The file is a detailed construction plan for a Marion County, Oregon public safety communications facility improvement project located at House Mountain, approximately 11.1 miles southeast of Drakes Crossing. The project involves modifying an existing communications site by replacing the current 60.6' self-support tower with a new 180'-0" self-support tower, installing new equipment shelters, a generator shelter, ground-mounted solar PV array, propane tank, and associated infrastructure. The site is situated on a 13,304.66-acre parcel in Marion County, zoned as Timber Conservation, with a total compound area of 10,589 square feet. The proposed modifications include removing existing equipment shelters, generators, propane tanks, and ice bridges, and installing new communications and support infrastructure.
The project is funded through county resources and will utilize a Cummins 36 kW backup generator, solar hybrid heat pump system, and comply with various building and safety codes including the 2018 International Building Code, 2017 National Electric Code, and NFPA 58 standards. The site will remain unmanned and is designed for essential communications infrastructure, with specific attention to seismic requirements, erosion control, and compliance with local jurisdictional guidelines. The property is owned by Weyerhaeuser Timber Holdings Inc and will be developed by Marion County Public Works, with engineering and surveying support from Cushing Civil Engineers and Orion Geomatics. The project demonstrates a comprehensive approach to modernizing and expanding critical communications infrastructure in a remote, forested location.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. PROPOSED MODIFICATION OF AN EXISTING PUBLIC SAFETY
COMMUNICATIONS FACILITY FOR MARION COUNTY, OREGON.
2. PROPOSED REPLACEMENT OF EXISTING 60.6' SELF-SUPPORT
TOWER W/ NEW 180'-0" SELF-SUPPORT TOWER
3. PROPOSED INSTALLATION OF THE FOLLOWING EQUIPMENT ON
A NEW 180'-0" SELF-SUPPORTED TOWER:
* NEW & EXISTING ANTENNAS & ASSOCIATED ANCILLARY
EQUIPMENT
4. PROPOSED REMOVAL OF THE FOLLOWING EQUIPMENT WITHIN
EXISTING GROUND SPACE:
* EQUIPMENT SHELTERS
* GENERATOR SHELTER
* ICE BRIDGES
* GENERATORS
* PROPANE TANKS
5. PROPOSED INSTALLATION OF THE FOLLOWING EQUIPMENT
WITHIN EXISTING GROUND SPACE:
* (1) 12'x16' EQUIPMENT SHELTER
* (1) 10'x10' GENERATOR SHELTER
* (1) GENERATOR
* ICE BRIDGE
* PROPANE TANK ICE CANOPY (REPLACE EXISTING)
* GROUND MOUNTED SOLAR PV ARRAY
SHEET INDEX
FROM MARION COUNTY PUBLIC WORKS BUILDING:
1. HEAD SOUTHEAST TOWARD OR-213 S (305 FT) & TURN RIGHT ONTO
OR-213 S (0.2 MI)
0.2 MI
2. TURN LEFT ONTO CORDON RD NE (4.1 MI) & SHARP LEFT ONTO
MACLEAY RD SE (0.2 MI)
4.3 MI
3. TURN RIGHT ONTO CULVER DR SE (1.0 MI) & TURN RIGHT ONTO
DEER PARK DR SE (0.6 MI)
1.6 M
4. MERGE ONTO OR-22 E/N SANTIAM HWY SE
19 MIN (19.2 MI)
5. TURN LEFT ONTO N FORK RD/LITTLE NORTH FORK. CONTINUE TO
FOLLOW N FORK RD
4.5 MI
6. SLIGHT LEFT (0.6 MI) & TURN RIGHT AT KIEL CREEK RD (2.0 MI)
2.6 MI
7. SLIGHT LEFT (1.4 MI) & TURN LEFT (1.4 MI)
2.8 MI
8. TURN RIGHT (1.0 MI) & SHARP RIGHT. DESITINATION WILL BE ON THE
LEFT (0.4 MI)
1.4 MI
EST. TIME: 50 MINS.
EST. MILEAGE: 36.6 MI
COVER
SHEET
SHEET NUMBER:
SHEET TITLE:
PROJECT INFORMATION PROJECT INFORMATION CONTINUED DRIVING DIRECTIONS
VICINITY MAP
PROPERTY OWNER:
WEYERHAEUSER TIMBER HOLDINGS INC ATTN TAX DEPARMENT
220 OCCIDNETAL AVE S
SEATTLE, WA 98104
CONTACT:
NAME
PHONE
PROJECT LOCATION:
*LAT: N 44° 50'28.4" (44.841210)
*LONG: W 122°28'58.9" (-122.483040)
*GROUND ELEVATION (ASML) = 3,955'±
*INFORMATION OBTAINED FROM GOOGLE EARTH
UTILITY PROVIDERS:
TELCO PROVIDER: N/A
POWER PROVIDER: CONSUMERS POWER
T-1
PROJECT AREA:
TOTAL COMPOUND AREA - 10,589 SQ FEET ±
ACCESS DRIVE AND PARKING - EXISTING
TOTAL - 10,589 SQ FEET ±
LOCATOR MAP
LICENSURE:
DRAWING INFORMATION:
THIS DRAWING IS COPYRIGHTED AND IS THE SOLE
PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY
FOR USE BY THE OWNER AND ITS AFFILIATES.
REPRODUCTION OR USE OF THIS DRAWING AND/OR
THE INFORMATION CONTAINED IN IT IS FORBIDDEN
WITHOUT THE WRITTEN PERMISSION OF THE OWNER.
PLANS PREPARED BY:
DATE RELEASE
07-26-24 SITE SKETCH
02-12-25 PRELIMINARY ZONING DRAWINGS
05-22-25
PRELIMINARY CONSTRUCTION DRAWINGS
09-23-25 FINAL CONSTRUCTION DRAWINGS
09-30-25 REV. FCD FOR PROPANE TANK UPDATE
10-15-25
REV. FCD FOR SITE CONFIGURATION
PROJECT INFORMATION:
12725 SW MILLIKAN WAY
SUITE 300
BEAVERTON, OR 97005
(503) 387-5331 www.cushingcivilengineers.com
Cushing
Civil Engineers
Civil Engineers
MARION COUNTY
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF
DRAKES CROSSING, OR
PROJECT DESCRIPTION
SITE NAME:
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF DRAKES CROSSING, OR
CONSTRUCTION SUBMITTAL:
T-1 COVER SHEET
V-1 EXISTING CONDITIONS (SURVEY)
EX-1 DEMOLITION PLAN
G-1 GENERAL NOTES
ER-1 GRADING & EROSION CONTROL PLAN
ER-2 GRADING & EROSION CONTROL DETAILS
C-1 OVERALL SITE PLAN
C-2 ENLARGED SITE PLAN
C-3 ELEVATIONS
C-4 COMPOUND DETAILS
C-5 GENERATOR & PROPANE TANK DETAILS
C-6 HVAC DETAILS
C-7 EQUIPMENT SHELTER FOUNDATION PLAN
C-8 GENERATOR SHELTER FOUNDATION PLAN
E-1 SITE GROUNDING PLAN & DETAILS
E-2 GROUNDING DETAILS I
E-3 GROUNDING DETAILS II
RF-1.0 RF TOWER APPURTENANCES I
RF-1.1 RF TOWER APPURTENANCES II
RF-1.2 RF TOWER APPURTENANCES III
RF-1.3 RF TOWER APPURTENANCES IV
RF-1.4 RF TOWER APPURTENANCES V
RF-1.5 RF TOWER APPURTENANCES VI
U-1 SOLAR PV ARRAY DETAILS I
U-2 SOLAR PV ARRAY DETAILS II
U-3 SOLAR PV ARRAY DETAILS III
U-4 SOLAR PV ARRAY DETAILS IV
SHELTER ONE PREFABRICATED SHELTER DRAWINGS
(REFER TO STATE OF OREGON BUILDING CODES
DIVISION FOR STATE INSIGNIA):
SH-1 EQUIPMENT SHELTER EXTERIOR ELEVATIONS
SH-2 EQUIPMENT SHELTER INTERIOR ELEVATIONS
SH-3 HIGH SNOW ENTRY VESTIBULE
SH-4 ELECTRICAL ONE LINE DRAWING
SH-5 ELECTRICAL PANEL SCHEDULE
SH-6 GENERATOR SHELTER EXTERIOR ELEVATIONS
SH-7 GENERATOR INTERIOR ELEVATIONS
SCALE: NTS SCALE: NTS
PROJECT LOCATION
PROJECT LOCATION
FOREST ACCESS ROAD
APPLICANT:
MARION COUNTY PUBLIC WORKS
5155 SILVERTON RD NE
SALEM, OR 97305
CONTACT:
BRIAN NICHOLAS
(503) 588-7943 bnicholas@co.marion.or.us
PROJECT MANAGER:
PATRICK HOOVER
(971) 295-0152 phoover@rtspnw.com
CONSTRUCTION
MANAGER:
PATRICK HOOVER
(971) 295-0152 phoover@rtspnw.com
ZONING CONTACT:
CUSHING CIVIL ENGINEERS
12725 SW MILLIKAN WAY, STE 300
BEAVERTON, OR 97005
CONTACT:
ROB HOWE
(503) 387-5331 rob@cushingcivilengineers.com
ENGINEER OF RECORD:
CUSHING CIVIL ENGINEERS
12725 SW MILLIKAN WAY, STE 300
BEAVERTON, OR 97005
CONTACT:
KENNY MCMANAWAY
(503) 387-5331 kenny@cushingcivilengineers.com
SURVEYOR:
ORION GEOMATICS
1724 23RD AVE
FOREST GROVE, OR 97116
CONTACT:
JOHN PUTNAM
(503) 359-1688 jputnam@oriongeomatics.com
JURISDICTION:
MARION COUNTY
COUNTY:
MARION
ZONING:
TC (TIMBER CONSERVATION)
PARCEL NUMBER(S) & AREA:
ACCOUNT #: 111272
TAXLOT #: 083E000000200
579,550,989.6 SQ FEET±
13304.66 ACRES±
GENERAL INFORMATION:
1. TRAFFIC IS UNAFFECTED
2. SIGNAGE AT SITE IS PROPOSED
3. SITE IS UNMANNED AND HANDICAP ACCESS IS NOT REQUIRED
CODE INFORMATION:
1. IBC-2018 INTERNATIONAL BUILDING CODE
2. NEC-2017 NATIONAL ELECTRIC CODE
3. 2019 OREGON STRUCTURAL SPECIALTY CODE
4. 2017 NFPA 58 CODE
5. OCCUPANCY GROUP: U
6. CONSTRUCTION TYPE: II-B
TOWER OWNER:
MARION COUNTY PUBLIC WORKS
5155 SILVERTON RD NE
SALEM, OR 97305
CONTACT:
BRIAN NICHOLAS
(503) 588-7943 bnicholas@co.marion.or.us
GEOTECH:
BLACK MOUNTAIN CONSULTING LLC
22566 SW WASHINGTON STE #206
SHERWOOD, OR 97140
CONTACT:
TAMMY STEMPEL
(503) 625-2517 tammys@blkmountain.com
NEPA FCC:
REPORT BY BLACK MOUNTAIN
DATED 04/03/2025
KamalThapa Snapshot
RobHowe Text Box
REVISION 1, 10/15/2025
WELL
YOGI ANTENNA TOP
4026.5
LATTICE TOWER TOP
4013.6
CONTINUOUSLY
OPERATING
REFERENCE STATION
(CORS)
'P384'
CORS SOLAR / UTILITY
CABINET
SEISMIC WARNING
SYSTEM SOLAR /
UTILITY RACK
ICE BRIDGE
STEEL GENERATOR
SHED
10'X8'
MODULAR
COMMUNICATIONS
BUILDING
SHIPPING
CONTAINER
.2
20.2'
.2
20.2'
8.
