This notice provides details for an upcoming construction project solicitation for the Expand Primary Care Clinic at the Newington VA Medical Center in Newington, Connecticut. The project scope involves renovating and expanding approximately 25,000 square feet of primary care clinic space by renovating 20,000 square feet in Buildings 2C and 2W and constructing a new 5,000 square foot structure. Additional space will be renovated in Buildings 1, 2E, 3, and 42 to relocate offices and services. The construction budget is estimated between $5-10 million. The solicitation will be issued as a total Service-Disabled Veteran-Owned Small Business set-aside invitation for bid on or about March 31, 2020. The contract performance period is approximately 600 calendar days from notice to proceed. Questions must be submitted in writing by the specified date. The applicable NAICS code is 236220 with a $39.5 million size standard.

View the file

Other files

File Type Posted
36E77620B0003 0008.docx DOCX document
36E77620B0003 0007.docx DOCX document
36E77620B0003 0006.docx DOCX document
36E77620B0003 0005.docx DOCX document
Attachment 16 - Steam Coil Piping Connections Detail (SD238216-03).pdf PDF
Attachment 18 - Answers to Technical Questions.pdf PDF
36E77620B0003 0004.docx DOCX document
Attachment 15 - Revised Specifications TOC and Added Specs.pdf PDF
Attachment 17 - Borings Log Pictures from 1995 Project.zip ZIP file
36E77620B0003 0003.docx DOCX document
Attachment 1.pdf PDF
36E77620B0003 0002.docx DOCX document
36E77620B0003 0001.docx DOCX document
Attachment 14 - Wage Determination.pdf PDF
36E77620B0003.docx DOCX document
Attachment 10 - Fire Protection Set Final.pdf PDF
Attachment 2 - Combined Specs Volume 2.pdf PDF
Attachment 4 - General Set Final.pdf PDF
Attachment 9 - Plumbing Set Final.pdf PDF
Attachment 3 - Hazardous Materials Surveys.zip ZIP file
Attachment 13 - CONTRACTOR SAFETY AND ENV RECORD FORM.docx DOCX document
Attachment 12 - Combined Survey Final.pdf PDF
Attachment 5 - Civil Set Final.pdf PDF
Attachment 1 - Combined Specs Volume 1.pdf PDF
Attachment 7 - Structural Set Final.pdf PDF
Attachment 11 - Electrical Set Final.pdf PDF
Attachment 6 - Architectural Set Final.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# CONSTRUCTION NOTE IDENTIFICATION

INDICATES ITEM TO BE PROVIDED

FLEXIBLE DUCT CONNECTION

VERTICAL FIRE DAMPER

VOLUME DAMPER

CEILING RETURN, EXHAUST OR TRANSFER REGISTER

CEILING SUPPLY DIFFUSER

MITERED ELBOW WITH TURNING VANES

RETURN DUCT TURNING UP

RETURN DUCT TURNING DOWN

EXHAUST DUCT TURNING UP

EXHAUST DUCT TURNING DOWN

SUPPLY DUCT TURNING UP (ROUND OR RECTANGULAR)

SUPPLY DUCT TURNING DOWN (ROUND OR RECTANGULAR)

10"x10" SQUARE OR RECTANGULAR DUCTWORK

PIPE TURNING UP

PIPE TURNING DOWN

THERMOSTAT (C=COOLING, H=HEATING,

H,C=HEATING AND COOLING

F10/6

(CFM)

EXHAUST GRILLE DESIGNATION

WITH CFM INDICATED

A6

(CFM)

CEILING DIFFUSER DESIGNATION

WITH CFM INDICATED

G20/20 RETURN GRILLE DESIGNATION

GENERAL

DUCTWORK

MOTORIZED CONTROL DAMPER

INDICATES ROUND DUCTWORK

FLEXIBLE CONNECTION

RETURN, EXHAUST OR TRANSFER AIR FLOW

SUPPLY AIR FLOW

ACCESS DOORAD

ABOVE FINISHED FLOORAFF

ABOVE FINISHED GRADEAFG

ALUMINUMALUM

ARCHITECTURALARCH

DIAMETERDIA

DRAWINGDWG

EXISTINGEX

EXISTING TO REMAINEXR

GAUGEGA

GOVERNMENT FURNISHED

CONTRACTOR INSTALLED

GFCI

MISCELLANEOUSMISC

NOT IN CONTRACTNIC

TYPICALTYP

UNLESS OTHERWISE

NOTED

UON

GALVANIZEDGALV

RUN THRU JOISTSRBJ

REMOVE EXISTINGREX

AUTOMATIC AIR VENT

VALVES AND ACCESSORIES

AUTOMATIC FLOW CONTROL VALVE

BACKFLOW PREVENTER

BALL VALVE

BOTTOM CONNECTION

BUTTERFLY VALVE

CAPPED PIPE

CHECK VALVE

CLEAN OUT

CONCENTRIC REDUCER

DIRECTION OF FLOW

ECCENTRIC REDUCER

FLANGED CONNECTION

FLEXIBLE CONNECTION

FLOW METER

BALL VALVE FOR 2" & UNDER

BUTTERFLY FOR 2.5" AND LARGER

GLOBE VALVE

MANUAL AIR VENT

METERED BALANCING VALVE

W/PRESSURE TAPS

PRESSURE/TEMPERATURE TEST PLUG

PT

NEEDLE VALVE

PLUG VALVE

PIPE ANCHOR (W=WALL, C=CEILING, F=FLOOR)W,C,F

PIPE GUIDE

PIPE SLEEVE

PITCH

PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

PRESSURE GAUGE WITH GAUGE COCK

SQUARE HEAD COCK

STEAM TRAP

STRAINER

STRAINER W/BLOW DOWN VALVE

THREE WAY CONTROL VALVE

TWO WAY CONTROL VALVE

THERMOMETER

THERMOSTATIC RADIATOR VALVE

TOP CONNECTION

UNION

VACUUM BREAKER

CONTROLS

ANALOG INPUT (TO PANEL)

ANALOG OUTPUT (OUT OF PANEL)

DIGITAL INPUT (TO PANEL)

DIGITAL OUTPUT (OUT OF PANEL)

TWO WAY CONTROL VALVE

THREE WAY CONTROL VALVE

BYPASS TIMER SWITCH

COMMON

CONTROL WIRING (SIGNAL PATH)

DATA TERMINAL CABINET

DIFFERENTIAL PRESSURE SWITCH

DIFFERENTIAL PRESSURE SENSOR

DUCT SMOKE DETECTOR

FAN ON-OFF SWITCH

FAN VARIABLE SPEED SWITCH

AI

DI

DO

C

FLOW MEASURING SYSTEM

FIRESTAT

FREEZESTAT

HIGH LIMIT TEMPERATURE SENSOR

HUMIDISTAT

LOW LIMIT TEMPERATURE SENSOR

LOCAL TEMPERATURE CONTROL PANEL

MOTOR

MOTORIZED CONTROL DAMPER

MOTOR STARTER

NORMALLY CLOSEDNC

NORMALLY OPENEDNO

POWER WIRINGEP

SENSOR

STATIC PRESSURE SENSOR

STATIC TOTALIZER STATION

SWITCH

ZONE TEMPERATURE SENSOR

TEMPERATURE TRANSMITTER

H,C

TIME CLOCK

VALVE IDENTIFICATION

CSR CURRENT SENSING RELAY

NORMALLY OPEN CONTROLS

NORMALLY CLOSED CONTROLS

CWR

HPS

HPC

MPS

MPC

HWS

HWR

LPS

PC

V

R

LPC

D

CWS

CHILLED WATER RETURN

MEDIUM PRESSURE CONDENSATE

DOMESTIC HOT WATER RECIRCULATING

HIGH PRESSURE STEAM

MEDIUM PRESSURE STEAM

LOW PRESSURE STEAM

HOT WATER SUPPLY

HOT WATER RETURN

REFRIGERANT LINE SET

STEAM VENT LINE

PUMPED CONDENSATE

LOW PRESSURE CONDENSATE

HIGH PRESSURE CONDENSATE

DIRECTION OF FLOW

DOMESTIC HOT WATER

DOMESTIC COLD WATER

CONDENSATE DRAIN LINE

CHILLED WATER SUPPLY

PIPING

FLEXIBLE DUCT CONNECTION

LEGEND

M

M

M

AO

S

P

T

TT

TC

DTC

DPS

DSD

FMS

FZ

HL

LL

TCP

MS

STS

V-1

BT

DP

F

VSF

FS

H

S

T

SUPPLY DUCT TURNING UP (OVAL)

SUPPLY DUCT TURNING DOWN (OVAL)

10"/10" OVAL DUCTWORK

DUCTWORK TO BE DEMOLISHED

SCOPE OF WORK MARK

GENERAL NOTES

1. SEE ARCHITECTURAL DRAWINGS FOR EXACT BUILDING DIMENSIONS AND DETAILS. THESE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE NOT TO BE SCALED. THE CONTRACTOR SHALL VISIT THE JOB SITE BEFORE WORK BEGINS

TO VERIFY ALL DIMENSIONS. NOTIFY THE COR OF ANY CONFLICTS.

2. COORDINATE DUCT ROUTING AND EQUIPMENT LOCATIONS WITH PLUMBING AND ELECTRICAL INSTALLATIONS AND WITH BUILDING STRUCTURAL MEMBERS. OFFSET DUCTS AND SHIFT EQUIPMENT AS REQUIRED TO AVOID CONFLICTS.

3. COORDINATE LOCATIONS OF CEILING REGISTERS AND DIFFUSERS WITH LIGHTING LAYOUT AND REFLECTED CEILING PLAN.

4. DUCT SIZES INDICATED ARE CLEAR INSIDE DIMENSIONS REQUIRED. WHERE DUCT LINER OCCURS, INCREASE SHEET METAL

DUCT SIZES TO ACCOMMODATE LINER.

