The file's text, extracted by GovTribe without its formatting.
Tab 1 - Labor Rate Ranges & Esc
| JPL RFP MEL-2664-09192024 | | | Attachment A-15 Tab 1 |
| Thermal Analysis Engineering Services | | | |
| Proposed Direct Labor Rate Ranges & Annual Escalation | | | |
| enter company name | | | |
| Notes - | | | |
| 1 | Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 1 and paragraph 3.1. | | |
| 2 | The Government fiscal year runs from October through September. | | |
| 3 | Insert or delete rows as needed. | | |
| Labor Categories | | | |
| # | Labor | | |
| Category | Code or # | | | |
| (if any) | Description of Roles and Responsibilities | | Typical Education | |
| & Experience | Clearance | | | |
None or Level
| # | Labor | | | | | | | | | |
| Category | FY'25 Labor Rate Range | | | | FY'26 Labor Rate Range | | | FY'27 Labor Rate Range | | | |
| | | Minimum | Midpoint | Maximum | Minimum | Midpoint | Maximum | Minimum | Midpoint | Maximum |
| 1 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 6 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 7 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| # | Labor | | | | | | | | | |
| Category | FY'28 Labor Rate Range | | | | FY'29 Labor Rate Range | | | FY'30 Labor Rate Range | | | |
| | | Minimum | Midpoint | Maximum | Minimum | Midpoint | Maximum | Minimum | Midpoint | Maximum |
| 1 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 3 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 6 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 7 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| SAMPLE - Rates shown are in no way indicative of proposed rates expected by JPL. | | | | | | |
| # | Title | Code or | | | | |
| Number (if any) | Description of Roles and Responsibilities | | | Typical Education | | | |
| & Experience | Clearance | | | | | | |
| None or Level | | Labor Rate Range | | | | | |
| | | | | Minimum | Midpoint | Maximum |
| 1 | Test Engineer III | TE3 | | | | |
tc={2C23CB6E-B18C-41A8-9892-06A402D44719}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Need to update this for our SET, do not have access to previous SET | Designs, develops, and implements testing methods and equipment. Plans and arranges the labor, schedules, and equipment required for testing and evaluating standard and special devices. Provides test area with parameters for sample testing and specifies tests to be performed. Compiles data and defines changes required in testing equipment, testing procedures, manufacturing processes, or new testing requirements. Responsible for testing all customer samples and for special tests that cannot be performed in the test area. | | | | BS + 6 years | None | $38.00 | $44.00 | $50.00 | | | |
| 2 | Test Engineer III | TE3SC | Holds Security Clearance. Designs, develops, and implements testing methods and equipment. Plans and arranges the labor, schedules, and equipment required for testing and evaluating standard and special devices. Provides test area with parameters for sample testing and specifies tests to be performed. Compiles data and defines changes required in testing equipment, testing procedures, manufacturing processes, or new testing requirements. Responsible for testing all customer samples and for special tests that cannot be performed in the test area. | | | BS + 6 years | Top Secret | | $42.00 | $48.00 | $54.00 |
Page &P of &N
Tab 2 - Indirect Rates
| JPL RFP MEL-2664-09192024 | Attachment A-15, Tab 2 |
| Thermal Analysis Engineering Services | |
| Indirect Rates & Fixed Fee for Fee Calculation | |
| enter company name | |
| Notes - | |
| 1 | Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 2 and paragraph 3.6. |
| 2 | The Government fiscal year runs from October through September. |
| 3 | Insert or delete rows as needed. |
| Fixed Fee | FY'25 | FY'26 | FY'27 | FY'28 | FY'29 | FY'30 |
| Fee Percentage for use in SWO fixed fee calculation | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| Indirect Rates - For use in SWO fixed fee calculation | | | Proposed Rate | | | | | |
| # | Indirect Rate Description | Application Base | FY'25 | FY'26 | FY'27 | FY'28 | FY'29 | FY'30 |
