progress since the last meeting.
Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do
so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.
1) Review schedule for next period.
b. Review present and future needs of each entity present, including the following:
1) Status of submittals.
2) Deliveries.
3) Site use.
4) Temporary facilities and controls.
5) Progress cleaning.
6) Quality and work standards.
7) Status of correction of deficient items.
8) Field observations.
9) Status of RFIs.
10) Status of Proposal Requests.
11) Pending changes.
12) Status of Change Orders.
13) Pending claims and disputes.
14) Documentation of information for payment requests.
3. Minutes: Contractor shall record and distribute the meeting minutes to each party present and to parties requiring information.
a. Schedule Updating: Revise Contractor's construction schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.
1.8 TERMS
A. "APPROVED" as used herein means "approved by the ODOT CPM.
B. 'FOR APPROVAL" means "for the CPM approval."
C. "SELECTED" means "selected by the CPM."
D. "PROVIDE" means "furnish and install."
E. "CONSTRUCT" means "furnish and install."
SECTION 013100 - PROJECT
013100 - 6
F. Where words "or approved" ae used, Construction Project Manager is sole judge of quality and suitability of proposed alternate or substitution.
G. "CONSTRUCTION PROJECT MANAGER" (CPM) refers to the individual selected by ODOT to manage the project.
H. "Project Coordination" refers to the on-site individual (if) selected by ODOT to be the local liaison the contractor.
I. "INSTALL" means "furnish and install."
J. Items noted as "N.I.C." are "Not in Contract" and will be furnished and installed by Owner or others.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 013100
SECTION 013300 -
SUBMITTAL PROCEDURES
013300 - 1
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Submittal schedule requirements.
2. Administrative and procedural requirements for submittals.
1.2 DEFINITIONS
A. Action Submittals: Written and graphic information and physical samples that require responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."
B. Informational Submittals: Written and graphic information and physical samples that do not require responsive action. Submittals may be rejected for not complying with requirements.
Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."
1.3 SUBMITTAL SCHEDULE
A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by CPM and additional time for handling and reviewing submittals required by those corrections.
1.4 SUBMITTAL FORMATS
A. Submittal Information: Include the following information in each submittal:
1. Project name.
2. Date.
3. Name of Contractor.
4. Names of subcontractor, manufacturer, and supplier.
5. Unique submittal number, including revision identifier. Include Specification Section number with sequential alphanumeric identifier; and alphanumeric suffix for resubmittals.
6. Number and title of Specification Section, with paragraph number and generic name for each of multiple items.
7. Drawing number and detail references, as appropriate.
8. Indication of full or partial submittal.
9. Signature of transmitter.
013300 - 2
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
B. Options: Identify options requiring selection by CPM.
C. Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested by CPM on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet.
D. Submittals shall be electronic.
1.5 SUBMITTAL PROCEDURES
A. Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.
1. Email: Prepare submittals as PDF package, and transmit to CPM by sending via email.
Include PDF transmittal form. Include information in email subject line as requested by
CPM.
B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
2. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.
3. Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.
C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.
Time for review shall commence on receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.
1. Initial Review: Allow 10 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.
2. Resubmittal Review: Allow 10 days for review of each resubmittal.
D. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.
E. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.
F. Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Professional Of Record's action stamp.
013300 - 3
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
1.6 SUBMITTAL REQUIREMENTS
A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's catalog cuts.
b. Manufacturer's product specifications.
c. Standard color charts.
d. Statement of compliance with specified referenced standards.
e. Notation of coordination requirements.
f. Availability and delivery time information.
4. Submit Product Data before Shop Drawings, and before or concurrent with Samples.
B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
C. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other materials.
1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.
2. Identification: Permanently attach label on unexposed side of Samples that includes the following:
a. Project name and submittal number.
b. Generic description of Sample.
c. Product name and name of manufacturer.
d. Sample source.
e. Number and title of applicable Specification Section.
f. Specification paragraph number and generic name of each item.
3. Email Transmittal: Provide PDF transmittal. Include digital image file illustrating Sample characteristics, and identification information for record.
4. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.
5. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
a. Number of Samples: Submit one full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. CPM will return submittal with options selected.
1.7 CONTRACTOR'S REVIEW
A. Action Submittals and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents.
Note corrections and field dimensions. Mark with approval stamp before submitting to CPM.
013300 - 4
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
B. Contractor's Approval: Indicate Contractor's approval for each submittal with contractors approval stamp . Include name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
1. CPM will not review submittals received from Contractor that do not have Contractor's review and approval.
1.8 ODOT REVIEW
A. Action Submittals: CPM will review each submittal, indicate corrections or revisions required.
1. PDF Submittals: CPM will indicate, via markup on each submittal, the appropriate action as follows:
a. Submittals will be returned marked Approved, Approved as Noted, Revise and
Resubmit. Incomplete submittals will be marked Rejected and not reviewed.
B. Informational Submittals: CPM will review each submittal and will not return it, or will return it if it does not comply with requirements. CPM will forward each submittal to appropriate party.
C. Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from CPM.
D. Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.
