Attachment 6 - Architectural Set Final.pdf

PDF 4 MB Posted

Attached to
Y1DA--689-402 Expand Primary Care - Construction (VA-19-00070477)
Solicitation number
36E77620B0003
Issued by

About this file

This document provides details for a construction project to expand primary care clinic space at the Newington VA Medical Center in Newington, Connecticut. The project involves renovating approximately 20,000 square feet in Buildings 2C and 2W, building a new 5,000 square foot addition, and renovating spaces in Buildings 1, 2E, 3, and 42 to relocate services. The project aims to create an additional 25,000 square feet of primary care clinic space. The Department of Veterans Affairs will issue a firm-fixed-price solicitation as a total Service-Disabled Veteran-Owned Small Business set-aside, with an anticipated award between $5-10 million. The period of performance is approximately 600 days from notice to proceed. Questions must be submitted in writing by March 31, 2020, and award is expected shortly after.

View the file

Other files

File Type Posted
36E77620B0003 0008.docx DOCX document
36E77620B0003 0007.docx DOCX document
36E77620B0003 0006.docx DOCX document
36E77620B0003 0005.docx DOCX document
Attachment 16 - Steam Coil Piping Connections Detail (SD238216-03).pdf PDF
Attachment 18 - Answers to Technical Questions.pdf PDF
36E77620B0003 0004.docx DOCX document
Attachment 15 - Revised Specifications TOC and Added Specs.pdf PDF
Attachment 17 - Borings Log Pictures from 1995 Project.zip ZIP file
36E77620B0003 0003.docx DOCX document
Attachment 1.pdf PDF
36E77620B0003 0002.docx DOCX document
36E77620B0003 0001.docx DOCX document
Attachment 14 - Wage Determination.pdf PDF
36E77620B0003.docx DOCX document
Attachment 10 - Fire Protection Set Final.pdf PDF
Attachment 2 - Combined Specs Volume 2.pdf PDF
Attachment 4 - General Set Final.pdf PDF
Attachment 9 - Plumbing Set Final.pdf PDF
Attachment 3 - Hazardous Materials Surveys.zip ZIP file
Attachment 13 - CONTRACTOR SAFETY AND ENV RECORD FORM.docx DOCX document
Attachment 12 - Combined Survey Final.pdf PDF
Attachment 5 - Civil Set Final.pdf PDF
Attachment 1 - Combined Specs Volume 1.pdf PDF
Attachment 7 - Structural Set Final.pdf PDF
Attachment 11 - Electrical Set Final.pdf PDF
Attachment 8 - Mechanical Set Final.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE 1 - AREA

REMAINS OCCUPIED

PHASE 1 -

DEMOLISH SITE

AND CONSTRUCT

NEW ADDITION

PHASE 1 - AREA

REMAINS OCCUPIED

AREA OF EXERCISE

EQUIPMENT TO BE

RELOCATED TO

BUILDING 3

PHASE 1 -

DEMOLITION AND

NEW

CONSTRUCTION

PHASE 1 -

DEMOLITION AND

NEW

CONSTRUCTION

PHASE 1 -

DEMOLITION

AND NEW

CONSTRUCTION

PHASE 1 -

DEMOLITION

AND NEW

CONSTRUCTION

NOTE: RELOCATE

EXERCISE

EQUIPMENT FROM

BLDG 2W AFTER

COMPLETION AND

ACCEPTANCE.

WORK PREVIOUSLY

COMPLETED IN

PHASE 1

PHASE 2 -

DEMOLITION AND

NEW CONSTRUCTION

PHASE 2 -

DEMOLITION AND

NEW CONSTRUCTION

PHASE 1

• DEMOLITION AND NEW CONSTRUCTION IN

BUILDINGS 1, 2E, 3, AND 42.

• CONSTRUCT NEW ADDITION NORTH OF BUILDING 2C.

RELOCATION DOWNTIME

• VA RELOCATES PERSONNEL AND EQUIPMENT FROM

BUILDINGS 2W AND 2C TO BUILDINGS 2E AND 42.

ALLOW 2 WEEKS NO WORK.

• CONTRACTOR RELOCATES EXERCISE EQUIPMENT

FROM BUILDING 2W TO BUILDING 3.

PHASE 2

• DEMOLITION AND NEW CONSTRUCTION IN EXISTING

BUILDINGS 2W AND 2C.

PHASING SUMMARY

NOTE: REFER TO GENERAL REQUIREMENTS SPEC SECTION 01 00 00 FOR

ADDITIONAL INFORMATION.

PHASE 1 -

DEMOLITION AND

NEW

CONSTRUCTION

BUILDING 2W

BUILDING 2C

BUILDING

2E

BLDG 1BUILDING 3

BLDG 34 BLDG

BLDG 33

B L D

G

KEY PLAN

NTS

ADDITION

BLDG

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

PHASING PLANS EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

AP101

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/16" = 1'-0"AP101

PHASE 1 PLAN - FIRST FLOOR -

BUILDINGS 2W AND 2C

1/16" = 1'-0"AP101

PHASE 1 PLAN - BASEMENT -

BUILDING 2E

1/16" = 1'-0"AP101

PHASE 1 PLAN - SECOND FLOOR -

BUILDING 42

1/16" = 1'-0"AP101

PHASE 1 PLAN - SECOND FLOOR -

BUILDING 3

1/16" = 1'-0"AP101

PHASE 2 PLAN - FIRST FLOOR -

BUILDINGS 2W AND 2C

PHASE 1

PHASE 2

1/16" = 1'-0"AP101

PHASE 1 PLAN - FOURTH FLOOR -

BUILDING 1

OPEN

OFFICE

2W-117

EXAM

2W-118

EXAM

2W-119

EXAM

2W-120

ANTE

2W-124

WOMEN

ISO/PROC

2W-125

TOILET

2W-126

CORR

1C4

F TLT

2W-116

M TLT

2W-115

EXAM

2W-114

EXAM

2W-112

EXAM

2W-109A

EXAM

2W-108A

CORR

1C3

FMS

COMM

2W-128

ELEC

2W-129

HAC

2W-131A

TOILET

2W-113

TOILET

2W-110

CLEAN

UTIL

2W-131B

MED

2W-131C

EQUIP

2W-109B

EXAM

2W-108B

EXAM

2W-103B

CLEAN

STO

2W-103A

EXAM

2W-121

EXAM

2W-123 EXAM

2W-127

EXAM

2W-130A

EXAM

2W-130B

OIT COMM

2W-132A

CORR

1C5

PHARM D

2W-132B

CORR

1C1-02W

NURSE

MGR

2W-100

CORR

1C2

EXAM

2W-101

TOILET

2W-106

TOILET

2W-104

EXAM

2W-107B

CONF

2W-107A

EXAM

2W-105B

EXAM

2W-105A

OPEN

OFFICE

2W-102

OPEN

OFFICE

2C-1178

LINEN

2C-1181

EXAM

2C-1180

EXAM

2C-1179

VESTIBULE

2W-215

CORR

C1-1041

EXAM

2C-1174

EXAM

2C-1175

EXAM

2C-1176

EXAM

2C-1177

CORR

C2-2

EXAM

2C-1173

EXAM

2C-1172

EXAM

2C-1171

PCMH

2C-1170

CORR

C2-1

EXAM

2C-1168

EXAM

2C-1167

OPEN

OFFICE

2C-1165

EXAM

2C-1166 SWITCHBOARD

2C-1164

TOILET

2C-1143

TRIAGE

2C-1144TOILET

2C-1145

WAITING

2C-1141

RECEPTION

2C-1146

154' TO EXIT

163' TO EXIT

128' TO EXIT

360 EGRESS

CAPACITY

DN

UP

DN

POINT OF EGRESS

POINT OF EGRESS

A B C ED F

SOILED

UTIL

2W-122

HSS

2C-1182 SMALL

MED

2C-1169

STAIR

STAIR

BUILDING DESCRIPTION

INTERIOR RENOVATION PROVIDING EXAM ROOMS, CLINICAL SUPPORT SPACES, OFFICE AREAS, RECEPTION AND

WAITING.

NEW ADDITION PROVIDING ADDITIONAL EXAM ROOMS, CLINICAL SUPPORT SPACES, AND OFFICE AREAS.

MINOR CIVIL WORK TO ACCOMMODATE NEW ADDITION.

BUILDING SEPARATION AND EXPOSURE

MINIMUM 20 FEET SEPARATION PROVIDED ON ENTIRE PERIMETER OF BUILDING.

INTERIOR FINISHED RATING

THE BUILDING IS PROVIDED WITH AN AUTOMATIC SPRINKLER SYSTEM THROUGHOUT. EXITS AND EXIT ACCESS CORRIDORS SHALL BE CLASS "A" OR CLASS "B" FINISHES. OTHER SPACES SHALL BE CLASS "A" OR CLASS "B"

FINISHES. NFPA 101, 39.3.3.2.

FINISH RATINGS

ALL NEW FINISHES PROVIDED SHALL COMPLY WITH REQUIREMENTS FOR BUSINESS OCCUPANCY AS DESCRIBED

ON LIFE SAFETY EVALUATION TABLE.

AUTOMATIC SPRINKLER SYSTEM

THE BUILDING IS PROVIDED WITH AUTOMATIC SPRINKLER SYSTEM PROTECTION THROUGHOUT. THIS SYSTEM WILL BE RECONFIGURED FOR THE NEW PLAN LAYOUT. NEW SPRINKLER HEADS AND PIPING WILL BE PROVIDED

IN AREAS CURRENTLY LACKING AND IN NEW ADDITION.

FIRE ALARM SYSTEM

TBD

FIRE EXTINGUISHERS

10 LB. FIRE EXTINGUISHERS ARE PROVIDED AND LOCATED IN ACCORDANCE WITH NFPA 10.

FIRE DEPARTMENT ACCESS

EXISTING CONDITIONS TO REMAIN.