| 1 | | | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| 2 | | | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| 3 | | | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| 4 | | | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| 5 | | | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| 6 | | | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| 7 | | | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| 8 | | | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| 9 | | | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% |
| INDIRECT RATE SAMPLE - Rates shown are in no way indicative of proposed rates expected by JPL. | | | | | | | | |
| Indirect Rates - For use in SWO fixed fee calculation | | | Proposed Rate | | | | | |
| # | Indirect Rate Description | Application Base | FY'25 | FY'26 | FY'27 | FY'28 | FY'29 | FY'30 |
| 1 | Fringe Benefits | Direct labor | 54.2% | 55.0% | 53.7% | 55.2% | 55.7% | 54.9% |
| 2 | Labor Overhead | Direct labor + fringe benefits | 34.7% | 35.2% | 35.0% | 35.2% | 35.5% | 34.8% |
| 3 | Material Overhead | Raw material cost | 7.5% | 7.7% | 7.2% | 6.9% | 7.1% | 7.1% |
| 4 | Subcontract Overhead | Subcontract cost | 3.0% | 2.7% | 3.1% | 2.9% | 3.2% | 3.2% |
| 5 | IT Services | Labor hours | $ 0.25 | $ 0.24 | $ 0.29 | $ 0.27 | $ 0.23 | $ 0.25 |
| 6 | General & Administrative | Subtotal direct cost | 43.7% | 41.0% | 42.2% | 44.0% | 42.7% | 43.0% |
Tab 3 - SWO Fee Calculation
| JPL RFP MEL-2664-09192024 | Attachment A-15, Tab 3 |
| Thermal Analysis Engineering Services | |
| SWO Fee Calculation | |
| Sample for Information Purposes Only | |
| Note - | | | | | | | | | |
| Tab 3 is for information purposes. Reference RFP Volume III Cost Instructions Section 2.1 Tab 3 for required acknowledgement of compliance. | | | | | | | | | |
| Cost Element | SWO Cost - Current Rates | | | SWO Cost for Fee Calculation | | | Total Negotiated SWO | | |
| Hours/ | Current | | Hours/ | Neg | Cost Est @ | Hours/ | Current | |
| Labor | Base | Rate | Total | Base | Rate | Current Rates | Base | Rate | Total |
| Data System Architect | 10 | $ 70.00 | $ 700 | 10 | $ 65.00 | $ 650 | 10 | $ 70.00 | $ 700 |
| Data Management & Archive | 10 | $ 45.00 | $ 450 | 10 | $ 47.00 | $ 470 | 10 | $ 45.00 | $ 450 |
| Technical Writing and Editing | 10 | $ 40.00 | $ 400 | 10 | $ 38.00 | $ 380 | 10 | $ 40.00 | $ 400 |
| Mission & Flight System Plan | 10 | $ 65.00 | $ 650 | 10 | $ 62.00 | $ 620 | 10 | $ 65.00 | $ 650 |
| Mission Operations | 10 | $ 55.00 | $ 550 | 10 | $ 50.00 | $ 500 | 10 | $ 55.00 | $ 550 |
| Total Labor | 50 | | $ 2,750 | 50 | | $ 2,620 | 50 | | $ 2,750 |
Overhead/Fringe $ 2,750 92.0% $ 2,530 $ 2,620 87.0% $ 2,279 92.0% $ 2,530
| Material | | | $ 5,000 | | | $ 5,000 | | $ 5,000 |
| Material Overhead | $ 5,000 | 4.3% | $ 215 | $ 5,000 | 4.0% | $ 200 | 4.3% | $ 215 |
| Subcontract | | | $ 2,000 | | | $ 2,000 | | $ 2,000 |
| Subtotal Cost / G&A Base | | | $ 12,495 | | | $ 12,099 | | $ 12,495 |
| G&A | $ 12,495 | 39.0% | $ 4,873 | $ 12,099 | 35.0% | $ 4,235 | | 39.0% | $ 4,873 |
| Total Cost | | | $ 17,368 | | | $ 16,334 | | | $ 17,368 |
| FCCM - Labor | $ 2,750 | 0.68% | $ 19 | $ 2,620 | 0.68% | $ 18 | | 0.68% | $ 19 |
| FCCM - Material | $ 5,000 | 0.07% | $ 4 | $ 5,000 | 0.07% | $ 4 | | 0.07% | $ 4 |
| FCCM - G&A | $ 12,495 | 0.42% | $ 52 | $ 12,099 | 0.42% | $ 51 | | 0.42% | $ 52 |
| Total Cost + FCCM | | | $ 17,443 | | | $ 16,407 | Cost at Current Rates | | $ 17,443 |
| Fixed Fee | | N/A | | | 4.0% | $ 653 | | | $ 653 |
| Total Price** | | N/A | | N/A | | | | | $ 18,096 |
| Notes - |
| 1 The SWO cost base for fee calculation is developed using the negotiated indirect rates. The negotiated fee percentage is applied to the total cost (excluding FCCM) resulting from the application of the negotiated indirect rates, to calculate the fee amount. |
2 The current direct labor rates are assumed to fall within the negotiated direct labor rate ranges.
3 The Total Price includes the total cost based on current rates plus the fee amount that results from applying the negotiated fee percentage to the total cost (excluding FCCM) as based on the negotiated indirect rates. Note that all direct labor & FCCM cost within the fee calculation cost base reflect current rates.
Tab 4 - RWO Cost Breakdown
| JPL RFP MEL-2664-09192024 | | | | | | | | | | Attachment A-15, Tab 4 | | |
| Thermal Analysis Engineering Services | | | | | | | | | | | | |
| RWO Cost Element Breakdown | | | | | | | | | | | | |
| enter company name | | | | | | | | | | | | |
| Notes - | | | | | | | | | | | | |
| 1. Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 4. | | | | | | | | | | | | |
| 2. The rates used below shall be consistent with the FY'25 labor rate ranges proposed within Tab 1 and the FY'25 indirect rates proposed within Tab 2. | | | | | | | | | | | | |
| 3. Insert or delete rows as needed. | | | | | | | | | | | | |
| Cost Element | RWO 1 | | | RWO 2 | | | RWO 3 | | | Total | | |
| Hours/Base | Rate | Amount | Hours/Base | Rate | Amount | Hours/Base | Rate | Amount | Hours/Base | Rate | Amount |
| Direct Labor | | | | | | | | | | | | |
| Category 1 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 |
| Category 2 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 |
| Category 3 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 |
| Category 4 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 |
| Category 5 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 |
| Category 6 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 |
| Category 7 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 | 0 | $0.00 | $0 |
| Total Direct Labor | 0 | | $0 | 0 | | $0 | 0 | | $0 | 0 | | $0 |
| Overhead | $0 | 0.0% | $0 | $0 | 0.0% | $0 | $0 | 0.0% | $0 | $0 | 0.0% | $0 |
| Fringe Benefits | $0 | 0.0% | $0 | $0 | 0.0% | $0 | $0 | 0.0% | $0 | $0 | 0.0% | $0 |
| Material | $0 | $0 | $0 | $0 |
| Subcontract | $0 | $0 | $0 | $0 |
| Travel | $0 | $0 | $0 | $0 |
| Other Direct Cost | $0 | $0 | $0 | $0 |
| Subtotal Cost | $0 | $0 | $0 | $0 |
| G&A | $0 | 0.0% | $0 | $0 | 0.0% | $0 | $0 | 0.0% | $0 | $0 | 0.0% | $0 |
| Total Cost | | | $0 | | | $0 | | | $0 | | | $0 |
| COM - Labor | $0 | $0 | $0 | $0 |
| COM - Non-labor | $0 | $0 | $0 | $0 |
| COM - G&A | $0 | $0 | $0 | $0 |
| Total COM | $0 | $0 | $0 | $0 |
Total Cost + COM $0 $0 $0 $0
| Fee | $0 | 0.0% | $0 | $0 | 0.0% | $0 | $0 | 0.0% | $0 | $0 | 0.0% | $0 |
| Total Price | | | $0 | | | $0 | | | $0 | | | $0 |
Tab 4-1 Travel
| JPL RFP MEL-2664-09192024 | | Attachment A-15, Tab 4-1 |
| Thermal Analysis Engineering Services | | |
| RWO Travel Cost Detail | | |
| enter company name | | |
| Notes - | | |
| 1 | Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.2. | |
| 2 | Insert or delete rows as needed. | |
| Travel Cost Detail | | | | | | | | | | | |
| Trip | RWO | | | | | | | | | | |
| # | Date | Origin | Destination | Number of - | Airfare | Mileage @ $0.xx/mile | Lodging | M&IE | Rental Car | Other (define) | Other (define) | Total $ |
/Trip
| # | | Travelers | Nights | Rental Cars | Unit $ | Total $ | # Miles | Total $ | Unit $ | Total $ | Unit $ | Total $ | Unit $ | Total $ | Unit $ | Total $ | Unit $ | Total $ | |
| 1 | | | | | | | | | | | | | | | | | | | $0.00 |
| 2 | | | | | | | | | | | | | | | | | | | $0.00 |
| 3 | | | | | | | | | | | | | | | | | | | $0.00 |
| 4 | | | | | | | | | | | | | | | | | | | $0.00 |
| 5 | | | | | | | | | | | | | | | | | | | $0.00 |
| 6 | | | | | | | | | | | | | | | | | | | $0.00 |
| 7 | | | | | | | | | | | | | | | | | | | $0.00 |
| 8 | | | | | | | | | | | | | | | | | | | $0.00 |
| 9 | | | | | | | | | | | | | | | | | | | $0.00 |
| 10 | | | | | | | | | | | | | | | | | | | $0.00 |
| 11 | | | | | | | | | | | | | | | | | | | $0.00 |
| 12 | | | | | | | | | | | | | | | | | | | $0.00 |
| | | | | | | | | | | | | | | | | Grand Total | | $0.00 |
