This solicitation package includes construction drawings and specifications for an expansion and renovation project at the Newington VA Medical Center in Connecticut. The project scope involves renovating approximately 20,000 square feet in Buildings 2C and 2W to create additional primary care clinic space, building a new 5,000 square foot structure, and renovating several other areas totaling approximately 12,000 square feet to relocate offices and storage. Drawings provide demolition plans, new work plans, sprinkler details and design data. The solicitation will be issued as an Invitation for Bid conducted in accordance with FAR Parts 14, 19, and 36. The solicitation period closes on March 31, 2020. The construction period is approximately 600 calendar days from notice to proceed. The project magnitude is estimated between $5-10 million. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files

File Type Posted
36E77620B0003 0008.docx DOCX document
36E77620B0003 0007.docx DOCX document
36E77620B0003 0006.docx DOCX document
36E77620B0003 0005.docx DOCX document
Attachment 16 - Steam Coil Piping Connections Detail (SD238216-03).pdf PDF
Attachment 18 - Answers to Technical Questions.pdf PDF
36E77620B0003 0004.docx DOCX document
Attachment 15 - Revised Specifications TOC and Added Specs.pdf PDF
Attachment 17 - Borings Log Pictures from 1995 Project.zip ZIP file
36E77620B0003 0003.docx DOCX document
Attachment 1.pdf PDF
36E77620B0003 0002.docx DOCX document
36E77620B0003 0001.docx DOCX document
Attachment 14 - Wage Determination.pdf PDF
36E77620B0003.docx DOCX document
Attachment 2 - Combined Specs Volume 2.pdf PDF
Attachment 4 - General Set Final.pdf PDF
Attachment 9 - Plumbing Set Final.pdf PDF
Attachment 3 - Hazardous Materials Surveys.zip ZIP file
Attachment 13 - CONTRACTOR SAFETY AND ENV RECORD FORM.docx DOCX document
Attachment 12 - Combined Survey Final.pdf PDF
Attachment 5 - Civil Set Final.pdf PDF
Attachment 1 - Combined Specs Volume 1.pdf PDF
Attachment 7 - Structural Set Final.pdf PDF
Attachment 11 - Electrical Set Final.pdf PDF
Attachment 6 - Architectural Set Final.pdf PDF
Attachment 8 - Mechanical Set Final.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

SCALE:

SCALE:

NONE

NONE

NONE

4"-6"

4"-6"

PIPE HANGER DETAIL

GENERAL NOTES:

DROP TO

PENDENT SPRINKLER HEAD DETAIL

UPRIGHT SPRINKLER HEAD DETAIL

HANGER ROD

PIPE

STRAP HANGER

HANGER ROD

PIPE

CLEVIS TYPE

HANGER

HEX NUT

HANGER ROD

(HANGER DETAIL ONLY)

A ALL HANGERS SHALL BE SPACED IN ACCORDANCE WITH PIPE

MANUFACTURERS REQUIREMENTS.

EXTERNAL PLUG DROP

IN CONCRETE ANCHOR

CONCRETE STRUCTURE

1" PIPE

REDUCER COUPLING

PENDENT SPRINKLER

CEILING

ESCUTCHEON PLATE

SPRINKLER MAIN

SUPPLY PIPING

ESCUTCHEON RETAINER

SPRINKLER MAIN

SUPPLY PIPING

OFFSET UPRIGHT SPRINKLER

HEAD AS REQUIRED FOR

OPTIMUM PLACEMENT

UPRIGHT SPRINKLER HEAD

WITH DEFLECTOR SAME

ANGLE AS CEILING

REDUCER COUPLING

CEILING

CEILING

CHECK VALVE

RISER DOWN

TS

CAPPED PIPE

GATE VALVE WITH TAMPER SWITCH

BALL VALVE

BACKFLOW PREVENTER

RISER UP

FIRE DEPARTMENT CONNECTIONFDC

PIPE TO BE DEMOLISHED

FIRE PROTECTION PIPING

POST INDICATOR VALVEPIV

BACK FLOW PREVENTERBFP

LIGHT HAZARDLH

ORDINARY HAZARD, GROUP 1OH1

FIRE HYDRANTFH

TAMPER SWITCH

FIRE PROTECTION LEGEND

2 HOUR FIRE RATED SMOKE BARRIER

1 HOUR FIRE RATED SMOKE BARRIER

SPRINKLER ZONE CONTROL ASSEMBLY DETAIL

NO SCALE

P

SPRINKLER

MAIN

UNION WITH CORROSION RESISTANT

ORIFICE GIVING FLOW EQUIVALENT TO

THE SMALLEST SPINKLER ORIFICE IN

THE

SYSTEM

SITE GLASS

AUXILIARY DRAIN VALVE

INSPECTOR'S TEST

VALVE

TO SPRINKLERS

PRESSURE GAUGE

WATER FLOW SWITCH

24"

