Attachment 8 - Mechanical Set Final.pdf
PDF 2 MB Posted
- Solicitation number
- 36E77620B0003
About this file
This notice provides details for an upcoming construction project solicitation for the Expand Primary Care Clinic at the Newington VA Medical Center in Newington, Connecticut. The project scope involves renovating and expanding approximately 25,000 square feet of primary care clinic space by renovating 20,000 square feet in Buildings 2C and 2W and constructing a new 5,000 square foot structure. Additional space will be renovated in Buildings 1, 2E, 3, and 42 to relocate offices and services. The construction budget is estimated between $5-10 million. The solicitation will be issued as a total Service-Disabled Veteran-Owned Small Business set-aside invitation for bid on or about March 31, 2020. The contract performance period is approximately 600 calendar days from notice to proceed. Questions must be submitted in writing by the specified date. The applicable NAICS code is 236220 with a $39.5 million size standard.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# CONSTRUCTION NOTE IDENTIFICATION
INDICATES ITEM TO BE PROVIDED
FLEXIBLE DUCT CONNECTION
VERTICAL FIRE DAMPER
VOLUME DAMPER
CEILING RETURN, EXHAUST OR TRANSFER REGISTER
CEILING SUPPLY DIFFUSER
MITERED ELBOW WITH TURNING VANES
RETURN DUCT TURNING UP
RETURN DUCT TURNING DOWN
EXHAUST DUCT TURNING UP
EXHAUST DUCT TURNING DOWN
SUPPLY DUCT TURNING UP (ROUND OR RECTANGULAR)
SUPPLY DUCT TURNING DOWN (ROUND OR RECTANGULAR)
10"x10" SQUARE OR RECTANGULAR DUCTWORK
PIPE TURNING UP
PIPE TURNING DOWN
THERMOSTAT (C=COOLING, H=HEATING,
H,C=HEATING AND COOLING
F10/6
(CFM)
EXHAUST GRILLE DESIGNATION
WITH CFM INDICATED
A6
(CFM)
CEILING DIFFUSER DESIGNATION
WITH CFM INDICATED
G20/20 RETURN GRILLE DESIGNATION
GENERAL
DUCTWORK
MOTORIZED CONTROL DAMPER
INDICATES ROUND DUCTWORK
FLEXIBLE CONNECTION
RETURN, EXHAUST OR TRANSFER AIR FLOW
SUPPLY AIR FLOW
ACCESS DOORAD
ABOVE FINISHED FLOORAFF
ABOVE FINISHED GRADEAFG
ALUMINUMALUM
ARCHITECTURALARCH
DIAMETERDIA
DRAWINGDWG
EXISTINGEX
EXISTING TO REMAINEXR
GAUGEGA
GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFCI
MISCELLANEOUSMISC
NOT IN CONTRACTNIC
TYPICALTYP
UNLESS OTHERWISE
NOTED
UON
GALVANIZEDGALV
RUN THRU JOISTSRBJ
REMOVE EXISTINGREX
AUTOMATIC AIR VENT
VALVES AND ACCESSORIES
AUTOMATIC FLOW CONTROL VALVE
BACKFLOW PREVENTER
BALL VALVE
BOTTOM CONNECTION
BUTTERFLY VALVE
CAPPED PIPE
CHECK VALVE
CLEAN OUT
CONCENTRIC REDUCER
DIRECTION OF FLOW
ECCENTRIC REDUCER
FLANGED CONNECTION
FLEXIBLE CONNECTION
FLOW METER
BALL VALVE FOR 2" & UNDER
BUTTERFLY FOR 2.5" AND LARGER
GLOBE VALVE
MANUAL AIR VENT
METERED BALANCING VALVE
W/PRESSURE TAPS
PRESSURE/TEMPERATURE TEST PLUG
PT
NEEDLE VALVE
PLUG VALVE
PIPE ANCHOR (W=WALL, C=CEILING, F=FLOOR)W,C,F
PIPE GUIDE
PIPE SLEEVE
PITCH
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
PRESSURE GAUGE WITH GAUGE COCK
SQUARE HEAD COCK
STEAM TRAP
STRAINER
STRAINER W/BLOW DOWN VALVE
THREE WAY CONTROL VALVE
TWO WAY CONTROL VALVE
THERMOMETER
THERMOSTATIC RADIATOR VALVE
TOP CONNECTION
UNION
VACUUM BREAKER
CONTROLS
ANALOG INPUT (TO PANEL)
ANALOG OUTPUT (OUT OF PANEL)
DIGITAL INPUT (TO PANEL)
DIGITAL OUTPUT (OUT OF PANEL)
TWO WAY CONTROL VALVE
THREE WAY CONTROL VALVE
BYPASS TIMER SWITCH
COMMON
CONTROL WIRING (SIGNAL PATH)
DATA TERMINAL CABINET
DIFFERENTIAL PRESSURE SWITCH
DIFFERENTIAL PRESSURE SENSOR
DUCT SMOKE DETECTOR
FAN ON-OFF SWITCH
FAN VARIABLE SPEED SWITCH
AI
DI
DO
C
FLOW MEASURING SYSTEM
FIRESTAT
FREEZESTAT
HIGH LIMIT TEMPERATURE SENSOR
HUMIDISTAT
LOW LIMIT TEMPERATURE SENSOR
LOCAL TEMPERATURE CONTROL PANEL
MOTOR
MOTORIZED CONTROL DAMPER
MOTOR STARTER
NORMALLY CLOSEDNC
NORMALLY OPENEDNO
POWER WIRINGEP
SENSOR
STATIC PRESSURE SENSOR
STATIC TOTALIZER STATION
SWITCH
ZONE TEMPERATURE SENSOR
TEMPERATURE TRANSMITTER
H,C
TIME CLOCK
VALVE IDENTIFICATION
CSR CURRENT SENSING RELAY
NORMALLY OPEN CONTROLS
NORMALLY CLOSED CONTROLS
CWR
HPS
HPC
MPS
MPC
HWS
HWR
LPS
PC
V
R
LPC
D
CWS
CHILLED WATER RETURN
MEDIUM PRESSURE CONDENSATE
DOMESTIC HOT WATER RECIRCULATING
HIGH PRESSURE STEAM
MEDIUM PRESSURE STEAM
LOW PRESSURE STEAM
HOT WATER SUPPLY
HOT WATER RETURN
REFRIGERANT LINE SET
STEAM VENT LINE
PUMPED CONDENSATE
LOW PRESSURE CONDENSATE
HIGH PRESSURE CONDENSATE
DIRECTION OF FLOW
DOMESTIC HOT WATER
DOMESTIC COLD WATER
CONDENSATE DRAIN LINE
CHILLED WATER SUPPLY
PIPING
FLEXIBLE DUCT CONNECTION
LEGEND
M
M
M
AO
S
P
T
TT
TC
DTC
DPS
DSD
FMS
FZ
HL
LL
TCP
MS
STS
V-1
BT
DP
F
VSF
FS
H
S
T
SUPPLY DUCT TURNING UP (OVAL)
SUPPLY DUCT TURNING DOWN (OVAL)
10"/10" OVAL DUCTWORK
DUCTWORK TO BE DEMOLISHED
SCOPE OF WORK MARK
GENERAL NOTES
1. SEE ARCHITECTURAL DRAWINGS FOR EXACT BUILDING DIMENSIONS AND DETAILS. THESE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE NOT TO BE SCALED. THE CONTRACTOR SHALL VISIT THE JOB SITE BEFORE WORK BEGINS
TO VERIFY ALL DIMENSIONS. NOTIFY THE COR OF ANY CONFLICTS.
2. COORDINATE DUCT ROUTING AND EQUIPMENT LOCATIONS WITH PLUMBING AND ELECTRICAL INSTALLATIONS AND WITH BUILDING STRUCTURAL MEMBERS. OFFSET DUCTS AND SHIFT EQUIPMENT AS REQUIRED TO AVOID CONFLICTS.
3. COORDINATE LOCATIONS OF CEILING REGISTERS AND DIFFUSERS WITH LIGHTING LAYOUT AND REFLECTED CEILING PLAN.
4. DUCT SIZES INDICATED ARE CLEAR INSIDE DIMENSIONS REQUIRED. WHERE DUCT LINER OCCURS, INCREASE SHEET METAL
DUCT SIZES TO ACCOMMODATE LINER.
5. REFER TO ELECTRICAL DRAWINGS FOR VOLTAGE REQUIREMENTS OF ALL EQUIPMENT.
6. SUPPORT ALL DUCTS, PIPING, AND EQUIPMENT FROM PRIMARY BUILDING STRUCTURAL MEMBERS. PROVIDE ADDITIONAL
STRUCTURAL MEMBERS WHERE NECESSARY TO ACCOMPLISH THIS REQUIREMENT.
7. EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED FROM THE PROJECT SITE IN ITS ENTIRETY INCLUDING ALL HANGERS, ELECTRICAL CONDUIT, WIRING, ELECTRICAL JUNCTION BOXES, PIPING, CONTROLS AND ACCESSORIES
RENDERED USELESS OR ABANDONED BY THE REMOVAL OF THE INDICATED EQUIPMENT.
8. THE TEST AND BALANCE CONTRACTOR SHALL BE A SUB-CONTRACTOR TO THE PRIME CONTRACTOR AND NOT A SUB-
CONTRACTOR TO THE MECHANICAL CONTRACTOR.SEE GENERAL
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
LEGEND AND GENERAL NOTES EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
M001
689-402
JUNE 7, 2019 WAW JLF 113
1, 2, 3, 42
MARK
NOTES:
GENERAL NOTE:
MARK SF=SUPPLY FAN
MARK EF=EXHAUST FAN
MARK RF=RETURN FANMAX.
OPER.
WEIGHT
(LBS)
MAX.
TIP
SPEED
F.P.M.
