Attachment 9 - Plumbing Set Final.pdf
PDF 7 MB Posted
- Solicitation number
- 36E77620B0003
About this file
This document provides details for an upcoming Invitation for Bid (IFB) to award a single Firm-Fixed-Price construction contract for the Expand Primary Care Clinic project at the Newington VA Medical Center in Newington, Connecticut. The project scope involves renovating and expanding existing primary care clinic space by approximately 25,000 square feet through work in Buildings 2C, 2W and a new 5,000 square foot addition. Additional space will be renovated in Buildings 1, 2E, 3 and 42 to relocate existing operations. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and issued on or around March 31, 2020. The period of performance is approximately 600 calendar days. The construction value is estimated between $5-10 million. Questions must be submitted in writing by the stated deadline.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ET-1
MARK
WATER
HEATER
VOLUME
SUPPLY
PRESSURE
PSI
AIR
PRE-CHARGE
PSI
TEMP
°F
EXPANSION
FACTOR
ACCEPTANCE
VOLUME
GALLONS
TOTAL
VOLUME
GALLONS
REMARKS
EXPANSION TANK SCHEDULE
NOTES:
DIRECTION OF FLOW
REDUCER OR INCREASER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
WATER HAMMER ARRESTOR
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
HOSE BIBB
NON-FREEZE WALL HYDRANT
FLOOR DRAIN
SHOWER DRAIN
FLOOR SINK
HUB DRAIN
PLUGGED TEE
WALL CLEANOUT
THERMOMETER
PRESSURE GAGE
PUMP
DOMESTIC COLD WATER, COLD WATER
DOMESTIC HOT WATER, HOT WATER
DOMESTIC HOT WATER RETURN, HOT WATER
RETURN
DRAIN
VENT, SANITARY
SOIL, WASTE, OR SANITARY SEWER
SANITARY SEWER, BELOW GRADE
140°F HOT WATER
130°F HOT WATER
CHECK VALVE
ANGLE GLOBE VALVE
BALL VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
BALANCING VALVE
VALVE ON RISER
LIMITS OF DEMOLITION
POINT OF CONNECTION
NEW WORK KEYED NOTE
DEMOLITION KEYED NOTE
DOMESTIC COLD WATER RETURN, COLD
WATER RETURN
STORM DRAINAGE, STORM SEWER
P-103
P-402
P-502
P-505
P-524
P-528
P-555
P-609
P-812
FD-1
P-103
P-402
P-528
P-555
P-609
- 1
- 4
1 8
6 50
17 120
70 250
200 500
400 750
RP-1
RP-2
RP-3
RP-4
RP-5
RP-6
RP-7
RP-8
MV-1
MV-2
MV-3
MV-4
P-103
P-402
P-502
P-505
P-528
P-555
P-812
FD-1
WH-1
WH-2
WH-3
WH-4
MARK FIXTURE DFU
DCWS
WSFU
DHWS
WSFU
TOTAL
WSFU
CONNECTION PIPE SIZE
REMARKS
WASTE VENT DCWS DHWS
4.00 10.00 - 10.00 3.00 2.00 1.00 -
1.00 1.50 1.50 2.00 1.50 1.50 0.375 0.375
2.00 3.00 3.00 4.00 3.00 1.50 0.50 0.50
5.00 10.00 3.00 10.00 4.00 2.00 0.50 0.50
1.00 1.50 1.50 2.00 1.50 1.50 0.375 0.375
1.00 1.50 1.50 2.00 1.50 1.50 0.375 0.375
1.00 1.50 1.50 2.00 1.50 1.50 0.375 0.375
0.50 0.25 - 0.25 1.50 1.50 0.375 -
- 0.25 - 0.25 - - 0.375 -
2.00 - - - 2.00 1.50 - -
MARK FIXTURE QTY
DRAINAGE FU DOMESTIC WATER FU
EACH TOTAL
COLD
WATER
EACH
COLD
WATER
TOTAL
HOT
WATER
EACH
HOT
WATER
TOTAL
WATER
SUPPLY
EACH
WATER
SUPPLY
TOTAL
4.00 8.00 10.00 20.00 - - 10.00 20.00
1.00 4.00 1.50 6.00 1.50 6.00 2.00 8.00
3.00 3.00 1.50 1.50 1.50 1.50 2.00 2.00
3.00 33.00 1.50 16.50 1.50 16.50 2.00 22.00
0.50 0.50 0.25 0.25 - - 0.25 0.25
48.50 44.25 24.00 52.25
DOMESTIC WATER SUPPLY 52.25 WSFU =
DOMESTIC COLD WATER SUPPLY 44.25 WSFU =
DOMESTIC HOT WATER SUPPLY 24.00 WSFU =
PIPE SIZE:
SIZE
GPM
FLUSH VALVE
WSFU
FLUSH TANK
WSFUFLUSH
VALVE
FLUSH
TANK
1/2"
3/4"
1"
1-1/4"
1-1/2"
2"
2-1/2"
3"
MARK TYPE
MOTOR
H.P.
ELECTRICAL TOTAL
HEAD FEET
GALLONS
PER
MINUTE
LOCATION
VOLTAGE PHASE
MARK
PIPING PRESSURE
DROP
PSI
MINIMUM
FLOW
GPM
CAPACITY
GPM
TEMPERATURE
REMARKS
INLET OUTLET COLD HOT TEMPERED
MARK FIXTURE QTY
DRAINAGE FU DOMESTIC WATER FU
EACH TOTAL
COLD
WATER
EACH
COLD
WATER
TOTAL
HOT
WATER
EACH
HOT
WATER
TOTAL
WATER
SUPPLY
EACH
WATER
SUPPLY
TOTAL
4.00 28.00 10.00 70.00 - - 10.00 70.00
1.00 10.00 1.50 15.00 1.50 15.00 2.00 20.00
2.00 2.00 3.00 3.00 3.00 3.00 4.00 4.00
5.00 5.00 10.00 10.00 - - 10.00 10.00
3.00 6.00 1.50 3.00 1.50 3.00 2.00 4.00
3.00 57.00 0.25 4.75 1.50 28.50 2.00 38.00
- - 0.25 0.25 - - 0.25 0.25
2.00 2.00 - - - - - -
110.00 106.00 49.50 146.25
DOMESTIC WATER SUPPLY 146.25 WSFU =
DOMESTIC COLD WATER SUPPLY 106.00 WSFU =
DOMESTIC HOT WATER SUPPLY 49.50 WSFU =
PIPE SIZE:
MARK TYPE
WATER CONDITIONS STEAM PRESSURE
CONTROL
VALVE
LB/HR
LOCATION
FLOW
GPM
EWT
°F
LWT
°F
ENT
CONTROL
VALVE
PSIG
ENT HEAT
EXCHANGER
PSIG
PLUMBING FIXTURE SCHEDULE
NOTES:
FIXTURE UNIT CALCULATION - BUILDING 2C
(BASED ON VA DESIGN MANUAL)
DOMESTIC WATER CALCULATIONS
NOTES:
DOMESTIC WATER CIRCULATING PUMP SCHEDULE
NOTES:
THERMOSTATIC TYPE PRESSURE BALANCE MIXING VALVE SCHEDULE
NOTES:
FIXTURE UNIT CALCULATION - BUILDING 2W
(BASED ON VA DESIGN MANUAL)
STEAM TO WATER HEAT EXCHANGER SCHEDULE
NOTES:
SD
GENERAL PLUMBING SYMBOLS
PLUMBING PIPING SYMBOLS
PLUMBING VALVE SYMBOLS
130°F
140°F
SAN
SS
D
PLUMBING ABBREVIATIONS
CONTRACTOR GENERAL NOTES
LEGEND
WATER CLOSET,
FLUSH VALVE,
PUBLIC
1 AND 10
LAVATORY, PUBLIC 2 AND 10
SERVICE SINK 3
CLINICAL SERVICE
SINK FAUCET/FLUSH
VALVE
SINK, CRS 5
SINK, CRS 9
SINK, INTEGRAL 6
ELECTRIC WATER
COOLER
7 AND 10
ICE MAKER SUPPLY
UNIT
FLOOR DRAIN
WATER CLOSET,
FLUSH VALVE,
PUBLIC
LAVATORY, PUBLIC 4
SINK, CRS 1
SINK, INTEGRAL 11
ELECTRIC WATER
COOLER
54 GPM
48 GPM
38 GPM
6" SS 2" DCWS ~ 1-1/2" DHWS
2 2
4 4
9 9
13 13
30 34
51 64
75 94
125 145
IN-LINE VFD 120 SINGLE 8'-0'' 5 MECHANICAL
IN-LINE VFD 120 SINGLE 8'-0'' 5 MECHANICAL
IN-LINE VFD 120 SINGLE 8'-0'' 5 MECHANICAL
IN-LINE VFD 120 SINGLE 8'-0'' 5 MECHANICAL
IN-LINE VFD 120 SINGLE 8'-0'' 5 2W-B02
IN-LINE VFD 120 SINGLE 8'-0'' 5 2W-B02
IN-LINE VFD 120 SINGLE 8'-0'' 5 2W-B02
IN-LINE VFD 120 SINGLE 8'-0'' 5 2W-B02
1 1/4 1 1/4 5 0.25 37 50°F 140°F 130°F 1 AND 4
1 1/4 1 1/4 5 0.25 37 50°F 140°F 130°F 1 AND 4
3/8 3/8 5 0.25 1 50°F 130°F 110°F 2 AND 5
1/2 1/2 5 0.50 1.5 50°F 130°F 110°F 3 AND 5
WATER CLOSET,
FLUSH VALVE,
PUBLIC
LAVATORY, PUBLIC 10
SERVICE SINK 1
CLINICAL SERVICE
SINK FAUCET/FLUSH
VALVE
SINK, CRS 2
SINK, INTEGRAL 19
ICE MAKER SUPPLY
UNIT
FLOOR DRAIN 1
81 GPM
73 GPM
50 GPM
6" SS 2-1/2" DCWS ~ 2" DHWS
DOUBLE WALL SEMI
INSTANTANEOUS
SHELL AND TUBE
22 40 160 30 7 7000 MECH BLDG C
DOUBLE WALL SEMI
INSTANTANEOUS
SHELL AND TUBE
22 40 160 30 7 7000 MECH BLDG C
DOUBLE WALL SEMI
INSTANTANEOUS
SHELL AND TUBE
29 40 160 30 7 7000 2W-B02
DOUBLE WALL SEMI
INSTANTANEOUS
SHELL AND TUBE
29 40 160 30 7 7000 2W-B02
1. WALL HUNG, VITREOUS CHINA, SIPHON JET, FLUSH VALVE 1.28 GPF MAXIMUM.
2. WALL HUNG, VITREOUS CHINA, ELBOW CONTROL, RIGID GOOSENECK SPOUT, 8 INCH CENTER
FAUCET, 0.35 GPM MAXIMUM LAMINAR FLOW DEVICE. INSTALL ASSE 1070 LISTED THERMOSTATIC
MIXING VALVE (MV-3) UNDER COUNTER.