5. REFER TO ELECTRICAL DRAWINGS FOR VOLTAGE REQUIREMENTS OF ALL EQUIPMENT.

6. SUPPORT ALL DUCTS, PIPING, AND EQUIPMENT FROM PRIMARY BUILDING STRUCTURAL MEMBERS. PROVIDE ADDITIONAL

STRUCTURAL MEMBERS WHERE NECESSARY TO ACCOMPLISH THIS REQUIREMENT.

7. EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED FROM THE PROJECT SITE IN ITS ENTIRETY INCLUDING ALL HANGERS, ELECTRICAL CONDUIT, WIRING, ELECTRICAL JUNCTION BOXES, PIPING, CONTROLS AND ACCESSORIES

RENDERED USELESS OR ABANDONED BY THE REMOVAL OF THE INDICATED EQUIPMENT.

8. THE TEST AND BALANCE CONTRACTOR SHALL BE A SUB-CONTRACTOR TO THE PRIME CONTRACTOR AND NOT A SUB-

CONTRACTOR TO THE MECHANICAL CONTRACTOR.SEE GENERAL

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

LEGEND AND GENERAL NOTES EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

M001

689-402

JUNE 7, 2019 WAW JLF 113

1, 2, 3, 42

MARK

NOTES:

GENERAL NOTE:

MARK SF=SUPPLY FAN

MARK EF=EXHAUST FAN

MARK RF=RETURN FANMAX.

OPER.

WEIGHT

(LBS)

MAX.

TIP

SPEED

F.P.M.

MOTOR

B E

LT

D

IR

E C

T

DRIVE

B

IR

D S

C R

E E

N

E

LE

C

TR

IC

D

A M

P E

R

G R

A V

IT

Y

D A

M P

E R

R O

O F

C U

R B

ACCESSORIES

C O

O K

C.F.M.

MNFR

G R

E E

N H

E C

K

1. ROOF-TOP CENTRIFUGAL

2. CENTRIFUGAL VENTILATION SET

3. EXISTING FAN. REBALANCE TO VALUES GIVEN.

NOTES

NOTES

1. SOUND POWER INDICATED AT SUPPLY OUTLET.

SOUND POWER DATA RE 10 WATTS OCTAVE BAND

CENTER FREQUENCY HZ

MNFRTYPE

C U

S

TO

M

V A

V

M U

LT

I Z

O N

E

S

IN

G

LE

Z O

N

EMARK

SUPPLY FAN

RPMTYPE

E.A.T.

R.P.M.H.P.

C

LA

S S

S.P.

MOTOR

R E

-H E

A T

P R

E -H

E A

T

L.A.T.

COOLING COIL

MAX.

OPER.

WEIGHT

(LBS)

HEATING COIL

50025012563 NOTES800040002000

C A

R R

IE

R

-M O

D U

LA

R

LB/HR

A

IR

FR

IC

TI

O

N

IN

.W .G

FR

IC

TI

O

N

IN

. W .G

. A

IR

G .P

.M . A

T

F

E .W

.T

E X

TE

R

N A

L

IN

. W .G

TO

TA

L

IN

. W .G

MOTORRETURN/RELIEF FAN

H.P. R.P.M.TYPE RPM

C

LA

S S

E .S

.P

IN

. W

.G

MODEL

SERIES

MAX.

C.F.M.

MIN.

C.F.M.

MIN.

O.A.

C.F.M.

MAX.

C.F.M.

MIN.

C.F.M.

TOTAL

MBH

CLG

MIN.

FACE

AREA

SQ.FT.

d.b.

°F w.b.

°F w.b.

°F d.b.

°F

W.P.D.

FT.

TOTAL

MBH

HTG

MIN.

FACE

AREA

SF.

E.A.T.

°F

L.A.T.

°F W.P.D.

FT.

MODEL

NO.

MAX.

HP.

E.S.P.

IN.

W.G.

MAX.

NOISE

SONES

1. PAINT FLAT BLACK INTERIOR DUCT SURFACES VISIBLE FROM OUTSIDE THE GRILLE.

2. PROVIDE FACTORY INSULATION BLANKET ON BACK OF DIFFUSER.

NOTES

ACCESSORIES

C

LR

B Y

A R

C H

A

LU

M

IN

U M

(A L)

A L

W

IT

H S

TL

F

R A

M E

O P

P B

LA

D

E D

A M

P E

R

P A

R B

LA

D

E D

A M

P E

R

MODEL NO.MARK FACE NECK

D

IF

FU

S

E R

LI

N

E A

R S

LO

T

G R

IL

LE

A C

U

TH

E R

M

LO

U

V E

R

TI

TU

S

S

TE

E L

(S

TL

P R

IM

E

R

O

FF

W H

IT

E

SIZE TYPE MNFR MATERIAL FINISH

FI

R

E D

A M

P E

R

- W

A Y

C O

R N

E R

E Q

U A

LI

ZI

N G

G R

ID

- W

A Y

FL

O

O R

T O

B O

TT

O

M

LA

Y

-IN

P

LE

N U

M

S U

R

FA

C E

FL

U

S H

- W

A Y

C E

IL

IN

G

- W

A Y

- W

A Y

NOTES

MTG HT.MOUNTING THROW

MAX.

LOSS

IN.

W.C.

MAX.

NC MARK NOTES:

MAX.

ENCLOSURE

MIN. FIN

TUBE (WXH)

MIN.

TUBE

DIA.

DIMENSIONSPERFORMANCE

1. PEDESTAL TYPE.

2. PROVIDE LENGTHS AS INDICATED ON PIPING DRAWINGS. CONTRACTOR TO COORDINATE ENCLOSURE LENGTHS

WITH FIELD VERIFIED ARCHITECTURAL DIMENSIONS.

NOTES

BTU/LF MAX. WATER

PD (FT/100 LF)

(WXH)

MARK NOTES:

S

IN.

PIPE SIZEPERFORMANCE

1. PROVIDE LENGTHS AS INDICATED ON PIPING DRAWINGS. CONTRACTOR TO COORDINATE ENCLOSURE LENGTHS

WITH FIELD VERIFIED ARCHITECTURAL DIMENSIONS.

NOTES

BTU/LF

MEAN

WATER

TEMP

(°F)

ROOM

AIR

TEMP

(°F)

WIDTH R

IN.

HRP-1 150 170 70 12 3/4 3/4 1;

HRP-2 187 170 70 15 3/4 3/4 1;

FTR-1 500 5 2.5 X 2.25 5.5 X 6.75 3/4" 1;2;A6

G 22/22

24X24

24X24

30 0.10

30 0.10

1;2;

1;2;

TMS

PAR

EF-1

EF-2

EF-3

230 0.5 *

G *

1;

1;

2;SFD

G

1/10 35 4,450 7.7

830 0.75 1/2 45 3,106 11.7

180 0.3 1/20 35 4,413 7.7

NOTES

1. STEAM TO WATER HEAT EXCHANGER.

LB/HR

S H

E

LL

T

U B

E

P

LA

TE

F R

A M

E

MARK

HIGH TEMPERATURE SIDE

G.P.M.

TYPE

SERVICE LWT

°F

EWT

°F

FOULING

FACTOR

MAX.

PRESS.

DROP

FT. W.G.

WATER

PRESS.

P.S.I.G.

STEAM

LOW TEMPERATURE SIDE

FOULING

FACTOR

EWT

°F

GPM

PRESS.

DROP

FT. W.G.

NOTES

6"

A8 24X24 * * * ** 30 0.10 1;2;TMS8"

A10 24X24 * * * ** 30 0.10 1;2;TMS10"

22X22

E 24/24 24X24 * * * ** 30 0.10 1;2;PAR22X22

NOTES

1. IN-LINE CLOSE COUPLED PUMP

MAX.

MOTOR HP.

TA

C

O

B

G

MARK

MNFR

CAPACITY

G.P.M.

MODEL

SERIES

NO.

WATER

HEAD FT.

W.G.

NOTES

SERVICE

FLUID

LWT

°F

PMP-1 * 008 5.10 13 0.10 WATER 1;

HX-1 STEAM * 5.0 0.0001 150 180 5.1 0.03 1;

RTU-42 * * 39MW 3035 2020 1400 PL 3554 4.28 1.5 II 5 3600 3035 2020 AF 2989 1.0 II 5 3600 116 5.9 81.8 66.6 54.46 54.08 23.2 1.04 3.3 * 96.0 3.31 25 69 98.93 0.61 5800 94 90 86 91 84 84 84 84 1;

C A

R R

IE

R

MARK

A A

O N

NOTES

TOTAL

COOLING

MBH

MODEL

NO.

HEATING MBH

MIN.

SEER

MNFR

M

IT

S U

B S

H I

NOTES

MODEL

NO.

MARK

M

IT

S U

B S

H I

A A

O N

C A

R R

IE

R

MNFR

NOTES

HEATING

MBH

SENSIBLETOTAL

COOLING

MBH

MAX.

1. AIR HANDLING UNIT AND CONDENSING UNIT SHALL BE OF SAME MANUFACTURER AND BE SPECIFICALLY DESIGNED TO OPERATE AS A SET.

2. WALL HUNG AIR HANDLING UNIT.

3. PROVIDE HARD WIRED THERMOSTAT.

CU-1 * MUZ-GL 12 14.4 23.1 1;2;3;4;

NOTES

1. COOLING CAPACITY BASED 0N 95°F AMBIENT AIR TEMPERATURE.

2. HEATING CAPACITY BASED ON 47°F AMBIENT AIR TEMPERATURE.

3. CONDENSING UNIT AND AIR HANDLING UNIT SHALL BE OF SAME MANUFACTURER SPECIFICALLY DESIGNED OPERATE AS A SET.

SUPPLY

C.F.M.

O.A.

C.F.M.

MIN.

EER

CU-2 * MUZ-GL 12 14.4 23.1 1;2;3;4;-

CU-3 * MUZ-GL 12 14.4 23.1 1;2;3;4;-

EF-4 * * * 1;G75 0.2 1/20 35 4,413 7.7*

COOLING

MBH W

E.S.P.

IN.

W.G.