0'
12.4'
7.
9'
12.4'
8'X8'
MODULAR
COMMUNICATIONS
BUILDING
EXISTING 60.6' LATTICE TOWER
LATITUDE: N 44° 50' 28.174"
LONGITUDE: W 122° 28' 58.741"
FOUNDATION ELEVATION: 3953.0
3,939
3,940
3,945
3,950
3,950
3,945
3,940
3,936
GRAVEL
GRAVEL
GRAVEL
GRAVEL
TOP OF CLIFF
1000 GAL PROPANE TANK (TYP)
STA: 100
DESC: CNTL SET 1/2"IR
W/OPC "ORION CNTL"
N: 185,635.37 E: 319,900.02
Z: 3,942.54
STA: 101
DESC: CNTL FOUND 1-1/8"BP
'MARION CO'
N: 185,747.72 E: 319,780.30 Z: 3,951.49
STA: 500
DESC: FOUND 5/8" IR W/ 2"
ALC 'MARION COUNTY
SURVEYOR LAESE AREA'
N: 185,681.02 E: 319,678.17
Z: 3,941.48
FOUND 5/8" IR W/ 2" ALC
'MARION COUNTY
SURVEYOR LAESE AREA'
FOUND 2-1/2" BR DISK
OTHER 'MARION COUNTY
SURVEYOR LAESE AREA'
FOUND 2-1/2" BR DISK
OTHER 'MARION COUNTY
SURVEYOR LAESE AREA'
FOUND 2-1/2" BR DISK
OTHER 'MARION COUNTY
SURVEYOR LAESE AREA'
CONCRETE FOOTING
(FORMER LOOKOUT
TOWER )
W
S
N
E
EXPOSED CONDUIT
EX 9:
~ LOCATION 30'X30' LEASE
11X17 SCALE: 1" = 40' 22X34 SCALE: 1" = 20'SECTION 30, T08S, R03E, W.M 1
EXISTING
CONDITIONS
V-1
SHEET NUMBER:
SHEET TITLE:
LICENSURE:
DRAWING INFORMATION:
THIS DRAWING IS COPYRIGHTED AND IS THE SOLE
PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY
FOR USE BY THE OWNER AND ITS AFFILIATES.
REPRODUCTION OR USE OF THIS DRAWING AND/OR
THE INFORMATION CONTAINED IN IT IS FORBIDDEN
WITHOUT THE WRITTEN PERMISSION OF THE OWNER.
PLANS PREPARED BY:
PROJECT INFORMATION:
MARION COUNTY
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF
DRAKES CROSSING, OR
12725 SW MILLIKAN WAY
SUITE 300
BEAVERTON, OR 97005
(503) 387-5331 www.cushing-engr.com
Cushing Civil Engineers
Civil Engineers orion
GEOMATICS
Because the world is a spatial place
TM
1724 23rd Avenue | Forest Grove OR 97116 T: 503.359.1688 | www.oriongeomatics.com
DATE RELEASE
12/12/2024 INITIAL SURVEY RELEASE0
UTILITY STATEMENT:
THE UNDERGROUND UTILITIES SHOWN ARE BASED ON SURVEYED UTILITY LOCATE
MARKINGS AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEE THAT
THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA,
EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT
THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED
ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS
POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY
LOCATED THE UNDERGROUND UTILITIES.
X
SD
SS
W
G
P
FO
CTV
O/H
LEGEND:
CENTERLINE OF ROAD
RIGHT-OF-WAY LINE
SECTION LINE
BOUNDARY LINE
PROPERTY / LOT LINE
EASEMENT LINE
CURB
EDGE OF CONCRETE
EDGE OF PAVEMENT
EDGE OF GRAVEL
STRIPING
CHAIN LINK FENCE
WOOD / METAL FENCE
WIRE FENCE
CANOPY
RAMP
CONCRETE
OVERHEAD UTILITIES
BURIED CABLE TV
BURIED FIBER OPTIC
BURIED POWER
GAS LINE
WATER LINE
SANITARY SEWER
STORM DRAIN
O/P
O/C OVERHEAD COMS LINE
OVERHEAD POWER
C BURIED COMS LINE
NATURAL GAS VAULT
NATURAL GAS VALVE
NATURAL GAS RISER
NATURAL GAS METER
IRRIGATION VALVE
WATER VALVE
WATER METER
FIRE AUTO
CONNECTION
FIRE HYDRANT
MANHOLE (UNK /
OTHER TYPE)
STORM INLET
DRY WELL
STORM MANHOLE
CLEAN OUT
SANITARY LIFT STATION
SANITARY VAULT
SANITARY MANHOLE
SS
STORM INLET (ROUND)
CB
SD
STORM INLET LID
STORM VAULT
CO
HANDHOLE (UNK /
OTHER TYPE)
RISER (UNK / OTHER
TYPE)
VAULT (UNK / OTHER
TYPE)
FW
FW
FW
FIRE RISER
FIRE VALVE
FIRE VAULT
IRR
IRR
IRRIGATION RISER
IRRIGATION VAULT
W
W
W
WATER MANHOLE
WATER RISER
WATER VAULT
G
G
SET MONUMENT AS
NOTED
FOUND MONUMENT AS
NOTED
POLE
UTILITY POLE W/DROP
GUY ANCHOR
TRANSFORMER
POWER METER
POWER RISER
POWER VAULT
LUMINAIRE / STREET
LIGHT
TRAFFIC SIGNAL
SIGNAL CONTROL BOX
CONIFER TREE
DECIDUOUS TREE
SHRUB
PHOTO CONTROL
SET CONTROL AS NOTED
FOUND CONTROL AS
NOTED
BENCH MARKSIGN
MAIL BOX
BOLLARD
RR CROSSING GATE
RR CROSSING SIGNAL
(NO GATE)
TEST BORE
MONITOR WELL
A
BRS
IP
IR
ALC
YPC
A/C ASPHALTIC CONCRETE
YELLOW PLASTIC CAP
ALUMINIUM CAP
IRON ROD
IRON PIPE
BRASS
AS-BUILT INFORMATION
RPC RED PLASTIC CAP
OPC ORANGE PLASTIC CAP
ENCROACHMENT
UKN UNKNOWN
P
P
P
P
P
POWER HANDHOLE
POWER MANHOLE
C
CTV
FO
C
C
C
COMS HANDHOLE
COMS COMMUNICATIONS
COMS RISER
COMS VAULT
COMS MANHOLE
FO
FO
T
T
T
T
CTV
CTV
TELCO HANDHOLE
TELCO RISER
TELCO VAULT
TELCO MANHOLE
FIBER HANDHOLE
FIBER RISER
FIBER VAULT
CABLE TV HANDHOLE
CABLE TV RISER
CABLE TV VAULT
F
FUEL FILLER
FUEL MANHOLE
SIG
SIG
PEDESTRIAN SIGNAL
SIGNAL VAULT
SIGNAL HANDHOLE
YARD LIGHT
TOWER
RR
RR
RR RR VAULT
RR HANDHOLE
RR RISER
RR SWITCH THROW
RR SIGNAL
VENT
PALM TREE
FOUND MONUMENT AS
NOTED (ALTERNATE)
SET MONUMENT AS
NOTED (ALTERNATE)
FOUND SECTION
CORNER AS NOTED
FOUND QUARTER
CONER AS NOTED
SET SECTION CORNER
AS NOTED
SET QUARTER CONER
AS NOTED
TEST PIT
TB
TP
HIGH OCCUPANCY
VEHICLE
HANDICAP PARKING
BIKE LANE
RAILROAD CROSSING
HFL HELD FOR LINE
SFNF SEARCHED FOR NOT
FOUND
BP COPPER PLUG
IRR IRRIGATION LINE
SG BURIED SIGNAL
ASPHALTIC CONCRETE
NARRATIVE:
THE PURPOSE OF THIS SURVEY IS TO PREPARE A PRE-DESIGN BASE MAP FOR FUTURE
EXPANSION OF MARION COUNTY'S COMMUNICATION SITE 'HOUSE MOUNTAIN,.
JOHN D PUTNAM PERFORMED THE FIELD SURVEY ON OCTOBER 1ST, 2024. TERRESTRIAL
MEASUREMENTS WERE MADE UTILIZING A LEICA MS60 1 SECOND ROBOTIC TOTAL STATION. GNSS
OBSERVATIONS WERE MADE UTILIZING A LEICA GS16 RECEIVER.
BEARINGS ARE BASED ON THE NAD 1983(2011) [EPOCH 2010] OREGON
COORDINATE REFERENCE SYSTEM, SALEM ZONE AS DETERMINED BY GNSS
OBSERVATION TO THE OREGON REAL-TIME GNSS NETWORK.
THE LEASE AREA WAS ESTABLISHED BY HOLDING FOUND MONUMENTS '500' -
'504'.
ALL MEASUREMENTS SHOWN MATCH RECORD UNLESS OTHERWISE NOTED.
FALLINGS SHOWN ARE FROM THE TRUE POINT.
NOTES:
1. FIELD SURVEY AND MAPPING PERFORMED ON OCTOBER 1ST, 2024 BY J. PUTNAM UTILIZING
A LEICA MS60 ROBOTIC TOTAL STATION AND LEICA GS18 GNSS RECEIVERS.
2. UNITS ARE STATED IN INTERNATIONAL FEET.
3. BEARINGS ARE BASED ON THE NAD 1983(2011) [EPOCH 2010] ORGON COORDINATE
PREFERENCE SYSTEM, SALEM ZONE AS DETERMINED BY GNSS OBSERVATION TO THE
OREGON REAL-TIME GNSS NETWORK .
4. ELEVATIONS ARE BASED NAVD 1988 AS ESTABLISHED BY GNSS OBSERVATION TO THE
OREGON REAL-TIME GNSS NETWORK.
5. ALL DISTANCES ARE GRID BASED ON THE LOW DISTORTION ZONE.
6. TRUE GEODETIC AZIMUTH = GRID AZIMUTH (BEARING BASIS) + MAPPING ANGLE. THE
MAPPING ANGLE IS 00°25'24" AT CONTROL STATION 101. THE MAGNETIC DECLINATION FROM
TRUE GEODETIC AZIMUTH IS 14°33 EAST.
7. THE TERM "CERTIFY" (OR ITS DERIVATIVES) SHALL MEAN A STATEMENT SIGNED AND/OR
SEALED BY A SURVEYOR REPRESENTING THAT THE SURVEYOR'S KNOWLEDGE,
INFORMATION AND BELIEF, IN ACCORDANCE WITH COMMONLY ACCEPTED PROCEDURES
CONSISTENT WITH APPLICABLE STANDARDS OF PRACTICE, AND IS NOT A GUARANTY OR
WARRANTY, EITHER EXPRESSED OR IMPLIED.
8. THIS SURVEY SHOWS ONLY THOSE DEDICATIONS AND EASEMENTS CONTAINED IN THE
SUPPLIED TITLE SEARCH. IT IS POSSIBLE THAT OTHER RECORDED OR UNRECORDED
INSTRUMENTS EFFECTING THIS PROPERTY MAY EXIST.
9. ORION GEOMATICS MAKES NO WARRANTIES AS TO MATTERS OF UNWRITTEN TITLE SUCH AS
ADVERSE POSSESSION, ACQUIESCENCE, ESTOPPLE, ETC.
10. ALL STATEMENTS WITHIN THE CERTIFICATION, AND OTHER REFERENCES LOCATED
ELSEWHERE HEREON, RELATED TO: UTILITIES, IMPROVEMENTS, STRUCTURES, BUILDINGS,
PARTY WALLS, EASEMENTS, SERVITUDES, AND ENCROACHMENTS; ARE BASED SOLELY ON
ABOVE GROUND, VISIBLE EVIDENCE, UNLESS ANOTHER SOURCE OF INFORMATION IS
SPECIFICALLY REFERENCED HEREON.
11. NO UTILITIES WERE MARKED PRIOR TO SURVEY. [TABLE 'A' ITEM 11]
REFERENCES:
-RECORDS OF SURVEY:
R1) SN 2607
R2) SN 30641
R3) SN 31487
R4) SN 38516
SURVEY RELATED SPECIAL EXCEPTIONS (SCHEDULE
B):
AMERITITLE STATUS OF RECORD TITLE NO. 658004AM DATED NOVEMBER 19,
1 - 4. NOT SURVEY RELATED
5. RIGHT-OF-WAY PERMIT, INCLUDING THE TERMS AND PROVISIONS THEREOF,
GRANTED TO: PORTLAND GENERAL ELECTRIC COMPANY
RECORDED: FEBRUARY 8, 1936
INSTRUMENT NO.: VOLUME: 225 PAGE: 48
SURVEYOR'S NOTE: EXCEPTION IS IS A BLANKET IN NATURE.
6. RIGHT OF WAY PERMIT, INCLUDING THE TERMS AND PROVISIONS THEREOF,
RECORDED: JULY 29, 1940
INSTRUMENT NO.: VOLUME: 249 PAGE: 691
SURVEYOR'S NOTE: EXCEPTION IS IS A BLANKET IN NATURE.
7 & 8. NOT SURVEY RELATED.
9. AN UNRECORDED LEASE WITH CERTAIN TERMS, COVENANTS, CONDITIONS AND
PROVISIONS SET FORTH THEREIN AND SUCH OTHER EXCEPTIONS AS MAY APPEAR
NECESSARY UPON RECORDING THEREOF,
LESSOR: LONGVIEW FIBRE COMPANY
LESSEE: US WEST NEWVECTOR GROUP, INC., A COLORADO CORPORATION, AS
SUCCESSOR-IN-INTEREST TO GTE MOBILNET OF NORTHWEST OREGON LIMITED
PARTNERSHIP
DISCLOSED BY: MEMORANDUM OF LEASE AGREEMENT DATE: JULY 2, 1997
RECORDED: NOVEMBER 5, 1997
INSTRUMENT NO.: REEL: 1438 PAGE: 516
SURVEYOR'S NOTE: THERE WAS NO OBSERVED EVIDENCE OF THIS EXCEPTION AT THE TIME
OF THE FIELDWORK. LEASE WAS SET TO EXPIRE ON MARCH 31, 2002. THE DOCUMENT
CONTAINS ONLY A SITE SKETCH. APPROXIMATE LOCATION PLOTTED HEREON.
10 - 12.NOT SURVEY RELATED.
Feet 1:120
20100 5 jdpor Stamp
DEMOLITION PLAN
EX-1
SHEET NUMBER:
SHEET TITLE:
LICENSURE:
DRAWING INFORMATION:
THIS DRAWING IS COPYRIGHTED AND IS THE SOLE
PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY
FOR USE BY THE OWNER AND ITS AFFILIATES.
REPRODUCTION OR USE OF THIS DRAWING AND/OR
THE INFORMATION CONTAINED IN IT IS FORBIDDEN
WITHOUT THE WRITTEN PERMISSION OF THE OWNER.
PLANS PREPARED BY:
DATE RELEASE
07-26-24 SITE SKETCH
02-12-25 PRELIMINARY ZONING DRAWINGS
05-22-25
PRELIMINARY CONSTRUCTION DRAWINGS
09-23-25 FINAL CONSTRUCTION DRAWINGS
09-30-25 REV. FCD FOR PROPANE TANK UPDATE
10-15-25
REV. FCD FOR SITE CONFIGURATION
PROJECT INFORMATION:
12725 SW MILLIKAN WAY
SUITE 300
BEAVERTON, OR 97005
(503) 387-5331 www.cushingcivilengineers.com
Cushing
Civil Engineers
Civil Engineers
MARION COUNTY
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF
DRAKES CROSSING, OR
11X17 SCALE: 1" = 10' 22X34 SCALE: 1" = 5' 1 DEMOLITION PLAN
(EX) EQUIPMENT SHELTER
(CONTAINER) TO BE REMOVED
(EX) EQUIPMENT SHELTER
TO BE REMOVED
(EX) GENERATOR SHELTER &
GENERATORS TO BE REMOVED
(EX) FOUNDATION TO BE REMOVED
(EX) FOUNDATION TO BE REMOVED
(EX) EQUIPMENT SHELTER
TO BE REMOVED
(EX) ICE BRIDGE TO BE REMOVED
(EX) CONCRETE TO BE REMOVED
(EX) CONCRETE
TO BE REMOVED
(EX) CONCRETE
TO BE REMOVED
(EX) CONCRETE BARRIER
TO BE REMOVED, TYP
(EX) PROPANE TANK TO
BE REMOVED, TYP OF (2)
(EX) ICE CANOPY
TO BE REMOVED
NOTE:
THIS IS NOT A SURVEY; ALL EXISTING INFORMATION
IS PROVIDED BY GIS, SURVEY & SITE WALK NOTES.
(EX) GAS VALVE TO BE REMOVED
(EX) EXPOSED CONDUIT
TO BE REMOVED
(EX) 60.6' SELF-SUPPORTED TOWER TO REMAIN IN
USE DURING WORK IN PROGRESS; TO BE REMOVED
PER MARION COUNTY DIRECTION(EX) PROPANE TANK TO BE
RELOCATED TO COMPLY W/
NFPA 58 CODE, TYP OF (4);
SEE SHEET C-2 FOR SITE PLAN
KamalThapa Snapshot
RobHowe
CENTER LINE
PROPERTY LINE
NUMBER
OTHERWISE
WATERPROOF
VERIFY IN FIELD
WITHOUT
WINDOW
VINYL TILE
VERTICAL
UNLESS NOTED
TOP OF MASONRY
TOP OF CONCRETE
SHEET VINYL
TYPICAL
THROUGH
SUSPENDED
STRUCTURAL
STAINLESS STEEL
SPECIFICATION
ROUGH OPENING
SQUARE
SIMILAR
REQUIRED
W/O
GA
GC
GALV
FT
FLR
FLUOR
FIN
EXT
EX
GAUGE
GENERAL CONTRACTOR
GALVANIZE(D)
FLUORESCENT
FOOT
FLOOR
FINISH
EXTERIOR
EXISTING
PRESSURE TREATED
OUTSIDE DIAMETER
PAIRPR
PROP
PROJ
PT
PROPERTY
PROJECT
OPP
OC, o/c
OPG
OD
OPPOSITE
OPENING
ON CENTER
AT
WP
C P L L
AND
ANGLE
GROUNDGRND
AIR CONDITIONINGA/C
REQ'D
CONTINUOUSCONT
DWG
EL, ELEV
E.W.
EQUIP
EQ
ELECT
EA
E
DIAG
DIM
DN
DTL, DETL
DIA, Ø
DBL
DRAWING
ELEVATION
EACH WAY
EQUIPMENT
EQUAL
ELECTRICAL
EACH
EAST
DIAGONAL
DETAIL
DOWN
DIMENSION
DIAMETER
DOUBLE
CONST
CONC
CLR
CLG
BLK
B/S
BMR
BLDG
AWG
ASTM
APPROX
AFF
ADJ
CONSTRUCTION
BUILDING STANDARD
BASE MOBILE RADIO
CONCRETE
CLEAR
CEILING
BLOCK
AMERICAN WIRE GAUGE
TESTING & MATERIALS
AMERICAN SOCIETY FOR
APPROXIMATELY
ABOVE FINISH FLOOR
BUILDING
ADJUSTABLE
T.O.C.
NOT IN CONTRACT
NOT APPLICABLE
MINIMUMMIN
N
NTS
NIC
NA
MISC
NORTH
NOT TO SCALE
MISCELLANEOUS
MET, MTL
MECH
MGR
MFR
LB(S)
MAX
MANAGER
MANUFACTURER
MECHANICAL
METAL
MAXIMUM
POUND(S)
VERT
WIN
W/ W
VT
VIF
WEST
WITH
U.N.O.
T.O.M.
TYP
GYPSUM WALL BOARD
HVAC
IN
INSUL
INT
INFO
I.D.
INCH
INTERIOR
INSULATION
INFORMATION
INSIDE DIA.
HORIZ
HARD'WD
HT
HR
GYP BD
GWB
HORIZONTAL
HARDWOOD
HEIGHT
HOUR
GYPSUM BOARD
SQ
TNND
THRU
SUSP
STRUCT
S.V.
SS
STL
TINNED
STEEL
SPEC
S
SHT
SIM
RM
R.O.
SOUTH
SHEET
ROOM
ANTENNA AMPLIFIERLNA
OVERHEAD POWEROHP
UNDRGRND POWERUGP
OVERHEAD TELCOOHT
UNDRGRND TELCOUGT
HEATING, VENTING AND
AIR CONDITIONING
1. DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS TAKE PRECEDENCE, THIS SET OF
DOCUMENTS IS INTENDED TO BE USED FOR DIAGRAMMATIC PURPOSED ONLY, UNLESS
NOTED OTHERWISE. THE GENERAL CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE
FURNISHING ALL MATERIALS, EQUIPMENT, LABOR AND ANY REQUIREMENTS DEEMED
NECESSARY TO COMPLETE INSTALLATION AS DESCRIBED IN THE DRAWINGS AND OWNER'S
PROJECT MANUAL.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS AND STANDARDIZED DETAILS THAT
REQUIRE MODIFICATIONS DUE TO ACTUAL FIELD CONDITIONS AND REQUIREMENTS MUST BE
SUBMITTED TO AND APPROVED BY OWNERS REPRESENTATIVE PRIOR TO START OF WORK.
3. PRIOR TO THE SUBMISSION OF BIDS, CONTRACTORS INVOLVED SHALL VISIT THE JOB SITE TO
FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE PROPOSED PROJECT.
CONTRACTORS SHALL VISIT THE CONSTRUCTION SITE WITH THE CONSTRUCTION/CONTRACT
DOCUMENTS TO VERIFY FIELD CONDITIONS AND CONFIRM THAT THE PROJECT WILL BE
ACCOMPLISHED AS SHOWN. PRIOR TO PROCEEDING WITH CONSTRUCTION, ANY ERRORS,
OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT/ENGINEER VERBALLY AND IN WRITING.
4. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO PROCEED WITH
CONSTRUCTION PRIOR TO STARTING WORK ON ANY ITEM NOT CLEARLY DEFINED BY THE
CONSTRUCTION DRAWINGS/CONTRACT DOCUMENTS.
5. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED IN THE
CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, SAFETY, AND PROCEDURES
FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT.
6. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS ACCORDING TO
MANUFACTURER'S/VENDOR'S SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE
LOCAL CODES OR ORDINANCES TAKE PRECEDENCE.
7. ALL WORK PERFORMED ON THE PROJECT AND MATERIALS INSTALLED SHALL BE IN STRICT
ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND ORDINANCES.
CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES,
REGULATIONS AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY, MUNICIPAL AND UTILITY
COMPANY SPECIFICATIONS, AND LOCAL AND STATE JURISDICTIONAL CODES BEARING ON THE
PERFORMANCE OF THE WORK.
8. THE CONTRACTOR SHALL PROVIDE, AT THE PROJECT SITE, A FULL SET OF CONSTRUCTION
DOCUMENTS UPDATED WITH THE LATEST REVISIONS INVOLVED WITH THE PROJECT. THIS
SET IS A VALID CONTRACT DOCUMENT ONLY IF THE TITLE SHEET IS STAMPED IN RED INK "FOR
CONSTRUCTION" AND EACH SUCCESSIVE SHEET BEARS THE ARCHITECT'S/ENGINEER'S
SIGNED WET STAMP.
9. THE CONTRACTOR IS RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL WORK
DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE, ETC. ACCORDING TO
APPLICABLE CODES, STANDARDS, AND GOOD CONSTRUCTION PRACTICES. THE
STRUCTURAL COMPONENTS OF ADJACENT CONSTRUCTION OR FACILITIES ARE NOT TO BE
ALTERED BY THE CONSTRUCTION PROJECT UNLESS NOTED OTHERWISE.
10. THE CONTRACTOR SHALL MEET ALL OSHA REQUIREMENTS FOR ALL INSTALLATIONS.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES TO THE EXISTING
CONSTRUCTION AND REPAIR ALL DAMAGES TO EQUAL OR BETTER NEW CONSTRUCTION. THE
CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER OF ANY DAMAGE TO THE BUILDING
SITE OR ANY ADJACENT STRUCTURES AROUND THE PROJECT. THE OWNERS
REPRESENTATIVE SHALL BE SOLE AND FINAL JUDGE AS TO THE QUALITY OF THE REPAIRED
CONSTRUCTION. ANY ADDITIONAL MODIFICATIONS WHICH MUST BE MADE SHALL BE MADE AT
THE CONTRACTOR'S EXPENSE.
12. WHERE NEW PAVING, CONCRETE SIDEWALKS OR PATHS MEET EXISTING CONSTRUCTION, THE
CONTRACTOR SHALL MATCH THE EXISTING PITCH, GRADE, AND ELEVATION SO THE ENTIRE
STRUCTURE SHALL HAVE A SMOOTH TRANSITION.
13. THE CONTRACTOR SHALL MODIFY THE EXISTING FLOORS, WALL, CEILING, OR OTHER
CONSTRUCTION AS REQUIRED TO GAIN ACCESS TO AREAS FOR ALL MECHANICAL, PLUMBING,
ELECTRICAL, OR STRUCTURAL MODIFICATIONS. WHERE THE EXISTING CONSTRUCTION
DOORS, PARTITIONS, CEILING, ETC., ARE TO BE REMOVED, MODIFIED, OR REARRANGED OR
WHERE THE EXPOSED OR HIDDEN MECHANICAL, ELECTRICAL, SYSTEMS ARE ADDED OR
MODIFIED, THE GENERAL CONTRACTOR SHALL REPAIR, PATCH AND MATCH ALL EXISTING
CONSTRUCTION AND FINISHES OF ALL FLOORS WALLS AND CEILINGS. WHERE CONCRETE
MASONRY CONSTRUCTION IS MODIFIED, THE CONTRACTOR SHALL TOOTH IN ALL NEW
CONSTRUCTION TO MATCH THE EXISTING BOND. WHERE CONCRETE CONSTRUCTION IS
MODIFIED, THE CONTRACTOR SHALL VERIFY THE EXACT DETAILS TO BE USED FOR
CONSTRUCTION. ALL WORK SHALL BE COVERED UNDER THE GENERAL CONTRACT.
14. IF CONTRACTOR OR SUBCONTRACTOR FIND IT NECESSARY TO DEVIATE FROM ORIGINAL
APPROVED PLANS, THEN IT IS THE CONTRACTOR'S AND THE SUBCONTRACTOR'S
RESPONSIBILITY TO PROVIDE THE PROJECT MANAGER WITH 4 COPIES OF THE PROPOSED
CHANGES FOR HIS APPROVAL BEFORE PROCEEDING WITH THE WORK. IN ADDITION THE
CONTRACTOR AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR PROCURING ALL
NECESSARY APPROVALS FROM THE BUILDING AUTHORITIES FOR THE PROPOSED CHANGES
BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR AND SUBCONTRACTORS SHALL
BE RESPONSIBLE FOR PROCURING ALL NECESSARY INSPECTIONS AND APPROVALS FROM
BUILDING AUTHORITIES DURING THE EXECUTION OF THE WORK.
15. CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS
THAN 2-A OR 2-A10BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF PROJECT
AREA DURING CONSTRUCTION.
16. THIS IS AN ESSENTIAL FACILITY THEREFORE SHALL STRICTLY MEET ALL APPLICABLE CODE
AND JURISDICTIONAL REQUIREMENTS.
1. RUBBISH, STUMPS, DEBRIS, STICKS, STONES AND OTHER REFUSE SHALL BE REMOVED
FROM THE SITE AND DISPOSED OF LEGALLY UNLESS OTHERWISE REQUIRED TO BE LEFT AS
DEFINED BY LAND/PROPERTY OWNER.
2. THE SITE SHALL BE GRADED TO CAUSE SURFACE WATER TO FLOW AWAY FROM THE
EQUIPMENT, EQUIPMENT SHELTER, GENERATOR, FUEL TANK, TOWER AREAS, AND
ADJACENT BUILDINGS, ETC.
3. NO FILL OR EMBANKMENT MATERIAL SHALL BE PLACED ON FROZEN GROUND. FROZEN
MATERIALS, SNOW OR ICE SHALL NOT BE PLACED IN ANY FILL OR EMBANKMENT.
4. THE SUBGRADE SHALL BE COMPACTED AND BROUGHT TO A SMOOTH UNIFORM GRADE
PRIOR TO THE CRUSHED STONE APPLICATION. FABRIC USE AS REQUIRED.
5. ALL APPLICABLE LOCATES SHALL BE PERFORMED PRIOR TO TO ANY EXCAVATION OR SITE
GRADING. ALL EXISTING ACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES
WHERE ENCOUNTERED IN THE WORK, SHALL BE PROTECTED AT ALL TIMES, AND WHERE
REQUIRED FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS
DIRECTED BY ENGINEERS. EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR
WHEN EXCAVATING OR PIER DRILLING AROUND OR NEAR UTILITIES. CONTRACTOR SHALL
PROVIDE SAFETY TRAINING FOR THE WORKING CREW.
6. ALL EXISTING INACTIVE SEWER, WATER, GAS, ELECTRIC AND OTHER UTILITIES, WHICH
INTERFERE WITH THE EXECUTION OF THE WORK, SHALL BE REMOVED AND SHALL BE
CAPPED, PLUGGED OR OTHERWISE DISCONTINUED AT POINTS WHICH WILL NOT INTERFERE
WITH THE EXECUTION OF THE WORK, SUBJECT TO THE APPROVAL OF ENGINEERING.
7. THE AREAS OF THE PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE
BUILDING, DRIVEWAY OR CRUSHED STONE, SHALL BE GRADED TO A UNIFORM SLOPE,
FERTILIZED, SEEDED, AND COVERED WITH MULCH AS SPECIFIED IN THE SPECIFICATION
LANDSCAPE WORK..
8. BEDDING MATERIAL FOR UTILITY LINES, CULVERTS AND PIPING: CLEAN SAND, MEDIUM TP
COARSE, SUB ROUNDED NATURAL RIVER OR BANK SAND, WASHED, FREE OF SILT OR CLAY,
LOAM, FRIABLE OR SOLUBLE MATERIALS, AND ORGANIC MATTER; GRADED IN
ACCORDANCE WITH THE FOLLOWING GRAIN SIZE DISTRIBUTION:
9. BMP'S FOR TEMPORARY EROSION/SEDIMENTATION CONTROL SHALL BE IMPLEMENTED PER
LOCAL, CITY OR COUNTY GUIDELINES AND PER PLAN IF APPLICABLE.
1. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH THE ACI 301, ACI 318 AND THE
SPECIFICATION CAST-IN-PLACE CONCRETE.
2. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI AT 28 DAYS
(UNO).
3. REINFORCING STEEL SHALL CONFORM TO ASTM A 615, GRADE 60, DEFORMED UNLESS NOTED
OTHERWISE. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A 185 WELDED STEEL WIRE
FABRIC UNLESS NOTED OTHERWISE. SPLICES CLASS "B" AND ALL HOOKS SHALL BE
STANDARD (UNO).
4. THE FOLLOWING MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCING STEEL
UNLESS SHOWN OTHERWISE ON DRAWINGS: CONCRETE CAST AGAINST EARTH - 3 IN.
CONCRETE EXPOSED TO EARTH OR WEATHER:
#6 AND LARGER ..........................2 IN.
#5 AND SMALLER & WWF ...........1-1/2 IN.
5. A 1/2" TROWELED RADIUS SHALL BE PROVIDED AT ALL EXPOSED EDGES OF CONCRETE (UNO).
HOLES TO RECEIVE EXPANSION/WEDGE ANCHORS SHALL BE 1/8" LARGER IN DIAMETER THAN
THE ANCHOR BOLT, DOWEL OR ROD AND SHALL CONFORM TO MFR RECOMMENDATION FOR
EMBEDMENT DEPTH OR AS SHOWN ON THE DRAWINGS. AVOID CUTTING EXISTING REBAR
WHEN DRILLING HOLES IN THE ELEVATED SLAB.
6. INSTALLATION OF CONCRETE EXPANSION AND WEDGE ANCHOR, SHALL BE PER
MANUFACTURER'S WRITTEN RECOMMENDED PROCEDURES.
7. FLOAT SURFACE SHALL BE A SMOOTH FINISH. SURFACE SHALL BE FREE OF ALL OBVIOUS
DEPRESSIONS. SURFACE SHALL BE SLOPED AT 2% TO PROMOTE DRAINAGE AWAY FROM
EQUIPMENT.
17. THE CONTRACTOR SHALL PERFORM WORK DURING SITE/PROPERTY OWNER'S PREFERRED
HOURS TO AVOID DISTURBING NORMAL BUSINESS.
18. SEAL ALL PENETRATIONS THROUGH FIRE-RATED AREAS WITH U.L. LISTED OR FIRE MARSHAL
APPROVED MATERIALS AS APPLICABLE TO THIS FACILITY AND OR PROJECT SITE.
19. CONTRACTOR SHALL BE RESPONSIBLE FOR UTILITY LOCATES, SCHEDULING, COORDINATING
SPECIAL AND BUILDING DEPARTMENT INSPECTIONS.
21. ROUTING OF ALL CONDUITS, CABLES, CABLE TRAYS ETC ARE INDICATED AS PROPOSED
LOCATION ONLY. CONFIRM THE EXACT LOCATION AND ROUTING WITH THE ON SITE PROJECT
MANAGER PRIOR TO STARTING WORK.
AGL ABOVE GRADE LEVEL
GENERAL NOTES CONTINUED:
CONCRETE NOTES:
GENERAL NOTES:
SITE WORK NOTES:
60-90
0-45 0-25 0-2
0-2NO. 200 MESH
NO. 100 MESH
NO. 16 MESH
NO. 8 MESH
NO. 4 MESH
PERCENT PASSINGSIEVE SIZE
SYMBOLS LEGEND
ABBREVIATIONS LEGEND
GENERAL
NOTES
G-1
SHEET NUMBER:
SHEET TITLE:
C-4
REVISION
KEY NOTE DETAIL
REFERENCE ELEVATION
SECTION REFERENCE
ELEVATION DATUM POINT
A C-3
GA
GC
GALV
FT
FLR
FIN
EXT
DWG
E.W.
EQ
EA
E
DIAG
DIM
DN
DBL
CLR
CLG
BLK
B/S
BMR
BLDG
AWG
LB(S)
MAX
IN
INT
INFO
I.D.
HT
HR
GWB
LNA
SYMBOLS LEGEND
10. ALL SITE DESIGN AND CONSTRUCTION MUST COMPLY WITH INDUSTRY STANDARDS AND BE
ALIGNED WITH BMP GUIDELINES AS TECHNICALLY APPLICABLE. EACH SITE MUST BE PM
APPROVED BEFORE IT SHALL BE CONSIDERED COMPLETE AND ACCEPTED.
11. IF INADVERTENT DISCOVERIES OF NATIVE AMERICAN CULTURAL MATERIALS OR HUMAN
REMAINS ARE MADE DURING CONSTRUCTION, ALL WORK SHOULD CEASE AND POTENTIALLY
AFFECTED TRIBES, AS WELL AS THE STATE HISTORIC PRESERVATION OFFICE, SHOULD BE
NOTIFIED IMMEDIATELY.
1. ALL ANTENNAS, LINES AND RELATED INSTALLATION HARDWARE TO BE PROVIDED BY THE
LAND MOBILE COMMUNICATIONS PROVIDER.
2. ALL HARDWARE (NUTS AND BOLTS) BE TIGHTENED AND TORQUED IN ACCORDANCE WITH
THE TOWER MANUFACTURER'S AND STRUCTURAL ENGINEER'S SPECIFICATIONS.
3. VERIFICATION THAT THE TOWER/POLE CAN SUPPORT THE PROPOSED ANTENNA LOADING
IS TO BE DONE BY OTHERS.
4. PROVIDE SUPPORTS FOR THE ANTENNA COAX CABLES TO THE ELEVATION OF ALL INITIAL
AND FUTURE ANTENNAS. ANTENNA COAX CABLES ARE TO BE SUPPORTED AND
RESTRAINED AT THE CENTERS SUITABLE TO THE MANUFACTURER'S REQUIREMENTS.
SITE WORK NOTES CONTINUED:
TOWER/POLE NOTES:
LICENSURE:
DRAWING INFORMATION:
THIS DRAWING IS COPYRIGHTED AND IS THE SOLE
PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY
FOR USE BY THE OWNER AND ITS AFFILIATES.
REPRODUCTION OR USE OF THIS DRAWING AND/OR
THE INFORMATION CONTAINED IN IT IS FORBIDDEN
WITHOUT THE WRITTEN PERMISSION OF THE OWNER.
PLANS PREPARED BY:
DATE RELEASE
07-26-24 SITE SKETCH
02-12-25 PRELIMINARY ZONING DRAWINGS
05-22-25
PRELIMINARY CONSTRUCTION DRAWINGS
09-23-25 FINAL CONSTRUCTION DRAWINGS
09-30-25 REV. FCD FOR PROPANE TANK UPDATE
10-15-25
REV. FCD FOR SITE CONFIGURATION
PROJECT INFORMATION:
12725 SW MILLIKAN WAY
SUITE 300
BEAVERTON, OR 97005
(503) 387-5331 www.cushingcivilengineers.com
Cushing
Civil Engineers
Civil Engineers
MARION COUNTY
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF
DRAKES CROSSING, OR
P PROPOSED
WATER
CENTERLINE
COAX
POWER/TELCO
TELCO
COAX COAX
EASEMENT
PROPERTY LINE
GAS
UNDERGROUND POWER
CEDAR FENCE
CHAINLINK FENCE
W W
OVERHEAD POWER
G G G G G G
OHP OHP OHP OHP OHP
LPG LPG LPG LPG
PROPANE
SUBJECT PROPERTY LINE
DESIGN LOADS:
CALL 1-800-332-2344 48 HOURS BEFORE YOU DIG. OREGON LAW REQUIRES YOU TO FOLLOW
OAR 952-001-0010 THRU 952-001-0090. COPIES ARE AVAILABLE AT THE OREGON UTILITY
NOTIFICATION CENTER 503-232-1987
ATTENTION (OREGON SITES ONLY):
ROOF SNOW LOAD DATA - GROUND SNOW LOAD: 407 PSF*
FLAT-ROOF SNOW LOAD: N/A
SNOW EXPOSURE FACTOR: N/A
SNOW LOAD IMPORTANCE FACTOR: N/A
THERMAL FACTOR: N/A
WIND DESIGN DATA - ULTIMATE DESIGN WIND SPEED: 107 MPH*
RISK CATEGORY: II
WIND EXPOSURE: C*
INTERNAL PRESSURE COEFFICIENT: N/A
DESIGN WIND PRESSURES;
WIND LOAD HORIZONTAL (MWFRS):N/A
WIND LOAD (UPLIFT) (MWFRS): N/A
EARTHQUAKE DESIGN DATA - RISK CATEGORY: IV
SEISMIC IMPORTANCE FACTOR: N/A
MAPPED SPECTRAL RESPONSE ACCEL-
ERATION PARAMETERS;
SS 0.71
S1 0.28
SITE CLASS: B/C
DESIGN SPECTRAL RESPONSE ACCEL-
ERATION PARAMETERS;
SDS 0.43
SD1 0.19
SEISMIC DESIGN CATEGORY: D
BASIC SEISMIC FORCE-RESISTING
SYSTEM: N/A
DESIGN BASE SHEAR: N/A
SEISMIC RESPONSE COEFFICIENT: N/A
RESPONSE MODIFICATION COEFFICIENT: N/A
ANALYSIS PROCEDURE USED: N/A
GEOTECHNICAL INFORMATION - ALLOWABLE BEARING CAPACITY: 2,500 PSF
REFER TO GEOTECH REPORT BY BLACK MOUNTAIN DATED SEPTEMBER 19, 2024
*INFORMATION OBTAINED FROM ASCE 7 HAZARD TOOL AND/OR OREGON SNOW LOAD MAP
KamalThapa Snapshot
RobHowe
GRADING & EROSION
CONTROL PLAN
ER-1
SHEET NUMBER:
SHEET TITLE:
LICENSURE:
DRAWING INFORMATION:
THIS DRAWING IS COPYRIGHTED AND IS THE SOLE
PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY
FOR USE BY THE OWNER AND ITS AFFILIATES.
REPRODUCTION OR USE OF THIS DRAWING AND/OR
THE INFORMATION CONTAINED IN IT IS FORBIDDEN
WITHOUT THE WRITTEN PERMISSION OF THE OWNER.
PLANS PREPARED BY:
DATE RELEASE
07-26-24 SITE SKETCH
02-12-25 PRELIMINARY ZONING DRAWINGS
05-22-25
PRELIMINARY CONSTRUCTION DRAWINGS
09-23-25 FINAL CONSTRUCTION DRAWINGS
09-30-25 REV. FCD FOR PROPANE TANK UPDATE
10-15-25
REV. FCD FOR SITE CONFIGURATION
PROJECT INFORMATION:
12725 SW MILLIKAN WAY
SUITE 300
BEAVERTON, OR 97005
(503) 387-5331 www.cushingcivilengineers.com
Cushing Civil Engineers
Civil Engineers
MARION COUNTY
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF
DRAKES CROSSING, OR
11X17 SCALE: 1" = 16' 22X34 SCALE: 1" = 8' GRADING & EROSION CONTROL PLAN 1
EROSION CONTROL NOTES:
1. OWNER OR DESIGNATED PERSON SHALL BE RESPONSIBLE FOR PROPER INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES, IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
2. THE IMPLEMENTATION OF THESE ESC PLANS AND CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED BY THE LOCAL JURISDICTION, AND VEGETATION/LANDSCAPING IS ESTABLISHED. THE DEVELOPER SHALL BE RESPONSIBLE FOR MAINTENANCE AFTER THE PROJECT IS APPROVED UNTIL THE LOTS ARE SOLD.
3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY MARKED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE MARKINGS SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF
CONSTRUCTION.
4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DOES
NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER STANDARDS.
5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS.
DURING CONSTRUCTION PERIODS, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DOES NOT LEAVE THE SITE.
6. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/CONTRACTOR AND MAINTAINED AS NECESSARY
TO ENSURE THEIR CONTINUED FUNCTIONING.
7. AT NO TIME SHALL SEDIMENT BE ALLOWED TO ACCUMULATE MORE THAN 1/3 THE BARRIER HEIGHT. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATIONS SHALL NOT
FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM.
8. STABILIZED GRAVEL ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS
ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
9. STORM DRAIN INLETS, BASINS, AND AREA DRAINS SHALL BE PROTECTED UNTIL PAVEMENT SURFACES ARE
COMPLETED AND/OR VEGETATION IS RE-ESTABLISHED.
10. PAVEMENT SURFACES AND VEGETATION ARE TO BE PLACED AS RAPIDLY AS POSSIBLE.
11. SEEDING SHALL BE PERFORMED NO LATER THAN SEPTEMBER 1 FOR EACH PHASE OF CONSTRUCTION.
12. IF THERE ARE EXPOSED SOILS OR SOILS NOT FULLY ESTABLISHED FROM OCTOBER 1ST THROUGH APRIL 30TH, THE
WET WEATHER EROSION PREVENTION MEASURES WILL BE IN EFFECT. SEE THE EROSION PREVENTION AND
SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (CHAPTER 4) FOR REQUIREMENTS.
13. NO EXPOSED, BARE SOILS SHALL REMAIN UNSTABILIZED FOR MORE THAN TWO DAYS DURING THE PERIOD OCTOBER 1 THROUGH APRIL 30 OR FOR MORE THAN SEVEN DAYS DURING THE PERIOD OF MAY 1 THROUGH SEPTEMBER 30.
ALL DISTURBED SOIL SURFACES SHALL BE STABILIZED BY A SUITABLE APPLICATION OF "BEST MANAGEMENT
PRACTICES".
14. WHERE FEASIBLE, NO MORE THAN 500 FEET OF TRENCH SHALL BE OPEN AT ONE TIME. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHIL SIDE OF TRENCHES PROVIDED IT DOES NOT CONFLICT WITH SAFETY
REQUIREMENTS.
15. THE DEVELOPER SHALL REMOVE ESC MEASURES WHEN VEGETATION IS FULLY ESTABLISHED.
4 GENERAL NOTES SCALE: NTS
2SCALE: NTS
3SCALE: NTS CUT/ FILL QUANTITIES
UNADJUSTED CUT/ FILL QUANTITIES
STRIPPING ORGANICS FOR COMPOUND;
CUT = ±84 CU. YD.
STRIPPING FOR ACCESS ROAD AND PARKING;
CUT = EXISTING
PROPOSED COMPOUND AREA;
CUT = 0 CU. YD.
FILL = 0 CU. YD.
PROPOSED ACCESS ROAD AND PARKING;
CUT = 0 CU. YD.
FILL = 0 CU. YD.
PROPOSED TOWER FOUNDATION;
EXCAVATION = ±148 CU. YD.
APPROX. TOTAL AREA OF DISTURBANCE OF PROPOSED GRADING = 2,245 SQ. FT.
REFER TO GEO-TECHNICAL ENGINEERING EVALUATION BY BLACK MOUNTAIN DATED 09/19/2024
NOT USED
±98 LF OF (P) SILT FENCE;
SEE SHEET ER-2 FOR DETAIL
3945'
3950'
3950'
3945'
TOP OF (P) EQUIPMENT
SHELTER FOUNDATION
3950.5'
TOP OF (P) FOUNDATION
3950.5'
EXISTING GRADE
PROPOSED GRADE
TEMPORARY SILT FENCE
CONSTRUCTION ENTRANCE
FLOW DIRECTION
GROUND ELEVATION
GRADE TO DRAIN
LEGEND
250'
TOP OF (P) SLAB
3947.5'
±150 LF OF (P) SILT FENCE;
SEE SHEET ER-2 FOR DETAIL
KamalThapa Snapshot
RobHowe
GRADING & EROSION
CONTROL DETAILS
ER-2
SHEET NUMBER:
SHEET TITLE:
LICENSURE:
DRAWING INFORMATION:
THIS DRAWING IS COPYRIGHTED AND IS THE SOLE
PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY
FOR USE BY THE OWNER AND ITS AFFILIATES.
REPRODUCTION OR USE OF THIS DRAWING AND/OR
THE INFORMATION CONTAINED IN IT IS FORBIDDEN
WITHOUT THE WRITTEN PERMISSION OF THE OWNER.
PLANS PREPARED BY:
DATE RELEASE
07-26-24 SITE SKETCH
02-12-25 PRELIMINARY ZONING DRAWINGS
05-22-25
PRELIMINARY CONSTRUCTION DRAWINGS
09-23-25 FINAL CONSTRUCTION DRAWINGS
09-30-25 REV. FCD FOR PROPANE TANK UPDATE
10-15-25
REV. FCD FOR SITE CONFIGURATION
PROJECT INFORMATION:
12725 SW MILLIKAN WAY
SUITE 300
BEAVERTON, OR 97005
(503) 387-5331 www.cushingcivilengineers.com
Cushing
Civil Engineers
Civil Engineers
MARION COUNTY
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF
DRAKES CROSSING, OR
SEDIMENT FENCE NOTES:
1. THE FILTER FABRIC FENCE SHALL BE INSTALLED TO FOLLOW THE CONTOURS WHERE FEASIBLE. THE FENCE POSTS SHALL BE SPACED A MAXIMUM OF 6'
APART AND DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24”.
2. THE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM 6” OVERLAP, AND BOTH ENDS SECURELY FASTENED TO THE POST, OR OVERLAP 2” X 2” POSTS AND ATTACH AS SHOWN ON DETAIL SHEET 4-3A OF THE EROSION CONTROL MANUAL.
3. THE FILTER FABRIC SHALL HAVE A MINIMUM VERTICAL BURIAL OF 6”. ALL EXCAVATED MATERIAL FROM FILTER FABRIC INSTALLATION SHALL BE
BACKFILLED AND COMPACTED ALONG THE ENTIRE DISTURBED AREA.
4. STANDARD OR HEAVY-DUTY FILTER FABRIC FENCES SHALL HAVE MANUFACTURED STITCHED LOOPS FOR 2” X 2” POST INSTALLATION. STITCHED LOOPS
SHALL BE INSTALLED ON THE UP HILLSIDE OF THE SLOPED AREA.
5. FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN
PERMANENTLY PROTECTED AND STABILIZED.
6. FILTER FABRIC FENCES SHALL BE INSPECTED BY APPLICANT/CONTRACTOR IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING
PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
3SCALE: NTS
2SCALE: NTS
4SCALE: NTS
1SCALE: NTS
TOE OF
SLOPE
PL
PL
H/5 BUT 2' MINIMUM
AND NEED NOT EXCEED
20' MAXIMUM
TOE OF
SLOPE
H/5 BUT 2'
MINIMUM
AND NEED
NOT
EXCEED 10'
MAXIMUM
NATURAL OR
FINISH GRADE
INTERCEPTOR DRAIN
(IF REQUIRED)
H
NATURAL OR
FINISH GRADE
CUT OR
FILL SLOPE
GRAVEL CONSTRUCTION ENTRANCE TEMPORARY SEDIMENT FENCE
PLASTIC SHEETING SETBACKS AND DRAINAGE DIMENSIONS
KamalThapa Snapshot
RobHowe
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
OVERALL
SITE PLAN
C-1
SHEET NUMBER:
SHEET TITLE:
LICENSURE:
DRAWING INFORMATION:
THIS DRAWING IS COPYRIGHTED AND IS THE SOLE
PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY
FOR USE BY THE OWNER AND ITS AFFILIATES.
REPRODUCTION OR USE OF THIS DRAWING AND/OR
THE INFORMATION CONTAINED IN IT IS FORBIDDEN
WITHOUT THE WRITTEN PERMISSION OF THE OWNER.
PLANS PREPARED BY:
DATE RELEASE
07-26-24 SITE SKETCH
02-12-25 PRELIMINARY ZONING DRAWINGS
05-22-25
PRELIMINARY CONSTRUCTION DRAWINGS
09-23-25 FINAL CONSTRUCTION DRAWINGS
09-30-25 REV. FCD FOR PROPANE TANK UPDATE
10-15-25
REV. FCD FOR SITE CONFIGURATION
PROJECT INFORMATION:
12725 SW MILLIKAN WAY
SUITE 300
BEAVERTON, OR 97005
(503) 387-5331 www.cushingcivilengineers.com
Cushing
Civil Engineers
Civil Engineers
MARION COUNTY
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF
DRAKES CROSSING, OR
22X34 SCALE: 1" = 1400' OVERALL SITE PLAN 111X17 SCALE: 1" = 2800'
PROPOSED PROJECT AREA
SEE SHEET C-2 FOR DETAILS
(EX) ACCESS ROAD
PARCEL#: 083E000000200
ZONING: TC
NOTE:
THIS IS NOT A SURVEY; ALL EXISTING
INFORMATION IS PROVIDED BY MARION
COUNTY GIS.
ZONING: TC
ZONING: TC
ZONING: TC
ZONING: TC
±2
±3976'
±7
±1241'
KamalThapa Snapshot
RobHowe
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
L P
G
ENLARGED SITE
PLAN
SHEET NUMBER:
SHEET TITLE:
LICENSURE:
DRAWING INFORMATION:
THIS DRAWING IS COPYRIGHTED AND IS THE SOLE
PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY
FOR USE BY THE OWNER AND ITS AFFILIATES.
REPRODUCTION OR USE OF THIS DRAWING AND/OR
THE INFORMATION CONTAINED IN IT IS FORBIDDEN
WITHOUT THE WRITTEN PERMISSION OF THE OWNER.
PLANS PREPARED BY:
DATE RELEASE
07-26-24 SITE SKETCH
02-12-25 PRELIMINARY ZONING DRAWINGS
05-22-25
PRELIMINARY CONSTRUCTION DRAWINGS
09-23-25 FINAL CONSTRUCTION DRAWINGS
09-30-25 REV. FCD FOR PROPANE TANK UPDATE
10-15-25
REV. FCD FOR SITE CONFIGURATION
PROJECT INFORMATION:
12725 SW MILLIKAN WAY
SUITE 300
BEAVERTON, OR 97005
(503) 387-5331 www.cushingcivilengineers.com
Cushing
Civil Engineers
Civil Engineers
MARION COUNTY
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF
DRAKES CROSSING, OR
11X17 SCALE: 1" = 12' 22X34 SCALE: 1" = 6' 1
1,2 C-3
(EX) SOLAR PANEL BY OTHERS
(EX) GRAVEL AREA, TYP
(EX) PROPANE TANK, TYP OF (4);
RE-INSTALL TO COMPLY W/
NFPA 58 CODE
(P) ICE CANOPY;
SEE SHEET C-5 FOR DETAIL
(P) BOLLARD, TYP;
SEE SHEET C-4 FOR DETAIL
(EX) SOLAR PANEL
BY OTHERS, TYP
(P) GAS AND TELCO LINE TO NEW GENERATOR;
SEE SHEET C-4 & C-5 FOR DETAIL
(EX) 60.6' SELF-SUPPORTED TOWER TO REMAIN IN
USE DURING WORK IN PROGRESS; TO BE REMOVED
PER MARION COUNTY DIRECTION
(P) GENERATOR INSIDE NEW SHELTER;
SEE SHEET C-5 FOR DETAIL
(EX) LEASE AREA
(P) ±24 LF ICE BRIDGE;
SEE SHEET C-4 FOR DETAIL
(P) TOWER FOUNDATION;
SEE SABRE TOWER DRAWINGS
FOR STRUCTURAL INFORMATION
(P) GROUND MOUNTED SOLAR PV ARRAY;
SEE SHEET U-1 THRU U-4 FOR DETAIL
(P) 3"Ø CONDUIT;
SEE SHEET C-5 DETAIL
(P) GENERATOR SHELTER FOUNDATION;
SEE SHEET C-8 FOR DETAIL
(P) SNOW ACCESS VESTIBULE;
SEE SHEET SH-3 FOR DETAIL
(P) 10'x10' GENERATOR SHELTER;
SEE SHEET SH-6 & SH-7 FOR DETAIL
(P) POWER/TELCO LINE FROM GENERATOR
TO EQUIPMENT SHELTER;
SEE SHEET C-4 & C-5 FOR DETAIL
(P) 180' SELF-SUPPORT TOWER;
SEE SABRE TOWER DRAWINGS
FOR STRUCTURAL INFORMATION
(P) 12'x16' EQUIPMENT SHELTER;
SEE SHEET SH-1 THRU SH-5 FOR DETAIL
(P) EQUIPMENT SHELTER FOUNDATION;
SEE SHEET C-7 FOR DETAIL
NOTES:
1. TOWER INFO SHOWN FOR CONCEPTUAL USE ONLY.
SEE SABRE TOWER STRUCTURAL DESIGN FOR DETAIL.
2. THIS IS NOT A SURVEY ALL EXISTING INFORMATION IS
PROVIDED BY GIS, SURVEY & SITE WALK NOTES.
3. PROPOSED AND EXISTING ANTENNAS NOT SHOWN
FOR CLARITY.
ENLARGED SITE PLAN
C-2
(P) SPLIT HVAC HYBRID SYSTEM W/
WALL MOUNT TO BE PROVIDED BY
CONTRACTOR, TYP OF (2);
SEE SHEET C-6 FOR DETAIL
(P) 23'x16' CONCRETE PAD;
SEE SHEET C-5 FOR DETAIL
(P) GROUND MOUNTED SOLAR PV ARRAY;
SEE SHEET U-1 THRU U-4 FOR DETAIL
SE
TB
AC
K
25'
SETBACK
5'
MAX.
3' 3'
3'
16'
23'
26'
4'
13'-11"
20'-7"
11'
KamalThapa Snapshot
RobHowe
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
COAX
COAX
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
C O
A X
LICENSURE:
DRAWING INFORMATION:
THIS DRAWING IS COPYRIGHTED AND IS THE SOLE
PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY
FOR USE BY THE OWNER AND ITS AFFILIATES.
REPRODUCTION OR USE OF THIS DRAWING AND/OR
THE INFORMATION CONTAINED IN IT IS FORBIDDEN
WITHOUT THE WRITTEN PERMISSION OF THE OWNER.
PLANS PREPARED BY:
DATE RELEASE
07-26-24 SITE SKETCH
02-12-25 PRELIMINARY ZONING DRAWINGS
05-22-25
PRELIMINARY CONSTRUCTION DRAWINGS
09-23-25 FINAL CONSTRUCTION DRAWINGS
09-30-25 REV. FCD FOR PROPANE TANK UPDATE
10-15-25
REV. FCD FOR SITE CONFIGURATION
PROJECT INFORMATION:
12725 SW MILLIKAN WAY
SUITE 300
BEAVERTON, OR 97005
(503) 387-5331 www.cushingcivilengineers.com
Cushing
Civil Engineers
Civil Engineers
MARION COUNTY
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF
DRAKES CROSSING, OR
11X17 SCALE: 1" = 24' 22X34 SCALE: 1" = 12'EXISTING SOUTH ELEVATION 1 11X17 SCALE: 1" = 24'PROPOSED SOUTH ELEVATION 222X34 SCALE: 1" = 12'
ELEVATIONS
C-3
SHEET NUMBER:
SHEET TITLE:
(EX) TOWER TOP ±63.6' AGL
GROUND LEVEL (GL)
(EX) 60.6' SELF-SUPPORT
TOWER TO BE REMOVED
(EX) COAX CABLE
(EX) EQUIPMENT SHELTER
BY OTHERS TO BE REMOVED
(P) TOWER TOP ±180.0' AGL
(P) ANTENNA BASE ±179.0' AGL
(EX) ANTENNA EQUIPMENT TO
BE RELOCATED TO NEW TOWER
(P) 180' SELF-SUPPORT TOWER
(P) COAX CABLE
(EX) ICE BRIDGE BY OTHERS
TO BE REMOVED, TYP
(P) EQUIPMENT SHELTER
(EX) GENERATOR
SHELTER TO BE REMOVED
(EX) EQUIPMENT SHELTER
(CONTAINER) TO BE REMOVED
(EX) EQUIPMENT SHELTER
TO BE REMOVED
(P) GENERATOR SHELTER
BEHIND SOLAR PV ARRAY
(P) ANTENNA CL ±50.0' AGL
(P) RECEIVE ANTENNA;
CC807-09
(EX) RELOCATED ANTENNA
EQUIPMENT BY OTHERS, TYP
(EX) TOP OF CONCRETE ±3.0' AGL
(P) GROUND MOUNTED
SOLAR PV ARRAY, TYP OF (2)
(P) 4Ø MICROWAVE ANTENNA;
COMMSCOPE - VHLPX4-11W
AZIMUTH = 259.31°
(TO SCC)
(P) 2Ø MICROWAVE ANTENNA;
COMMSCOPE - VHLP2-18
AZIMUTH = 157.44°
(TO APW)
(P) ANTENNA CL ±17.0' AGL
NOTES:
1. TOWER INFO SHOWN FOR CONCEPTUAL USE ONLY. SEE
SABRE TOWER STRUCTURAL REPORT FOR DETAIL.
2. TOWER SHALL BE PAINTED WITH A DULL, NON-REFLECTIVE
GRAY COLOR.
3. LOADING INFORMATION PROVIDED BY TAIT COMMUNICATIONS.
GROUND LEVEL (GL)
(P) VHF AS-IP RECEIVE ANTENNA;
DS1F06F36U-D
(P) ANTENNA CL ±80.0' AGL
(P) ANTENNA BASE ±94.0' AGL
(P) VHF AS-IP TRANSMIT ANTENNA;
SV227-SF2SNM
(P) LIGHTNING ROD
(EX) PROPANE TANK,
TYP OF (4)
(P) ICE CANOPY
(P) BOLLARD, TYP
(EX) PROPANE TANK TO
BE REMOVED; TYP OF (2)
(EX) PROPANE TANK TO
REMAIN, TYP OF (4);
RE-INSTALL TO COMPLY
W/ NFPA 58 CODE
(EX) ICE CANOPY
TO BE REMOVED (P) ICE BRIDGE
KamalThapa Snapshot
RobHowe
COMPOUND
DETAILS
C-4
SHEET NUMBER:
SHEET TITLE:
LICENSURE:
DRAWING INFORMATION:
THIS DRAWING IS COPYRIGHTED AND IS THE SOLE
PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY
FOR USE BY THE OWNER AND ITS AFFILIATES.
REPRODUCTION OR USE OF THIS DRAWING AND/OR
THE INFORMATION CONTAINED IN IT IS FORBIDDEN
WITHOUT THE WRITTEN PERMISSION OF THE OWNER.
PLANS PREPARED BY:
DATE RELEASE
07-26-24 SITE SKETCH
02-12-25 PRELIMINARY ZONING DRAWINGS
05-22-25
PRELIMINARY CONSTRUCTION DRAWINGS
09-23-25 FINAL CONSTRUCTION DRAWINGS
09-30-25 REV. FCD FOR PROPANE TANK UPDATE
10-15-25
REV. FCD FOR SITE CONFIGURATION
PROJECT INFORMATION:
12725 SW MILLIKAN WAY
SUITE 300
BEAVERTON, OR 97005
(503) 387-5331 www.cushingcivilengineers.com
Cushing
Civil Engineers
Civil Engineers
MARION COUNTY
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF
DRAKES CROSSING, OR
4" OF 3/4" CHIP ROCK;
NO FINES
GEOTEXTILE FABRIC,
TYPAR-3401
OR EQUIVALENT
4" OF 3/4"-MINUS
CRUSHED ROCK
COMPACTED 95%
SUBSOIL COMPACTED TO 92% OF
MAXIMUM DRY DENSITY MIN. PER
ASTM-D1557
NOTE: STRIP ALL ORGANICS
3" MIN OF 3/4" MINUS CRUSHED
ROCK COMPACTED TP 95% IN
ACCORDANCE WITH ASTM-D698
GEOTEXTILE FABRIC,
MIRAFI 500X (12"
OVERLAP AT SEAMS)SUBSOIL COMPACTED TO 92% OF
MAXIMUM DRY DENSITY MIN PER
ASTM-D1557
NOTES:
1. CONTRACTOR SHALL STRIP SUPERFICIAL, SOFT, WET, ORGANIC OR DELETERIOUS SOILS TO EXPOSE FIRM AND UNYIELDING SOIL (BETWEEN 6" & 12"). IF STRIPPING IS REQUIRED DEEPER THAN 12", CONTRACTOR SHALL CONTACT THE SITE CONSTRUCTION MANGER TO DETERMINE THE APPROPRIATE STRIPPING DEPTH
AT THE TIME OF CONSTRUCTION.
2. MATERIAL AND INSTALLATION SHALL CONFORM TO CURRENT ODOT/APWA STANDARD SPECIFICATIONS AND
MANUFACTURERS RECOMMENDATIONS.
12" MIN OF 3" MINUS
CRUSHED ROCK COMPACTED
TO 95% IN ACCORDANCE WITH
ASTM-D698
POWER LINE TRENCH
4SCALE: NTS ICE BRIDGE DETAIL 5SCALE: NTS
3SCALE: NTS2 COMPOUND ROCK SECTION DETAILSCALE: NTS1SCALE: NTS GRAVEL ROAD SECTION DETAIL
6SCALE: NTS
" E
LE
CT
RI
CA
L P
RI
MA
RY
" E
LE
CT
RI
CA
L S
EC
ON
DA
RY
2'- 6"
T O
3'- 6"
±4
±4
12" MIN
CLEAR
24"±
WARNING TAPE
FINISH GRADE
UNEXCAVATED EARTH
COMPACTED FILL
(85% IN LANDSCAPED AREAS,
95% IN PAVED AREAS)
ELECTRICAL CONDUIT(S); 3"Ø
MIN, SCHEDULE 40 PVC, OR
AS SHOWN ON PLAN
COMPACTED SAND
NOTES:
1. EXCAVATE TO REQUIRED DEPTH.
2. VERIFY ALL TRENCHING REQUIREMENTS PER LOCAL UTILITIES.
3. CONTRACTOR TO PROVIDE (1) 300 POUND NYLON PULL CORD
AND CONDUCTORS AS REQUIRED PER CONDUIT.
CONTRACTOR TO VERIFY WITH
MARION COUNTY PM IF SPARE
CONDUIT TO BE PLACED IN
TRENCH FOR FUTURE
SIGN DETAILS
UNDISTURBED EARTH
CROWN TO DRAIN
48" X 18"Ø CONCRETE
FOOTING @ 2,500 PSI
STANDARD 6"Ø STEEL PIPE,
CONCRETE FILLED PAINT
W/MIN (3) COATS EPOXY
ENAMEL (YELLOW)
BOLLARD DETAIL
SIGN NOTES:
1. SIGN MATERIAL: 18GA
ALUMINUM
2. LETTERING COLOR =
BLACK / WHITE
3. BACKGROUND COLOR =
WHITE / BLUE
7"
SIGN NOTES:
1. SIGN MATERIAL: 18GA
ALUMINUM
2. LETTERING COLOR =
BLACK
3. BACKGROUND COLOR =
WHITE / RED
12"
SIGN NOTES:
1. SIGN MATERIAL: 18GA
ALUMINUM
2. LETTERING COLOR =
BLACK
3. BACKGROUND COLOR =
YELLOW
7"
MARION COUNTY
7SCALE: NTS ACCESS ROAD SECTION DETAIL
36" OC MAX
10'-0" OC MAX
FIELD VERIFY
12"
2"CLR.
2'-0"
CLR MIN.
COAX BRIDGE: 14 GA.
GALV. GRIPSTRUT 24"
WIDTH, 2" PLANK 14 GA.
SUPPORT COLUMN: 4"Ø
O.D. GALV. SCHED. 40
POST @ 10'-0" O.C. MAX
CROWN TO DRAIN; TYP.
FOOTING
MUST BE 6"
BELOW
FROST LINE,
TYP.
SIDE ELEVATIONFRONT ELEVATION
NOTE: GROUND COAX BRIDGE PER THE REQUIREMENTS
OF THE NEC STANDARDS - SEE DETAIL 1/E-2
COAX SUPPORT BLOCKS
AT 3'-0" MAX O.C.
EDGE OF
SHELTER
20" UNISTRUT W/ NUT
AND WASHER EACH
SIDE/ EACH LEVEL AS
REQUIRED
12"Ø X 48" DEEP CONC.
FOOTING; TYPICAL
COAX BRIDGE-(2) 24" WIDE
SAFETY GRATED WAVE
GUIDE BRIDGE CHANNEL,
OR APPROVED EQUAL
DUAL POST 24" ICE
BRIDGE KIT SITE PRO1
PART# 4B24D OR
APPROVED EQUAL
8"
2-1/2"
1-1/2"
8" x 8" x 1/2" PLATE
SUPPORT PIPE
1/2"Ø HILTI-KWIK-BOLT-TZ
SS EXPANSION ANCHOR
MIN 2" EMBED (TYP. OF 4)
5/16 TYP
8" x 8" x 1/2" PLATE
CONC. SLAB (IF
REQUIRED)
B
ICE-BRIDGE
SUPPORT POST
SECTION B
BASE PLATE - OPTIONAL
PIPE TO CONC
ATTACHMENT
KamalThapa Snapshot
RobHowe
GENERATOR &
PROPANE TANK
DETAILS
C-5
SHEET NUMBER:
SHEET TITLE:
LICENSURE:
DRAWING INFORMATION:
THIS DRAWING IS COPYRIGHTED AND IS THE SOLE
PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY
FOR USE BY THE OWNER AND ITS AFFILIATES.
REPRODUCTION OR USE OF THIS DRAWING AND/OR
THE INFORMATION CONTAINED IN IT IS FORBIDDEN
WITHOUT THE WRITTEN PERMISSION OF THE OWNER.
PLANS PREPARED BY:
DATE RELEASE
07-26-24 SITE SKETCH
02-12-25 PRELIMINARY ZONING DRAWINGS
05-22-25
PRELIMINARY CONSTRUCTION DRAWINGS
09-23-25 FINAL CONSTRUCTION DRAWINGS
09-30-25 REV. FCD FOR PROPANE TANK UPDATE
10-15-25
REV. FCD FOR SITE CONFIGURATION
PROJECT INFORMATION:
12725 SW MILLIKAN WAY
SUITE 300
BEAVERTON, OR 97005
(503) 387-5331 www.cushingcivilengineers.com
Cushing
Civil Engineers
Civil Engineers
MARION COUNTY
HOUSE MOUNTAIN
11.1 MILES SOUTHEAST OF
DRAKES CROSSING, OR
G A
S G
A S
G A
S G
A S
25'-0" REQUIRED PROPANE
TANK SETBACK BUFFER;
NO IGNITION SOURCES
WITHIN SETBACK
NOTE:
ALL CONDUIT INSIDE THE BUILDING MUST BE METAL AND BE GROUNDED PER R-56 STANDARDS.
INTERIOR SHELTER LAYOUT IS FOR REFERENCE ONLY.
THIS GENERATOR & PROPANE LAYOUT IS FOR INFORMATION ONLY AND IS PRESENTED AS A GUIDELINE. VERIFY SITE CONDITIONS AND LAYOUT PRIOR TO INSTALLATION OF ALL EQUIPMENT. INSTALL ALL EQUIPMENT PER MANUFACTURER'S
INSTRUCTIONS.
FUEL LINE SIZE PER MANUFACTURERS
RECOMMENDATION
EQUIPMENT SHELTER
±25
LIQUID PROPANE FUEL TANK
OR EQUAL ON CONCRETE PAD
2-CAT-5 CONTROL WIRING IN 3/4"
RIGID PVC CONDUIT
AUTOMATIC TRANSFER SWITCH
CIRCUIT BREAKER PANEL
POWER CONDUIT TO STUB UP AT
METER
BORE AND WEATHERPROOF NEW
PENETRATIONS INTO SHELTER FOR
NEW CONDUIT ROUTING, TYP.
LIQUID WITHDRAWL
DOME
RELIEF VALVE
2-#12 THHN PLUS #12 GROUND IN
1" RIGID METAL CONDUIT FROM
GENERATOR TO DEDICATED
CIRCUIT BREAKER @ BREAKER
PANEL, RATING 20A
MANUAL TRANSFER SWITCH
SCALE: NTS
SCALE: NTS
SCALE: NTS GENERATOR PLAN
GENERATOR FUEL SYSTEM ELEVATION
SIDE
FRONT
SIDE
TRENCH SECTION NOT USED
SCALE: NTS GENERATOR ELEVATION NOT USED
TYPICAL GENERATOR LAYOUT
NOTE:…