3. STAIN RESISTANT TERRAZZO, CORNER, FLOOR MOUNTED 36X24X12 INCHES WITH DROP FRONT.
4. WALL HUNG, FLUSHING RIM, FLUSH VALVE 3 GPF MAXIMUM, ELBOW CONTROL, WALL HUNG, 2.5
GPM MAXIMUM FAUCET, AND PEDAL OPERATED MIXING VALVE BED PAN WASHER.
5. DOUBLE COMPARTMENT, CORROSIVE RESISTANT STAINLESS STEEL, COUNTER TOP, 16X19X7-1/2
INCH BOWL, DECK MOUNTED, 0.5 GPM MAXIMUM, SWIVEL GOOSENECK SPOUT, 8 INCH CENTER
WITH 4" WRIST BLADES. INSTALL ASSE 1070 LISTED THERMOSTATIC MIXING VALVE (MV-4) UNDER
COUNTER.
6. SINK INTEGRAL WITH COUNTER-TOP. CONTRACTOR SHALL PROVIDE HANDS FREE SENSOR
FAUCET 0.5 GPM MAXIMUM, GRID DRAIN, TRAP, SUPPLIES, STOP, AND ASSE 1070 LISTED
THERMOSTATIC MIXING VALVE (MV-4) UNDER COUNTER.
7. DUAL HEIGHT, SELF CONTAINED, WITH BOTTLE FILLER.
8. WALL MOUNTED, 16-GAUGE STEEL WITH CORROSION RESISTANT EPOXY FINISH, 1/2 INCH BALL
TYPE SHUT-OFF VALVE, MOUNT BOTTOM OF BOX AT 18 INCHES ABOVE FINISHED FLOOR.
9. SINGLE COMPARTMENT, CORROSIVE RESISTANT STAINLESS STEEL, COUNTER TOP, 16X19X7-1/2
INCH BOWL, DECK MOUNTED,0.5 GPM MAXIMUM,SWING ARM, SINGLE LEVER FAUCET. INSTALL
ASSE 1070 LISTED THERMOSTATIC MIXING VALVE (MV-4) UNDER COUNTER.
10. HANDICAPPED FIXTURE. FIXTURE WILL MEET THE AMERICANS WITH DISABILITIES ACT AND
BARRIER-FREE HEALTH CARE INITIATIVE REQUIREMENTS.
1. PUMP AND MOTOR SHALL BE LISTED BY A NATIONAL TESTING LABORATORY.
2. PUMP BASE, IMPELLER, AND PUMP HEAD SHALL BE NSF61 APPROVED STAINLESS STEEL.
3. INTEGRAL VFD TO MAINTAIN CONSTANT RETURN TEMPERATURE. SET POINT 135°F.
4. DESIGN BASIS; GRUNDFOS MAGNA 3 32-60FN WITH CONTROL CONNECTION.
5. PROVIDE TEMPERATURE SENSOR IN SUCTION PIPING FOR DOMESTIC HOT WATER RETURN
PIPING. CONNECT TO INTEGRAL VFD. SET POINT 135°F.
6. PROVIDE 24-HOUR TIME CONTROLLER WITH AUTOMATIC SWITCH OVER FOR DOMESTIC COLD
WATER RETURN PIPING. CONNECT TIME CONTROLLER TO INTEGRAL VFD.
7. REFER TO WATER HEATER DETAIL ON SHEET PP401.
1. DESIGN BASIS: POWERS LFMM433-ACS3 OR APPROVED EQUAL.
2. DESIGN BASIS: POWERS LFG480-11 OR APPROVED EQUAL.
3. DESIGN BASIS: POWERS LGE480-01 OR APPROVED EQUAL.
4. EXPOSED, ROUGH BRONZE FINISH, BOTTOM CONNECTIONS.
5. EXPOSED, CHROME PLATED.
1. FIXTURE UNIT VALUES BASED ON THE VAMC PLUMBING DESIGN MANUAL SIZING CHARTS.
2. MAX VELOCITY FOR HOT WATER - 5 FT/SEC, FOR COLD WATER 6 FT/SECOND.
A. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE NOT TO BE
SCALED. FIELD VERIFY ALL DIMENSIONS, PIPE SIZES, AND INVERTS.
REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND
LOCATIONS OF ALL PLUMBING FIXTURES AND EQUIPMENT.
B. COORDINATE PIPE ROUTING WITH DUCT ROUTING, EQUIPMENT
LOCATIONS, ELECTRICAL INSTALLATIONS, AND BUILDING STRUCTURAL
MEMBERS. OFFSET PIPING WHERE REQUIRED TO AVOID CONFLICTS.
AVOID PENETRATING ANY MAIN STRUCTURAL BEAM. NOTIFY COR OF
ANY CONFLICTS.
C. CONTRACTOR SHALL REMOVE AND REPAIR PORTIONS OF FLOORS,
CEILINGS AND/OR SLABS AFFECTED BY PLUMBING MODIFICATIONS.
REPAIR SURFACES TO MATCH EXISTING UNLESS OTHERWISE NOTED ON
ARCHITECTURAL DRAWINGS.
D. WHERE CHASES ARE NOT PRESENT, CONNECT VENT PIPING TOGETHER
IN CEILING SPACE IF POSSIBLE TO AVOID CUTTING THROUGH STUDS.
E. PRIOR TO PERFORMING ANY PLUMBING WORK OR PURCHASING ANY
MATERIALS VERIFY EXACT LOCATION, ROUTING, AND PIPE SIZES, ETC.
OF ALL EXISTING WASTE, DRAIN, VENT, DOMESTIC WATER SUPPLY AND
RETURN PIPING.
F. ALL HORIZONTAL STORM DRAINAGE PIPING SHALL BE INSULATED.
G. ALL DOMESTIC COLD WATER SUPPLY, DOMESTIC HOT WATER SUPPLY,
AND DOMESTIC HOT WATER RETURN PIPING SHALL BE INSULATED.
GAL GALLON
GCO GRADE CLEANOUTS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GT GREASE TRAP
H&CW HOT AND COLD
WATER
HB HOSE BIBB
HD HUB DRAIN
HP HORSEPOWER
HYD HYDRANT
INV.EL INVERT ELEVATION
INV INVERT
IPC INTERNATIONAL PLUMBING
CODE
IRW IRRIGATION WATER
KW KILOWATT
KWH KILOWATT-HOUR
MA MEDICAL AIR
MBH 1000 BTUH
MED MEDICAL
MV MEDICAL VACUUM
NC NORMALLY CLOSED
NTS NOT TO SCALE
OX OXYGEN
OSCO OUTSIDE CLEANOUT
PG PRESSURE GAGE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH
GAGE
RP RECIRULATION PUMP
SS SANITARY SEWER
SCFM STANDARD CUBIC
FOOT/MINUTE
TYP TYPICAL
V VENT
VP VACUUM PUMP
VE VENT EXHAUST
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WCO WALL CLEANOUT
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WSFU WATER SUPPLY FIXTURE
UNITS
YCO YARD CLEANOUT
A/E ARCHITECT / ENGINEER
AC ABOVE CEILING
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
ASHRAE AMERICAN SOCIETY OF
HEATING,
REFRIGERATION,
AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY
OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY
OF
PLUMBING ENGINEERS
ASR AUTOMATIC
SPRINKLER
RISER
BF BELOW FLOOR
BG BELOW GRADE
CFM CUBIC FEET PER
MINUTE
COTG CLEANOUT TO GRADE
DCWS DOMESTIC COLD
WATER SUPPLY
DFU DRAINAGE FIXTURE
UNITS
DHWR DOMESTIC HOT
WATER RETURN
DHWS DOMESTIC HOT
WATER SUPPLY
DN DOWN
DWG DRAWING
EL ELEVATION
ET EXPANSION TANK
EWH ELECTRIC WATER
HEATER
F FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
(HOSE) CONNECTION
FS FLOW SWITCH
FU FIXTURE UNITS
1. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL REQUIREMENTS
2. DUPLEX HEATERS. REFER TO WATER HEATER DETAIL ON DRAWING P-401 AND MANUFACTURER'S
RECOMMENDATIONS FOR INSTALLATION.
3. BASIS OF DESIGN: MANUFACTURE: AERCO; MODEL B+06 WATER WIZARD TDS WITH ELECTRONIC
CONTROLS.