| Trip | Purpose of Travel | | | | | | | | | | | | | | | | | | |
| # | | | | | | | | | | | | | | | | | | | |
| 1 | | | | | | | | | | | | | | | | | | | |
| 2 | | | | | | | | | | | | | | | | | | | |
| 3 | | | | | | | | | | | | | | | | | | | |
| 4 | | | | | | | | | | | | | | | | | | | |
| 5 | | | | | | | | | | | | | | | | | | | |
| 6 | | | | | | | | | | | | | | | | | | | |
| 7 | | | | | | | | | | | | | | | | | | | |
| 8 | | | | | | | | | | | | | | | | | | | |
| 9 | | | | | | | | | | | | | | | | | | | |
| 10 | | | | | | | | | | | | | | | | | | | |
| 11 | | | | | | | | | | | | | | | | | | | |
| 12 | | | | | | | | | | | | | | | | | | | |
Tab 4-2 Material
| JPL RFP MEL-2664-09192024 | | Attachment A-15, Tab 4-2 |
| Thermal Analysis Engineering Services | | |
| RWO Material Cost Detail | | |
| enter company name | | |
| Notes: | | |
| 1 | Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.3. | |
| 2 | "Raw Mat'l Mark-up" shall include only those mark-up amounts unique to raw material cost, e.g. material handling, freight-in, scrap, etc. | |
| 3 | Basis of Estimate "Source Document" includes (but is not limited to); Purchase Order (current or historical), catalog price, engineering estimate. | |
| 4 | Basis of Estimate "Reference" shall cite the specific Source Document, e.g. P.O. # and date, catalog publication & date, engineering estimate back-up, etc. | |
| 5 | Insert or delete rows as needed | |
| RWO 1 | | | | | | | | |
| Item | | | | | | | | |
| # | Part | | | | | | | | |
| Number | Part | | | | | | | | |
| Description | Unit of | | | | | | | | |
| Measure | Quantity | | | | | | | | |
| Required | Minimum | | | | | | | | |
| Buy/Lot | Purchase | | | | | | | | |
| Quantity | Cost/ | | | | | | | | |
| Unit | Total Raw | | | | | | | | |
| Mat'l Cost | Raw Mat'l | Total | Lead Time | | | | | | |
| in Weeks | Supplier | Basis of Estimate | | | | | | | |
| | | | | | Mark-up | Material | Source Document | Reference |
| 1 | | | | | | | | |
| 2 | | | | | | | | |
| 3 | | | | | | | | |
| 4 | | | | | | | | |
| 5 | | | | | | | | |
| 6 | | | | | | | | |
| 7 | | | | | | | | |
| | | | Total | $ - 0 | $ - 0 | $ - 0 | | |
| RWO 2 | | | | | | | | |
| Item | | | | | | | | |
| # | Part | | | | | | | | |
| Number | Part | | | | | | | | |
| Description | Unit of | | | | | | | | |
| Measure | Quantity | | | | | | | | |
| Required | Minimum | | | | | | | | |
| Buy/Lot | Purchase | | | | | | | | |
| Quantity | Cost/ | | | | | | | | |
| Unit | Total Raw | | | | | | | | |
| Mat'l Cost | Raw Mat'l | Total | Lead Time | | | | | | |
| in Weeks | Supplier | Basis of Estimate | | | | | | | |
| | | | | | Mark-up | Material | Source Document | Reference |
| 1 | | | | | | | | |
| 2 | | | | | | | | |
| 3 | | | | | | | | |
| 4 | | | | | | | | |
| 5 | | | | | | | | |
| 6 | | | | | | | | |
| 7 | | | | | | | | |
| | | | Total | $ - 0 | $ - 0 | $ - 0 | | |
| RWO 3 | | | | | | | | |
| Item | | | | | | | | |
| # | Part | | | | | | | | |
| Number | Part | | | | | | | | |
| Description | Unit of | | | | | | | | |
| Measure | Quantity | | | | | | | | |
| Required | Minimum | | | | | | | | |
| Buy/Lot | Purchase | | | | | | | | |
| Quantity | Cost/ | | | | | | | | |
| Unit | Total Raw | | | | | | | | |
| Mat'l Cost | Raw Mat'l | Total | Lead Time | | | | | | |
| in Weeks | Supplier | Basis of Estimate | | | | | | | |
| | | | | | Mark-up | Material | Source Document | Reference |
| 1 | | | | | | | | |
| 2 | | | | | | | | |
| 3 | | | | | | | | |
| 4 | | | | | | | | |
| 5 | | | | | | | | |
| 6 | | | | | | | | |
| 7 | | | | | | | | |
| | | | Total | $ - 0 | $ - 0 | $ - 0 | | |