HP-1 25HCB 34.9 31.8 16.5 13.0* 3;

AC-1 MSZ-GL 200 0 0 30W 12.0 - 14.4 1;2;3;

*AC-2 MSZ-GL 200 0 0 30W 12.0 - 14.4 1;2;3;

*AC-3 MSZ-GL 200 0 0 30W 12.0 - 14.4 1;2;3;

FV4C 1000 150 0 - 34.9 21.6 31.8 1;AHU-1

EF-5 * 1;G75 0.2 1/20 35 4,413 7.7* * *

EF-6 3;-750 0.75 - - - -*

79.1

PRESS.

P.S.I.G.

5.0

FAN SCHEDULE

AIR HANDLING UNIT SCHEDULE

AIR DEVICE SCHEDULE HOT WATER FIN TUBE RADIATOR

HYDRONIC RADIANT CEILING PANELS

HEAT EXCHANGER SCHEDULE

PUMP SCHEDULE

CONDENSING UNIT SCHEDULE

AIR HANDLING UNIT SCHEDULE

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

SCHEDULES EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

M011

689-402

JUNE 7, 2019 WAW JLF 113

NOTES

1. MAXIMUM AIR PRESSURE DROP FOR TERMINAL IS SUM OF DESIGN DROP AND COIL DROP AT MAXIMUM C.F.M.

2. N.C. LEVEL BASED ON 10dB ROOM ABSORPTION, RE RAISED TO THE -12 WATTS.

3. PRIMARY AIR VALVE C.F.M. SHALL NOT EXCEED MANUFACTURER'S "NOMINAL C.F.M.".

PRIMARY AIR

MARK MODEL NO.

S H

U

TO

FF

R E

H E

A T

D U

A L

D U

C T

S E

R

IE

S F

A N

P A

R A

LL

E

L

FA

N

E N

V

IR

O -T

E C

TI

TU

S

TYPE MNFR

INLET OUTLET

PRESSURE DUCT CONN.

WATER

TEMP.

ENT./LVG.

AIR

HANDLING

SYSTEM

H O

T W

A

TE

R

E

LE

C

TR

IC

AIR

TEMP.

ENT./LVG.

G.P.M.

HEATING COIL

C.F.M. HP.

FAN

NOTES

D E

S

IG

N

IN

LE

T

S

TA

TI

C

IN

.W

.G

D E

S

IG

N D

R O

P

IN

. W .G

. M A

X

A

IR

F R

IC

TI

O N

IN

W .G

MAX.

C.F.M.

MIN.

C.F.M.

CAP.

MBH

PRESS.

DROP

FT.

W.G.

E.S.P.

IN.

W.G.

MAX.

NOISE

NC.

CONTROL

SEQUENCE

C O

N N

E C

TI

O

N S

P

IP

E

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/9055/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/90

55/85

55/85

55/90

55/90

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

180/150

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1-AHU42

1-AHU42

1-AHU42

1-AHU42

1-AHU42

2E-AHU-2

2E-AHU-2

2E-AHU-2

2E-AHU-1

2E-AHU-1

2E-AHU-1

2C-AHU-1

2C-AHU-1

2C-AHU-1

2C-AHU-1

2C-AHU-1

2C-AHU-1

2C-AHU-1

2C-AHU-1

2C-AHU-1

2C-AHU-1

2C-AHU-1

2C-AHU-1

2C-AHU-1

2W-AHU-1

2W-AHU-1

2W-AHU-1

2W-AHU-1

2W-AHU-1

2W-AHU-1

2W-AHU-1

2W-AHU-1

2W-AHU-1

2W-AHU-1

2W-AHU-1

2W-AHU-1

2W-AHU-1

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

DESV

1A42-01

1A42-02

1A42-03

1A42-04

1A42-05

2E2-01

2E2-02

2E2-03

2E1-01

2E1-02

2E1-03

2C-01

2C-02

2C-03

2C-04

2C-05

2C-06

2C-07

2C-08

2C-09

2C-10

2C-11

2C-12

2C-13

2W-01

2W-02

2W-03

2W-04

2W-05

2W-06

2W-07

2W-08

2W-09

2W-10

2W-11

2W-12

2W-13

2W-14

2W-15

NOT USED

615 14 20X18

14 20X18

6 12X8

6 12X8

6 12X8

12X8

6 12X8

6 12X8

6 12X8

6 12X8

6 12X8

6 12X8

6 12X8

6 12X8

8 12X10

8 12X10

8 12X10

8 12X10

10 14X12

12X10

8 12X10

8 12X10

8 12X10

8 12X10

10 14X12

10 14X12

10 14X12

23.2 1.55

0.86

22.4 1.49

16.6 1.11

8.1 0.54

8.7 0.58

14.2 0.95

7.6 0.50

21.9 1.46

8.7 0.58

9.5 0.63

7.9 0.53

16.3 1.08

26.1 1.74

9.3 0.62

5.9 0.39

17.0 1.13

8.5 0.57

5.9 0.39

15.1 1.01

7.6 0.50

34.8 2.32

5.9 0.39

9.5 0.63

14.2 0.95

9.5 0.63

5.7

4.5 0.30

7.2 0.48

9.1 0.60

11.3 0.76

18.9 1.26

9.1 0.60

4 12X8

4 12X8

4 12X8

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

1;2;3;

DESV**B42-2 385 6 12X8

DESV**B42-1 660 55/90 180/150RTU-42 *

55/90 180/150* 6.6 0.44

55/90 180/150* 55/90 180/150* 7.6 0.50

55/90 180/150* 55/90 180/150* 7.6 0.50

55/90 180/150* 7.6 0.50

DESV**B42-4 405 8

DESV**B42-3 730

DESV**B42-6 250 6 12X8

DESV**B42-5 180 6 12X8

1;2;3;

1;2;3;

55/90 180/150* 10.4 0.69

55/90 180/150*

DESV*

*B42-7 250

*B42-9 475 *B42-8 455

DESV

DESV

6 12X8

55/90 180/150 30 1;2;3;2W-AHU-1DESV ***470 420 8 7.6 0.50

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

55/90 180/150 30 1;2;3;2E-AHU-1DESV ***2E1-04 6 12X8 3'

55/90 180/150 30 1;2;3;2E-AHU-2DESV ***2E2-04 3'

55/90 180/150 30 1;2;3;2E-AHU-2DESV ***2E2-05 6.6 0.44 3'

55/90 180/150 30 1;2;3;2E-AHU-2DESV ***2E2-06 3'

55/90 180/150 30 1;2;3;2E-AHU-2DESV ***2E2-07 4.2 0.28 3'

55/90 180/150 30 1;2;3;2E-AHU-2DESV ***2E2-08 3'

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

1 0.35

12X10

12X10

8 12X10

8 12X10

8 12X10

8 12X10

8 12X10

8 12X10

6 12X8

4 12X8

6 12X8

4 12X8

14X12

RTU-42

RTU-42

RTU-42

RTU-42

RTU-42

RTU-42

RTU-42

RTU-42

4.5 0.30

11.3 0.76

11.3 0.76

5.7

11.3 0.76

4.5 0.30

9.5 0.63

4.5 0.30

9.5 0.63

11.3 0.76

4.5 0.30

11.3 0.76

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

12X10

12X10

12X10

12X10

12X10

55/90

55/90 180/150

180/150

1;2;3;

1;2;3;2W-AHU-1

2W-AHU-1

DESV

DESV

*60

4 10X8

4 10X8

2.3

1.3

3'

3'

1 0.35

1 0.35

0.15

0.15

2W-16

2W-17

13400

0.15

0.09

0.38

0.38

V.A.V. TERMINAL SCHEDULE

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

SCHEDULES EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

M012

689-402

JUNE 7, 2019 WAW WNW 113

CWS

CWR

2' MAX

24"

30"

12"MIN.

SCALE: NONE

MAINS

1/2" CLOSE NIPPLE

DIRECTION OF FLOW

SERVICE TEE OR WELDOLET

CONCENTRIC REDUCER

1/4" COPPER TO FLOOR DRAIN "P"

1/2" GATE VALVE

1/2" CLOSE NIPPLE

AUTOMATIC AIR VENT.

1/8"NPT x 1/4" FLARE ELL

TRAP DRAIN PAN OR OUTSIDE.

SCALE: NONE

HWS

HWR

SEE FLOOR PLANS FOR CONTINUATION

OF PIPING

2-WAY HOT WATER

CONTROL VALVE

TEST PLUG TYPICAL

TEMPERATURE/PRESSURE

STRUCTURE USING DROP RODS

SUPPORT UNIT FROM

VAV OR FAN TERMINAL

MANUAL AIR VENT

FIXED VENTURI TYPE

BALANCING VALVE (TYP)

PITCH

PITCH

BI-FLOW SOLENOID VALVE (SOLENOID DROP

CONTROL), FOR HEAT PUMPS

ISOLATION VALVE

ISOLATION VALVE

ISOLATION VALVE

TXV (HARD SHUT-OFF TYPE FOR COOLING

ONLY UNITS)

TO FLOOR SINK

FILTER DRIER

SIGHT GLASS

DX COIL

OIL TRAP

CONDENSING

UNIT

CONTRACTOR AND MANUFACTURER ARE

RESPONSIBLE FOR CORRECTLY SIZING

REFRIGERANT LINES TO ENSURE THAT

EQUIPMENT DELIVERS FULL SCHEDULED

CAPACITY WITHOUT NEGATIVELY IMPACTING

THE LIFE OF THE EQUIPMENT. WHEN

REQUIRED BY THE INSTALLATION

CONDITIONS AND LENGTH OF REFRIGERANT

LINES THE CONTRACTOR AND HVAC UNIT

MANUFACTURER SHALL PROVIDE AT NO

ADDITIONAL COST ALL SPECIALTY

EQUIPMENT REQUIRED FOR PROPER

EQUIPMENT OPERATION. SPECIALTY

EQUIPMENT SHALL INCLUDE BUT NOT BE

LIMITED TO SPECIALTY VALVES SUCH AS

REFRIGERANT SOLENOID VALVES, PUMP

DOWN CONTROLS, SUB-COOLING EXPANSION

VALVES, AND REFRIGERANT LIQUID

RECEIVERS.

TAB AGENT SHALL CHECK TXV SUCTION AND

SUPERHEAT SETTING AND REPORT.

CONNECTIONS

FLOW

AIR

CHILLED WATER

CWS, DOWNSTREAM

COIL

COIL

CWR,UPSTREAM

1/2" DRAIN VALVE WITH HOSE

2-WAY CONTROL VALVE.

SEE SPECIFICATIONS AND

CONNECTION

STRAINER WITH HOSE

CONTROL SEQUENCE

CHILLED WATER COIL

FROM CHILLED WATER MAINS.

SEE SCHEDULES FOR SIZES

MANUAL AIR VENT

MANUAL FLOW

BALANCING VALVE

P/T PLUG

(TYPICAL)

THERMOMETER

(TYP. OF 2)

CONNECTION BLOW DOWN VALVE

RETURN DUCT

FLEXIBLE CONNECTOR

2x2x1/4 WELDED

GALVANIZED ANGLE

AUXILIARY DRAIN PAN

STAINLESS STEEL

AND PLENUM SHALL NOT

NOTE: MAXIMUM HEIGHT OF STAND

EXCEED 12"

TO STAND

STEEL GRADING WELDED

PROVIDE LEGS 30 IN.

(MAX.) APART

FEILD FABRICATED SHEET

METAL PLENUM

VIBRATION ISOLATORS

SECURED TO GRADING

CONNECTIONS

REFRIGERANT PIPE

CIRCUIT BREAKER

CONNECTION

CONDENSATE DRAIN PIPE

FLEXIBLE CONNECTOR

SUPPLY DUCT

SUPPORTED ON RUBBER

TO THE FAN SHROUD WITH

ALUMINUM DOME SECURED

STAINLESS STEEL FASTENERS AND

MIN. 12" ABOVE ROOF

TOP OF CURB SHALL BE

BUILDING ROOF SYSTEM.

AND BE COMPATIBLE TO

SECURE THE FAN TO THE

GENERAL CONTRACTOR

BE COORDINATED WITH

SIDE. ROOF CURB SHALL

THAN 2 S/M SCREWS PER

O.C. ALL AROUND. NO LESS

CURB WITH S/M SCREWS 12"

VIBRATION ISOLATORS

BACKDRAFT DAMPER

PITCH W/ ARCHITECTURAL

COORDINATE ROOF

ALUMINUM BIRD SCREEN

TEST AND BALANCE

AND PLASTIC CAP FOR

STATIC PRESSURE PROBE

DRAWINGS.

ALL AROUND

OF THE FAN

MOTOR LOCATED OUTSIDE

THE AIRSTREAM WITH

BREATHER TUBE AND

RUBBER IN SHEAR

#57 GRAVEL

DRAIN PVC WITH SLOPE

FULL SIZE CONDENSATE

@ 1/8" PER FOOT.

PROVIDE SYNTHETIC SOIL FABRIC

GRASS HAS BEEN DISTURBED.

AROUND ALL SIDES OF DRYWELL.

RE-SEED SOIL WHERE ANY

COMPACT EARTH FILL.

AUTOMATIC AIR VENT

NOTE:

TYPICAL SYSTEM AND MATERIAL INSTALLATION

VAV TERMINAL PIPING DETAIL

DX COOLING PIPING SCHEMATIC

2 WAY CONTROL VALVE CHILLED WATER COIL PIPING

FLEXIBLE DUCT SHALL NOT

SURFACES. PROVIDE O.B. DAMPER

45° RIGID RADIUS ELBOW

IN ONE FLEX SEGMENT

THE MAXIMUM NUMBER

OF FLEX DUCT TURNS

SHALL NOT EXCEED 45°

NOTE

SCALE: NONE

DIFFUSER W/ INSULATION

COMPLETELY COVERING METAL

EXCEED 5 LINEAR FEET.

DUCT ACCESS PANEL

SUPPORTED FROM

MAIN SUPPLY DUCT

STRUCTURE

D

1.25D

AIR FLOW

MIN 4 INCH

BRANCH SUPPLY DUCT

SUPPORTED FROM STRUCTURE

DAMPER

OPPOSED BLADE BALANCING

TURNING VANES

DOUBLE WALL

AIR FLOW

ROUND TAKE-OFF

RECTANGULAR TO

SEAL CONNECTION

45 DEGREE

WITH GASKET

BALANCING DAMPER WITH LOCKING QUADRANT TYPICAL ALL

DIFFUSERS, GRILLES, & REGISTERS UNLESS OTHERWISE INDICATED.

30° M

AX

SCALE: NONE

SCALE: NONE

RS

RL

VAV TERMINAL INSTALLATION DETAIL (PLAN VIEW)

AHU-1 SUPPORT DETAIL

ROOF MOUNTED EXHAUST FAN DETAIL

DRYWELL DRAIN DETAIL

36"

MIN.

SCALE: NONE

MODELS.

PER NEC ON ELECTRONIC

36" MINIMUM CLEAR AREA

REHEAT COIL CONNECTION PER

HOT WATER COIL PIPING DETAIL.

FLOOR PLAN. SEAL OUTLET DUCT

FOR OUTLET DUCT SIZE SEE

CONNECTION PER DUCT SEALING

REQUIREMENTS.

FOLLOW SMACNA DUCT SUPPORT

SUPPORT FROM BUILDING STRUCTURE

AT MINIMUM OF FOUR POINTS.

FLEXIBLE DUCT.

DUCT OR MAXIMUM 2'-0"

RIGID CONNECTION TO MAIN

LENGTH OF STRAIGHT

SCREWED AND SEALED CONNECTION.

SEAL AS SPECIFIED FOR DUCT SEALING.

D

5D MIN.

CRITERIA.

OF SIZE SHOWN

BRANCH DUCT

ON FLOOR PLAN

TO TERMINAL

REDUCTION

INLET SIZE "D"

RIGID METAL DUCT SAME DIAMETER (D) AS TERMINAL

INLET. MINIMUM STRAIGHT LENGTH EQUAL TO 5 TIMES

D.

T

T

AHU

SCALE: NONE

GROMMET

SCALE: NONE

SCALE: NONE

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

DETAILS EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

M013

689-402

JUNE 7, 2019 WAW JLF 113

[6 "M

IN

(T Y

P

D

0m m

0m m

[1 2"

M

IN

[6

" M

IN

2m m

SCALE: NONE

SCALE: NONE

SCALE: NONE

STRAINER

PUMP

IN-LINE

PRESSURE GAUGE

GATE VALVE

HOSE END ADAPTER

3/4 " GATE VALVE

STRUCTURE ABOVE. PROVIDE VIBRATION

CHECK VALVE

BALANCE VALVE

FLEXIBLE CONNECTION

MINIMUM 2'-0" FLEXIBLE

ELECTRICAL CONDUIT PUMP SUPPORTED FROM BUILDING

ISOLATION PER SPECIFICATIONS.

GAUGE COCK TYP OF 4

(TYP. OF 2)

TEST PLUG

SCALE: NONE

SCALE: NONE

SCALE: NONE

SCALE: NONE

NOTE:

ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 300mm [12"] MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO

TRAP INLET. DRIP LEG SHALL HAVE 150mm [6"] SCALE POCKET BELOW TRAP INLET.

TO RETURN MAIN

PIPE SIZE SHALL BE SAME SIZE AS TRAP

FLOAT AND THERMOSTATIC TRAP.

SEE PLANS, AND SCHEDULES

DIELECTRIC FITTING WHERE

RETURN IS COPPER PIPE

FLOW

SCHEDULE 80

STEEL PIPE

BYPASS-INSTALL IN HORIZONTAL PLANE LEVEL WITH

TRAP OR IN VERTICAL PLANE & BELOW TRAP PROVIDE

BYPASS PIPING FOR ALL TRAPS 25mm [1"] AND

LARGER.

DRIP LEG OR EQUIPMENT CONNECTION. MAKE

THE SAME SIZE AS THE SUPPLY MAIN OR

EQUIPMENT CONNECTION. SEE NOTE 1

SCHEDULE 80 STEEL PIPE

SEE DRAWINGS FOR PIPE SIZES

25mm [1"]

GATE VALVE

USE 4-BOLT RAISED FACE FLANGES

THERMOMETER (TYP.)

LPS STEAM

SUPPLY

HEAT

EXCHANGER (TYP.)

15mm [1/2"] CHECK VALVE

VACUUM BREAKER (TYP.)

DDC TEMPERATURE

SENSORS (TYP.)

THERMOSTATIC AIR

VENT (TYP.)

IF INSTALLED LOWER

THAN MAIN HPS

LINE, PROVIDE

ANOTHER SCALE

POCKET/TRAP HERE.

NOTES:

1. THE ABOVE DETAIL SHOWS REQUIRED PIPING FOR TWO HEAT EXCHANGERS IN PARALLEL. INDICATE IF 100% REDUNDANT OR NOT.

2. PROVIDE SADDLE SUPPORTS AND LEGS OR HANGERS FOR HEAT EXCHANGER. MOUNTING HEIGHT SHALL BE ADJUSTED TO FACILITATE GRAVITY RETURN OF STEAM

CONDENSATE.

3. MAKE THE BYPASS THE SAME SIZE AS THE CONNECTIONS TO THE CONTROL VALVES.

4. CONTROL VALVES SHALL BE IN A 1_

AND 2_

SIZE ARRANGEMENT.

HWR

HWS

SCALE POCKET

(TYP.)

TT

PI-

TT

DDC PRESSURE

SENSORS (TYP.)

ISOLATION VALVE (TYP)

TANK OR TO HPR MAIN LINE (TYP.)