MOTOR
B E
LT
D
IR
E C
T
DRIVE
B
IR
D S
C R
E E
N
E
LE
C
TR
IC
D
A M
P E
R
G R
A V
IT
Y
D A
M P
E R
R O
O F
C U
R B
ACCESSORIES
C O
O K
C.F.M.
MNFR
G R
E E
N H
E C
K
1. ROOF-TOP CENTRIFUGAL
2. CENTRIFUGAL VENTILATION SET
3. EXISTING FAN. REBALANCE TO VALUES GIVEN.
NOTES
NOTES
1. SOUND POWER INDICATED AT SUPPLY OUTLET.
SOUND POWER DATA RE 10 WATTS OCTAVE BAND
CENTER FREQUENCY HZ
MNFRTYPE
C U
S
TO
M
V A
V
M U
LT
I Z
O N
E
S
IN
G
LE
Z O
N
EMARK
SUPPLY FAN
RPMTYPE
E.A.T.
R.P.M.H.P.
C
LA
S S
S.P.
MOTOR
R E
-H E
A T
P R
E -H
E A
T
L.A.T.
COOLING COIL
MAX.
OPER.
WEIGHT
(LBS)
HEATING COIL
50025012563 NOTES800040002000
C A
R R
IE
R
-M O
D U
LA
R
LB/HR
A
IR
FR
IC
TI
O
N
IN
.W .G
FR
IC
TI
O
N
IN
. W .G
. A
IR
G .P
.M . A
T
F
E .W
.T
E X
TE
R
N A
L
IN
. W .G
TO
TA
L
IN
. W .G
MOTORRETURN/RELIEF FAN
H.P. R.P.M.TYPE RPM
C
LA
S S
E .S
.P
IN
. W
.G
MODEL
SERIES
MAX.
C.F.M.
MIN.
C.F.M.
MIN.
O.A.
C.F.M.
MAX.
C.F.M.
MIN.
C.F.M.
TOTAL
MBH
CLG
MIN.
FACE
AREA
SQ.FT.
d.b.
°F w.b.
°F w.b.
°F d.b.
°F
W.P.D.
FT.
TOTAL
MBH
HTG
MIN.
FACE
AREA
SF.
E.A.T.
°F
L.A.T.
°F W.P.D.
FT.
MODEL
NO.
MAX.
HP.
E.S.P.
IN.
W.G.
MAX.
NOISE
SONES
1. PAINT FLAT BLACK INTERIOR DUCT SURFACES VISIBLE FROM OUTSIDE THE GRILLE.
2. PROVIDE FACTORY INSULATION BLANKET ON BACK OF DIFFUSER.
NOTES
ACCESSORIES
C
LR
B Y
A R
C H
A
LU
M
IN
U M
(A L)
A L
W
IT
H S
TL
F
R A
M E
O P
P B
LA
D
E D
A M
P E
R
P A
R B
LA
D
E D
A M
P E
R
MODEL NO.MARK FACE NECK
D
IF
FU
S
E R
LI
N
E A
R S
LO
T
G R
IL
LE
A C
U
TH
E R
M
LO
U
V E
R
TI
TU
S
S
TE
E L
(S
TL
P R
IM
E
R
O
FF
W H
IT
E
SIZE TYPE MNFR MATERIAL FINISH
FI
R
E D
A M
P E
R
- W
A Y
C O
R N
E R
E Q
U A
LI
ZI
N G
G R
ID
- W
A Y
FL
O
O R
T O
B O
TT
O
M
LA
Y
-IN
P
LE
N U
M
S U
R
FA
C E
FL
U
S H
- W
A Y
C E
IL
IN
G
- W
A Y
- W
A Y
NOTES
MTG HT.MOUNTING THROW
MAX.
LOSS
IN.
W.C.
MAX.
NC MARK NOTES:
MAX.
ENCLOSURE
MIN. FIN
TUBE (WXH)
MIN.
TUBE
DIA.
DIMENSIONSPERFORMANCE
1. PEDESTAL TYPE.
2. PROVIDE LENGTHS AS INDICATED ON PIPING DRAWINGS. CONTRACTOR TO COORDINATE ENCLOSURE LENGTHS
WITH FIELD VERIFIED ARCHITECTURAL DIMENSIONS.
NOTES
BTU/LF MAX. WATER
PD (FT/100 LF)
(WXH)
MARK NOTES:
S
IN.
PIPE SIZEPERFORMANCE
1. PROVIDE LENGTHS AS INDICATED ON PIPING DRAWINGS. CONTRACTOR TO COORDINATE ENCLOSURE LENGTHS
WITH FIELD VERIFIED ARCHITECTURAL DIMENSIONS.
NOTES
BTU/LF
MEAN
WATER
TEMP
(°F)
ROOM
AIR
TEMP
(°F)
WIDTH R
IN.
HRP-1 150 170 70 12 3/4 3/4 1;
HRP-2 187 170 70 15 3/4 3/4 1;
FTR-1 500 5 2.5 X 2.25 5.5 X 6.75 3/4" 1;2;A6
G 22/22
24X24
24X24
30 0.10
30 0.10
1;2;
1;2;
TMS
PAR
EF-1
EF-2
EF-3
230 0.5 *
G *
1;
1;
2;SFD
G
1/10 35 4,450 7.7
830 0.75 1/2 45 3,106 11.7
180 0.3 1/20 35 4,413 7.7
NOTES
1. STEAM TO WATER HEAT EXCHANGER.
LB/HR
S H
E
LL
T
U B
E
P
LA
TE
F R
A M
E
MARK
HIGH TEMPERATURE SIDE
G.P.M.
TYPE
SERVICE LWT
°F
EWT
°F
FOULING
FACTOR
MAX.
PRESS.
DROP
FT. W.G.
WATER
PRESS.
P.S.I.G.
STEAM
LOW TEMPERATURE SIDE
FOULING
FACTOR
EWT
°F
GPM
PRESS.
DROP
FT. W.G.
NOTES
6"
A8 24X24 * * * ** 30 0.10 1;2;TMS8"
A10 24X24 * * * ** 30 0.10 1;2;TMS10"
22X22
E 24/24 24X24 * * * ** 30 0.10 1;2;PAR22X22
NOTES
1. IN-LINE CLOSE COUPLED PUMP
MAX.
MOTOR HP.
TA
C
O
B
G
MARK
MNFR
CAPACITY
G.P.M.
MODEL
SERIES
NO.
WATER
HEAD FT.
W.G.
NOTES
SERVICE
FLUID
LWT
°F
PMP-1 * 008 5.10 13 0.10 WATER 1;
HX-1 STEAM * 5.0 0.0001 150 180 5.1 0.03 1;
RTU-42 * * 39MW 3035 2020 1400 PL 3554 4.28 1.5 II 5 3600 3035 2020 AF 2989 1.0 II 5 3600 116 5.9 81.8 66.6 54.46 54.08 23.2 1.04 3.3 * 96.0 3.31 25 69 98.93 0.61 5800 94 90 86 91 84 84 84 84 1;
C A
R R
IE
R
MARK
A A
O N
NOTES
TOTAL
COOLING
MBH
MODEL
NO.
HEATING MBH
MIN.
SEER
MNFR
M
IT
S U
B S
H I
NOTES
MODEL
NO.
MARK
M
IT
S U
B S
H I
A A
O N
C A
R R
IE
R
MNFR
NOTES
HEATING
MBH
SENSIBLETOTAL
COOLING
MBH
MAX.
1. AIR HANDLING UNIT AND CONDENSING UNIT SHALL BE OF SAME MANUFACTURER AND BE SPECIFICALLY DESIGNED TO OPERATE AS A SET.
2. WALL HUNG AIR HANDLING UNIT.
3. PROVIDE HARD WIRED THERMOSTAT.
CU-1 * MUZ-GL 12 14.4 23.1 1;2;3;4;
NOTES
1. COOLING CAPACITY BASED 0N 95°F AMBIENT AIR TEMPERATURE.
2. HEATING CAPACITY BASED ON 47°F AMBIENT AIR TEMPERATURE.
3. CONDENSING UNIT AND AIR HANDLING UNIT SHALL BE OF SAME MANUFACTURER SPECIFICALLY DESIGNED OPERATE AS A SET.
SUPPLY
C.F.M.
O.A.
C.F.M.
MIN.
EER
CU-2 * MUZ-GL 12 14.4 23.1 1;2;3;4;-
CU-3 * MUZ-GL 12 14.4 23.1 1;2;3;4;-
EF-4 * * * 1;G75 0.2 1/20 35 4,413 7.7*
COOLING
MBH W
E.S.P.
IN.
W.G.
HP-1 25HCB 34.9 31.8 16.5 13.0* 3;
AC-1 MSZ-GL 200 0 0 30W 12.0 - 14.4 1;2;3;
*AC-2 MSZ-GL 200 0 0 30W 12.0 - 14.4 1;2;3;
*AC-3 MSZ-GL 200 0 0 30W 12.0 - 14.4 1;2;3;
FV4C 1000 150 0 - 34.9 21.6 31.8 1;AHU-1
EF-5 * 1;G75 0.2 1/20 35 4,413 7.7* * *
EF-6 3;-750 0.75 - - - -*
79.1
PRESS.
P.S.I.G.
5.0
FAN SCHEDULE
AIR HANDLING UNIT SCHEDULE
AIR DEVICE SCHEDULE HOT WATER FIN TUBE RADIATOR
HYDRONIC RADIANT CEILING PANELS
HEAT EXCHANGER SCHEDULE
PUMP SCHEDULE
CONDENSING UNIT SCHEDULE
AIR HANDLING UNIT SCHEDULE
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
SCHEDULES EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
M011
689-402
JUNE 7, 2019 WAW JLF 113
NOTES
1. MAXIMUM AIR PRESSURE DROP FOR TERMINAL IS SUM OF DESIGN DROP AND COIL DROP AT MAXIMUM C.F.M.
2. N.C. LEVEL BASED ON 10dB ROOM ABSORPTION, RE RAISED TO THE -12 WATTS.
3. PRIMARY AIR VALVE C.F.M. SHALL NOT EXCEED MANUFACTURER'S "NOMINAL C.F.M.".
PRIMARY AIR
MARK MODEL NO.