HYDRANTS

EXISTING CONDITIONS TO REMAIN.

WATER SUPPLY/SOURCE

EXISTING CONDITIONS TO REMAIN.

LIFE SAFETY EVALUATION - BLDG 2W/2C

VA MEDICAL CENTER

NEWINGTON, CT

ITEM EXISTING OR

PROPOSED

REQUIRED OR

PERMITTED

CODE SECTION (NOTE 1)

OCCUPANCY

CLASSIFICATION

BUSINESS

BUSINESS

BUSINESS

BUSINESS

IBC CHAPTER 3, PARA 304.1

NFPA 101, CHAPTER 6.1.11

TYPE OF CONSTRUCTION TYPE IIB (000)

SPRINKLERED

TYPE IIB (000)

SPRINKLERED

IBC CHAPTER 6, TABLE 601

IBC CHAPTER 5, TABLE 503

FULLY SPRINKLERED

BUILDING AREA,

SQUARE FEET (MAX)

26,807 SF 69,000 SF

PER STORY

NUMBER OF STORIES 3 STORIES 4 STORIES

TRAVEL DISTANCE TO EXIT REFER TO PLAN 300' NFPA 101, 38.2.6.3

NFPA 101, 39.2.6.3

COMMON PATH OF TRAVEL 75' 100' NFPA 101, 38.2.5.3.1

NFPA 101, 39.2.5.3.1

DEAD END TRAVEL 44' 50' NFPA 101, 38.2.5.2

NFPA 101, 39.2.5.2

OCCUPANT LOAD (NOTE 2) 152 -- NFPA 101, TABLE 7.3.1.2

EXIT CAPACITY SEE LIFE SAFETY

PLAN

-- NFPA 101, 7.3.3.1

FINISH RATINGS:

WALLS AND CEILINGS

AT EXITS

OTHER WALLS AND

CEILINGS

CLASS A OR B

CLASS A OR B

CLASS A OR B

CLASS A OR B

NFPA 101, 39.3.3

NOTES:

1. ANALYSIS BASED ON 2012 INTERNATIONAL BUILDING CODE (IBC) AND 2012 NFPA 101 LIFE SAFETY

CODE.

2. OCCUPANT LOAD BASED ON NFPA 101, CHAPTER 7, TABLE 7.3.1.2: 100 SF/PERSON.

IBC CHAPTER 5, TABLE 503

FULLY SPRINKLERED

1-HR FIRE-SMOKE BARRIER

2-HR FIRE-SMOKE BARRIER

LIFE SAFETY PLAN LEGEND

SMOKE BARRIER

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

NOTE: FOR OTHER SPACES NOT INDICATED IN LIFE SAFETY

PLAN, NEITHER OCCUPANCY N OR EGRESS IS CHANGED.

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

LIFE SAFETY PLAN AND

EVALUATION

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

AL101

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/8" = 1'-0"AL101

LIFE SAFETY PLAN - BUILDINGS 2W

AND 2C

HAZARDOUS MATERIAL AND ASBESTOS ABATEMENT

GENERAL NOTES – BUILDINGS 2W, 2C, 2E, AND 42

A. CONTRACTOR SHALL COORDINATE THIS PROJECT

WITH THE CONTRACTING OFFICER TO MINIMIZE

INTERFERENCE WITH STANDARD OPERATING

PROCEDURES OF THE FACILITY.

B. AN ASBESTOS AND LEAD IN PAINT SURVEY REPORT

FOR THIS PROJECT IS AVAILABLE FOR CONTRACTOR

USE.

C. CONTRACTOR SHALL COMPLY WITH ALL FEDERAL,

STATE OF CONNECTICUT, AND LOCAL REGULATIONS.

D. CONTRACTOR SHALL COLLECT AND DISPOSE OF

LIGHTING BALLASTS AND HIGH-INTENSITY DISCHARGE

(HID) LIGHTING CAPACITORS CONTAINING PCBS IN

ACCORDANCE WITH EPA AND THE STATE OF

CONNECTICUT SECTION 22A-449(C)-100 HAZARDOUS

WASTE MANGEMENT SYSTEM.

E. CONTRACTOR SHALL COLLECT AND RECYCLE

FLUORESCENT BULBS, MERCURY THERMOSTATS, AND

BATTERIES IN ACCORDANCE WITH EPA AND THE STATE

OF CONNECTICUT UNIVERSAL WASTE MANAGEMENT

REGULATION SECTION 22A-449(C)-113.

F. CONTRACTOR SHALL REFER TO ARCHITECTURAL AND

MECHANICAL DRAWINGS FOR LOCATIONS OF AREAS

THAT REQUIRE THE DISTURBANCE OF PAINTED

SURFACES. CONTRACTOR SHALL ASSUME ALL

PAINTED SURFACES CONTAIN DETECTABLE LEVELS OF

LEAD AND SHALL PERFORM WORK IN ACCORDANCE

WITH OSHA 29 CFR 1926.62 AND IN ACCORDANCE WITH

EPA AND STATE OF CONNECTICUT. CONTRACTOR

SHALL PERFORM TCLP TESTING TO DETERMINE

PROPER DISPOSAL REQUIREMENTS.

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"PLAN

NORTH

TRUE

NORTH

VBA STO

MECH

3-203A

VBA STO

3-203B

PT-OT STO

3-201

VBA STO

3-203

CORR

C2-2

CORR

C2-1

HAZARDOUS MATERIAL AND ASBESTOS ABATEMENT GENERAL

NOTES – BUILDING 3

A. CONTRACTOR SHALL REMOVE ALL OSHA CLASS II ASBESTOS

CONTAINING AND ASBESTOS CONTAMINATED MATERIALS

AND ASSOCIATED DEBRIS INDICATED IN THESE GENERAL

NOTES, SPECIFICATIONS AND/OR AS SHOWN ON DRAWINGS,

AND DISPOSE OF AS ASBESTOS WASTE.

B. CONTRACTOR SHALL PROVIDE MANUFACTURER’S

EQUIPMENT CERTIFICATION TO CONTRACTING OFFICER FOR

REVIEW AND APPROVAL PRIOR TO PLACING EQUIPMENT ON

JOB SITE.

C. CONTRACTOR SHALL COORDINATE THIS ASBESTOS

REMOVAL PROJECT WITH THE CONTRACTING OFFICER TO

MINIMIZE INTERFERENCE WITH STANDARD OPERATING

PROCEDURES OF THE FACILITY.

D. CONTRACTOR SHALL BE RESPONSIBLE FOR PHYSICALLY

SECURING ALL ENTRANCES AND OPENINGS TO THE WORK

AREA. ALL AREAS WHERE ASBESTOS CONTAINING

MATERIALS ARE PRESENT SHALL BE CONSIDERED AN

ASBESTOS REGULATED WORK AREA UNTIL SUCCESSFUL

COMPLETION OF PROJECT FINAL CLEARANCE CRITERIA.

E. LOCATION OF DECONTAMINATION SYSTEMS, ASBESTOS

ABATEMENT CONTAINMENT BARRIERS SHALL BE APPROVED

BY THE CONTRACTING OFFICER PRIOR TO START OF WORK.

F. ASBESTOS ABATEMENT CONTRACTOR SHALL REMOVE ACM

PRIOR TO ALLOWING OTHER NON-ASBESTOS TRADES TO

PERFORM RENOVATION WORK.

G. ASBESTOS DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE

NOT TO BE SCALED. CONTRACTOR SHALL VISIT SITE

BEFORE WORK BEGINS TO VERIFY ALL DIMENSIONS AND

WORK CONDITIONS. NOTIFY CONTRACTING OFFICER OF ANY

CONFLICTS.

H. AN ASBESTOS AND LEAD IN PAINT SURVEY REPORT FOR THIS

PROJECT IS AVAILABLE FOR CONTRACTOR USE.

I. CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE OF

CONNECTICUT AND LOCAL REGULATIONS.

J. CONTRACTOR SHALL COLLECT AND DISPOSE OF LIGHTING

BALLASTS AND HIGH-INTENSITY DISCHARGE (HID) LIGHTING

CAPACITORS CONTAINING PCB’S IN ACCORDANCE WITH EPA

AND THE STATE OF CONNECTICUT SECTION 22A-449(C)-100

HAZARDOUS WASTE MANGEMENT SYSTEM.

K. CONTRACTOR SHALL COLLECT AND RECYCLE FLUORESCENT

BULBS, MERCURY THERMOSTATS, AND BATTERIES IN

ACCORDANCE WITH EPA AND THE STATE OF CONNECTICUT

UNIVERSAL WASTE MANAGEMENT REGULATION SECTION

22A-449(C)-113.

L. CONTRACTOR SHALL REFER TO ARCHITECTURAL AND

MECHANICAL DRAWINGS FOR LOCATIONS OF AREAS THAT

REQUIRE THE DISTURBANCE OF CERAMIC WALL, CERAMIC

FLOOR TILE, AND PAINTED SURFACES. CONTRACTOR SHALL

ASSUME ALL CERAMIC TILE AND PAINTED SURFACES

CONTAIN DETECTABLE LEVELS OF LEAD AND SHALL

PERFORM WORK IN ACCORDANCE WITH OSHA 29 CFR 1926.62

AND IN ACCORDANCE WITH EPA AND STATE OF

CONNECTICUT. CONTRACTOR SHALL PERFORM TCLP

TESTING TO DETERMINE PROPER DISPOSAL REQUIREMENTS.

ROOMS 3-201 AND 3-203B BOTH CONTAIN CERAMIC WALLS

AND FLOORS.

M. CONTRACTOR SHALL REMOVE AND DISPOSE OF AND/OR

DECONTAMINATE MOLD CONTAMINATED PLASTER WALLS,

PLASTER CEILINGS, GYPSUM WALLS OR OTHER ITEMS AND

APPURTENANCES WITH VISUAL MOLD GROWTH WITHIN THE

ASBESTOS REGULATED WORK AREA.

ABATEMENT KEY NOTES - BUILDING 3

1. REMOVE AND DISPOSE OF AS ASBESTOS CONTAINING

WASTE ALL FLOOR TILE AND ASSOCIATED

MASTICS/GLUES/ADHESIVES.

2. REMOVE AND DISPOSE OF AS ASBESTOS CONTAINING

MATERIAL ALL GLUE DOTS LOCATED ON PLASTER CEILING

(GLUE DOTS ARE EXPOSED AND/OR ABOVE SUSPENDED

CEILING SYSTEM).

3. REMOVE AND DISPOSE OF AS ASBESTOS THE TWO

STAINLESS STEEL SINKS UNDERCOATING.

HAZARDOUS MATERIAL AND ASBESTOS ABATEMENT GENERAL

NOTES – BUILDING 1

A. CONTRACTOR SHALL REMOVE ALL OSHA CLASS II ASBESTOS

CONTAINING AND ASBESTOS CONTAMINATED MATERIALS

AND ASSOCIATED DEBRIS INDICATED IN THESE GENERAL

NOTES, SPECIFICATIONS AND/OR AS SHOWN ON DRAWINGS,

AND DISPOSE OF AS ASBESTOS WASTE.

B. CONTRACTOR SHALL PROVIDE MANUFACTURER’S

EQUIPMENT CERTIFICATION TO CONTRACTING OFFICER FOR

REVIEW AND APPROVAL PRIOR TO PLACING EQUIPMENT ON

JOB SITE.

C. CONTRACTOR SHALL COORDINATE THIS ASBESTOS

REMOVAL PROJECT WITH THE CONTRACTING OFFICER TO

MINIMIZE INTERFERENCE WITH STANDARD OPERATING

PROCEDURES OF THE FACILITY.

D. CONTRACTOR SHALL BE RESPONSIBLE FOR PHYSICALLY

SECURING ALL ENTRANCES AND OPENINGS TO THE WORK

AREA. ALL AREAS WHERE ASBESTOS CONTAINING

MATERIALS ARE PRESENT SHALL BE CONSIDERED AN

ASBESTOS REGULATED WORK AREA UNTIL SUCCESSFUL

COMPLETION OF PROJECT FINAL CLEARANCE CRITERIA.

E. LOCATION OF DECONTAMINATION SYSTEMS, ASBESTOS

ABATEMENT CONTAINMENT BARRIERS SHALL BE APPROVED

BY THE CONTRACTING OFFICER PRIOR TO START OF WORK.

F. ASBESTOS ABATEMENT CONTRACTOR SHALL REMOVE ACM

PRIOR TO ALLOWING OTHER NON-ASBESTOS TRADES TO

PERFORM RENOVATION WORK.

G. ASBESTOS DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE

NOT TO BE SCALED. CONTRACTOR SHALL VISIT SITE

BEFORE WORK BEGINS TO VERIFY ALL DIMENSIONS AND

WORK CONDITIONS. NOTIFY CONTRACTING OFFICER OF ANY

CONFLICTS.

H. AN ASBESTOS AND LEAD IN PAINT SURVEY REPORT FOR THIS

PROJECT IS AVAILABLE FOR CONTRACTOR USE.

I. CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE OF

CONNECTICUT AND LOCAL REGULATIONS.

J. CONTRACTOR SHALL COLLECT AND DISPOSE OF LIGHTING

BALLASTS AND HIGH-INTENSITY DISCHARGE (HID) LIGHTING

CAPACITORS CONTAINING PCB’S IN ACCORDANCE WITH EPA

AND THE STATE OF CONNECTICUT SECTION 22a-449(c)-100

HAZARDOUS WASTE MANGEMENT SYSTEM.

K. CONTRACTOR SHALL COLLECT AND RECYCLE FLUORESCENT

BULBS, MERCURY THERMOSTATS, AND BATTERIES IN

ACCORDANCE WITH EPA AND THE STATE OF CONNECTICUT

UNIVERSAL WASTE MANAGEMENT REGULATION SECTION

22a-449(c)-113.

L. CONTRACTOR SHALL REFER TO ARCHITECTURAL AND

MECHANICAL DRAWINGS FOR LOCATIONS OF AREAS THAT

REQUIRE THE DISTURBANCE OF PAINTED SURFACES.

CONTRACTOR SHALL ASSUME ALL PAINTED SURFACES

CONTAIN DETECTABLE LEVELS OF LEAD AND SHALL

PERFORM WORK IN ACCORDANCE WITH OSHA 29 CFR 1926.62

AND IN ACCORDANCE WITH EPA AND STATE OF

CONNECTICUT. CONTRACTOR SHALL PERFORM TCLP

TESTING TO DETERMINE PROPER DISPOSAL REQUIREMENTS.

LEGEND FOR ASBESTOS ABATEMENT - BUILDING 1

REMOVE AND DISPOSE OF AS ASBESTOS CONTAINING

WASTE ALL PLASTER AND SKIM COAT AS NECESSARY TO

INSTALL NEW WORK. THE PLASTER AND SKIM COAT IS AN

OSHA CLASS II MATERIAL AND AN EPA NESHAP

CATEGORY II NON-FRIABLE ASBESTOS CONTAINING

MATERIAL.

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

ABATEMENT PLANS EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

AB101

689-402

JUNE 7, 2019 Checker Author 113

1, 2, 3, 42

1/8" = 1'-0"AB101

SECOND FLOOR ABATEMENT PLAN

- BUILDING 3

1/8" = 1'-0"AB101

FOURTH FLOOR ABATEMENT PLAN

- BUILDING 1

BUILDING 2W

BUILDING 2C

BUILDING

2E

BLDG 1BUILDING 3

BLDG 34 BLDG

BLDG 33

B L D

G

KEY PLAN

NTS

ADDITION

BLDG

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

DEMOLITION PLAN GENERAL NOTES

A. IN ALL ROOMS SHOWN TO BE DEMOLISHED,

REMOVE ALL FLOORING, WALL BASE,

CEILING TILES AND GRID, GWB BULKHEADS

AND ASSOCIATED FRAMING, CEILING

FIXTURES, MECHANICAL EQUIPMENT, AND

OTHER CEILING MOUNTED EQUIPMENT UNO.

REMOVE ALL ABANDONED WIRING TO ITS

RESPECTIVE PANEL UNO.

B. WHERE EXISTING PIPING PENETRATING

EXISTING, RATED WALL IS REMOVED AND

NOT REPLACED, PROVIDE RATED CLOSURE/

INFILL AT ABANDONED WALL PENETRATION

TO MATCH WALL RATING.

DEMOLITION PLAN KEY NOTES

(ALL NOTES NOT USED ON ALL SHEETS)

1. FIRE ALARM ANNUNCIATOR PANEL TO BE

REMOVED AND STORED FOR

REINSTALLATION.

2. REMOVE CONC WALKS AND STAIR. SEE CIVIL

DRAWINGS.

3. CONC WALK AND HANDRAILS TO REMAIN.

SEE CIVIL DRAWINGS.

4. PATCH CONC SLAB AS NEEDED.

5. REMOVE FLOORING, WALL BASE, WALL

TILES (IF PRESENT), AND ACOUSTICAL OR

GWB CEILING (IF PRESENT) IN PREPARATION

FOR INSTALLING NEW FINISHES. REMOVE

TOILET ACCESSORIES IF PRESENT.

6. REMOVE DOORS. FRAME TO REMAIN.

7. NOT USED.

8. REMOVE WALL TILE FROM EXISTING WALL.

9. REMOVE HANDRAILS, BUMPER GUARDS,

VINYL WAINSCOT, AND CORNER GUARDS

FROM EXISTING CORRIDOR WALLS TO

REMAIN.

10. DEMOLISH WALL FROM FLOOR SLAB TO

ROOF BEAM

11. DEMOLISH FLOOR SLAB AS NEEDED FOR

PLUMBING WORK. REPLACE SLAB PER

11/S301.

DEMOLITION PLAN LEGEND

EXISTING CONSTRUCTION

TO REMAIN

EXISTING CONSTRUCTION

TO BE DEMOLISHED

OFFICE

2W-118

OFFICE

2W-117

OFFICE

2W-119

OFFICE

2W-120

OFFICE

2W-122

OFFICE

2W-124

OFFICE

2W-125

OFFICE

2W-126

OFFICE

2W-121

OFFICE

2W-118

F TLT

2W-116

M TLT

2W-115

STAIR

COMM

2W-128

ELEC

2W-129

HAC

2W-118

TLT

2W-113

TLT

2W-110

OFFICE

2W-114

OFFICE

2W-112

OFFICE

2W-109

OFFICE

2W-108

OFFICE

2W-107

KITCHEN

2W-105 MULTIPURPOSE

ROOM

2W-102

OFFICE

2W-101

OFFICE

2W-100

OFFICE

2W-103

CORR

C1-2

OFFICE

2W-131

OFFICE

2W-130

RECEPTION

2W-032

OFFICE

2W-127

CORR

C1-11

CORR

C1-10

CORR

C1-9

CORR

C1-7

CORR

C1-8

CORR

C1-5

WAITING

2W-024

TLT

2W-106

TLT

2W-104

CORR

CORR

C1-1041

CONTROL

2C-1141

HEALTH

PSYCH

CLINICS

2C-1144

HEALTH

PSYCH

CLINICS

2C-1146

HEALTH

PSYCH

CLINICS

2C-1148

NEUROLAB

2C-1147 NEUROLAB

VIEWING

2C-1145

STO

2C-1143

BIO-FB

CONTROL

2C-1150

BIO-FB

PATIENT

2C-1149

CORR

C1-1044

STAIR

HEALTH

PSYCH

CLINICS

2C-1142

COPY

SWITCHBOARD

2C-1164

UP

DN

TYP

5 9 .

TYP

5 .

TYP

LIMITS OF WORK

9 .

TYP

10.

PLAN

NORTH

TRUE

NORTH

REMOVE COPING AND EXTRANEOUS

FRAMING - SEE 7/A502 FOR EXISTING

CONSTRUCTION TO REMAINE

X

IS

T B

U

IL

D

IN

G

W

EXIST BUILDING 2C

REMOVE PARAPET, ROOF MEMBRANE, ROOF

INSUL, AND ASSOCIATED FLASHING DOWN TO

ROOF DECK - REFER TO 4/A502 AND 3/A302

FOR EXISTING CONSTRUCTION TO REMAIN

AREA OF NEW ADDITION

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

DEMOLITION PLAN - BUILDINGS

2W AND 2C

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

AD101

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/8" = 1'-0"AD101

FIRST FLOOR DEMOLITION PLAN -

BUILDINGS 2W AND 2C

1/8" = 1'-0"AD101

2 ROOF DEMOLITION PLAN

RECORDS

2E-B140

STORAGE

2E-B127

STORAGE

OFFICE

2E-B137C

CORR

B043

WORK

ROOM

2E-B137

WAITING

2E-B042

CONFERENCE

2E-B137A

OFFICE

2E-B137B

LIMITS OF WORK

LIMITS OF WORK

4 . 5 .

5 .

TYP

5 .

TYP

11 .

DEMOLITION PLAN GENERAL NOTES

A. IN ALL ROOMS SHOWN TO BE DEMOLISHED,

REMOVE ALL FLOORING, WALL BASE,

CEILING TILES AND GRID, GWB BULKHEADS

AND ASSOCIATED FRAMING, CEILING

FIXTURES, MECHANICAL EQUIPMENT, AND

OTHER CEILING MOUNTED EQUIPMENT UNO.

REMOVE ALL ABANDONED WIRING TO ITS

RESPECTIVE PANEL UNO.

B. WHERE EXISTING PIPING PENETRATING

EXISTING, RATED WALL IS REMOVED AND

NOT REPLACED, PROVIDE RATED CLOSURE/

INFILL AT ABANDONED WALL PENETRATION

TO MATCH WALL RATING.

DEMOLITION PLAN KEY NOTES

(ALL NOTES NOT USED ON ALL SHEETS)

1. FIRE ALARM ANNUNCIATOR PANEL TO BE

REMOVED AND STORED FOR

REINSTALLATION.

2. REMOVE CONC WALKS AND STAIR. SEE CIVIL

DRAWINGS.

3. CONC WALK AND HANDRAILS TO REMAIN.

SEE CIVIL DRAWINGS.

4. PATCH CONC SLAB AS NEEDED.

5. REMOVE FLOORING, WALL BASE, WALL

TILES (IF PRESENT), AND ACOUSTICAL OR

GWB CEILING (IF PRESENT) IN PREPARATION

FOR INSTALLING NEW FINISHES. REMOVE

TOILET ACCESSORIES IF PRESENT.

6. REMOVE DOORS. FRAME TO REMAIN.

7. NOT USED.

8. REMOVE WALL TILE FROM EXISTING WALL.

9. REMOVE HANDRAILS, BUMPER GUARDS,

VINYL WAINSCOT, AND CORNER GUARDS

FROM EXISTING CORRIDOR WALLS TO

REMAIN.

10. DEMOLISH WALL FROM FLOOR SLAB TO

ROOF BEAM

11. DEMOLISH FLOOR SLAB AS NEEDED FOR

PLUMBING WORK. REPLACE SLAB PER

11/S301.

DEMOLITION PLAN LEGEND

EXISTING CONSTRUCTION

TO REMAIN

EXISTING CONSTRUCTION

TO BE DEMOLISHED

BUILDING 2W

BUILDING 2C

BUILDING

2E

BLDG 1BUILDING 3

BLDG 34 BLDG

BLDG 33

B L D

G

KEY PLAN

NTS

ADDITION

BLDG

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

PLAN

NORTH

TRUE

NORTH

ROOF

ROOF

STORAGE

42-201A

STORAGE

42-204

OFFICE

42-205

OFFICE

42-206 LABOR

RELATIONS

42-201

STORAGE

42-202

VOL STO

42-211

TLT

42-208

VOL STO

42-209

OFFICE

42-210

OFFICE

42-212

HAC

42-214

STORAGE

42-216

STORAGE

42-217

STORAGE

42-218

STORAGE

42-213

MECH

42-219

CORR

42-207

CORR

42-203

CORR

42-215

CORR

C2-1

LIMITS OF WORK

5 .

TYP

VBA STO

MECH

3-203A

VBA STO

3-203B

PT-OT STO

3-201

VBA STO

3-203

CORR

C2-2

CORR

C2-1

LIMITS OF WORK

5 .

TYP

CONFERENCE

1-438

CONF/STO

1-445

MECH

1-446

STORAGE

1-434

VIS

IMPAIRMENT

SVC

1-428

SUI COORD

1-428

1-430 CORR

C4-12A

ELEC

1-444

STAIR #2

LIMITS OF WORK

5 .

TYP

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

DEMOLITION PLANS - BUILDINGS

1, 2E, 3, AND 42

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

AD102

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/8" = 1'-0"AD102

BASEMENT DEMOLITION PLAN -

BUILDING 2E

1/8" = 1'-0"AD102

SECOND FLOOR DEMOLITION PLAN

- BUILDING 42

1/8" = 1'-0"AD102

SECOND FLOOR DEMOLITION PLAN

- BUILDING 3

1/8" = 1'-0"AD102

FOURTH FLOOR DEMOLITION PLAN

- BUILDING 1

S

FA

FA

FA

FA

FA

FA

FA

FA

FA

FA

FA

FA

FA

FA

FA

FA

FA

FA

S

SS

S

S

S

S

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

S

DL

FA

FA

FA

S S S

FA

OS OS OS

OS

OS

OS

OS

OS

OS

OS

OS

FA

FA

FA

FA

FA

IC

IC

IC

IC

OS

FA

LIMITS OF WORK

BUILDING 2W

BUILDING 2C

BUILDING

2E

BLDG 1BUILDING 3

BLDG 34 BLDG

BLDG 33

B L D

G

KEY PLAN

NTS

ADDITION

BLDG

DEMOLITION CEILING PLAN GENERAL NOTES

A. REMOVE ALL CEILING WORK AND DEVICES,

TYP UNLESS NOTED OTHERWISE.

COORDINATE WITH ENGINEERING

DRAWINGS (HVAC, PLUMBING, FIRE

PROTECTION, AND ELECTRICAL).

FA

DL

OS

S

S

DEMOLITION CEILING PLAN LEGEND

EXISTING CONSTRUCTION TO

REMAIN, TYP

EXISTING CONSTRUCTION TO BE

REMOVED, TYP

REMOVE EXIST LAY-IN LIGHT

REMOVE EXIST UTIILITY LIGHT

REMOVE EXIST CAN LIGHT

REMOVE EXIST EXIT LIGHT

REMOVE EXIST NURSE CALL

LIGHT

REMOVE EXIST DIFFUSER

REMOVE EXIST RETURN AIR

GRILLE

REMOVE EXIST FIRE ALARM

REMOVE EXIST DAYLIGHT SENSOR

REMOVE EXIST OCCUPANCY

SENSOR

REMOVE EXIST SMOKE

DETECTOR

REMOVE EXIST SPEAKER

REMOVE EXIST WIFI DEVICE

REMOVE EXIST ACOUSTICAL

CEILING

REMOVE EXIST GWB/PLASTER

CEILING/BULKHEAD

REMOVE EXIST SPRINKLER HEAD

NOTE: SYMBOLS BELOW SHOWN FOR EXISTING

CONSTRUCTION TO BE REMOVED. EXISTING

CONSTRUCTION TO REMAIN USES IDENTICAL

SYMBOLS SHOWN SOLID. NOT ALL SYMBOLS

USED ON ALL DRAWINGS.

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

DEMOLITION RCP AND ROOF

PLANS - BUILDINGS 2W AND 2C

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

AD111

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/8" = 1'-0"AD111

FIRST FLOOR DEMOLITION RCP -

BUILDINGS 2W AND 2C

S S

S S

FA

FA

FA

S

OS

S

S

LIMITS OF WORK

LIMITS OF WORK

BUILDING 2W

BUILDING 2C

BUILDING

2E

BLDG 1BUILDING 3

BLDG 34 BLDG

BLDG 33

B L D

G

KEY PLAN

NTS

ADDITION

BLDG

DEMOLITION CEILING PLAN GENERAL NOTES

A. REMOVE ALL CEILING WORK AND DEVICES,

TYP UNLESS NOTED OTHERWISE.

COORDINATE WITH ENGINEERING

DRAWINGS (HVAC, PLUMBING, FIRE

PROTECTION, AND ELECTRICAL).

FA

DL

OS

S

S

DEMOLITION CEILING PLAN LEGEND

EXISTING CONSTRUCTION TO

REMAIN, TYP

EXISTING CONSTRUCTION TO BE

REMOVED, TYP

REMOVE EXIST LAY-IN LIGHT

REMOVE EXIST UTIILITY LIGHT

REMOVE EXIST CAN LIGHT

REMOVE EXIST EXIT LIGHT

REMOVE EXIST NURSE CALL

LIGHT

REMOVE EXIST DIFFUSER

REMOVE EXIST RETURN AIR

GRILLE

REMOVE EXIST FIRE ALARM

REMOVE EXIST DAYLIGHT SENSOR

REMOVE EXIST OCCUPANCY

SENSOR

REMOVE EXIST SMOKE

DETECTOR

REMOVE EXIST SPEAKER

REMOVE EXIST WIFI DEVICE

REMOVE EXIST ACOUSTICAL

CEILING

REMOVE EXIST GWB/PLASTER

CEILING/BULKHEAD

REMOVE EXIST SPRINKLER HEAD

NOTE: SYMBOLS BELOW SHOWN FOR EXISTING

CONSTRUCTION TO BE REMOVED. EXISTING

CONSTRUCTION TO REMAIN USES IDENTICAL

SYMBOLS SHOWN SOLID. NOT ALL SYMBOLS

USED ON ALL DRAWINGS.

PLAN

NORTH

TRUE

NORTH

FA

S

S

S

FA

FA

FAFA

FA

FA

FA

FA

FA

FA

FA

LIMITS OF WORK

S

S

LIMITS OF WORK

FA

FA

OS

OS

FA

LIMITS OF WORK

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

DEMOLITION RCPs - BUILDINGS

1, 2E, 3, AND 42

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

AD112

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/8" = 1'-0"AD112

BASEMENT DEMOLITION RCP -

BUILDING 2E

1/8" = 1'-0"AD112

SECOND FLOOR DEMOLITION RCP -

BUILDING 42

1/8" = 1'-0"AD112

SECOND FLOOR DEMOLITION RCP -

BUILDING 3

1/8" = 1'-0"AD112

FOURTH FLOOR DEMOLITION RCP -

BUILDING 1

BUILDING 2W

BUILDING 2C

BUILDING

2E

BLDG 1BUILDING 3

BLDG 34 BLDG

BLDG 33

B L D

G

KEY PLAN

NTS

ADDITION

BLDG

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

FLOOR PLAN GENERAL NOTES

A. PATIENT DOORS INTO EXAM ROOMS TO BE

3'-6" WIDE, TYP.

B. SEE 10/A401 FOR TYPICAL TOILET ROOM

ELEVATIONS. ORIENT FIXTURES PER PLAN.

MAINTAIN CLEARANCES AND DIMENSIONS

SHOWN ON G002.

C. PROVIDE HANDRAILS, BUMPER GUARDS,

CORNER GUARDS AND VINYL WAINSCOT AT

ALL CORRIDORS IN AREA OF WORK. SEE

1/A611.

D. INSTALL NEW TOILETS AND WALL-HUNG

LAVATORIES IN SAME LOCATION AS AS

EXISTING ONES REMOVED DURING

DEMOLITION.

E. COORDINATE NEW DOOR OPENINGS WITH

EXISTING CONSTRUCTION AND STRUCTURAL

DRAWINGS.

F. SEE 1/G002 FOR DETAILS WHERE NEW

PIPING PENETRATES EXISTING OR NEW

RATED WALLS.

DIMENSIONING GENERAL NOTES

(NOT APPLICABLE TO SHEET A101. SEE A101D FOR

DIMENSIONS AND PARTITION TYPE CALLOUTS OF

BUILDINGS 2W AND 2C.)

A. SEE SHEET A501 FOR PARTITION TYPES.

B. DIMENSIONS AT EXISTING CONSTRUCTION

ARE TO FACE OF EXISTING FINISH OR

COLUMN LINE UNO.

C. DIMENSIONS AT NEW CONSTRUCTION ARE

TO FACE OF STUD OR MASONRY UNO.

D. NEW PARTITIONS WHICH FALL ON COLUMN

LINES ARE CENTERED ON COLUMN LINE

UNO.

E. ALL NEW WALLS ARE PARTITION TYPE GC4

UNO.

F. SEE 3/A503 FOR TYPICAL COLUMN

ENCLOSURE DETAILS.

FLOOR PLAN KEY NOTES

(ALL NOTES NOT USED ON ALL SHEETS)

1. PAINT INTERIOR FACE OF WINDOW BLACK.

2. DOUBLE-TIER LOCKERS.

3. REINSTALL FIRE ALARM ANNUNCIATOR

PANEL. COORDINATE WITH ELECTRICAL

DRAWINGS AND SPECIFICATIONS.

4. EXISTING CONC WALK AND HANDRAILS TO

REMAIN.

5. 5'x13' RECESSED WALK-OFF MAT. SEE 2/A503.

EXISTING CONSTRUCTION

TO REMAIN

NEW CONSTRUCTION

1-HR FIRE-SMOKE BARRIER

2-HR FIRE-SMOKE BARRIER

FLOOR PLAN LEGEND

SMOKE BARRIER

OPEN

OFFICE

2W-117

EXAM

2W-118

EXAM

2W-119

EXAM

2W-120

ANTE

2W-124

WOMEN

ISO/PROC

2W-125

TOILET

2W-126CORR

1C4

CORR

1C3

CORR

1C5

F TLT

2W-116

M TLT

2W-115

EXAM

2W-114

EXAM

2W-112

EXAM

2W-109A

EXAM

2W-108A

EXAM

2W-107B

CORR

1C2

EXAM

2W-121

EXAM

2W-123

EXAM

2W-127

EXAM

2W-130A

EXAM

2W-130B

OIT COMM

2W-132A

PHARM D

2W-132B

MED

2W-131C

CLEAN

UTIL

2W-131B

HAC

2W-131A

ELEC

2W-129

TOILET

2W-113

TOILET

2W-110

EQUIP

2W-109B

EXAM

2W-108B

EXAM

2W-103B

TOILET

2W-104

TOILET

2W-106

CONF

2W-107A

EXAM

2W-105B

EXAM

2W-105A

OPEN

OFFICE

2W-102

EXAM

2W-101

NURSE

MGR

2W-100

CLEAN

STO

2W-103A

OPEN

OFFICE

2C-1178

LINEN

2C-1181

EXAM

2C-1180

EXAM

2C-1179

VESTIBULE

2W-215

CORR

C2-2

CORR

C2-1

OPEN

OFFICE

2C-1165

EXAM

2C-1177

EXAM

2C-1176

EXAM

2C-1175

EXAM

2C-1174

PCMH

2C-1170

EXAM

2C-1171

EXAM

2C-1172

EXAM

2C-1173

EXAM

2C-1168

EXAM

2C-1167

EXAM

2C-1166

SWITCHBOARD

2C-1164

CORR

C1-1041

TOILET

2C-1145

TRIAGE

2C-1144

TOILET

2C-1143

WAITING

2C-1141

RECEPTION

2C-1146

A121

A301

1 1 1 1 1

A401

A401

A401

TYP

A401

A401

TYP

A401

TYP

A401

11 1 1 1 12W-117

2W-118 2W-119 2W-120 2W-124

2W-126

2W-127A

2W-130AA

2W-130BA

2W-132A

2W-132B 2W-131C

2W-131B

2W-131A

2W-110

2W-109B

2W-112

2W-109A

2W-114

2W-107B

2W-108A 2W-103B

2W-108B

2W-103A

2W-107A

2W-105B 2W-105AA

2W-102A

2W-101

2W-100

2W-215B

2W-215A

2C-1179A2C-1180A

2C-1181

2W-130BB

2W-130AB

2W-127B

2W-105AB

2W-121 2W-123

2W-102B

2W-125

2C-1182

2C-1177B

2C-1176B

2C-1175B

2C-1174B

2C-1178

2C-1146

C2-2

2C-1174A

2C-1175A

2C-1176A

2C-1177A

2C-1173

2C-1172

2C-1171

2C-1169

C2-1

2C-1166A

2C-1165

2C-1167A

2C-1168A 2C-1168B

2C-1167B

2C-1166B

2C-1145 2C-1144 2C-1143

C1-1041

DN

UP

DN

FMS

COMM

2W-128

2W-215C

HSS

2C-1182

SMALL

MED

2C-1169

2C-1170

A B C ED F

A503

TYP

PILASTER

A401

A302

475 SF

110 SF 110 SF 110 SF 65 SF 280 SF

90 SF

120 SF

110 SF

110 SF

110 SF

110 SF

120 SF

120 SF

30 SF

125 SF

125 SF

125 SF

125 SF

120 SF

530 SF

100 SF 100 SF

750 SF

125 SF

60 SF

125 SF

60 SF

90 SF

80 SF

130 SF

130 SF

250 SF

1600 SF

60 SF

60 SF

60 SF

150 SF

150 SF

150 SF

660 SF

150 SF

150 SF

150 SF

50 SF

95 SF

140 SF

140 SF

140 SF

140 SF

1075 SF

130 SF130 SF100 SF

45 SF

2C-1180B 2C-1179B

A401

A401

A401

A401

A401

A401

A401

SOILED

UTIL

2W-122

2W-122

A401

STAIR 8

2C-S8

STAIR

2W-S

5' -0

13'-0"

FEC

FEC

LIMITS OF WORK

A503

TYP

BOX-OUT

PLAN

NORTH

TRUE

NORTH

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

FLOOR PLAN - BUILDINGS 2W

AND 2C

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

A101

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/8" = 1'-0"A101

FIRST FLOOR PLAN - BUILDINGS 2W

A B C ED F

OPEN

OFFICE

2W-117

EXAM

2W-118

EXAM

2W-119

EXAM

2W-120

ANTE

2W-124

WOMEN

ISO/PROC

2W-125

TOILET

2W-126

CORR

1C4

CORR

1C3

CORR

1C5

F TLT

2W-116

M TLT

2W-115

EXAM

2W-114

EXAM

2W-112

EXAM

2W-109A

EXAM

2W-108A

EXAM

2W-107B

CORR

1C2

CORR

1C1-02W

EXAM

2W-121

EXAM

2W-123 EXAM

2W-127

EXAM

2W-130A

EXAM

2W-130B

OIT COMM

2W-132A

PHARM D

2W-132BMED

2W-131C

CLEAN

UTIL

2W-131B

HAC

2W-131A

ELEC

2W-129

TOILET

2W-113

TOILET

2W-110

EQUIP

2W-109B

EXAM

2W-108B

EXAM

2W-103B

TOILET

2W-104

TOILET

2W-106

CONF

2W-107A

EXAM

2W-105B

EXAM

2W-105A

OPEN

OFFICE

2W-102

EXAM

2W-101

NURSE

MGR

2W-100

CLEAN

STO

2W-103A

OPEN

OFFICE

2C-1178

LINEN

2C-1181

EXAM

2C-1180

EXAM

2C-1179

VESTIBULE

2W-215

CORR

C2-2

CORR

C2-1

OPEN

OFFICE

2C-1165

EXAM

2C-1177

EXAM

2C-1176

EXAM

2C-1175

EXAM

2C-1174

PCMH

2C-1170

EXAM

2C-1171

EXAM

2C-1172

EXAM

2C-1173

EXAM

2C-1168

EXAM

2C-1167

EXAM

2C-1166

SWITCHBOARD

2C-1164

CORR

C1-1041

TOILET

2C-1145

TOILET

2C-1143

WAITING

2C-1141

RECEPTION

2C-1146

DN

UP

DN

SMALL

MED

2C-1169

HSS

2C-1182

FMS

COMM

2W-128

8'-8"

ALIGN

'-1

0"

ALIGN

CLEAR

6'-0"

C

LE

A R

6' -0

ALIGN

CLEAR

6'-0"

'-1

'-6

'-6

'-4

C

LE

A R

6' -0

CLEAR

6'-0"

13'-6"

ALIGN

ALIGN

10'-2"

8' -2

ALIGN ALIGN

ALIG

N

7' -6

ALIGN

13'-6" 9'-10" 9'-10" 6'-2"

ALIGN

'-2

C

LE

A R

6' -0

CLEAR

6'-0"

9' -7

9'

-8

1'-4" TYP

5' -0

5'

-0

2' -8

ALIGN

ALIGN

30'-2 5/8" 21'-5 1/4" 15'-9 1/2" 15'-6" 21'-11 1/2"

'-8

'-1

/4

5' -4

/4

3'

-1 1"

CLEAR

6'-0"

CLEAR

6'-0" 6'-11"

'-7

'-1 0"

'-1

0"

'-7

'-1

0" 9'

-5

CLEAR

5'-0"

6"

7' -4

2'-1" CLEAR

10'-4" 5'-0" 10'-2" 10'-4" 2'-1" CLEAR

ALIGN

6' -9

3'-0"

9"1' -6

8"

E Q

E Q

6' -1

1"

CLEAR

10'-8"

A401

1'-0"

GL6

GL4

GL4

GL4

GF10

GL4

GL4

GL2 GL2 GL2

GL4 GL4

GD10

GC6

GC6

GT4

GT4

GT4

GT4GT4GT4

SA3

GL4

GG6

GL4

GL4

GL4

GL4 GL4

GL4

GB6

GD6

ALIGN

GA4

GA4

GA4

GB4

GG4

GG4

GB4GB4

TYP AT WING

WALLS

TYP AT WING

WALLS

GC4

GT4

GC6

GC6

GL4

7' -5

ALIGN

GL4 GL4

GA4

GA4

GA4

GG4

C

LE

A R

7' -6

C

LE

A R

7' -6

1'-0"

/8

TRIAGE

2C-1144

9'-10" 8'-0"

SOILED

UTIL

2W-122

GL4

3' -0

ALIGN

GC6

GL4

GF4

GF4

SEE 2/A121 FOR PILASTER SPACING AND DIMENSIONS

10'-0"10'-1"

GA4

STAIR 8

2C-S8

STAIR

2W-S

GD4

GD4

GD4

GD4

GD4

GD4

GD4

GD4

GD4

CLEAN

UTIL

2W-131B GD4

GD4

9' -1

8'-0"

ALIGN

7" 8"GG4

GG6 GG6

GG4

GG4

GG4

SB3

GA6

21'-0"

6' -2

4'

-0

GL4

GL4 GL4

6'-0"15'-0"

COLUMN LINE TO FACE

OF EXIST BRICK

C O

LU

M

N L

IN

E

T O

F A

C E

O

F E

XI

S

T B

R

IC

K

DIMENSION PLAN GENERAL NOTES

A. SEE SHEET A501 FOR PARTITION TYPES.

B. DIMENSIONS AT EXISTING CONSTRUCTION

ARE TO FACE OF EXISTING FINISH OR

COLUMN LINE UNO.

C. DIMENSIONS AT NEW CONSTRUCTION ARE

TO FACE OF STUD OR MASONRY UNO.

D. NEW PARTITIONS WHICH FALL ON COLUMN

LINES ARE CENTERED ON COLUMN LINE

UNO.

E. ALL NEW WALLS ARE PARTITION TYPE GC4

UNO.

F. ALL WALLS BETWEEN EXAM ROOMS AND

CORRIDORS ARE PARTITION TYPE GC4, TYP.

G. SEE 3/A503 FOR TYPICAL COLUMN

ENCLOSURE DETAILS.

EXISTING CONSTRUCTION

TO REMAIN

NEW CONSTRUCTION

1-HR FIRE-SMOKE BARRIER

2-HR FIRE-SMOKE BARRIER

FLOOR PLAN LEGEND

SMOKE BARRIER

BUILDING 2W

BUILDING 2C

BUILDING

2E

BLDG 1BUILDING 3

BLDG 34 BLDG

BLDG 33

B L D

G

KEY PLAN

NTS

ADDITION

BLDG

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

DIMENSION PLAN - BUILDINGS

2W AND 2C

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

A101D

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/8" = 1'-0"A101D

FIRST FLOOR DIMENSION PLAN -

BUILDINGS 2W AND 2C

2E-B127D

ALIGN

2E-B127A 2E-B127B

2E-B127F

2E-B127E2E-B127C

2E-B140CA

2E-B140CB

2E-B140D 2E-B140E 2E-B140F

OFFICE

2E-B127E

OFFICE

2E-B127C

OFFICE

2E-B127D

INTERNS

2E-B127F

CUBICLES

2E-B127BOFFICE

2E-B127A

WAITING

2E-B140A

RECEPTION

2E-B140B

KITCHENETTE

2E-B042

COPY/WORK

2E-B137

OPEN

OFFICE

2E-B137C

OFFICE

2E-B137A

OFFICE

2E-B137B

OPEN

OFFICE

2E-B140C

OFFICE

2E-B140D

OFFICE

2E-B140E

OFFICE

2E-B140F

OFFICE

2E-B140H

8' -4

"10'-4"

15'-7"

16'-6"

ALIGN

ALIGN

'-6

CLEAR

8'-0"

CLEAR

8'-0"

7' -0

7' -0

ALIGN

10'-6" 10'-6"

A401

A401

A401

A401

2' -0

2E-B140G

2E-B140H

OFFICE

2E-B140G

ALIGN

ALIGN

FEC

LIMITS OF WORK

LIMITS OF WORK

GG4

GG4

FLOOR PLAN GENERAL NOTES

A. PATIENT DOORS INTO EXAM ROOMS TO BE

3'-6" WIDE, TYP.

B. SEE 10/A401 FOR TYPICAL TOILET ROOM

ELEVATIONS. ORIENT FIXTURES PER PLAN.

MAINTAIN CLEARANCES AND DIMENSIONS

SHOWN ON G002.

C. PROVIDE HANDRAILS, BUMPER GUARDS,

CORNER GUARDS AND VINYL WAINSCOT AT

ALL CORRIDORS IN AREA OF WORK. SEE

1/A611.

D. INSTALL NEW TOILETS AND WALL-HUNG

LAVATORIES IN SAME LOCATION AS AS

EXISTING ONES REMOVED DURING

DEMOLITION.

E. COORDINATE NEW DOOR OPENINGS WITH

EXISTING CONSTRUCTION AND STRUCTURAL

DRAWINGS.

F. SEE 1/G002 FOR DETAILS WHERE NEW

PIPING PENETRATES EXISTING OR NEW

RATED WALLS.

DIMENSIONING GENERAL NOTES

(NOT APPLICABLE TO SHEET A101. SEE A101D FOR

DIMENSIONS AND PARTITION TYPE CALLOUTS OF

BUILDINGS 2W AND 2C.)

A. SEE SHEET A501 FOR PARTITION TYPES.

B. DIMENSIONS AT EXISTING CONSTRUCTION

ARE TO FACE OF EXISTING FINISH OR

COLUMN LINE UNO.

C. DIMENSIONS AT NEW CONSTRUCTION ARE

TO FACE OF STUD OR MASONRY UNO.

D. NEW PARTITIONS WHICH FALL ON COLUMN

LINES ARE CENTERED ON COLUMN LINE

UNO.

E. ALL NEW WALLS ARE PARTITION TYPE GC4

UNO.

F. SEE 3/A503 FOR TYPICAL COLUMN

ENCLOSURE DETAILS.

FLOOR PLAN KEY NOTES

(ALL NOTES NOT USED ON ALL SHEETS)

1. PAINT INTERIOR FACE OF WINDOW BLACK.

2. DOUBLE-TIER LOCKERS.

3. REINSTALL FIRE ALARM ANNUNCIATOR

PANEL. COORDINATE WITH ELECTRICAL

DRAWINGS AND SPECIFICATIONS.

4. EXISTING CONC WALK AND HANDRAILS TO

REMAIN.

5. 5'x13' RECESSED WALK-OFF MAT. SEE 2/A503.

EXISTING CONSTRUCTION

TO REMAIN

NEW CONSTRUCTION

1-HR FIRE-SMOKE BARRIER

2-HR FIRE-SMOKE BARRIER

FLOOR PLAN LEGEND

SMOKE BARRIER

BUILDING 2W

BUILDING 2C

BUILDING

2E

BLDG 1BUILDING 3

BLDG 34 BLDG

BLDG 33

B L D

G

KEY PLAN

NTS

ADDITION

BLDG

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

PLAN

NORTH

TRUE

NORTH

ROOF

ROOF

HUDVASH

42-216

HUDVASH

42-217

HUDVASH

42-218

CORR

42-215

HAC

42-214

HUDVASH

42-209

CORR

42-207

OFFICE

42-213

MECH

42-219

SUPERS

42-211

TLT

42-208 WAITING

42-202

CORR

42-203

TEAM

42-206

VOCATIONAL

42-205

GRANT

42-204

STO

42-201A

HCHV

42-201A401

42-201A 42-201

GC4

GD4

GC4

ALIGN

FEC

LIMITS OF WORK

CORR

C2-2

CORR

C2-1

FITNESS

3-201

GL2

LIMITS OF WORK

1'-10" 10"

GL4

ALIGN, TYP

ALIGN, TYP

ALIGN

8'-6"

'-6

'-6

'-6

10'-0"

SMALL

CONF

1-434D

OPEN

OFFICE

1-434

OFFICE

1-434C

OFFICE

1-434B

OFFICE

1-434A

OPEN

OFFICE

1-445

OFFICE

1-445A

MECH

1-446

VIS

IMPAIRMENT

SVC

1-428

SUI COORD

1-428

1-430 CORR

C4-12A

ELEC

1-444

STAIR #2

1-434D

1-434C

1-434B

1-434A

1-445A

A401

A401

CONFERENCE

1-438

FEC

LIMITS OF WORK

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

FLOOR PLANS - BUILDINGS 1,

2E, 3, AND 42

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

A102

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/8" = 1'-0"A102

BASEMENT FLOOR PLAN -

BUILDING 2E

1/8" = 1'-0"A102

SECOND FLOOR PLAN - BUILDING

1/8" = 1'-0"A102

3 SECOND FLOOR PLAN - BUILDING 3

1/8" = 1'-0"A102

4 FOURTH FLOOR PLAN - BUILDING 1

A503

A503

A503

A503

TYP 5

A503

TYP

A503

5' -0

A B C ED F

TYP

TYP

TYP

OS

DL

OS OS OS

OS

OS

OS OS

OSOS

OS

OS

OS

OS

OS

OS

OS

OS

OSOS

DL DL

DL

DL

DL

DL

DLDL

DL

DL

DL

DL

DL

DL

FA

FA

FA

FA

FA

FAFA

FA

FA

FA

FA

FA

FA

FA

FA

FA

FA FA

FA

FA

FA

FAFAFA

FA

S

FA

S

S S

S

S

S

S

S

S

SS

S

S

S

S

S

S

S

S

S

S

S

S S

S

S S

S

FA

SSS

S

S

S S

S

SS S

S

FA

S

S

S

S 1'-6"

TY

P

E Q

TY

P

E Q

DL

R 15'-0"

2'-8"

2' -0

2'-0"

2'-0"

A503

SIM

'-4

7'-10"

A503

TYP

2' -0

ALIGN, TYP

GWB

8' - 0" AFF

ACT

9' - 0" AFF

FA

FA

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

LIMITS OF WORK

BUILDING 2W

BUILDING 2C

BUILDING

2E

BLDG 1BUILDING 3

BLDG 34 BLDG

BLDG 33

B L D

G

KEY PLAN

NTS

ADDITION

BLDG

CEILING PLAN GENERAL NOTES

A. ACT GRIDS ARE CENTERED IN ROOM

UNLESS DIMENSIONED OTHERWISE.

B. SEE ROOM FINISH SCHEDULE FOR CEILING

HEIGHTS.

CEILING PLAN KEY NOTES

(ALL NOTES NOT USED ON ALL SHEETS)

1. EXISTING GWB BULKHEAD

CEILING PLAN LEGEND

EXISTING CONSTRUCTION TO

REMAIN, TYP

NEW CONSTRUCTION

NEW LAY-IN LIGHT

NEW UTIILITY LIGHT

NEW CAN LIGHT

NEW EXIT LIGHT

NEW NURSE CALL LIGHT

NEW DIFFUSER

NEW RETURN AIR GRILLE

NEW FIRE ALARM/STROBE

NEW ACOUSTICAL CEILING

NEW GWB CEILING/BULKHEAD

NEW DAYLIGHT SENSOR

NEW INVENTORY CONTROL UNIT

NEW OCCUPANCY SENSOR

NEW SMOKE DETECTOR

NEW SPEAKER

NEW WIFI DEVICE

FA

DL

IC

OS

S

NEW SPRINKLER HEAD

1-HR FIRE-SMOKE BARRIER

2-HR FIRE-SMOKE BARRIER

SMOKE BARRIER

NEW BARIATRIC LIFT TRACK

NOTE: SYMBOLS BELOW SHOWN FOR NEW

CONSTRUCTION. EXISTING CONSTRUCTION TO

REMAIN USES IDENTICAL SYMBOLS SHOWN

GRAY.

NEW PRIVACY CURTAIN TRACK,

TYP AT EXAM ROOMS

S

NEW STROBEST

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

RCP - BUILDING 2W AND 2C EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

A111

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/8" = 1'-0"A111

FIRST FLOOR RCP - BUILDINGS 2W

A503

S

S

S

S

SS

S

SS

FA

FA

FA

FA

S

TYP

EQ

TYP

EQ

TY

P

E Q

TY

P

E Q

LIMITS OF WORK

LIMITS OF WORK

BUILDING 2W

BUILDING 2C

BUILDING

2E

BLDG 1BUILDING 3

BLDG 34 BLDG

BLDG 33

B L D

G

KEY PLAN

NTS

ADDITION

BLDG

CEILING PLAN GENERAL NOTES

A. ACT GRIDS ARE CENTERED IN ROOM

UNLESS DIMENSIONED OTHERWISE.

B. SEE ROOM FINISH SCHEDULE FOR CEILING

HEIGHTS.

CEILING PLAN KEY NOTES

(ALL NOTES NOT USED ON ALL SHEETS)

1. EXISTING GWB BULKHEAD

CEILING PLAN LEGEND

EXISTING CONSTRUCTION TO

REMAIN, TYP

NEW CONSTRUCTION

NEW LAY-IN LIGHT

NEW UTIILITY LIGHT

NEW CAN LIGHT

NEW EXIT LIGHT

NEW NURSE CALL LIGHT

NEW DIFFUSER

NEW RETURN AIR GRILLE

NEW FIRE ALARM/STROBE

NEW ACOUSTICAL CEILING

NEW GWB CEILING/BULKHEAD

NEW DAYLIGHT SENSOR

NEW INVENTORY CONTROL UNIT

NEW OCCUPANCY SENSOR

NEW SMOKE DETECTOR

NEW SPEAKER

NEW WIFI DEVICE

FA

DL

IC

OS

S

NEW SPRINKLER HEAD

1-HR FIRE-SMOKE BARRIER

2-HR FIRE-SMOKE BARRIER

SMOKE BARRIER

NEW BARIATRIC LIFT TRACK

NOTE: SYMBOLS BELOW SHOWN FOR NEW

CONSTRUCTION. EXISTING CONSTRUCTION TO

REMAIN USES IDENTICAL SYMBOLS SHOWN

GRAY.

NEW PRIVACY CURTAIN TRACK,

TYP AT EXAM ROOMS

S

NEW STROBEST

PLAN

NORTH

TRUE

NORTH

S

S

S

S

S SFA

FA

FAFA

LIMITS OF WORK

DL

OS

OS

FAS

LIMITS OF WORK

S

S

S

S

S

DL

OS

OS

OS

OS

OS

DL

DL

ST

LIMITS OF WORK

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

RCPs - BUILDINGS 1. 2E, 3, AND

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

A112

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/8" = 1'-0"A112

1 BASEMENT RCP - BUILDING 2E

1/8" = 1'-0"A112

2 SECOND FLOOR RCP - BUILDING 42

1/8" = 1'-0"A112

3 SECOND FLOOR RCP - BUILDING 3

1/8" = 1'-0"A112

4 FOURTH FLOOR RCP - BUILDING 1

CRICKET CRICKET CRICKET CRICKET CRICKET

L O

P

/4

F

O O

T

S L O

F

O O

T

S L O

F

O O

T

S L O

F

O O

T

S L O

F

O O

T

S L O

F

O O

T

CAST STONE

COPING

ROOF

DRAIN, TYP

OVERFLOW

DRAIN, TYP

CRICKET

EXIST BUILDING 2C

A B C ED F

A502

TYP

SIM

A301

A502

A502

A502

A502

EXPANSION

JOINT SCUPPER

CRICKETCRICKET

COLUMN STUB COVER

WITH CRICKET AS

INDICATED, TYP AT ALL

NEW COLUMNS ON

COLUMN LINES 2, 3, AND 4 -

SEE 3/A502

A502

A302

A302

NOTE: SLOPE CRICKETS 1/8"

PER FOOT, TYP

PIPE

PENETRATION, TYP

- SEE 11/A502

A502

NEW ADDITION

ROOF

BUILDING 2C

BUILDING 2W

ROOF

BUILDING 2C

ROOF

EXHAUST FAN

EXHAUST FAN

CONDENSING

UNITS

EXHAUST FAN

A502

A502

A502

TYP

A503

A503

TYP

GUY WIRE

GUY WIRE

EXHAUST FAN

A502

A502

SIM

EXISTING

BUILDING 2W

EXISTING

BUILDING 2C

FIRST FLOOR

EL 0'-0"

SECOND FLOOR

EL 12'-0"

THIRD FLOOR

EL 24'-0"

SEE NEW CONSTRUCTION

1'-0"1'-4" 1'-0" 1'-4" 1'-4" 1'-0" 1'-0"

1'-4" 1'-4" 1'-0" 1'-0"

1'-4" 1'-4" 1'-0"

1'-0"

1'-4"

PILASTER, TYP

EXISTING

BUILDING 2C

EXISTING

BUILDING 2C

A301

A301

PLAN

NORTH

TRUE

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

BUILDING 42 ROOF

LOWER ROOF

W A

L K

W A

Y R

O O

FLOWER

ROOF

EXHAUST FAN

A502

A502

ROOFTOP

UNIT

EXHAUST FAN

A502 th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

ROOF PLANS AND EXTERIOR

ELEVATION

EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

A121

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

1/8" = 1'-0"A121

1 ROOF PLAN - BUILDING 2W/2C

1/8" = 1'-0"A121

2 PARTIAL NORTH ELEVATION

1/8" = 1'-0"A121

3 ROOF PLAN - BUILDING 42

CAST STONE ACCENT BAND

STEEL WITH SPRAY-ON FIREPROOFING

- SEE UL DESIGNS ON G002 BEAM

MODULAR BRICK VENEER W/ MASONRY

VENEER ANCHORS @ 16" OC

2" POLYISOCYANURATE BOARD

INSULATION

4" CONC SLAB

GRADE

2" POLYSTYRENE BOARD INSULATION

CONC FOUNDATION WALL

CONC FOOTING

1/2" CEMENTITIOUS SHEATHING

DAMPPROOFING

5/8" GWB ON 6" CFMF @ 16" OC W/ 5-1/2"

BATT INSUL

2'-0"

ACOUSTICAL CEILING TILE SYSTEM

TO CONC SLAB

EL 12'-0"

TO STEEL

EL 11'-6 3/4"

FIRST FLOOR

EL 0'-0"

8"

4"

TPO ROOF MEMBRANE ON TAPERED

POLYISOCYANURATE ROOF

INSULATION ON 3-1/4" CONC TOPPING

ON 2" COMPOSITE ROOF DECK

1'-0"

1"

TO FRAMING

EL 13'-10 1/2"

(4

C O

U R

S E

S

'-5

/1

6" (1

C

O U

R S

E S

2'

-8

P R

O

FI

L E

S E

E

NOTE: SEE 7/A503 FOR CAST STONE

PROFILES

A502

A502

TPO ROOF MEMBRANE ON TAPERED

POLYISOCYANURATE ROOF

INSULATION ON 3-1/4" CONC TOPPING

ON 2" COMPOSITE ROOF DECK

CAST STONE ACCENT BAND

STEEL BEAM WITH SPRAY-ON

FIREPROOFING - SEE UL DESIGNS ON

G002

ALUM STOREFRONT WINDOW

MODULAR BRICK VENEER W/ MASONRY

VENEER ANCHORS @ 16" OC

2" POLYISOCYANURATE BOARD

INSULATION

4" CONC SLAB

GRADE

2" POLYSTYRENE BOARD INSULATION

CONC FOUNDATION WALL

CONC FOOTING

1/2" CEMENTITIOUS SHEATHING

DAMPPROOFING

5/8" GWB ON 6" CFMF @ 16" OC W/ 5-1/2"

BATT INSUL

2'-0"

ACOUSTICAL CEILING TILE SYSTEM

TO CONC SLAB

EL 12'-0"

TO STEEL

EL 11'-6 3/4"

FIRST FLOOR

EL 0'-0"

BO ANGLE

EL 8'-8"

TO SILL

EL 3'-6"

TO FRAMING

EL 13'-10 1/2"

8"

4"

1'-0"

1"

A601

A601

A601

A502

A502

NOTE: SEE 7/A503 FOR CAST STONE

PROFILES

NOTE: SEE 2/A301 FOR BRICK VENEER

COURSING COUNTS AND DIMENSIONS

FIRST FLOOR

EL 0'-0"

SECOND FLOOR

EL 12'-0"

NEW TPO MEMBRANE

ON SLOPING ROOF INSULATION

NEW CONC SLAB

EXIST CONC FOUNDATION

WALL

EXIST WALL CONSTRUCTION

5 4 3 2 1

A301

A302 th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

BUILDING AND WALL SECTIONS EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

A301

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

3/4" = 1'-0"A301

WALL SECTION - TYPICAL ADDITION

WALL

3/4" = 1'-0"A301

WALL SECTION - ADDITION AT

WINDOW

1/4" = 1'-0"A301

1 BUILDING SECTION AT ADDITION

TO CONC SLAB

EL 12'-0"

TO STEEL

EL 11'-6 3/4"

FIRST FLOOR

EL 0'-0"

EXISTING CONC SLAB

STEEL BEAMS WITH SPRAY-ON

FIREPROOFING - SEE UL DESIGNS ON

G002

EXISTING CONC BEAM

EXISTING CMU, CAST STONE VENEER,

BRICK VENEER, AND STEEL

CONSTRUCTION

ACOUSTICAL CEILING TILE SYSTEM

5/8" GWB ON 4" METAL STUDS @ 16" OC

- INFILL DEMOLISHED WINDOW

OPENING FLUSH WITH EXISTING GWB

WALL SURFACE

EXISTING CMU, GWB, AND BRICK

VENEER CONSTRUCTION

EXISTING CONC SLAB

1/2" JOINT FILLER

EXISTING CONC FOUNDATION WALL

ACOUSTICAL CEILING TILE SYSTEM

SEE PLAN FOR PARTITION TYPE

LINE OF STEEL COLUMN IN WALL

BEYOND

4" CONC SLAB

4"

EXISTING WINDOW

TPO ROOF MEMBRANE ON

TAPERED

POLYISOCYANURATE ROOF

INSULATION ON 3-1/4" CONC

TOPPING ON 2" COMPOSITE

ROOF DECK

COLUMN STUB CAP

A502

TO CONC SLAB

EL 12'-0"

TO STEEL

EL 11'-6 3/4"

FIRST FLOOR

EL 0'-0"

EXISTING CONC SLAB

STEEL BEAMS WITH SPRAY-ON

FIREPROOFING - SEE UL DESIGNS ON

G002

EXISTING CONC BEAM

EXISTING CMU, CAST STONE VENEER,

BRICK VENEER, AND STEEL

CONSTRUCTION

ACOUSTICAL CEILING TILE SYSTEM

EXISTING CONC SLAB

1/2" JOINT FILLER

EXISTING CONC FOUNDATION WALL

ACOUSTICAL CEILING TILE SYSTEM

EXISTING WINDOW

SEE PLAN FOR PARTITION TYPE

TPO ROOF MEMBRANE ON

TAPERED

POLYISOCYANURATE ROOF

INSULATION ON 3-1/4" CONC

TOPPING ON 2" COMPOSITE

ROOF DECK

LINE OF STEEL COLUMN IN WALL

BEYOND

4" CONC SLAB

A502

A502

TPO ROOF MEMBRANE ON

TAPERED

POLYISOCYANURATE ROOF

INSULATION ON 3-1/4" CONC

TOPPING ON 2" COMPOSITE

ROOF DECK

TO CONC SLAB

EL 12'-0"

TO STEEL

EL 11'-6 3/4"

FIRST FLOOR

EL 0'-0"

EXISTING CONC SLAB

1/2" JOINT FILLER

4" CONC SLAB

EXISTING CONC FOUNDATION WALL

SEE PLAN FOR PARTITION TYPE

EXIST EXTERIOR WALL CONSTRUCTION

STEEL BEAMS WITH SPRAY-ON

FIREPROOFING - SEE UL DESIGNS ON

G002

EXISTING STEEL BEAM

ACOUSTICAL CEILING TILE SYSTEM

EXISTING ROOF DECK

NEW STEEL TUBES

A502 th re e in ch es o ne fo ot 6"

Department of Veterans Affairs on e an d on e ha lf in ch es o ne fo ot

6" on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot on e ei gh th in ch o ne fo ot

6"

6"

VA FORM 08-6231

Revisions:

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director:

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number:

Building Numbers:

Project Number:

Dwg. of

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .A R C H I T E C T S , I N C .

TOLANDTOLANDTOLANDTOLAND MIZELLMIZELLMIZELLMIZELL

FINAL SUBMITTAL

WALL SECTIONS EXPAND PRIMARY CARE -

NEWINGTON VAMC

NEWINGTON, CT

A302

689-402

JUNE 7, 2019 AT CC 113

1, 2, 3, 42

3/4" = 1'-0"A302

WALL SECTION - ADDITION

CONNECTION TO BLDG 2C AT

WINDOW

3/4" = 1'-0"A302

WALL SECTION - ADDITION

CONNECTION TO BLDG 2C AT

DOOR

3/4" = 1'-0"A302

WALL SECTION - ADDITION

CONNECTION AT SWITCHBOARD

3' -0

2' -1

0"

2' -0

2'

-8

3'-0" 2'-0"

SINK BASE

WALL CABINETS

WALL PROTECTION

PANEL

ACCESSORY RAIL

SLOPED CABINET

TOP

WORK SURFACE

NOTE: PROVIDE HERMAN MILLER

COMPASS SYSTEM MODEL C502 OR

APPROVED EQUAL.

SOAP DISPENSER

(VA PURCHASED/

VA INSTALLED)

PAPER TOWEL

DISPENSER

(VA PURCHASED/

VA INSTALLED)

2' -1

0"

A501

A501

A501

A501

REF

(NIC)

FRZ

(NIC)

PYXIS

(NIC)

2'-6"

2' -2

3'

-0 " 2' -0

2'-6" 2'-6"

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .