Attachment 9 - Drawings Fire Suppression.pdf
PDF 831 KB Posted
- Attached to
- Y1DA--580-324 | Replace/Construct Bldg 121 | Houston, TX Federal contract opportunity
- Solicitation number
- 36C77625R0030_1
About this file
These are fire suppression drawing documents for the Replace Building 121 project at the Michael E. Debakey VA Medical Center in Houston, Texas. The drawings include three sheets: FX001 (Fire Suppression General Information), FX101 (First Floor Fire Suppression Plan), and FX102 (First Floor Fire Suppression Reflected Ceiling Plan). The documents detail a comprehensive wet pipe sprinkler system design for a new 1-story approximately 14,977 square foot building, featuring multiple sprinkler head types including semi-recessed, upright, and pendant styles. The design follows NFPA 13 standards and includes specific requirements such as FM approved quick response sprinklers, red-painted exposed piping, fire department connections, backflow prevention, and a total water demand estimate of 497.5 GPM with provisions for hose stream demand.
Key technical specifications include a wet system with ordinary hazard group 1 classification, 0.15 GPM/ft2 density, and coverage for a 1,500 square foot area. The drawings provide detailed installation guidelines, including requirements for pipe supports, fire-rated wall penetrations, sprinkler head placement, and infection control measures. Additional components include a 6-inch fire service backflow preventer, floor control valve assembly, and specific notes about sprinkler head placement in various room types, with most spaces classified as light hazard occupancy. The project requires professional engineering review and submittal of detailed shop drawings, hydraulic calculations, and system design documentation.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S SS
NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT
SEMI-RECESSED SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
FIRE SUPPRESSION LINEFS
CONCEALED SPRINKLER HEAD
PENDANT SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
FIRE DEPARTMENT CONNECTION (FDC)
FIRE DRAINDRAIN
POINT OF NEW CONNECTION
LIMIT OF DEMOLITION
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
FIRE PROTECTION CONTRACTORFPC
TAMPER SWITCH
FLOW SWITCH
CHECK VALVE
GATE VALVE
EXTERIOR ALARM GONG (WATER ACTIVATED)
TEST AND DRAIN ASSEMBLY
BACKFLOW PREVENTER
T&D
TS
FS
ORDINARY HAZARD
GROUP 1 OCCUPANCY
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
ORDINARY HAZARD
GROUP 2 OCCUPANCY
LIGHT HAZARD
FIRE SUPPRESSION SYMBOLS & ABBREVIATIONS
THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA 13.
IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE PROTECTION
WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS DRAWING IS “FOR
INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE PROTECTION CONTRACTOR TO
BASE THE DESIGN OF THE FIRE PROTECTION SYSTEM ON. THE CONTRACTOR SHALL
VERIFY THE EXACT CONDITIONS THAT THIS DRAWING REPRESENTS, INCLUDING ANY
PERCEIVED CONCEALED SPACES, AND THE BUILDING TYPE AND CONSTRUCTION AS
OUTLINED IN THE INTERNATIONAL BUILDING CODE, PRIOR TO THE START OF WORK.
REFER TO THE VAFPDM, NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE
PROTECTION REQUIREMENTS.
FLUSHING CONNECTION
FEED OR CROSS MAIN.
TYPICAL TEE WITH
CROSS MAIN PITCH
TOWARDS FEED MAIN.
NOTE: INSTALL FLUSHING
CONNECTION AT END OF
CROSS MAINS.
2" NIPPLE 4" LONG
WITH CAP.
MECHANICAL TEE
NEW PIPING
MECHANICAL TEE
SCREWED END
STEEL BEAM
RETAINING STRAP
C-CLAMP
THREADED HANGER ROD
ADJUSTABLE RING HANGER
NOTE:
HANGING DETAILS SHOWN ARE SUBJECT TO REQUIREMENTS OF SEISMIC DESIGN.
EXPANSION ANCHOR HILTI QUIK
BOLT TZ OR APPROVED EQUAL.
EXPANSION ANCHOR SHALL BE
QUALIFIED FOR USE IN CRACKED
CONCRETE PER ACI 355.2
EXISTING CONCRETE SLAB
AUTO. SPRINKLER PIPE
SET SCREW
SURGE RESTRAINER
DUCTWORK OR OTHER
OBSTRUCTION OVER
48" IN WIDTH.