S H
U
TO
FF
R E
H E
A T
D U
A L
D U
C T
S E
R
IE
S F
A N
P A
R A
LL
E
L
FA
N
E N
V
IR
O -T
E C
TI
TU
S
TYPE MNFR
INLET OUTLET
PRESSURE DUCT CONN.
WATER
TEMP.
ENT./LVG.
AIR
HANDLING
SYSTEM
H O
T W
A
TE
R
E
LE
C
TR
IC
AIR
TEMP.
ENT./LVG.
G.P.M.
HEATING COIL
C.F.M. HP.
FAN
NOTES
D E
S
IG
N
IN
LE
T
S
TA
TI
C
IN
.W
.G
D E
S
IG
N D
R O
P
IN
. W .G
. M A
X
A
IR
F R
IC
TI
O N
IN
W .G
MAX.
C.F.M.
MIN.
C.F.M.
CAP.
MBH
PRESS.
DROP
FT.
W.G.
E.S.P.
IN.
W.G.
MAX.
NOISE
NC.
CONTROL
SEQUENCE
C O
N N
E C
TI
O
N S
P
IP
E
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/9055/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/90
55/85
55/85
55/90
55/90
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
180/150
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1-AHU42
1-AHU42
1-AHU42
1-AHU42
1-AHU42
2E-AHU-2
2E-AHU-2
2E-AHU-2
2E-AHU-1
2E-AHU-1
2E-AHU-1
2C-AHU-1
2C-AHU-1
2C-AHU-1
2C-AHU-1
2C-AHU-1
2C-AHU-1
2C-AHU-1
2C-AHU-1
2C-AHU-1
2C-AHU-1
2C-AHU-1
2C-AHU-1
2C-AHU-1
2W-AHU-1
2W-AHU-1
2W-AHU-1
2W-AHU-1
2W-AHU-1
2W-AHU-1
2W-AHU-1
2W-AHU-1
2W-AHU-1
2W-AHU-1
2W-AHU-1
2W-AHU-1
2W-AHU-1
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
DESV
1A42-01
1A42-02
1A42-03
1A42-04
1A42-05
2E2-01
2E2-02
2E2-03
2E1-01
2E1-02
2E1-03
2C-01
2C-02
2C-03
2C-04
2C-05
2C-06
2C-07
2C-08
2C-09
2C-10
2C-11
2C-12
2C-13
2W-01
2W-02
2W-03
2W-04
2W-05
2W-06
2W-07
2W-08
2W-09
2W-10
2W-11
2W-12
2W-13
2W-14
2W-15
NOT USED
615 14 20X18
14 20X18
6 12X8
6 12X8
6 12X8
12X8
6 12X8
6 12X8
6 12X8
6 12X8
6 12X8
6 12X8
6 12X8
6 12X8
8 12X10
8 12X10
8 12X10
8 12X10
10 14X12
12X10
8 12X10
8 12X10
8 12X10
8 12X10
10 14X12
10 14X12
10 14X12
23.2 1.55
0.86
22.4 1.49
16.6 1.11
8.1 0.54
8.7 0.58
14.2 0.95
7.6 0.50
21.9 1.46
8.7 0.58
9.5 0.63
7.9 0.53
16.3 1.08
26.1 1.74
9.3 0.62
5.9 0.39
17.0 1.13
8.5 0.57
5.9 0.39
15.1 1.01
7.6 0.50
34.8 2.32
5.9 0.39
9.5 0.63
14.2 0.95
9.5 0.63
5.7
4.5 0.30
7.2 0.48
9.1 0.60
11.3 0.76
18.9 1.26
9.1 0.60
4 12X8
4 12X8
4 12X8
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
1;2;3;
DESV**B42-2 385 6 12X8
DESV**B42-1 660 55/90 180/150RTU-42 *
55/90 180/150* 6.6 0.44
55/90 180/150* 55/90 180/150* 7.6 0.50
55/90 180/150* 55/90 180/150* 7.6 0.50
55/90 180/150* 7.6 0.50
DESV**B42-4 405 8
DESV**B42-3 730
DESV**B42-6 250 6 12X8
DESV**B42-5 180 6 12X8
1;2;3;
1;2;3;
55/90 180/150* 10.4 0.69
55/90 180/150*
DESV*
*B42-7 250
*B42-9 475 *B42-8 455
DESV
DESV
6 12X8
55/90 180/150 30 1;2;3;2W-AHU-1DESV ***470 420 8 7.6 0.50
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
3'
55/90 180/150 30 1;2;3;2E-AHU-1DESV ***2E1-04 6 12X8 3'
55/90 180/150 30 1;2;3;2E-AHU-2DESV ***2E2-04 3'
55/90 180/150 30 1;2;3;2E-AHU-2DESV ***2E2-05 6.6 0.44 3'
55/90 180/150 30 1;2;3;2E-AHU-2DESV ***2E2-06 3'
55/90 180/150 30 1;2;3;2E-AHU-2DESV ***2E2-07 4.2 0.28 3'
55/90 180/150 30 1;2;3;2E-AHU-2DESV ***2E2-08 3'
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
1 0.35
12X10
12X10
8 12X10
8 12X10
8 12X10
8 12X10
8 12X10
8 12X10
6 12X8
4 12X8
6 12X8
4 12X8
14X12
RTU-42
RTU-42
RTU-42
RTU-42
RTU-42
RTU-42
RTU-42
RTU-42
4.5 0.30
11.3 0.76
11.3 0.76
5.7
11.3 0.76
4.5 0.30
9.5 0.63
4.5 0.30
9.5 0.63
11.3 0.76
4.5 0.30
11.3 0.76
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
12X10
12X10
12X10
12X10
12X10
55/90
55/90 180/150
180/150
1;2;3;
1;2;3;2W-AHU-1
2W-AHU-1
DESV
DESV
*60
4 10X8
4 10X8
2.3
1.3
3'
3'
1 0.35
1 0.35
0.15
0.15
2W-16
2W-17
13400
0.15
0.09
0.38
0.38
V.A.V. TERMINAL SCHEDULE
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
SCHEDULES EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
M012
689-402
JUNE 7, 2019 WAW WNW 113
CWS
CWR
2' MAX
24"
30"
12"MIN.
SCALE: NONE
MAINS
1/2" CLOSE NIPPLE
DIRECTION OF FLOW
SERVICE TEE OR WELDOLET
CONCENTRIC REDUCER
1/4" COPPER TO FLOOR DRAIN "P"
1/2" GATE VALVE
1/2" CLOSE NIPPLE
AUTOMATIC AIR VENT.
1/8"NPT x 1/4" FLARE ELL
TRAP DRAIN PAN OR OUTSIDE.
SCALE: NONE
HWS
HWR
SEE FLOOR PLANS FOR CONTINUATION
OF PIPING
2-WAY HOT WATER
CONTROL VALVE
TEST PLUG TYPICAL
TEMPERATURE/PRESSURE
STRUCTURE USING DROP RODS
SUPPORT UNIT FROM
VAV OR FAN TERMINAL
MANUAL AIR VENT
FIXED VENTURI TYPE
BALANCING VALVE (TYP)
PITCH
PITCH
BI-FLOW SOLENOID VALVE (SOLENOID DROP
CONTROL), FOR HEAT PUMPS
ISOLATION VALVE
ISOLATION VALVE
ISOLATION VALVE
TXV (HARD SHUT-OFF TYPE FOR COOLING
ONLY UNITS)
TO FLOOR SINK
FILTER DRIER
SIGHT GLASS
DX COIL
OIL TRAP
CONDENSING
UNIT
CONTRACTOR AND MANUFACTURER ARE
RESPONSIBLE FOR CORRECTLY SIZING
REFRIGERANT LINES TO ENSURE THAT
EQUIPMENT DELIVERS FULL SCHEDULED
CAPACITY WITHOUT NEGATIVELY IMPACTING
THE LIFE OF THE EQUIPMENT. WHEN
REQUIRED BY THE INSTALLATION
CONDITIONS AND LENGTH OF REFRIGERANT
LINES THE CONTRACTOR AND HVAC UNIT
MANUFACTURER SHALL PROVIDE AT NO
ADDITIONAL COST ALL SPECIALTY
EQUIPMENT REQUIRED FOR PROPER
EQUIPMENT OPERATION. SPECIALTY
EQUIPMENT SHALL INCLUDE BUT NOT BE
LIMITED TO SPECIALTY VALVES SUCH AS
REFRIGERANT SOLENOID VALVES, PUMP
DOWN CONTROLS, SUB-COOLING EXPANSION
VALVES, AND REFRIGERANT LIQUID
RECEIVERS.
TAB AGENT SHALL CHECK TXV SUCTION AND
SUPERHEAT SETTING AND REPORT.
CONNECTIONS
FLOW
AIR
CHILLED WATER
CWS, DOWNSTREAM
COIL
COIL
CWR,UPSTREAM
1/2" DRAIN VALVE WITH HOSE
2-WAY CONTROL VALVE.
SEE SPECIFICATIONS AND
CONNECTION
STRAINER WITH HOSE
CONTROL SEQUENCE
CHILLED WATER COIL
FROM CHILLED WATER MAINS.
