A-15 TAES Custom CEB 3242025.xlsx

XLSX spreadsheet 68 KB Posted

Attached to
THERMAL ANALYSIS ENGINEERING SERVICES
Solicitation number
MEL-2664-09192024
Issued by

About this file

This is a Pricing Template (Excel spreadsheet) for a Thermal Analysis Engineering Services Request for Proposal (RFP) issued by the Jet Propulsion Laboratory (JPL) under solicitation number MEL-2664-09192024. The document is a comprehensive cost proposal template with multiple tabs detailing labor rates, indirect rates, and cost breakdowns for potential contractors. The solicitation is a Small Business Set Aside for research and development services in physical, engineering, and life sciences, with a NAICS code of 541715 and a size standard of 1,300 employees.

Key details include a proposal due date of April 23rd, 2025, at 3:00 p.m. Pacific Time, with Past Performance documentation due by April 12th, 2025. JPL plans to award multiple Cost Reimbursable Type Subcontracts in an initial study phase. The template requires detailed cost information across six fiscal years (FY'25-FY'30), including labor categories, indirect rates (such as fringe benefits, overhead, and G&A), and cost elements like materials, subcontracts, and travel. Sample labor rates are provided, with examples like a Test Engineer III role ranging from $38-$50 per hour, and indirect rates like Fringe Benefits at 54.2-55.7% across the fiscal years.

View the file

Other files

File Type Posted
RFP Addenda 2 MEL-2664-09192024.doc DOC document
RFP_Addenda_1 MEL-2664-09192024.doc DOC document
JPL_AGP_Cyber_Review_Template_Rev_41 (2).xlsx XLSX spreadsheet
Attachment A-17 Proposer Acct Sys and CAS info.xlsx XLSX spreadsheet
Attachment A-22 RWO 1 - Thermal Analysis Example 22025.docx DOCX document
Attachment A-22 RWO 2 - Thermal CFD Analysis Example 22025.docx DOCX document
Attachment B12 (1).docx DOCX document
Stnd Subc TAES RFP 3242025 v.docx DOCX document
TAES RFP MEL-2664-09192024.docx DOCX document
2384-A1 (3) MEL SET.docx DOCX document
Attachment A20 (1).doc DOC document
Attachment B10 (1).doc DOC document
Attachment B5 (1).doc DOC document
0358-A14 (1).docx DOCX document
Attachment B-21 (1).xlsx XLSX spreadsheet
Attachment A-22 RWO 3 - Thermal Test Support Example 22025.docx DOCX document
2455-A2 (1).docx DOCX document
4022-A6-2.02-MEL-2664-091924 Notice of Small Business Set-Aside (Form JPL 4022-A6).docx DOCX document
Attachment A21 (1).doc DOC document
4412-B11 (3).docx DOCX document
2891-B7 (1).doc DOC document
Attachment B13 (1).doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1 - Labor Rate Ranges & Esc

JPL RFP MEL-2664-09192024Attachment A-15 Tab 1
Thermal Analysis Engineering Services
Proposed Direct Labor Rate Ranges & Annual Escalation
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 1 and paragraph 3.1.
2The Government fiscal year runs from October through September.
3Insert or delete rows as needed.
Labor Categories
#Labor
CategoryCode or #
(if any)Description of Roles and ResponsibilitiesTypical Education
& ExperienceClearance

None or Level

1
2
3
4
5
6
7
#Labor
CategoryFY'25 Labor Rate RangeFY'26 Labor Rate RangeFY'27 Labor Rate Range
MinimumMidpointMaximumMinimumMidpointMaximumMinimumMidpointMaximum
1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
2$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
4$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
5$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
6$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
7$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
#Labor
CategoryFY'28 Labor Rate RangeFY'29 Labor Rate RangeFY'30 Labor Rate Range
MinimumMidpointMaximumMinimumMidpointMaximumMinimumMidpointMaximum
1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
2$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
4$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
5$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
6$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
7$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SAMPLE - Rates shown are in no way indicative of proposed rates expected by JPL.
#TitleCode or
Number (if any)Description of Roles and ResponsibilitiesTypical Education
& ExperienceClearance
None or LevelLabor Rate Range
MinimumMidpointMaximum
1Test Engineer IIITE3

tc={2C23CB6E-B18C-41A8-9892-06A402D44719}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Need to update this for our SET, do not have access to previous SETDesigns, develops, and implements testing methods and equipment. Plans and arranges the labor, schedules, and equipment required for testing and evaluating standard and special devices. Provides test area with parameters for sample testing and specifies tests to be performed. Compiles data and defines changes required in testing equipment, testing procedures, manufacturing processes, or new testing requirements. Responsible for testing all customer samples and for special tests that cannot be performed in the test area.BS + 6 yearsNone$38.00$44.00$50.00
2Test Engineer IIITE3SCHolds Security Clearance. Designs, develops, and implements testing methods and equipment. Plans and arranges the labor, schedules, and equipment required for testing and evaluating standard and special devices. Provides test area with parameters for sample testing and specifies tests to be performed. Compiles data and defines changes required in testing equipment, testing procedures, manufacturing processes, or new testing requirements. Responsible for testing all customer samples and for special tests that cannot be performed in the test area.BS + 6 yearsTop Secret$42.00$48.00$54.00

Page &P of &N

Tab 2 - Indirect Rates

JPL RFP MEL-2664-09192024Attachment A-15, Tab 2
Thermal Analysis Engineering Services
Indirect Rates & Fixed Fee for Fee Calculation
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 2 and paragraph 3.6.
2The Government fiscal year runs from October through September.
3Insert or delete rows as needed.
Fixed FeeFY'25FY'26FY'27FY'28FY'29FY'30
Fee Percentage for use in SWO fixed fee calculation0.0%0.0%0.0%0.0%0.0%0.0%
Indirect Rates - For use in SWO fixed fee calculationProposed Rate
#Indirect Rate DescriptionApplication BaseFY'25FY'26FY'27FY'28FY'29FY'30
10.0%0.0%0.0%0.0%0.0%0.0%
20.0%0.0%0.0%0.0%0.0%0.0%
30.0%0.0%0.0%0.0%0.0%0.0%
40.0%0.0%0.0%0.0%0.0%0.0%
50.0%0.0%0.0%0.0%0.0%0.0%
60.0%0.0%0.0%0.0%0.0%0.0%
70.0%0.0%0.0%0.0%0.0%0.0%
80.0%0.0%0.0%0.0%0.0%0.0%
90.0%0.0%0.0%0.0%0.0%0.0%
INDIRECT RATE SAMPLE - Rates shown are in no way indicative of proposed rates expected by JPL.
Indirect Rates - For use in SWO fixed fee calculationProposed Rate
#Indirect Rate DescriptionApplication BaseFY'25FY'26FY'27FY'28FY'29FY'30
1Fringe BenefitsDirect labor54.2%55.0%53.7%55.2%55.7%54.9%
2Labor OverheadDirect labor + fringe benefits34.7%35.2%35.0%35.2%35.5%34.8%
3Material OverheadRaw material cost7.5%7.7%7.2%6.9%7.1%7.1%
4Subcontract OverheadSubcontract cost3.0%2.7%3.1%2.9%3.2%3.2%
5IT ServicesLabor hours$ 0.25$ 0.24$ 0.29$ 0.27$ 0.23$ 0.25
6General & AdministrativeSubtotal direct cost43.7%41.0%42.2%44.0%42.7%43.0%

Tab 3 - SWO Fee Calculation

JPL RFP MEL-2664-09192024Attachment A-15, Tab 3
Thermal Analysis Engineering Services
SWO Fee Calculation
Sample for Information Purposes Only
Note -
Tab 3 is for information purposes. Reference RFP Volume III Cost Instructions Section 2.1 Tab 3 for required acknowledgement of compliance.
Cost ElementSWO Cost - Current RatesSWO Cost for Fee CalculationTotal Negotiated SWO
Hours/CurrentHours/NegCost Est @Hours/Current
LaborBaseRateTotalBaseRateCurrent RatesBaseRateTotal
Data System Architect10$ 70.00$ 70010$ 65.00$ 65010$ 70.00$ 700
Data Management & Archive10$ 45.00$ 45010$ 47.00$ 47010$ 45.00$ 450
Technical Writing and Editing10$ 40.00$ 40010$ 38.00$ 38010$ 40.00$ 400
Mission & Flight System Plan10$ 65.00$ 65010$ 62.00$ 62010$ 65.00$ 650
Mission Operations10$ 55.00$ 55010$ 50.00$ 50010$ 55.00$ 550
Total Labor50$ 2,75050$ 2,62050$ 2,750

Overhead/Fringe $ 2,750 92.0% $ 2,530 $ 2,620 87.0% $ 2,279 92.0% $ 2,530

Material$ 5,000$ 5,000$ 5,000
Material Overhead$ 5,0004.3%$ 215$ 5,0004.0%$ 2004.3%$ 215
Subcontract$ 2,000$ 2,000$ 2,000
Subtotal Cost / G&A Base$ 12,495$ 12,099$ 12,495
G&A$ 12,49539.0%$ 4,873$ 12,09935.0%$ 4,23539.0%$ 4,873
Total Cost$ 17,368$ 16,334$ 17,368
FCCM - Labor$ 2,7500.68%$ 19$ 2,6200.68%$ 180.68%$ 19
FCCM - Material$ 5,0000.07%$ 4$ 5,0000.07%$ 40.07%$ 4
FCCM - G&A$ 12,4950.42%$ 52$ 12,0990.42%$ 510.42%$ 52
Total Cost + FCCM$ 17,443$ 16,407Cost at Current Rates$ 17,443
Fixed FeeN/A4.0%$ 653$ 653
Total Price**N/AN/A$ 18,096
Notes -
1 The SWO cost base for fee calculation is developed using the negotiated indirect rates. The negotiated fee percentage is applied to the total cost (excluding FCCM) resulting from the application of the negotiated indirect rates, to calculate the fee amount.

2 The current direct labor rates are assumed to fall within the negotiated direct labor rate ranges.

3 The Total Price includes the total cost based on current rates plus the fee amount that results from applying the negotiated fee percentage to the total cost (excluding FCCM) as based on the negotiated indirect rates. Note that all direct labor & FCCM cost within the fee calculation cost base reflect current rates.

Tab 4 - RWO Cost Breakdown

JPL RFP MEL-2664-09192024Attachment A-15, Tab 4
Thermal Analysis Engineering Services
RWO Cost Element Breakdown
enter company name
Notes -
1. Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 4.
2. The rates used below shall be consistent with the FY'25 labor rate ranges proposed within Tab 1 and the FY'25 indirect rates proposed within Tab 2.
3. Insert or delete rows as needed.
Cost ElementRWO 1RWO 2RWO 3Total
Hours/BaseRateAmountHours/BaseRateAmountHours/BaseRateAmountHours/BaseRateAmount
Direct Labor
Category 10$0.00$00$0.00$00$0.00$00$0.00$0
Category 20$0.00$00$0.00$00$0.00$00$0.00$0
Category 30$0.00$00$0.00$00$0.00$00$0.00$0
Category 40$0.00$00$0.00$00$0.00$00$0.00$0
Category 50$0.00$00$0.00$00$0.00$00$0.00$0
Category 60$0.00$00$0.00$00$0.00$00$0.00$0
Category 70$0.00$00$0.00$00$0.00$00$0.00$0
Total Direct Labor0$00$00$00$0
Overhead$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Fringe Benefits$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Material$0$0$0$0
Subcontract$0$0$0$0
Travel$0$0$0$0
Other Direct Cost$0$0$0$0
Subtotal Cost$0$0$0$0
G&A$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Total Cost$0$0$0$0
COM - Labor$0$0$0$0
COM - Non-labor$0$0$0$0
COM - G&A$0$0$0$0
Total COM$0$0$0$0

Total Cost + COM $0 $0 $0 $0

Fee$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Total Price$0$0$0$0

Tab 4-1 Travel

JPL RFP MEL-2664-09192024Attachment A-15, Tab 4-1
Thermal Analysis Engineering Services
RWO Travel Cost Detail
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.2.
2Insert or delete rows as needed.
Travel Cost Detail
TripRWO
#DateOriginDestinationNumber of -AirfareMileage @ $0.xx/mileLodgingM&IERental CarOther (define)Other (define)Total $

/Trip

#TravelersNightsRental CarsUnit $Total $# MilesTotal $Unit $Total $Unit $Total $Unit $Total $Unit $Total $Unit $Total $
1$0.00
2$0.00
3$0.00
4$0.00
5$0.00
6$0.00
7$0.00
8$0.00
9$0.00
10$0.00
11$0.00
12$0.00
Grand Total$0.00
TripPurpose of Travel
#
1
2
3
4
5
6
7
8
9
10
11
12

Tab 4-2 Material

JPL RFP MEL-2664-09192024Attachment A-15, Tab 4-2
Thermal Analysis Engineering Services
RWO Material Cost Detail
enter company name
Notes:
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.3.
2"Raw Mat'l Mark-up" shall include only those mark-up amounts unique to raw material cost, e.g. material handling, freight-in, scrap, etc.
3Basis of Estimate "Source Document" includes (but is not limited to); Purchase Order (current or historical), catalog price, engineering estimate.
4Basis of Estimate "Reference" shall cite the specific Source Document, e.g. P.O. # and date, catalog publication & date, engineering estimate back-up, etc.
5Insert or delete rows as needed
RWO 1
Item
#Part
NumberPart
DescriptionUnit of
MeasureQuantity
RequiredMinimum
Buy/LotPurchase
QuantityCost/
UnitTotal Raw
Mat'l CostRaw Mat'lTotalLead Time
in WeeksSupplierBasis of Estimate
Mark-upMaterialSource DocumentReference
1
2
3
4
5
6
7
Total$ - 0$ - 0$ - 0
RWO 2
Item
#Part
NumberPart
DescriptionUnit of
MeasureQuantity
RequiredMinimum
Buy/LotPurchase
QuantityCost/
UnitTotal Raw
Mat'l CostRaw Mat'lTotalLead Time
in WeeksSupplierBasis of Estimate
Mark-upMaterialSource DocumentReference
1
2
3
4
5
6
7
Total$ - 0$ - 0$ - 0
RWO 3
Item
#Part
NumberPart
DescriptionUnit of
MeasureQuantity
RequiredMinimum
Buy/LotPurchase
QuantityCost/
UnitTotal Raw
Mat'l CostRaw Mat'lTotalLead Time
in WeeksSupplierBasis of Estimate
Mark-upMaterialSource DocumentReference
1
2
3
4
5
6
7
Total$ - 0$ - 0$ - 0

Tab 4-3 Subcontracts

JPL RFP MEL-2664-09192024Attachment A-15, Tab 4-3
Thermal Analysis Engineering Services
RWO Subcontract Cost Detail
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.4.
2Insert or delete rows as needed.
RWO 1
Row
#Subcontractor
NameSubcontract
DescriptionBasis of
EstimateProposed Amount
NameDivision/LocationDescriptionTypeYear 1Year 2Year 3Total
1$0$0$0$0
2$0$0$0$0
3$0$0$0$0
4$0$0$0$0
5$0$0$0$0
6$0$0$0$0
7$0$0$0$0
Total$0$0$0$0
RWO 2
Row
#Subcontractor
NameSubcontract
DescriptionBasis of
EstimateProposed Amount
NameDivision/LocationDescriptionTypeYear 1Year 2Year 3Total
1$0$0$0$0
2$0$0$0$0
3$0$0$0$0
4$0$0$0$0
5$0$0$0$0
6$0$0$0$0
7$0$0$0$0
Total$0$0$0$0
RWO 3
Row
#Subcontractor
NameSubcontract
DescriptionBasis of
EstimateProposed Amount
NameDivision/LocationDescriptionTypeYear 1Year 2Year 3Total
1$0$0$0$0
2$0$0$0$0
3$0$0$0$0
4$0$0$0$0
5$0$0$0$0
6$0$0$0$0
7$0$0$0$0
Total$0$0$0$0

Tab 4-4 Other Direct Cost

JPL RFP MEL-2664-09192024Attachment A-15, Tab 4-4
Thermal Analysis Engineering Services
RWO Other Direct Cost Detail
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.5.
2Insert or delete rows as needed.
#ODC ItemDescriptionBasis of Estimate
1
2
3
4
5
6
7
8
9
10
11
12
RWO 1RWO 2RWO 3
#ODC ItemQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal Cost
1$0.00$0.00$0.00$0.00$0.00$0.00
2$0.00$0.00$0.00$0.00$0.00$0.00
3$0.00$0.00$0.00$0.00$0.00$0.00
4$0.00$0.00$0.00$0.00$0.00$0.00
5$0.00$0.00$0.00$0.00$0.00$0.00
6$0.00$0.00$0.00$0.00$0.00$0.00
7$0.00$0.00$0.00$0.00$0.00$0.00
8$0.00$0.00$0.00$0.00$0.00$0.00
9$0.00$0.00$0.00$0.00$0.00$0.00
10$0.00$0.00$0.00$0.00$0.00$0.00
11$0.00$0.00$0.00$0.00$0.00$0.00
12$0.00$0.00$0.00$0.00$0.00$0.00
Total$0.00TotalTotal$0.00

File details come from the government source that posted it. Updated .