MIN

PIPE DRAIN TO

EXTERIOR

GENERAL NOTES

1. DESIGN AND PROVIDE THE SPRINKLER SYSTEM FOR THE

HAZARD OCCUPANCY SHOWN ON THIS SHEET AND BY

HYDRAULIC CALCULATION.

2. RUN PIPING IN ROOMS AND CORRIDORS CONCEALED ABOVE

CEILINGS. IN ROOMS WITH CEILINGS OF EXPOSED

CONSTRUCTION, RUN THE PIPING EXPOSED USING UPRIGHT

SPRINKLER HEADS, EXCEPT AS NOTED OTHERWISE.

3. NO PIPE PENETRATIONS OF STRUCTURAL MEMBERS, EXCEPT

AS NOTED, ARE PERMITTED WITHOUT THE APPROVAL OF THE

ARCHITECT.

4. PROVIDE PIPE PENETRATIONS OF FIRE OR SMOKE PARTITIONS

OR WALLS AND MAKE FIRE AND SMOKE TIGHT.

5. DESIGN AND PROVIDE THE SPRINKLER SYSTEM IN

ACCORDANCE WITH NFPA 13-2015 AND THE CURRENT VA FIRE

PROTECTION DESIGN GUIDE CONTRACTOR SHALL SUBMIT

SHOP DRAWINGS FOR REVIEW BY AE

6. EACH SMOKE ZONE SHALL BE PROVIDED WITH A DEDICATED

WET PIPE SPRINKLER SYSTEM.

7. PROVIDE QUICK RESPONSE SPRINKLER HEADS THROUGHOUT.

SPACE SYSTEM

TYPE

OCCUPANCY TYPE DESIGN DENSITY

GPM/SF

DESIGN AREA

SF

TOTAL FLOW RATE

GPM

OFFICES, CORRIDORS, EXAM ROOMS,

TOILETS

ELEC., STORAGE, MECH., MAINT.

ROOMS

WET

WET

LIGHT HAZARD

ORDINARY HAZARD, GROUP 1

0.10

0.15

HOSE STREAM

GPM

1500 250 NOTE

500 NOTE

NOTES: 1. ALL SPACES NOT SHOWN AS ORDINARY HAZARD GROUP 1 ARE LIGHT HAZARD.

2. ACTUAL FLOW RATES SHALL BE BASED ON HYDRAULIC CALULATIONS.

3. REMOTE AREA REDUCTION WITH QUICK RESPONSE SPRINKLERS IS PERMITTED, IAW NFPA 13 REQUIREMENTS.

SPRINKLER SYSTEM DESIGN DATA

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

FIRE PROTECTION LEGEND AND

DETAILS

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

F001

689-402

June 7, 2019 RWC PNW 113

Approver

DEMOLITION PLAN GENERAL NOTES

A. FIRE ALARM OUTAGES INCLUDING FIRE

ALARM IMPAIRMENT ASSOCIATED WITH

FIRE SPRINKLER SYSTEM OUTAGES SHALL

BE IN ACCORDANCE WITH NFPA 101

PARAGRAPH 9.6.1.6 "WHEN A REQUIRED

FIRE ALARM SYSTEM IS OUT OF SERVICE

FOR MORE THAN 4 HOURS OUT OF A 24

HOUR PERIOD, THE AUTHORITY HAVING

JURISDICTION SHALL BE NOTIFIED, AND

THE BUILDING SHALL BE EVACUATED OR

AN APPROVED FIRE WATCH SHALL BE

PROVIDED FOR ALL PARTIES LEFT

UNPROTECTED BY THE SHUT DOWN UNTIL

THE FIRE ALARM SYSTEM HAS BEED

RETURNED TO SERVICE".