SEE SCHEDULES FOR SIZES
MANUAL AIR VENT
MANUAL FLOW
BALANCING VALVE
P/T PLUG
(TYPICAL)
THERMOMETER
(TYP. OF 2)
CONNECTION BLOW DOWN VALVE
RETURN DUCT
FLEXIBLE CONNECTOR
2x2x1/4 WELDED
GALVANIZED ANGLE
AUXILIARY DRAIN PAN
STAINLESS STEEL
AND PLENUM SHALL NOT
NOTE: MAXIMUM HEIGHT OF STAND
EXCEED 12"
TO STAND
STEEL GRADING WELDED
PROVIDE LEGS 30 IN.
(MAX.) APART
FEILD FABRICATED SHEET
METAL PLENUM
VIBRATION ISOLATORS
SECURED TO GRADING
CONNECTIONS
REFRIGERANT PIPE
CIRCUIT BREAKER
CONNECTION
CONDENSATE DRAIN PIPE
FLEXIBLE CONNECTOR
SUPPLY DUCT
SUPPORTED ON RUBBER
TO THE FAN SHROUD WITH
ALUMINUM DOME SECURED
STAINLESS STEEL FASTENERS AND
MIN. 12" ABOVE ROOF
TOP OF CURB SHALL BE
BUILDING ROOF SYSTEM.
AND BE COMPATIBLE TO
SECURE THE FAN TO THE
GENERAL CONTRACTOR
BE COORDINATED WITH
SIDE. ROOF CURB SHALL
THAN 2 S/M SCREWS PER
O.C. ALL AROUND. NO LESS
CURB WITH S/M SCREWS 12"
VIBRATION ISOLATORS
BACKDRAFT DAMPER
PITCH W/ ARCHITECTURAL
COORDINATE ROOF
ALUMINUM BIRD SCREEN
TEST AND BALANCE
AND PLASTIC CAP FOR
STATIC PRESSURE PROBE
DRAWINGS.
ALL AROUND
OF THE FAN
MOTOR LOCATED OUTSIDE
THE AIRSTREAM WITH
BREATHER TUBE AND
RUBBER IN SHEAR
#57 GRAVEL
DRAIN PVC WITH SLOPE
FULL SIZE CONDENSATE
@ 1/8" PER FOOT.
PROVIDE SYNTHETIC SOIL FABRIC
GRASS HAS BEEN DISTURBED.
AROUND ALL SIDES OF DRYWELL.
RE-SEED SOIL WHERE ANY
COMPACT EARTH FILL.
AUTOMATIC AIR VENT
NOTE:
TYPICAL SYSTEM AND MATERIAL INSTALLATION
VAV TERMINAL PIPING DETAIL
DX COOLING PIPING SCHEMATIC
2 WAY CONTROL VALVE CHILLED WATER COIL PIPING
FLEXIBLE DUCT SHALL NOT
SURFACES. PROVIDE O.B. DAMPER
45° RIGID RADIUS ELBOW
IN ONE FLEX SEGMENT
THE MAXIMUM NUMBER
OF FLEX DUCT TURNS
SHALL NOT EXCEED 45°
NOTE
SCALE: NONE
DIFFUSER W/ INSULATION
COMPLETELY COVERING METAL
EXCEED 5 LINEAR FEET.
DUCT ACCESS PANEL
SUPPORTED FROM
MAIN SUPPLY DUCT
STRUCTURE
D
1.25D
AIR FLOW
MIN 4 INCH
BRANCH SUPPLY DUCT
SUPPORTED FROM STRUCTURE
DAMPER
OPPOSED BLADE BALANCING
TURNING VANES
DOUBLE WALL
AIR FLOW
ROUND TAKE-OFF
RECTANGULAR TO
SEAL CONNECTION
45 DEGREE
WITH GASKET
BALANCING DAMPER WITH LOCKING QUADRANT TYPICAL ALL
DIFFUSERS, GRILLES, & REGISTERS UNLESS OTHERWISE INDICATED.
30° M
AX
SCALE: NONE
SCALE: NONE
RS
RL
VAV TERMINAL INSTALLATION DETAIL (PLAN VIEW)
AHU-1 SUPPORT DETAIL
ROOF MOUNTED EXHAUST FAN DETAIL
DRYWELL DRAIN DETAIL
36"
MIN.
SCALE: NONE
MODELS.
PER NEC ON ELECTRONIC
36" MINIMUM CLEAR AREA
REHEAT COIL CONNECTION PER
HOT WATER COIL PIPING DETAIL.
FLOOR PLAN. SEAL OUTLET DUCT
FOR OUTLET DUCT SIZE SEE
CONNECTION PER DUCT SEALING
REQUIREMENTS.
FOLLOW SMACNA DUCT SUPPORT
SUPPORT FROM BUILDING STRUCTURE
AT MINIMUM OF FOUR POINTS.
FLEXIBLE DUCT.
DUCT OR MAXIMUM 2'-0"
RIGID CONNECTION TO MAIN
LENGTH OF STRAIGHT
SCREWED AND SEALED CONNECTION.
SEAL AS SPECIFIED FOR DUCT SEALING.
D
5D MIN.
CRITERIA.
OF SIZE SHOWN
BRANCH DUCT
ON FLOOR PLAN
TO TERMINAL
REDUCTION
INLET SIZE "D"
RIGID METAL DUCT SAME DIAMETER (D) AS TERMINAL
INLET. MINIMUM STRAIGHT LENGTH EQUAL TO 5 TIMES
D.
T
T
AHU
SCALE: NONE
GROMMET
SCALE: NONE
SCALE: NONE
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
DETAILS EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
M013
689-402
JUNE 7, 2019 WAW JLF 113
[6 "M
IN
(T Y
P
D
0m m
0m m
[1 2"
M
IN
[6
" M
IN
2m m
SCALE: NONE
SCALE: NONE
SCALE: NONE
STRAINER
PUMP
IN-LINE
PRESSURE GAUGE
GATE VALVE
HOSE END ADAPTER
3/4 " GATE VALVE
STRUCTURE ABOVE. PROVIDE VIBRATION
CHECK VALVE
BALANCE VALVE
FLEXIBLE CONNECTION
MINIMUM 2'-0" FLEXIBLE
ELECTRICAL CONDUIT PUMP SUPPORTED FROM BUILDING
ISOLATION PER SPECIFICATIONS.
GAUGE COCK TYP OF 4
(TYP. OF 2)
TEST PLUG
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
NOTE:
ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 300mm [12"] MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO
TRAP INLET. DRIP LEG SHALL HAVE 150mm [6"] SCALE POCKET BELOW TRAP INLET.
TO RETURN MAIN
PIPE SIZE SHALL BE SAME SIZE AS TRAP
FLOAT AND THERMOSTATIC TRAP.
SEE PLANS, AND SCHEDULES
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPE
FLOW
SCHEDULE 80
STEEL PIPE
BYPASS-INSTALL IN HORIZONTAL PLANE LEVEL WITH
TRAP OR IN VERTICAL PLANE & BELOW TRAP PROVIDE
BYPASS PIPING FOR ALL TRAPS 25mm [1"] AND
LARGER.
DRIP LEG OR EQUIPMENT CONNECTION. MAKE
THE SAME SIZE AS THE SUPPLY MAIN OR
EQUIPMENT CONNECTION. SEE NOTE 1
SCHEDULE 80 STEEL PIPE
SEE DRAWINGS FOR PIPE SIZES
25mm [1"]
GATE VALVE
USE 4-BOLT RAISED FACE FLANGES
THERMOMETER (TYP.)
LPS STEAM
SUPPLY
HEAT
EXCHANGER (TYP.)
15mm [1/2"] CHECK VALVE
VACUUM BREAKER (TYP.)
DDC TEMPERATURE
SENSORS (TYP.)
THERMOSTATIC AIR
VENT (TYP.)
IF INSTALLED LOWER
THAN MAIN HPS
LINE, PROVIDE
ANOTHER SCALE
POCKET/TRAP HERE.
NOTES:
1. THE ABOVE DETAIL SHOWS REQUIRED PIPING FOR TWO HEAT EXCHANGERS IN PARALLEL. INDICATE IF 100% REDUNDANT OR NOT.
2. PROVIDE SADDLE SUPPORTS AND LEGS OR HANGERS FOR HEAT EXCHANGER. MOUNTING HEIGHT SHALL BE ADJUSTED TO FACILITATE GRAVITY RETURN OF STEAM
CONDENSATE.
3. MAKE THE BYPASS THE SAME SIZE AS THE CONNECTIONS TO THE CONTROL VALVES.
4. CONTROL VALVES SHALL BE IN A 1_
AND 2_
SIZE ARRANGEMENT.
HWR
HWS
SCALE POCKET
(TYP.)
TT
PI-
TT
DDC PRESSURE
SENSORS (TYP.)
ISOLATION VALVE (TYP)
TANK OR TO HPR MAIN LINE (TYP.)
HPR TO FLASH
FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY
HEAT EXCHANGER - STEAM TO HOT WATER
UTILITY EXHAUST FAN DETAIL
IN - LINE PUMP DETAIL
ROOF MOUNTED CONDENSING UNIT
STEAM PRESSURE RELIEF VALVE DETAIL
HYDRONIC RADIANT PANEL
RTU-42 COMPONENT DIAGRAM
CURB AND EQUIPMENT RAIL SUPPORTS SHALL
MATCH ROOF SLOPE SO THAT TOPS ARE LEVEL.
ALL EQUIPMENT, DUCT, ETC. ABOVE THE ROOF
LINE SHALL BE PAINTED TO MATCH ROOF AS
PER ARCHITECTURAL DRAWINGS AND SPECIFICATIONS.
(TYPICAL).
FROM BELOW.