1. DESIGN BASES; MANUFACTURE: WATTS WATER TECHNOLOGIES, MODEL: DELTA 20 OR APPROVED
EQUAL.
2. REFER TO MANUFACTURER LITERATURE FOR INSTALLATION OF EXPANSION TANK AND
SPECIFICATIONS FOR MANUFACTURER.
25.00 60.00 40.00 140.00 0.01 2.19 7.25 1 AND 2
DCWR DOMESTIC COLD
WATER RETURN
DS DOWNSPOUT
RL RAIN WATER LEADER
th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
ABBREVIATIONS, LEGEND, AND
SCHEDULES
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
P-001
689-402
JUNE 7, 2019 RWC GTK 113
1,2C,W,E,3,42
UP
DEMOLITION PLAN GENERAL NOTES
A. EXISTING PLUMBING FIXTURES, PIPING, AND
EQUIPMENT TO REMAIN UNLESS NOTED
OTHERWISE.
B. REMOVE INDICATED EXISTING PLUMBING
FIXTURES AND ALL ASSOCIATED PIPING
BACK TO THE LIMITS OF DEMOLITION.
C. DEMOLITION SHALL INCLUDE ALL FITTINGS,
VALVES, PIPE SUPPORTS, AND HANGERS.
D. ABANDONED OR UNUSED PIPING AND/OR
STACKS SHALL BE REMOVED DURING
DEMOLITION.
DEMOLITION PLAN KEY NOTES
(ALL NOTES NOT USED ON ALL SHEETS)
1. DEMOLISH/REMOVE/DISCARD PIPING AS
INDICATED BY BOLD DASHED LINE TO THE
LIMITS OF DEMOLITION.
2. DEMOLISH/REMOVE/DISCARD EXISTING
WATER HEATER AND CIRCULATION PUMP.
3. DEMOLISH/REMOVE/DISCARD EXISTING
STORM DRAIN UP TO AND INCLUDING RAIN
LEADER BOOT.
4. DEMOLISH/REMOVE EXISTING WALL
HYDRANT AND BRANCH PIPING.
5. EXISTING 3" DOMESTIC WATER SERVICE.
REFER TO CIVIL PLANS FOR EXTENT OF
DEMOLITION.
6. EXISTING 6" SANITARY BUILDING DRAIN.
REFER TO CIVIL PLANS FOR EXTENT OF
DEMOLITION.
7. EXISTING 8" STORM BUILDING DRAIN. REFER
TO CIVIL PLANS FOR EXTENT OF
DEMOLITION.
8. DEMOLISH/REMOVE/DISCARD DOMESTIC
HOT WATER SUPPLY AND DOMESTIC HOT
WATER RETURN PIPING RISERS FROM FIRST
FLOOR DOWN TO WATER HEATER.
DEMOLISH/REMOVE DOMESTIC COLD WATER
RISER FROM FIRST FLOOR DOWN TO MAIN.
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
SAN SAN
S A
N S
A N
S A
N
D C
W S
D C
W S
DCWS
S D
SD
S D
SD
SD
DCWS DCWS
D C
W S
SAN
V
V
SAN
S A
N
SAN
D C
W S
DCWS
D C
W S
D C
W S
SANSAN
S A
N
S A
N S
A N
SD
SD
SD SD
SD
S A
N
SANSANSAN
S D
S D
S D th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BASEMENT AND CRAWL SPACE
BUILDINGS 2C & 2W DEMOLITION
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PD101
689-402
JUNE 7, 2019 RWC GTK 113
2C AND 2W
1/8" = 1'-0"
BASEMENT AND CRAWL SPACE
DEMOLITION PLANS - BUILDINGS 2C &
2W
SD
S D
SD
OFFICE
2W-118
OFFICE
2W-117
OFFICE
2W-119
OFFICE
2W-120
OFFICE
2W-122
OFFICE
2W-124
OFFICE
2W-125
OFFICE
2W-126
OFFICE
2W-121
OFFICE
2W-118
F TLT
2W-116
M TLT
2W-115
STAIR
COMM
2W-128
ELEC
2W-129
HAC
2W-118
TLT
2W-113
TLT
2W-110
OFFICE
2W-114
OFFICE
2W-112
OFFICE
2W-109
OFFICE
2W-108
OFFICE
2W-107
KITCHEN
2W-105
MULTIPURPOSE
ROOM
2W-102
OFFICE
2W-101
OFFICE
2W-100
OFFICE
2W-103
CORR
C1-2
OFFICE
2W-131
OFFICE
2W-130
RECEPTION
2W-032
OFFICE
2W-127
CORR
C1-11
CORR
C1-10
CORR
C1-9
CORR
C1-7
CORR
C1-8
CORR
C1-5
WAITING
2W-024
TLT
2W-106
TLT
2W-104
CORR
CORR
C1-1041
CONTROL
2C-1141
HEALTH
PSYCH
CLINICS
2C-1144
HEALTH
PSYCH
CLINICS
2C-1146
HEALTH
PSYCH
CLINICS
2C-1148
NEUROLAB
2C-1147 NEUROLAB
VIEWING
2C-1145
STO
2C-1143
BIO-FB
CONTROL
2C-1150
BIO-FB
PATIENT
2C-1149
CORR
C1-1044
STAIR
HEALTH
PSYCH
CLINICS
2C-1142
SD
GCO GCO
RLRLRL
GCO
GCO
5 5
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
DEMOLITION PLAN GENERAL NOTES
A. EXISTING PLUMBING FIXTURES, PIPING, AND
EQUIPMENT TO REMAIN UNLESS NOTED
OTHERWISE.
B. REMOVE ALL EXISTING PLUMBING FIXTURES
AND ALL ASSOCIATED PIPING BACK TO THE
LIMIT OF DEMOLITION.
C. DEMOLITION SHALL INCLUDE ALL FITTINGS,
VALVES, PIPE SUPPORTS, AND HANGERS.
D. ABANDONED OR UNUSED PIPING AND/OR
STACKS SHALL BE REMOVED DURING
DEMOLITION.
DEMOLITION PLAN KEY NOTES
(ALL NOTES NOT USED ON ALL SHEETS)
1. DEMOLISH/REMOVE/DISCARD PIPING AS
INDICATED BY BOLD DASHED LINE TO LIMIT
OF DEMOLITION.
2. DEMOLISH/REMOVE/DISCARD EXISTING
PLUMBING FIXTURE. LEAVE ROUGH-IN FOR
NEW FIXTURE.
3. DEMOLISH/REMOVE/DISCARD EXISTING
PLUMBING FIXTURE, TRIM, AND ROUGH-IN.
4. DEMOLISH/REMOVE/DISCARD EXISTING
DOMESTIC COLD, HOT, AND HOT RETURN
RISERS DOWN TO BASEMENT. REFER TO
SHEET PD101 FOR CONTINUATION.
5. DEMOLISH/REMOVE/DISCARD EXISTING
DOWNSPOUT.
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FIRST FLOOR BUILDINGS 2C & 2W
DEMOLITION
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PD102
689-402
JUNE 7, 2019 RWC GTK 113
2C AND 2W
1/8" = 1'-0"
FIRST FLOOR DEMOLITION PLAN -
BUILDINGS 2C & 2W
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
PLAN
NORTH
TRUE
NORTH KEY PLAN
NTS
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG 34 BLDG
BLDG 33
B
LD
G
ADDITION
BLDG
DEMOLITION PLAN GENERAL NOTES
A. EXISTING PLUMBING FIXTURES, PIPING, AND
EQUIPMENT TO REMAIN UNLESS NOTED
OTHERWISE.
B. REMOVE ALL EXISTING PLUMBING FIXTURES
AND ALL ASSOCIATED PIPING BACK TO THE
LIMITS OF DEMOLITION.
C. DEMOLITION SHALL INCLUDE ALL FITTINGS,
VALVES, PIPE SUPPORTS, AND HANGERS.
D. ABANDONED OR UNUSED PIPING AND/OR
STACKS SHALL BE REMOVED DURING
DEMOLITION.
DEMOLITION PLAN KEY NOTES
(ALL NOTES NOT USED ON ALL SHEETS)
1. EXISTING PLUMBING, TRIM, AND PIPING TO
REMAIN.
2. REMOVE EXISTING WATER CLOSET AND
FLUSH VALVE. CARRIER AND WATER
SUPPLY TO REMAIN FOR CONNECTION OF
NEW WATER CLOSET.
3. REMOVE EXISTING LAVATORY, FAUCET,
TAILPIECE, TRAP, AND SUPPLIES. WASTE
STUB-OUT AND STOPS TO REMAIN FOR
CONNECTION OF NEW LAVATORY.
4. NO PLUMBING DEMOLITION WORK IN THIS
AREA.
1 1 1 1 th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BUILDING 1, 2E, 3 AND 42
DEMOLITION FLOOR PLANS
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PD103
689-402
JUNE 7, 2019 RWC GTK 113
2E AND 42
1/8" = 1'-0"
BASEMENT DEMOLITION PLAN -
BUILDING 2E
1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN -
BUILDING 42
UP
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
FLOOR PLAN GENERAL NOTES
A. THESE DRAWINGS ARE DIAGRAMMATIC
ONLY AND ARE NOT TO BE SCALED. FIELD
VERIFY ALL DIMENSIONS, PIPE SIZES, AND
INVERTS. REFER TO ARCHITECTURAL
DRAWINGS FOR DIMENSIONS AND
LOCATIONS OF ALL PLUMBING FIXTURES
AND EQUIPMENT.
B. COORDINATE PIPE ROUTING WITH DUCT
ROUTING, EQUIPMENT LOCATIONS,
ELECTRICAL INSTALLATIONS, AND BUILDING
STRUCTURAL MEMBERS. OFFSET PIPING
WHERE REQUIRED TO AVOID CONFLICTS.
