Attachment 9 - Drawings Fire Suppression.pdf

PDF 831 KB Posted

Attached to
Y1DA--580-324 | Replace/Construct Bldg 121 | Houston, TX Federal contract opportunity
Solicitation number
36C77625R0030_1
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

These are fire suppression drawing documents for the Replace Building 121 project at the Michael E. Debakey VA Medical Center in Houston, Texas. The drawings include three sheets: FX001 (Fire Suppression General Information), FX101 (First Floor Fire Suppression Plan), and FX102 (First Floor Fire Suppression Reflected Ceiling Plan). The documents detail a comprehensive wet pipe sprinkler system design for a new 1-story approximately 14,977 square foot building, featuring multiple sprinkler head types including semi-recessed, upright, and pendant styles. The design follows NFPA 13 standards and includes specific requirements such as FM approved quick response sprinklers, red-painted exposed piping, fire department connections, backflow prevention, and a total water demand estimate of 497.5 GPM with provisions for hose stream demand.

Key technical specifications include a wet system with ordinary hazard group 1 classification, 0.15 GPM/ft2 density, and coverage for a 1,500 square foot area. The drawings provide detailed installation guidelines, including requirements for pipe supports, fire-rated wall penetrations, sprinkler head placement, and infection control measures. Additional components include a 6-inch fire service backflow preventer, floor control valve assembly, and specific notes about sprinkler head placement in various room types, with most spaces classified as light hazard occupancy. The project requires professional engineering review and submittal of detailed shop drawings, hydraulic calculations, and system design documentation.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--580-324 | Replace/Construct Bldg 121 | Houston, TX, newest first.
File Type Posted
Amendment 0006 - Att.pdf PDF
Amendment 0006 - Att.pdf PDF
Amendment 0006 - Att 4 - Updated RFI Log 6-20-25.docx DOCX document
Amendment 0006 - Att. 1 - Mechanical Addendum.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004 - Att. 6 - RFI 43 Bldg. 121 Floor Plan.pdf PDF
Amendment 0004 - Att. 4 - RFI 55 Contractor Map.png PNG image
Amendment 0004 - Att. 3 - RFI 53 Construction Fence Limit 121.png PNG image
Amendment 0004 - Att. 5 - RFI 48 11 41 00 Food Storage Equipment.docx DOCX document
Amendment 0004 - Att. 2 - Bldg. 121 Geotech Report.pdf PDF
Amendment 0004 - Att. 1 RFI Log.docx DOCX document
Amendment 0004.pdf PDF
Attachment A - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Bldg. 121 Floor plan.pdf PDF
Site Visit Sign-in-sheet..pdf PDF
Site Visit Agenda.pdf PDF
Amendment 0001.pdf PDF
Attachment 13 - Drawings Technology.pdf PDF
Attachment 4 - Drawings Civil.pdf PDF
Attachment 11 - Drawings Mechanical.pdf PDF
Attachment 1 - Houston Bldg 121 - Specs - Vol 1.pdf PDF
Attachment 5 - Drawings Landscape.pdf PDF
Attachment 3 - Drawings General.pdf PDF
36C77625R0030_1.pdf PDF
Attachment 8 - Drawings Interior.pdf PDF
Attachment 7 - Drawings Architectural.pdf PDF
Attachment 2 - Houston Bldg 121 - Specs - Vol 2.pdf PDF
Attachment 15 - Wage Determination Harris County.pdf PDF
Attachment 6 - Drawings Structural.pdf PDF
Attachment 16 - PPQ.docx DOCX document
Attachment 12 - Drawings Electrical.pdf PDF
Attachment 10 - Drawings Plumbing.pdf PDF
Attachment 14 - Limitations on Subcontracting - Construction.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S SS

NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT

SEMI-RECESSED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

FIRE SUPPRESSION LINEFS

CONCEALED SPRINKLER HEAD

PENDANT SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

FIRE DEPARTMENT CONNECTION (FDC)