3"x3"x1/4" STEEL ANGLE SUPPORT
FRAME. ADJUST HEIGHT TO PROVIDE
ALIGNMENT WITH EXHAUST DUCT
LOADING POINTS
RAIL. REFER TO ARCHITECTURAL
EQUIPMENT SUPPORT
DRAWINGS
NEOPRENE PAD AT
NOTE:
DISCHARGE STACK
TO DISCHARGE DUCT
DRIVE ENCLOSURE
VIBRATION ISOLATION
16 GA. STAINLESS STEEL
BRACKET UPPER DUCT
FAN WITH MOTOR AND
8"
32"
DUCT THRU ROOF PENETRATION.
CURB TO BE PROVIDED BY ROOF
SHALL BE WATERTIGHT.
EXHAUST DUCT UP FROM
MANUFACTURER. PENETRATION
8"∅
FLOOR BELOW.
TOP OF STACK TO DISCHARGE 10'-0"
1/8" S.S. STRANDED CABLE GUY
WIRES. TYPICAL OF 3.
(TYPICAL)
FLANGED CONNECTIONS
CONNECTION
FLEX
6" MINIMUM
9"
ABOVE ROOF
MOUNTING PLATFORM
ROOF
PIPING
SHEET METAL CAP
REFRIGERANT
GALV. METAL
FLASHING
24 GAUGE
AIR CONDITIONER
SPLIT-TYPE
FRONT FAN GRILLE
OUTDOOR UNIT.
ANCHOR BOLTS
DOWN TO UNIT
RELIEF VALVE
SCALE: NONE
SHORT NIPPLE
TO FLOOR DRAIN
3/4'
DISCHARGE ELL
SAFETY VALVE
9" LONG NIPPLE
PIPE THROUGH ROOF
HEATING ONLY PANELS
HWS
HWR
RUNOUT & INTERCONNECTING PIPING.
PROVIDE DIELECTRIC FITTINGS AS
REQUIRED. CIRCUIT TO COMPLY WITH
SPECIFIED CAPACITY & PRESSURE
DROP. (TYP.)
NOTE:
1. MINIMUM FLOW SHALL BE NO
LESS THAN 0.5 GPM [1.9 LPM]
RETURN FAN
INTEGRAL FACE AND BYPASS STEAM COIL
CHILLED WATER COIL AND PLENUMMIXING BOX
EXHAUST BOX
MIXING BOX
VFD PLENUM
BAG/CARTRIDGE FILTER
PLENUM
VFD PLENUM
BLOW-THRU SUPPLY FAN
BLOW-THRU PLENUM
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
DETAILS EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
M014
689-402
JUNE 7, 2019 WAW WNW 113
DEMOLITION PLAN GENERAL NOTES:
A. EXISTING VAV BOXES AND SUPPLY
RUNOUTS IN SCOPE OF WORK AREA TO BE
REMOVED BACK TO MAIN TRUNK.
B. RETURN RUNOUTS TO BE REMOVED BACK
TO MAIN TRUNK.
C. AHU SERVING BUILDING 2C SERVES AREAS
OUTSIDE OF SCOPE OF RENOVATION. UNIT
SHALL STAY IN OPERATION THROUGHOUT
RENOVATION. PROVIDE ALL NECESSARY
TEMPORARY DUCT CLOSURES, TEMPORARY
DUCTWORK, OFFSETS, ETC. REQUIRED TO
ALLOW FOR CONTINUAL OPERATION.
D. COORDINATE DOWNTIME REQUIRED TO TIE
IN TO THE NEW DUCTWORK WITH BUILDING
OCCUPANTS.
DEMOLITION PLAN KEY NOTES:
1. REMOVE DUCTWORK TO SCOPE OF WORK
MARK.
2. EXISTING DUCTWORK TO REMAIN.
3. DUCTWORK DOWN TO AHU LOCATED IN
BASEMENT.
4. EXHAUST DUCTWORK UP TO ROOF
MOUNTED FAN. RISER AND FAN SHALL BE
EXISTING TO REMAIN.
5. PROVIDE PRE WORK TESTING AT THIS
LOCATION. RECORD AIRFLOW AND STATIC
PRESSURE.
"x
8"
"x
8"
"x
8" 9" x8
8"8"
8" 8" 16 "x
6"
6"x6"
5"
12"x6"
"x
6"
"x
8"
12"x6"
8"
9" x8
8"
8"8" 16 "x
8"
"x
8"
"x
9"
"x 9"
34"x10"
"x
8"
"x 8"
"x
8"
"x 8"
10"x8"
14"x6"10"x6"
6" 6" 6" 6" 5"
5"
8"x6"
12"x4"
12"x4"
10"x6"
"x
8"
"x 8"
5"
5"
12"x4"
5"
5"
12"x4"
12"x4"
5"
5"
12"x8"
"x
5"
"x
8"
36"x10"
"x
8"
8"x6"
"x
9" x8
6"6"
12"x12"
"x
13"x8"
"x
"x
10"
10"
"x
8"
16"x36"
"x
"x
8"x8" 8"
"x6
8"x10"
15"x8" 16"x10"
8"
34"x12" 30"x12"
36"x18"
6" x6
6" x6
"x
6"
"x 8"
40"x20"
48"x17"
"x
42"x16" 40"x15"
40"x20"
"x
"x
"x
"x
"x
"x
"x
"16
"x 7"
16"x7"
23"x8"
23"x8"
"x
8"
16"x6"
"x
6"
"x
6"
9"x8"
8"x6"12"x8" 8" x6
8" x6
17"x7"
14"x8"
6"x6"
12"x9"
"x
8"
8"x8"
11"x8"
9" x6
"6"
30"x10"
"x
6"
12"
9" x6
6"
12"x10"
52 (TYP)
2 (TYP)
2 (TYP)
32 (TYP)
2'
/3
2"
73' - 3 3/8"
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FIRST FLOOR DEMOLITION PLAN
BUILDINGS 2W & 2C
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
MD101
689-402
JUNE 7, 2019 WAW JLF 113
1, 2, 3, 42
1/8" = 1'-0"
FIRST FLOOR DEMOLITION PLAN BUILDINGS 2W & 2C
16"x8"
48"x18"
16"x10" 8"x8"
"x
6"
24"x12"
48"x18"
48"x22"
"x
48"x22"
32"x14"
"x
48"x14"
30"x14"
28"x12"
18"x12"
"x
8"
"x
8"
36"x28"
40"x28"
40"x28"
48"x15"46"x16"
"x
"x
8" x6
14"x6"
"x
"x
"x
6"
"x
6"
10"x6" 10"x6"
"x
6"
"x 6"
"x
6"
"x
6"
16"x8"
10"x6"
"x
8"
"x
6"
"x
6"
10"x6"
34"x14"
34"x14"
"x
"x
12"x4"
12"x4"
12"x4"
12"x4"
10"x6"
"x
6"
10"x8"
12"x8"
"x
6"
12"x4"10"x8"10"x8"
"x
6"
10"x6"
12"x6"
12"x6"
12"x6"
12"x6"
12"x6"
"x
4"
18"x10"
"ø 5" ø
"x
"x
6"
10"x8"
10"x6" 12"x6"
"x
14"x6"
12"x8"
"x
13"ø
40"x24"
"x
9"
"x
10"x8"
"x
6"
12"x4"12"x4"
"x
8"
"x
4"
8" ø
"x
4"
12"x4"
"x
4"
8"x6"
"x
6"
10"x6"
"x
6"
8" x8
12"x6"
"x
6"
12"x6"
"x
"x
6"
"x
8"
14"x6"
"x
6"
"x
6"
"x
8"
14"x6"16 "x
"x
10"x6"
"x
6"
1 1
2 (TYP)
2 (TYP)
2 (TYP)
(TYP)
(TYP)
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
DEMOLITION PLAN GENERAL NOTES
A. EXISTING VAV BOXES AND SUPPLY
RUNOUTS IN SCOPE OF WORK AREA TO
BE REMOVED BACK TO MAIN TRUNK.
B. RETURN RUNOUTS TO BE REMOVED
BACK TO MAIN TRUNK.
C. AHU SERVING BUILDING 2E SERVES
AREAS OUTSIDE OF SCOPE OF
RENOVATION. UNIT SHALL STAY IN
OPERATION THROUGHOUT
RENOVATION. PROVIDE ALL NECESSARY
TEMPORARY DUCT CLOSURES,
TEMPORARY DUCTWORK, OFFSETS,
ETC. REQUIRED TO ALLOW FOR
CONTINUAL OPERATION.
D. COORDINATE DOWNTIME REQUIRED TO
TIE IN TO THE NEW DUCTWORK WITH
BUILDING OCCUPANTS.
DEMOLITION PLAN KEY NOTES:
1. REMOVE DUCTWORK TO SCOPE OF
WORK MARK.
2. EXISTING DUCTWORK TO REMAIN.
3. DUCTWORK TO AHU/EXHAUST IN
MECHANICAL ROOM.
4. PROVIDE PRE WORK TESTING AT THIS
LOCATION. RECORD AIRFLOW AND
STATIC PRESSURE.
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BASEMENT DEMOLITION PLAN
BUILDING 2E
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
MD102
689-402
JUNE 7, 2019 WAW JLF 113
1, 2, 3, 42
BASEMENT DEMOLITION PLAN BUILDING 2E
"x
6"
"x 6"
"x
8"
22"x9" 18"x6"
"x
6"
8"x5"
36"x12"
"x
"x
"x
6"
"x 6"
16"x6"
"x
6"
12"x4"
12"x4"
12"x6"
36"x12"
"x
"x
8"
8"ø
8" ø
14"x8"
"x
4"
"x 4"
12"x4"
6"ø 14"x4"
"x
4"
6"ø 10"x6"
24"x8"
8" x6
8" ø
8" ø
"x
8"
14"x4"14"x4"
"x
4"
8" ø
"x
6"
14"x4"14"x4"
8" ø
8" ø
14"x6"
12"x4"
28"x8"
"x
6"
"x
6"
"x
4"
8"ø
"x
4"
12"x4"
12"x6"
8"ø 12 "x
6"
8"ø
"x
6"
12"x6"
12"x6"
"x
6"
10"ø
"x
4"
"x
4"
"x 4"
10"x4"
8"x6"
16"x6"
12"x6"
"x
6"
12"x6"
"x
6"
24"x4"
12"x4"
12"x4"
"x
4"
"x
4"
12"x4"
12"x4"
8" x6
12"x4"
14"x12"
"x
4"
12"x4"
12"x4"
2 (TYP)
(TYP)
(TYP)
"x
6"
"x
6"12"x6"
12"x6"
12"x4" 12"x4"
2 (TYP)
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
DEMOLITION PLAN GENERAL NOTES:
A. EXISTING VAV BOXES AND SUPPLY
RUNOUTS IN SCOPE OF WORK AREA TO BE
REMOVED BACK TO MAIN TRUNK.