HPR TO FLASH

FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY

HEAT EXCHANGER - STEAM TO HOT WATER

UTILITY EXHAUST FAN DETAIL

IN - LINE PUMP DETAIL

ROOF MOUNTED CONDENSING UNIT

STEAM PRESSURE RELIEF VALVE DETAIL

HYDRONIC RADIANT PANEL

RTU-42 COMPONENT DIAGRAM

CURB AND EQUIPMENT RAIL SUPPORTS SHALL

MATCH ROOF SLOPE SO THAT TOPS ARE LEVEL.

ALL EQUIPMENT, DUCT, ETC. ABOVE THE ROOF

LINE SHALL BE PAINTED TO MATCH ROOF AS

PER ARCHITECTURAL DRAWINGS AND SPECIFICATIONS.

(TYPICAL).

FROM BELOW.

3"x3"x1/4" STEEL ANGLE SUPPORT

FRAME. ADJUST HEIGHT TO PROVIDE

ALIGNMENT WITH EXHAUST DUCT

LOADING POINTS

RAIL. REFER TO ARCHITECTURAL

EQUIPMENT SUPPORT

DRAWINGS

NEOPRENE PAD AT

NOTE:

DISCHARGE STACK

TO DISCHARGE DUCT

DRIVE ENCLOSURE

VIBRATION ISOLATION

16 GA. STAINLESS STEEL

BRACKET UPPER DUCT

FAN WITH MOTOR AND

8"

32"

DUCT THRU ROOF PENETRATION.

CURB TO BE PROVIDED BY ROOF

SHALL BE WATERTIGHT.

EXHAUST DUCT UP FROM

MANUFACTURER. PENETRATION

8"∅

FLOOR BELOW.

TOP OF STACK TO DISCHARGE 10'-0"

1/8" S.S. STRANDED CABLE GUY

WIRES. TYPICAL OF 3.

(TYPICAL)

FLANGED CONNECTIONS

CONNECTION

FLEX

6" MINIMUM

9"

ABOVE ROOF

MOUNTING PLATFORM

ROOF

PIPING

SHEET METAL CAP

REFRIGERANT

GALV. METAL

FLASHING

24 GAUGE

AIR CONDITIONER

SPLIT-TYPE

FRONT FAN GRILLE

OUTDOOR UNIT.

ANCHOR BOLTS

DOWN TO UNIT

RELIEF VALVE

SCALE: NONE

SHORT NIPPLE

TO FLOOR DRAIN

3/4'

DISCHARGE ELL

SAFETY VALVE

9" LONG NIPPLE

PIPE THROUGH ROOF

HEATING ONLY PANELS

HWS

HWR

RUNOUT & INTERCONNECTING PIPING.

PROVIDE DIELECTRIC FITTINGS AS

REQUIRED. CIRCUIT TO COMPLY WITH

SPECIFIED CAPACITY & PRESSURE

DROP. (TYP.)

NOTE:

1. MINIMUM FLOW SHALL BE NO

LESS THAN 0.5 GPM [1.9 LPM]

RETURN FAN

INTEGRAL FACE AND BYPASS STEAM COIL

CHILLED WATER COIL AND PLENUMMIXING BOX

EXHAUST BOX

MIXING BOX

VFD PLENUM

BAG/CARTRIDGE FILTER

PLENUM

VFD PLENUM

BLOW-THRU SUPPLY FAN

BLOW-THRU PLENUM

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

DETAILS EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

M014

689-402

JUNE 7, 2019 WAW WNW 113

DEMOLITION PLAN GENERAL NOTES:

A. EXISTING VAV BOXES AND SUPPLY

RUNOUTS IN SCOPE OF WORK AREA TO BE

REMOVED BACK TO MAIN TRUNK.

B. RETURN RUNOUTS TO BE REMOVED BACK

TO MAIN TRUNK.

C. AHU SERVING BUILDING 2C SERVES AREAS

OUTSIDE OF SCOPE OF RENOVATION. UNIT

SHALL STAY IN OPERATION THROUGHOUT

RENOVATION. PROVIDE ALL NECESSARY

TEMPORARY DUCT CLOSURES, TEMPORARY

DUCTWORK, OFFSETS, ETC. REQUIRED TO

ALLOW FOR CONTINUAL OPERATION.

D. COORDINATE DOWNTIME REQUIRED TO TIE

IN TO THE NEW DUCTWORK WITH BUILDING

OCCUPANTS.

DEMOLITION PLAN KEY NOTES:

1. REMOVE DUCTWORK TO SCOPE OF WORK

MARK.

2. EXISTING DUCTWORK TO REMAIN.

3. DUCTWORK DOWN TO AHU LOCATED IN

BASEMENT.

4. EXHAUST DUCTWORK UP TO ROOF

MOUNTED FAN. RISER AND FAN SHALL BE

EXISTING TO REMAIN.

5. PROVIDE PRE WORK TESTING AT THIS

LOCATION. RECORD AIRFLOW AND STATIC

PRESSURE.

"x

8"

"x

8"

"x

8" 9" x8

8"8"

8" 8" 16 "x

6"

6"x6"

5"

12"x6"

"x

6"

"x

8"

12"x6"

8"

9" x8

8"

8"8" 16 "x

8"

"x

8"

"x

9"

"x 9"

34"x10"

"x

8"

"x 8"

"x

8"

"x 8"

10"x8"

14"x6"10"x6"

6" 6" 6" 6" 5"

5"

8"x6"

12"x4"

12"x4"

10"x6"

"x

8"

"x 8"

5"

5"

12"x4"

5"

5"

12"x4"

12"x4"

5"

5"

12"x8"

"x

5"

"x

8"

36"x10"

"x

8"

8"x6"

"x

9" x8

6"6"

12"x12"

"x

13"x8"

"x

"x

10"

10"

"x

8"

16"x36"

"x

"x

8"x8" 8"

"x6

8"x10"

15"x8" 16"x10"

8"

34"x12" 30"x12"

36"x18"

6" x6

6" x6

"x

6"

"x 8"

40"x20"

48"x17"

"x

42"x16" 40"x15"

40"x20"

"x

"x

"x

"x

"x

"x

"x

"16

"x 7"

16"x7"

23"x8"

23"x8"

"x

8"

16"x6"

"x

6"

"x

6"

9"x8"

8"x6"12"x8" 8" x6

8" x6

17"x7"

14"x8"

6"x6"

12"x9"

"x

8"

8"x8"

11"x8"

9" x6

"6"

30"x10"

"x

6"

12"

9" x6

6"

12"x10"

52 (TYP)

2 (TYP)

2 (TYP)

32 (TYP)

2'

/3

2"

73' - 3 3/8"

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

FIRST FLOOR DEMOLITION PLAN

BUILDINGS 2W & 2C

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

MD101

689-402

JUNE 7, 2019 WAW JLF 113

1, 2, 3, 42

1/8" = 1'-0"

FIRST FLOOR DEMOLITION PLAN BUILDINGS 2W & 2C

16"x8"

48"x18"

16"x10" 8"x8"

"x

6"

24"x12"

48"x18"

48"x22"

"x

48"x22"

32"x14"

"x

48"x14"

30"x14"

28"x12"

18"x12"

"x

8"

"x

8"

36"x28"

40"x28"

40"x28"

48"x15"46"x16"

"x

"x

8" x6

14"x6"

"x

"x

"x

6"

"x

6"

10"x6" 10"x6"

"x

6"

"x 6"

"x

6"

"x

6"

16"x8"

10"x6"

"x

8"

"x

6"

"x

6"

10"x6"

34"x14"

34"x14"

"x

"x

12"x4"

12"x4"

12"x4"

12"x4"

10"x6"

"x

6"

10"x8"

12"x8"

"x

6"

12"x4"10"x8"10"x8"

"x

6"

10"x6"

12"x6"

12"x6"

12"x6"

12"x6"

12"x6"

"x

4"

18"x10"

"ø 5" ø

"x

"x

6"

10"x8"

10"x6" 12"x6"

"x

14"x6"

12"x8"

"x

13"ø

40"x24"

"x

9"

"x

10"x8"

"x

6"

12"x4"12"x4"

"x

8"

"x

4"

8" ø

"x

4"

12"x4"

"x

4"

8"x6"

"x

6"

10"x6"

"x

6"

8" x8

12"x6"

"x

6"

12"x6"

"x

"x

6"

"x

8"

14"x6"

"x

6"

"x

6"

"x

8"

14"x6"16 "x

"x

10"x6"

"x

6"

1 1

2 (TYP)

2 (TYP)

2 (TYP)

(TYP)

(TYP)

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

DEMOLITION PLAN GENERAL NOTES

A. EXISTING VAV BOXES AND SUPPLY

RUNOUTS IN SCOPE OF WORK AREA TO

BE REMOVED BACK TO MAIN TRUNK.

B. RETURN RUNOUTS TO BE REMOVED

BACK TO MAIN TRUNK.

C. AHU SERVING BUILDING 2E SERVES

AREAS OUTSIDE OF SCOPE OF

RENOVATION. UNIT SHALL STAY IN

OPERATION THROUGHOUT

RENOVATION. PROVIDE ALL NECESSARY

TEMPORARY DUCT CLOSURES,

TEMPORARY DUCTWORK, OFFSETS,

ETC. REQUIRED TO ALLOW FOR

CONTINUAL OPERATION.

D. COORDINATE DOWNTIME REQUIRED TO

TIE IN TO THE NEW DUCTWORK WITH

BUILDING OCCUPANTS.

DEMOLITION PLAN KEY NOTES:

1. REMOVE DUCTWORK TO SCOPE OF

WORK MARK.

2. EXISTING DUCTWORK TO REMAIN.

3. DUCTWORK TO AHU/EXHAUST IN

MECHANICAL ROOM.

4. PROVIDE PRE WORK TESTING AT THIS

LOCATION. RECORD AIRFLOW AND

STATIC PRESSURE.

