Attachment B - Coefficient Schedule.docx

DOCX document 28 KB Posted

Attached to
Camp Lemonnier Djibout Job Order Contract
Solicitation number
N3319126R0014
Issued by

About this file

This is a Coefficient Schedule template for pricing evaluation under Solicitation N3319126R0014, a Job Order Contract for construction services at Camp Lemonnier in Djibouti and U.S. Government-controlled sites in Somalia. The schedule requires offerors to submit four coefficients applicable to both geographic areas: two for pre-priced (RS Means) work consisting of Material and Equipment and Labor coefficients, and two for non-pre-priced work with separate Material and Equipment and Labor coefficients. Offerors must apply these coefficients to $100,000 example values to calculate estimated amounts and determine a Total Evaluated Price for each location.

Key submission requirements include: coefficients must be provided to no more than two decimal places, all coefficients remain fixed throughout the contract's 66-month duration including all option periods, and the completed schedule must be submitted with the price proposal and becomes part of the contract award. The Government will correct any mathematical errors using the submitted coefficients to calculate the Total Evaluated Price. The schedule explicitly notes that example values are for evaluation purposes only and actual work distribution may differ significantly, requiring offerors to ensure coefficients accurately reflect their anticipated costs. This is a single-award contract with a maximum value of $75,000,000 and $5,000 guaranteed minimum.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

COEFFICIENT SCHEDULE

SOLICITATION N3319126R0014

NAVFAC CLDJ AREA OF RESPONSIBILITY JOB ORDER CONTRACT

Coeff. #
DESCRIPTION
PROPOSED COEFFICIENT DJIBOUTI

EXAMPLE VALUE

EXAMPLE VALUE W/COEFFICIENT

Pre-Priced (RS Means)

1
Material and Equipment Coefficient
X
$100,000
=
2
Labor Coefficient
X
$100,000
=

Non Pre-Priced

3
Material and Equipment Coefficient
X
$100,000
=
4
Labor Coefficient
X
$100,000
=

TOTAL EVALUATED PRICE (TEP)

Coeff. #
DESCRIPTION
PROPOSED COEFFICIENT SOMALIA

EXAMPLE VALUE

EXAMPLE VALUE W/COEFFICIENT

Pre-Priced (RS Means)

1
Material and Equipment Coefficient
X
$100,000
=
2
Labor Coefficient
X
$100,000
=

Non Pre-Priced

3
Material and Equipment Coefficient
X
$100,000
=
4
Labor Coefficient
X
$100,000
=

TOTAL EVALUATED PRICE (TEP)

NOTES:

(1) The Offeror is to provide Proposed Coefficients for Coefficients 1 through 4, calculate the Estimated Amounts, and provide a Total Evaluated Price.

(2) The completed Coefficient Schedule is to be submitted with the Price Proposal and will become a part of the contract award.

(3) The value of work estimated for Coefficients 1 through 4 is for price evaluation purposes only. The actual distribution of work may differ significantly from that shown. Therefore, the Contractor should ensure that the coefficient properly reflects its costs for each category.

(4) Coefficients are not to exceed more than two places to the right of the decimal.

(5) In the event the Example Value W/Coefficient is calculated incorrectly by the offeror, the Government will use the Proposed Coefficient to correctly calculate the Example Value W/Coefficient in order to calculate the Total Evaluated Price.

(6) All coefficients will remain in effect throughout the life of contract including all option periods.

(7) Multiple awards will not be made.