FIRE DRAINDRAIN

POINT OF NEW CONNECTION

LIMIT OF DEMOLITION

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

FIRE PROTECTION CONTRACTORFPC

TAMPER SWITCH

FLOW SWITCH

CHECK VALVE

GATE VALVE

EXTERIOR ALARM GONG (WATER ACTIVATED)

TEST AND DRAIN ASSEMBLY

BACKFLOW PREVENTER

T&D

TS

FS

ORDINARY HAZARD

GROUP 1 OCCUPANCY

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

ORDINARY HAZARD

GROUP 2 OCCUPANCY

LIGHT HAZARD

FIRE SUPPRESSION SYMBOLS & ABBREVIATIONS

THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA 13.

IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE PROTECTION

WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS DRAWING IS “FOR

INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE PROTECTION CONTRACTOR TO

BASE THE DESIGN OF THE FIRE PROTECTION SYSTEM ON. THE CONTRACTOR SHALL

VERIFY THE EXACT CONDITIONS THAT THIS DRAWING REPRESENTS, INCLUDING ANY

PERCEIVED CONCEALED SPACES, AND THE BUILDING TYPE AND CONSTRUCTION AS

OUTLINED IN THE INTERNATIONAL BUILDING CODE, PRIOR TO THE START OF WORK.

REFER TO THE VAFPDM, NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE

PROTECTION REQUIREMENTS.

FLUSHING CONNECTION

FEED OR CROSS MAIN.

TYPICAL TEE WITH

CROSS MAIN PITCH

TOWARDS FEED MAIN.

NOTE: INSTALL FLUSHING

CONNECTION AT END OF

CROSS MAINS.

2" NIPPLE 4" LONG

WITH CAP.

MECHANICAL TEE

NEW PIPING

MECHANICAL TEE

SCREWED END

STEEL BEAM

RETAINING STRAP

C-CLAMP

THREADED HANGER ROD

ADJUSTABLE RING HANGER

NOTE:

HANGING DETAILS SHOWN ARE SUBJECT TO REQUIREMENTS OF SEISMIC DESIGN.

EXPANSION ANCHOR HILTI QUIK

BOLT TZ OR APPROVED EQUAL.

EXPANSION ANCHOR SHALL BE

QUALIFIED FOR USE IN CRACKED

CONCRETE PER ACI 355.2

EXISTING CONCRETE SLAB

AUTO. SPRINKLER PIPE

SET SCREW

SURGE RESTRAINER

DUCTWORK OR OTHER

OBSTRUCTION OVER

48" IN WIDTH.

UPRIGHT HEAD

SPRINKLER BRANCH LINE

ALL EXPOSED

SPRINKLER PIPING

SHALL BE PAINTED RED.

UPRIGHT HEAD.

PROVIDE GUARD.

NOTE:

1. PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR OTHER OBSTRUCTION OVER 48" IN WIDTH.

2. COORDINATE SPRINKLER PIPE ROUTING AND LOCATION WITH COR AND ALL PARTIES INVOLVED WITH

INSTALLATION OF THE OBSTRUCTION.

3. PROVIDE PIPE SUPPORTS THAT COMPLY WITH NFPA 13 REQUIREMENTS. INCLUDE COST OF ADDITIONAL

SUPPORTS AS REQUIRED.

4. ATTACH PIPE SUPPORTS TO BUILDING STRUCTURE OR PROVIDE SUPPLEMENTAL STEEL ANCHOR POINTS. DO NOT ATTACH PIPE SUPPORTS TO DUCTWORK, PIPES, CONDUIT, OR EXISTING HANGER RODS FOR OTHER

EQUIPMENT.

INSTALL INSULATION AFTER

CAULKING SLEEVE, SEAL

ANNULAR SPACE.

FIRE RATED WALL AND OR SLAB.

STEEL PIPE SLEEVE TERMINATE

SLEEVE FLUSH WITH FINISHED

SURFACE.

UL-LISTED FIRESTOPPING

FINISHED ESCUTCHEON PLATE

FLUSH AGAINST WALL AND OF

SIZE TO COMPLETELY COVER

OPENING.

APPROVED TYPE FIRE SAFE &

SMOKE TIGHT CAULKING SEALER

BETWEEN BARE PIPE AND SLEEVE.

NOTE:

MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF CONCRETE OR CMU WALLS

SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC REQUIREMENTS.

1" X ARMOVER

1" 90 EL

1" X DROP

DROP NIPPLE

1" x 1/2" R.C. REDUCER

NOTE:

1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.

2. ALL EXPOSED PIPING SHALL BE PAINTED RED.

SUSPENDED CEILING

HANGERS SHALL

BE PROVIDED AS

REQUIRED BY

NFPA 13 TYPICAL

1" x 2" NIPPLE

BRANCH LINE

PENDENT SPRINKLER HEAD

1. USE NFPA-13 (CURRENT EDITION), “PLANS AND CALCULATIONS” CHAPTER AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE

INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM.

2. INSTALLATION SHALL COMPLY WITH NFPA AND VA REQUIREMENTS.

3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS.

COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS.

LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE

HAZARD CLASSIFICATION.

4. THIS FACILITY IS FULLY SPRINKLERED. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA AND VA

REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.

5. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13 AND VA

STANDARDS.

6. HYDRAULICALLY CALCULATE SPRINKLER DEMAND IN ACCORDANCE WITH REQUIREMENTS FOR APPROPRIATE HAZARD OCCUPANCY. PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND OPERABLE SYSTEM IN ACCORDANCE

WITH NFPA AND VA REQUIREMENTS.

7. FIRE PROTECTION CONTRACTOR SHALL OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW, STATIC PRESSURE AVAILABLE WITH NO FLOW, AND RESIDUAL PRESSURE AT FULL FLOW TO THE FACILITY. SUBMIT HYDRAULIC CALCULATIONS

AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.

8. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.

9. SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS

AT PRIMARY BUILDING STRUCTURAL MEMBERS.

10. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS IN ACCORDANCE WITH NFPA REQUIREMENTS.

11. CLEAN ENTIRE WORK AREA OF ALL DUST, DIRT, AND OTHER DEBRIS. MAINTAIN WORK AREA IN CLEAN CONDITION.

12. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS

SPECIFIED AND INDICATED ON THE DRAWINGS.

13. SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, HYDRAULIC CALCULATIONS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A

PROFESSIONAL ENGINEER.

14. REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE WORK AT NO ADDITIONAL COST TO THE VA.

15. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL

PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.

16. FLOW AND TAMPER SWITCHES ARE TO BE PURCHASED AND INSTALLED AS WORK OF DIVISION 21. PROVIDE WIRING TO FLOW

AND TAMPER SWITCHES AS WORK OF DIVISION 26.

17. WATER SERVICE AND DETECTOR TYPE REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER TO BE PROVIDED AND TESTED AS WORK OF DIVISION 22. INCORPORATE ASSOCIATED PRESSURE DROP OF SELECTED BACKFLOW PREVENTER

DEVICE IN HYDRAULIC CALCULATIONS.

18. FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES IN ACCORDANCE WITH NFPA-13.

19. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONNECTION AT TOP OF PIPE.

20. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS OR CORRIDORS.

LOCATE CENTERED IN CEILING TILE WHERE POSSIBLE.

21. LOCATE THE INSPECTOR'S TEST CONNECTION AND MAIN DRAIN LOCATIONS IN ACCORDANCE WITH NFPA-13.

22. FIRE DEPARTMENT CONNECTION SHALL BE LOCATED NOT MORE THAN 100 FEET AWAY FROM THE NEAREST FIRE HYDRANT CONNECTED TO AN APPROVED WATER SUPPLY AND SHALL BE LOCATED NOT LESS THAN 18 INCHES, NOR MORE THAN 48

INCHES ABOVE ADJACENT SURFACE.

23. STANDPIPES SHALL BE PROVIDED IN EACH REQUIRED EGRESS STAIRWAY, WITH 4 INCH DIAMETER MINIMUM SIZE.

24. CLASS 1 SYSTEM SHALL BE PROVIDED WITH 2 1/2 INCH HOSE CONNECTIONS AT EACH INTERMEDIATE LANDING BETWEEN FLOORS IN EACH REQUIRED EGRESS EXIT STAIRWAY. COORDINATE TYPE OF HOSE CONNECTIONS WITH THE LOCAL FIRE

DEPARTMENT.

25. SPRINKLER DRAINS SHALL DISCHARGE DIRECTLY TO THE OUTSIDE.

FIRE SUPPRESSION GENERAL NOTES

1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST

CONTROL PLAN.

2. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC

PATHOGENS.

3. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE COR ACCEPTANCE.

INFECTION CONTROL MEASURES

NOTE:

1. ALL EXPOSED PIPING SHALL BE PAINTED RED.

2. PROVIDE GUARDS ON UPRIGHT SPRINKLERS

UNLESS OTHERWISE NOTED.

THREADED

HANGER ROD

SURGE

RESTRAINER

ADJUSTABLE

RING HANGER

BRANCHLINE

AUTO. SPRINKLER FEED

UPRIGHT AUTOMATIC

SPRINKLER, FM APPROVED,

QUICK RESPONSE

REDUCER

RISER NIPPLE

REDUCING TEE

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

WALL RATING LEGEND

FIRE PROTECTION WATER

SUPPLY DEMAND ESTIMATE

DESIGN DATA:

SYSTEM TYPE: WET

OCCUPATION CLASSIFICATION: ORD. GR. 1

DENSITY: 0.15 GPM/FT2

AREA OF APPLICATION: 1500

MINIMUM SPRINKLER DEMAND: 225 GPM

HOSE STREAM DEMAND: 250 GPM

OVERFLOW FACTOR (10%): 22.5 GPM

TOTAL WATER REQUIRED

(INCLUDING HOSE STREAMS): 497.5 GPM

SPRINKLER RISER.

INDICATING BUTTERFLY VALVE

WITH TAMPER SWITCH

WATER FLOW SWITCH.

PRESSURE GAUGE.

TO SPRINKLER SYSTEM.

AUXILIARY DRAIN VALVE.

1" INSPECTOR'S TEST VALVE.

SIGHT GLASS.

2" DRAIN CONNECTION.

ISOLATION VALVE

DOUBLE CHECK TYPE REDUCED

PRESSURE ASSEMBLY. PROVIDE

IN AN ACCESIBLE LOCATION.

COMPLY WITH LOCAL

REQUIREMENTS

ISOLATION VALVE (SUPERVISED)

(TYPICAL OF 3)

CONCRETE PAD

DRAIN PIPE TO BE 2X LINE

SIZE. ROUTE TO EXTERIOR

OF ENCLOSURE

PROVIDE PROPER

SUPPORT FOR

RPZ ASSEMBLY

AIR GAP

HEATED FIBERGLASS

ENCLOSURE

TO SPRINKLER SYSTEM

FROM CITY SUPPLY

DRAIN VALVE & TEST (SUPERVISED)

HOSE CONNECTION

GRADE

FLOOR

WALL

FIRE DEPARTMENT

CONNECTION

WALL PLATE

(TYPICAL)

PIPE TAP FOR BALL

DRIP VALVE

18" TO 48"

DRAIN PIPE TO EXTERIOR

DISCHARGE MIN 6" ABOVE

FINISHED GRADE

HORIZONTAL MOUNTED

BALL DRIP VALVE

CHECK

VALVE

PIPE SUPPORT

NOTE:

1. ALL EXPOSED PIPING SHALL BE PAINTED RED.

2. PROVIDE GUARDS ON UPRIGHT SPRINKLERS

UNLESS OTHERWISE NOTED.

THREADED

HANGER ROD

SURGE

RESTRAINER

ADJUSTABLE

RING HANGER

BRANCHLINE

AUTO. SPRINKLER FEED

UPRIGHT AUTOMATIC

SPRINKLER WITH CAGE, FM APPROVED,

STANDARD RESPONSE

REDUCER

RISER NIPPLE

REDUCING TEE

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:2

:2

A

M C

R e v it p ro je c ts

\M

-0

-B

C L

C V

A -B

L D

G tb u d a i.

rv t

FX001

FIRE SUPPRESSION GENERAL

INFORMATION

1 3TB

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

SPG

22-021

Scale: No Scale

MECHANICAL TEE AND FLUSHING CONNECTION DETAIL

Scale: No Scale

PIPE HANGER SUPPORT DETAIL

Scale: No Scale

SPRINKLER ABOVE AND BELOW DUCT DETAIL

Scale: No Scale

SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL DETAIL

Scale: No Scale

SEMI-RECESSED PENDENT SPRINKLER DETAIL

Scale: No Scale

UPRIGHT AUTOMATIC SPRINKLER DETAIL

FIRE SERVICE BACKFLOW PREVENTER SCHEDULE

MARK LOCATION SYSTEM TYPE SIZE REMARKS

121-BFP-1 HOT BOX OUTSIDE THE BUILDING FIRE SERVICE DETECTOR 6" -

Scale: No Scale

FLOOR CONTROL VALVE ASSEMBLY DETAIL

Scale: No Scale

BACKFLOW PREVENTER INSTALLATION DETAIL

Scale: No Scale

WALL MOUNTED FIRE DEPARTMENT CONNECTION DETAIL

Scale: No Scale

UPRIGHT AUTOMATIC SPRINKLER DETAIL WITH CAGE (GUARD)

Docusign Envelope ID: 80537957-6FE1-43C1-90A3-95C473977FCA

1/27/2025

A

2 3 4 5 6

B

D

C

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

TR

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

GROUP

ROOM 2

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

TLT

OFFICE/CONSULT

HAC

STAFF TLT

TOILET

33OFFICE

OFFICE

OFFICE

ELEC

SOILED

FAMILY

CONSULT

STAFF

CONFERENCE

ROOM

OCCUPATIONAL

THERAPY

COMMUNITY

ROOM

RESOURCE/

COMPUTERS

OFFICE

FAMILY

CONSULT

EXAM

OFFICE

OFFICE

STAFF

LOUNGE

VEST

MECHANICAL

OPEN

OFFICE

GROUP

ROOM 1

RECEPTION/CHECK-IN

VEST

WAITING

CORRIDOR

C06

CORRIDOR

C04

CORRIDOR

C05

CORRIDOR

C03

CORRIDOR

C02

CORRIDOR

C01

LOBBY

FIRE

RISER

ROOM

STORAGE

2 2

3 3

6" FS

FS

F S

FS

FS FS

FS

FS

F S

FS

FS

TOILET

CLEAN

SUPPLY

07A

MEDS

TRAINING

TLT

53B

STOR

53C

6" FS

CHECK VALVE

1.7

E

A.5

B.11 B.10

121-BFP-1

6" FS

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:2

:2

A

M C

R e v it p ro je c ts

\M

-0

-B

C L

C V

A -B

L D

G tb u d a i.

rv t

FX101

FIRST FLOOR FIRE SUPPRESSION

PLAN

2 3TB

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

SPG

22-021

N O

R T

H

0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR FIRE SUPPRESSION PLAN

1 UNDERGROUND FIRE WATER SERVICE LINE.

REFER TO CU101 FOR CONTINUATION.

2 THIS ROOM SHALL BE CONSIDERED ORDINARY

HAZARD, GROUP 1.

3 THIS ROOM SHALL BE CONSIDERED ORDINARY

HAZARD, GROUP 2.

4 FLOOR CONTROL VALVE ASSEMBLY. SEE

DETAIL 9/FX001.

5 PROVIDE FIRE DEPARTMENT CONNECTION AND

CONNECT TO THE FIRE MAIN. PROVIDE CHECK

VALVE. SEE DETAIL 5/FX001.

6 PROVIDE HEATED HOT BOX, FIBERGLASS

FLIPTOP ENCLOSURE FOR BACKFLOW

PREVENTER ASSEMBLY. SEE DETAIL 10/FX001.

7 BACKFLOW PREVENTER DRAIN TO EXTERIOR AT

SHOWN LOCATION.

A. UNLESS OTHERWISE NOTED, SPACES ARE LIGHT

HAZARD CLASSIFICATION.

B. PROVIDE NEW SPRINKLERS HEADS AS PER NEW

LAYOUT.

C. PROVIDE BRANCH PIPING AS REQUIRED.

D. WET SPRINKLER PIPING LAYOUT AND

SPRINKLERS LAYOUT IS FOR REFERENCE ONLY.

SUBMIT SHOP DRAWINGS, CALCULATION, PIPE

SIZING AND LAYOUT, DETAILS SIGNED BY

PROFESSIONAL ENGINEER FOR VA REVIEW.

A

2 3 4 5 6

B

D

C

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

TR

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

GROUP

ROOM 2

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

TLT

OFFICE/CONSULT

HAC

STAFF TLT

TOILET

OFFICE

OFFICE

OFFICE

ELEC

SOILED

FAMILY

CONSULT

STAFF

CONFERENCE

ROOM

OCCUPATIONAL

THERAPY

COMMUNITY

ROOM

52 RESOURCE/

COMPUTERS

OFFICE

FAMILY

CONSULT

EXAM

OFFICE

OFFICE

STAFF

LOUNGE

VEST

MECHANICAL

OPEN

OFFICE

GROUP

ROOM 1

RECEPTION/CHECK-IN

VEST

WAITING

CORRIDOR

C06

CORRIDOR

C04

CORRIDOR

C05

CORRIDOR

C03

CORRIDOR

C02

CORRIDOR

C01

LOBBY

FIRE

RISER

ROOM

STORAGE

2 3

1 TYP.3

4 TYP.

MEDS

CLEAN

SUPPLY

07A

TOILET

TRAINING

TLT

53B

STOR

53C

1.7

E

A.5

B.11 B.10

5 3

TYP.

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:2

:2

A

M C

R e v it p ro je c ts

\M

-0

-B

C L

C V

A -B

L D

G tb u d a i.

rv t

FX102

FIRST FLOOR FIRE SUPPRESSION

REFLECTED CEILING PLAN

3 3TB

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

SPG

22-021

Scale: 1/8" = 1'-0"

FIRST FLOOR FIRE SUPPRESSION REFLECTED CEILING PLAN

1 PROVIDE NEW SEMI-RECESSED QUICK

RESPONSE SPRINKLER HEADS PER NEW

LAYOUT. SEE DETAIL 6/FX001.

2 PROVIDE NEW UPRIGHT SPRINKLER HEADS PER

NEW LAYOUT. SEE DETAIL 7/FX001.

3 PROVIDE NEW BRANCH PIPING AS REQUIRED.

4 SPRINKLER HEADS IN THE LOBBY/WAITING

AREA ARE LOCATED AT ELEVATION 19'-6".

5 PROVIDE NEW UPRIGHT SPRINKLER HEAD WITH

CAGE PER NEW LAYOUT. SEE DETAIL 8/FX001.

A. PROVIDE NEW SPRINKLERS HEADS AS PER NEW

LAYOUT.

B. PROVIDE BRANCH PIPING AS REQUIRED.

C. WET SPRINKLER PIPING LAYOUT AND

SPRINKLERS LAYOUT IS FOR REFERENCE ONLY.

SUBMIT SHOP DRAWINGS, CALCULATION, PIPE

SIZING AND LAYOUT, DETAILS SIGNED BY

PROFESSIONAL ENGINEER FOR VA REVIEW.

D. ALL AIR TERMINALS AND LIGHTING FIXTURES ARE

SHOWN FOR COORDINATION PURPOSES ONLY.