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

BASEMENT DEMOLITION PLAN

BUILDING 2E

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

MD102

689-402

JUNE 7, 2019 WAW JLF 113

1, 2, 3, 42

BASEMENT DEMOLITION PLAN BUILDING 2E

"x

6"

"x 6"

"x

8"

22"x9" 18"x6"

"x

6"

8"x5"

36"x12"

"x

"x

"x

6"

"x 6"

16"x6"

"x

6"

12"x4"

12"x4"

12"x6"

36"x12"

"x

"x

8"

8"ø

8" ø

14"x8"

"x

4"

"x 4"

12"x4"

6"ø 14"x4"

"x

4"

6"ø 10"x6"

24"x8"

8" x6

8" ø

8" ø

"x

8"

14"x4"14"x4"

"x

4"

8" ø

"x

6"

14"x4"14"x4"

8" ø

8" ø

14"x6"

12"x4"

28"x8"

"x

6"

"x

6"

"x

4"

8"ø

"x

4"

12"x4"

12"x6"

8"ø 12 "x

6"

8"ø

"x

6"

12"x6"

12"x6"

"x

6"

10"ø

"x

4"

"x

4"

"x 4"

10"x4"

8"x6"

16"x6"

12"x6"

"x

6"

12"x6"

"x

6"

24"x4"

12"x4"

12"x4"

"x

4"

"x

4"

12"x4"

12"x4"

8" x6

12"x4"

14"x12"

"x

4"

12"x4"

12"x4"

2 (TYP)

(TYP)

(TYP)

"x

6"

"x

6"12"x6"

12"x6"

12"x4" 12"x4"

2 (TYP)

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

DEMOLITION PLAN GENERAL NOTES:

A. EXISTING VAV BOXES AND SUPPLY

RUNOUTS IN SCOPE OF WORK AREA TO BE

REMOVED BACK TO MAIN TRUNK.

B. RETURN RUNOUTS TO BE REMOVED BACK

TO MAIN TRUNK.

C. AHU SERVING BUILDING 1 SERVES AREAS

OUTSIDE OF SCOPE OF RENOVATION. UNIT

SHALL STAY IN OPERATION THROUGHOUT

RENOVATION. PROVIDE ALL NECESSARY

TEMPORARY DUCT CLOSURES,

TEMPORARY DUCTWORK, OFFSETS, ETC.

REQUIRED TO ALLOW FOR CONTINUAL

OPERATION.

D. COORDINATE DOWNTIME REQUIRED TO

TIE IN TO THE NEW DUCTWORK WITH

BUILDING OCCUPANTS.

DEMOLITION PLAN KEY NOTES:

1. REMOVE DUCTWORK TO SCOPE OF WORK

MARK.

2. EXISTING DUCTWORK TO REMAIN.

3. DUCTWORK TO AHU/EXHAUST

MECHANICAL ROOM.

4. PROVIDE PRE WORK TESTING AT THIS

LOCATION. RECORD AIRFLOW AND STATIC

PRESSURE.

5. REMOVE EXISTING EXHAUST DUCTWORK

INCLUDING ALL ASSOCIATED HANGERS,

SUPPORTS, DROPS, GRILLES, CONTROLS,

AND ANY ITEM RENDERED ABANDONED.

6. CUT AND CAP EXHAUST DUCT BELOW

FLOOR PENETRATION AND REPAIR SLAB.

7. REMOVE EXISTING EXHAUST FAN

LOCATED IN WINDOW. REPAIR WINDOW TO

OPERATING CONDITION.

8. REMOVE EXISTING AHU AND ALL

ASSOCIATED DUCTWORK, CONTROLS,

SUPPORTS, HANGERS, REFRIGERANT

PIPING AND CONDENSING UNIT. REPAIR

BUILDING PENETRATIONS.

9. OUTDOOR AIR INTAKE IN WINDOW TO BE

REUSED.

10. REMOVE EXISTING DUCTWORK AND

DIFFUSERS.

12"ø

16"ø12"ø

"ø

8" ø

7" ø

"ø

4" ø

4" ø

"ø

"ø

12"ø

"ø

12"ø

(TYP)

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

PLAN

NORTH

TRUE

NORTH

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

FOURTH FLOOR DEMOLITION

PLAN BUILDING 1

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

MD103

689-402

JUNE 7, 2019 WAW JLF 113

1, 2, 3, 42

1/8" = 1'-0"

FOURTH FLOOR DEMOLITION PLAN BUILDING 1

1/4" = 1'-0"

SECOND FLOOR DEMOLITION BUILDING 3

"x

"x

24"x10" 30"x12"

30"x12"16"x10"

"x

"x

8"

8"x8"

"x

8"x10" 8"x10"

"x

8"

7"ø

7"ø

10"x8"

7"ø

7"ø

"x

6"

10"x6"

10"x6"6"x10"

7" ø

8"x10"

8" x1

0" 6" x1 0"

10"x6"

9"ø 9"ø 9"ø

"x

6"

14"x10"

14"x6"

"x

8"

9"ø7"ø 9"ø

9"ø

10"x6"

7"ø

"x

8"

7"ø

10"x6"

7" ø

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

8 8

DEMOLITION PLAN GENERAL NOTES:

A. REMOVE EXISTING HVAC SYSTEM SERVING

THE UPPER LEVEL OF BUILDING 42. THIS

SHALL INCLUDE ALL DUCTWORK,

EQUIPMENT, SUPPORTS, CONTROLS, PIPING,

INSULATION, AND ANY ITEM RENDERED

ABANDONED BY THE REMOVAL OF THE

HVAC SYSTEMS.

B. AHU SERVING UPPER FLOOR OF BUILDING

42 ALSO SERVERS A SMALL PART OF THE

LOWER LEVEL. PROVIDE TEMPORARY

HEATING AND COOLING FOR THIS AREA

DURING THE RENOVATION WORK.

C. COORDINATE DOWNTIME REQUIRED TO TIE

IN TO THE NEW DUCTWORK WITH BUILDING

OCCUPANTS.

DEMOLITION PLAN KEY NOTES:

1. REMOVE EXISTING DUCTWORK.

2. REMOVE RETURN GRILLE.

3. REMOVE EXHAUST FAN AND DUCTWORK.

ROOF PENETRATION SHALL REMAIN READY

TO BE REUSE.

4. REMOVE EXISTING EXHAUST FAN AND

DUCTWORK. CAP AND SEAL ROOF

PENETRATION. COORDINATE WITH

ARCHITECTURAL DRAWINGS.

5. REMOVE EXISTING AHU, DUCTWORK,

PIPING, AND CONTROL.

6. REMOVE EXISTING CONDENSING UNIT

LOCATED ON GRADE. REPAIR WALL FROM

REMOVAL OF REFRIGERANT LINES, GROUT

OPENINGS.

7. EXISTING DUCTWORK TO REMAIN.

8. DUCTWORK DOWN TO FIRST FLOOR.

9. AHU HAS REFRIGERANT COOLING COIL,

STEAM HEATING, SUPPLY, RETURN, AND

OUTDOOR AIR DUCT.

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

PLAN

NORTH

TRUE

NORTH

0' 2' 4' 8' 12'

SCALE: 1/4" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

BUILDING 42 EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

MD104

689-402

JUNE 7, 2019 WAW WNW 113

1, 2, 3, 42

BUILDING 42 UPPER FLOOR DEMO

FTR-1

HRP-1

HRP-1

HRP-1

HRP-1

FTR-1

FTR-1

HRP-1HRP-1 HRP-1 HRP-1

FTR-1

FTR-1 HRP-1

HRP-1

HRP-1

HRP-1

HRP-1

HRP-1

HRP-1

FCU

HWR

1/4"

1 1/4" HWR

1" 1"

1 1/4"

1"

H W

S

H W

S

3/4"

3/4"

HWR

HWS

HWS

HWR

H W

S H

W R

1/4"

1/4"

1/4"

1"

3/4"

1/4"1

1/4"

HRP-1 HRP-1

HRP-1 HRP-1 HRP-1 HRP-1

3/4"

1/2"

3/4" 2"

1"3/4"

1/2"

1"

2"

1/2"

1. REMOVE PIPING TO SCOPE OF

WORK MARK. LEAVE PIPING READY

FOR RECONNECTION.

2. SEE TEMPORARY PIPING PLAN THIS

SHEET.

3. CONNECT TEMPORARY PIPING TO

EXISTING. INSTALL TEMPORARY

PIPING BEFORE STARTING

DEMOLITION.

DEMOLITION KEY NOTES:#

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

2"

1/2"

1 1/2" HWS

1" HWR

1" H

W S

1 1/2" HWS

1" HWR

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

2W & 2C PIPING DEMOLITION

PLAN

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

MD105

689-402

JUNE 7, 2019 WAW WNW 113

1, 2, 3, 42

1/8" = 1'-0"

FIRST FLOOR DEMOLITION PIPING PLAN BUILDINGS 2W & 2C

FIRST FLOOR TEMPORARY PIPING PLAN BUILDINGS 2W & 2C

HRP-2

HRP-2

HRP-2

HRP-2

HRP-2

HRP-2

HRP-2 HRP-2

HRP-2

1/

4"

1/ 4"

H W

S

1/ 4"

1/

4" H

W R

1/

4"

1/ 4"

1/

4"

1/ 4"

1/

4"

1/ 4"

1/

4"

1/ 4"

1/

4"

1/ 4"1

1/ 4"

1/

4"

1/ 4"

1/

4"

DEMOLITION PLAN KEY NOTES:

1. PROVIDE TEMPORARY PIPING TO

PROVIDE UNINTERRUPTED SERVICE

TO THE REMAINDER OF THE BUILDING.

2. REMOVE PIPING TO SCOPE OF WORK

MARK.

3. CONNECT TEMPORARY PIPING TO

EXISTING. INSTALL TEMPORARY

PIPING BEFORE STARTING

DEMOLITION.

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

1/

4" H

W S

1/

4" H

W S

1/

4" H

W S 1

1/ 4"

H W

S

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

FOURTH FLOOR BUILDING 1

DEMOLITION PIPING PLAN

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

MD106

689-402

JUNE 7, 2019 WAW WNW 113

1, 2, 3, 42

1/8" = 1'-0"

FOURTH FLOOR DEMOLITION PIPING PLAN BUILDING 1

FOURTH FLOOR TEMPORARY PIPING PLAN BUILDING 1

2 1/2"2 1/2" HWR

1 1/4"1 1/4" HWR3"3" HWS

6"6" CWR

6"6" CWS

1 1/2"1 1/2" HWR 2 1/2"2 1/2" HWS

3/4"3/4" HWS

1 1 1

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

DEMOLITION PLAN KEY NOTES:

1. REMOVE PIPING TO SCOPE OF WORK

MARK. LEAVE READY FOR

RECONNECTION.

2. REMOVE PIPING TO SCOPE OF WORK

MARK. CAP AND REPAIR INSULATION.

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

BUILDING 2E DEMOLITION

PIPING PLAN

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

MD107

689-402

JUNE 7, 2019 WAW WNW 113

1, 2, 3, 42

BUILDING 2E DEMOLITION PIPING PLAN

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

FLOOR PLAN GENERAL NOTES:

A. PROVIDE NEW VAV BOX AND SUPPLY

DIFFUSERS.

B. PROVIDE NEW RETURN DUCTWORK.

CONNECT TO EXISTING MAIN RETURN.

C. REFER TO SHEET MP101 FOR

TERMOSTAT LOCATIONS.

KEY NOTES:

1. CONNECT TO EXISTING DUCTWORK.

2. EXHAUST DUCT UP TO EXHAUST FAN

ON ROOF.

3. UNDER CUT DOOR

40"x15"

30"x10"

40"x12"

"x

8"

"x

8"

"x

"x

7"

12"x8"

23"x8"

48"x17"

"x

8"x6"

8" x6

8" x6

"x

"x

8" x6

8" x6

8"x6"

10"x6"

36"x18"

OPEN

OFFICE

2W-117

EXAM

2W-118

EXAM

2W-119

ANTE

2W-124

WOMEN

ISO/PROC

2W-125

TOILET

2W-126

CORR

1C4

F TLT

2W-116

M TLT

2W-115

EXAM

2W-114

EXAM

2W-112

EXAM

2W-109A

EXAM

2W-108A

CORR

1C3

FMS

COMM

2W-128

ELEC

2W-129

HAC

2W-131A

TOILET

2W-113

TOILET

2W-110

CLEAN

UTIL

2W-131B

MED

2W-131C

EQUIP

2W-109B

EXAM

2W-108B

EXAM

2W-103B

CLEAN

STO

2W-103A

EXAM

2W-121

EXAM

2W-123

EXAM

2W-127

EXAM

2W-130A

EXAM

2W-130B

OIT COMM

2W-132A

CORR

1C5

PHARM D

2W-132B

CORR

1C1-02W

NURSE

MGR

2W-100

CORR

1C2

EXAM

2W-101

TOILET

2W-106

TOILET

2W-104

EXAM

2W-107B

CONF

2W-107A

EXAM

2W-105B

EXAM

2W-105A

OPEN

OFFICE

2W-102

OPEN

OFFICE

2C-1178

LINEN

2C-1181

EXAM

2C-1180

EXAM

2C-1179

VESTIBULE

2W-215

CORR

C1-1041

EXAM

2C-1174

EXAM

2C-1175

EXAM

2C-1176

EXAM

2C-1177

CORR

C2-2

EXAM

2C-1173

EXAM

2C-1172

EXAM

2C-1171

CORR

C2-1

EXAM

2C-1168

EXAM

2C-1167 OPEN

OFFICE

2C-1165

EXAM

2C-1166

SWITCHBOARD

2C-1164

TOILET

2C-1143

TRIAGE

2C-1144

TOILET

2C-1145

WAITING

2C-1141

RECEPTION

2C-1146

"x

8"

"x

6"x6"

"x

40"x12"

"x

8"

"x

"x

7"

12"x8"

48"x17"

"x

8"x6"

8" x6

8" x6

8" x6

"x

36"x18"

20"x8"16"x6"

8"x5"

"x

8"

"x

24"x12" 26"x10" 14"x12"

42"x16"

"x

40"x20"

40"x20"

16"x9" 12"x8"

"x

"x

12"x12"8"x12"

4" ø 8"x5"

6" x6

"x

8"

6" x6

8" x6

"x

8"

18"x8"

"x

8"

"x

8"

"x 8"

6"x6"

6"x6"

"x

8"

6" x6

" 8"x5" 8"x8"

6"x6"

8" x8

8" x6

"x 6"

10"x10" 18"x6"

"x

6"x6"

8" x8

8" x5

6"x6"

23"x8" 10"x8"

12"x8"

"x

"x

"x

5" x5

12"x12"

"x

"x

"x

18"x10"

10"x10"

8"x8"

"x

"x

26"x12"

"x

"x

"x

8"

"x

"x

10"x10"

10"x10"

"x

"x

36"x16"

"x

"x

26"x12"

"x

20"x14"

"x

"x

10"x10"

10"x10"

5"x5"

8"x8" 18"x8"

"x

8"

12"x8"18 "x

6"x6"

"x

8"

10"x10"

14"x6"

"x

8"

"x

8"

"x

6"x6"

8" x7

34"x10"

"x

"x

8"

"x

7"

10"x10"

10"x10"

8"x8"

6" x6

10"x8"

8" ø

34"x12"

6"x6"

6" x6

"x

6"x6"

"x

8"

40"x12"

"x

8"

"x 7"

12"x8"

48"x17"

"x

8"x6"

8" x6

8" x6

8" x6

"x

36"x18"

36"x16"

"x

"x

30"x12"

6"x6"

"x

8"

6" ø

"x

8"

"x 8"

10"x8"

"x

9"

"x 9"

"x

16"x10"

"x

40"x12"

"x

8"

"x 8"

"x

8"

"x

16"x7"

"x

7" 16 "x

"x

8"

12"x8"

"x

8"

48"x17"

"x

8"x6"

"x

8"

"x 8"

8" x6

8" x6

"x

8" x6

8" x6

"x

"x

36"x18"

A10

A8

A6

A6

A6

A8

A10

A10

A10

A10

A8 110A8

A10

A10

A10

A10

A10

A10

A10

A10

A10

A10

A10

A10

A8

A8

A8

A8

A6

A8

A6

A8

A8

A10

A10

A10

A10

A8

A10

A8

A8

A8

A8

A10

A10

A6

A8

A8

A6

A8

A8

A8

A8

A8

A8

A10

A10

A10

A10

A8

A8

A8

A8

A8

A8

A8

A8

A8

A8

A10

A10

A10

A10

A10

A10

A10

A10

A10

A6

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

E24/24

E24/24

E24/24

E24/24 50E24/24

E24/24

E24/24

G22/22

G22/22

E24/24

E24/24

G22/22

G22/22

G22/22

G22/22 85 G22/22

G22/22

E24/24

E24/24

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

2W -0

2C-04

2C-03

2C-01

2C -0

2C-10

2C-13

6" x6

10"ø

10"ø 10"ø

8"ø

"x

1 1

2C-05

6"ø 12"x8" 10"ø6"ø

"ø

8"ø

2C-12

2C-11

6" ø

8"ø

6" x6

10"ø

4"ø 4"ø

8" ø

8"ø

8"ø

2W-02

6"ø

8"ø

8"ø

2W-08

6" ø

14"ø

2W-11

2W-15

10"ø

A10

A6

10"x8"8"x8"8"ø

A8

A6

G22/22

E24/24

G22/22

G22/22

A6

A6

EXAM

2W-120

SOILED

UTIL

2W-122

HSS

2C-1182

SMALL

MED

2C-1169

PCMH

2C-1170

2W-14

2C-09

2W-07

G22/22

A6

A8

2C-02 10"x8"

A8

10"x8"2W-12

2W-13

6"x6"

"ø

8" x8

"2W-09

"x

10"x6"

8" x4

6" x6

10"x10"

8" x8

2W-01

14"ø

5" x5

10"ø

10"ø

"x

8" ø

E24/24

14"x10" 8"x8"6"x6"

"x

8"

E24/24

6" x6

"x

8" 8" x6

6"x6"

8" x8

E24/24

E24/24

E24/24

6" x6

AC-1

AC-2

AC-3

2C-08

2C-06

2W-03

2W-05

2W-10

6"x6"

6"ø

8" x8

" 6"ø

6"x6"

8"x7" 6"ø

5" x5

8"ø

8" x8

8" x6 "10

"ø

"ø

"ø

"ø

5"x5"

10"x10"

8" ø

8" ø

8" ø

8" ø

6" x6

"x

6" 8" x5

6" ø

6"ø

5" x5

" 8"ø

12"x8"

"x

A8

10"ø

8"x8"

"x

8"

10"x10"

10"x10"

6" x6

10"ø

10"ø

10"ø 10"ø

6"x6"

8"ø

FEDCBA

10"x8"

2W-17

2W-16

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

FIRST FLOOR NEW WORK

DUCTWORK PLAN BLDG 2W&2C

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

MH101

689-402

JUNE 7, 2019 WAW JLF 113

1, 2, 3, 42

FIRST FLOOR NEW WORK DUCTWORK PLAN BUILDINGS 2W & 2C

A B C ED F

EF-1

EF-3

CU-1

CU-2

CU-3

14"ø

EF-2

FEDCBA

EF-07

KEY NOTES:

1. DUCTWORK DOWN TO FIRST FLOOR SEE

SHEET MH101 FOR CONTINUATION.

2. REFRIGERANT PIPING DOWN TO FIRST

FLOOR SEE SHEET MP101 FOR

CONTINUATION.

3. EXISTING EXHAUST FAN TO REMAIN.

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

ROOF PLAN DUCTWORK PLAN

BUILDINGS 2W&2C

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

MH102

689-402

JUNE 7, 2019 WAW WNW 113

1, 2, 3, 42

ROOF PLAN NEW WORK DUCTWORK PLAN BUILDINGS 2W & 2C

24"x12"24"x10"

36"x28"

"x

10"x8"

"x

8"

"x

8"

12"x6"

"x

6"

"x

9"

24"x12"24"x10"

"x

10"x8"

"x

8"

"x 6"

"x

9"

24"x12"24"x10"

12"x4"

"x

10"x8"

"x

8"

"x 6"

"x

9"

48"x22"

48"x18"

"x

4"

8"x6"

10"x6"

12"x4"

32"x14"

"x

" 48"x18"

48"x22"

48"x14"

24"x12"24"x10"

10"x8"10"x8"

"x

8"

"x

4"

"x

36"x28"

40"x28"

"x

6"

"x 6"

"x

4"

40"x28"

"x

50"x20"

48"x15"

"x

6"

40"x24"38"x18"

"x

"x

"x

6"

"x

14"x6"12"x6"

"x

"x

8"

"x

"x

"x

"x

16"x12"

30"x14"

30"x14"28"x12"

12"x6"

10"x8"

"x

6"

18"x12"

"x

8"

12"x6"

10"x6"

"x

6"

"x

8"

12"x6"

"x

6"

12"x4"

10"x8"

"x

9"

"x

6" 14 "x

8"

"x

10"x6"

G22/22

A8

A8

A8

A8

A8

A8 135 A6

A6

A6

A6

A6

G22/22

G22/22

34"x14"

"x

6"

"x

8"

"x

8"

6" ø6" ø

16"x8"

14"x6"

2E1-01

2E1-02

2E2-01

46"x16"

EA

SA

RA

SA

EA

1 1

6"ø

A6

2E1-04

"x

8" 8" ø

8"ø 5" ø

8" x8

8"x8"

8"ø

"x

8"ø

8"ø

8" ø

"x

"x

20"x12"

G22/22

A8

A8

A8

A8

A8

A8

12"x10"

8" ø 8" ø

8"ø

8"ø

12"x10"

8" ø

8" ø

2E2-03

2E2-02

8"ø

"ø

8" ø

8" ø

12"x10"

8" ø

8" ø

A8

G22/22 100 G22/22

G22/22

10012"x10"

6"ø A6

A6

A6

A6

G22/22

6"x6"

6"ø 2E2-07 4"ø G22/22

10"x10"

G22/22

A8

A8

G22/22

6" x6

"x

12"x10" 8" ø

6" ø

"ø 6"ø

8"ø

"ø

2E2-08

A8

8"ø

"x

8" ø

A8

8" ø

A8 250 E24/24

E24/24

8"x4"8"x6"

6"ø A6

10"x10"

8" ø

8" ø

10"x10"

8" ø

8" ø

6" ø

2E1-03

6" ø

8"ø

6"ø6" ø

14"x12"

2E2-06

2E2-04

2E2-05

A8

E24/24 80A8

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

FLOOR PLAN GENERAL NOTES:

A. PROVIDE NEW VAV BOX AND SUPPLY

DIFFUSERS.

B. PROVIDE NEW RETURN DUCTWORK.

CONNECT TO EXISTING MAIN RETURN.

KEY NOTES:

1. CONNECT TO EXISTING DUCTWORK.

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

PLAN

NORTH

TRUE

NORTH

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

BASEMENT NEW WORK

DUCTWORK PLAN BUILDING 2E

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

MH103

689-402

JUNE 7, 2019 WAW JLF 113

1, 2, 3, 42

BASEMENT NEW WORK DUCTWORK PLAN BUILDING 2E

36"x12"

"x

6"

"x

8"

"x

6"

"x

6"

"x

6"

"x

8"

"x

6"

"x

6"

"x

8"

"x

6"

28"x8"

"x

6"

"x

6"

"x

8"

"x

6"

"x

"x

"x

6"

"x

"x

8"

24"x8"

"x

7"

"x

8"

14"x10"

"x

8"

16"x10"

8" x6

"x 8"

18"x6"22"x9"

36"x12"

A6

A8

A8

A8

A8

A8

A8

A8

A8

A8

A8

A8

A8

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

G22/22

1A42-02 1A42-05

1A42-03

1A42-04

1A42-01

"ø

"ø

12"x12" 12"ø

8"ø

4"ø

8" ø

"ø

6" ø

8" ø

8"ø

8"ø

8" ø

A8

6"x6" 8"ø

G22/22

"x

8" ø

8" ø

OPEN

OFFICE

1-434 OFFICE

1-434A

OFFICE

1-434C

SMALL

CONF

1-434D

OPEN

OFFICE

1-445

OFFICE

1-445A

OPEN

OFFICE

1-445

"x

7"

8" ø

"x

7"

"x

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

"x

10"x10"

8" ø

8"ø

"x

10"x10"

8" ø

8"ø

A8

A8

A8

A8

R R

C C

HP-1

AHU-1

TAHU-1

FITNESS

3-201

FLOOR PLAN GENERAL NOTES:

A. PROVIDE NEW VAV BOX AND SUPPLY

DIFFUSERS.

B. PROVIDE NEW RETURN DUCTWORK.

CONNECT TO EXISTING MAIN RETURN.

KEY NOTES:

1. CONNECT TO EXISTING DUCTWORK.

2. ROUTE REFRIGERANT LINE SET DOWN TO

CONDENSING UNIT LOCATED ON GRADE.

3. REUSE O.A. INTAKE LOUVER IN WINDOW

PANE. BALANCE TO 150 CFM.

4. ROUTE CONDENSATE DRAIN TO DRY WELL

AT GRADE. SEE DETAIL ON SHEET M013.

5. PROVIDE AHU. COORDINATE WITH

WORKOUT EQUIPMENT. ROUTE DUCTWORK

UP ABOVE CEILING. EXPOSED DUCTWORK

SHALL BE DOUBLE WALL READY FOR

FINISHING PAINT.

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

FOURTH FLOOR NEW WORK

DUCTWORK PLAN BUILDING 1&3

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

MH104

689-402

JUNE 7, 2019 WAW JLF 113

1, 2, 3, 42

1/8" = 1'-0"

FOURTH FLOOR NEW WORK DUCTWORK PLAN BUILDING 1

SECOND FLOOR NEW WORK BUILDING 3

A8

A8

G22/22

G22/22

A10

A8

A10

A6

A10

A10

G22/22

G22/22

G22/22

A6

G22/22

"x

A8

G22/22

8"x5"

G22/22

G22/22

A8

A8

A6

G22/22

A8

A8

G22/22

G22/22

A10

A10

A10

A10

G22/22

G22/22

"x

8"

6"ø 14"x12"

"ø

8" ø

8" ø

15"x10" 25"x12"

"x

"x

7"

21"x16" 16"x16"

"x

"x

14"x12"12"x12"

"x

7"

11"x8"

8" ø 8" ø

6" ø

10"x10"

"x

"x

"10"x10"

"x

8"

10"x8"

"x

10"x10" 10"x10"

8" x5

8"x8"

10"x10"8"ø

8" x5

"x

14"x14"

"x

6" ø

6" ø

6"ø

6" ø

B42-01

B42-02

B42-03

B42-04

B42-05

B42-06

B42-07

B42-09

B42-08

1/2" 1/2"

1/ 2" 1/

2"

1/2"

1/2"

2 1/2"2 1/2" CWS

2 1/2"2 1/2" CWR

3/ 4"

3/ 4"

H W

R 3/

4" 3/

4" H

W R

1/ 2"

1/ 2"

H W

R 1/

2" 1/

2" H

W S

1"1" HWS

1"1" HWR

1" 1"

H W

S 1"

1" H

W R

3/4"3/4" HWS3/4"3/4" HWR

TEAM

42-206

VOCATIONAL

42-205

GRANT

42-204

STO

42-201A

HCHV

42-201

CORR

42-207

HUDVASH

42-209

HAC

42-214

HUDVASH

42-216

HUDVASH

42-217

HUDVASH

42-218

MECH

42-219

OFFICE

42-213

SUPERS

42-211

WAITING

42-202

TLT

42-208

CORR

42-203

CORR

42-215

12"x8"

A8

8" x8

8"x8"

E24/24

E24/24

MH105

9"x6"

5" x5

"x

8"x8"

6" x6

9" x5

8"ø

6" ø

8" ø

"x

6"x6"

T

T T

B42-02

B42-01 B42-08

T B42-03

T B42-04

T B42-05

T B42-07TB42-06

1" D

FLOOR PLAN GENERAL NOTES:

A. COORDINATE ROOF PENETRATIONS

WITH EXISTING STRUCTURE. EXISTING

STRUCTURE IS 2' PANEL. DUCT

PENETRATIONS SHALL NOT CUT MORE

THAN ONE PANEL ( SEE STRUCTURAL

DRAWINGS). RTU OPENING SHALL BE

COORDINATED SO THAT OPENING

ALLOWS FOR ROOF

PENETRATION/CUT OPENING OF ONLY

ONE PANEL.

B. BOTH DUCTWORK AND PIPING ARE

SHOWN ON THIS PLAN.

KEY NOTES:

1. CONNECT TO EXISTING CHILLED

WATER PIPING. EXISTING PIPING IS

LOCATED ABOVE THE CORRIDOR

CEILING AND HAS ISOLATION VALVES

AND BLIND FLANGES PROVIDED FOR

CONNECTION.

2. PROVIDE ISOLATION VALVES AND

BLIND FLANGES FOR FUTURE

CONNECTION. PROVIDE VALVE TAG

STATING FUTURE: XXX GPM.

3. DUCTWORK UP TO ROOF TOP UNIT.

4. WINDOW PROVIDES ACCESS TO

LOWER ROOF AND EXTENSION

LADDER TO UPPER ROOF.

5. PIPING UP TO RTU PROVIDE PIPING

DOG HOUSE ON RTU.

6. CONNECT TO EXISTING DUCTWORK AT

THIS APPROXIMATE LOCATION.

7. CONNECT TO EXISTING 1" STEAM LINE

AT THIS APPROXIMATE LOCATION.

8. CONNECT TO EXISTING 1"

CONDENSATE RETURN LINE AT THIS

APPROXIMATE LOCATION

9. SEE LARGE SCALE MECHANICAL

ROOM PLAN FOR CONTINUATION.

10. EXHAUST DUCT…