B. RETURN RUNOUTS TO BE REMOVED BACK
TO MAIN TRUNK.
C. AHU SERVING BUILDING 1 SERVES AREAS
OUTSIDE OF SCOPE OF RENOVATION. UNIT
SHALL STAY IN OPERATION THROUGHOUT
RENOVATION. PROVIDE ALL NECESSARY
TEMPORARY DUCT CLOSURES,
TEMPORARY DUCTWORK, OFFSETS, ETC.
REQUIRED TO ALLOW FOR CONTINUAL
OPERATION.
D. COORDINATE DOWNTIME REQUIRED TO
TIE IN TO THE NEW DUCTWORK WITH
BUILDING OCCUPANTS.
DEMOLITION PLAN KEY NOTES:
1. REMOVE DUCTWORK TO SCOPE OF WORK
MARK.
2. EXISTING DUCTWORK TO REMAIN.
3. DUCTWORK TO AHU/EXHAUST
MECHANICAL ROOM.
4. PROVIDE PRE WORK TESTING AT THIS
LOCATION. RECORD AIRFLOW AND STATIC
PRESSURE.
5. REMOVE EXISTING EXHAUST DUCTWORK
INCLUDING ALL ASSOCIATED HANGERS,
SUPPORTS, DROPS, GRILLES, CONTROLS,
AND ANY ITEM RENDERED ABANDONED.
6. CUT AND CAP EXHAUST DUCT BELOW
FLOOR PENETRATION AND REPAIR SLAB.
7. REMOVE EXISTING EXHAUST FAN
LOCATED IN WINDOW. REPAIR WINDOW TO
OPERATING CONDITION.
8. REMOVE EXISTING AHU AND ALL
ASSOCIATED DUCTWORK, CONTROLS,
SUPPORTS, HANGERS, REFRIGERANT
PIPING AND CONDENSING UNIT. REPAIR
BUILDING PENETRATIONS.
9. OUTDOOR AIR INTAKE IN WINDOW TO BE
REUSED.
10. REMOVE EXISTING DUCTWORK AND
DIFFUSERS.
12"ø
16"ø12"ø
"ø
8" ø
7" ø
"ø
4" ø
4" ø
"ø
"ø
12"ø
"ø
12"ø
(TYP)
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
PLAN
NORTH
TRUE
NORTH
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FOURTH FLOOR DEMOLITION
PLAN BUILDING 1
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
MD103
689-402
JUNE 7, 2019 WAW JLF 113
1, 2, 3, 42
1/8" = 1'-0"
FOURTH FLOOR DEMOLITION PLAN BUILDING 1
1/4" = 1'-0"
SECOND FLOOR DEMOLITION BUILDING 3
"x
"x
24"x10" 30"x12"
30"x12"16"x10"
"x
"x
8"
8"x8"
"x
8"x10" 8"x10"
"x
8"
7"ø
7"ø
10"x8"
7"ø
7"ø
"x
6"
10"x6"
10"x6"6"x10"
7" ø
8"x10"
8" x1
0" 6" x1 0"
10"x6"
9"ø 9"ø 9"ø
"x
6"
14"x10"
14"x6"
"x
8"
9"ø7"ø 9"ø
9"ø
10"x6"
7"ø
"x
8"
7"ø
10"x6"
7" ø
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
8 8
DEMOLITION PLAN GENERAL NOTES:
A. REMOVE EXISTING HVAC SYSTEM SERVING
THE UPPER LEVEL OF BUILDING 42. THIS
SHALL INCLUDE ALL DUCTWORK,
EQUIPMENT, SUPPORTS, CONTROLS, PIPING,
INSULATION, AND ANY ITEM RENDERED
ABANDONED BY THE REMOVAL OF THE
HVAC SYSTEMS.
B. AHU SERVING UPPER FLOOR OF BUILDING
42 ALSO SERVERS A SMALL PART OF THE
LOWER LEVEL. PROVIDE TEMPORARY
HEATING AND COOLING FOR THIS AREA
DURING THE RENOVATION WORK.
C. COORDINATE DOWNTIME REQUIRED TO TIE
IN TO THE NEW DUCTWORK WITH BUILDING
OCCUPANTS.
DEMOLITION PLAN KEY NOTES:
1. REMOVE EXISTING DUCTWORK.
2. REMOVE RETURN GRILLE.
3. REMOVE EXHAUST FAN AND DUCTWORK.
ROOF PENETRATION SHALL REMAIN READY
TO BE REUSE.
4. REMOVE EXISTING EXHAUST FAN AND
DUCTWORK. CAP AND SEAL ROOF
PENETRATION. COORDINATE WITH
ARCHITECTURAL DRAWINGS.
5. REMOVE EXISTING AHU, DUCTWORK,
PIPING, AND CONTROL.
6. REMOVE EXISTING CONDENSING UNIT
LOCATED ON GRADE. REPAIR WALL FROM
REMOVAL OF REFRIGERANT LINES, GROUT
OPENINGS.
7. EXISTING DUCTWORK TO REMAIN.
8. DUCTWORK DOWN TO FIRST FLOOR.
9. AHU HAS REFRIGERANT COOLING COIL,
STEAM HEATING, SUPPLY, RETURN, AND
OUTDOOR AIR DUCT.
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
PLAN
NORTH
TRUE
NORTH
0' 2' 4' 8' 12'
SCALE: 1/4" = 1'-0"
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BUILDING 42 EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
MD104
689-402
JUNE 7, 2019 WAW WNW 113
1, 2, 3, 42
BUILDING 42 UPPER FLOOR DEMO
FTR-1
HRP-1
HRP-1
HRP-1
HRP-1
FTR-1
FTR-1
HRP-1HRP-1 HRP-1 HRP-1
FTR-1
FTR-1 HRP-1
HRP-1
HRP-1
HRP-1
HRP-1
HRP-1
HRP-1
FCU
HWR
1/4"
1 1/4" HWR
1" 1"
1 1/4"
1"
H W
S
H W
S
3/4"
3/4"
HWR
HWS
HWS
HWR
H W
S H
W R
1/4"
1/4"
1/4"
1"
3/4"
1/4"1
1/4"
HRP-1 HRP-1
HRP-1 HRP-1 HRP-1 HRP-1
3/4"
1/2"
3/4" 2"
1"3/4"
1/2"
1"
2"
1/2"
1. REMOVE PIPING TO SCOPE OF
WORK MARK. LEAVE PIPING READY
FOR RECONNECTION.
2. SEE TEMPORARY PIPING PLAN THIS
SHEET.
3. CONNECT TEMPORARY PIPING TO
EXISTING. INSTALL TEMPORARY
PIPING BEFORE STARTING
DEMOLITION.
DEMOLITION KEY NOTES:#
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
2"
1/2"
1 1/2" HWS
1" HWR
1" H
W S
1 1/2" HWS
1" HWR
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
2W & 2C PIPING DEMOLITION
PLAN
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
MD105
689-402
JUNE 7, 2019 WAW WNW 113
1, 2, 3, 42
1/8" = 1'-0"
FIRST FLOOR DEMOLITION PIPING PLAN BUILDINGS 2W & 2C
FIRST FLOOR TEMPORARY PIPING PLAN BUILDINGS 2W & 2C
HRP-2
HRP-2
HRP-2
HRP-2
HRP-2
HRP-2
HRP-2 HRP-2
HRP-2
1/
4"
1/ 4"
H W
S
1/ 4"
1/
4" H
W R
1/
4"
1/ 4"
1/
4"
1/ 4"
1/
4"
1/ 4"
1/
4"
1/ 4"
1/
4"
1/ 4"1
1/ 4"
1/
4"
1/ 4"
1/
4"
DEMOLITION PLAN KEY NOTES:
1. PROVIDE TEMPORARY PIPING TO
PROVIDE UNINTERRUPTED SERVICE
TO THE REMAINDER OF THE BUILDING.
2. REMOVE PIPING TO SCOPE OF WORK
MARK.
3. CONNECT TEMPORARY PIPING TO
EXISTING. INSTALL TEMPORARY
PIPING BEFORE STARTING
DEMOLITION.
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
1/
4" H
W S
1/
4" H
W S
1/
4" H
W S 1
1/ 4"
H W
S
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FOURTH FLOOR BUILDING 1
DEMOLITION PIPING PLAN
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
MD106
689-402
JUNE 7, 2019 WAW WNW 113
1, 2, 3, 42
1/8" = 1'-0"
FOURTH FLOOR DEMOLITION PIPING PLAN BUILDING 1
FOURTH FLOOR TEMPORARY PIPING PLAN BUILDING 1
2 1/2"2 1/2" HWR
1 1/4"1 1/4" HWR3"3" HWS
6"6" CWR
6"6" CWS
1 1/2"1 1/2" HWR 2 1/2"2 1/2" HWS
3/4"3/4" HWS
1 1 1
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
DEMOLITION PLAN KEY NOTES:
1. REMOVE PIPING TO SCOPE OF WORK
MARK. LEAVE READY FOR
RECONNECTION.
