Attachment 8 - Drawings Interior.pdf
PDF 17 MB Posted
- Attached to
- Y1DA--580-324 | Replace/Construct Bldg 121 | Houston, TX Federal contract opportunity
- Solicitation number
- 36C77625R0030_1
About this file
These are architectural and engineering interior design drawings for the replacement of Building 121 at the Michael E. Debakey VA Medical Center in Houston, Texas. The 20-page drawing set (pages I-001 through I-903) provides detailed interior design plans for a new 14,977 square foot Psychosocial Rehabilitation and Recovery Center (PRRC), including comprehensive documentation for room finishes, equipment schedules, wall protection, signage, casework, and axonometric views of key spaces.
The drawings specify intricate design details for multiple room types including offices, consultation rooms, group rooms, staff areas, medical supply spaces, and support facilities. Key design elements include specific floor and wall finishes (such as luxury vinyl tile, porcelain tile, and paint specifications), detailed casework and millwork elevations, equipment placement, ADA compliance considerations, and specialized area requirements like static dissipative tile in technical rooms. The drawings are part of a design-bid-build project intended to consolidate and relocate the VA medical center's psychosocial rehabilitation practice into a modern, purpose-designed facility.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S SS
GENERAL
1. THE CONTRACTOR SHALL PROVIDE ALL ITEMS AND MATERIALS SHOWN, INDICATED, OR REQUIRED FOR A
COMPLETE INSTALLATION (UNO).
2. REFERENCE ROOM FINISH SCHEDULE, FINISH MATERIAL LEGEND, AND SPECIFICATION SECTION 09 06 00
SCHEDULE OF FINISHES FOR MORE INFORMATION.
3. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL CEILING INFORMATION.
4. REFER TO DETAIL SHEET I-501 FOR FLOORING TRANSITIONS AND OTHER DETAILS.
5. PREPARE FLOOR AND WALL CONSTRUCTION TO RECEIVE NEW FINISHES IN ACCORDANCE WITH
MANUFACTURER’S RECOMMENDED INSTALLATION METHODS AND MATERIALS.
6. PRIOR TO THE INSTALLATION OF NEW FINISHES, THE CONTRACTOR SHALL INSPECT ALL SUBSTRATES. IF A SUBSTRATE IS DEEMED UNACCEPTABLE, THE CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO RECTIFY THE SITUATION OR CONTACT THE COR WITH THE CONCERN. STARTING WORK CONSTITUTES ACCEPTANCE OF
EXISTING CONDITIONS.
ALL WORK
1. USE MANUFACTURER'S RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL FINISHES.
2. TILE FLOORING SYSTEM ASSEMBLIES TO BE PROVIDED BY THE FLOORING CONTRACTOR. SYSTEM ASSEMBLIE COMPONENTS TO BE FROM THE SAME MANUFACTURER. THE INSTALLER SHALL BE APPROVED BY
FLOORING MANUFACTURER.
3. FLOORING TRANSITIONS SHALL COMPLY WITH ADA GUIDELINES. AS PART OF THE SUBMITTAL PROCESS THE FLOORING CONTRACTOR SHALL SUBMIT A DIAGRAM SHOWING FLOORING TRANSITION LOCATIONS FOR
DESIGNERS APPROVAL PRIOR TO INSTALLATION.
4. FLOOR TRANSITIONS BETWEEN DISLIKE MATERIALS SHALL BE STAINLESS STEEL METAL TRIM. LOCATE AT
CENTERLINE OF DOOR WHEN IN THE CLOSED POSITION.
5. OUTSIDE AND INSIDE CORNERS OF WALL TILE SHALL BE STAINLESS STEEL METAL TRIM.
6. TRANSITIONS BETWEEN WALL AND FLOOR TILE SHALL BE STAINLESS STEEL COVE PROFILE METAL TRIM.
7. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT DOORS (UNO).
8. FLOOR FINISHES SHALL EXTEND UNDER NEW BUILT-IN CABINETS.
9. PROVIDE LEVEL 4 FINISH ON GYPSUM. BOARD. WALLS, CEILINGS, AND SOFFITS (UNO).
10. PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE PRIMER COAT AND (2) TWO TOP COATS.
11. USE MPI GLOSS LEVEL 3 PAINT FOR ALL WALLS (UNO). USE MPI GLOSS LEVEL 5 PAINT FOR ALL WET AREA
WALLS, METAL DOORS AND METAL FRAMES (UNO).
12. PAINT ALL EXPOSED METAL SURFACES, SUCH AS GRILLES, ACCESS PANELS, ELECTRICAL PANELS, ETC. TO MATCH ADJACENT SURFACE. ELECTRICAL PANELS WITHIN TELECOM SPACES TO BE LEFT UNPAINTED.