DEMOLITION PLAN KEY NOTES

(THIS SHEET ONLY)

1. REMOVE ALL SPRINKLER HEADS, PIPING

DROPS, BRANCHLINES AND MAINS OF

EXISTING SPRINKLER/SMOKE ZONES 4 AND

6 BACK TO THE ZONE CONTROL ASSEMBLY.

2. ZONE 6 - 3" SPRINKLER RISER

3. ZONE 4 - 4" COMBINED

SPRINKLER/STANDPIPE RISER

OFFICE

2W-118

OFFICE

2W-117

OFFICE

2W-119 OFFICE

2W-120

OFFICE

2W-122

OFFICE

2W-124

OFFICE

2W-125

OFFICE

2W-126

OFFICE

2W-121

OFFICE

2W-118

F TLT

2W-116

M TLT

2W-115

STAIR

COMM

2W-128

ELEC

2W-129

HAC

2W-118

TLT

2W-113

TLT

2W-110

OFFICE

2W-114

OFFICE

2W-112

OFFICE

2W-109

OFFICE

2W-108

OFFICE

2W-107

KITCHEN

2W-105

MULTIPURPOSE

ROOM

2W-102

OFFICE

2W-101

OFFICE

2W-100

OFFICE

2W-103

CORR

C1-2

OFFICE

2W-131

OFFICE

2W-130

RECEPTION

2W-032

OFFICE

2W-127

CORR

C1-11

CORR

C1-10

CORR

C1-9

CORR

C1-7

CORR

C1-8

CORR

C1-5

WAITING

2W-024

TLT

2W-106

TLT

2W-104

CORR

CORR

C1-1041

CONTROL

2C-1141

HEALTH

PSYCH

CLINICS

2C-1144

HEALTH

PSYCH

CLINICS

2C-1146

HEALTH

PSYCH

CLINICS

2C-1148

NEUROLAB

2C-1147

NEUROLAB

VIEWING

2C-1145

STO

2C-1143

BIO-FB

CONTROL

2C-1150

BIO-FB

PATIENT

2C-1149 CORR

C1-1044

STAIR

HEALTH

PSYCH

CLINICS

2C-1142

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

FIRST FLOOR DEMOLITION

BUILDING 2C AND 2W

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FD101

689-402

June 7, 2019 RWC PNW 113

Approver

1/8" = 1'-0"

FIRST FLOOR DEMOLITION BUILDINGS 2C & 2W

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

FIRST FLOOR DEMOLITION

BUILDING 2C AND 2W

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FD101

689-402

June 7, 2019 RWC PNW 113

MECH

1-446

CONF/STO

1-445

CONFERENCE

1-438

STORAGE

1-434

VIS

IMPAIRMENT

SVC

1-428

CORR

C4-12A

SUI COORD

1-428

1-430

STAIR

ELEC

1-444

AREA OF NEW WORK

DEMOLITION PLAN GENERAL NOTES

A. FIRE ALARM OUTAGES INCLUDING FIRE

ALARM IMPAIRMENT ASSOCIATED WITH FIRE

SPRINKLER SYSTEM OUTAGES SHALL BE IN

ACCORDANCE WITH NFPA 101 PARAGRAPH

9.6.1.6 "WHEN A REQUIRED FIRE ALARM

SYSTEM IS OUT OF SERVICE FOR MORE

THAN 4 HOURS OUT OF A 24 HOUR PERIOD,

THE AUTHORITY HAVING JURISDICTION

SHALL BE NOTIFIED, AND THE BUILDING

SHALL BE EVACUATED OR AN APPROVED

FIRE WATCH SHALL BE PROVIDED FOR ALL

PARTIES LEFT UNPROTECTED BY THE SHUT

DOWN UNTIL THE FIRE ALARM SYSTEM HAS

BEED RETURNED TO SERVICE".

DEMOLITION PLAN KEY NOTES

(THIS SHEET ONLY)

1. REMOVE ALL SPRINKLER HEADS, PIPING

DROPS AND BRANCHLINES IN AREA OF NEW

WORK AS INDICATED

RECORDS

2E-B140

STORAGE

2E-B127

STORAGE

OFFICE

2E-B137C

CORR

B043

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

BLDG 2E BASEMENT AND BLDG 1 -

4TH FLOOR DEMOLITION

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FD102

689-402

June 7, 2019 RWC PNW 113

Approver

1/8" = 1'-0"

FOURTH FLOOR DEMOLITION PLAN BUILDING 1

1/8" = 1'-0"

BASEMENT DEMOLITION PLAN BUILDING 2E

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

BLDG 2E BASEMENT AND BLDG 1 -

4TH FLOOR DEMOLITION

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FD102

689-402

June 7, 2019 RWC PNW 113

DEMOLITION PLAN GENERAL NOTES

A. FIRE ALARM OUTAGES INCLUDING FIRE

ALARM IMPAIRMENT ASSOCIATED WITH FIRE

SPRINKLER SYSTEM OUTAGES SHALL BE IN

ACCORDANCE WITH NFPA 101 PARAGRAPH

9.6.1.6 "WHEN A REQUIRED FIRE ALARM

SYSTEM IS OUT OF SERVICE FOR MORE

THAN 4 HOURS OUT OF A 24 HOUR PERIOD,

THE AUTHORITY HAVING JURISDICTION

SHALL BE NOTIFIED, AND THE BUILDING

SHALL BE EVACUATED OR AN APPROVED

FIRE WATCH SHALL BE PROVIDED FOR ALL

PARTIES LEFT UNPROTECTED BY THE SHUT

DOWN UNTIL THE FIRE ALARM SYSTEM HAS

BEED RETURNED TO SERVICE".

DEMOLITION PLAN KEY NOTES

(THIS SHEET ONLY)

1. REMOVE ALL SPRINKLER HEADS, PIPING

DROPS AND BRANCHLINES IN AREA OF NEW

WORK AS INDICATED

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

BUILDING 3 AND 42 DEMOLITION EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FD103

689-402

June 7, 2019 RWC PNW 113

Approver

1/8" = 1'-0"

BUILDING 42 2ND FLOOR DEMO1/8" = 1'-0"

BUILDING 3 2ND FLOOR DEMO

A B C ED F

OPEN OFFICE

2C-1178

WOMEN

ISO/PROC

2W-125

ANTE

2W-124

EXAM

2W-120

EXAM

2W-119

EXAM

2W-118

OPEN OFFICE

2W-117

CORR

1C4

EXAM

2W-121

EXAM

2W-123

FMS COMM

2W-128

F TLT

2W-116

M TLT

2W-115

EXAM

2W-114

EXAM

2W-112

EXAM

2W-109A

EXAM

2W-108A

EXAM

2W-107B

CONF

2W-107A

CORR

1C3

EXAM

2W-105B

EXAM

2W-105A

OPEN OFFICE

2W-102

TOILET

2W-106

TOILET

2W-104

CORR

1C2

EXAM

2W-103B

CLEAN STO

2W-103A

EXAM

2W-108B

EXAM

2W-101

NURSE MGR

2W-100

VESTIBULE

2W-215

CORR

1C1-02W

MED

2W-131C

CLEAN UTIL

2W-131B

TOILET

2W-113

TOILET

2W-110

EQUIP

2W-109B

ELEC

2W-129

HAC

2W-131A

TOILET

2W-126

EXAM

2W-127

EXAM

2W-130A

EXAM

2W-130B

OIT COMM

2W-132A

PHARM D

2W-132B

CORR

1C5

LINEN

2C-1181

EXAM

2C-1180

EXAM

2C-1179

RECEPTION

2C-1146

CORR

C1-1041

EXAM

2C-1174

EXAM

2C-1175

EXAM

2C-1176

EXAM

2C-1177 EXAM

2C-1173

EXAM

2C-1172

EXAM

2C-1171

PCMH

2C-1170

TOILET

2C-1145

WAITING

2C-1141

TRIAGE

2C-1144

TOILET

2C-1143

EXAM

2C-1166

OPEN OFFICE

2C-1165

CORR

C2-1

EXAM

2C-1167

EXAM

2C-1168

CORR

C2-2

SWITCHBOARD

2C-1164

EXISTING SPRINKLER/SMOKE ZONE 4

NEW SPRINKLER/SMOKE ZONE X

EXISTING SPRINKLER/SMOKE ZONE 6

OH1

OH1 OH1

OH1

OH1

OH1

OH1

OH1

A B C D E F

SOILED UTIL

2W-122

OH1

OH1

FLOOR PLAN GENERAL NOTES

A. ALL PIPING SHALL BE SUPPORTED FROM

BUILDING STRUCTURE IN ACCORDANCE WITH

NFPA 13.

FLOOR PLAN KEY NOTES

(THIS SHEET ONLY)

1. CONNECT TO EXISTING ZONE CONTROL

ASSEMBLY AND ROUTE NEW FIRE MAINS AS

INDICATED.

2. CONNECT TO EXISTING STANDPIPE /

SPRINKLER RISER AND INSTALL A NEW ZONE

CONTROL ASSEMBLY IN ACCORDANCE WITH

NFPA 13.

3. INSTALL QUICK RESPONCE PENDENT

SPRINKLER HEADS AND BRANCH PIPING IN

SPRINKLER/SMOKE ZONES AS INDICATED ON

DRAWING AND IN ACCORDANCE WITH NFPA

13.

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

FIRST FLOOR NEW WORK PLAN

BLDGS 2C AND 2W

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FP101

689-402

June 7, 2019 RWC PNW 113

Approver

1/8" = 1'-0"

FIRST FLOOR NEW WORK PLAN BUILDING 2C AND 2W FIRST FLOOR

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

FIRST FLOOR NEW WORK PLAN

BLDGS 2C AND 2W

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FP101

689-402

June 7, 2019 RWC PNW 113

Approver th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

FIRST FLOOR NEW WORK PLAN

BLDGS 2C AND 2W

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FP101

689-402

June 7, 2019 RWC PNW 113

BUILDING 2W

BUILDING 2C

BUILDING 2E

BLDG 1BUILDING 3

BLDG

BLDG 34 BLDG

BLDG 33

B

LD

G

KEY PLAN

NTS

ADDITION

AREA OF NEW WORK

AREA OF NEW WORK

1 1 1

1 1

EXISTING SPRINKLER/SMOKE ZONE 2

AREA OF NEW WORK

EXISTING ZONE

CONTROL VALVE

FLOOR PLAN GENERAL NOTES

A. ALL PIPING SHALL BE SUPPORTED FROM

BUILDING STRUCTURE IN ACCORDANCE

WITH NFPA 13.

B. EXISTING PIPING NOT AVAILABLE FOR

BUILDING 1

FLOOR PLAN KEY NOTES

(THIS SHEET ONLY)

1. INSTALL QUICK RESPONSE PENDENT

SPRINKLER HEADS AND BRANCH PIPING IN

AREAS OF NEW WORK AS INDICATED ON

DRAWING AND IN ACCORDANCE WITH NFPA

13. CONNECT BRANCH PIPING TO EXISTING

FIRE MAINS.

2. IN ROOM WITH NO CEILING INSTALL QUICK

RESPONSE UPRIGHT SPRINKLER HEADS IN

ACCORDANCE WITH NFPA 13.

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

BASEMENT FLOOR PLAN BLDG 2E,

4TH FLOOR PLAN BLDG 1

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FP102

689-402

June 7, 2019 RWC PNW 113

Approver

1/8" = 1'-0"

BASEMENT NEW WORK PLAN BUILDING 2E

1/8" = 1'-0"

FOURTH FLOOR NEW WORK PLAN BUILDING 1

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

BASEMENT FLOOR PLAN BLDG 2E,

4TH FLOOR PLAN BLDG 1

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FP102

689-402

June 7, 2019 RWC PNW 113

FLOOR PLAN GENERAL NOTES

A. ALL PIPING SHALL BE SUPPORTED FROM

BUILDING STRUCTURE IN ACCORDANCE

WITH NFPA 13.

B. EXISTING PIPING NOT AVAILABLE FOR

BUILDING 1

FLOOR PLAN KEY NOTES

(THIS SHEET ONLY)

1. INSTALL QUICK RESPONCE PENDENT

SPRINKLER HEADS AND BRANCH PIPING IN

AREAS OF NEW WORK AS INDICATED ON

DRAWING AND IN ACCORDANCE WITH NFPA

13. CONNECT BRANCH PIPING TO EXISTING

FIRE MAINS.

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

BUILDING 3 AND 42 NEW WORK EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FP103

689-402

June 7, 2019 RC PW 113

Approver

1/8" = 1'-0"

BUILDING 42 2ND FLOOR NEW WORK1/8" = 1'-0"

BUILDING 3 2ND FLOOR NEW WORK

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .

TOLAND MIZELL

FINAL SUBMITTAL

BUILDING 3 AND 42 NEW WORK EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

FP103

689-402

June 7, 2019 RC PW 113

Sheets
F001 - FIRE PROTECTION LEGEND AND DETAILS
FD101 - FIRST FLOOR DEMOLITION BUILDING 2C AND 2W
FD102 - BLDG 2E BASEMENT AND BLDG 1 - 4TH FLOOR DEMOLITION
FD103 - BUILDING 3 AND 42 DEMOLITION
FP101 - FIRST FLOOR NEW WORK PLAN BLDGS 2C AND 2W
FP102 - BASEMENT FLOOR PLAN BLDG 2E, 4TH FLOOR PLAN BLDG 1
FP103 - BUILDING 3 AND 42 NEW WORK