UPRIGHT HEAD
SPRINKLER BRANCH LINE
ALL EXPOSED
SPRINKLER PIPING
SHALL BE PAINTED RED.
UPRIGHT HEAD.
PROVIDE GUARD.
NOTE:
1. PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR OTHER OBSTRUCTION OVER 48" IN WIDTH.
2. COORDINATE SPRINKLER PIPE ROUTING AND LOCATION WITH COR AND ALL PARTIES INVOLVED WITH
INSTALLATION OF THE OBSTRUCTION.
3. PROVIDE PIPE SUPPORTS THAT COMPLY WITH NFPA 13 REQUIREMENTS. INCLUDE COST OF ADDITIONAL
SUPPORTS AS REQUIRED.
4. ATTACH PIPE SUPPORTS TO BUILDING STRUCTURE OR PROVIDE SUPPLEMENTAL STEEL ANCHOR POINTS. DO NOT ATTACH PIPE SUPPORTS TO DUCTWORK, PIPES, CONDUIT, OR EXISTING HANGER RODS FOR OTHER
EQUIPMENT.
INSTALL INSULATION AFTER
CAULKING SLEEVE, SEAL
ANNULAR SPACE.
FIRE RATED WALL AND OR SLAB.
STEEL PIPE SLEEVE TERMINATE
SLEEVE FLUSH WITH FINISHED
SURFACE.
UL-LISTED FIRESTOPPING
FINISHED ESCUTCHEON PLATE
FLUSH AGAINST WALL AND OF
SIZE TO COMPLETELY COVER
OPENING.
APPROVED TYPE FIRE SAFE &
SMOKE TIGHT CAULKING SEALER
BETWEEN BARE PIPE AND SLEEVE.
NOTE:
MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF CONCRETE OR CMU WALLS
SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC REQUIREMENTS.
1" X ARMOVER
1" 90 EL
1" X DROP
DROP NIPPLE
1" x 1/2" R.C. REDUCER
NOTE:
1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.
2. ALL EXPOSED PIPING SHALL BE PAINTED RED.
SUSPENDED CEILING
HANGERS SHALL
BE PROVIDED AS
REQUIRED BY
NFPA 13 TYPICAL
1" x 2" NIPPLE
BRANCH LINE
PENDENT SPRINKLER HEAD
1. USE NFPA-13 (CURRENT EDITION), “PLANS AND CALCULATIONS” CHAPTER AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE
INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM.
2. INSTALLATION SHALL COMPLY WITH NFPA AND VA REQUIREMENTS.
3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS.
COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS.
LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE
HAZARD CLASSIFICATION.
4. THIS FACILITY IS FULLY SPRINKLERED. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA AND VA
REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.
5. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13 AND VA
STANDARDS.
6. HYDRAULICALLY CALCULATE SPRINKLER DEMAND IN ACCORDANCE WITH REQUIREMENTS FOR APPROPRIATE HAZARD OCCUPANCY. PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND OPERABLE SYSTEM IN ACCORDANCE
WITH NFPA AND VA REQUIREMENTS.
7. FIRE PROTECTION CONTRACTOR SHALL OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW, STATIC PRESSURE AVAILABLE WITH NO FLOW, AND RESIDUAL PRESSURE AT FULL FLOW TO THE FACILITY. SUBMIT HYDRAULIC CALCULATIONS
AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.
8. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.
9. SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS
AT PRIMARY BUILDING STRUCTURAL MEMBERS.
10. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS IN ACCORDANCE WITH NFPA REQUIREMENTS.
11. CLEAN ENTIRE WORK AREA OF ALL DUST, DIRT, AND OTHER DEBRIS. MAINTAIN WORK AREA IN CLEAN CONDITION.
12. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS
SPECIFIED AND INDICATED ON THE DRAWINGS.
13. SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A
PROFESSIONAL ENGINEER.
14. REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE WORK AT NO ADDITIONAL COST TO THE VA.
15. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL
PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.
16. FLOW AND TAMPER SWITCHES ARE TO BE PURCHASED AND INSTALLED AS WORK OF DIVISION 21. PROVIDE WIRING TO FLOW
AND TAMPER SWITCHES AS WORK OF DIVISION 26.
17. WATER SERVICE AND DETECTOR TYPE REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER TO BE PROVIDED AND TESTED AS WORK OF DIVISION 22. INCORPORATE ASSOCIATED PRESSURE DROP OF SELECTED BACKFLOW PREVENTER
DEVICE IN HYDRAULIC CALCULATIONS.
18. FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES IN ACCORDANCE WITH NFPA-13.
19. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONNECTION AT TOP OF PIPE.
20. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS OR CORRIDORS.
LOCATE CENTERED IN CEILING TILE WHERE POSSIBLE.
21. LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS IN ACCORDANCE WITH NFPA-13.
22. FIRE DEPARTMENT CONNECTION SHALL BE LOCATED NOT MORE THAN 100 FEET AWAY FROM THE NEAREST FIRE HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY AND SHALL BE LOCATED NOT LESS THAN 18 INCHES, NOR MORE THAN 48
INCHES ABOVE ADJACENT SURFACE.
23. STANDPIPES SHALL BE PROVIDED IN EACH REQUIRED EGRESS STAIRWAY, WITH 4 INCH DIAMETER MINIMUM SIZE.
24. CLASS 1 SYSTEM SHALL BE PROVIDED WITH 2 1/2 INCH HOSE CONNECTIONS AT EACH INTERMEDIATE LANDING BETWEEN FLOORS IN EACH REQUIRED EGRESS EXIT STAIRWAY. COORDINATE TYPE OF HOSE CONNECTIONS WITH THE LOCAL FIRE
DEPARTMENT.
25. SPRINKLER DRAINS SHALL DISCHARGE DIRECTLY TO THE OUTSIDE.
FIRE SUPPRESSION GENERAL NOTES
1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST
CONTROL PLAN.
2. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC
PATHOGENS.
3. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE COR ACCEPTANCE.
INFECTION CONTROL MEASURES
NOTE:
1. ALL EXPOSED PIPING SHALL BE PAINTED RED.
2. PROVIDE GUARDS ON UPRIGHT SPRINKLERS
UNLESS OTHERWISE NOTED.
THREADED
HANGER ROD
SURGE
RESTRAINER
ADJUSTABLE
RING HANGER
BRANCHLINE
AUTO. SPRINKLER FEED
UPRIGHT AUTOMATIC
SPRINKLER, FM APPROVED,
QUICK RESPONSE
REDUCER
RISER NIPPLE
REDUCING TEE
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
WALL RATING LEGEND
FIRE PROTECTION WATER
SUPPLY DEMAND ESTIMATE
DESIGN DATA:
SYSTEM TYPE: WET
OCCUPATION CLASSIFICATION: ORD. GR. 1
DENSITY: 0.15 GPM/FT2
AREA OF APPLICATION: 1500
MINIMUM SPRINKLER DEMAND: 225 GPM
HOSE STREAM DEMAND: 250 GPM
OVERFLOW FACTOR (10%): 22.5 GPM
TOTAL WATER REQUIRED
(INCLUDING HOSE STREAMS): 497.5 GPM
SPRINKLER RISER.
INDICATING BUTTERFLY VALVE
WITH TAMPER SWITCH
WATER FLOW SWITCH.
PRESSURE GAUGE.
TO SPRINKLER SYSTEM.
AUXILIARY DRAIN VALVE.
1" INSPECTOR'S TEST VALVE.
SIGHT GLASS.
2" DRAIN CONNECTION.
ISOLATION VALVE
DOUBLE CHECK TYPE REDUCED
PRESSURE ASSEMBLY. PROVIDE
IN AN ACCESIBLE LOCATION.
COMPLY WITH LOCAL
REQUIREMENTS
ISOLATION VALVE (SUPERVISED)
(TYPICAL OF 3)
CONCRETE PAD
DRAIN PIPE TO BE 2X LINE
SIZE. ROUTE TO EXTERIOR
OF ENCLOSURE
PROVIDE PROPER
SUPPORT FOR
RPZ ASSEMBLY
AIR GAP
HEATED FIBERGLASS
ENCLOSURE
TO SPRINKLER SYSTEM
FROM CITY SUPPLY
DRAIN VALVE & TEST (SUPERVISED)
HOSE CONNECTION
GRADE
FLOOR
WALL
FIRE DEPARTMENT
CONNECTION
WALL PLATE
(TYPICAL)
PIPE TAP FOR BALL
DRIP VALVE
18" TO 48"
DRAIN PIPE TO EXTERIOR
DISCHARGE MIN 6" ABOVE
FINISHED GRADE
HORIZONTAL MOUNTED
BALL DRIP VALVE
CHECK
VALVE
PIPE SUPPORT
NOTE:
1. ALL EXPOSED PIPING SHALL BE PAINTED RED.
2. PROVIDE GUARDS ON UPRIGHT SPRINKLERS
UNLESS OTHERWISE NOTED.
THREADED
HANGER ROD
SURGE
RESTRAINER
ADJUSTABLE
RING HANGER
BRANCHLINE
AUTO. SPRINKLER FEED
UPRIGHT AUTOMATIC
SPRINKLER WITH CAGE, FM APPROVED,
STANDARD RESPONSE
REDUCER
RISER NIPPLE
REDUCING TEE
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:2
:2
A
M C
R e v it p ro je c ts
\M
-0
-B
C L
C V
A -B
L D
G tb u d a i.
rv t
FX001
FIRE SUPPRESSION GENERAL
INFORMATION
1 3TB
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
SPG
22-021
Scale: No Scale
MECHANICAL TEE AND FLUSHING CONNECTION DETAIL
Scale: No Scale
PIPE HANGER SUPPORT DETAIL
Scale: No Scale
SPRINKLER ABOVE AND BELOW DUCT DETAIL
Scale: No Scale
SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL DETAIL
Scale: No Scale
SEMI-RECESSED PENDENT SPRINKLER DETAIL
Scale: No Scale
UPRIGHT AUTOMATIC SPRINKLER DETAIL
FIRE SERVICE BACKFLOW PREVENTER SCHEDULE
MARK LOCATION SYSTEM TYPE SIZE REMARKS
121-BFP-1 HOT BOX OUTSIDE THE BUILDING FIRE SERVICE DETECTOR 6" -
Scale: No Scale
FLOOR CONTROL VALVE ASSEMBLY DETAIL
Scale: No Scale
BACKFLOW PREVENTER INSTALLATION DETAIL
Scale: No Scale
WALL MOUNTED FIRE DEPARTMENT CONNECTION DETAIL
Scale: No Scale
UPRIGHT AUTOMATIC SPRINKLER DETAIL WITH CAGE (GUARD)
Docusign Envelope ID: 80537957-6FE1-43C1-90A3-95C473977FCA
1/27/2025
A
2 3 4 5 6
B
D
C
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
TR
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
GROUP
ROOM 2
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
TLT
OFFICE/CONSULT
HAC
STAFF TLT
TOILET
33OFFICE
OFFICE
OFFICE
ELEC
SOILED
FAMILY
CONSULT
STAFF
CONFERENCE
ROOM
OCCUPATIONAL
THERAPY
COMMUNITY
ROOM
RESOURCE/
COMPUTERS
OFFICE
FAMILY
CONSULT
EXAM
OFFICE
OFFICE
STAFF
LOUNGE
VEST
MECHANICAL
OPEN
OFFICE
GROUP
ROOM 1
RECEPTION/CHECK-IN
VEST
WAITING
CORRIDOR
C06
CORRIDOR
C04
CORRIDOR
C05
CORRIDOR
C03
CORRIDOR
C02
CORRIDOR
C01
LOBBY
FIRE
RISER
ROOM
STORAGE
2 2
3 3
6" FS
FS
F S
FS
FS FS
FS
FS
F S
FS
FS
TOILET
CLEAN
SUPPLY
07A
MEDS
TRAINING
TLT
53B
STOR
53C
6" FS
CHECK VALVE
1.7
E
A.5
B.11 B.10
121-BFP-1
6" FS
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:2
:2
A
M C
R e v it p ro je c ts
\M
-0
-B
C L
C V
A -B
L D
G tb u d a i.
rv t
FX101
FIRST FLOOR FIRE SUPPRESSION
PLAN
2 3TB
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
SPG
22-021
N O
R T
H
0 4 8 16
Scale: 1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION PLAN
1 UNDERGROUND FIRE WATER SERVICE LINE.
REFER TO CU101 FOR CONTINUATION.
2 THIS ROOM SHALL BE CONSIDERED ORDINARY
HAZARD, GROUP 1.
3 THIS ROOM SHALL BE CONSIDERED ORDINARY
HAZARD, GROUP 2.
4 FLOOR CONTROL VALVE ASSEMBLY. SEE
DETAIL 9/FX001.
5 PROVIDE FIRE DEPARTMENT CONNECTION AND
CONNECT TO THE FIRE MAIN. PROVIDE CHECK
VALVE. SEE DETAIL 5/FX001.
6 PROVIDE HEATED HOT BOX, FIBERGLASS
FLIPTOP ENCLOSURE FOR BACKFLOW
PREVENTER ASSEMBLY. SEE DETAIL 10/FX001.
7 BACKFLOW PREVENTER DRAIN TO EXTERIOR AT
SHOWN LOCATION.
A. UNLESS OTHERWISE NOTED, SPACES ARE LIGHT
HAZARD CLASSIFICATION.
B. PROVIDE NEW SPRINKLERS HEADS AS PER NEW
LAYOUT.
C. PROVIDE BRANCH PIPING AS REQUIRED.
D. WET SPRINKLER PIPING LAYOUT AND
SPRINKLERS LAYOUT IS FOR REFERENCE ONLY.
SUBMIT SHOP DRAWINGS, CALCULATION, PIPE
SIZING AND LAYOUT, DETAILS SIGNED BY
PROFESSIONAL ENGINEER FOR VA REVIEW.
A
2 3 4 5 6
B
D
C
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
TR
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
GROUP
ROOM 2
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
TLT
OFFICE/CONSULT
HAC
STAFF TLT
TOILET
OFFICE
OFFICE
OFFICE
ELEC
SOILED
FAMILY
CONSULT
STAFF
CONFERENCE
ROOM
OCCUPATIONAL
THERAPY
COMMUNITY
ROOM
52 RESOURCE/
COMPUTERS
OFFICE
FAMILY
CONSULT
EXAM
OFFICE
OFFICE
STAFF
LOUNGE
VEST
MECHANICAL
OPEN
OFFICE
GROUP
ROOM 1
RECEPTION/CHECK-IN
VEST
WAITING
CORRIDOR
C06
CORRIDOR
C04
CORRIDOR
C05
CORRIDOR
C03
CORRIDOR
C02
CORRIDOR
C01
LOBBY
FIRE
RISER
ROOM
STORAGE
2 3
1 TYP.3
4 TYP.
MEDS
CLEAN
SUPPLY
07A
TOILET
TRAINING
TLT
53B
STOR
53C
1.7
E
A.5
B.11 B.10
5 3
TYP.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:2
:2
A
M C
R e v it p ro je c ts
\M
-0
-B
C L
C V
A -B
L D
G tb u d a i.
rv t
FX102
FIRST FLOOR FIRE SUPPRESSION
REFLECTED CEILING PLAN
3 3TB
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
SPG
22-021
Scale: 1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION REFLECTED CEILING PLAN
1 PROVIDE NEW SEMI-RECESSED QUICK
RESPONSE SPRINKLER HEADS PER NEW
LAYOUT. SEE DETAIL 6/FX001.
2 PROVIDE NEW UPRIGHT SPRINKLER HEADS PER
NEW LAYOUT. SEE DETAIL 7/FX001.
3 PROVIDE NEW BRANCH PIPING AS REQUIRED.
4 SPRINKLER HEADS IN THE LOBBY/WAITING
AREA ARE LOCATED AT ELEVATION 19'-6".
5 PROVIDE NEW UPRIGHT SPRINKLER HEAD WITH
CAGE PER NEW LAYOUT. SEE DETAIL 8/FX001.
A. PROVIDE NEW SPRINKLERS HEADS AS PER NEW
LAYOUT.
B. PROVIDE BRANCH PIPING AS REQUIRED.
C. WET SPRINKLER PIPING LAYOUT AND
SPRINKLERS LAYOUT IS FOR REFERENCE ONLY.
SUBMIT SHOP DRAWINGS, CALCULATION, PIPE
SIZING AND LAYOUT, DETAILS SIGNED BY
PROFESSIONAL ENGINEER FOR VA REVIEW.
D. ALL AIR TERMINALS AND LIGHTING FIXTURES ARE
SHOWN FOR COORDINATION PURPOSES ONLY.
REFER TO THE CORRESPONDING MECHANICAL
AND ELECTRICAL DRAWINGS FOR MORE
INFORMATION.
N O
R T
H
0 4 8 16
File details come from the government source that posted it. Updated .