13. PAINT INTERIOR SURFACES OF AIR DUCTS THAT ARE VISIBLE THROUGH GRILLES AND LOUVERS WITH ONE
COAT OF MPI GLOSS LEVEL 1 BLACK PAINT.
14. CAULK AROUND ALL NEW AND EXISTING WINDOWS, WINDOWSILLS, DOORS, AND AT NEW FINISHES AROUND
ELEVATORS.
FINISH
1. ALL PAINTED WALLS TO BE PAINTED P-1 (UNO).
2. ALL GYPSUM BOARD CEILINGS TO BE PAINTED P-1 (UNO).
3. ALL EXISTING AND NEW HOLLOW METAL DOORS AND WINDOW FRAMES IN SCOPE OF WORK TO BE PAINTED P-7
(UNO).
4. ALL SIDES OF GYPSUM BOARD BULKHEAD TO BE PAINTED THE SAME COLOR, PAINT P-1 (UNO).
5. ALL EXISTING AND NEW EXPOSED STRUCTURE, DECK, AND DUCTWORK TO BE PAINTED P-1 (UNO).
6. EXTEND STATIC DISSIPATIVE TILE IN TELECOM AND DEMARK ROOMS UNDER THE DOOR TO EXISTING
FLOORING.
7. ALL ADJACENT AREAS TO TELECOM ROOMS AFFECTED BY INFILL OF EXISTING DOORS, NEW DOORS AND/OR NEW WALLS SHALL HAVE FLOORING, CEILINGS, BASE, PAINT, AND WALL PROTECTION PATCHED AND MADE READY TO RECEIVE NEW WORK. NEW WORK TO MATCH EXISTING. VA INTERIOR DESIGNER TO GIVE DIRECTION
ON NEW FINISHES OR EXISTING FINISHES TO MATCH.
8. INSTALL WINDOW FILM (WF-1) AT TELECOM ROOMS THAT HAVE EXPOSED WINDOWS.
FINISH
ALL PLYWOOD BACKER BOARD IN TELECOM ROOMS SHALL BE PAINTED WITH 3 COATS OF FIRE RETARDANT PAINT, COLOR: P-1. LEAVE ONE STAMP ON PLYWOOD EXPOSED
GENERAL
1. THE CONTRACTOR SHALL PROVIDE ALL ITEMS AND MATERIALS SHOWN, INDICATED, OR REQUIRED FOR A
COMPLETE INSTALLATION (UNO).
2. SEE TYPICAL DETAIL SECTIONS ON SHEET I-101.
ALL WORK
1. ALL CORNER GUARDS TO BE FROM TOP OF BASE TO 8'-0"H.
2. PROVIDE 16 GAUGE BACKING IN WALLS FOR ALL HANDRAILS, CRASH RAILS, BUMPER RAILS AND CHAIR RAILS.
3. TYPICAL HIGH IMPACT WALLCOVERING HEIGHT IS 4'-0"H IN ROOMS. CORRIDORS ARE 3’-0” HIGH (UNO).
4. STOP HIGH IMPACT WALLCOVERING WAINSCOTS AT CASEWORK.
5. HOLD BACK HANDRAIL AND BUMPER OR CRASH RAILS 2" FROM CORNER GUARDS AND DOOR FRAMES.
6. DO NOT INSTALL HANDRAILS BEHIND DOORS. INSTALATION TO START 6" AWAY FROM FRONT EDGE OF DOOR
WHEN OPEN 180 DEGREES.
7. USE .040” THICK STANDARD HIGH IMPACT WALLCOVERING SHEETS FOR DRYWALL APPLICATIONS USE 0.60”
THICK SHEETS FOR BRICK/CMU.
8. SEE SPECIFICATION 09 06 00 SCHEDULE OF FINISHES FOR MATERIALS AND FINISHES.
ABBREVIATION LEGEND
BR: BUMPER RAIL
CG: CORNER GUARD
HR: HANDRAIL
HIW: HIGH IMPACT WALLCOVERING
GENERAL
1. THE CONTRACTOR SHALL PROVIDE ALL ITEMS AND MATERIALS SHOWN, INDICATED, OR REQUIRED FOR A COMPLETE INSTALLATION (UNO) THIS PACKAGE IS TO INCLUDE A COMPREHENSIVE SIGNAGE SCHEDULE CONSISTING OF: ROOM NUMBERS, SIGN TYPES, SIGN TYPES, QUANTITIES, AND LOCATIONS FOR ALL FLOORS
2. SIGNAGE VENDOR TO REVIEW PROJECT DRAWINGS AND DETERMINE NECESSARY SIGNAGE LOCATIONS AND
QUANTITIES.