AVOID PENETRATING ANY MAIN
STRUCTURAL BEAM. NOTIFY COR AND
ARCHITECT OF ANY CONFLICTS.
C. CONTRACTOR SHALL REMOVE AND REPAIR
PORTIONS OF FLOORS, CEILINGS AND/OR
SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO
MATCH EXISTING UNLESS NOTED
OTHERWISE ON ARCHITECTURAL
DRAWINGS.
D. CONTRACTOR SHALL INSPECT AND ROD OUT
EXISTING SANITARY WASTE AND/OR SEWER
PIPING BEFORE MAKING ANY NEW
CONNECTIONS. CONTRACTOR SHALL NOTIFY
GOVERNMENT AND COR OF ALL SANITARY
SEWER WHICH IS NOT SERVICEABLE AND
REQUIRE REPLACEMENT.
E. PRIOR TO PERFORMING ANY PLUMBING
WORK OR PURCHASING ANY MATERIALS,
VERIFY EXACT LOCATION, ROUTING, AND
PIPE SIZES, ETC. OF ALL EXISTING SANITARY
SEWER, VENT, AND STORM DRAINAGE
PIPING.
F. PROVIDE CLEANOUT(S) AS REQUIRED BY
INTERNATIONAL PLUMBING CODE, LOCAL
CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES
DIRECTION OVER 45°.
G. NEW 2" SANITARY SEWER PIPING SHALL BE
SLOPED A MINIMUM TWO PERCENT, ONE-
QUARTER INCH PER FOOT. NEW 3" AND 4"
SANITARY SEWER PIPING SHALL BE SLOPED
A MINIMUM ONE PERCENT, ONE-EIGHTH
INCH PER FOOT.
H. ALL HORIZONTAL STORM DRAINAGE PIPING
SHALL BE INSULATED.
I. REFER TO SANITARY ISOMETRIC RISER
DIAGRAM FOR PIPE SIZES ON PLUMBING
DRAWING PL201.
J. SEE ARCHITECTURAL PLANS FOR WALL
RATINGS.
FLOOR PLAN KEY NOTES
(ALL NOTES NOT USED ON ALL SHEETS)
1. 2" SS UP
2. 3" SS UP
3. 4" SS UP
4. 4" SS UP TO FLOOR CLEANOUT
5. 4" VENT UP
6. 3" STORM DRAINAGE UP
7. 4" STORM DRAINAGE UP
8. 1/2" DOMESTIC COLD WATER RETURN UP
9. 1/2" DOMESTIC HOT WATER RETURN UP
10. 1-1/2" DOMESTIC HOT WATER SUPPLY UP
11. 2" DOMESTIC HOT WATER SUPPLY UP
12. 2" DOMESTIC COLD WATER SUPPLY UP
13. 2-1/2" DOMESTIC COLD WATER SUPPLY UP
14. 3" DOMESTIC COLD WATER SUPPLY UP
15. INSTALL NEW WATER HEATERS AND
CIRCULATION PUMPS. REFER TO
SCHEDULES ON SHEET P001.
16. 3" DOMESTIC WATER SERVICE. INV.EL. 111.3'
REFER TO CIVIL DWGS FOR CONTINUATION.
17. REFER TO CIVIL DRAWINGS FOR
CONTINUATION OF PIPING.
18. STORM DRAIN. VERIFY INVERT ELEVATION
OF EXISTING PIPING IN THE BUILDING AT
POINT OF NEW CONNECTION.
19. 4" UP TO GROUND CLEANOUT.
20. 3" UP TO GROUND CLEANOUT.
21. CONNECT NEW SANITARY SEWER PIPING TO
EXISTING SANITARY SEWER PIPING AT
APPROXIMATE LOCATION INDICATED.
22. 2"V-UP.
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
B C D F
A
E
6789 10
8 12
201920
17 1816
11 2
3 3
V
SAN
S D
S D
SAN
V
SD
SD
V
SD
S A
N
SAN
S A
N
SD
S A
N
SD SD
SD
S D
SAN
S A
N
S D
S D
S D
S D
SAN
S D
SAN
S D
S A
N
SAN SAN
SAN
SAN
SAN SAN
SAN
S A
N
SAN
SAN
S A
N
SANSAN
SAN
S A
N
V
S A
N
SAN
S A
N
WH-1
WH-2
RP-1
RP-2
RP-3
RP-4
WH-3 WH-4RP-6RP-5
RP-8RP-7
RL RL RL
CO
CO
CO
CO
CO
CO
CO
CO
MV-1
MV-2
CO
CO
CO
CO
CO
INV.EL: 114.00' INV.EL: 113.80'
INV.EL: 113.90'
INV.EL: 114.00'
INV.EL: 113.09'
BUILDING 2 FINISHED
FLOOR ELEV. 117.68±
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
CRAWLSPACE
CRAWLSPACE
CRAWLSPACE
MECH
STAIR
EQUIPMENT
2W-B100B
ELECTRICAL
2W-B100
MECHANICAL/
CHILLERS
2W-B02
VEST
2W-B021
ATS
2W-B100A th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BASEMENT, CRAWL SPACE, &
FOUNDATION BUILDINGS 2C & 2W
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PL101
689-402
JUNE 7, 2019 RWC GTK 113
2C AND 2W
1/8" = 1'-0"
BASEMENT, CRAWSPACE, AND
FOUNDATION BUILDING 2C AND 2W
P-402
P-103
P-502
P-524
P-555
P-555
P-555
P-402
P-555
P-555
P-555
P-555
P-555P-555P-555
P-555P-555
P-555
P-555
P-555
P-555
P-555 P-555
P-524
P-103 P-103
P-402 P-402
P-103
P-402
P-103
P-402
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-402
P-555
P-555
P-555
P-103
P-402
P-103
P-402
P-609
P-402
P-103
P-402
P-103
SD
S D
V
V
S D
GCO GCO
DS DS DS
S D
O D
O D
S
DO
D FCO
FCO
FCO FCO
V
V
V
VV
V
V
V
2"
2" V
V
1 1
1 1
81010
14 1414
15181915
1 1
P-555
V
FCO
P-555
S D
P-524
P-402
EXISTING BUILDING 2
FINISHED FIRST FLOOR
ELEV. 117.68
P-402
P-505
A B C ED F
OPEN OFFICE
2W-117
EXAM
2W-118
EXAM
2W-119
EXAM
2W-120
SOILED UTIL
2W-122
ANTE
2W-124
WOMEN ISO/PROC
2W-125
TOILET
2W-126
CORR
1C4
F TLT
2W-116
M TLT
2W-115
EXAM
2W-121
EXAM
2W-123 EXAM
2W-127
EXAM
2W-130A
EXAM
2W-130B
FMS COMM
2W-128
STAIR
2W-S
ELEC
2W-129
EXAM
2W-114
EXAM
2W-112
CLEAN UTIL
2W-131B
OIT COMM
2W-132A
HSS
2C-1182
EXAM
2C-1179
EXAM
2C-1180
PHARM D
2W-132B
LINEN
2C-1181
MED
2W-131C
EQUIP
2W-109B
EXAM
2W-109A
EXAM
2W-108A
CORR
1C3
EXAM
2W-108B
EXAM
2W-103B
CLEAN STO
2W-103A
CORR
1C1-02W
NURSE MGR
2W-100
VESTIBULE
2W-215
OPEN OFFICE
2C-1178
CONF
2W-107A
EXAM
2W-107B
EXAM
2W-105A
EXAM
2W-105B
OPEN OFFICE
2W-102
EXAM
2W-101
TOILET
2W-106
TOILET
2W-104
STAIR 8
2C-S8
RECEPTION
2C-1146
WAITING
2C-1141
TOILET
2C-1145
TRIAGE
2C-1144
TOILET
2C-1143
SWITCHBOARD
2C-1164
EXAM
2C-1166
OPEN OFFICE
2C-1165
EXAM
2C-1174
EXAM
2C-1175
EXAM
2C-1176
EXAM
2C-1177
EXAM
2C-1173
EXAM
2C-1172
EXAM
2C-1171
SMALL MED
2C-1169
PCMH
2C-1170
EXAM
2C-1167
EXAM
2C-1168
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
FLOOR PLAN GENERAL NOTES
A. THESE DRAWINGS ARE DIAGRAMMATIC
ONLY AND ARE NOT TO BE SCALED. FIELD
VERIFY ALL DIMENSIONS, PIPE SIZES, AND
INVERTS. REFER TO ARCHITECTURAL
DRAWINGS FOR DIMENSIONS AND
LOCATIONS OF ALL PLUMBING FIXTURES
AND EQUIPMENT.
B. COORDINATE PIPE ROUTING WITH DUCT
ROUTING, EQUIPMENT LOCATIONS,
ELECTRICAL INSTALLATIONS, AND BUILDING
STRUCTURAL MEMBERS. OFFSET PIPING
WHERE REQUIRED TO AVOID CONFLICTS.
AVOID PENETRATING ANY MAIN
STRUCTURAL BEAM. NOTIFY COR AND
ARCHITECT OF ANY CONFLICTS.
C. CONTRACTOR SHALL REMOVE AND REPAIR
PORTIONS OF FLOORS, CEILINGS AND/OR
SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO
MATCH EXISTING UNLESS NOTED
OTHERWISE ON ARCHITECTURAL
DRAWINGS.
D. CONTRACTOR SHALL INSPECT AND ROD OUT
EXISTING SANITARY WASTE AND/OR SEWER
PIPING BEFORE MAKING ANY NEW
CONNECTIONS. CONTRACTOR SHALL NOTIFY
OWNER AND COR OF ALL SANITARY SEWER
WHICH IS NOT SERVICEABLE AND REQUIRE
REPLACEMENT.
