This solicitation package includes construction drawings and specifications for an expansion and renovation project at the Newington VA Medical Center in Connecticut. The project scope involves renovating approximately 20,000 square feet in Buildings 2C and 2W to create additional primary care clinic space, building a new 5,000 square foot structure, and renovating several other areas totaling approximately 12,000 square feet to relocate offices and storage. Drawings provide demolition plans, new work plans, sprinkler details and design data. The solicitation will be issued as an Invitation for Bid conducted in accordance with FAR Parts 14, 19, and 36. The solicitation period closes on March 31, 2020. The construction period is approximately 600 calendar days from notice to proceed. The project magnitude is estimated between $5-10 million. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:
SCALE:
SCALE:
NONE
NONE
NONE
4"-6"
4"-6"
PIPE HANGER DETAIL
GENERAL NOTES:
DROP TO
PENDENT SPRINKLER HEAD DETAIL
UPRIGHT SPRINKLER HEAD DETAIL
HANGER ROD
PIPE
STRAP HANGER
HANGER ROD
PIPE
CLEVIS TYPE
HANGER
HEX NUT
HANGER ROD
(HANGER DETAIL ONLY)
A ALL HANGERS SHALL BE SPACED IN ACCORDANCE WITH PIPE
MANUFACTURERS REQUIREMENTS.
EXTERNAL PLUG DROP
IN CONCRETE ANCHOR
CONCRETE STRUCTURE
1" PIPE
REDUCER COUPLING
PENDENT SPRINKLER
CEILING
ESCUTCHEON PLATE
SPRINKLER MAIN
SUPPLY PIPING
ESCUTCHEON RETAINER
SPRINKLER MAIN
SUPPLY PIPING
OFFSET UPRIGHT SPRINKLER
HEAD AS REQUIRED FOR
OPTIMUM PLACEMENT
UPRIGHT SPRINKLER HEAD
WITH DEFLECTOR SAME
ANGLE AS CEILING
REDUCER COUPLING
CEILING
CEILING
CHECK VALVE
RISER DOWN
TS
CAPPED PIPE
GATE VALVE WITH TAMPER SWITCH
BALL VALVE
BACKFLOW PREVENTER
RISER UP
FIRE DEPARTMENT CONNECTIONFDC
PIPE TO BE DEMOLISHED
FIRE PROTECTION PIPING
POST INDICATOR VALVEPIV
BACK FLOW PREVENTERBFP
LIGHT HAZARDLH
ORDINARY HAZARD, GROUP 1OH1
FIRE HYDRANTFH
TAMPER SWITCH
FIRE PROTECTION LEGEND
2 HOUR FIRE RATED SMOKE BARRIER
1 HOUR FIRE RATED SMOKE BARRIER
SPRINKLER ZONE CONTROL ASSEMBLY DETAIL
NO SCALE
P
SPRINKLER
MAIN
UNION WITH CORROSION RESISTANT
ORIFICE GIVING FLOW EQUIVALENT TO
THE SMALLEST SPINKLER ORIFICE IN
THE
SYSTEM
SITE GLASS
AUXILIARY DRAIN VALVE
INSPECTOR'S TEST
VALVE
TO SPRINKLERS
PRESSURE GAUGE
WATER FLOW SWITCH
24"
MIN
PIPE DRAIN TO
EXTERIOR
GENERAL NOTES
1. DESIGN AND PROVIDE THE SPRINKLER SYSTEM FOR THE
HAZARD OCCUPANCY SHOWN ON THIS SHEET AND BY
HYDRAULIC CALCULATION.
2. RUN PIPING IN ROOMS AND CORRIDORS CONCEALED ABOVE
CEILINGS. IN ROOMS WITH CEILINGS OF EXPOSED
CONSTRUCTION, RUN THE PIPING EXPOSED USING UPRIGHT
SPRINKLER HEADS, EXCEPT AS NOTED OTHERWISE.
3. NO PIPE PENETRATIONS OF STRUCTURAL MEMBERS, EXCEPT
AS NOTED, ARE PERMITTED WITHOUT THE APPROVAL OF THE
ARCHITECT.
4. PROVIDE PIPE PENETRATIONS OF FIRE OR SMOKE PARTITIONS
OR WALLS AND MAKE FIRE AND SMOKE TIGHT.
5. DESIGN AND PROVIDE THE SPRINKLER SYSTEM IN
ACCORDANCE WITH NFPA 13-2015 AND THE CURRENT VA FIRE
PROTECTION DESIGN GUIDE CONTRACTOR SHALL SUBMIT
SHOP DRAWINGS FOR REVIEW BY AE
6. EACH SMOKE ZONE SHALL BE PROVIDED WITH A DEDICATED
WET PIPE SPRINKLER SYSTEM.
7. PROVIDE QUICK RESPONSE SPRINKLER HEADS THROUGHOUT.
SPACE SYSTEM
TYPE
OCCUPANCY TYPE DESIGN DENSITY
GPM/SF
DESIGN AREA
SF
TOTAL FLOW RATE
GPM
OFFICES, CORRIDORS, EXAM ROOMS,
TOILETS
ELEC., STORAGE, MECH., MAINT.
ROOMS
WET
WET
LIGHT HAZARD
ORDINARY HAZARD, GROUP 1
0.10
0.15
HOSE STREAM
GPM
1500 250 NOTE
500 NOTE
NOTES: 1. ALL SPACES NOT SHOWN AS ORDINARY HAZARD GROUP 1 ARE LIGHT HAZARD.
2. ACTUAL FLOW RATES SHALL BE BASED ON HYDRAULIC CALULATIONS.
3. REMOTE AREA REDUCTION WITH QUICK RESPONSE SPRINKLERS IS PERMITTED, IAW NFPA 13 REQUIREMENTS.
SPRINKLER SYSTEM DESIGN DATA
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FIRE PROTECTION LEGEND AND
DETAILS
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
F001
689-402
June 7, 2019 RWC PNW 113
Approver
DEMOLITION PLAN GENERAL NOTES
A. FIRE ALARM OUTAGES INCLUDING FIRE
ALARM IMPAIRMENT ASSOCIATED WITH
FIRE SPRINKLER SYSTEM OUTAGES SHALL
BE IN ACCORDANCE WITH NFPA 101
PARAGRAPH 9.6.1.6 "WHEN A REQUIRED
FIRE ALARM SYSTEM IS OUT OF SERVICE
FOR MORE THAN 4 HOURS OUT OF A 24
HOUR PERIOD, THE AUTHORITY HAVING
JURISDICTION SHALL BE NOTIFIED, AND
THE BUILDING SHALL BE EVACUATED OR
AN APPROVED FIRE WATCH SHALL BE
PROVIDED FOR ALL PARTIES LEFT
UNPROTECTED BY THE SHUT DOWN UNTIL
THE FIRE ALARM SYSTEM HAS BEED
RETURNED TO SERVICE".
DEMOLITION PLAN KEY NOTES
(THIS SHEET ONLY)
1. REMOVE ALL SPRINKLER HEADS, PIPING
DROPS, BRANCHLINES AND MAINS OF
EXISTING SPRINKLER/SMOKE ZONES 4 AND
6 BACK TO THE ZONE CONTROL ASSEMBLY.
2. ZONE 6 - 3" SPRINKLER RISER
3. ZONE 4 - 4" COMBINED
SPRINKLER/STANDPIPE RISER
OFFICE
2W-118
OFFICE
2W-117
OFFICE
2W-119 OFFICE
2W-120
OFFICE
2W-122
OFFICE
2W-124
OFFICE
2W-125
OFFICE
2W-126
OFFICE
2W-121
OFFICE
2W-118
F TLT
2W-116
M TLT
2W-115
STAIR
COMM
2W-128
ELEC
2W-129
HAC
2W-118
TLT
2W-113
TLT
2W-110
OFFICE
2W-114
OFFICE
2W-112
OFFICE
2W-109
OFFICE
2W-108
OFFICE
2W-107
KITCHEN
2W-105
MULTIPURPOSE
ROOM
2W-102
OFFICE
2W-101
OFFICE
2W-100
OFFICE
2W-103
CORR
C1-2
OFFICE
2W-131
OFFICE
2W-130
RECEPTION
2W-032
OFFICE
2W-127
CORR
C1-11
CORR
C1-10
CORR
C1-9
CORR
C1-7
CORR
C1-8
CORR
C1-5
WAITING
2W-024
TLT
2W-106
TLT
2W-104
CORR
CORR
C1-1041
CONTROL
2C-1141
HEALTH
PSYCH
CLINICS
2C-1144
HEALTH
PSYCH
CLINICS
2C-1146
HEALTH
PSYCH
CLINICS
2C-1148
NEUROLAB
2C-1147
NEUROLAB
VIEWING
2C-1145
STO
2C-1143
BIO-FB
CONTROL
2C-1150
BIO-FB
PATIENT
2C-1149 CORR
C1-1044
STAIR
HEALTH
PSYCH
CLINICS
2C-1142
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FIRST FLOOR DEMOLITION
BUILDING 2C AND 2W
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FD101
689-402
June 7, 2019 RWC PNW 113
Approver
1/8" = 1'-0"
FIRST FLOOR DEMOLITION BUILDINGS 2C & 2W
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FIRST FLOOR DEMOLITION
BUILDING 2C AND 2W
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FD101
689-402
June 7, 2019 RWC PNW 113
MECH
1-446
CONF/STO
1-445
CONFERENCE
1-438
STORAGE
1-434
VIS
IMPAIRMENT
SVC
1-428
CORR
C4-12A
SUI COORD
1-428
1-430
STAIR
ELEC
1-444
AREA OF NEW WORK
DEMOLITION PLAN GENERAL NOTES
A. FIRE ALARM OUTAGES INCLUDING FIRE
ALARM IMPAIRMENT ASSOCIATED WITH FIRE
SPRINKLER SYSTEM OUTAGES SHALL BE IN
ACCORDANCE WITH NFPA 101 PARAGRAPH
9.6.1.6 "WHEN A REQUIRED FIRE ALARM
SYSTEM IS OUT OF SERVICE FOR MORE
THAN 4 HOURS OUT OF A 24 HOUR PERIOD,
THE AUTHORITY HAVING JURISDICTION
SHALL BE NOTIFIED, AND THE BUILDING
SHALL BE EVACUATED OR AN APPROVED
FIRE WATCH SHALL BE PROVIDED FOR ALL
PARTIES LEFT UNPROTECTED BY THE SHUT
DOWN UNTIL THE FIRE ALARM SYSTEM HAS
BEED RETURNED TO SERVICE".
DEMOLITION PLAN KEY NOTES
(THIS SHEET ONLY)
1. REMOVE ALL SPRINKLER HEADS, PIPING
DROPS AND BRANCHLINES IN AREA OF NEW
WORK AS INDICATED
RECORDS
2E-B140
STORAGE
2E-B127
STORAGE
OFFICE
2E-B137C
CORR
B043
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BLDG 2E BASEMENT AND BLDG 1 -
4TH FLOOR DEMOLITION
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FD102
689-402
June 7, 2019 RWC PNW 113
Approver
1/8" = 1'-0"
FOURTH FLOOR DEMOLITION PLAN BUILDING 1
1/8" = 1'-0"
BASEMENT DEMOLITION PLAN BUILDING 2E
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BLDG 2E BASEMENT AND BLDG 1 -
4TH FLOOR DEMOLITION
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FD102
689-402
June 7, 2019 RWC PNW 113
DEMOLITION PLAN GENERAL NOTES
A. FIRE ALARM OUTAGES INCLUDING FIRE
ALARM IMPAIRMENT ASSOCIATED WITH FIRE
SPRINKLER SYSTEM OUTAGES SHALL BE IN
ACCORDANCE WITH NFPA 101 PARAGRAPH
9.6.1.6 "WHEN A REQUIRED FIRE ALARM
SYSTEM IS OUT OF SERVICE FOR MORE
THAN 4 HOURS OUT OF A 24 HOUR PERIOD,
THE AUTHORITY HAVING JURISDICTION
SHALL BE NOTIFIED, AND THE BUILDING
SHALL BE EVACUATED OR AN APPROVED
FIRE WATCH SHALL BE PROVIDED FOR ALL
PARTIES LEFT UNPROTECTED BY THE SHUT
DOWN UNTIL THE FIRE ALARM SYSTEM HAS
BEED RETURNED TO SERVICE".
DEMOLITION PLAN KEY NOTES
(THIS SHEET ONLY)
1. REMOVE ALL SPRINKLER HEADS, PIPING
DROPS AND BRANCHLINES IN AREA OF NEW
WORK AS INDICATED
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BUILDING 3 AND 42 DEMOLITION EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FD103
689-402
June 7, 2019 RWC PNW 113
Approver
1/8" = 1'-0"
BUILDING 42 2ND FLOOR DEMO1/8" = 1'-0"
BUILDING 3 2ND FLOOR DEMO
A B C ED F
OPEN OFFICE
2C-1178
WOMEN
ISO/PROC
2W-125
ANTE
2W-124
EXAM
2W-120
EXAM
2W-119
EXAM
2W-118
OPEN OFFICE
2W-117
CORR
1C4
EXAM
2W-121
EXAM
2W-123
FMS COMM
2W-128
F TLT
2W-116
M TLT
2W-115
EXAM
2W-114
EXAM
2W-112
EXAM
2W-109A
EXAM
2W-108A
EXAM
2W-107B
CONF
2W-107A
CORR
1C3
EXAM
2W-105B
EXAM
2W-105A
OPEN OFFICE
2W-102
TOILET
2W-106
TOILET
2W-104
CORR
1C2
EXAM
2W-103B
CLEAN STO
2W-103A
EXAM
2W-108B
EXAM
2W-101
NURSE MGR
2W-100
VESTIBULE
2W-215
CORR
1C1-02W
MED
2W-131C
CLEAN UTIL
2W-131B
TOILET
2W-113
TOILET
2W-110
EQUIP
2W-109B
ELEC
2W-129
HAC
2W-131A
TOILET
2W-126
EXAM
2W-127
EXAM
2W-130A
EXAM
2W-130B
OIT COMM
2W-132A
PHARM D
2W-132B
CORR
1C5
LINEN
2C-1181
EXAM
2C-1180
EXAM
2C-1179
RECEPTION
2C-1146
CORR
C1-1041
EXAM
2C-1174
EXAM
2C-1175
EXAM
2C-1176
EXAM
2C-1177 EXAM
2C-1173
EXAM
2C-1172
EXAM
2C-1171
PCMH
2C-1170
TOILET
2C-1145
WAITING
2C-1141
TRIAGE
2C-1144
TOILET
2C-1143
EXAM
2C-1166
OPEN OFFICE
2C-1165
CORR
C2-1
EXAM
2C-1167
EXAM
2C-1168
CORR
C2-2
SWITCHBOARD
2C-1164
EXISTING SPRINKLER/SMOKE ZONE 4
NEW SPRINKLER/SMOKE ZONE X
EXISTING SPRINKLER/SMOKE ZONE 6
OH1
OH1 OH1
OH1
OH1
OH1
OH1
OH1
A B C D E F
SOILED UTIL
2W-122
OH1
OH1
FLOOR PLAN GENERAL NOTES
A. ALL PIPING SHALL BE SUPPORTED FROM
BUILDING STRUCTURE IN ACCORDANCE WITH
NFPA 13.
FLOOR PLAN KEY NOTES
(THIS SHEET ONLY)
1. CONNECT TO EXISTING ZONE CONTROL
ASSEMBLY AND ROUTE NEW FIRE MAINS AS
INDICATED.
2. CONNECT TO EXISTING STANDPIPE /
SPRINKLER RISER AND INSTALL A NEW ZONE
CONTROL ASSEMBLY IN ACCORDANCE WITH
NFPA 13.
3. INSTALL QUICK RESPONCE PENDENT
SPRINKLER HEADS AND BRANCH PIPING IN
SPRINKLER/SMOKE ZONES AS INDICATED ON
DRAWING AND IN ACCORDANCE WITH NFPA
13.
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FIRST FLOOR NEW WORK PLAN
BLDGS 2C AND 2W
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FP101
689-402
June 7, 2019 RWC PNW 113
Approver
1/8" = 1'-0"
FIRST FLOOR NEW WORK PLAN BUILDING 2C AND 2W FIRST FLOOR
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FIRST FLOOR NEW WORK PLAN
BLDGS 2C AND 2W
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FP101
689-402
June 7, 2019 RWC PNW 113
Approver th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
FIRST FLOOR NEW WORK PLAN
BLDGS 2C AND 2W
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FP101
689-402
June 7, 2019 RWC PNW 113
BUILDING 2W
BUILDING 2C
BUILDING 2E
BLDG 1BUILDING 3
BLDG
BLDG 34 BLDG
BLDG 33
B
LD
G
KEY PLAN
NTS
ADDITION
AREA OF NEW WORK
AREA OF NEW WORK
1 1 1
1 1
EXISTING SPRINKLER/SMOKE ZONE 2
AREA OF NEW WORK
EXISTING ZONE
CONTROL VALVE
FLOOR PLAN GENERAL NOTES
A. ALL PIPING SHALL BE SUPPORTED FROM
BUILDING STRUCTURE IN ACCORDANCE
WITH NFPA 13.
B. EXISTING PIPING NOT AVAILABLE FOR
BUILDING 1
FLOOR PLAN KEY NOTES
(THIS SHEET ONLY)
1. INSTALL QUICK RESPONSE PENDENT
SPRINKLER HEADS AND BRANCH PIPING IN
AREAS OF NEW WORK AS INDICATED ON
DRAWING AND IN ACCORDANCE WITH NFPA
13. CONNECT BRANCH PIPING TO EXISTING
FIRE MAINS.
2. IN ROOM WITH NO CEILING INSTALL QUICK
RESPONSE UPRIGHT SPRINKLER HEADS IN
ACCORDANCE WITH NFPA 13.
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BASEMENT FLOOR PLAN BLDG 2E,
4TH FLOOR PLAN BLDG 1
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FP102
689-402
June 7, 2019 RWC PNW 113
Approver
1/8" = 1'-0"
BASEMENT NEW WORK PLAN BUILDING 2E
1/8" = 1'-0"
FOURTH FLOOR NEW WORK PLAN BUILDING 1
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BASEMENT FLOOR PLAN BLDG 2E,
4TH FLOOR PLAN BLDG 1
EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FP102
689-402
June 7, 2019 RWC PNW 113
FLOOR PLAN GENERAL NOTES
A. ALL PIPING SHALL BE SUPPORTED FROM
BUILDING STRUCTURE IN ACCORDANCE
WITH NFPA 13.
B. EXISTING PIPING NOT AVAILABLE FOR
BUILDING 1
FLOOR PLAN KEY NOTES
(THIS SHEET ONLY)
1. INSTALL QUICK RESPONCE PENDENT
SPRINKLER HEADS AND BRANCH PIPING IN
AREAS OF NEW WORK AS INDICATED ON
DRAWING AND IN ACCORDANCE WITH NFPA
13. CONNECT BRANCH PIPING TO EXISTING
FIRE MAINS.
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BUILDING 3 AND 42 NEW WORK EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FP103
689-402
June 7, 2019 RC PW 113
Approver
1/8" = 1'-0"
BUILDING 42 2ND FLOOR NEW WORK1/8" = 1'-0"
BUILDING 3 2ND FLOOR NEW WORK
th re e in ch es o ne fo ot 6"
Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot
6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot
6"
6"
VA FORM 08-6231
Revisions:
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number:
Building Numbers:
Project Number:
Dwg. of
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A R C H I T E C T S , I N C .
TOLAND MIZELL
FINAL SUBMITTAL
BUILDING 3 AND 42 NEW WORK EXPAND PRIMARY CARE -
NEWINGTON VAMC
NEWINGTON, CT
FP103
689-402
June 7, 2019 RC PW 113
| Sheets |
| F001 - FIRE PROTECTION LEGEND AND DETAILS |
| FD101 - FIRST FLOOR DEMOLITION BUILDING 2C AND 2W |
| FD102 - BLDG 2E BASEMENT AND BLDG 1 - 4TH FLOOR DEMOLITION |
| FD103 - BUILDING 3 AND 42 DEMOLITION |
| FP101 - FIRST FLOOR NEW WORK PLAN BLDGS 2C AND 2W |
| FP102 - BASEMENT FLOOR PLAN BLDG 2E, 4TH FLOOR PLAN BLDG 1 |
| FP103 - BUILDING 3 AND 42 NEW WORK |