Tab 4-3 Subcontracts
| JPL RFP MEL-2664-09192024 | | Attachment A-15, Tab 4-3 |
| Thermal Analysis Engineering Services | | |
| RWO Subcontract Cost Detail | | |
| enter company name | | |
| Notes - | | |
| 1 | Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.4. | |
| 2 | Insert or delete rows as needed. | |
| RWO 1 | | | | | | | | | |
| Row | | | | | | | | | |
| # | Subcontractor | | | | | | | | | |
| Name | | Subcontract | | | | | | | | |
| Description | | Basis of | | | | | | | | |
| Estimate | Proposed Amount | | | | | | | | | |
| | Name | Division/Location | Description | Type | | Year 1 | Year 2 | Year 3 | Total |
| 1 | | | | | | $0 | $0 | $0 | $0 |
| 2 | | | | | | $0 | $0 | $0 | $0 |
| 3 | | | | | | $0 | $0 | $0 | $0 |
| 4 | | | | | | $0 | $0 | $0 | $0 |
| 5 | | | | | | $0 | $0 | $0 | $0 |
| 6 | | | | | | $0 | $0 | $0 | $0 |
| 7 | | | | | | $0 | $0 | $0 | $0 |
| | | | | | Total | $0 | $0 | $0 | $0 |
| RWO 2 | | | | | | | | | |
| Row | | | | | | | | | |
| # | Subcontractor | | | | | | | | | |
| Name | | Subcontract | | | | | | | | |
| Description | | Basis of | | | | | | | | |
| Estimate | Proposed Amount | | | | | | | | | |
| | Name | Division/Location | Description | Type | | Year 1 | Year 2 | Year 3 | Total |
| 1 | | | | | | $0 | $0 | $0 | $0 |
| 2 | | | | | | $0 | $0 | $0 | $0 |
| 3 | | | | | | $0 | $0 | $0 | $0 |
| 4 | | | | | | $0 | $0 | $0 | $0 |
| 5 | | | | | | $0 | $0 | $0 | $0 |
| 6 | | | | | | $0 | $0 | $0 | $0 |
| 7 | | | | | | $0 | $0 | $0 | $0 |
| | | | | | Total | $0 | $0 | $0 | $0 |
| RWO 3 | | | | | | | | | |
| Row | | | | | | | | | |
| # | Subcontractor | | | | | | | | | |
| Name | | Subcontract | | | | | | | | |
| Description | | Basis of | | | | | | | | |
| Estimate | Proposed Amount | | | | | | | | | |
| | Name | Division/Location | Description | Type | | Year 1 | Year 2 | Year 3 | Total |
| 1 | | | | | | $0 | $0 | $0 | $0 |
| 2 | | | | | | $0 | $0 | $0 | $0 |
| 3 | | | | | | $0 | $0 | $0 | $0 |
| 4 | | | | | | $0 | $0 | $0 | $0 |
| 5 | | | | | | $0 | $0 | $0 | $0 |
| 6 | | | | | | $0 | $0 | $0 | $0 |
| 7 | | | | | | $0 | $0 | $0 | $0 |
| | | | | | Total | $0 | $0 | $0 | $0 |
Tab 4-4 Other Direct Cost
| JPL RFP MEL-2664-09192024 | | Attachment A-15, Tab 4-4 |
| Thermal Analysis Engineering Services | | |
| RWO Other Direct Cost Detail | | |
| enter company name | | |
| Notes - | | |
| 1 | Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.5. | |
| 2 | Insert or delete rows as needed. | |
| # | ODC Item | Description | Basis of Estimate |
| 1 | | | |
| 2 | | | |
| 3 | | | |
| 4 | | | |
| 5 | | | |
| 6 | | | |
| 7 | | | |
| 8 | | | |
| 9 | | | |
| 10 | | | |
| 11 | | | |
| 12 | | | |
| | RWO 1 | | | RWO 2 | | | RWO 3 | | |
| # | ODC Item | Quantity | Unit Cost | Total Cost | Quantity | Unit Cost | Total Cost | Quantity | Unit Cost | Total Cost |
| 1 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| 2 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| 3 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| 4 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| 5 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| 6 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| 7 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| 8 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| 9 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| 10 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| 11 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| 12 | | | $0.00 | $0.00 | | $0.00 | $0.00 | | $0.00 | $0.00 |
| | Total | | $0.00 | | Total | | Total | | $0.00 |