E. PRIOR TO PERFORMING ANY PLUMBING
WORK OR PURCHASING ANY MATERIALS,
VERIFY EXACT LOCATION, ROUTING, AND
PIPE SIZES, ETC. OF ALL EXISTING SANITARY
SEWER, VENT, AND STORM DRAINAGE
PIPING.
F. PROVIDE CLEANOUT(S) AS REQUIRED BY
INTERNATIONAL PLUMBING CODE, LOCAL
CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES
DIRECTION OVER 45°.
G. NEW 2" SANITARY SEWER PIPING SHALL BE
SLOPED A MINIMUM TWO PERCENT, ONE-
QUARTER INCH PER FOOT. NEW 3" AND 4"
SANITARY SEWER PIPING SHALL BE SLOPED
A MINIMUM ONE PERCENT, ONE-EIGHTH
INCH PER FOOT.
H. ALL HORIZONTAL STORM DRAINAGE PIPING
SHALL BE INSULATED.
I. REFER TO SANITARY ISOMETRIC RISER
DIAGRAM FOR PIPE SIZES ON PLUMBING
DRAWING PL201.
J. SEE ARCHITECTURAL PLANS FOR WALL
RATINGS.
FLOOR PLAN KEY NOTES
(ALL NOTES NOT USED ON ALL SHEETS)
1. 2" SS DN
2. 3" SS DN
3. 4" SS DN
4. 4" SS DN AND 4" SS UP. ROUTE PIPING
VERTICAL TO ABOVE CEILING AND PROVIDE
CLEANOUT PLUG ABOVE CEILING.
5. 3" VENT UP THRU ROOF
6. 4" VENT DN AND 2" VENT UP THRU ROOF
7. 4" STORM DRAINAGE UP TO ROOF DRAIN
8. 4" STORM DRAINAGE DN
9. 3" STORM DRAINAGE UP TO ROOF DRAIN
10. 3" STORM DRAINAGE DN
11. 3" OVERFLOW UP TO OVERFLOW ROOF
DRAIN
12. 4" OVERFLOW UP TO OVERFLOW ROOF
DRAIN
13. CONNECT NEW PLUMBING FIXTURE TO
EXISTING ROUGH-IN.
14. EMERGENCY ROOF DRAIN (OVERFLOW)
DROP AND PENETRATE THRU WALL ABOVE
GRADE TERMINATING WITH A DOWNSPOUT
NOZZLE. CENTERLINE OF NOZZLE 12" ABOVE
FINISHED GRADE.
15. GROUND CLEANOUT INV.EL. 114.00'.
16. GROUND CLEANOUT INV.EL. 113.09'.
17. 2" VENT THRU ROOF.
18. GROUND CLEANOUT INV.EL. 113.80'.
19. GROUND CLEANOUT INV.EL. 113.90'.
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
PLAN
NORTH
TRUE
NORTH
th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
WASTE, DRAIN, AND VENT PIPING
FIRST FLOOR BUILDINGS 2C & 2W
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PL102
689-402
JUNE 7, 2019 RWC GTK 113
2C AND 2W
1/8" = 1'-0"
FIRST FLOOR WASTE, DRAIN AND
VENT PIPING BUILDINGS 2C & 2W
FLOOR PLAN GENERAL NOTES
A. THESE DRAWINGS ARE DIAGRAMMATIC
ONLY AND ARE NOT TO BE SCALED. FIELD
VERIFY ALL DIMENSIONS, PIPE SIZES, AND
INVERTS. REFER TO ARCHITECTURAL
DRAWINGS FOR DIMENSIONS AND
LOCATIONS OF ALL PLUMBING FIXTURES
AND EQUIPMENT.
B. COORDINATE PIPE ROUTING WITH DUCT
ROUTING, EQUIPMENT LOCATIONS,
ELECTRICAL INSTALLATIONS, AND BUILDING
STRUCTURAL MEMBERS. OFFSET PIPING
WHERE REQUIRED TO AVOID CONFLICTS.
AVOID PENETRATING ANY MAIN
STRUCTURAL BEAM. NOTIFY COR AND
ARCHITECT OF ANY CONFLICTS.
C. CONTRACTOR SHALL REMOVE AND REPAIR
PORTIONS OF FLOORS, CEILINGS AND/OR
SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO
MATCH EXISTING UNLESS NOTED
OTHERWISE ON ARCHITECTURAL
DRAWINGS.
D. CONTRACTOR SHALL INSPECT AND ROD OUT
EXISTING SANITARY WASTE AND/OR SEWER
PIPING BEFORE MAKING ANY NEW
CONNECTIONS. CONTRACTOR SHALL NOTIFY
OWNER AND COR OF ALL SANITARY SEWER
WHICH IS NOT SERVICEABLE AND REQUIRE
REPLACEMENT.
E. PRIOR TO PERFORMING ANY PLUMBING
WORK OR PURCHASING ANY MATERIALS,
VERIFY EXACT LOCATION, ROUTING, AND
PIPE SIZES, ETC. OF ALL EXISTING SANITARY
SEWER, VENT, AND STORM DRAINAGE
PIPING.
F. PROVIDE CLEANOUT(S) AS REQUIRED BY
INTERNATIONAL PLUMBING CODE, LOCAL
CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES
DIRECTION OVER 45°.
G. NEW 2" SANITARY SEWER PIPING SHALL BE
SLOPED A MINIMUM TWO PERCENT, ONE-
QUARTER INCH PER FOOT. NEW 3" AND 4"
SANITARY SEWER PIPING SHALL BE SLOPED
A MINIMUM ONE PERCENT, ONE-EIGHTH
INCH PER FOOT.
H. ALL HORIZONTAL STORM DRAINAGE PIPING
SHALL BE INSULATED.
I. REFER TO SANITARY ISOMETRIC RISER
DIAGRAM FOR PIPE SIZES ON PLUMBING
DRAWING PL201.
J. SEE ARCHITECTURAL PLANS FOR WALL
RATINGS.
FLOOR PLAN KEY NOTES
(THIS SHEET ONLY)
1. 4" VENT THRU ROOF.
2. 2" VENT THRU ROOF.
3. 3" ROOF DRAIN.
4. 4" ROOF DRAIN.
5. 3" EMERGENCY (OVERFLOW) ROOF DRAIN.
6. 4" EMERGENCY (OVERFLOW) ROOF DRAIN.
7. 3" VENT THRU ROOF.
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
1 2
3545 SQ FT2696 SQ FT
2035 SQ FT
1 2
1 2
1 2
2 1
A B C ED F
ROOF
CRICKET CRICKET CRICKET CRICKET CRICKET
S L O
P E
/4
F
O O
T
S L O
F
O O
T
S L O
F
O O
T
S L O
F
O O
T
S L O
F
O O
T
CRICKET
EXIST BUILDING 2C
TYP
SIM
CRICKETCRICKET
NEW ADDITION
ROOF
BUILDING 2C
BUILDING 2W
ROOF
BUILDING 2C
ROOF
EXHAUST FANS
L O
F
O O
T
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
WASTE, DRAIN, AND VENT PIPING
BUILDING 2 ADD ROOF PLAN
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PL103
689-402
JUNE 7, 2019 RWC GTK 113
2-ADDITION
1/8" = 1'-0"
ROOF PLAN ADDITION BUILDING 2C
2" 2"
BFAC
1 1 1 1
P-528
RECEPTION
2E-B140B
WAITING
2E-B140A
CUBICLES
2E-B127B
OFFICE
2E-B127A
OFFICE
2E-B127C
OFFICE
2E-B127E
INTERNS
2E-B127F
OFFICE
2E-B127D
COPY/WORK
2E-B137
OPEN OFFICE
2E-B140C
OFFICE
2E-B137AOPEN OFFICE
2E-B137C
OFFICE
2E-B140H
OFFICE
2E-B140G
OFFICE
2E-B140F
OFFICE
2E-B140E
OFFICE
2E-B140D
KITCHENETTE
2E-B042
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
FLOOR PLAN GENERAL NOTES
A. THESE DRAWINGS ARE DIAGRAMMATIC
ONLY AND ARE NOT TO BE SCALED. FIELD
VERIFY ALL DIMENSIONS, PIPE SIZES, AND
INVERTS. REFER TO ARCHITECTURAL
DRAWINGS FOR DIMENSIONS AND
LOCATIONS OF ALL PLUMBING FIXTURES
AND EQUIPMENT.
B. COORDINATE PIPE ROUTING WITH DUCT
ROUTING, EQUIPMENT LOCATIONS,
ELECTRICAL INSTALLATIONS, AND BUILDING
STRUCTURAL MEMBERS. OFFSET PIPING
WHERE REQUIRED TO AVOID CONFLICTS.
AVOID PENETRATING ANY MAIN
STRUCTURAL BEAM. NOTIFY COR AND
ARCHITECT OF ANY CONFLICTS.
C. CONTRACTOR SHALL REMOVE AND REPAIR
PORTIONS OF FLOORS, CEILINGS AND/OR
SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO
MATCH EXISTING UNLESS NOTED
OTHERWISE ON ARCHITECTURAL
DRAWINGS.
D. CONTRACTOR SHALL INSPECT AND ROD OUT
EXISTING SANITARY WASTE AND/OR SEWER
PIPING BEFORE MAKING ANY NEW
CONNECTIONS. CONTRACTOR SHALL NOTIFY
OWNER AND COR OF ALL SANITARY SEWER
WHICH IS NOT SERVICEABLE AND REQUIRE
REPLACEMENT.
