Attachment 9-Price Proposal.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Mid-Atlantic Regional Maintenance Center (MARMC) Technical and Professional Services
Solicitation number
N5005426R0006
Issued by

About this file

This is a Price Proposal template for solicitation N50054-26-R-0006, a task order under the SeaPort-NxG Multiple Award Contract (MAC) for Technical and Professional Services Support at the Mid-Atlantic Regional Maintenance Center (MARMC) in Norfolk, VA. The pricing structure covers a base period of eight months (7/22/2026-7/21/2027) and four one-year option periods (7/22/2027-7/21/2031), plus a six-month extension option (7/22/2031-9/21/2031). Offerors must submit pricing for two primary CLINs: Labor (5000, 5100, 5200, 5300, 5400, 5500) and Overtime (5001, 5101, 5201, 5301, 5401, 5501), with all costs to be presented as monthly estimated prices and total estimated prices in firm fixed price format.

The template requires detailed labor cost breakdowns by job category, including 35 specified labor positions across administrative, quality assurance, logistics, production control, engineering, and security roles. Offerors must provide fully burdened hourly rates for each labor category across all performance periods and a separate overtime rate structure. The pricing submission must account for all pass-through costs and fees, with a maximum pass-through limit of eight percent as allowed under the SeaPort-e IDIQ contract. Additional sections include direct labor costs for the prime contractor, subcontractor labor costs with fee analysis, other direct costs (travel and materials), and a comprehensive pass-through analysis to ensure compliance with the MAC requirements.

View the file

Other files

File Type Posted
Solicitation Amendment - N5005426R00060005.pdf PDF
Solicitation Amendment N5005426R00060005 SF 30.pdf PDF
Attachment 9-Price Proposal Rev 3.xlsx XLSX spreadsheet
Solicitation Amendment N5005426R00060004 SF 30.pdf PDF
Solicitation N5005426R0006 Conformed Through Amendment 0004.pdf PDF
Attachment 3- WD 2015-4341 REV 35 dated 07302026.pdf PDF
Attachment 9-Price Proposal Rev 2.xlsx XLSX spreadsheet
Solicitation Amendment N5005426R00060003 SF 30.pdf PDF
Solicitation N5005426R0006 Conformed Through Amendment 0003.pdf PDF
Bidders Questions and Responses-AMD 2.pdf PDF
Attachment 9-Price Proposal Rev 1.xlsx XLSX spreadsheet
Solicitation Amendment N5005426R00060002 SF 30.pdf PDF
Solicitation N5005426R0006 Conformed Through Amendment 0002.pdf PDF
Solicitation N5005426R0006 Conformed Through Amendment 0001.pdf PDF
Solicitation Amendment N5005426R00060001 SF 30.pdf PDF
Questions and Responses-AMD1.pdf PDF
Attachment 8- Past Performance Reference.docx DOCX document
Attachment 10-SF1408-14f.pdf PDF
N5005426R0006.pdf PDF
Attachment 5-CDRL-A002 Status Report.pdf PDF
Attachment 1-QASP.pdf PDF
Attachment 2-DD254.pdf PDF
Attachment 3-WD 2015-4341 Rev 34.txt TXT text file
Attachment 4-CDRL-A001_STATUS_REPORT.pdf PDF
Attachment 6-CDRL-A003 End of Task.pdf PDF
Attachment 7-Staffing Plan.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN PRICING SHEET

Attachment 9- Prime Offeror Price Summary
N50054-26-R-0006
PRIME:

Instructions: Fill in the yellow boxes only. All other numbers will automatically calculate. If your company has any additional charges or fees, prompt payment discounts, etc., clearly state what these are in your proposal. All Pass Through Allowed by SeaPort-e IDIQ shall be included in the price proposed.

FY26 MARMC Technical and Professional Services Support, Pricing

CLINDescriptionQTYUnit of IssueProposed Monthly Estimated PriceProposed Total Estimated Price
BASEPERIOD OF PERFORMANCE: ESTIMATED BASE PERIOD (7/22/2026-7/21/2027)
5000Labor8Month$0.00
5001Overtime1Lot$0.00
Subtotals$0.00$0.00
OPTION 1PERIOD OF PERFORMANCE: ESTIMATED OPTION PERIOD ONE (1) (7/22/2027-7/21/2028)
5100Labor12Month$0.00
5101Overtime1Lot$0.00
Subtotals$0.00$0.00
OPTION 2PERIOD OF PERFORMANCE: ESTIMATED OPTION PERIOD TWO (2) (7/22/2028-7/21/2029)
5200Labor12Month$0.00
5201Overtime1Lot$0.00
Subtotals$0.00$0.00
OPTION 3PERIOD OF PERFORMANCE: ESTIMATED OPTION PERIOD THREE (3) (7/22/2029-7/21/2030)
5300Labor12Month$0.00
5301Overtime1Lot$0.00
Subtotals$0.00$0.00
OPTION 4PERIOD OF PERFORMANCE: ESTIMATED OPTION PERIOD FOUR (4) (7/22/2030-7/21/2031
5400Labor12Month$0.00
5401Overtime1Lot$0.00
Subtotals$0.00$0.00

Estimated Task Order Total (Base and All Option Periods) $0.00

The total value of 6 months of the last option period to accommodate the estimated value of support services under FAR clause 52.217-8, Option to Extend Services, in the event it is exercised. In accordance with Section M of the solicitation, the extension option described at FAR 52.217-8 will be evaluated using 50% of the value proposed for those CLINs associated with Option Year 4.

6-MO EXTPERIOD OF PERFORMANCE: ESTIMATED OPTION EXTENSION (7/22/31-9/21/31)
5500Labor6Month$0.00
5501Overtime1Lot$0.00
Subtotals$0.00$0.00

Estimated Task Order Total (Base, All Option Periods and 6 Month Extension ) $0.00

Price Summary

SOLICITATION NO. N50054-26-R-0006 - ATTACHMENT 5
PRICE SUMMARY FORMAT
Prime Offeror Name:
Subcontractor Name (if applicable):
DCAA Point of Contact Information:Key
PersonnelTotal for All YearsBase PeriodOption Year 1Option Year 2Option 3Option 4
Price ElementsLabor CategoryCLINY / NHoursAmountRateHoursPer Month AmountAmountRateHoursPer Month AmountAmountRateHoursPer Month AmountAmountRateHoursPer Month AmountAmountRateHoursPer Month AmountAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor FFP
Employee Example Name
Employee Example Name
Employee Example Name
etc.

Total Prime Contractor Labor Cost

Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Subcontractor 3
Etc.
Total proposed subcontractor labor cost and fee
Total pass through (not including fee)
Total Subcontractor Cost including pass through
Total Labor Price (Subcontractor Labor)
Fixed Fee
Prime Contractor Fee for Subcontractors Labor *
Total Fee (Subcontractor Labor)

Total Labor Firm Fixed Price

Other Direct Costs
Travel
Material Costs
Other Direct Costs (ODCs)
Total ODCs
ODCs

Total FFP all CLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$0ERROR:#DIV/0!
Maximum Pass Through Allowed by SeaPort-e IDIQ Contract8%
* When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B.

Rates N50054-26-R-0006

Please provide the hourly rate for each key position below that the offeror plans to use during the period of performance of this contract.

Fully Burdened Labor Rate
Prime or Sub Contractor LaborEmployee NameLabor CategoryeCRAFT Labor CategoryBaseOption Year 1Option Year 2Option Year 3Option Year 4
Administrative Assistant II
Quality Assurance Technician
Quality Assurance Technician
Management Analyst
Habitability Program Logistics Specialist
Production Controller II
Production Controller II
Production Controller II
Production Controller II
Production Controller II
Production Controller II
Management Analyst
Senior Schedule Analyst
Senior Schedule Analyst
Administrative Specialist
Administrative Specialist
Logistics Analyst
Logistics Analyst
Logistics Analyst
Logistics Analyst
Logistics Analyst
Logistics Analyst
Logistics Analyst
Logistics Analyst
Logistics Analyst
Logistics Analyst
Logistics Analyst
Logistics Analyst
Logistics Analyst
Production Controller II
Production Controller II
Production Controller II
Warehouse Specialist
Warehouse Specialist
Production Controller I
Production Controller I
Production Controller I
Engineering Technician I
Engineering Technician II
Engineering Technician II
Technical Instructor (Marine Welding & Systems)
Public Affairs Specialist
Security Administrative Assistant
Security Administrative Assistant
Security Administrative Assistant
Security Administrative Assistant

Totals

Fully Burdened Labor Rate
OvertimeEmployee NameLabor CategoryBaseOption Year 1Option Year 2Option Year 3Option Year 4
Security Administrative Assistant
Security Administrative Assistant
Security Administrative Assistant
Security Administrative Assistant

Totals

File details come from the government source that posted it. Updated .