Attachment A - AMLC APS-4 Bldg. 765 & 955 Price Proposal Worksheet.xlsx

XLSX spreadsheet 100 KB Posted

Attached to
Initial Outfitting & Transition (IO&T) Services AMLC APS-4 (Army Prepositioned Stocks) Warehouse, Buildings 765 & 955, Camp Carroll, Republic of Korea
Solicitation number
W912DY26R1103
Issued by

About this file

This is a pricing proposal worksheet template for Initial Outfitting & Transition (IO&T) Services supporting the activation of the AMLC APS-4 Warehouse at Buildings 765 and 955, Camp Carroll, Republic of Korea. The contract structure includes a base bid with a firm fixed price of $240,000 for Equipment (CLIN 0002), while CLINs 0001A through 0001H covering comprehensive services (Project Management, Interior Design, FF&E Planning, Equipment Purchasing, Transition Planning and Relocation, Installation/Testing/Training, Warehouse Management, and Final Turnover & Closeout) are priced separately by offerors. Additional line items include Service Contract Reporting (CLIN 0003) and Defense Base Act Insurance (CLIN 0004) at the current rate of $3.50 per $100 of compensation. The contract includes two six-month option periods: Option 01 for Period of Performance Extension (CLIN 0005) and Option 02 for Warehousing Extension (CLIN 0006).

The worksheet provides detailed labor and cost breakdowns for each service element, allowing offerors to input burdened hourly rates for specified labor categories (Program Manager, Project Manager, Interior Designer, Senior Contracts Manager, Equipment Planning Specialist, Transition Planner, Scheduler, and IT Planner), other direct costs, subcontractor expenses with handling charges and G&A markups, and travel expenses (airfare, meals and incidental expenses, lodging, rental cars, and miscellaneous). Only light yellow shaded fields are designated for offeror input, with autofill formulas for calculating extended prices and totals. The template emphasizes firm fixed price arrangements across all CLINs and notes that only South Korean local vendors are eligible per USFK 7150.01 and US ROK SOFA requirements.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Summary Contract Price Proposal - SUMMARY

DATE

IO&T Services, AMLC APS-4 Warehouse Buildings 765 & 955, Camp Carroll, Republic of KoreaNote: Highlighted fields are autofilled based on the intact formulas
Solicitation Number:TBD
Offeror:TBD
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW SHADED FIELDS MUST BE POPULATED***
SUPPLIES/SERVICES - GENERAL
NON-PERSONAL SERVICES: Provide all management, supervision, labor, materials, and travel necessary to execute the requirements of the IO&T PWS.
BASE BID
CLIN 0001 - IO&T Services (CLINs 0001A - 0001H)$ -
CLIN 0002 - Equipment$ 240,000
CLIN 0003 - Service Contract Reporting (SCR)$ -
CLIN 0004 - Defense Base Act (DBA) Insurance$ -

SUBTOTAL BASE BID $ 240,000

OPTIONS
CLIN 0005 - Option 01 - Period of Performance (PoP) Extension$ -
CLIN 0006 - Option 02 - Warehousing Extension$ -

SUBTOTAL ALL OPTIONS $ -

GRAND TOTAL $ 240,000

Pricing Detail Contract Price Proposal

DATE

IO&T Services, AMLC APS-4 Warehouse Buildings 765 & 955, Camp Carroll, Republic of Korea000000Note: Highlighted fields are autofilled based on the intact formulas
Solicitation Number:TBD
Offeror:TBD
SUPPLIES/SERVICES - GENERAL
NON-PERSONAL SERVICES: Provide all management, supervision, labor, materials, and travel necessary to execute the requirements of the IO&T PWS.00000000000
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW FIELDS MUST BE POPULATED***

CLIN DESCRIPTION OF SERVICES (All items Firm Fixed Price) MAX QTY UNIT UNIT PRICE MAX AMOUNT

BASE BID

0001A Comprehensive Project Management Services 1 Task $ - $ -

0001B Comprehensive Interior Design Services 1 Task $ - $ -

0001C Comprehensive FF&E Planning Services 1 Task $ - $ -

0001D Comprehensive Equipment Purchasing Services 1 Task $ - $ -

0001E Comprehensive Transition Planning and Relocation Services 1 Task $ - $ -

0001F Comprehensive Installation, Testing & Training Services 1 Task $ - $ -

0001G Comprehensive Warehouse Management Services 1 Task $ - 0 $ -

0001H Comprehensive Final Turnover & Closeout Services 1 Task $ - $ -

SUBTOTAL TASK CLINs 0001A-0001H (Labor) $ -

0002 Equipment. Provide all equipment/furniture/materials as authorized by the Government. NO LABOR FOR SERVICES IS PERMITTED UNDER THIS CLIN 1 Lot $ 240,000 $ 240,000

0003 Service Contract Reporting 1 Lot $ - $ -

0004 Defense Base Act (DBA) Insurance 1 Lot $ - $ -

BASE BID SUBTOTAL CLINS 0001-0004 $ 240,000

OPTIONS

0005 Option 01 - Period of Performance (PoP) Extension 6 Month $ - $ -

0006 Option 02 - Warehousing Extension 6 Month $ - $ -

SUBTOTAL ALL OPTIONS $ -

GRAND TOTAL PRICING -- ALL TASKS (Firm Fixed Price) $ 240,000

Comp PM Svcs

Comprehensive Project Management ServicesNote: Highlighted fields are autofilled
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW FIELDS MUST BE POPULATED***
PRIME Burdened LABOR
Labor CategoryBurdened Hourly Rate Less ProfitQty [hrs]Extended Price
1Program Manager$0.000$0.00
2Project Manager$0.000$0.00
3Interior Designer$0.000$0.00
4Senior Contracts Manager$0.000$0.00
5Equipment Planning Specialist$0.000$0.00
6Transition Planner$0.000$0.00
7Scheduler$0.000$0.00
8Information Technology (IT) Planner$0.000$0.00
OTHER PROFESSIONAL RATES
9$0.000$0.00
10$0.000$0.00
11$0.000$0.00
12$0.000$0.00
13$0.000$0.00
14$0.000$0.00
15$0.000$0.00
16$0.000$0.00
17$0.000$0.00
18$0.000$0.00
19$0.000$0.00
20$0.000$0.00
21$0.000$0.00
22$0.000$0.00
$0.00
Total Prime Direct Labor$0.00
Other Direct Costs (Job Supplies/Equipment)
ItemDescriptionQTYUnit PriceExtended Price
00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total ODC$0.00
SUBCONTRACTORS
NameGeneral Description of Service to be ProvidedAmount
Sub #1$ - 0
Sub #2$ - 0
Sub #3$ - 0
Sub #4$ - 0
Sub #5$ - 0
Sub #6$ - 0
Subtotal Subcontractors$0.00

Handling Charge on Subcontractors 0.00% $0.00

G&A on Subs & Other Direct Costs 0.00% $0.00

Total Subcontractors and Other Direct Costs $0.00

Subtotal Labor, Subcontractors & Other Direct Costs$0.00
Profit on Labor, Subcontractors & Other Direct Costs0.00%$0.00
Total Labor, Subcontractors & Other Direct Costs$0.00
TravelQTY$ EachTotal
AIRFAREEA.$0.00
M&IE
USACE: Meals & Incidental ExpensesDAYS$0.00
LODGINGDAYS$0.00
RENTAL CARDAYS$0.00
MISCDAYS$0.00
$0.00
$0.00
$0.00
$0.00
Total Travel$0.00
GRAND TOTAL Comprehensive Project Management Services$0.00
Rounded GRAND TOTAL Comprehensive Project Management Services$0.00

Comp ID Svcs

Comprehensive Interior Design ServicesNote: Highlighted fields are autofilled
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW FIELDS MUST BE POPULATED***
PRIME Burdened LABOR
Labor CategoryBurdened Hourly Rate Less ProfitQty [hrs]Extended Price
1Program Manager$0.000$0.00
2Project Manager$0.000$0.00
3Interior Designer$0.000$0.00
4Senior Contracts Manager$0.000$0.00
5Equipment Planning Specialist$0.000$0.00
6Transition Planner$0.000$0.00
7Scheduler$0.000$0.00
8Information Technology (IT) Planner$0.000$0.00
OTHER PROFESSIONAL RATES
9$0.000$0.00
10$0.000$0.00
11$0.000$0.00
12$0.000$0.00
13$0.000$0.00
14$0.000$0.00
15$0.000$0.00
16$0.000$0.00
17$0.000$0.00
18$0.000$0.00
19$0.000$0.00
20$0.000$0.00
21$0.000$0.00
22$0.000$0.00
$0.00
Total Prime Direct Labor$0.00
Other Direct Costs (Job Supplies/Equipment)
ItemDescriptionQTYUnit PriceExtended Price
00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total ODC$0.00
SUBCONTRACTORS
NameGeneral Description of Service to be ProvidedAmount
Sub #1$ - 0
Sub #2$ - 0
Sub #3$ - 0
Sub #4$ - 0
Sub #5$ - 0
Sub #6$ - 0
Subtotal Subcontractors$0.00

Handling Charge on Subcontractors 0.00% $0.00

G&A on Subs & Other Direct Costs 0.00% $0.00

Total Subcontractors and Other Direct Costs $0.00

Subtotal Labor, Subcontractors & Other Direct Costs$0.00
Profit on Labor, Subcontractors & Other Direct Costs0.00%$0.00
Total Labor, Subcontractors & Other Direct Costs$0.00
TravelQTY$ EachTotal
AIRFAREEA.$0.00
M&IE
USACE: Meals & Incidental ExpensesDAYS$0.00
LODGINGDAYS$0.00
RENTAL CARDAYS$0.00
MISCDAYS$0.00
$0.00
$0.00
$0.00
$0.00
Total Travel$0.00
GRAND TOTAL Comprehensive Interior Design Services$0.00
Rounded GRAND TOTAL Comprehensive Interior Design Services$0.00

Comp FF&E Planning Svcs

Equipment Planning ServicesNote: Highlighted fields are autofilled
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW FIELDS MUST BE POPULATED***
PRIME Burdened LABOR
Labor CategoryBurdened Hourly Rate Less ProfitQty [hrs]Extended Price
1Program Manager$0.000$0.00
2Project Manager$0.000$0.00
3Interior Designer$0.000$0.00
4Senior Contracts Manager$0.000$0.00
5Equipment Planning Specialist$0.000$0.00
6Transition Planner$0.000$0.00
7Scheduler$0.000$0.00
8Information Technology (IT) Planner$0.000$0.00
OTHER PROFESSIONAL RATES
9$0.000$0.00
10$0.000$0.00
11$0.000$0.00
12$0.000$0.00
13$0.000$0.00
14$0.000$0.00
15$0.000$0.00
16$0.000$0.00
17$0.000$0.00
18$0.000$0.00
19$0.000$0.00
20$0.000$0.00
21$0.000$0.00
22$0.000$0.00
$0.00
Total Prime Direct Labor$0.00
Other Direct Costs (Job Supplies/Equipment)
ItemDescriptionQTYUnit PriceExtended Price
00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total ODC$0.00
SUBCONTRACTORS
NameGeneral Description of Service to be ProvidedAmount
Sub #1$ - 0
Sub #2$ - 0
Sub #3$ - 0
Sub #4$ - 0
Sub #5$ - 0
Sub #6$ - 0
Subtotal Subcontractors$0.00

Handling Charge on Subcontractors 0.00% $0.00

G&A on Subs & Other Direct Costs 0.00% $0.00

Total Subcontractors and Other Direct Costs $0.00

Subtotal Labor, Subcontractors & Other Direct Costs$0.00
Profit on Labor, Subcontractors & Other Direct Costs0.00%$0.00
Total Labor, Subcontractors & Other Direct Costs$0.00
TravelQTY$ EachTotal
AIRFAREEA.$0.00
M&IE
USACE: Meals & Incidental ExpensesDAYS$0.00
LODGINGDAYS$0.00
RENTAL CARDAYS$0.00
MISCDAYS$0.00
$0.00
$0.00
$0.00
$0.00
Total Travel$0.00
GRAND TOTAL Comprehensive FF&E Planning Services$0.00
Rounded GRAND TOTAL Comprehensive FF&E Planning Services$0.00

Comp FF&E Purchasing Svcs

Comprehensive Equipment Purchasing ServicesNote: Highlighted fields are autofilled
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW FIELDS MUST BE POPULATED***
PRIME Burdened LABOR
Labor CategoryBurdened Hourly Rate Less ProfitQty [hrs]Extended Price
1Program Manager$0.000$0.00
2Project Manager$0.000$0.00
3Interior Designer$0.000$0.00
4Senior Contracts Manager$0.000$0.00
5Equipment Planning Specialist$0.000$0.00
6Transition Planner$0.000$0.00
7Scheduler$0.000$0.00
8Information Technology (IT) Planner$0.000$0.00
OTHER PROFESSIONAL RATES
9$0.000$0.00
10$0.000$0.00
11$0.000$0.00
12$0.000$0.00
13$0.000$0.00
14$0.000$0.00
15$0.000$0.00
16$0.000$0.00
17$0.000$0.00
18$0.000$0.00
19$0.000$0.00
20$0.000$0.00
21$0.000$0.00
22$0.000$0.00
$0.00
Total Prime Direct Labor$0.00
Other Direct Costs (Job Supplies/Equipment)
ItemDescriptionQTYUnit PriceExtended Price
00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total ODC$0.00
SUBCONTRACTORS
NameGeneral Description of Service to be ProvidedAmount
Sub #1$ - 0
Sub #2$ - 0
Sub #3$ - 0
Sub #4$ - 0
Sub #5$ - 0
Sub #6$ - 0
Subtotal Subcontractors$0.00

Handling Charge on Subcontractors 0.00% $0.00

G&A on Subs & Other Direct Costs 0.00% $0.00

Total Subcontractors and Other Direct Costs $0.00

Subtotal Labor, Subcontractors & Other Direct Costs$0.00
Profit on Labor, Subcontractors & Other Direct Costs0.00%$0.00
Total Labor, Subcontractors & Other Direct Costs$0.00
TravelQTY$ EachTotal
AIRFAREEA.$0.00
M&IE
USACE: Meals & Incidental ExpensesDAYS$0.00
LODGINGDAYS$0.00
RENTAL CARDAYS$0.00
MISCDAYS$0.00
$0.00
$0.00
$0.00
$0.00
Total Travel$0.00
GRAND TOTAL Comprehensive Equipment Purchasing Services$0.00
Rounded GRAND TOTAL Comprehensive Equipment Purchasing Services$0.00

Comp Trans Plan & Reloc Svcs

Transition Planning and Relocation ServicesNote: Highlighted fields are autofilled
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW FIELDS MUST BE POPULATED***
PRIME Burdened LABOR
Labor CategoryBurdened Hourly Rate Less ProfitQty [hrs]Extended Price
1Program Manager$0.000$0.00
2Project Manager$0.000$0.00
3Interior Designer$0.000$0.00
4Senior Contracts Manager$0.000$0.00
5Equipment Planning Specialist$0.000$0.00
6Transition Planner$0.000$0.00
7Scheduler$0.000$0.00
8Information Technology (IT) Planner$0.000$0.00
OTHER PROFESSIONAL RATES
9$0.000$0.00
10$0.000$0.00
11$0.000$0.00
12$0.000$0.00
13$0.000$0.00
14$0.000$0.00
15$0.000$0.00
16$0.000$0.00
17$0.000$0.00
18$0.000$0.00
19$0.000$0.00
20$0.000$0.00
21$0.000$0.00
22$0.000$0.00
$0.00
Total Prime Direct Labor$0.00
Other Direct Costs (Job Supplies/Equipment)
ItemDescriptionQTYUnit PriceExtended Price
00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total ODC$0.00
SUBCONTRACTORS
NameGeneral Description of Service to be ProvidedAmount
Sub #1$ - 0
Sub #2$ - 0
Sub #3$ - 0
Sub #4$ - 0
Sub #5$ - 0
Sub #6$ - 0
Subtotal Subcontractors$0.00

Handling Charge on Subcontractors 0.00% $0.00

G&A on Subs & Other Direct Costs 0.00% $0.00

Total Subcontractors and Other Direct Costs $0.00

Subtotal Labor, Subcontractors & Other Direct Costs$0.00
Profit on Labor, Subcontractors & Other Direct Costs0.00%$0.00
Total Labor, Subcontractors & Other Direct Costs$0.00
TravelQTY$ EachTotal
AIRFAREEA.$0.00
M&IE
USACE: Meals & Incidental ExpensesDAYS$0.00
LODGINGDAYS$0.00
RENTAL CARDAYS$0.00
MISCDAYS$0.00
$0.00
$0.00
$0.00
$0.00
Total Travel$0.00
GRAND TOTAL Comprehensive Transition Planning and Relocation Services$0.00
Rounded GRAND TOTAL Comprehensive Transition Planning and Relocation Services$0.00

Comp IT&T Svcs

Comprehensive Installation, Testing & Training ServicesNote: Highlighted fields are autofilled
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW FIELDS MUST BE POPULATED***
PRIME Burdened LABOR
Labor CategoryBurdened Hourly Rate Less ProfitQty [hrs]Extended Price
1Program Manager$0.000$0.00
2Project Manager$0.000$0.00
3Interior Designer$0.000$0.00
4Senior Contracts Manager$0.000$0.00
5Equipment Planning Specialist$0.000$0.00
6Transition Planner$0.000$0.00
7Scheduler$0.000$0.00
8Information Technology (IT) Planner$0.000$0.00
OTHER PROFESSIONAL RATES
9$0.000$0.00
10$0.000$0.00
11$0.000$0.00
12$0.000$0.00
13$0.000$0.00
14$0.000$0.00
15$0.000$0.00
16$0.000$0.00
17$0.000$0.00
18$0.000$0.00
19$0.000$0.00
20$0.000$0.00
21$0.000$0.00
22$0.000$0.00
$0.00
Total Prime Direct Labor$0.00
Other Direct Costs (Job Supplies/Equipment)
ItemDescriptionQTYUnit PriceExtended Price
00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total ODC$0.00
SUBCONTRACTORS
NameGeneral Description of Service to be ProvidedAmount
Sub #1$ - 0
Sub #2$ - 0
Sub #3$ - 0
Sub #4$ - 0
Sub #5$ - 0
Sub #6$ - 0
Subtotal Subcontractors$0.00

Handling Charge on Subcontractors 0.00% $0.00

G&A on Subs & Other Direct Costs 0.00% $0.00

Total Subcontractors and Other Direct Costs $0.00

Subtotal Labor, Subcontractors & Other Direct Costs$0.00
Profit on Labor, Subcontractors & Other Direct Costs0.00%$0.00
Total Labor, Subcontractors & Other Direct Costs$0.00
TravelQTY$ EachTotal
AIRFAREEA.$0.00
M&IE
USACE: Meals & Incidental ExpensesDAYS$0.00
LODGINGDAYS$0.00
RENTAL CARDAYS$0.00
MISCDAYS$0.00
$0.00
$0.00
$0.00
$0.00
Total Travel$0.00
GRAND TOTAL Comprehensive Installation, Testing & Training Services$0.00
Rounded GRAND TOTAL Comprehensive Installation, Testing & Training Services$0.00

Comp Warehouse Svcs

Installation ServicesNote: Highlighted fields are autofilled
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW FIELDS MUST BE POPULATED***
PRIME Burdened LABOR
Labor CategoryBurdened Hourly Rate Less ProfitQty [hrs]Extended Price
1Program Manager$0.000$0.00
2Project Manager$0.000$0.00
3Interior Designer$0.000$0.00
4Senior Contracts Manager$0.000$0.00
5Equipment Planning Specialist$0.000$0.00
6Transition Planner$0.000$0.00
7Scheduler$0.000$0.00
8Information Technology (IT) Planner$0.000$0.00
OTHER PROFESSIONAL RATES
9$0.000$0.00
10$0.000$0.00
11$0.000$0.00
12$0.000$0.00
13$0.000$0.00
14$0.000$0.00
15$0.000$0.00
16$0.000$0.00
17$0.000$0.00
18$0.000$0.00
19$0.000$0.00
20$0.000$0.00
21$0.000$0.00
22$0.000$0.00
$0.00
Total Prime Direct Labor$0.00
Other Direct Costs (Job Supplies/Equipment)
ItemDescriptionQTYUnit PriceExtended Price
00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total ODC$0.00
SUBCONTRACTORS
NameGeneral Description of Service to be ProvidedAmount
Sub #1$ - 0
Sub #2$ - 0
Sub #3$ - 0
Sub #4$ - 0
Sub #5$ - 0
Sub #6$ - 0
Subtotal Subcontractors$0.00

Handling Charge on Subcontractors 0.00% $0.00

G&A on Subs & Other Direct Costs 0.00% $0.00

Total Subcontractors and Other Direct Costs $0.00

Subtotal Labor, Subcontractors & Other Direct Costs$0.00
Profit on Labor, Subcontractors & Other Direct Costs0.00%$0.00
Total Labor, Subcontractors & Other Direct Costs$0.00
TravelQTY$ EachTotal
AIRFAREEA.$0.00
M&IE
USACE: Meals & Incidental ExpensesDAYS$0.00
LODGINGDAYS$0.00
RENTAL CARDAYS$0.00
MISCDAYS$0.00
$0.00
$0.00
$0.00
$0.00
Total Travel$0.00
GRAND TOTAL Comprehensive Warehouse Management Services$0.00
Rounded GRAND TOTAL Comprehensive Warehouse Management Services$0.00

FT&C Svcs

Comprehensive Final Turnover & Closeout ServicesNote: Highlighted fields are autofilled
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW FIELDS MUST BE POPULATED***
PRIME Burdened LABOR
Labor CategoryBurdened Hourly Rate Less ProfitQty [hrs]Extended Price
1Program Manager$0.000$0.00
2Project Manager$0.000$0.00
3Interior Designer$0.000$0.00
4Senior Contracts Manager$0.000$0.00
5Equipment Planning Specialist$0.000$0.00
6Transition Planner$0.000$0.00
7Scheduler$0.000$0.00
8Information Technology (IT) Planner$0.000$0.00
OTHER PROFESSIONAL RATES
9$0.000$0.00
10$0.000$0.00
11$0.000$0.00
12$0.000$0.00
13$0.000$0.00
14$0.000$0.00
15$0.000$0.00
16$0.000$0.00
17$0.000$0.00
18$0.000$0.00
19$0.000$0.00
20$0.000$0.00
21$0.000$0.00
22$0.000$0.00
$0.00
Total Prime Direct Labor$0.00
Other Direct Costs (Job Supplies/Equipment)
ItemDescriptionQTYUnit PriceExtended Price
00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total ODC$0.00
SUBCONTRACTORS
NameGeneral Description of Service to be ProvidedAmount
Sub #1$ - 0
Sub #2$ - 0
Sub #3$ - 0
Sub #4$ - 0
Sub #5$ - 0
Sub #6$ - 0
Subtotal Subcontractors$0.00

Handling Charge on Subcontractors 0.00% $0.00

G&A on Subs & Other Direct Costs 0.00% $0.00

Total Subcontractors and Other Direct Costs $0.00

Subtotal Labor, Subcontractors & Other Direct Costs$0.00
Profit on Labor, Subcontractors & Other Direct Costs0.00%$0.00
Total Labor, Subcontractors & Other Direct Costs$0.00
TravelQTY$ EachTotal
AIRFAREEA.$0.00
M&IE
USACE: Meals & Incidental ExpensesDAYS$0.00
LODGINGDAYS$0.00
RENTAL CARDAYS$0.00
MISCDAYS$0.00
$0.00
$0.00
$0.00
$0.00
Total Travel$0.00
GRAND TOTAL Comprehensive Final Turnover & Closeout Services$0.00
Rounded GRAND TOTAL Comprehensive Final Turnover & Closeout Services$0.00

Service Contract Reporting

SERVICE CONTRACT REPORTING

Service Contract Reporting Note: Highlighted fields require offeror input or are autofilled based on intact formulas

Service Contract Reporting
Enter the total firm-fixed price for Service Contract Reporting required under this task order. The entered amount will flow to the Pricing Detail and Pricing Summary worksheets.
TYPE OF CONTRACTDESCRIPTION OF SERVICESMAX QTYUNITUNIT PRICEMAX AMOUNT
3AFFPService Contract Reporting1Lot$ - 0
SUB-TOTAL FIRM-FIXED PRICE TASKS$ - 0

Korea-DBA

Source Selection Information—See FAR 2.101 and 3.104.
DBA

Korea-Defense Base Act (DBA) Insurance Note: Highlighted fields are autofill based on the intact formulas

DBA Insurance
The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors, multiplied by the applicable rate(s)). The actual amount paid by the government under this CLIN will be based on the amount of the Rutherfoord invoice submitted by the offeror after contract award. In the event of recalculation of the premium by CNA based on actual payroll amounts, the Contracting Officer will adjust this CLIN by contract modification to reflect actual premium amounts paid.

TYPE OF CONTRACT DESCRIPTION OF SERVICES MAX QTY UNIT UNIT PRICE MAX AMOUNT

4A FFP Defense Base Act (DBA) Insurance* 1 Task 0.00

SUB-TOTAL FIRM-FIXED PRICE TASKS 0.00

*The current rate under the USACE and JCC-I/A contract is $3.50 per $100 of compensation for services.

Opt 01 PoP Extension

Option 01 - PoP ExtensionNote: Highlighted fields are autofilled
PRICING PER MONTH
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW FIELDS MUST BE POPULATED***
PRIME Burdened LABOR
Labor CategoryBurdened Hourly Rate Less ProfitQty [hrs]Extended Price
1Program Manager$0.000$0.00
2Project Manager$0.000$0.00
3Interior Designer$0.000$0.00
4Senior Contracts Manager$0.000$0.00
5Equipment Planning Specialist$0.000$0.00
6Transition Planner$0.000$0.00
7Scheduler$0.000$0.00
8Information Technology (IT) Planner$0.000$0.00
OTHER PROFESSIONAL RATES
9$0.000$0.00
10$0.000$0.00
11$0.000$0.00
12$0.000$0.00
13$0.000$0.00
14$0.000$0.00
15$0.000$0.00
16$0.000$0.00
17$0.000$0.00
18$0.000$0.00
19$0.000$0.00
20$0.000$0.00
21$0.000$0.00
22$0.000$0.00
$0.00
Total Prime Direct Labor$0.00
Other Direct Costs (Job Supplies/Equipment)
ItemDescriptionQTYUnit PriceExtended Price
00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total ODC$0.00
SUBCONTRACTORS
NameGeneral Description of Service to be ProvidedAmount
Sub #1$ - 0
Sub #2$ - 0
Sub #3$ - 0
Sub #4$ - 0
Sub #5$ - 0
Sub #6$ - 0
Subtotal Subcontractors$0.00

Handling Charge on Subcontractors 0.00% $0.00

G&A on Subs & Other Direct Costs 0.00% $0.00

Total Subcontractors and Other Direct Costs $0.00

Subtotal Labor, Subcontractors & Other Direct Costs$0.00
Profit on Labor, Subcontractors & Other Direct Costs0.00%$0.00
Total Labor, Subcontractors & Other Direct Costs$0.00
TravelQTY$ EachTotal
AIRFAREEA.$0.00
M&IE
USACE: Meals & Incidental ExpensesDAYS$0.00
LODGINGDAYS$0.00
RENTAL CARDAYS$0.00
MISCDAYS$0.00
$0.00
$0.00
$0.00
$0.00
Total Travel$0.00
GRAND TOTAL Option 01 - Period of Performance (PoP) Extension$0.00
Rounded GRAND TOTAL Option 01 - Period of Performance (PoP) Extension$0.00

Opt 02 Whse Extension

Option 02 - Warehouse ExtensionNote: Highlighted fields are autofilled
PRICING PER MONTH
***NOTE: ONLY INPUT DATA INTO LIGHT YELLOW SHADED FIELDS, NOT ALL LIGHT YELLOW FIELDS MUST BE POPULATED***
PRIME Burdened LABOR
Labor CategoryBurdened Hourly Rate Less ProfitQty [hrs]Extended Price
1Program Manager$0.000$0.00
2Project Manager$0.000$0.00
3Interior Designer$0.000$0.00
4Senior Contracts Manager$0.000$0.00
5Equipment Planning Specialist$0.000$0.00
6Transition Planner$0.000$0.00
7Scheduler$0.000$0.00
8Information Technology (IT) Planner$0.000$0.00
OTHER PROFESSIONAL RATES
9$0.000$0.00
10$0.000$0.00
11$0.000$0.00
12$0.000$0.00
13$0.000$0.00
14$0.000$0.00
15$0.000$0.00
16$0.000$0.00
17$0.000$0.00
18$0.000$0.00
19$0.000$0.00
20$0.000$0.00
21$0.000$0.00
22$0.000$0.00
$0.00
Total Prime Direct Labor$0.00
Other Direct Costs (Job Supplies/Equipment)
ItemDescriptionQTYUnit PriceExtended Price
00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total ODC$0.00
SUBCONTRACTORS
NameGeneral Description of Service to be ProvidedAmount
Sub #1$ - 0
Sub #2$ - 0
Sub #3$ - 0
Sub #4$ - 0
Sub #5$ - 0
Sub #6$ - 0
Subtotal Subcontractors$0.00

Handling Charge on Subcontractors 0.00% $0.00

G&A on Subs & Other Direct Costs 0.00% $0.00

Total Subcontractors and Other Direct Costs $0.00

Subtotal Labor, Subcontractors & Other Direct Costs$0.00
Profit on Labor, Subcontractors & Other Direct Costs0.00%$0.00
Total Labor, Subcontractors & Other Direct Costs$0.00
TravelQTY$ EachTotal
AIRFAREEA.$0.00
M&IE
USACE: Meals & Incidental ExpensesDAYS$0.00
LODGINGDAYS$0.00
RENTAL CARDAYS$0.00
MISCDAYS$0.00
$0.00
$0.00
$0.00
$0.00
Total Travel$0.00
GRAND TOTAL Option 02 - Warehousing Extension$0.00
Rounded GRAND TOTAL Option 02 - Warehousing Extension$0.00

File details come from the government source that posted it. Updated .