E. PRIOR TO PERFORMING ANY PLUMBING
WORK OR PURCHASING ANY MATERIALS
VERIFY EXACT LOCATION, ROUTING, AND
PIPE SIZES, ETC. OF ALL EXISTING SANITARY
SEWER, VENT, AND STORM DRAINAGE
PIPING.
F. PROVIDE CLEANOUT(S) AS REQUIRED BY
INTERNATIONAL PLUMBING CODE, LOCAL
CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES
DIRECTION OVER 45°.
G. NEW 2" SANITARY SEWER PIPING SHALL BE
SLOPED A MINIMUM TWO PERCENT, ONE-
QUARTER INCH PER FOOT. NEW 3" AND 4"
SANITARY SEWER PIPING SHALL BE SLOPED
A MINIMUM ONE PERCENT, ONE-EIGHT INCH
PER FOOT.
H. ALL HORIZONTAL STORM DRAINAGE PIPING
SHALL BE INSULATED.
I. SEE ARCHITECTURAL PLANS FOR WALL
RATINGS.
FLOOR PLAN KEY NOTES
(ALL NOTES NOT USED ON ALL SHEETS)
1. EXISTING FIXTURE TO REMAIN.
2. CONNECT NEW SANITARY SEWER PIPING TO
EXISTING SANITARY SEWER PIPING ABOVE
FIRST FLOOR CEILING AT APPROXIMATE
LOCATION INDICATED.
3. CONNECT NEW VENT PIPING TO EXISTING
VENT PIPING ABOVE SECOND FLOOR
CEILING AT APPROXIMATE LOCATION
INDICATED.
4. CONNECT 2" SS INTO EXISTING SS STACK
ABOVE THIRD FLOOR CEILING.
5. CONNECT 2" VENT INTO EXISTING VENT
STACK ABOVE FOURTH FLOOR CEILING
6. 2" SS-DN.
P-528
S A
N
SAN
V
S A
N
V
V
2"
AC
BF
2"
BF
OFFICE
1-434C
OFFICE
1-434B
OFFICE
1-434A
OPEN OFFICE
1-434
SMALL CONF
1-434D
OPEN OFFICE
1-445
OFFICE
1-445A
HUDVASH
42-216
HUDVASH
42-217
HUDVASH
42-218
CORR
42-215
HAC
42-214
MECH
42-219
OFFICE
42-213
HUDVASH
42-209
CORR
42-207
SUPERS
42-211
WAITING
42-202
CORR
42-203
TEAM
42-206
VOCATIONAL
42-205 GRANT
42-204
STO
42-201A
HCHV
42-201
TLT
42-208 th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
WASTE, DRAIN, AND VENT PIPING
BUILDING 1, 2E, 3, AND 42 PLANS
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PL104
689-402
JUNE 7, 2019 RWC GTK 113
1, 2E, AND 42
1/8" = 1'-0"
WASTE, DRAIN, AND VENT PIPING
FLOOR PLAN BUILDING 2E
1/8" = 1'-0"
WASTE, DRAIN, AND VENT PIPING
FOURTH FLOOR - BUILDING 1
1/8" = 1'-0"
WASTE, DRAIN, AND VENT PIPING
SECOND FLOOR PLAN - BULDING 42
2"
2"
2"
P-555
P-555
P-555
P-555 P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555P-609
P-402
P-103
P-402 P-402
P-103
P-528
P-402
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-103
P-103
P-402
P-402
P-555
P-402
P-402
P-402 P-402
P-103
P-103
P-402P-402
P-505
P-502
P-524
P-103 P-103
P-524
P-402
4" 3"
2"
2"
1 1/2" 3"
2"
2"
2"
2"
2"
2"
2"
2"
2"
2"4"
3"
3"
2"
2"
2"
2"
2"
2" 6"
2"
2"
4"
4"
2"
6"
4"
4"
3"
3"
2"
2"
2"
4"
2"VTR
2"VTR
4"
4"
4"
4"
4"
4"
4"CO
6"
4"CO
3"
3"
3"
2"
4"
4"
4"
4"
4"
4"
4"
2"
4"
2"
4"
4"
2"
4"
4"
2"
2"VTR
2"VTR
2"
2"
2"VTR
2"VTR
4"
CO
2"2"
2"2"
2"
2"
2"
2" 2"
2"
4"
2"
2"
2"
2"
CO
CO
2"
2"
2"2"
2"
2"
2"
2"
2"2"
3"
3"
2"
2"
2"
2"
2"
2"
4"
OD
SD
2"VTR
2"VTR
2"VTR
2"VTR
4"CO
2"VTR
2"VTR
2"VTR
2"VTR
2"VTR
4"COTG
SD
OD
SD
4"COTG
4"COTG
SD
SD
OD2"VTR
3"COTG
3"COTG
P-103 P-402
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
S A
N
S A
N
S A
N
S A
N
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
S A
N
S A
N
S A
N
S A
N
SD
SD
SD
SD S
A
N
S D
SD
O D
O D
O D
SD
SD
SD
SD
S D
S D
4"
2" 4"
4"
2"
3"VTR
CO
4"CO
4"CO
4"CO
4"CO
CO
CO
CO
S A
N
S A
N
CO
6"
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
WASTE, DRAIN, AND VENT
ISOMETRIC RISER DIAGRAMS
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PL201
689-402
JUNE 7, 2019 RWC GTK 113
2C AND 2W
WASTE, DRAIN, AND VENT ISOMETRIC
RISER DIAGRAM
P-402
P-103
P-502
P-524
P-555
P-555
P-555
P-402
P-555
P-555
P-555
P-555
P-555P-555
P-555
P-555P-555
P-555
P-555
P-555
P-555
P-555
P-555 P-555
P-524
P-103 P-103
P-402
P-402
P-103
P-402
P-402
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-528
P-555
P-555
P-555
P-103
P-402
P-103
P-402
P-609
P-402
P-103
P-402
P-103
DCWS
P-103
2"
P-402
P-555
P-402
P-402
P-402
P-505
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
ACAC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC AC AC
A B C ED F
OPEN OFFICE
2C-1178
EXAM
2C-1176
EXAM
2C-1177
EXAM
2C-1175
EXAM
2C-1174
EXAM
2C-1179
EXAM
2C-1180
HSS
2C-1182
LINEN
2C-1181
PHARM D
2W-132B
OIT COMM
2W-132A
EXAM
2W-130B
EXAM
2W-130A
EXAM
2W-127
TOILET
2W-126
WOMEN ISO/PROC
2W-125
ANTE
2W-124
SOILED UTIL
2W-122
EXAM
2W-120
EXAM
2W-119
EXAM
2W-118
OPEN OFFICE
2W-117
OPEN OFFICE
2W-117
CORR
1C3
F TLT
2W-116
EXAM
2W-114
EXAM
2W-112
EXAM
2W-109A
EXAM
2W-108A
EXAM
2W-107B
CONF
2W-107A
EXAM
2W-105B
EXAM
2W-105A
OPEN OFFICE
2W-102
CORR
1C2
EXAM
2W-103B
EXAM
2W-108B
CLEAN UTIL
2W-131B
MED
2W-131C
EQUIP
2W-109B
EQUIP
2W-109B
M TLT
2W-115
TOILET
2W-110
TOILET
2W-113
ELEC
2W-129
STAIR
2W-S
FMS COMM
2W-128
HAC
2W-131A
EXAM
2W-121
EXAM
2W-123
CORR
1C5
CORR
1C4
CORR
1C1-02W
EXAM
2W-101
STAIR 8
2C-S8
RECEPTION
2C-1146
VESTIBULE
2W-215
WAITING
2C-1141
CORR
C1-1041
SWITCHBOARD
2C-1164
EXAM
2C-1166
OPEN OFFICE
2C-1165
EXAM
2C-1167
SMALL MED
2C-1169
EXAM
2C-1171
EXAM
2C-1172
EXAM
2C-1173 EXAM
2C-1168
OPEN OFFICE
2C-1165
TOILET
2C-1145
TRIAGE
2C-1144
TOILET
2C-1143
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
FLOOR PLAN GENERAL NOTES
A. THESE DRAWINGS ARE DIAGRAMMATIC
ONLY AND ARE NOT TO BE SCALED. FIELD
VERIFY ALL DIMENSIONS, PIPE SIZES, AND
INVERTS. REFER TO ARCHITECTURAL
DRAWINGS FOR DIMENSIONS AND
LOCATIONS OF ALL PLUMBING FIXTURES
AND EQUIPMENT.
B. COORDINATE PIPE ROUTING WITH DUCT
ROUTING, EQUIPMENT LOCATIONS,
ELECTRICAL INSTALLATIONS, AND BUILDING
STRUCTURAL MEMBERS. OFFSET PIPING
WHERE REQUIRED TO AVOID CONFLICTS.
AVOID PENETRATING ANY MAIN
STRUCTURAL BEAM. NOTIFY COR AND
ARCHITECT OF ANY CONFLICTS.
C. CONTRACTOR SHALL REMOVE AND REPAIR
PORTIONS OF FLOORS, CEILINGS AND/OR
SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO
MATCH EXISTING UNLESS NOTED
OTHERWISE ON ARCHITECTURAL
DRAWINGS.
D. PRIOR TO PERFORMING ANY PLUMBING
WORK OR PURCHASING ANY MATERIALS,
VERIFY EXACT LOCATION, ROUTING, AND
PIPE SIZES, ETC. OF ALL EXISTING
DOMESTIC WATER PIPING.
E. REFER TO DOMESTIC WATER ISOMETRIC
RISER DIAGRAM FOR PIPE SIZES ON
PLUMBING DRAWING PP301.
F. SEE ARCHITECTURAL PLANS FOR WALL
RATINGS.