2. REMOVE PIPING TO SCOPE OF WORK
MARK. CAP AND REPAIR INSULATION.
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BUILDING 2E DEMOLITION
PIPING PLAN
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
MD107
689-402
JUNE 7, 2019 WAW WNW 113
1, 2, 3, 42
BUILDING 2E DEMOLITION PIPING PLAN
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
FLOOR PLAN GENERAL NOTES:
A. PROVIDE NEW VAV BOX AND SUPPLY
DIFFUSERS.
B. PROVIDE NEW RETURN DUCTWORK.
CONNECT TO EXISTING MAIN RETURN.
C. REFER TO SHEET MP101 FOR
TERMOSTAT LOCATIONS.
KEY NOTES:
1. CONNECT TO EXISTING DUCTWORK.
2. EXHAUST DUCT UP TO EXHAUST FAN
ON ROOF.
3. UNDER CUT DOOR
40"x15"
30"x10"
40"x12"
"x
8"
"x
8"
"x
"x
7"
12"x8"
23"x8"
48"x17"
"x
8"x6"
8" x6
8" x6
"x
"x
8" x6
8" x6
8"x6"
10"x6"
36"x18"
OPEN
OFFICE
2W-117
EXAM
2W-118
EXAM
2W-119
ANTE
2W-124
WOMEN
ISO/PROC
2W-125
TOILET
2W-126
CORR
1C4
F TLT
2W-116
M TLT
2W-115
EXAM
2W-114
EXAM
2W-112
EXAM
2W-109A
EXAM
2W-108A
CORR
1C3
FMS
COMM
2W-128
ELEC
2W-129
HAC
2W-131A
TOILET
2W-113
TOILET
2W-110
CLEAN
UTIL
2W-131B
MED
2W-131C
EQUIP
2W-109B
EXAM
2W-108B
EXAM
2W-103B
CLEAN
STO
2W-103A
EXAM
2W-121
EXAM
2W-123
EXAM
2W-127
EXAM
2W-130A
EXAM
2W-130B
OIT COMM
2W-132A
CORR
1C5
PHARM D
2W-132B
CORR
1C1-02W
NURSE
MGR
2W-100
CORR
1C2
EXAM
2W-101
TOILET
2W-106
TOILET
2W-104
EXAM
2W-107B
CONF
2W-107A
EXAM
2W-105B
EXAM
2W-105A
OPEN
OFFICE
2W-102
OPEN
OFFICE
2C-1178
LINEN
2C-1181
EXAM
2C-1180
EXAM
2C-1179
VESTIBULE
2W-215
CORR
C1-1041
EXAM
2C-1174
EXAM
2C-1175
EXAM
2C-1176
EXAM
2C-1177
CORR
C2-2
EXAM
2C-1173
EXAM
2C-1172
EXAM
2C-1171
CORR
C2-1
EXAM
2C-1168
EXAM
2C-1167 OPEN
OFFICE
2C-1165
EXAM
2C-1166
SWITCHBOARD
2C-1164
TOILET
2C-1143
TRIAGE
2C-1144
TOILET
2C-1145
WAITING
2C-1141
RECEPTION
2C-1146
"x
8"
"x
6"x6"
"x
40"x12"
"x
8"
"x
"x
7"
12"x8"
48"x17"
"x
8"x6"
8" x6
8" x6
8" x6
"x
36"x18"
20"x8"16"x6"
8"x5"
"x
8"
"x
24"x12" 26"x10" 14"x12"
42"x16"
"x
40"x20"
40"x20"
16"x9" 12"x8"
"x
"x
12"x12"8"x12"
4" ø 8"x5"
6" x6
"x
8"
6" x6
8" x6
"x
8"
18"x8"
"x
8"
"x
8"
"x 8"
6"x6"
6"x6"
"x
8"
6" x6
" 8"x5" 8"x8"
6"x6"
8" x8
8" x6
"x 6"
10"x10" 18"x6"
"x
6"x6"
8" x8
8" x5
6"x6"
23"x8" 10"x8"
12"x8"
"x
"x
"x
5" x5
12"x12"
"x
"x
"x
18"x10"
10"x10"
8"x8"
"x
"x
26"x12"
"x
"x
"x
8"
"x
"x
10"x10"
10"x10"
"x
"x
36"x16"
"x
"x
26"x12"
"x
20"x14"
"x
"x
10"x10"
10"x10"
5"x5"
8"x8" 18"x8"
"x
8"
12"x8"18 "x
6"x6"
"x
8"
10"x10"
14"x6"
"x
8"
"x
8"
"x
6"x6"
8" x7
34"x10"
"x
"x
8"
"x
7"
10"x10"
10"x10"
8"x8"
6" x6
10"x8"
8" ø
34"x12"
6"x6"
6" x6
"x
6"x6"
"x
8"
40"x12"
"x
8"
"x 7"
12"x8"
48"x17"
"x
8"x6"
8" x6
8" x6
8" x6
"x
36"x18"
36"x16"
"x
"x
30"x12"
6"x6"
"x
8"
6" ø
"x
8"
"x 8"
10"x8"
"x
9"
"x 9"
"x
16"x10"
"x
40"x12"
"x
8"
"x 8"
"x
8"
"x
16"x7"
"x
7" 16 "x
"x
8"
12"x8"
"x
8"
48"x17"
"x
8"x6"
"x
8"
"x 8"
8" x6
8" x6
"x
8" x6
8" x6
"x
"x
36"x18"
A10
A8
A6
A6
A6
A8
A10
A10
A10
A10
A8 110A8
A10
A10
A10
A10
A10
A10
A10
A10
A10
A10
A10
A10
A8
A8
A8
A8
A6
A8
A6
A8
A8
A10
A10
A10
A10
A8
A10
A8
A8
A8
A8
A10
A10
A6
A8
A8
A6
A8
A8
A8
A8
A8
A8
A10
A10
A10
A10
A8
A8
A8
A8
A8
A8
A8
A8
A8
A8
A10
A10
A10
A10
A10
A10
A10
A10
A10
A6
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
E24/24
E24/24
E24/24
E24/24 50E24/24
E24/24
E24/24
G22/22
G22/22
E24/24
E24/24
G22/22
G22/22
G22/22
G22/22 85 G22/22
G22/22
E24/24
E24/24
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
2W -0
2C-04
2C-03
2C-01
2C -0
2C-10
2C-13
6" x6
10"ø
10"ø 10"ø
8"ø
"x
1 1
2C-05
6"ø 12"x8" 10"ø6"ø
"ø
8"ø
2C-12
2C-11
6" ø
8"ø
6" x6
10"ø
4"ø 4"ø
8" ø
8"ø
8"ø
2W-02
6"ø
8"ø
8"ø
2W-08
6" ø
14"ø
2W-11
2W-15
10"ø
A10
A6
10"x8"8"x8"8"ø
A8
A6
G22/22
E24/24
G22/22
G22/22
A6
A6
EXAM
2W-120
SOILED
UTIL
2W-122
HSS
2C-1182
SMALL
MED
2C-1169
PCMH
2C-1170
2W-14
2C-09
2W-07
G22/22
A6
A8
2C-02 10"x8"
A8
10"x8"2W-12
2W-13
6"x6"
"ø
8" x8
"2W-09
"x
10"x6"
8" x4
6" x6
10"x10"
8" x8
2W-01
14"ø
5" x5
10"ø
10"ø
"x
8" ø
E24/24
14"x10" 8"x8"6"x6"
"x
8"
E24/24
6" x6
"x
8" 8" x6
6"x6"
8" x8
E24/24
E24/24
E24/24
6" x6
AC-1
AC-2
AC-3
2C-08
2C-06
2W-03
2W-05
2W-10
6"x6"
6"ø
8" x8
" 6"ø
6"x6"
8"x7" 6"ø
5" x5
8"ø
8" x8
8" x6 "10
"ø
"ø
"ø
"ø
5"x5"
10"x10"
8" ø
8" ø
8" ø
8" ø
6" x6
"x
6" 8" x5
6" ø
6"ø
5" x5
" 8"ø
12"x8"
"x
A8
10"ø
8"x8"
"x
8"
10"x10"
10"x10"
6" x6
10"ø
10"ø
10"ø 10"ø
6"x6"
8"ø
FEDCBA
10"x8"
2W-17
2W-16
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FIRST FLOOR NEW WORK
DUCTWORK PLAN BLDG 2W&2C
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
MH101
689-402
JUNE 7, 2019 WAW JLF 113
1, 2, 3, 42
FIRST FLOOR NEW WORK DUCTWORK PLAN BUILDINGS 2W & 2C
A B C ED F
EF-1
EF-3
CU-1
CU-2
CU-3
14"ø
EF-2
FEDCBA
EF-07
KEY NOTES:
1. DUCTWORK DOWN TO FIRST FLOOR SEE
SHEET MH101 FOR CONTINUATION.
2. REFRIGERANT PIPING DOWN TO FIRST
FLOOR SEE SHEET MP101 FOR
CONTINUATION.
3. EXISTING EXHAUST FAN TO REMAIN.
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
ROOF PLAN DUCTWORK PLAN
BUILDINGS 2W&2C
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
MH102
689-402
JUNE 7, 2019 WAW WNW 113
1, 2, 3, 42
ROOF PLAN NEW WORK DUCTWORK PLAN BUILDINGS 2W & 2C
24"x12"24"x10"
36"x28"
"x
10"x8"
"x
8"
"x
8"
12"x6"
"x
6"
"x
9"
24"x12"24"x10"
"x
10"x8"
"x
8"
"x 6"
"x
9"
24"x12"24"x10"
12"x4"
"x
10"x8"
"x
8"
"x 6"
"x
9"
48"x22"
48"x18"
"x
4"
8"x6"
10"x6"
12"x4"
32"x14"
"x
" 48"x18"
48"x22"
48"x14"
24"x12"24"x10"
10"x8"10"x8"
"x
8"
"x
4"
"x
36"x28"
40"x28"
"x
6"
"x 6"
"x
4"
40"x28"
"x
50"x20"
48"x15"
"x
6"
40"x24"38"x18"
"x
"x
"x
6"
"x
14"x6"12"x6"
"x
"x
8"
"x
"x
"x
"x
16"x12"
30"x14"
30"x14"28"x12"
12"x6"
10"x8"
"x
6"
18"x12"
"x
8"
12"x6"
10"x6"
"x
6"
"x
8"
12"x6"
"x
6"
12"x4"
10"x8"
"x
9"
"x
6" 14 "x
8"
"x
10"x6"
G22/22
A8
A8
A8
A8
A8
A8 135 A6
A6
A6
A6
A6
G22/22
G22/22
34"x14"
"x
6"
"x
8"
"x
8"
6" ø6" ø
16"x8"
14"x6"
2E1-01
2E1-02
2E2-01
46"x16"
EA
SA
RA
SA
EA
1 1
6"ø
A6
2E1-04
"x
8" 8" ø
8"ø 5" ø
8" x8
8"x8"
8"ø
"x
8"ø
8"ø
8" ø
"x
"x
20"x12"
G22/22
A8
A8
A8
A8
A8
A8
12"x10"
8" ø 8" ø
8"ø
8"ø
12"x10"
8" ø
8" ø
2E2-03
2E2-02
8"ø
"ø
8" ø
8" ø
12"x10"
8" ø
8" ø
A8
G22/22 100 G22/22
G22/22
10012"x10"
6"ø A6
A6
A6
A6
G22/22
6"x6"
6"ø 2E2-07 4"ø G22/22
10"x10"
G22/22
A8
A8
G22/22
6" x6
"x
12"x10" 8" ø
6" ø
"ø 6"ø
8"ø
"ø
2E2-08
A8
8"ø
"x
8" ø
A8
8" ø
A8 250 E24/24
E24/24
8"x4"8"x6"
6"ø A6
10"x10"
8" ø
8" ø
10"x10"
8" ø
8" ø
6" ø
2E1-03
6" ø
8"ø
6"ø6" ø
14"x12"
2E2-06
2E2-04
2E2-05
A8
E24/24 80A8
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
FLOOR PLAN GENERAL NOTES:
A. PROVIDE NEW VAV BOX AND SUPPLY
DIFFUSERS.
B. PROVIDE NEW RETURN DUCTWORK.
CONNECT TO EXISTING MAIN RETURN.
KEY NOTES:
1. CONNECT TO EXISTING DUCTWORK.
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
PLAN
NORTH
TRUE
NORTH
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BASEMENT NEW WORK
DUCTWORK PLAN BUILDING 2E
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
MH103
689-402
JUNE 7, 2019 WAW JLF 113
1, 2, 3, 42
BASEMENT NEW WORK DUCTWORK PLAN BUILDING 2E
36"x12"
"x
6"
"x
8"
"x
6"
"x
6"
"x
6"
"x
8"
"x
6"
"x
6"
"x
8"
"x
6"
28"x8"
"x
6"
"x
6"
"x
8"
"x
6"
"x
"x
"x
6"
"x
"x
8"
24"x8"
"x
7"
"x
8"
14"x10"
"x
8"
16"x10"
8" x6
"x 8"
18"x6"22"x9"
36"x12"
A6
A8
A8
A8
A8
A8
A8
A8
A8
A8
A8
A8
A8
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
G22/22
1A42-02 1A42-05
1A42-03
1A42-04
1A42-01
"ø
"ø
12"x12" 12"ø
8"ø
4"ø
8" ø
"ø
6" ø
8" ø
8"ø
8"ø
8" ø
A8
6"x6" 8"ø
G22/22
"x
8" ø
8" ø
OPEN
OFFICE
1-434 OFFICE
1-434A
OFFICE
1-434C
SMALL
CONF
1-434D
OPEN
OFFICE
1-445
OFFICE
1-445A
OPEN
OFFICE
1-445
"x
7"
8" ø
"x
7"
"x
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
"x
10"x10"
8" ø
8"ø
"x
10"x10"
8" ø
8"ø
A8
A8
A8
A8
R R
C C
HP-1
AHU-1
TAHU-1
FITNESS
3-201
FLOOR PLAN GENERAL NOTES:
A. PROVIDE NEW VAV BOX AND SUPPLY
DIFFUSERS.
B. PROVIDE NEW RETURN DUCTWORK.
CONNECT TO EXISTING MAIN RETURN.
KEY NOTES:
1. CONNECT TO EXISTING DUCTWORK.
2. ROUTE REFRIGERANT LINE SET DOWN TO
CONDENSING UNIT LOCATED ON GRADE.
3. REUSE O.A. INTAKE LOUVER IN WINDOW
PANE. BALANCE TO 150 CFM.
4. ROUTE CONDENSATE DRAIN TO DRY WELL
AT GRADE. SEE DETAIL ON SHEET M013.
5. PROVIDE AHU. COORDINATE WITH
WORKOUT EQUIPMENT. ROUTE DUCTWORK
UP ABOVE CEILING. EXPOSED DUCTWORK
SHALL BE DOUBLE WALL READY FOR
FINISHING PAINT.
PLAN
NORTH
TRUE
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1'-0"
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FOURTH FLOOR NEW WORK
DUCTWORK PLAN BUILDING 1&3
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
MH104
689-402
JUNE 7, 2019 WAW JLF 113
1, 2, 3, 42
1/8" = 1'-0"
FOURTH FLOOR NEW WORK DUCTWORK PLAN BUILDING 1
SECOND FLOOR NEW WORK BUILDING 3
A8
A8
G22/22
G22/22
A10
A8
A10
A6
A10
A10
G22/22
G22/22
G22/22
A6
G22/22
"x
A8
G22/22
8"x5"
G22/22
G22/22
A8
A8
A6
G22/22
A8
A8
G22/22
G22/22
A10
A10
A10
A10
G22/22
G22/22
"x
8"
6"ø 14"x12"
"ø
8" ø
8" ø
15"x10" 25"x12"
"x
"x
7"
21"x16" 16"x16"
"x
"x
14"x12"12"x12"
"x
7"
11"x8"
8" ø 8" ø
6" ø
10"x10"
"x
"x
"10"x10"
"x
8"
10"x8"
"x
10"x10" 10"x10"
8" x5
8"x8"
10"x10"8"ø
8" x5
"x
14"x14"
"x
6" ø
6" ø
6"ø
6" ø
B42-01
B42-02
B42-03
B42-04
B42-05
B42-06
B42-07
B42-09
B42-08
1/2" 1/2"
1/ 2" 1/
2"
1/2"
1/2"
2 1/2"2 1/2" CWS
2 1/2"2 1/2" CWR
3/ 4"
3/ 4"
H W
R 3/
4" 3/
4" H
W R
1/ 2"
1/ 2"
H W
R 1/
2" 1/
2" H
W S
1"1" HWS
1"1" HWR
1" 1"
H W
S 1"
1" H
W R
3/4"3/4" HWS3/4"3/4" HWR
TEAM
42-206
VOCATIONAL
42-205
GRANT
42-204
STO
42-201A
HCHV
42-201
CORR
42-207
HUDVASH
42-209
HAC
42-214
HUDVASH
42-216
HUDVASH
42-217
HUDVASH
42-218
MECH
42-219
OFFICE
42-213
SUPERS
42-211
WAITING
42-202
TLT
42-208
CORR
42-203
CORR
42-215
12"x8"
A8
8" x8
8"x8"
E24/24
E24/24
MH105
9"x6"
5" x5
"x
8"x8"
6" x6
9" x5
8"ø
6" ø
8" ø
"x
6"x6"
T
T T
B42-02
B42-01 B42-08
T B42-03
T B42-04
T B42-05
T B42-07TB42-06
1" D
FLOOR PLAN GENERAL NOTES:
A. COORDINATE ROOF PENETRATIONS
WITH EXISTING STRUCTURE. EXISTING
STRUCTURE IS 2' PANEL. DUCT
PENETRATIONS SHALL NOT CUT MORE
THAN ONE PANEL ( SEE STRUCTURAL
DRAWINGS). RTU OPENING SHALL BE
COORDINATED SO THAT OPENING
ALLOWS FOR ROOF
PENETRATION/CUT OPENING OF ONLY
ONE PANEL.
B. BOTH DUCTWORK AND PIPING ARE
SHOWN ON THIS PLAN.
KEY NOTES:
1. CONNECT TO EXISTING CHILLED
WATER PIPING. EXISTING PIPING IS
LOCATED ABOVE THE CORRIDOR
CEILING AND HAS ISOLATION VALVES
AND BLIND FLANGES PROVIDED FOR
CONNECTION.
2. PROVIDE ISOLATION VALVES AND
BLIND FLANGES FOR FUTURE
CONNECTION. PROVIDE VALVE TAG
STATING FUTURE: XXX GPM.
3. DUCTWORK UP TO ROOF TOP UNIT.
4. WINDOW PROVIDES ACCESS TO
LOWER ROOF AND EXTENSION
LADDER TO UPPER ROOF.
5. PIPING UP TO RTU PROVIDE PIPING
DOG HOUSE ON RTU.
6. CONNECT TO EXISTING DUCTWORK AT
THIS APPROXIMATE LOCATION.
7. CONNECT TO EXISTING 1" STEAM LINE
AT THIS APPROXIMATE LOCATION.
8. CONNECT TO EXISTING 1"
CONDENSATE RETURN LINE AT THIS
APPROXIMATE LOCATION
9. SEE LARGE SCALE MECHANICAL
ROOM PLAN FOR CONTINUATION.
10. EXHAUST DUCT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .