The file is a detailed construction plan for a Marion County, Oregon public safety communications facility improvement project located at House Mountain, approximately 11.1 miles southeast of Drakes Crossing. The project involves modifying an existing communications site by replacing the current 60.6' self-support tower with a new 180'-0" self-support tower, installing new equipment shelters, a generator shelter, ground-mounted solar PV array, propane tank, and associated infrastructure. The site is situated on a 13,304.66-acre parcel in Marion County, zoned as Timber Conservation, with a total compound area of 10,589 square feet. The proposed modifications include removing existing equipment shelters, generators, propane tanks, and ice bridges, and installing new communications and support infrastructure.

The project is funded through county resources and will utilize a Cummins 36 kW backup generator, solar hybrid heat pump system, and comply with various building and safety codes including the 2018 International Building Code, 2017 National Electric Code, and NFPA 58 standards. The site will remain unmanned and is designed for essential communications infrastructure, with specific attention to seismic requirements, erosion control, and compliance with local jurisdictional guidelines. The property is owned by Weyerhaeuser Timber Holdings Inc and will be developed by Marion County Public Works, with engineering and surveying support from Cushing Civil Engineers and Orion Geomatics. The project demonstrates a comprehensive approach to modernizing and expanding critical communications infrastructure in a remote, forested location.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. PROPOSED MODIFICATION OF AN EXISTING PUBLIC SAFETY

COMMUNICATIONS FACILITY FOR MARION COUNTY, OREGON.

2. PROPOSED REPLACEMENT OF EXISTING 60.6' SELF-SUPPORT

TOWER W/ NEW 180'-0" SELF-SUPPORT TOWER

3. PROPOSED INSTALLATION OF THE FOLLOWING EQUIPMENT ON

A NEW 180'-0" SELF-SUPPORTED TOWER:

* NEW & EXISTING ANTENNAS & ASSOCIATED ANCILLARY

EQUIPMENT

4. PROPOSED REMOVAL OF THE FOLLOWING EQUIPMENT WITHIN

EXISTING GROUND SPACE:

* EQUIPMENT SHELTERS

* GENERATOR SHELTER

* ICE BRIDGES

* GENERATORS

* PROPANE TANKS

5. PROPOSED INSTALLATION OF THE FOLLOWING EQUIPMENT

WITHIN EXISTING GROUND SPACE:

* (1) 12'x16' EQUIPMENT SHELTER

* (1) 10'x10' GENERATOR SHELTER

* (1) GENERATOR

* ICE BRIDGE

* PROPANE TANK ICE CANOPY (REPLACE EXISTING)

* GROUND MOUNTED SOLAR PV ARRAY

SHEET INDEX

FROM MARION COUNTY PUBLIC WORKS BUILDING:

1. HEAD SOUTHEAST TOWARD OR-213 S (305 FT) & TURN RIGHT ONTO

OR-213 S (0.2 MI)

0.2 MI

2. TURN LEFT ONTO CORDON RD NE (4.1 MI) & SHARP LEFT ONTO

MACLEAY RD SE (0.2 MI)

4.3 MI

3. TURN RIGHT ONTO CULVER DR SE (1.0 MI) & TURN RIGHT ONTO

DEER PARK DR SE (0.6 MI)

1.6 M

4. MERGE ONTO OR-22 E/N SANTIAM HWY SE

19 MIN (19.2 MI)

5. TURN LEFT ONTO N FORK RD/LITTLE NORTH FORK. CONTINUE TO

FOLLOW N FORK RD

4.5 MI

6. SLIGHT LEFT (0.6 MI) & TURN RIGHT AT KIEL CREEK RD (2.0 MI)

2.6 MI

7. SLIGHT LEFT (1.4 MI) & TURN LEFT (1.4 MI)

2.8 MI

8. TURN RIGHT (1.0 MI) & SHARP RIGHT. DESITINATION WILL BE ON THE

LEFT (0.4 MI)

1.4 MI

EST. TIME: 50 MINS.

EST. MILEAGE: 36.6 MI

COVER

SHEET

SHEET NUMBER:

SHEET TITLE:

PROJECT INFORMATION PROJECT INFORMATION CONTINUED DRIVING DIRECTIONS

VICINITY MAP

PROPERTY OWNER:

WEYERHAEUSER TIMBER HOLDINGS INC ATTN TAX DEPARMENT

220 OCCIDNETAL AVE S

SEATTLE, WA 98104

CONTACT:

NAME

PHONE

PROJECT LOCATION:

*LAT: N 44° 50'28.4" (44.841210)

*LONG: W 122°28'58.9" (-122.483040)

*GROUND ELEVATION (ASML) = 3,955'±

*INFORMATION OBTAINED FROM GOOGLE EARTH

UTILITY PROVIDERS:

TELCO PROVIDER: N/A

POWER PROVIDER: CONSUMERS POWER

T-1

PROJECT AREA:

TOTAL COMPOUND AREA - 10,589 SQ FEET ±

ACCESS DRIVE AND PARKING - EXISTING

TOTAL - 10,589 SQ FEET ±

LOCATOR MAP

LICENSURE:

DRAWING INFORMATION:

THIS DRAWING IS COPYRIGHTED AND IS THE SOLE

PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY

FOR USE BY THE OWNER AND ITS AFFILIATES.

REPRODUCTION OR USE OF THIS DRAWING AND/OR

THE INFORMATION CONTAINED IN IT IS FORBIDDEN

WITHOUT THE WRITTEN PERMISSION OF THE OWNER.

PLANS PREPARED BY:

DATE RELEASE

07-26-24 SITE SKETCH

02-12-25 PRELIMINARY ZONING DRAWINGS

05-22-25

PRELIMINARY CONSTRUCTION DRAWINGS

09-23-25 FINAL CONSTRUCTION DRAWINGS

09-30-25 REV. FCD FOR PROPANE TANK UPDATE

10-15-25

REV. FCD FOR SITE CONFIGURATION

PROJECT INFORMATION:

12725 SW MILLIKAN WAY

SUITE 300

BEAVERTON, OR 97005

(503) 387-5331 www.cushingcivilengineers.com

Cushing

Civil Engineers

Civil Engineers

MARION COUNTY

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF

DRAKES CROSSING, OR

PROJECT DESCRIPTION

SITE NAME:

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF DRAKES CROSSING, OR

CONSTRUCTION SUBMITTAL:

T-1 COVER SHEET

V-1 EXISTING CONDITIONS (SURVEY)

EX-1 DEMOLITION PLAN

G-1 GENERAL NOTES

ER-1 GRADING & EROSION CONTROL PLAN

ER-2 GRADING & EROSION CONTROL DETAILS

C-1 OVERALL SITE PLAN

C-2 ENLARGED SITE PLAN

C-3 ELEVATIONS

C-4 COMPOUND DETAILS

C-5 GENERATOR & PROPANE TANK DETAILS

C-6 HVAC DETAILS

C-7 EQUIPMENT SHELTER FOUNDATION PLAN

C-8 GENERATOR SHELTER FOUNDATION PLAN

E-1 SITE GROUNDING PLAN & DETAILS

E-2 GROUNDING DETAILS I

E-3 GROUNDING DETAILS II

RF-1.0 RF TOWER APPURTENANCES I

RF-1.1 RF TOWER APPURTENANCES II

RF-1.2 RF TOWER APPURTENANCES III

RF-1.3 RF TOWER APPURTENANCES IV

RF-1.4 RF TOWER APPURTENANCES V

RF-1.5 RF TOWER APPURTENANCES VI

U-1 SOLAR PV ARRAY DETAILS I

U-2 SOLAR PV ARRAY DETAILS II

U-3 SOLAR PV ARRAY DETAILS III

U-4 SOLAR PV ARRAY DETAILS IV

SHELTER ONE PREFABRICATED SHELTER DRAWINGS

(REFER TO STATE OF OREGON BUILDING CODES

DIVISION FOR STATE INSIGNIA):

SH-1 EQUIPMENT SHELTER EXTERIOR ELEVATIONS

SH-2 EQUIPMENT SHELTER INTERIOR ELEVATIONS

SH-3 HIGH SNOW ENTRY VESTIBULE

SH-4 ELECTRICAL ONE LINE DRAWING

SH-5 ELECTRICAL PANEL SCHEDULE

SH-6 GENERATOR SHELTER EXTERIOR ELEVATIONS

SH-7 GENERATOR INTERIOR ELEVATIONS

SCALE: NTS SCALE: NTS

PROJECT LOCATION

PROJECT LOCATION

FOREST ACCESS ROAD

APPLICANT:

MARION COUNTY PUBLIC WORKS

5155 SILVERTON RD NE

SALEM, OR 97305

CONTACT:

BRIAN NICHOLAS

(503) 588-7943 bnicholas@co.marion.or.us

PROJECT MANAGER:

PATRICK HOOVER

(971) 295-0152 phoover@rtspnw.com

CONSTRUCTION

MANAGER:

PATRICK HOOVER

(971) 295-0152 phoover@rtspnw.com

ZONING CONTACT:

CUSHING CIVIL ENGINEERS

12725 SW MILLIKAN WAY, STE 300

BEAVERTON, OR 97005

CONTACT:

ROB HOWE

(503) 387-5331 rob@cushingcivilengineers.com

ENGINEER OF RECORD:

CUSHING CIVIL ENGINEERS

12725 SW MILLIKAN WAY, STE 300

BEAVERTON, OR 97005

CONTACT:

KENNY MCMANAWAY

(503) 387-5331 kenny@cushingcivilengineers.com

SURVEYOR:

ORION GEOMATICS

1724 23RD AVE

FOREST GROVE, OR 97116

CONTACT:

JOHN PUTNAM

(503) 359-1688 jputnam@oriongeomatics.com

JURISDICTION:

MARION COUNTY

COUNTY:

MARION

ZONING:

TC (TIMBER CONSERVATION)

PARCEL NUMBER(S) & AREA:

ACCOUNT #: 111272

TAXLOT #: 083E000000200

579,550,989.6 SQ FEET±

13304.66 ACRES±

GENERAL INFORMATION:

1. TRAFFIC IS UNAFFECTED

2. SIGNAGE AT SITE IS PROPOSED

3. SITE IS UNMANNED AND HANDICAP ACCESS IS NOT REQUIRED

CODE INFORMATION:

1. IBC-2018 INTERNATIONAL BUILDING CODE

2. NEC-2017 NATIONAL ELECTRIC CODE

3. 2019 OREGON STRUCTURAL SPECIALTY CODE

4. 2017 NFPA 58 CODE

5. OCCUPANCY GROUP: U

6. CONSTRUCTION TYPE: II-B

TOWER OWNER:

MARION COUNTY PUBLIC WORKS

5155 SILVERTON RD NE

SALEM, OR 97305

CONTACT:

BRIAN NICHOLAS

(503) 588-7943 bnicholas@co.marion.or.us

GEOTECH:

BLACK MOUNTAIN CONSULTING LLC

22566 SW WASHINGTON STE #206

SHERWOOD, OR 97140

CONTACT:

TAMMY STEMPEL

(503) 625-2517 tammys@blkmountain.com

NEPA FCC:

REPORT BY BLACK MOUNTAIN

DATED 04/03/2025

KamalThapa Snapshot

RobHowe Text Box

REVISION 1, 10/15/2025

WELL

YOGI ANTENNA TOP

4026.5

LATTICE TOWER TOP

4013.6

CONTINUOUSLY

OPERATING

REFERENCE STATION

(CORS)

'P384'

CORS SOLAR / UTILITY

CABINET

SEISMIC WARNING

SYSTEM SOLAR /

UTILITY RACK

ICE BRIDGE

STEEL GENERATOR

SHED

10'X8'

MODULAR

COMMUNICATIONS

BUILDING

SHIPPING

CONTAINER

.2

20.2'

.2

20.2'

8.

0'

12.4'

7.

9'

12.4'

8'X8'

MODULAR

COMMUNICATIONS

BUILDING

EXISTING 60.6' LATTICE TOWER

LATITUDE: N 44° 50' 28.174"

LONGITUDE: W 122° 28' 58.741"

FOUNDATION ELEVATION: 3953.0

3,939

3,940

3,945

3,950

3,950

3,945

3,940

3,936

GRAVEL

GRAVEL

GRAVEL

GRAVEL

TOP OF CLIFF

1000 GAL PROPANE TANK (TYP)

STA: 100

DESC: CNTL SET 1/2"IR

W/OPC "ORION CNTL"

N: 185,635.37 E: 319,900.02

Z: 3,942.54

STA: 101

DESC: CNTL FOUND 1-1/8"BP

'MARION CO'

N: 185,747.72 E: 319,780.30 Z: 3,951.49

STA: 500

DESC: FOUND 5/8" IR W/ 2"

ALC 'MARION COUNTY

SURVEYOR LAESE AREA'

N: 185,681.02 E: 319,678.17

Z: 3,941.48

FOUND 5/8" IR W/ 2" ALC

'MARION COUNTY

SURVEYOR LAESE AREA'

FOUND 2-1/2" BR DISK

OTHER 'MARION COUNTY

SURVEYOR LAESE AREA'

FOUND 2-1/2" BR DISK

OTHER 'MARION COUNTY

SURVEYOR LAESE AREA'

FOUND 2-1/2" BR DISK

OTHER 'MARION COUNTY

SURVEYOR LAESE AREA'

CONCRETE FOOTING

(FORMER LOOKOUT

TOWER )

W

S

N

E

EXPOSED CONDUIT

EX 9:

~ LOCATION 30'X30' LEASE

11X17 SCALE: 1" = 40' 22X34 SCALE: 1" = 20'SECTION 30, T08S, R03E, W.M 1

EXISTING

CONDITIONS

V-1

SHEET NUMBER:

SHEET TITLE:

LICENSURE:

DRAWING INFORMATION:

THIS DRAWING IS COPYRIGHTED AND IS THE SOLE

PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY

FOR USE BY THE OWNER AND ITS AFFILIATES.

REPRODUCTION OR USE OF THIS DRAWING AND/OR

THE INFORMATION CONTAINED IN IT IS FORBIDDEN

WITHOUT THE WRITTEN PERMISSION OF THE OWNER.

PLANS PREPARED BY:

PROJECT INFORMATION:

MARION COUNTY

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF

DRAKES CROSSING, OR

12725 SW MILLIKAN WAY

SUITE 300

BEAVERTON, OR 97005

(503) 387-5331 www.cushing-engr.com

Cushing Civil Engineers

Civil Engineers orion

GEOMATICS

Because the world is a spatial place

TM

1724 23rd Avenue | Forest Grove OR 97116 T: 503.359.1688 | www.oriongeomatics.com

DATE RELEASE

12/12/2024 INITIAL SURVEY RELEASE0

UTILITY STATEMENT:

THE UNDERGROUND UTILITIES SHOWN ARE BASED ON SURVEYED UTILITY LOCATE

MARKINGS AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEE THAT

THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA,

EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT

THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED

ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS

POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY

LOCATED THE UNDERGROUND UTILITIES.

X

SD

SS

W

G

P

FO

CTV

O/H

LEGEND:

CENTERLINE OF ROAD

RIGHT-OF-WAY LINE

SECTION LINE

BOUNDARY LINE

PROPERTY / LOT LINE

EASEMENT LINE

CURB

EDGE OF CONCRETE

EDGE OF PAVEMENT

EDGE OF GRAVEL

STRIPING

CHAIN LINK FENCE

WOOD / METAL FENCE

WIRE FENCE

CANOPY

RAMP

CONCRETE

OVERHEAD UTILITIES

BURIED CABLE TV

BURIED FIBER OPTIC

BURIED POWER

GAS LINE

WATER LINE

SANITARY SEWER

STORM DRAIN

O/P

O/C OVERHEAD COMS LINE

OVERHEAD POWER

C BURIED COMS LINE

NATURAL GAS VAULT

NATURAL GAS VALVE

NATURAL GAS RISER

NATURAL GAS METER

IRRIGATION VALVE

WATER VALVE

WATER METER

FIRE AUTO

CONNECTION

FIRE HYDRANT

MANHOLE (UNK /

OTHER TYPE)

STORM INLET

DRY WELL

STORM MANHOLE

CLEAN OUT

SANITARY LIFT STATION

SANITARY VAULT

SANITARY MANHOLE

SS

STORM INLET (ROUND)

CB

SD

STORM INLET LID

STORM VAULT

CO

HANDHOLE (UNK /

OTHER TYPE)

RISER (UNK / OTHER

TYPE)

VAULT (UNK / OTHER

TYPE)

FW

FW

FW

FIRE RISER

FIRE VALVE

FIRE VAULT

IRR

IRR

IRRIGATION RISER

IRRIGATION VAULT

W

W

W

WATER MANHOLE

WATER RISER

WATER VAULT

G

G

SET MONUMENT AS

NOTED

FOUND MONUMENT AS

NOTED

POLE

UTILITY POLE W/DROP

GUY ANCHOR

TRANSFORMER

POWER METER

POWER RISER

POWER VAULT

LUMINAIRE / STREET

LIGHT

TRAFFIC SIGNAL

SIGNAL CONTROL BOX

CONIFER TREE

DECIDUOUS TREE

SHRUB

PHOTO CONTROL

SET CONTROL AS NOTED

FOUND CONTROL AS

NOTED

BENCH MARKSIGN

MAIL BOX

BOLLARD

RR CROSSING GATE

RR CROSSING SIGNAL

(NO GATE)

TEST BORE

MONITOR WELL

A

BRS

IP

IR

ALC

YPC

A/C ASPHALTIC CONCRETE

YELLOW PLASTIC CAP

ALUMINIUM CAP

IRON ROD

IRON PIPE

BRASS

AS-BUILT INFORMATION

RPC RED PLASTIC CAP

OPC ORANGE PLASTIC CAP

ENCROACHMENT

UKN UNKNOWN

P

P

P

P

P

POWER HANDHOLE

POWER MANHOLE

C

CTV

FO

C

C

C

COMS HANDHOLE

COMS COMMUNICATIONS

COMS RISER

COMS VAULT

COMS MANHOLE

FO

FO

T

T

T

T

CTV

CTV

TELCO HANDHOLE

TELCO RISER

TELCO VAULT

TELCO MANHOLE

FIBER HANDHOLE

FIBER RISER

FIBER VAULT

CABLE TV HANDHOLE

CABLE TV RISER

CABLE TV VAULT

F

FUEL FILLER

FUEL MANHOLE

SIG

SIG

PEDESTRIAN SIGNAL

SIGNAL VAULT

SIGNAL HANDHOLE

YARD LIGHT

TOWER

RR

RR

RR RR VAULT

RR HANDHOLE

RR RISER

RR SWITCH THROW

RR SIGNAL

VENT

PALM TREE

FOUND MONUMENT AS

NOTED (ALTERNATE)

SET MONUMENT AS

NOTED (ALTERNATE)

FOUND SECTION

CORNER AS NOTED

FOUND QUARTER

CONER AS NOTED

SET SECTION CORNER

AS NOTED

SET QUARTER CONER

AS NOTED

TEST PIT

TB

TP

HIGH OCCUPANCY

VEHICLE

HANDICAP PARKING

BIKE LANE

RAILROAD CROSSING

HFL HELD FOR LINE

SFNF SEARCHED FOR NOT

FOUND

BP COPPER PLUG

IRR IRRIGATION LINE

SG BURIED SIGNAL

ASPHALTIC CONCRETE

NARRATIVE:

THE PURPOSE OF THIS SURVEY IS TO PREPARE A PRE-DESIGN BASE MAP FOR FUTURE

EXPANSION OF MARION COUNTY'S COMMUNICATION SITE 'HOUSE MOUNTAIN,.

JOHN D PUTNAM PERFORMED THE FIELD SURVEY ON OCTOBER 1ST, 2024. TERRESTRIAL

MEASUREMENTS WERE MADE UTILIZING A LEICA MS60 1 SECOND ROBOTIC TOTAL STATION. GNSS

OBSERVATIONS WERE MADE UTILIZING A LEICA GS16 RECEIVER.

BEARINGS ARE BASED ON THE NAD 1983(2011) [EPOCH 2010] OREGON

COORDINATE REFERENCE SYSTEM, SALEM ZONE AS DETERMINED BY GNSS

OBSERVATION TO THE OREGON REAL-TIME GNSS NETWORK.

THE LEASE AREA WAS ESTABLISHED BY HOLDING FOUND MONUMENTS '500' -

'504'.

ALL MEASUREMENTS SHOWN MATCH RECORD UNLESS OTHERWISE NOTED.

FALLINGS SHOWN ARE FROM THE TRUE POINT.

NOTES:

1. FIELD SURVEY AND MAPPING PERFORMED ON OCTOBER 1ST, 2024 BY J. PUTNAM UTILIZING

A LEICA MS60 ROBOTIC TOTAL STATION AND LEICA GS18 GNSS RECEIVERS.

2. UNITS ARE STATED IN INTERNATIONAL FEET.

3. BEARINGS ARE BASED ON THE NAD 1983(2011) [EPOCH 2010] ORGON COORDINATE

PREFERENCE SYSTEM, SALEM ZONE AS DETERMINED BY GNSS OBSERVATION TO THE

OREGON REAL-TIME GNSS NETWORK .

4. ELEVATIONS ARE BASED NAVD 1988 AS ESTABLISHED BY GNSS OBSERVATION TO THE

OREGON REAL-TIME GNSS NETWORK.

5. ALL DISTANCES ARE GRID BASED ON THE LOW DISTORTION ZONE.

6. TRUE GEODETIC AZIMUTH = GRID AZIMUTH (BEARING BASIS) + MAPPING ANGLE. THE

MAPPING ANGLE IS 00°25'24" AT CONTROL STATION 101. THE MAGNETIC DECLINATION FROM

TRUE GEODETIC AZIMUTH IS 14°33 EAST.

7. THE TERM "CERTIFY" (OR ITS DERIVATIVES) SHALL MEAN A STATEMENT SIGNED AND/OR

SEALED BY A SURVEYOR REPRESENTING THAT THE SURVEYOR'S KNOWLEDGE,

INFORMATION AND BELIEF, IN ACCORDANCE WITH COMMONLY ACCEPTED PROCEDURES

CONSISTENT WITH APPLICABLE STANDARDS OF PRACTICE, AND IS NOT A GUARANTY OR

WARRANTY, EITHER EXPRESSED OR IMPLIED.

8. THIS SURVEY SHOWS ONLY THOSE DEDICATIONS AND EASEMENTS CONTAINED IN THE

SUPPLIED TITLE SEARCH. IT IS POSSIBLE THAT OTHER RECORDED OR UNRECORDED

INSTRUMENTS EFFECTING THIS PROPERTY MAY EXIST.

9. ORION GEOMATICS MAKES NO WARRANTIES AS TO MATTERS OF UNWRITTEN TITLE SUCH AS

ADVERSE POSSESSION, ACQUIESCENCE, ESTOPPLE, ETC.

10. ALL STATEMENTS WITHIN THE CERTIFICATION, AND OTHER REFERENCES LOCATED

ELSEWHERE HEREON, RELATED TO: UTILITIES, IMPROVEMENTS, STRUCTURES, BUILDINGS,

PARTY WALLS, EASEMENTS, SERVITUDES, AND ENCROACHMENTS; ARE BASED SOLELY ON

ABOVE GROUND, VISIBLE EVIDENCE, UNLESS ANOTHER SOURCE OF INFORMATION IS

SPECIFICALLY REFERENCED HEREON.

11. NO UTILITIES WERE MARKED PRIOR TO SURVEY. [TABLE 'A' ITEM 11]

REFERENCES:

-RECORDS OF SURVEY:

R1) SN 2607

R2) SN 30641

R3) SN 31487

R4) SN 38516

SURVEY RELATED SPECIAL EXCEPTIONS (SCHEDULE

B):

AMERITITLE STATUS OF RECORD TITLE NO. 658004AM DATED NOVEMBER 19,

1 - 4. NOT SURVEY RELATED

5. RIGHT-OF-WAY PERMIT, INCLUDING THE TERMS AND PROVISIONS THEREOF,

GRANTED TO: PORTLAND GENERAL ELECTRIC COMPANY

RECORDED: FEBRUARY 8, 1936

INSTRUMENT NO.: VOLUME: 225 PAGE: 48

SURVEYOR'S NOTE: EXCEPTION IS IS A BLANKET IN NATURE.

6. RIGHT OF WAY PERMIT, INCLUDING THE TERMS AND PROVISIONS THEREOF,

RECORDED: JULY 29, 1940

INSTRUMENT NO.: VOLUME: 249 PAGE: 691

SURVEYOR'S NOTE: EXCEPTION IS IS A BLANKET IN NATURE.

7 & 8. NOT SURVEY RELATED.

9. AN UNRECORDED LEASE WITH CERTAIN TERMS, COVENANTS, CONDITIONS AND

PROVISIONS SET FORTH THEREIN AND SUCH OTHER EXCEPTIONS AS MAY APPEAR

NECESSARY UPON RECORDING THEREOF,

LESSOR: LONGVIEW FIBRE COMPANY

LESSEE: US WEST NEWVECTOR GROUP, INC., A COLORADO CORPORATION, AS

SUCCESSOR-IN-INTEREST TO GTE MOBILNET OF NORTHWEST OREGON LIMITED

PARTNERSHIP

DISCLOSED BY: MEMORANDUM OF LEASE AGREEMENT DATE: JULY 2, 1997

RECORDED: NOVEMBER 5, 1997

INSTRUMENT NO.: REEL: 1438 PAGE: 516

SURVEYOR'S NOTE: THERE WAS NO OBSERVED EVIDENCE OF THIS EXCEPTION AT THE TIME

OF THE FIELDWORK. LEASE WAS SET TO EXPIRE ON MARCH 31, 2002. THE DOCUMENT

CONTAINS ONLY A SITE SKETCH. APPROXIMATE LOCATION PLOTTED HEREON.

10 - 12.NOT SURVEY RELATED.

Feet 1:120

20100 5 jdpor Stamp

DEMOLITION PLAN

EX-1

SHEET NUMBER:

SHEET TITLE:

LICENSURE:

DRAWING INFORMATION:

THIS DRAWING IS COPYRIGHTED AND IS THE SOLE

PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY

FOR USE BY THE OWNER AND ITS AFFILIATES.

REPRODUCTION OR USE OF THIS DRAWING AND/OR

THE INFORMATION CONTAINED IN IT IS FORBIDDEN

WITHOUT THE WRITTEN PERMISSION OF THE OWNER.

PLANS PREPARED BY:

DATE RELEASE

07-26-24 SITE SKETCH

02-12-25 PRELIMINARY ZONING DRAWINGS

05-22-25

PRELIMINARY CONSTRUCTION DRAWINGS

09-23-25 FINAL CONSTRUCTION DRAWINGS

09-30-25 REV. FCD FOR PROPANE TANK UPDATE

10-15-25

REV. FCD FOR SITE CONFIGURATION

PROJECT INFORMATION:

12725 SW MILLIKAN WAY

SUITE 300

BEAVERTON, OR 97005

(503) 387-5331 www.cushingcivilengineers.com

Cushing

Civil Engineers

Civil Engineers

MARION COUNTY

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF

DRAKES CROSSING, OR

11X17 SCALE: 1" = 10' 22X34 SCALE: 1" = 5' 1 DEMOLITION PLAN

(EX) EQUIPMENT SHELTER

(CONTAINER) TO BE REMOVED

(EX) EQUIPMENT SHELTER

TO BE REMOVED

(EX) GENERATOR SHELTER &

GENERATORS TO BE REMOVED

(EX) FOUNDATION TO BE REMOVED

(EX) FOUNDATION TO BE REMOVED

(EX) EQUIPMENT SHELTER

TO BE REMOVED

(EX) ICE BRIDGE TO BE REMOVED

(EX) CONCRETE TO BE REMOVED

(EX) CONCRETE

TO BE REMOVED

(EX) CONCRETE

TO BE REMOVED

(EX) CONCRETE BARRIER

TO BE REMOVED, TYP

(EX) PROPANE TANK TO

BE REMOVED, TYP OF (2)

(EX) ICE CANOPY

TO BE REMOVED

NOTE:

THIS IS NOT A SURVEY; ALL EXISTING INFORMATION

IS PROVIDED BY GIS, SURVEY & SITE WALK NOTES.

(EX) GAS VALVE TO BE REMOVED

(EX) EXPOSED CONDUIT

TO BE REMOVED

(EX) 60.6' SELF-SUPPORTED TOWER TO REMAIN IN

USE DURING WORK IN PROGRESS; TO BE REMOVED

PER MARION COUNTY DIRECTION(EX) PROPANE TANK TO BE

RELOCATED TO COMPLY W/

NFPA 58 CODE, TYP OF (4);

SEE SHEET C-2 FOR SITE PLAN

KamalThapa Snapshot

RobHowe

CENTER LINE

PROPERTY LINE

NUMBER

OTHERWISE

WATERPROOF

VERIFY IN FIELD

WITHOUT

WINDOW

VINYL TILE

VERTICAL

UNLESS NOTED

TOP OF MASONRY

TOP OF CONCRETE

SHEET VINYL

TYPICAL

THROUGH

SUSPENDED

STRUCTURAL

STAINLESS STEEL

SPECIFICATION

ROUGH OPENING

SQUARE

SIMILAR

REQUIRED

W/O

GA

GC

GALV

FT

FLR

FLUOR

FIN

EXT

EX

GAUGE

GENERAL CONTRACTOR

GALVANIZE(D)

FLUORESCENT

FOOT

FLOOR

FINISH

EXTERIOR

EXISTING

PRESSURE TREATED

OUTSIDE DIAMETER

PAIRPR

PROP

PROJ

PT

PROPERTY

PROJECT

OPP

OC, o/c

OPG

OD

OPPOSITE

OPENING

ON CENTER

AT

WP

C P L L

AND

ANGLE

GROUNDGRND

AIR CONDITIONINGA/C

REQ'D

CONTINUOUSCONT

DWG

EL, ELEV

E.W.

EQUIP

EQ

ELECT

EA

E

DIAG

DIM

DN

DTL, DETL

DIA, Ø

DBL

DRAWING

ELEVATION

EACH WAY

EQUIPMENT

EQUAL

ELECTRICAL

EACH

EAST

DIAGONAL

DETAIL

DOWN

DIMENSION

DIAMETER

DOUBLE

CONST

CONC

CLR

CLG

BLK

B/S

BMR

BLDG

AWG

ASTM

APPROX

AFF

ADJ

CONSTRUCTION

BUILDING STANDARD

BASE MOBILE RADIO

CONCRETE

CLEAR

CEILING

BLOCK

AMERICAN WIRE GAUGE

TESTING & MATERIALS

AMERICAN SOCIETY FOR

APPROXIMATELY

ABOVE FINISH FLOOR

BUILDING

ADJUSTABLE

T.O.C.

NOT IN CONTRACT

NOT APPLICABLE

MINIMUMMIN

N

NTS

NIC

NA

MISC

NORTH

NOT TO SCALE

MISCELLANEOUS

MET, MTL

MECH

MGR

MFR

LB(S)

MAX

MANAGER

MANUFACTURER

MECHANICAL

METAL

MAXIMUM

POUND(S)

VERT

WIN

W/ W

VT

VIF

WEST

WITH

U.N.O.

T.O.M.

TYP

GYPSUM WALL BOARD

HVAC

IN

INSUL

INT

INFO

I.D.

INCH

INTERIOR

INSULATION

INFORMATION

INSIDE DIA.

HORIZ

HARD'WD

HT

HR

GYP BD

GWB

HORIZONTAL

HARDWOOD

HEIGHT

HOUR

GYPSUM BOARD

SQ

TNND

THRU

SUSP

STRUCT

S.V.

SS

STL

TINNED

STEEL

SPEC

S

SHT

SIM

RM

R.O.

SOUTH

SHEET

ROOM

ANTENNA AMPLIFIERLNA

OVERHEAD POWEROHP

UNDRGRND POWERUGP

OVERHEAD TELCOOHT

UNDRGRND TELCOUGT

HEATING, VENTING AND

AIR CONDITIONING

1. DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS TAKE PRECEDENCE, THIS SET OF

DOCUMENTS IS INTENDED TO BE USED FOR DIAGRAMMATIC PURPOSED ONLY, UNLESS

NOTED OTHERWISE. THE GENERAL CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE

FURNISHING ALL MATERIALS, EQUIPMENT, LABOR AND ANY REQUIREMENTS DEEMED

NECESSARY TO COMPLETE INSTALLATION AS DESCRIBED IN THE DRAWINGS AND OWNER'S

PROJECT MANUAL.

2. THE CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS AND STANDARDIZED DETAILS THAT

REQUIRE MODIFICATIONS DUE TO ACTUAL FIELD CONDITIONS AND REQUIREMENTS MUST BE

SUBMITTED TO AND APPROVED BY OWNERS REPRESENTATIVE PRIOR TO START OF WORK.

3. PRIOR TO THE SUBMISSION OF BIDS, CONTRACTORS INVOLVED SHALL VISIT THE JOB SITE TO

FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE PROPOSED PROJECT.

CONTRACTORS SHALL VISIT THE CONSTRUCTION SITE WITH THE CONSTRUCTION/CONTRACT

DOCUMENTS TO VERIFY FIELD CONDITIONS AND CONFIRM THAT THE PROJECT WILL BE

ACCOMPLISHED AS SHOWN. PRIOR TO PROCEEDING WITH CONSTRUCTION, ANY ERRORS,

OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT/ENGINEER VERBALLY AND IN WRITING.

4. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO PROCEED WITH

CONSTRUCTION PRIOR TO STARTING WORK ON ANY ITEM NOT CLEARLY DEFINED BY THE

CONSTRUCTION DRAWINGS/CONTRACT DOCUMENTS.

5. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED IN THE

CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL

CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, SAFETY, AND PROCEDURES

FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT.

6. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS ACCORDING TO

MANUFACTURER'S/VENDOR'S SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE

LOCAL CODES OR ORDINANCES TAKE PRECEDENCE.

7. ALL WORK PERFORMED ON THE PROJECT AND MATERIALS INSTALLED SHALL BE IN STRICT

ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND ORDINANCES.

CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES,

REGULATIONS AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY, MUNICIPAL AND UTILITY

COMPANY SPECIFICATIONS, AND LOCAL AND STATE JURISDICTIONAL CODES BEARING ON THE

PERFORMANCE OF THE WORK.

8. THE CONTRACTOR SHALL PROVIDE, AT THE PROJECT SITE, A FULL SET OF CONSTRUCTION

DOCUMENTS UPDATED WITH THE LATEST REVISIONS INVOLVED WITH THE PROJECT. THIS

SET IS A VALID CONTRACT DOCUMENT ONLY IF THE TITLE SHEET IS STAMPED IN RED INK "FOR

CONSTRUCTION" AND EACH SUCCESSIVE SHEET BEARS THE ARCHITECT'S/ENGINEER'S

SIGNED WET STAMP.

9. THE CONTRACTOR IS RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL WORK

DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE, ETC. ACCORDING TO

APPLICABLE CODES, STANDARDS, AND GOOD CONSTRUCTION PRACTICES. THE

STRUCTURAL COMPONENTS OF ADJACENT CONSTRUCTION OR FACILITIES ARE NOT TO BE

ALTERED BY THE CONSTRUCTION PROJECT UNLESS NOTED OTHERWISE.

10. THE CONTRACTOR SHALL MEET ALL OSHA REQUIREMENTS FOR ALL INSTALLATIONS.

11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES TO THE EXISTING

CONSTRUCTION AND REPAIR ALL DAMAGES TO EQUAL OR BETTER NEW CONSTRUCTION. THE

CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER OF ANY DAMAGE TO THE BUILDING

SITE OR ANY ADJACENT STRUCTURES AROUND THE PROJECT. THE OWNERS

REPRESENTATIVE SHALL BE SOLE AND FINAL JUDGE AS TO THE QUALITY OF THE REPAIRED

CONSTRUCTION. ANY ADDITIONAL MODIFICATIONS WHICH MUST BE MADE SHALL BE MADE AT

THE CONTRACTOR'S EXPENSE.

12. WHERE NEW PAVING, CONCRETE SIDEWALKS OR PATHS MEET EXISTING CONSTRUCTION, THE

CONTRACTOR SHALL MATCH THE EXISTING PITCH, GRADE, AND ELEVATION SO THE ENTIRE

STRUCTURE SHALL HAVE A SMOOTH TRANSITION.

13. THE CONTRACTOR SHALL MODIFY THE EXISTING FLOORS, WALL, CEILING, OR OTHER

CONSTRUCTION AS REQUIRED TO GAIN ACCESS TO AREAS FOR ALL MECHANICAL, PLUMBING,

ELECTRICAL, OR STRUCTURAL MODIFICATIONS. WHERE THE EXISTING CONSTRUCTION

DOORS, PARTITIONS, CEILING, ETC., ARE TO BE REMOVED, MODIFIED, OR REARRANGED OR

WHERE THE EXPOSED OR HIDDEN MECHANICAL, ELECTRICAL, SYSTEMS ARE ADDED OR

MODIFIED, THE GENERAL CONTRACTOR SHALL REPAIR, PATCH AND MATCH ALL EXISTING

CONSTRUCTION AND FINISHES OF ALL FLOORS WALLS AND CEILINGS. WHERE CONCRETE

MASONRY CONSTRUCTION IS MODIFIED, THE CONTRACTOR SHALL TOOTH IN ALL NEW

CONSTRUCTION TO MATCH THE EXISTING BOND. WHERE CONCRETE CONSTRUCTION IS

MODIFIED, THE CONTRACTOR SHALL VERIFY THE EXACT DETAILS TO BE USED FOR

CONSTRUCTION. ALL WORK SHALL BE COVERED UNDER THE GENERAL CONTRACT.

14. IF CONTRACTOR OR SUBCONTRACTOR FIND IT NECESSARY TO DEVIATE FROM ORIGINAL

APPROVED PLANS, THEN IT IS THE CONTRACTOR'S AND THE SUBCONTRACTOR'S

RESPONSIBILITY TO PROVIDE THE PROJECT MANAGER WITH 4 COPIES OF THE PROPOSED

CHANGES FOR HIS APPROVAL BEFORE PROCEEDING WITH THE WORK. IN ADDITION THE

CONTRACTOR AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR PROCURING ALL

NECESSARY APPROVALS FROM THE BUILDING AUTHORITIES FOR THE PROPOSED CHANGES

BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR AND SUBCONTRACTORS SHALL

BE RESPONSIBLE FOR PROCURING ALL NECESSARY INSPECTIONS AND APPROVALS FROM

BUILDING AUTHORITIES DURING THE EXECUTION OF THE WORK.

15. CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS

THAN 2-A OR 2-A10BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF PROJECT

AREA DURING CONSTRUCTION.

16. THIS IS AN ESSENTIAL FACILITY THEREFORE SHALL STRICTLY MEET ALL APPLICABLE CODE

AND JURISDICTIONAL REQUIREMENTS.

1. RUBBISH, STUMPS, DEBRIS, STICKS, STONES AND OTHER REFUSE SHALL BE REMOVED

FROM THE SITE AND DISPOSED OF LEGALLY UNLESS OTHERWISE REQUIRED TO BE LEFT AS

DEFINED BY LAND/PROPERTY OWNER.

2. THE SITE SHALL BE GRADED TO CAUSE SURFACE WATER TO FLOW AWAY FROM THE

EQUIPMENT, EQUIPMENT SHELTER, GENERATOR, FUEL TANK, TOWER AREAS, AND

ADJACENT BUILDINGS, ETC.

3. NO FILL OR EMBANKMENT MATERIAL SHALL BE PLACED ON FROZEN GROUND. FROZEN

MATERIALS, SNOW OR ICE SHALL NOT BE PLACED IN ANY FILL OR EMBANKMENT.

4. THE SUBGRADE SHALL BE COMPACTED AND BROUGHT TO A SMOOTH UNIFORM GRADE

PRIOR TO THE CRUSHED STONE APPLICATION. FABRIC USE AS REQUIRED.

5. ALL APPLICABLE LOCATES SHALL BE PERFORMED PRIOR TO TO ANY EXCAVATION OR SITE

GRADING. ALL EXISTING ACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES

WHERE ENCOUNTERED IN THE WORK, SHALL BE PROTECTED AT ALL TIMES, AND WHERE

REQUIRED FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS

DIRECTED BY ENGINEERS. EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR

WHEN EXCAVATING OR PIER DRILLING AROUND OR NEAR UTILITIES. CONTRACTOR SHALL

PROVIDE SAFETY TRAINING FOR THE WORKING CREW.

6. ALL EXISTING INACTIVE SEWER, WATER, GAS, ELECTRIC AND OTHER UTILITIES, WHICH

INTERFERE WITH THE EXECUTION OF THE WORK, SHALL BE REMOVED AND SHALL BE

CAPPED, PLUGGED OR OTHERWISE DISCONTINUED AT POINTS WHICH WILL NOT INTERFERE

WITH THE EXECUTION OF THE WORK, SUBJECT TO THE APPROVAL OF ENGINEERING.

7. THE AREAS OF THE PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE

BUILDING, DRIVEWAY OR CRUSHED STONE, SHALL BE GRADED TO A UNIFORM SLOPE,

FERTILIZED, SEEDED, AND COVERED WITH MULCH AS SPECIFIED IN THE SPECIFICATION

LANDSCAPE WORK..

8. BEDDING MATERIAL FOR UTILITY LINES, CULVERTS AND PIPING: CLEAN SAND, MEDIUM TP

COARSE, SUB ROUNDED NATURAL RIVER OR BANK SAND, WASHED, FREE OF SILT OR CLAY,

LOAM, FRIABLE OR SOLUBLE MATERIALS, AND ORGANIC MATTER; GRADED IN

ACCORDANCE WITH THE FOLLOWING GRAIN SIZE DISTRIBUTION:

9. BMP'S FOR TEMPORARY EROSION/SEDIMENTATION CONTROL SHALL BE IMPLEMENTED PER

LOCAL, CITY OR COUNTY GUIDELINES AND PER PLAN IF APPLICABLE.

1. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH THE ACI 301, ACI 318 AND THE

SPECIFICATION CAST-IN-PLACE CONCRETE.

2. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI AT 28 DAYS

(UNO).

3. REINFORCING STEEL SHALL CONFORM TO ASTM A 615, GRADE 60, DEFORMED UNLESS NOTED

OTHERWISE. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A 185 WELDED STEEL WIRE

FABRIC UNLESS NOTED OTHERWISE. SPLICES CLASS "B" AND ALL HOOKS SHALL BE

STANDARD (UNO).

4. THE FOLLOWING MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCING STEEL

UNLESS SHOWN OTHERWISE ON DRAWINGS: CONCRETE CAST AGAINST EARTH - 3 IN.

CONCRETE EXPOSED TO EARTH OR WEATHER:

#6 AND LARGER ..........................2 IN.

#5 AND SMALLER & WWF ...........1-1/2 IN.

5. A 1/2" TROWELED RADIUS SHALL BE PROVIDED AT ALL EXPOSED EDGES OF CONCRETE (UNO).

HOLES TO RECEIVE EXPANSION/WEDGE ANCHORS SHALL BE 1/8" LARGER IN DIAMETER THAN

THE ANCHOR BOLT, DOWEL OR ROD AND SHALL CONFORM TO MFR RECOMMENDATION FOR

EMBEDMENT DEPTH OR AS SHOWN ON THE DRAWINGS. AVOID CUTTING EXISTING REBAR

WHEN DRILLING HOLES IN THE ELEVATED SLAB.

6. INSTALLATION OF CONCRETE EXPANSION AND WEDGE ANCHOR, SHALL BE PER

MANUFACTURER'S WRITTEN RECOMMENDED PROCEDURES.

7. FLOAT SURFACE SHALL BE A SMOOTH FINISH. SURFACE SHALL BE FREE OF ALL OBVIOUS

DEPRESSIONS. SURFACE SHALL BE SLOPED AT 2% TO PROMOTE DRAINAGE AWAY FROM

EQUIPMENT.

17. THE CONTRACTOR SHALL PERFORM WORK DURING SITE/PROPERTY OWNER'S PREFERRED

HOURS TO AVOID DISTURBING NORMAL BUSINESS.

18. SEAL ALL PENETRATIONS THROUGH FIRE-RATED AREAS WITH U.L. LISTED OR FIRE MARSHAL

APPROVED MATERIALS AS APPLICABLE TO THIS FACILITY AND OR PROJECT SITE.

19. CONTRACTOR SHALL BE RESPONSIBLE FOR UTILITY LOCATES, SCHEDULING, COORDINATING

SPECIAL AND BUILDING DEPARTMENT INSPECTIONS.

21. ROUTING OF ALL CONDUITS, CABLES, CABLE TRAYS ETC ARE INDICATED AS PROPOSED

LOCATION ONLY. CONFIRM THE EXACT LOCATION AND ROUTING WITH THE ON SITE PROJECT

MANAGER PRIOR TO STARTING WORK.

AGL ABOVE GRADE LEVEL

GENERAL NOTES CONTINUED:

CONCRETE NOTES:

GENERAL NOTES:

SITE WORK NOTES:

60-90

0-45 0-25 0-2

0-2NO. 200 MESH

NO. 100 MESH

NO. 16 MESH

NO. 8 MESH

NO. 4 MESH

PERCENT PASSINGSIEVE SIZE

SYMBOLS LEGEND

ABBREVIATIONS LEGEND

GENERAL

NOTES

G-1

SHEET NUMBER:

SHEET TITLE:

C-4

REVISION

KEY NOTE DETAIL

REFERENCE ELEVATION

SECTION REFERENCE

ELEVATION DATUM POINT

A C-3

GA

GC

GALV

FT

FLR

FIN

EXT

DWG

E.W.

EQ

EA

E

DIAG

DIM

DN

DBL

CLR

CLG

BLK

B/S

BMR

BLDG

AWG

LB(S)

MAX

IN

INT

INFO

I.D.

HT

HR

GWB

LNA

SYMBOLS LEGEND

10. ALL SITE DESIGN AND CONSTRUCTION MUST COMPLY WITH INDUSTRY STANDARDS AND BE

ALIGNED WITH BMP GUIDELINES AS TECHNICALLY APPLICABLE. EACH SITE MUST BE PM

APPROVED BEFORE IT SHALL BE CONSIDERED COMPLETE AND ACCEPTED.

11. IF INADVERTENT DISCOVERIES OF NATIVE AMERICAN CULTURAL MATERIALS OR HUMAN

REMAINS ARE MADE DURING CONSTRUCTION, ALL WORK SHOULD CEASE AND POTENTIALLY

AFFECTED TRIBES, AS WELL AS THE STATE HISTORIC PRESERVATION OFFICE, SHOULD BE

NOTIFIED IMMEDIATELY.

1. ALL ANTENNAS, LINES AND RELATED INSTALLATION HARDWARE TO BE PROVIDED BY THE

LAND MOBILE COMMUNICATIONS PROVIDER.

2. ALL HARDWARE (NUTS AND BOLTS) BE TIGHTENED AND TORQUED IN ACCORDANCE WITH

THE TOWER MANUFACTURER'S AND STRUCTURAL ENGINEER'S SPECIFICATIONS.

3. VERIFICATION THAT THE TOWER/POLE CAN SUPPORT THE PROPOSED ANTENNA LOADING

IS TO BE DONE BY OTHERS.

4. PROVIDE SUPPORTS FOR THE ANTENNA COAX CABLES TO THE ELEVATION OF ALL INITIAL

AND FUTURE ANTENNAS. ANTENNA COAX CABLES ARE TO BE SUPPORTED AND

RESTRAINED AT THE CENTERS SUITABLE TO THE MANUFACTURER'S REQUIREMENTS.

SITE WORK NOTES CONTINUED:

TOWER/POLE NOTES:

LICENSURE:

DRAWING INFORMATION:

THIS DRAWING IS COPYRIGHTED AND IS THE SOLE

PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY

FOR USE BY THE OWNER AND ITS AFFILIATES.

REPRODUCTION OR USE OF THIS DRAWING AND/OR

THE INFORMATION CONTAINED IN IT IS FORBIDDEN

WITHOUT THE WRITTEN PERMISSION OF THE OWNER.

PLANS PREPARED BY:

DATE RELEASE

07-26-24 SITE SKETCH

02-12-25 PRELIMINARY ZONING DRAWINGS

05-22-25

PRELIMINARY CONSTRUCTION DRAWINGS

09-23-25 FINAL CONSTRUCTION DRAWINGS

09-30-25 REV. FCD FOR PROPANE TANK UPDATE

10-15-25

REV. FCD FOR SITE CONFIGURATION

PROJECT INFORMATION:

12725 SW MILLIKAN WAY

SUITE 300

BEAVERTON, OR 97005

(503) 387-5331 www.cushingcivilengineers.com

Cushing

Civil Engineers

Civil Engineers

MARION COUNTY

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF

DRAKES CROSSING, OR

P PROPOSED

WATER

CENTERLINE

COAX

POWER/TELCO

TELCO

COAX COAX

EASEMENT

PROPERTY LINE

GAS

UNDERGROUND POWER

CEDAR FENCE

CHAINLINK FENCE

W W

OVERHEAD POWER

G G G G G G

OHP OHP OHP OHP OHP

LPG LPG LPG LPG

PROPANE

SUBJECT PROPERTY LINE

DESIGN LOADS:

CALL 1-800-332-2344 48 HOURS BEFORE YOU DIG. OREGON LAW REQUIRES YOU TO FOLLOW

OAR 952-001-0010 THRU 952-001-0090. COPIES ARE AVAILABLE AT THE OREGON UTILITY

NOTIFICATION CENTER 503-232-1987

ATTENTION (OREGON SITES ONLY):

ROOF SNOW LOAD DATA - GROUND SNOW LOAD: 407 PSF*

FLAT-ROOF SNOW LOAD: N/A

SNOW EXPOSURE FACTOR: N/A

SNOW LOAD IMPORTANCE FACTOR: N/A

THERMAL FACTOR: N/A

WIND DESIGN DATA - ULTIMATE DESIGN WIND SPEED: 107 MPH*

RISK CATEGORY: II

WIND EXPOSURE: C*

INTERNAL PRESSURE COEFFICIENT: N/A

DESIGN WIND PRESSURES;

WIND LOAD HORIZONTAL (MWFRS):N/A

WIND LOAD (UPLIFT) (MWFRS): N/A

EARTHQUAKE DESIGN DATA - RISK CATEGORY: IV

SEISMIC IMPORTANCE FACTOR: N/A

MAPPED SPECTRAL RESPONSE ACCEL-

ERATION PARAMETERS;

SS 0.71

S1 0.28

SITE CLASS: B/C

DESIGN SPECTRAL RESPONSE ACCEL-

ERATION PARAMETERS;

SDS 0.43

SD1 0.19

SEISMIC DESIGN CATEGORY: D

BASIC SEISMIC FORCE-RESISTING

SYSTEM: N/A

DESIGN BASE SHEAR: N/A

SEISMIC RESPONSE COEFFICIENT: N/A

RESPONSE MODIFICATION COEFFICIENT: N/A

ANALYSIS PROCEDURE USED: N/A

GEOTECHNICAL INFORMATION - ALLOWABLE BEARING CAPACITY: 2,500 PSF

REFER TO GEOTECH REPORT BY BLACK MOUNTAIN DATED SEPTEMBER 19, 2024

*INFORMATION OBTAINED FROM ASCE 7 HAZARD TOOL AND/OR OREGON SNOW LOAD MAP

KamalThapa Snapshot

RobHowe

GRADING & EROSION

CONTROL PLAN

ER-1

SHEET NUMBER:

SHEET TITLE:

LICENSURE:

DRAWING INFORMATION:

THIS DRAWING IS COPYRIGHTED AND IS THE SOLE

PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY

FOR USE BY THE OWNER AND ITS AFFILIATES.

REPRODUCTION OR USE OF THIS DRAWING AND/OR

THE INFORMATION CONTAINED IN IT IS FORBIDDEN

WITHOUT THE WRITTEN PERMISSION OF THE OWNER.

PLANS PREPARED BY:

DATE RELEASE

07-26-24 SITE SKETCH

02-12-25 PRELIMINARY ZONING DRAWINGS

05-22-25

PRELIMINARY CONSTRUCTION DRAWINGS

09-23-25 FINAL CONSTRUCTION DRAWINGS

09-30-25 REV. FCD FOR PROPANE TANK UPDATE

10-15-25

REV. FCD FOR SITE CONFIGURATION

PROJECT INFORMATION:

12725 SW MILLIKAN WAY

SUITE 300

BEAVERTON, OR 97005

(503) 387-5331 www.cushingcivilengineers.com

Cushing Civil Engineers

Civil Engineers

MARION COUNTY

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF

DRAKES CROSSING, OR

11X17 SCALE: 1" = 16' 22X34 SCALE: 1" = 8' GRADING & EROSION CONTROL PLAN 1

EROSION CONTROL NOTES:

1. OWNER OR DESIGNATED PERSON SHALL BE RESPONSIBLE FOR PROPER INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES, IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.

2. THE IMPLEMENTATION OF THESE ESC PLANS AND CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED BY THE LOCAL JURISDICTION, AND VEGETATION/LANDSCAPING IS ESTABLISHED. THE DEVELOPER SHALL BE RESPONSIBLE FOR MAINTENANCE AFTER THE PROJECT IS APPROVED UNTIL THE LOTS ARE SOLD.

3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY MARKED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE MARKINGS SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF

CONSTRUCTION.

4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DOES

NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER STANDARDS.

5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS.

DURING CONSTRUCTION PERIODS, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DOES NOT LEAVE THE SITE.

6. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/CONTRACTOR AND MAINTAINED AS NECESSARY

TO ENSURE THEIR CONTINUED FUNCTIONING.

7. AT NO TIME SHALL SEDIMENT BE ALLOWED TO ACCUMULATE MORE THAN 1/3 THE BARRIER HEIGHT. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATIONS SHALL NOT

FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM.

8. STABILIZED GRAVEL ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS

ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.

9. STORM DRAIN INLETS, BASINS, AND AREA DRAINS SHALL BE PROTECTED UNTIL PAVEMENT SURFACES ARE

COMPLETED AND/OR VEGETATION IS RE-ESTABLISHED.

10. PAVEMENT SURFACES AND VEGETATION ARE TO BE PLACED AS RAPIDLY AS POSSIBLE.

11. SEEDING SHALL BE PERFORMED NO LATER THAN SEPTEMBER 1 FOR EACH PHASE OF CONSTRUCTION.

12. IF THERE ARE EXPOSED SOILS OR SOILS NOT FULLY ESTABLISHED FROM OCTOBER 1ST THROUGH APRIL 30TH, THE

WET WEATHER EROSION PREVENTION MEASURES WILL BE IN EFFECT. SEE THE EROSION PREVENTION AND

SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (CHAPTER 4) FOR REQUIREMENTS.

13. NO EXPOSED, BARE SOILS SHALL REMAIN UNSTABILIZED FOR MORE THAN TWO DAYS DURING THE PERIOD OCTOBER 1 THROUGH APRIL 30 OR FOR MORE THAN SEVEN DAYS DURING THE PERIOD OF MAY 1 THROUGH SEPTEMBER 30.

ALL DISTURBED SOIL SURFACES SHALL BE STABILIZED BY A SUITABLE APPLICATION OF "BEST MANAGEMENT

PRACTICES".

14. WHERE FEASIBLE, NO MORE THAN 500 FEET OF TRENCH SHALL BE OPEN AT ONE TIME. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHIL SIDE OF TRENCHES PROVIDED IT DOES NOT CONFLICT WITH SAFETY

REQUIREMENTS.

15. THE DEVELOPER SHALL REMOVE ESC MEASURES WHEN VEGETATION IS FULLY ESTABLISHED.

4 GENERAL NOTES SCALE: NTS

2SCALE: NTS

3SCALE: NTS CUT/ FILL QUANTITIES

UNADJUSTED CUT/ FILL QUANTITIES

STRIPPING ORGANICS FOR COMPOUND;

CUT = ±84 CU. YD.

STRIPPING FOR ACCESS ROAD AND PARKING;

CUT = EXISTING

PROPOSED COMPOUND AREA;

CUT = 0 CU. YD.

FILL = 0 CU. YD.

PROPOSED ACCESS ROAD AND PARKING;

CUT = 0 CU. YD.

FILL = 0 CU. YD.

PROPOSED TOWER FOUNDATION;

EXCAVATION = ±148 CU. YD.

APPROX. TOTAL AREA OF DISTURBANCE OF PROPOSED GRADING = 2,245 SQ. FT.

REFER TO GEO-TECHNICAL ENGINEERING EVALUATION BY BLACK MOUNTAIN DATED 09/19/2024

NOT USED

±98 LF OF (P) SILT FENCE;

SEE SHEET ER-2 FOR DETAIL

3945'

3950'

3950'

3945'

TOP OF (P) EQUIPMENT

SHELTER FOUNDATION

3950.5'

TOP OF (P) FOUNDATION

3950.5'

EXISTING GRADE

PROPOSED GRADE

TEMPORARY SILT FENCE

CONSTRUCTION ENTRANCE

FLOW DIRECTION

GROUND ELEVATION

GRADE TO DRAIN

LEGEND

250'

TOP OF (P) SLAB

3947.5'

±150 LF OF (P) SILT FENCE;

SEE SHEET ER-2 FOR DETAIL

KamalThapa Snapshot

RobHowe

GRADING & EROSION

CONTROL DETAILS

ER-2

SHEET NUMBER:

SHEET TITLE:

LICENSURE:

DRAWING INFORMATION:

THIS DRAWING IS COPYRIGHTED AND IS THE SOLE

PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY

FOR USE BY THE OWNER AND ITS AFFILIATES.

REPRODUCTION OR USE OF THIS DRAWING AND/OR

THE INFORMATION CONTAINED IN IT IS FORBIDDEN

WITHOUT THE WRITTEN PERMISSION OF THE OWNER.

PLANS PREPARED BY:

DATE RELEASE

07-26-24 SITE SKETCH

02-12-25 PRELIMINARY ZONING DRAWINGS

05-22-25

PRELIMINARY CONSTRUCTION DRAWINGS

09-23-25 FINAL CONSTRUCTION DRAWINGS

09-30-25 REV. FCD FOR PROPANE TANK UPDATE

10-15-25

REV. FCD FOR SITE CONFIGURATION

PROJECT INFORMATION:

12725 SW MILLIKAN WAY

SUITE 300

BEAVERTON, OR 97005

(503) 387-5331 www.cushingcivilengineers.com

Cushing

Civil Engineers

Civil Engineers

MARION COUNTY

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF

DRAKES CROSSING, OR

SEDIMENT FENCE NOTES:

1. THE FILTER FABRIC FENCE SHALL BE INSTALLED TO FOLLOW THE CONTOURS WHERE FEASIBLE. THE FENCE POSTS SHALL BE SPACED A MAXIMUM OF 6'

APART AND DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24”.

2. THE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM 6” OVERLAP, AND BOTH ENDS SECURELY FASTENED TO THE POST, OR OVERLAP 2” X 2” POSTS AND ATTACH AS SHOWN ON DETAIL SHEET 4-3A OF THE EROSION CONTROL MANUAL.

3. THE FILTER FABRIC SHALL HAVE A MINIMUM VERTICAL BURIAL OF 6”. ALL EXCAVATED MATERIAL FROM FILTER FABRIC INSTALLATION SHALL BE

BACKFILLED AND COMPACTED ALONG THE ENTIRE DISTURBED AREA.

4. STANDARD OR HEAVY-DUTY FILTER FABRIC FENCES SHALL HAVE MANUFACTURED STITCHED LOOPS FOR 2” X 2” POST INSTALLATION. STITCHED LOOPS

SHALL BE INSTALLED ON THE UP HILLSIDE OF THE SLOPED AREA.

5. FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN

PERMANENTLY PROTECTED AND STABILIZED.

6. FILTER FABRIC FENCES SHALL BE INSPECTED BY APPLICANT/CONTRACTOR IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING

PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.

3SCALE: NTS

2SCALE: NTS

4SCALE: NTS

1SCALE: NTS

TOE OF

SLOPE

PL

PL

H/5 BUT 2' MINIMUM

AND NEED NOT EXCEED

20' MAXIMUM

TOE OF

SLOPE

H/5 BUT 2'

MINIMUM

AND NEED

NOT

EXCEED 10'

MAXIMUM

NATURAL OR

FINISH GRADE

INTERCEPTOR DRAIN

(IF REQUIRED)

H

NATURAL OR

FINISH GRADE

CUT OR

FILL SLOPE

GRAVEL CONSTRUCTION ENTRANCE TEMPORARY SEDIMENT FENCE

PLASTIC SHEETING SETBACKS AND DRAINAGE DIMENSIONS

KamalThapa Snapshot

RobHowe

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

OVERALL

SITE PLAN

C-1

SHEET NUMBER:

SHEET TITLE:

LICENSURE:

DRAWING INFORMATION:

THIS DRAWING IS COPYRIGHTED AND IS THE SOLE

PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY

FOR USE BY THE OWNER AND ITS AFFILIATES.

REPRODUCTION OR USE OF THIS DRAWING AND/OR

THE INFORMATION CONTAINED IN IT IS FORBIDDEN

WITHOUT THE WRITTEN PERMISSION OF THE OWNER.

PLANS PREPARED BY:

DATE RELEASE

07-26-24 SITE SKETCH

02-12-25 PRELIMINARY ZONING DRAWINGS

05-22-25

PRELIMINARY CONSTRUCTION DRAWINGS

09-23-25 FINAL CONSTRUCTION DRAWINGS

09-30-25 REV. FCD FOR PROPANE TANK UPDATE

10-15-25

REV. FCD FOR SITE CONFIGURATION

PROJECT INFORMATION:

12725 SW MILLIKAN WAY

SUITE 300

BEAVERTON, OR 97005

(503) 387-5331 www.cushingcivilengineers.com

Cushing

Civil Engineers

Civil Engineers

MARION COUNTY

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF

DRAKES CROSSING, OR

22X34 SCALE: 1" = 1400' OVERALL SITE PLAN 111X17 SCALE: 1" = 2800'

PROPOSED PROJECT AREA

SEE SHEET C-2 FOR DETAILS

(EX) ACCESS ROAD

PARCEL#: 083E000000200

ZONING: TC

NOTE:

THIS IS NOT A SURVEY; ALL EXISTING

INFORMATION IS PROVIDED BY MARION

COUNTY GIS.

ZONING: TC

ZONING: TC

ZONING: TC

ZONING: TC

±2

±3976'

±7

±1241'

KamalThapa Snapshot

RobHowe

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

L P

G

ENLARGED SITE

PLAN

SHEET NUMBER:

SHEET TITLE:

LICENSURE:

DRAWING INFORMATION:

THIS DRAWING IS COPYRIGHTED AND IS THE SOLE

PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY

FOR USE BY THE OWNER AND ITS AFFILIATES.

REPRODUCTION OR USE OF THIS DRAWING AND/OR

THE INFORMATION CONTAINED IN IT IS FORBIDDEN

WITHOUT THE WRITTEN PERMISSION OF THE OWNER.

PLANS PREPARED BY:

DATE RELEASE

07-26-24 SITE SKETCH

02-12-25 PRELIMINARY ZONING DRAWINGS

05-22-25

PRELIMINARY CONSTRUCTION DRAWINGS

09-23-25 FINAL CONSTRUCTION DRAWINGS

09-30-25 REV. FCD FOR PROPANE TANK UPDATE

10-15-25

REV. FCD FOR SITE CONFIGURATION

PROJECT INFORMATION:

12725 SW MILLIKAN WAY

SUITE 300

BEAVERTON, OR 97005

(503) 387-5331 www.cushingcivilengineers.com

Cushing

Civil Engineers

Civil Engineers

MARION COUNTY

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF

DRAKES CROSSING, OR

11X17 SCALE: 1" = 12' 22X34 SCALE: 1" = 6' 1

1,2 C-3

(EX) SOLAR PANEL BY OTHERS

(EX) GRAVEL AREA, TYP

(EX) PROPANE TANK, TYP OF (4);

RE-INSTALL TO COMPLY W/

NFPA 58 CODE

(P) ICE CANOPY;

SEE SHEET C-5 FOR DETAIL

(P) BOLLARD, TYP;

SEE SHEET C-4 FOR DETAIL

(EX) SOLAR PANEL

BY OTHERS, TYP

(P) GAS AND TELCO LINE TO NEW GENERATOR;

SEE SHEET C-4 & C-5 FOR DETAIL

(EX) 60.6' SELF-SUPPORTED TOWER TO REMAIN IN

USE DURING WORK IN PROGRESS; TO BE REMOVED

PER MARION COUNTY DIRECTION

(P) GENERATOR INSIDE NEW SHELTER;

SEE SHEET C-5 FOR DETAIL

(EX) LEASE AREA

(P) ±24 LF ICE BRIDGE;

SEE SHEET C-4 FOR DETAIL

(P) TOWER FOUNDATION;

SEE SABRE TOWER DRAWINGS

FOR STRUCTURAL INFORMATION

(P) GROUND MOUNTED SOLAR PV ARRAY;

SEE SHEET U-1 THRU U-4 FOR DETAIL

(P) 3"Ø CONDUIT;

SEE SHEET C-5 DETAIL

(P) GENERATOR SHELTER FOUNDATION;

SEE SHEET C-8 FOR DETAIL

(P) SNOW ACCESS VESTIBULE;

SEE SHEET SH-3 FOR DETAIL

(P) 10'x10' GENERATOR SHELTER;

SEE SHEET SH-6 & SH-7 FOR DETAIL

(P) POWER/TELCO LINE FROM GENERATOR

TO EQUIPMENT SHELTER;

SEE SHEET C-4 & C-5 FOR DETAIL

(P) 180' SELF-SUPPORT TOWER;

SEE SABRE TOWER DRAWINGS

FOR STRUCTURAL INFORMATION

(P) 12'x16' EQUIPMENT SHELTER;

SEE SHEET SH-1 THRU SH-5 FOR DETAIL

(P) EQUIPMENT SHELTER FOUNDATION;

SEE SHEET C-7 FOR DETAIL

NOTES:

1. TOWER INFO SHOWN FOR CONCEPTUAL USE ONLY.

SEE SABRE TOWER STRUCTURAL DESIGN FOR DETAIL.

2. THIS IS NOT A SURVEY ALL EXISTING INFORMATION IS

PROVIDED BY GIS, SURVEY & SITE WALK NOTES.

3. PROPOSED AND EXISTING ANTENNAS NOT SHOWN

FOR CLARITY.

ENLARGED SITE PLAN

C-2

(P) SPLIT HVAC HYBRID SYSTEM W/

WALL MOUNT TO BE PROVIDED BY

CONTRACTOR, TYP OF (2);

SEE SHEET C-6 FOR DETAIL

(P) 23'x16' CONCRETE PAD;

SEE SHEET C-5 FOR DETAIL

(P) GROUND MOUNTED SOLAR PV ARRAY;

SEE SHEET U-1 THRU U-4 FOR DETAIL

SE

TB

AC

K

25'

SETBACK

5'

MAX.

3' 3'

3'

16'

23'

26'

4'

13'-11"

20'-7"

11'

KamalThapa Snapshot

RobHowe

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

COAX

COAX

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

C O

A X

LICENSURE:

DRAWING INFORMATION:

THIS DRAWING IS COPYRIGHTED AND IS THE SOLE

PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY

FOR USE BY THE OWNER AND ITS AFFILIATES.

REPRODUCTION OR USE OF THIS DRAWING AND/OR

THE INFORMATION CONTAINED IN IT IS FORBIDDEN

WITHOUT THE WRITTEN PERMISSION OF THE OWNER.

PLANS PREPARED BY:

DATE RELEASE

07-26-24 SITE SKETCH

02-12-25 PRELIMINARY ZONING DRAWINGS

05-22-25

PRELIMINARY CONSTRUCTION DRAWINGS

09-23-25 FINAL CONSTRUCTION DRAWINGS

09-30-25 REV. FCD FOR PROPANE TANK UPDATE

10-15-25

REV. FCD FOR SITE CONFIGURATION

PROJECT INFORMATION:

12725 SW MILLIKAN WAY

SUITE 300

BEAVERTON, OR 97005

(503) 387-5331 www.cushingcivilengineers.com

Cushing

Civil Engineers

Civil Engineers

MARION COUNTY

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF

DRAKES CROSSING, OR

11X17 SCALE: 1" = 24' 22X34 SCALE: 1" = 12'EXISTING SOUTH ELEVATION 1 11X17 SCALE: 1" = 24'PROPOSED SOUTH ELEVATION 222X34 SCALE: 1" = 12'

ELEVATIONS

C-3

SHEET NUMBER:

SHEET TITLE:

(EX) TOWER TOP ±63.6' AGL

GROUND LEVEL (GL)

(EX) 60.6' SELF-SUPPORT

TOWER TO BE REMOVED

(EX) COAX CABLE

(EX) EQUIPMENT SHELTER

BY OTHERS TO BE REMOVED

(P) TOWER TOP ±180.0' AGL

(P) ANTENNA BASE ±179.0' AGL

(EX) ANTENNA EQUIPMENT TO

BE RELOCATED TO NEW TOWER

(P) 180' SELF-SUPPORT TOWER

(P) COAX CABLE

(EX) ICE BRIDGE BY OTHERS

TO BE REMOVED, TYP

(P) EQUIPMENT SHELTER

(EX) GENERATOR

SHELTER TO BE REMOVED

(EX) EQUIPMENT SHELTER

(CONTAINER) TO BE REMOVED

(EX) EQUIPMENT SHELTER

TO BE REMOVED

(P) GENERATOR SHELTER

BEHIND SOLAR PV ARRAY

(P) ANTENNA CL ±50.0' AGL

(P) RECEIVE ANTENNA;

CC807-09

(EX) RELOCATED ANTENNA

EQUIPMENT BY OTHERS, TYP

(EX) TOP OF CONCRETE ±3.0' AGL

(P) GROUND MOUNTED

SOLAR PV ARRAY, TYP OF (2)

(P) 4Ø MICROWAVE ANTENNA;

COMMSCOPE - VHLPX4-11W

AZIMUTH = 259.31°

(TO SCC)

(P) 2Ø MICROWAVE ANTENNA;

COMMSCOPE - VHLP2-18

AZIMUTH = 157.44°

(TO APW)

(P) ANTENNA CL ±17.0' AGL

NOTES:

1. TOWER INFO SHOWN FOR CONCEPTUAL USE ONLY. SEE

SABRE TOWER STRUCTURAL REPORT FOR DETAIL.

2. TOWER SHALL BE PAINTED WITH A DULL, NON-REFLECTIVE

GRAY COLOR.

3. LOADING INFORMATION PROVIDED BY TAIT COMMUNICATIONS.

GROUND LEVEL (GL)

(P) VHF AS-IP RECEIVE ANTENNA;

DS1F06F36U-D

(P) ANTENNA CL ±80.0' AGL

(P) ANTENNA BASE ±94.0' AGL

(P) VHF AS-IP TRANSMIT ANTENNA;

SV227-SF2SNM

(P) LIGHTNING ROD

(EX) PROPANE TANK,

TYP OF (4)

(P) ICE CANOPY

(P) BOLLARD, TYP

(EX) PROPANE TANK TO

BE REMOVED; TYP OF (2)

(EX) PROPANE TANK TO

REMAIN, TYP OF (4);

RE-INSTALL TO COMPLY

W/ NFPA 58 CODE

(EX) ICE CANOPY

TO BE REMOVED (P) ICE BRIDGE

KamalThapa Snapshot

RobHowe

COMPOUND

DETAILS

C-4

SHEET NUMBER:

SHEET TITLE:

LICENSURE:

DRAWING INFORMATION:

THIS DRAWING IS COPYRIGHTED AND IS THE SOLE

PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY

FOR USE BY THE OWNER AND ITS AFFILIATES.

REPRODUCTION OR USE OF THIS DRAWING AND/OR

THE INFORMATION CONTAINED IN IT IS FORBIDDEN

WITHOUT THE WRITTEN PERMISSION OF THE OWNER.

PLANS PREPARED BY:

DATE RELEASE

07-26-24 SITE SKETCH

02-12-25 PRELIMINARY ZONING DRAWINGS

05-22-25

PRELIMINARY CONSTRUCTION DRAWINGS

09-23-25 FINAL CONSTRUCTION DRAWINGS

09-30-25 REV. FCD FOR PROPANE TANK UPDATE

10-15-25

REV. FCD FOR SITE CONFIGURATION

PROJECT INFORMATION:

12725 SW MILLIKAN WAY

SUITE 300

BEAVERTON, OR 97005

(503) 387-5331 www.cushingcivilengineers.com

Cushing

Civil Engineers

Civil Engineers

MARION COUNTY

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF

DRAKES CROSSING, OR

4" OF 3/4" CHIP ROCK;

NO FINES

GEOTEXTILE FABRIC,

TYPAR-3401

OR EQUIVALENT

4" OF 3/4"-MINUS

CRUSHED ROCK

COMPACTED 95%

SUBSOIL COMPACTED TO 92% OF

MAXIMUM DRY DENSITY MIN. PER

ASTM-D1557

NOTE: STRIP ALL ORGANICS

3" MIN OF 3/4" MINUS CRUSHED

ROCK COMPACTED TP 95% IN

ACCORDANCE WITH ASTM-D698

GEOTEXTILE FABRIC,

MIRAFI 500X (12"

OVERLAP AT SEAMS)SUBSOIL COMPACTED TO 92% OF

MAXIMUM DRY DENSITY MIN PER

ASTM-D1557

NOTES:

1. CONTRACTOR SHALL STRIP SUPERFICIAL, SOFT, WET, ORGANIC OR DELETERIOUS SOILS TO EXPOSE FIRM AND UNYIELDING SOIL (BETWEEN 6" & 12"). IF STRIPPING IS REQUIRED DEEPER THAN 12", CONTRACTOR SHALL CONTACT THE SITE CONSTRUCTION MANGER TO DETERMINE THE APPROPRIATE STRIPPING DEPTH

AT THE TIME OF CONSTRUCTION.

2. MATERIAL AND INSTALLATION SHALL CONFORM TO CURRENT ODOT/APWA STANDARD SPECIFICATIONS AND

MANUFACTURERS RECOMMENDATIONS.

12" MIN OF 3" MINUS

CRUSHED ROCK COMPACTED

TO 95% IN ACCORDANCE WITH

ASTM-D698

POWER LINE TRENCH

4SCALE: NTS ICE BRIDGE DETAIL 5SCALE: NTS

3SCALE: NTS2 COMPOUND ROCK SECTION DETAILSCALE: NTS1SCALE: NTS GRAVEL ROAD SECTION DETAIL

6SCALE: NTS

" E

LE

CT

RI

CA

L P

RI

MA

RY

" E

LE

CT

RI

CA

L S

EC

ON

DA

RY

2'- 6"

T O

3'- 6"

±4

±4

12" MIN

CLEAR

24"±

WARNING TAPE

FINISH GRADE

UNEXCAVATED EARTH

COMPACTED FILL

(85% IN LANDSCAPED AREAS,

95% IN PAVED AREAS)

ELECTRICAL CONDUIT(S); 3"Ø

MIN, SCHEDULE 40 PVC, OR

AS SHOWN ON PLAN

COMPACTED SAND

NOTES:

1. EXCAVATE TO REQUIRED DEPTH.

2. VERIFY ALL TRENCHING REQUIREMENTS PER LOCAL UTILITIES.

3. CONTRACTOR TO PROVIDE (1) 300 POUND NYLON PULL CORD

AND CONDUCTORS AS REQUIRED PER CONDUIT.

CONTRACTOR TO VERIFY WITH

MARION COUNTY PM IF SPARE

CONDUIT TO BE PLACED IN

TRENCH FOR FUTURE

SIGN DETAILS

UNDISTURBED EARTH

CROWN TO DRAIN

48" X 18"Ø CONCRETE

FOOTING @ 2,500 PSI

STANDARD 6"Ø STEEL PIPE,

CONCRETE FILLED PAINT

W/MIN (3) COATS EPOXY

ENAMEL (YELLOW)

BOLLARD DETAIL

SIGN NOTES:

1. SIGN MATERIAL: 18GA

ALUMINUM

2. LETTERING COLOR =

BLACK / WHITE

3. BACKGROUND COLOR =

WHITE / BLUE

7"

SIGN NOTES:

1. SIGN MATERIAL: 18GA

ALUMINUM

2. LETTERING COLOR =

BLACK

3. BACKGROUND COLOR =

WHITE / RED

12"

SIGN NOTES:

1. SIGN MATERIAL: 18GA

ALUMINUM

2. LETTERING COLOR =

BLACK

3. BACKGROUND COLOR =

YELLOW

7"

MARION COUNTY

7SCALE: NTS ACCESS ROAD SECTION DETAIL

36" OC MAX

10'-0" OC MAX

FIELD VERIFY

12"

2"CLR.

2'-0"

CLR MIN.

COAX BRIDGE: 14 GA.

GALV. GRIPSTRUT 24"

WIDTH, 2" PLANK 14 GA.

SUPPORT COLUMN: 4"Ø

O.D. GALV. SCHED. 40

POST @ 10'-0" O.C. MAX

CROWN TO DRAIN; TYP.

FOOTING

MUST BE 6"

BELOW

FROST LINE,

TYP.

SIDE ELEVATIONFRONT ELEVATION

NOTE: GROUND COAX BRIDGE PER THE REQUIREMENTS

OF THE NEC STANDARDS - SEE DETAIL 1/E-2

COAX SUPPORT BLOCKS

AT 3'-0" MAX O.C.

EDGE OF

SHELTER

20" UNISTRUT W/ NUT

AND WASHER EACH

SIDE/ EACH LEVEL AS

REQUIRED

12"Ø X 48" DEEP CONC.

FOOTING; TYPICAL

COAX BRIDGE-(2) 24" WIDE

SAFETY GRATED WAVE

GUIDE BRIDGE CHANNEL,

OR APPROVED EQUAL

DUAL POST 24" ICE

BRIDGE KIT SITE PRO1

PART# 4B24D OR

APPROVED EQUAL

8"

2-1/2"

1-1/2"

8" x 8" x 1/2" PLATE

SUPPORT PIPE

1/2"Ø HILTI-KWIK-BOLT-TZ

SS EXPANSION ANCHOR

MIN 2" EMBED (TYP. OF 4)

5/16 TYP

8" x 8" x 1/2" PLATE

CONC. SLAB (IF

REQUIRED)

B

ICE-BRIDGE

SUPPORT POST

SECTION B

BASE PLATE - OPTIONAL

PIPE TO CONC

ATTACHMENT

KamalThapa Snapshot

RobHowe

GENERATOR &

PROPANE TANK

DETAILS

C-5

SHEET NUMBER:

SHEET TITLE:

LICENSURE:

DRAWING INFORMATION:

THIS DRAWING IS COPYRIGHTED AND IS THE SOLE

PROPERTY OF THE OWNER. IT IS PRODUCED SOLELY

FOR USE BY THE OWNER AND ITS AFFILIATES.

REPRODUCTION OR USE OF THIS DRAWING AND/OR

THE INFORMATION CONTAINED IN IT IS FORBIDDEN

WITHOUT THE WRITTEN PERMISSION OF THE OWNER.

PLANS PREPARED BY:

DATE RELEASE

07-26-24 SITE SKETCH

02-12-25 PRELIMINARY ZONING DRAWINGS

05-22-25

PRELIMINARY CONSTRUCTION DRAWINGS

09-23-25 FINAL CONSTRUCTION DRAWINGS

09-30-25 REV. FCD FOR PROPANE TANK UPDATE

10-15-25

REV. FCD FOR SITE CONFIGURATION

PROJECT INFORMATION:

12725 SW MILLIKAN WAY

SUITE 300

BEAVERTON, OR 97005

(503) 387-5331 www.cushingcivilengineers.com

Cushing

Civil Engineers

Civil Engineers

MARION COUNTY

HOUSE MOUNTAIN

11.1 MILES SOUTHEAST OF

DRAKES CROSSING, OR

G A

S G

A S

G A

S G

A S

25'-0" REQUIRED PROPANE

TANK SETBACK BUFFER;

NO IGNITION SOURCES

WITHIN SETBACK

NOTE:

ALL CONDUIT INSIDE THE BUILDING MUST BE METAL AND BE GROUNDED PER R-56 STANDARDS.

INTERIOR SHELTER LAYOUT IS FOR REFERENCE ONLY.

THIS GENERATOR & PROPANE LAYOUT IS FOR INFORMATION ONLY AND IS PRESENTED AS A GUIDELINE. VERIFY SITE CONDITIONS AND LAYOUT PRIOR TO INSTALLATION OF ALL EQUIPMENT. INSTALL ALL EQUIPMENT PER MANUFACTURER'S

INSTRUCTIONS.

FUEL LINE SIZE PER MANUFACTURERS

RECOMMENDATION

EQUIPMENT SHELTER

±25

LIQUID PROPANE FUEL TANK

OR EQUAL ON CONCRETE PAD

2-CAT-5 CONTROL WIRING IN 3/4"

RIGID PVC CONDUIT

AUTOMATIC TRANSFER SWITCH

CIRCUIT BREAKER PANEL

POWER CONDUIT TO STUB UP AT

METER

BORE AND WEATHERPROOF NEW

PENETRATIONS INTO SHELTER FOR

NEW CONDUIT ROUTING, TYP.

LIQUID WITHDRAWL

DOME

RELIEF VALVE

2-#12 THHN PLUS #12 GROUND IN

1" RIGID METAL CONDUIT FROM

GENERATOR TO DEDICATED

CIRCUIT BREAKER @ BREAKER

PANEL, RATING 20A

MANUAL TRANSFER SWITCH

SCALE: NTS

SCALE: NTS

SCALE: NTS GENERATOR PLAN

GENERATOR FUEL SYSTEM ELEVATION

SIDE

FRONT

SIDE

TRENCH SECTION NOT USED

SCALE: NTS GENERATOR ELEVATION NOT USED

TYPICAL GENERATOR LAYOUT

NOTE:…