FLOOR PLAN KEY NOTES
(ALL NOTES NOT USED ON ALL SHEETS)
1. 1/2" DOMESTIC HOT WATER RETURN DN
2. 1/2" DOMESTIC COLD WATER RETURN DN
3. 1-1/2" DOMESTIC HOT WATER SUPPLY DN
4. 2" DOMESTIC HOT WATER SUPPLY DN
5. 2" DOMESTIC COLD WATER SUPPLY DN
6. 2-1/2" DOMESTIC COLD WATER SUPPLY DN
7. 3" DOMESTIC COLD WATER SUPPLY DN
8. 3/4" NON-FREEZE WALL HYDRANT WITH
VACUUM BREAKER. MOUNT CENTERLINE OF
HYDRANT 24 INCHES ABOVE FINISHED
GRADE.
9. PROVIDE SHUT-OFF VALVE IN VERTICAL
WITH ACCESS PANEL.
10. NEW BALANCING VALVE ASSEMBLY (CIRCUIT
SETTER) ABOVE CEILING AT APPROXIMATE
LOCATION INDICATED. CIRCUITS SHALL BE
TESTED, BALANCED, AND CERTIFIED BY A
COMPANY WHO SPECIALIZES IN SUCH
SERVICES. A TEST AND BALANCE REPORT
SHALL BE PROVIDED.
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
DOMESTIC WATER DISTRIBUTION
FIRST FLOOR BUILDINGS 2C & 2W
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PP101
689-402
JUNE 7, 2019 RWC GTK 113
2C AND 2W
1/8" = 1'-0"
FIRST FLOOR DOMESTIC WATER
DISTRIBUTION BUILDINGS 2C & 2W
P-528
1 3/4"
3/4"
AC
6 5
EXISTING DOMESTIC
WATER ABOVE CEILING
OFFICE
2E-B127A
CUBICLES
2E-B127B
OFFICE
2E-B127C
OFFICE
2E-B127D
INTERNS
2E-B127F
OFFICE
2E-B127E
RECEPTION
2E-B140B
WAITING
2E-B140A
OPEN OFFICE
2E-B140C
C O
P Y
/W O
R K
E
-B
OFFICE
2E-B137A
KITCHENETTE
2E-B042
OFFICE
2E-B137B
OFFICE
2E-B140H
OFFICE
2E-B140G
OFFICE
2E-B140F
OFFICE
2E-B140E
OFFICE
2E-B140D
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
FLOOR PLAN GENERAL NOTES
A. THESE DRAWINGS ARE DIAGRAMMATIC
ONLY AND ARE NOT TO BE SCALED. FIELD
VERIFY ALL DIMENSIONS, PIPE SIZES, AND
INVERTS. REFER TO ARCHITECTURAL
DRAWINGS FOR DIMENSIONS AND
LOCATIONS OF ALL PLUMBING FIXTURES
AND EQUIPMENT.
B. COORDINATE PIPE ROUTING WITH DUCT
ROUTING, EQUIPMENT LOCATIONS,
ELECTRICAL INSTALLATIONS, AND BUILDING
STRUCTURAL MEMBERS. OFFSET PIPING
WHERE REQUIRED TO AVOID CONFLICTS.
AVOID PENETRATING ANY MAIN
STRUCTURAL BEAM. NOTIFY COR AND
ARCHITECT OF ANY CONFLICTS.
C. CONTRACTOR SHALL REMOVE AND REPAIR
PORTIONS OF FLOORS, CEILINGS AND/OR
SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO
MATCH EXISTING UNLESS NOTED
OTHERWISE ON ARCHITECTURAL
DRAWINGS.
D. PRIOR TO PERFORMING ANY PLUMBING
WORK OR PURCHASING ANY MATERIALS,
VERIFY EXACT LOCATION, ROUTING, AND
PIPE SIZES, ETC. OF ALL EXISTING
DOMESTIC WATER PIPING.
E. SEE ARCHITECTURAL PLANS FOR WALL
RATINGS.
FLOOR PLAN KEY NOTES
(ALL NOTES NOT USED ON ALL SHEETS)
1. CONNECT NEW DOMESTIC COLD WATER
SUPPLY PIPING TO EXISTING DOMESTIC
COLD WATER SUPPLY PIPING ABOVE
CEILING AT APPROXIMATE LOCATION
INDICATED.
2. CONNECT NEW DOMESTIC HOT WATER
SUPPLY PIPING TO EXISTING DOMESTIC HOT
WATER SUPPLY PIPING ABOVE CEILING AT
APPROXIMATE LOCATION INDICATED.
3. CONNECT NEW DOMESTIC HOT WATER
RETURN PIPING TO EXISTING DOMESTIC
HOT WATER RETURN PIPING ABOVE CEILING
AT APPROXIMATE LOCATION INDICATED.
4. NEW BALANCING VALVE ASSEMBLY (CIRCUIT
SETTER) ABOVE CEILING AT APPROXIMATE
LOCATION INDICATED. DOMESTIC HOT
WATER CIRCULATION CIRCUITS SHALL BE
TESTED, BALANCED, AND CERTIFIED BY A
COMPANY WHO SPECIALIZES IN SUCH
SERVICES. A TEST AND BALANCE REPORT
SHALL BE PROVIDED INDICATING A MINIMUM
HOT WATER TEMPERATURE OF 120
DEGREES AT THE MOST REMOTE PLUMBING
FIXTURE ON EACH CIRCUIT.
5. 1/2"DCWS-DN TO FIXTURE STOP.
6. 1/2"DHWS-DN TO FIXTURE STOP.
7. NO NEW PLUMBING WORK IN THIS AREA.
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
HUDVASH
42-216
HUDVASH
42-217
HUDVASH
42-218
MECH
42-219
OFFICE
42-213
SUPERS
42-211
HUDVASH
42-209
WAITING
42-202
CORR
42-203
TEAM
42-206
VOCATIONAL
42-205
GRANT
42-204
STO
42-201A
HCHV
42-201
CORR
42-215
HAC
42-214
P-528
1/2"
1/2"
1/2"
EXISTING DOMESTIC
WATER ABOVE CEILING
SMALL CONF
1-434D
OPEN OFFICE
1-434
OFFICE
1-434C
OFFICE
1-434B
OFFICE
1-434A
OPEN OFFICE
1-445
OFFICE
1-445A th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
DOMESTIC WATER DISTRIBUTION
BUILDING 1, 2E, 3 AND 42
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PP102
689-402
JUNE 7, 2019 RWC GTK 113
1, 2E, AND 42
1/8" = 1'-0"
DOMESTIC WATER DISTRIBUTION
BASEMENT PLAN BUILDING 2E
1/8" = 1'-0"
DOMESTIC WATER DISTRIBUTION
SECOND FLOOR PLAN - BULDING 42
1/8" = 1'-0"
DOMESTIC WATER DISTRIBUTION
FOURTH FLOOR - BUILDING 1
1 1/2"
1 1/4"
1 1/2"
3/4"
1 1/2"
3/4"
P-555
P-555
P-555
P-555P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555 P-609
P-402
P-103
P-402
P-402
P-103
P-528
P-402
P-555
P-555 P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-555
P-103
P-103
P-402
P-402
P-555
P-402
P-402
P-402 P-402
P-103
P-103
P-402
P-402
P-505
P-502
P-528
P-103
P-103
P-528
P-402
3/4"
3/4"
1 1/2"
2"
3/4"
2"
2"
1 1/4"
1"
1"
1"
1 1/2"
1 1/4"
2"
1 1/2"
1 1/2" 1 1/2"
1 1/2"
1 1/2" 1 1/2"
2" 2 1/2"
2"
2 1/2"
2 1/2"
2 1/2"
1 1/2"
2 1/2"
2 1/2"
2 1/2"
2"
2"
1 1/2"
1 1/4"
2"
1 1/2"
1 1/2"
1 1/4"
1"
1"
1/2" 1"
1/2"
1/2"1/2"
1/2"
3/4"
3"
3" th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
DOMESTIC WATER DISTRIBUTION
ISOMETRIC RISER DIAGRAM
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PP301
689-402
JUNE 7, 2019 RWC GTK 113
2C AND 2W
DMOESTIC WATER DISTRIBUTION
ISOMETRIC RISER DIAGRAM
SCALE: NONE
SCALE: NONE
NONESCALE:
NONESCALE:
PT
F T P
PT
TT
FF
PTT
T PF
T
CL pH
36" REF. ONLY
°F
140°F
TS
T S
TS
D
D
D D
END OF PIPE CLEANOUT
HEAVY DUTY
NO-HUB
COUPLING
18x18x6
CONCRETE PAD
FLOW FLOW
LINE SIZE
SERVICE WEIGHT
CAST IRON
SERVICE WEIGHT
CAST IRON
COMBINATION WYE
& EIGHTH BEND
"C.O." CAST IN
SECURED COVER
FLASHING CLAMP
FLASHING FLANGE
(WHEN SPECIFIED)
ADJUSTABLE TOP
AND FRAME
SERVICE WEIGHT HUB
AND SPIGOT PIPE
GRADE
FLOW FLOW
LINE SIZE
SERVICE WEIGHT
CAST IRON
SERVICE WEIGHT
CAST IRON
COMBINATION WYE
& EIGHTH BEND
"C.O." CAST IN
SECURED COVER
FLASHING CLAMP
FLASHING FLANGE
(WHEN SPECIFIED)
FINISHED FLOOR
ADJUSTABLE TOP
AND FRAME
SERVICE WEIGHT HUB
AND SPIGOT PIPE
°F
°F
°F
160°F
160°F 160°F
WATER HEATER SYSTEM DETAIL
OUTSIDE CLEANOUT DETAIL
FLOOR CLEANOUT DETAIL
A. HOT AND COLD WATER SUPPLY PIPING SHALL BE
INSTALLED FOR PARALLEL WATER HEATERS USING
"REVERSE RETURN" METHOD.
ELECTRIC WATER HEATER. REFER TO SCHEDULE ON DRAWING
P-001.
THERMOSTATIC PRESSURE BALANCED MIXING VALVE. REFER
TO SCHEDULE ON DRAWING P-001.
HOT WATER CIRCULATION PUMP. REFER TO SCHEDULE ON
DRAWING P-001. CONNECT TO AQUASTAT CONTROLLED
ALTERNATING STARTER.
MASTER THERMOSTATIC PRESSURE TEMPERING VALVE.
REFER TO SCHEDULE ON DRAWING P-001.
ASME APPROVED T&P RELIEF VALVE.
RELIEF DRAIN PIPE. FULL SIZE OF DISCHARGE OPENING.
THERMAL EXPANSION TANK. REFER TO SCHEDULE ON
DRAWING P-001.
ANALOG THERMOMETER, TEMPERATURE SENSOR, AND PETE'S
PLUG, (TYPICAL).
HEAT TRAP. INSULATE ALL PIPING.
UNION, (TYPICAL).
CONCRETE PAD WITH CHAMFERED EDGES REFER TO
STRUCTURAL DRAWINGS..
CHECK VALVE, (TYPICAL).
NORMALLY CLOSED BY-PASS.
BALANCING VALVE. SET FLOW TO ACHIEVE A RETURN
TEMPERATURE OF 125°. PROVIDE TEST AND BALANCING
SERVICES.
VACUUM RELIEF VALVE.
AQUASTAT.
COLD WATER CIRCULATION PUMP. REFER TO SCHEDULE ON
DRAWING P-001. CONNECT TO DDC TIMED CONTROLLED
ALTERNATING STARTER.
ANALOG PRESSURE GAUGE AND PRESSURE SENSOR.
FLOW SENSOR.
CHLORINE SENSOR.
POTENTIAL HYDROGEN pH SENSOR.
(WATER HEATER SYSTEM DETAIL ONLY)
(WATER HEATER SYSTEM DETAIL ONLY)
NOTES:
GENERAL NOTES:
8 8
10 10
6 6
FLOOR DRAIN
FINISHED FLOOR
DOMESTIC HOT
WATER RECIRCULATION
DOMESTIC COLD
MAIN
DOMESTIC HOT
WATER SUPPLY
DOMESTIC COLD
WATER SUPPLY
DOMESTIC COLD
WATER RECIRCULATION
th re e in ch es o ne fo ot 6" on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
DETAILS EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
PP401
689-402
JUNE 7, 2019 RWC GTK 113
1,2,C,W,C,3,42
| Sheets |
| P-001 - ABBREVIATIONS, LEGEND, AND SCHEDULES |
| PD101 - BASEMENT AND CRAWL SPACE BUILDINGS 2C & 2W DEMOLITION |
| PD102 - FIRST FLOOR BUILDINGS 2C & 2W DEMOLITION |
| PD103 - BUILDING 1, 2E, 3 AND 42 DEMOLITION FLOOR PLANS |
| PL101 - BASEMENT, CRAWL SPACE, & FOUNDATION BUILDINGS 2C & 2W |
| PL102 - WASTE, DRAIN, AND VENT PIPING FIRST FLOOR BUILDINGS 2C & 2W |
| PL103 - WASTE, DRAIN, AND VENT PIPING BUILDING 2 ADD ROOF PLAN |
| PL104 - WASTE, DRAIN, AND VENT PIPING BUILDING 1, 2E, 3, AND 42 PLANS |
| PL201 - WASTE, DRAIN, AND VENT ISOMETRIC RISER DIAGRAMS |
| PP101 - DOMESTIC WATER DISTRIBUTION FIRST FLOOR BUILDINGS 2C & 2W |
| PP102 - DOMESTIC WATER DISTRIBUTION BUILDING 1, 2E, 3 AND 42 |
| PP301 - DOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAM |
| PP401 - DETAILS |
| PD101 - BASEMENT AND CRAWL SPACE BUILDINGS 2C & 2W DEMOLITION |
| Sheets |
| P-001 - ABBREVIATIONS, LEGEND, AND SCHEDULES |
| PD101 - BASEMENT AND CRAWL SPACE BUILDINGS 2C & 2W DEMOLITION |
| PD102 - FIRST FLOOR BUILDINGS 2C & 2W DEMOLITION |
| PD103 - BUILDING 1, 2E, 3 AND 42 DEMOLITION FLOOR PLANS |
| PL101 - BASEMENT, CRAWL SPACE, & FOUNDATION BUILDINGS 2C & 2W |
| PL102 - WASTE, DRAIN, AND VENT PIPING FIRST FLOOR BUILDINGS 2C & 2W |
| PL103 - WASTE, DRAIN, AND VENT PIPING BUILDING 2 ADD ROOF PLAN |
| PL104 - WASTE, DRAIN, AND VENT PIPING BUILDING 1, 2E, 3, AND 42 PLANS |
| PL201 - WASTE, DRAIN, AND VENT ISOMETRIC RISER DIAGRAMS |
| PP101 - DOMESTIC WATER DISTRIBUTION FIRST FLOOR BUILDINGS 2C & 2W |
| PP102 - DOMESTIC WATER DISTRIBUTION BUILDING 1, 2E, 3 AND 42 |
| PP301 - DOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAM |
| PP401 - DETAILS |
| PD102 - FIRST FLOOR BUILDINGS 2C & 2W DEMOLITION |
| Sheets |
| P-001 - ABBREVIATIONS, LEGEND, AND SCHEDULES |
| PD101 - BASEMENT AND CRAWL SPACE BUILDINGS 2C & 2W DEMOLITION |
| PD102 - FIRST FLOOR BUILDINGS 2C & 2W DEMOLITION |
| PD103 - BUILDING 1, 2E, 3 AND 42 DEMOLITION FLOOR PLANS |
| PL101 - BASEMENT, CRAWL SPACE, & FOUNDATION BUILDINGS 2C & 2W |
| PL102 - WASTE, DRAIN, AND VENT PIPING FIRST FLOOR BUILDINGS 2C & 2W |
| PL103 - WASTE, DRAIN, AND VENT PIPING BUILDING 2 ADD ROOF PLAN |
| PL104 - WASTE, DRAIN, AND VENT PIPING BUILDING 1, 2E, 3, AND 42 PLANS |
| PL201 - WASTE, DRAIN, AND VENT ISOMETRIC RISER DIAGRAMS |
| PP101 - DOMESTIC WATER DISTRIBUTION FIRST FLOOR BUILDINGS 2C & 2W |
| PP102 - DOMESTIC WATER DISTRIBUTION BUILDING 1, 2E, 3 AND 42 |
| PP301 - DOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAM |
| PP401 - DETAILS |
| PD103 - BUILDING 1, 2E, 3 AND 42 DEMOLITION FLOOR PLANS |
| Sheets |
| P-001 - ABBREVIATIONS, LEGEND, AND SCHEDULES |
| PD101 - BASEMENT AND CRAWL SPACE BUILDINGS 2C & 2W DEMOLITION |
| PD102 - FIRST FLOOR BUILDINGS 2C & 2W DEMOLITION |
| PD103 - BUILDING 1, 2E, 3 AND 42 DEMOLITION FLOOR PLANS |
| PL101 - BASEMENT, CRAWL SPACE, & FOUNDATION BUILDINGS 2C & 2W |
| PL102 - WASTE, DRAIN, AND VENT PIPING FIRST FLOOR BUILDINGS 2C & 2W |
| PL103 - WASTE, DRAIN, AND VENT PIPING BUILDING 2 ADD ROOF PLAN |
| PL104 - WASTE, DRAIN, AND VENT PIPING BUILDING 1, 2E, 3, AND 42 PLANS |
| PL201 - WASTE, DRAIN, AND VENT ISOMETRIC RISER DIAGRAMS |
| PP101 - DOMESTIC WATER DISTRIBUTION FIRST FLOOR BUILDINGS 2C & 2W |
| PP102 - DOMESTIC WATER DISTRIBUTION BUILDING 1, 2E, 3 AND 42 |
| PP301 - DOMESTIC WATER DISTRIBUTION ISOMETRIC RISER DIAGRAM |
| PP401 - DETAILS |
| PL101 - BASEMENT, CRAWL SPACE, & FOUNDATION BUILDINGS 2C & 2W |
| Sheets |
| P-001 - ABBREVIATIONS, LEGEND, AND SCHEDULES |
| PD101 - BASEMENT AND CRAWL SPACE BUILDINGS 2C & 2W DEMOLITION |
| PD102 - FIRST FLOOR BUILDINGS 2C & 2W DEMOLITION |
| PD103 - BUILDING 1, 2E, 3 AND 42 DEMOLITION FLOOR PLANS |
| PL101 - BASEMENT, CRAWL SPACE, & FOUNDATION BUILDINGS 2C & 2W |
| PL102 - WASTE, DRAIN, AND VENT PIPING FIRST FLOOR BUILDINGS 2C & 2W |
| PL103 - WASTE, DRAIN, AND VENT PIPING BUILDING 2 ADD ROOF PLAN |
| PL104 - WASTE, DRAIN, AND VENT PIPING BUILDING 1, 2E, 3, AND 42 PLANS |
| PL201 - WASTE, DRAIN, AND VENT ISOMETRIC RISER DIAGRAMS |
| PP101 - DOMESTIC WATER DISTRIBUTION FIRST FLOOR BUILDINGS 2C & 2W |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .