This document contains a technical questions and answers tracking sheet for a solicitation to expand a primary care clinic. Key details include that the solicitation number is 36E77620B0003 and seeks to renovate and expand approximately 25,000 square feet of primary care space at the VA Medical Center in Newington, Connecticut through renovating existing buildings and constructing a new 5,000 square foot addition. The period of performance is approximately 600 calendar days from notice to proceed. Questions must be submitted in writing by a specified date and telephone calls will not be accepted. The magnitude of construction is estimated between $5-10 million.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION: 36E77620B0003 PROJECT NAME: Expand Primary Care Clinic TECHNICAL QUESTIONS AND VA RESPONSE TRACKING
SHEET
ITEM
NO.
DATE
QUESTION
RECEIVED
QUESTION GOVERNMENT RESPONSE
1. 7/16/2020 Due to COVID 19 concerns will emailed proposal be accepted?
No. Only original copies of bids and associated bid bonds will be accepted.
2. 7/21/2020 Does this project have fire protection? If so, where can I retrieve plans?
Refer to the drawings and specs
3. 7/21/2020 Would it be possible to get a copy of the site plans for the above project? Do you happen to know if there are any tree removals?
Refer to the dwgs and specs
4. 7/23/2020 Please provide Geotechnical Report and Test Boring logs for the project.
See Attachment 17 for the photos of test boring logs from a project done in 1995. No additional information is available.
5. 7/23/2020 Documents provided with bases of design for the plumbing equipment’s but what about the fixtures?
Please clarify.
Fixture requirements are indicated and specified
6. 7/23/2020 In regards to the typical exam rooms compass system that is on page A 401 (elevation 2), is the owner to supply, the GC or by us?
1/A471 EQUIPMENT PLAN – EXAM ROOM
defines the Exam Room casework (Compass system) as contractor furnished/contractor installed
7. 7/23/2020 On the plan view (page A 101) there is quite a few exam rooms but there is no elevation number that points to elevation 2, if we are to bid the compass systems should we bid these areas same as elevation 2?
1/A101 shows the Compass system called out as typical for all Exam Rooms. See EXAM 2W-123, EXAM 2W-107B, and EXAM 2C-1172 on
1/A101 for callout. Also, WOMEN ISO/PROC
2W-125 shows Compass system elevation called out.
8. 7/28/2020 Is Division 27 “communications” is bidding separate from the electrical package on this job? I’m having difficulty locating the actual bid forms and see that there are no separate T drawings.
Coordinate with GC’s-not a Gov’t isssue
DATE
QUESTION
RECEIVED
QUESTION GOVERNMENT RESPONSE
9. 7/28/2020 In the glazing specs, they list a minimum thickness for glazing types. On the drawings it list 1/4" thickness for the glass. It also give an STC Rating of 45 which is equal to a 2" thick insulating unit using 1/4" lami, 2" air space, and 3/16" outer lite. Please advise as to correct glass types and correct STC ratings for the glass.
Interior doors for patient care rooms are intended to be STC 45 and should not have windows
10. 7/28/2020 The spec also states that all sound rated aluminum storefront shall come from the factory pre-glazed. We do not see any storefront on the drawings. All we see is a pair of aluminum doors. Are they to come thru pre-glazed?? Please advise
We do not find such a reference
11. 7/28/2020 Are all the doors to have an STC rating (provided pre-glazed from the factory)? Please confirm.
See response above
12. 7/29/2020 Is there duct liner required and if so liner type and location?
Duct liner is prohibited from installation on VA projects.
13. 7/29/2020 What is the duct pressure class and for which systems is required?
Ductwork construction requirements are specified in Section 23 31 00. Sheet metal medium pressure supply ducts (i.e., located upstream of
VAV terminal units) shall be designed for a pressure class of 4 inches WC. Sheet metal low pressure supply ducts (i.e., located downstream of
VAV terminal units) shall be designed for a pressure class of 2 inches WC. Sheet metal return, exhaust, and transfer ducts shall be designed for a pressure class of negative 2 inches
WC.
14. 7/29/2020 What is the schedule for this project? See specs & VA issued info
15. 7/29/2020 Who is responsible for support rails to utility exhaust
,guy wires and curb?
GCs to coordinate
16. 7/29/2020 Will you have to work through existing ceiling grids during the demo phase?
All ceiling grids are shown as to be demolished on AD111 and AD112.
DATE
QUESTION
RECEIVED
QUESTION GOVERNMENT RESPONSE
17. 7/29/2020 What is the all the duct material used for EF-2 Utility
Fan?
Galvanized per section 23 31 00
18. 7/29/2020 Does all work require duct cleaning? Yes
19. 7/29/2020 Does all duct work in the fitness area 3-201 need to be double wall construction?
Yes, per note #3 on sheet MH104, all exposed ductwork shall be double wall.
20. 7/30/2020 Will crane picks related to mechanical work be permitted during the week or on weekends only? Are there restrictions on operating hours?
Because of the location of the mechanical pick for
Bldg. 42, plan on working after normal hours or weekends.
21. 7/30/2020 It appears the Physical Access Control and Video
Surveillance (Div. 28 13 & 28 23) are missing from the specs.
Can you please provide thru addendum.
With the Security details missing can the cut date to submit questions be extended until Monday?
See Attachment 15.
22. 7/30/2020 Can the Site Superintendent serve as Site Superintendent, Quality Assurance Manager, and Safety Manager? Or will a separate individual be required for either of those three roles?
If qualified, yes. Submittals will include
Certificates of training.
23. 7/30/2020 Please advise if Pro Core the construction management software will be allowed to be used for this project?
Yes.
24. 7/30/2020 Is this project sales tax exempt? If the project is sales tax exempt, will the government provide a sales tax exemption certificate to the awardee; with an applicable
Government contract number?
The solicitation contains FAR 52.229-3, Federal, State and Local Taxes. As such, all applicable federal, state and local taxes shall be included in the contract price.
25. 7/30/2020 Electrical: Is there a spec on the cable tray? See plans and details in drawings for cable tray requirements
26. 7/30/2020 The electrical specs calls for conduit and wire and no cable is mentioned. Would MC cable be acceptable in the office areas and Hospital Grade cable be acceptable in the Exam rooms?
All circuits must be in conduit as specified
DATE
QUESTION
RECEIVED
QUESTION GOVERNMENT RESPONSE
27. 7/30/2020 Who is responsible for properly disposing of the fluorescent lamps? If the contractor is responsible, does the hospital have a program that we can hand them to the
VA and they will dispose of them?
Include disposal.
28. 7/30/2020 Will the fire alarm system wiring have to be in EMT or can MC fire alarm cable be used?
All circuits must be in conduit as specified
29. 7/30/2020 Who is the vendor that supplies and maintains the Nurse
Call System?
VA Electronics Dept.
30. 7/30/2020 Who is the vendor that supplies and maintains the Public
Address System?
VA Electronics Dept.
31. 7/30/2020 Who is the vendor that supplies and maintains the Mater
Antenna TV System?
VA Electronics Dept.
32. 7/30/2020 Who is the vendor that supplies and maintains the
Security Camera System?
Johnson Controls
33. 7/31/2020 Sheet PD103 Bldg. 42 2nd Flr Demolition: Notes 2 & 3 say to remove existing water closet and Lav. Sheet
PL104 says existing water closet and Lav. To remain, see note #1. Please clarify.
Replace water closet, lavatory, and supports.
Reuse existing piping rough-in
34. 7/31/2020 There is a specification Section # 12 24 00 Window
Shades but not found any details on the architectural drawings. Please advise.
New spec 12 24 00 provided. See Attachment 15.
35. 7/31/2020 Where will the designated parking area be for workers accessing the construction site?
Behind Bldg. 12.
36. 7/31/2020 Does the Government have a fire alarm servicer that they currently work with? What is the name and contact information of the person or persons that will need to be coordinated with for security and fire alarm and suppression systems work and/or disruptions?
Johnson Controls
37. 7/31/2020 Is AISC (American Iron and Steel Certification) required for the structural steel fabrication and/or erection for this project?
Yes as specified
DATE
QUESTION
RECEIVED
QUESTION GOVERNMENT RESPONSE
38. 7/31/2020 May the Superintendent be dual hatted to serve as the
SSHO provided they meet the specified requirements for both?
Certificates of training must be submitted
39. 7/31/2020 Describe any and all tasks that may be required for this project as it relates to infectious control?
Refer to specs
40. 7/31/2020 What is the level of infectious disease control rating for this site?
See spec 01 35 26 for that info
41. 7/31/2020 Many outlets are shown in system furniture but does not show if being fed from below or from a power pole.
a. Please clarify
b. Are these outlets provide in the system furniture or are they installed by the EC?
c. Spec section 26 05 73 calls for a coordination study.
i. Is this required seeing all panels are existing?
ii. Where does it start from if required?
Coordinate receptacle installation with system furniture manufacturer’s requirements. Power for systems furniture should be provided using power poles.
Coordination study will not be required
42. 7/31/2020 Are there any specs on the security system card readers, camera’s, etc.?
See Attachment 15.
43. 7/31/2020 Have the construction personal and material access and debris haul routes to the Building 1, 4th Floor work area been determined?
Will address prior to construction
44. 7/31/2020 Have the construction personal and material access and debris haul routes to the Building 2E, Basement work area been determined?
Will address prior to construction
45. 7/31/2020 Have the construction personal and material access and debris haul routes to the Building 3, 2nd Floor work area been determined?
Will address prior to construction
46. 7/31/2020 Have the construction personal and material access and debris haul routes to the Building 42, 2nd Floor work area been determined?
Will address prior to construction
47. 7/31/2020 During Phase 1, is interior access for VA staff and patients to the 1st Floor of Building 2W through the 1st
Floor of Building 2C required? If yes what is the minimum width required?
Must meet life safety and otherwise as VA will allow
48. 7/31/2020 During Phase 2, what is the minimum width of passage that must be maintained for VA staff and patients in
Corridor C1-1041 and Vestibule 2W-215 for access and egress to the 1st Floor Building 2C addition completed during Phase 1?
Must meet life safety and otherwise as VA will allow
49. 7/31/2020 Has the VA developed Infection Control Project Risk
Assessments of the following work areas?
a. Building 1, 4th Floor
b. Building 2E, Basement
c. Building 3, 2nd Floor
d. Phase 2, Building 2C, 1st Floor
Will address prior to construction
50. 7/31/2020 In the first phase the VA hospital will be relocated staff, offices, phone and computer equipment from 2W and 2C to the basement and another location.
a. Are there plans and prints of the layout and location needs of these other offices? I do not have detailed prints and key sheets showing riser/IDF closets for voice. We need to know quantities, type and location of communication outlets in these other areas.
b. It would be prudent to know where, how many and if existing analog voice feeds are adequate to provide phones in these new location areas. The
NEC PBX will run a phone on a single pair; i.e.
the 300 pair feeders. The voice patch panel is then patched to the station Jack patch panel.
c. If we are installing voice feeds presumably there will also be fiber needed. What speed, length, quantity and connector type; OM3? OM4?
Single mode?
Systems requirements for the swing spaces are shown on the drawings
51. 7/31/2020 I spoke with the rep from Johnson Controls and confirmed they will be supplying the hardware and nurse call system, but the cabling will be provided by the contractor. Please confirm cable requirements, locations of nurse call stations, master stations, pull stations and lights.
See sheet EY101 for nurse call requirements.
52. 7/31/2020 Referencing electrical drawing EY101 it denotes overhead paging speakers. Presumably these will be a requirement elsewhere in the buildings. Looking at where the speakers were positioned, they appear to be in offices that have phones. A phone can receive a page announcement. Typically, overhead paging speakers are used in a loud environment where a phone would not suffice.
a. It may be a redundant cost to wire for paging speakers and phones in an office. Where is the source of the page broadcast from? Campus wide from the phone system or does each wing have its own mic and source station?
Install speakers as per the plan
53. 7/31/2020 Architectural prints make note of an HDMI cable for
TVs. But it was noticed that at least one of the TVs viewed during the site visit has a data cable connection, presumably to a media player (or it could be a CAT
Balun HDMI extender). Please clarify.
From VA Electronics Dept: Regular analog RG
6 or RG 59 cable
54. 7/31/2020 During our walk-through we were shown an area that will be come a gym and exercise room. I would suspect there would be TVs in here. We only have plans for 2W, 2C and the addition. Please clarify.
Sheets EP102 and EY102 show the gym, BLDG
3, second floor. There is one receptacle and one
TV outlet for TV.
55. 7/31/2020 I didn’t see any existing security cameras to confirm if they are IP or analog cameras. Presumably the blueprint notes for a camera are IP to the nearest IDF closet and will be on the internal LAN and be part of an existing larger camera system. Please clarify.
CCTV cameras are IP based
56. 7/31/2020 Please provide a steam piping detail for the coil in RTU-
42.
See Attachment 16.
57. 8/3/2020 In reviewing the specifications Volume 1, the specs reference requirements for Card Readers see Section 28
13 and Video Surveillance see Section 28 23
The spec jumps from Section 28 05 to 28 31, the Security requirements are missing.
Floor plan EY101 indicate camera’s and Card Readers to be included in this job, as well as Monitoring System.
In order to provide Bidding for the Life Safety, I will need a copy of the Specs with requirements, if there is no
Security in job can you plse. send a revision removing the reference.
▪ Comply with requirements in Section 28 23 00, VIDEO SURVEILLANCE
▪ Comply with requirements in Section 28 13 00
See Attachment 15.
58. 8/4/2020 Is there duct liner required and if so liner type and location?
See response to question 12 above.
59. 8/4/2020 What is the duct pressure class and for which systems is required?
See response to question 13 above.
60. 8/4/2020 What is the all the duct material used for EF-2 Utility
Fan?
See response to question 17 above.
61. 8/4/2020 Does all work require duct cleaning?
See response to question 18 above.
62. 8/4/2020 Does all duct work in the fitness area 3-201 need to be double wall construction?
See response to question 19 above.
63. 8/5/2020 Drawing EP103 displays panel SWBD (new panel 42-A second floor building 42) feeding a new transformer and panel (XMR2W, MR2W), the location for this equipment is not shown on the drawings aside from the detail which just states what building and floor they are
on. The panel schedule clearly states MR2W is to feed
HVAC equipment on the roof of building 2W, this building is five-hundred feet (500’) away from building
42. This scenario seems a bit extreme and in all probability incorrect, also the wire sizes feeding this equipment in incorrect, 30 amp wire feeding a 100 amp panel with a load of approximately 80 amps is not up to code. Please advise.
Drawing EP103 shows the location of new panel
MR2W on roof plan for 2W. Transformer
XMR2W is served from SWBD 2W in B2W, see
Note 5. References to B42 are typos.
42 – Roof-Top Connection Riser is for 2W not
Bldg 42. Equipment on the roof of building 42 is fed from panel 42A in building 42. All reference in the riser to building should read 2W not 42.
The 30 amp feeder is for the 30kVA transformer.
The transformer secondary is a100 amp for the panel feed.