This document is a Representative Work Order (RWO) for a NASA mission involving thermal and fluids analysis of a spacecraft system during its Martian atmospheric descent. The scope includes developing CFD models to determine convective heat transfer coefficients, modifying existing thermal finite element models, performing thermal analysis to assess component temperature compliance, and providing weekly project support. Specific tasks include creating analytical tools for heat transfer assumptions, updating thermal models with convective boundary conditions, conducting thermal analysis for "Worst Case Hot" and "Worst Case Cold" scenarios, and documenting model parameters and assessments.

The associated federal contract opportunity is a Small Business Set-Aside solicitation (MEL-2664-09192024) for Thermal Analysis Engineering Services issued by the Jet Propulsion Laboratory (JPL). The cost-type contract is targeted at small businesses in the NAICS code 541715 with a size standard of 1,300 employees. Proposal submission is due by April 23rd, 2025, at 3:00 p.m. Pacific Time, with past performance information preferred by April 12th, 2025. JPL anticipates awarding multiple cost-reimbursable subcontracts in this initial study phase, though funding is not yet confirmed. Interested small businesses are advised to consult APEX Accelerators and Small Business Development Center resources for guidance.

View the file

Other files

File Type Posted
RFP Addenda 2 MEL-2664-09192024.doc DOC document
RFP_Addenda_1 MEL-2664-09192024.doc DOC document
JPL_AGP_Cyber_Review_Template_Rev_41 (2).xlsx XLSX spreadsheet
Attachment A-17 Proposer Acct Sys and CAS info.xlsx XLSX spreadsheet
Attachment A-22 RWO 1 - Thermal Analysis Example 22025.docx DOCX document
Attachment B12 (1).docx DOCX document
Stnd Subc TAES RFP 3242025 v.docx DOCX document
TAES RFP MEL-2664-09192024.docx DOCX document
2384-A1 (3) MEL SET.docx DOCX document
Attachment A20 (1).doc DOC document
Attachment B10 (1).doc DOC document
Attachment B5 (1).doc DOC document
0358-A14 (1).docx DOCX document
Attachment B-21 (1).xlsx XLSX spreadsheet
Attachment A-22 RWO 3 - Thermal Test Support Example 22025.docx DOCX document
2455-A2 (1).docx DOCX document
A-15 TAES Custom CEB 3242025.xlsx XLSX spreadsheet
4022-A6-2.02-MEL-2664-091924 Notice of Small Business Set-Aside (Form JPL 4022-A6).docx DOCX document
Attachment A21 (1).doc DOC document
4412-B11 (3).docx DOCX document
2891-B7 (1).doc DOC document
Attachment B13 (1).doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPRESENTATIVE WORK ORDER (RWO) 2

SWO INFORMATION

Subcontract Number:
Action Type:
Choose an item.
Subcontract Type:
Cost Type
Proj/Task #:
SWO Number - Mod Number
Effort Type:
Choose an item. *
APO Number:
Labor Type:
Choose an item.
SUBCONTRACTOR INFORMATION
Subcontractor Name:
Subcontractor Address:
Other:

WORK DESCRIPTION

Work Title:
Planetary Entry Body Thermal Analysis
Start Date:
At time of executionEnd Date:
Click or tap to enter a date.
Refer To:
☐ Below Description
☐ Attachment(s)
☐ Incremental Funding

Work Description:

Pursuant to the Provisions of the above Subcontract, the Subcontractor is authorized to proceed with the work as follows:

Statement of Work: See below for SOW.

Other:

* Please fill out this section only if you chose “Level of Effort” under Effort Type.

Previous Hours
Change Hours
New Total Hours
Estimated Work Hours:

FINANCIAL SUMMARY

Financial Categories
Previous Amount
Change Amount
New Amount
Estimated Cost
Fixed Fee:
Total Value:
Total Amount Allotted:

SIGNATURE BLOCKS

JPL Subcontracts Manager’s Name
JPL Subcontracts Manager’s Signature
Signature Date
Authorized Subcontractor’s Name
Authorized Subcontractor’s Signature
Signature Date

Introduction

A future NASA mission involves entry, descent, and landing of a spacecraft system onto the surface of Mars. The scope of this work includes thermal and fluids analysis of the spacecraft for the atmospheric descent portion of the mission to assess compliance of component temperature requirement limits.

Analysis Overview

The portion of the mission to be analyzed is the post-heatshield separation of the entry body vehicle. In this configuration, the primary heatshield structure has been jettisoned, the parachute has been deployed, and the landed payload is now exposed to the Martian atmosphere.

An analytical thermal mass model of the landed payload and the attached heatshield structure is provided by JPL for this analysis.

The analysis involves determining the appropriate convective heat transfer assumptions and models for the interaction of the Martian atmosphere with the entry body, modifying the existing thermal mass models to accurately predict heat transfer in this environment, and perform thermal analysis runs on the resulting model.

Perform the following Tasks

1. Develop CFD models or other analytical tools to determine appropriate convective heat transfer coefficients and flow velocity assumptions to be applied to the entry body thermal model.

a. JPL will provide timeline assumptions for entry body speed, Martian atmospheric properties, and other parameters as required.

b. Assumptions will be grouped into “Worst Case Cold” and “Worst Case Hot” sets, with the intent that the amount of convective heat transfer will be bounded in the analysis.

c. CFD simulation may be used to determine heat transfer coefficients where necessary.

2. Modify entry body thermal models to map heat transfer coefficients and/or atmospheric flow velocity assumptions onto existing thermal finite element model (FEM).

a. Inherit existing thermal models from the JPL team.

b. Update existing thermal FEMs with convective boundary condition assumptions as derived in Task 1.

c. Perform iterative thermal analysis on FEM as needed to ensure accuracy of thermal convection assumptions.

d. Provide summary presentation of the thermal model and results.

3. Perform thermal analysis cases to show entry body component temperature compliance to the Temperature Requirements Table (TRT).

a. Initial temperatures for transient runs provided by JPL.

b. Perform thermal analysis for both Worst Case Hot and Worst Case Cold transient assumptions.

c. Compile an TRT compliance table clearly showing where temperature predictions violate TRT requirements for all components included in the entry body thermal model.

d. Produce transient temperature plots for a subset of components as specified by JPL (typically for components that are highly affected by convection or show TRT violations).

4. Provide support for a weekly tagup via Microsoft Teams. The tagup will target 1 hour per week, but allocate 1.5 hours per week in proposal. Some weeks will run shorter or be cancelled, and some weeks may run longer.

5. Documentation of the thermal models

a. Document model parameters, assumptions, properties, etc. and the location(s) used within the models to provide insight into the thermal FEMs.

b. For all model inputs, perform an engineering assessment of the quantitative values defined. Indicate any properties that seem out-of-family based on your past experience.

c. Output package will be in *.pptx or *.docx.

Deliverables

Deliver all modified thermal FEMs and other documentation generated and utilized throughout the course of this subcontract work order.

JPL 7478 Rev 05/22 image1.png image2.png image3.png image4.png