E. Submittals received from sources other than Contractor will be returned without review.
F. Submittals not required by the Contract Documents will be returned by CPM without action.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 013300
SECTION 014000 - QUALITY
REQUIREMENTS
014000 - 1
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
SECTION 014000 - QUALITY REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for quality assurance and quality control.
1.2 DEFINITIONS
A. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, assembly, and similar operations.
1. Use of trade-specific terminology in referring to a Work result does not require that certain construction activities specified apply exclusively to specific trade(s).
1.3 CONFLICTING REQUIREMENTS
A. Conflicting Standards and Other Requirements: If compliance with two or more standards or requirements is specified and the standards or requirements establish different or conflicting requirements for minimum quantities or quality levels, inform the CPM regarding the conflict and obtain clarification prior to proceeding with the Work. Refer conflicting requirements that are different, but apparently equal, to CPM for clarification before proceeding.
B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified is the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to the CPM for a decision before proceeding.
1.4 INFORMATIONAL SUBMITTALS
A. Permits, Licenses, and Certificates: For Owner's record, submit copies to CPM of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents established for compliance with standards and regulations bearing on performance of the Work.
1.5 QUALITY CONTROL
A. Contractor Responsibilities: Tests and inspections not explicitly noted or assigned to Owner are Contractor's responsibility. Perform additional quality-control activities, whether specified or not, to verify and document that the Work complies with requirements.
SECTION 014000 - QUALITY
014000 - 2
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 REPAIR AND PROTECTION
A. General: On completion of testing, inspection, sample taking, and similar services, repair damaged construction and restore substrates and finishes.
END OF SECTION 014000
SECTION 015000 -
TEMPORARY FACILITIES
AND CONTROLS
015000 - 1
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
1.1 USE CHARGES
A. Sewer Service: Contractor Supplied.
B. Water Service: Contractor Supplied .
C. Electric Power Service: Available from existing system without charge. Contractor shall provide temporary connection to existing service as required.
1.2 INFORMATIONAL SUBMITTALS
A. Erosion- and sedimentation-control plan.
1.3 MATERIALS
A. Portable chain-link fencing at contractor's option.
1.4 TEMPORARY FACILITIES
A. Field office as required by contractor.
1.5 EQUIPMENT
A. Fire extinguishers.
1.6 TEMPORARY UTILITY INSTALLATION
A. Sanitary Facilities: Provide temporary toilets, wash facilities, and dinking water.
B. Electric Power Service: Connect to existing service .
C. Lighting: Provide temporary lighting as required.
1.7 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Provide security fencing around project, staging and materials storage area at contractor's option.
B. Provide temporary concrete washout water containment facility.
END OF SECTION 015000
SECTION 016000 - PRODUCT
016000 - 1
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688)
SECTION 016000 - PRODUCT REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products;
special warranties; and comparable products.
1.2 DEFINITIONS
A. Products: Items obtained for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.
1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents.
2. New Products: Items that have not previously been incorporated into another project or facility. Salvaged items or items reused from other projects are not considered new products. Items that are manufactured or fabricated to include recycled content materials are considered new products, unless indicated otherwise.
3. Comparable Product: Product by named manufacturer that is demonstrated and approved through the comparable product submittal process described in Part 2 "Comparable Products" Article, to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.
B. Basis-of-Design Product Specification: A specification in which a single manufacturer's product is named and accompanied by the words "basis-of-design product," including make or model number or other designation. Published attributes and characteristics of basis-of-design product establish salient characteristics of products.
1. Evaluation of Comparable Products: In addition to the basis-of-design product description, product attributes and characteristics may be listed to establish the significant qualities related to type, function, in-service performance and physical properties, weight, dimension, durability, visual characteristics, and other special features and requirements for purposes of evaluating comparable products of additional manufacturers named in the specification. Manufacturer's published attributes and characteristics of basis-of-design product also establish salient characteristics of products for purposes of evaluating comparable products.
C. Subject to Compliance with Requirements: Where the phrase "Subject to compliance with requirements" introduces a product selection procedure in an individual Specification Section, provide products qualified under the specified product procedure. In the event that a named product or product by a named manufacturer does not meet the other requirements of the
016000 - 2
Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.
It was created by "Oregon Department of Transportation" for "Wyeth Scale House Replacement". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26688) specifications, select another named product or product from another named manufacturer that does meet the requirements of the specifications; submit a comparable product request or substitution request, if applicable.
D. Comparable Product Request Submittal: An action submittal requesting consideration of a comparable product, including the following information:
1. Identification of basis-of-design product or fabrication or installation method to be replaced, including Specification Section number and title and Drawing numbers and titles.
2. Data indicating compliance with the requirements specified in Part 2 "Comparable Products" Article.
E. Basis-of-Design Product Specification Submittal: An action submittal complying with requirements in Section 013300 "Submittal Procedures."
F. Substitution: Refer to Section 012500 "Substitution Procedures" for definition and limitations on substitutions.
1.3 QUALITY ASSURANCE
A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, select product compatible with products previously selected, even if previously selected products were also options.
1.4 QUALITY AND QUANTITY
A. Work shall be executed in conformity with the Owner accepted standard of…