3. ALL SIGNAGE TO MEET VA SIGNAGE GUIDELINES AND ADA INSTALLATION HEIGHTS. CONTRACTOR TO COORDINATE THE TEXT OF SIGN INSERTS WITH COR AND PROVIDE A ROOM SIGNAGE SCHEDULE WITH CONSTRUCTION SUBMITTAL FOR COR TO GIVE FINAL APPROVAL OF ALL SIGNAGE TEXT, DESIGN, AND LOCATIONS.
ALL WORK
1. SIGNS TO MATCH MICHAEL E DEBAKEY VAMC CAMPUS SIGNAGE STANDARDS. COLORS AND STYLES TO BE
DETERMINED BY FACILITIES.
2. SIGNAGE SHALL BE CONTRACTOR FURNISHED AND INSTALLED (UNO).
3. PERMANENT ROOM SIGNAGE MUST INCLUDE RAISED LETTERS AND BRAILLE AND MEET ADA GUIDELINES.
4. IF WALL SPACE IS NOT AVAILABLE FOR SIGNAGE ON LATCH SIDE OF DOOR PER MOUNTING STANDARDS, SIGNS
SHALL BE INSTALLED PER CURRENT ADA STANDARDS ON NEAREST ADJACENT WALL.
5. ALL NEW TELECOM SIGNAGE SHALL BE NUMBERS ONLY.
6. CONTRACTOR TO TURN OVER ALL SIGNAGE NOT REUSED TO VA COR.
GENERAL
1. CONTRACTOR IS RESPONSIBLE FOR REMOVING AND RELOCATING ALL EXISTING FURNITURE, FIXTURES AND
EQUIPMENT FOR RENOVATION PROJECTS PRIOR TO CONSTRUCTION.
2. FURNITURE, FIXTURES AND EQUIPMENT DESIGNATED “VV” ON PLANS AND SCHEDULES ARE FOR COORDINATION
AND SPATIAL PURPOSES ONLY AND NOT TO BE USED FOR ACTUAL PURCHASING QUANTITIES.
3. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, FIRE ALARM AND TECHNOLOGY DRAWINGS FOR ADDITIONAL
UTILITY CONNECTIONS AND LOCATIONS.
4. REFER TO G-002 FOR STANDARD MOUNTING HEIGHTS. REFER TO EQUIPMENT DRAWINGS FOR LOCATIONS AND ADDITIONAL DIMENSIONS. PROVIDE 16 GAUGE BACKING FOR ALL WALL MOUNTED EQUIPMENT OR AS REQUIRED BY
THE MANUFACTURER’S REQUIREMENTS FOR INSTALLATION.
5. REFER TO SHEETS I-431 THRU I-432 FOR ENLARGED TOILET ROOMS AND ELEVATIONS.
6. REFER TO REFLECTED CEILING PLAN A-110 FOR CUBICLE CURTAIN TRACKS, LIFT AND ALL OTHER
CEILING MOUNTED EQUIPMENT ITEMS.
7. SEE ENLARGED EQUIPMENT PLANS ON SHEETS I-421 TO I-424.
8. SEE EQUIPMENT SCHEDULES ON SHEET I-601 FOR SPECIFICS ON EQUIPMENT.
ALL WORK
1. ITEM TAGS INCLUDE ACQUISITION AND INSTALLATION RESPONSIBILITIES (ACQ.), DENOTED AS FOLLOWS:
"VV" = VA FURNISHED & VA INSTALLED
"VC" = VA FURNISHED & CONTRACTOR INSTALLED
“CC" = CONTRACTOR FURNISHED & CONTRACTOR INSTALLED
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
PLASTIC LAMINATE CASEWORK GENERAL NOTES
GENERAL
1. THE CONTRACTOR SHALL PROVIDE ALL ITEMS AND MATERIALS SHOWN, INDICATED, OR REQUIRED FOR A
COMPLETE INSTALLATION (UNO).
2. THE FOLLOWING NOTES ARE SPECIFIC TO CASEWORK AND ARE IN ADDITION TO THE GENERAL FINISH NOTES.
3. DIMENSIONS FOR CASEWORK SHALL BE FIELD VERIFIED PRIOR TO FABRICATION AND INSTALLATION.
4. CONTRACTOR SHALL COORDINATE INSTALLATION OF CASEWORK WITH SINKS / PLUMBING FIXTURES AND
ASSOCIATED PIPINGS AND FITTINGS.
5. SEE SHEET I-210 FOR TYPICAL CABINET SECTIONS.
6. PROVIDE 16 GAUGE BACKING FOR ITEMS THAT ARE REQUIRED TO BE SECURED TO THE WALLS. REFERENCE MECHANICAL, PLUMBING, ELECTRICAL AND TECHNOLOGY DRAWINGS. COORDINATE WITH FURNITURE SUPPLIER
WHERE APPROPRIATE.
ALL WORK
1. ALL BASE CABINETS TO BE 23" DEEP WITH 24” DEEP COUNTERTOP INCLUDING BACKSPLASH (UNO).
2. ALL WALL CABINETS TO BE 15" DEEP OUT TO OUT (UNO). PROVIDE LIGHT VALANCES WHERE UNDERCABINET
LIGHTS ARE SHOWN.
3. ALL WALL CABINETS WITHOUT SOFFITS ARE TO HAVE SLOPE TOPS.
4. ALL SHELVING SHOWN AS DASHED LINES IN ELEVATIONS ARE TO BE ADJUSTABLE.
5. WHEN FILLER PANELS ARE REQUIRED AT BOTH ENDS OF CASEWORK BOTH FILLER PANELS SHALL BE EQUAL WIDTH (UNO). ADD FILLER PANEL AS NEEDED AT ALL CABINETS TO ENSURE FULL DOOR SWING AND DRAWER
OPERATION (UNO).
6. PROVIDE FINISHED END PANEL AT EXPOSED CASEWORK ENDS AND BACKS AS NEEDED. PANEL TO MATCH
PLASTIC LAMINATE. END PANEL SUPPORTS SHALL BE 1-1/2” WIDE.
7. ALL COUNTERTOPS TO BE SOLID SURFACE INTEGRAL ONE PIECE DESIGN WITH EASED EDGE AT ALL EXPOSED EDGES, WITH 1/2" RADIUS AT EXPOSED CORNERS.). ALL JOINTS IN COUNTERTOPS, SPLASHES AND CURBS SHALL ALIGN AND BE SMOOTH. ALL COUNTERTOPS ARE 1-1/2" THICK WITH 4" HIGH BACK/SIDE SPLASHES (UNO).
8. SEALANT JOINTS AT COUNTERTOPS, TRANSACTION TOPS, BACK / SIDE SPLASHES, AND END TO THE WALLSHALL HAVE CLASS 50 SILICONE SEALANT. SEALANT TO BE CLEAR OR COORDINATING COLOR. COLOR TO BE SELECTED
BY DESIGNER FROM MANUFACTURER’S CUSTOM RANGE.
9. ALL COUNTERTOPS TO EXTEND 1" BEYOND FRONT OF CABINET DOOR FACE AND OPEN SIDES.
10. BEYOND BASE CABINET PROVIDE HYBRID THIN WALL BRACKET COUNTERTOP SUPPORTS AT 36" O.C. MAX..
11. COUNTERTOP SUPPORT END PANELS SHALL BE 1-1/2” THICK.
12. WHERE INDICATED ON DRAWINGS PROVIDE 2-1/2" DIAMETER GROMMETS.
13. PROVIDE PIPE WRAP AT EXPOSED PIPES.
14. GLASS FRONTS TO BE 1/4" THICK CLEAR TEMPERED GLASS (UNO).
15. PROVIDE HORIZONTAL FILE RAILINGS TO SUPPORT HANGING FOLDERS AT ALL BUILT- IN FILING CABINETS.
16. PROVIDE LOCKS AT ALL CABINETS AS INDICATED ON ELEVATIONS. KEY ALIKE PER ROOM.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:1
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-001
GENERAL NOTES, ABBREVIATIONS
AND ROOM FINISH SCHEDULE
1 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
FINISH ABBREVIATIONS
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
BR BUMPER RAIL
CC CUBICLE CURTAIN
CR CRASH RAIL
CG CORNER GUARD
CJ CONTROL JOINT
CMU CONCRETE MASONRY UNIT
CON CONCRETE FLOORING
CR CARD READER
CPT CARPET
EP EPOXY PAINT
EX EXISTING
EXJ EXPANSION JOINT
EXP EXPOSED
G GROUT
GYP GYPSUM WALL BOARD
GWT GLASS WALL TILE
HR HAND RAIL
HIW HIGH IMPACT WALLCOVERING
LF LINEAR FEET (FOOT)
LVT LUXURY VINYL TILE
LWC LINEAR WOOD CEILING
MTL METAL
MISC MISCELLANEOUS
NA NOT APPLICABLE
P PAINT
PFIN PREFINISHED
PL PLASTIC LAMINATE
PT PORCELAIN TILE
RB RUBBER BASE
RP RESIN PANEL SYSTEM
SC SEALED CONCRETE
SDT STATIC DISSAPATIVE TILE
SF SQUARE FEET (FOOT)
SS SOLID SURFACE
SST STAINLESS STEEL
TYP TYPICAL
TR TRIM
TZT TERAZZO TILE FLOORING
UFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VIF VERIFY IN FIELD
WSF WELDED SHEET FLOORING
WSFB WELDED SHEET FLOORING BASE
WOC WALK-OFF CARPET
ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS WAINSCOT CEILING
REMARKSEAST NORTH SOUTH WEST FINISH HEIGHT FINISH
01 VEST WOC-1 RB-1 P-1 P-1 P-1 P-1 GYP-1/P-1
02 WAITING TZT-1 RB-1 P-1 P-1 P-1 GP-1, SS-3,
GWT-1
LWC-1 REFERENCE ELEVATION 4/I-202 FOR
LOCATIONS
03 LOBBY TZT-1 RB-1 P-1 P-1 PWT-1 P-1 LWC-1 / ACT-1
04 RECEPTION/CHECK-IN LVT-1 RB-1 P-1 P-1 P-1 P-7 GYP / ACT-1
06 TOILET PT-1 TR-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 GYP-1/P-1
07 MEDS/CLEAN SUPPLY WSF-1 WSFB-1 EP-1/HIW-2 EP-1/HIW-2 EP-1/HIW-2 EP-1/HIW-2 HIW-2 4' ACT-1
07A CLEAN SUPPLY WSF-1 WSFB-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 HIW-1 4' ACT-2
08 EXAM WSF-1 WSFB-1 P-1 P-5 P-1 P-1 ACT-1
09 FAMILY CONSULT LVT-1 RB-1 P-1 P-1 P-1 P-6 ACT-1
10 FAMILY CONSLT LVT-1 RB-1 P-5 P-1 P-1 P-1 ACT-1
11 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-4 P-1 ACT-1
12 TLT PT-1 TR-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 GYP
13 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-6 P-1 ACT-1
14 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-6 P-1 ACT-1
15 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-6 P-1 ACT-1
16 OFFICE/CONSULT LVT-1 RB-1 P-6 P-6 P-6 P-6 EXPOSED STRUCTURE
17 HAC WSF-1 WSFB-1 EP-1/HIW-3 EP-1/HIW-3 EP-1/HIW-3 EP-1/HIW-3 HIW-3 4' GYP-1/EP-1
18 SOILED WSF-1 WSFB-1 EP-1/HIW-3 EP-1/HIW-3 EP-1/HIW-3 EP-1/HIW-3 HIW-3 4' GYP-1/EP-1
19 STAFF LOUNGE LVT-1 RB-1 P-1/CWT-1 P-1 P-1 P-2 ACT-1 CWT-1 BACKSPLASH AT CASEWORK, REFERENCE I-201
20 VEST WOC-1 RB-1 P-1 P-1 P-1 P-1 GYP
21 FIRE RISER ROOM EPF-1 RB-1 P-1 P-1 P-1 P-1 EXPOSED STRUCTURE
22 STORAGE LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
23 MECHANICAL EPF-1 RB-1 P-1 P-1 P-1 P-1 EXPOSED STRUCTURE
24 ELEC EPF-1 RB-1 P-1 P-1 P-1 P-1 EXPOSED STRUCTURE
25 OPEN OFFICE LVT-1 RB-1 P-4 P-1 P-1 P-4 ACT-1
26 OFFICE LVT-1 RB-1 P-1 P-1 P-1 P-6 ACT-1
27 OFFICE LVT-1 RB-1 P-6 P-1 P-1 P-1 ACT-1
29 OFFICE LVT-1 RB-1 P-1 P-3 P-1 P-1 ACT-1
30 OFFICE LVT-1 RB-1 P-6 P-1 P-1 P-1 ACT-1
31 OFFICE LVT-1 RB-1 P-1 P-1 P-1 P-6 ACT-1
32 OFFICE LVT-1 RB-1 P-6 P-1 P-1 P-1 ACT-1
33 TOILET PT-1 TR-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 GYP-1/P-1
34 STAFF TLT PT-1 TR-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 GYP-1/P-1
35 OFFICE/CONSULT LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1
36 OFFICE/CONSULT LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1
37 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1
38 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1
39 GROUP ROOM 2 LVT-1 RB-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 HIW-1 4' ACT-1
40 GROUP ROOM 1 LVT-1 RB-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 HIW-1 4' ACT-1
41 OFFICE/CONSULT LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1
42 TR SDT-1 RB-1 P-8 P-8 P-8 P-8 EXPOSED STRUCTURE COVER ALL 6 SIDES WITH 2
COATS, EXPOSE ONLY 1 STAMP
ON ALL PLYWOOD IN TELECOM
ROOMS
43 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1
44 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1
45 OFFICE/CONSULT LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1
46 OFFICE/CONSULT LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1
47 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-1 P-2 ACT-1
48 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1
49 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1
50 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-1 P-2 ACT-1
51 RESOURCE/ COMPUTERS LVT-1 RB-1 P-1 P-1 P-4 P-1 ACT-1
52 COMMUNITY ROOM LVT-1 RB-1 P-1 P-1 P-4/ CWT-1 P-1 ACT-1 CWT-1 BACKSPLASH AT CASEWORK, REFERENCE I-201
53 OCCUPATIONAL THERAPY LVT-1 RB-1 P-1 P-1 P-1 P-4/CWT-1 ACT-1 CWT-1 BACKSPLASH AT CASEWORK, REFERENCE I-201
53B TRAINING TOILET LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
54 STAFF CONFERENCE ROOM LVT-1 RB-1 P-1 P-4 P-1 P-1 ACT-1
C01 CORRIDOR LVT-1 RB-1 HIW-2 P-1 P-1 HIW-1 HIW-1/2 FULL HEIGHT FLOOR
TO CEILING WITH
RB-1
ACT-1
C02 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
C03 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
C04 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
C05 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
C06 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1
FINISH GENERAL NOTES
WALL PROTECTION GENERAL NOTES
SIGNAGE GENERAL NOTES
EQUIPMENT GENERAL NOTES
WALL RATING LEGEND
Docusign Envelope ID: 4A451C82-CA71-46CA-A562-A3A832916AE1
1/27/2025
A
2 3 4 5 6
B
D
C
1.7
E
A.5
B.11 B.10
1 1 1 1
1 1 1
11 11 11
1 1
I-202
I-202
I-201
I-2011
I-201
I-201
I-201
I-201
I-401
I-401
I-4016 5
I-40110 9
I-40112 11
OPEN OFFICE
OFFICE
OFFICE
53B
TRAINING
TOILET
STAFF
CONFERENCE
ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
MECHANICAL
ELEC
STORAGE
FIRE RISER
ROOM 20
VEST
STAFF LOUNGE
OFFICE/CONSULT
OFFICE/CONSULT
TR
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
C03
CORRIDOR
C06
CORRIDOR
C04
CORRIDOR
C02
CORRIDOR
OFFICE/CONSULT
OFFICE/CONSULT
GROUP ROOM 1
GROUP ROOM 2
COMMUNITY
ROOM
RESOURCE/
COMPUTERS
RECEPTION/CHECK-IN
LOBBY
C01
CORRIDOR
TOILET
STAFF TLT
WAITING
VEST
MEDS/CLEAN
SUPPLY
FAMILY
CONSULT
EXAM
FAMILY CONSLT
OFFICE/CONSULT
SOILED
HAC
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
TLT
C05
CORRIDOR
7 7
7 5
5 5
5 5
5 5
5 5
9 9 9 7
I-2023
I-201
OCCUPATIONAL
THERAPY
53C
STOR 1 1
07A
CLEAN SUPPLY
TOILET
I-202
I-401
I-401 14
I-201
I-201 8
I-201 8
I-201 8
FINISHED FLOOR
VINYL BASE (4") OR SHEET
VINYL BASE (6")
FINISHED WALL
S E
E E
L E
V A
T
IO
N
V A
R
IE
S
HIGH IMPACT
WALLCOVERING OR
FLEXIBLE WALLCOVERING
METAL CAP BY WALL
PROTECTION MFR.
(REF ELEVATIONS FOR MATERIALS AND
HEIGHTS)
V A
R
IE
S
CONTINUOUS CAULK APPLIED TO TOP INSIDE CORNER
3"
1/4"
METAL STUDS
GYPSUM BOARD
REGRIND RETAINER
(24U026000)
#6 X 1 5/8" BUGLE HD SMS
18" [457.2mm] MAX.
R1/4" [R6.4mm]
PETG COVER
NEOPRENE CUSHION AT
EACH FASTENING
FINISHED FLOOR
BASE
FINISHED WALL
HANDRAIL
/2
RESILIENT BUMPER RAILT
O
P O
F H
A N
D R
A
IL
" 16 GA METAL BLOCKING
16 GA METAL BLOCKING
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:2
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-101
FIRST FLOOR FINISH AND WALL
PROTECTION PLAN
2 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
N O
R T H
0 4 8 16
Scale: 1/8" = 1'-0"
FIRST FLOOR FINISH AND WALL PROTECTION PLAN
1 CONTRACTO TO PROVIDE AND INSTALL FULL
HEIGHT CORNER GUARD
2 PWT-1 PORCELAIN WALL TILE
3 HIW-1, HIGH IMPACT WALLCOVERING FLOOR TO
CEILING WITH RB-1, DRYWALL FINISH LEVEL TO
MATCH MANUFACTURER RECOMMENDATIONS
4 HIW-2 HIGH IMPACT WALLCOVERING FLOOR TO
CEILING WITH RB-1, DRYWALL FINISH LEVEL TO
MATCH MANUFACTURER RECOMMENDATIONS
5 PAINT: P-2, REFERENCE SPECIFICATIONS FOR
COLOR
6 PAINT: P-3, REFERENCE SPECIFICATIONS FOR
COLOR
7 PAINT: P-4, REFERENCE SPECIFICATIONS FOR
COLOR
8 PAINT: P-5, REFERENCE SPECIFICATIONS FOR
COLOR
9 PAINT: P-6, REFERENCE SPECIFICATIONS FOR
COLOR
10 CONTRACTOR TO PROVIDE AND INSTALL FULL
HEIGHT 135 DEGREE CORNER GUARD
12 PLYWOOD TO BE PAINTED P-1
Scale: 1" = 1'-0"
TYPICAL WALL PROTECTION
Scale: 6" = 1'-0"
CORNER GUARD DETAIL
Scale: 1" = 1'-0"
TYPICAL HANDRAIL/BUMPER SECTION
2 3 4 5 6
B
D
C
1.7
E
A.5
B.11 B.10
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
TR
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
GROUP ROOM 2
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
TLT
OFFICE/CONSULT17
HAC
STAFF TLT
TOILET
OFFICE
OFFICE
OFFICE
ELEC
SOILED
FAMILY
CONSULT
STAFF
CONFERENCE
ROOM 53
OCCUPATIONAL
THERAPY
COMMUNITY
ROOM
RESOURCE/
COMPUTERS
OFFICE
FAMILY
CONSULT
EXAM
OFFICE
OFFICE
STAFF LOUNGE
VEST
MECHANICAL
MEDS
OPEN OFFICE 40
GROUP ROOM 1
RECEPTION/CHECK-IN
VEST
WAITING
C06
CORRIDOR
C04
CORRIDOR
C05
CORRIDOR
C03
CORRIDOR
C02
CORRIDOR
C01
CORRIDOR
LOBBY
FIRE RISER
ROOM
STORAGE
1 1
1 12
44 1
6 6
53B
TRAINING
TOILET
53C
STOR
07A
CLEAN SUPPLY
16 16
TOILET
IN-03.01
ROOM NUMBER
IDENTIFICATION
MICHAEL E. DEBAKEY MEMORIAL VA MEDICAL CENTER CAMPUS STANDARD
IN-04.02
SECONDARY ROOM
IDENTIFICATION WITH INSERT
IN-04.01
PRIMARY ROOM
IDENTIFICATION WITH INSERT
IN-01.31
FIRE EXTINGUISHER
IDENTIFICATION FLAG SIGN
IN-01.03
FIRE PROCEDURE "R.A.C.E."
SIGN
IN-11.04
PERMANENT MESSAGE
SIGN 'PUSH BUTTON TO
OPEN DOOR'
IN-01.38
EMERGENCY EYE WASH
STATION SIGN
IN-01.22
BIOHAZARD WARNING SIGN
IN-09.06
RESTROOM IDENTIFICATION
IN-09.07
REQUIRED RESTROOM
POSTING
IN-13.01
PERPENDICULAR FLAG
MOUNT - LAYOUT A
IN-02.07.03
POLICIES AND
DIRECTIVES
IN-02.07.04
NOTICE OF PRIVACY
PRACTICES
IN-02.07.03
POLICIES AND
DIRECTIVES
IN-02.07.02
RIGHTS AND
RESPONSIBILITIES OF FAMILY
MEMBERS OF VA PATIENTS
IN-02.07.01
RIGHTS AND
RESPONSIBILITIES OF VA
PATIENTS
GROUPED MANDATORY
SIGNAGE - SINGLE PANEL
IN-02.01
CONSENT TO INSPECTION
IN-02.10
NO WEAPONS NOTICE
IN-02.03
NO WEAPONS POLICY
IN-02.14
VIDEO SURVEILLANCE
IN-02.15
SERVICE DOGS
IN-02.02
NO SMOKING, NO VAPING
MANDATORY ENTRANCE SIGN GROUP LAYOUT
IN-02.04.01
BUSINESS HOURS &
VIDEO SURVEILLANCE
SIGN - VINYL
EN-06.04
WALL MOUNTED
BUILDING IDENTIFICATION
MEDIUM - LAYOUT B
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:2
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-141
FIRST FLOOR SIGNAGE PLAN
3 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
Scale: 1/8" = 1'-0"
FIRST FLOOR SIGNAGE PLAN N
O
R T H
0 4 8 16
1 PRIMARY ROOM IDENTIFICATION SIGN WITH
INSERT, IN-04.01
2 ALL-GENDER RESTROOM IDENTIFICATION SIGN,
IN-09.03
3 FLAG MOUNTED RESTROOM SIGN, IN-13.01
LAYOUT A
4 SECONDARY ROOM IDENTIFICATION SIGN WITH
INSERT, IN-04.02
5 ROOM NUMBER IDENTIFICATION SIGN, IN-03.01
6 SECONDARY ROOM IDENTIFICATION, EXTERIOR
GRADE, IN-04.02
7 MANDATORY ENTRANCE SIGNS, GROUP LAYOUT
B - SEE SIGN TYPE DETAIL FOR SPECIFIC SIGN
TYPES REQUIRED IN GROUP LAYOUT
8 FIRE EXTINGUISHER IDENTIFICATION FLAG SIGN,
IN-01.31
9 FIRE EXTINGUISHER IDENTIFICATION TAG, CLEAN
AGENT
10 CHANGING STATION RESTROOM POSTING,
IN-09.07
11 <varies>
12 FIRE PROCEDURE R.A.C.E. SIGN, IN-01.03
13 POLICIES AND DIRECTIVES SIGN, IN-02.07.03
14 NOTICE OF PRIVACY PRACTICES, IN-02.07.04
15 EMERGENCY EYEWASH STATION SIGN, IN-01.38
16 PERMANENT MESSAGE SIGN, IN-11.04
17 BUSINESS HOURS AND VIDEO SURVEILLANCE
VINYL SIGN, IN-02.04.01
18 WALL MOUNTED BUILDING IDENTIFICATION -
MEDIUM, EN-06.04
Scale: 12" = 1'-0"
SIGNAGE TYPES
2'-6" 3'-0" 1 3/4"
1 3/4"3'-0"2'-6"
5'-7 3/4"
W5 W10
SB1 B1
5'-7 3/4"
7 7
1 1/2"2'-6"3'-0"2'-2 1/2"1"
1 1/2"2'-6"3'-0"2'-3"
B3 SB2
W7 W10 W5
7 7
2'-6"2'-6"2'-6"5'-2 3/4"
12'-8 3/4"
2'-0" 2'-6" 2'-6" 2'-6"
9'-6"
W4 W8 W8 W5
SB2B2B2B4
W11
7 7 7 7
7 7 7 7
B3 B3 B3
3'-0" 3'-0" 3'-0"
9'-0"
4" 2'-9" 4'-0" 2'-6" 2'-9" 2'-9" 2'-3" 3'-0" 3'-3" 10 3/4"
24'-5 3/4"
T2 T1 W8 W6 W9 W7 W1 W2
SB4B3B2
2'-6" 2'-8" 3'-0" 2'-1" 3'-0"
13'-3"
"663
7 7 7 7 7 7 7 7
T3 W10 W10 W5
SB1B3B3
2'-6"3'-0"3'-0"3'-6"3"
12'-3"
3'-0" 3'-0" 2'-6"
8'-6"
3 53
7 7 7
7 7 7
SB5
3'-0" 2"
3'-2"
SB1
2'-6"
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:3
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-201
CASEWORK AND MILLWORK
ELEVATIONS
4 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
1 24"D SOLID SURFACE COUNTERTOP WITH
BACK/END SPLASH, SS-1
2 FINISHED END PANEL
3 FILLER PANEL
5 CABINET SLOPE TOP
6 24"D SOLID SURFACE COUNTERTOP WITH
BACK/END SPLASH, SS-2
7 PL-3 PLASTIC LAMINATE
8 CWT-1, CERAMIC WALL TILE 4X8
9 PL-1 PLASTIC LAMINATE
10 KEYED LOCKS, COORDINATE WITH VA COR
AND INTERIOR DESIGNER ON TYPE,
QUANTITY AND LOCATION
PLASTIC LAMINATE CASEWORK SCHEDULE
MARK WIDTH DESCRIPTION SECTION REFERENCE
B1 3' - 0" 34"H x 23"D BASE STORAGE CABINET, 1 DRAWER, 2 DOORS, 1
ADJ. SHELF
4/I-203
B2 2' - 6" 34"H x 23"D OPEN BASE STORAGE UNIT, 1 FIXED SHELF, MICROWAVE
13/I-203
B3 3' - 0" 34"H x 23"D BASE STORAGE UNIT, TWO DRAWER, TWO DOOR, 1
ADJ. SHELF
4/I-203
B4 2' - 0" 34"H x 23"D THREE EQUAL DRAWER BASE 5/I-203
SB1 2' - 6" 22"H x 23"D ADA SLOPED BASE CABINET <varies>
SB2 2' - 6" 34"H x 23"D SINK BASE, W/ REMOVABLE PANEL 2/I-203
SB3 3' - 0" 34"H x 23"D SINK BASE WITH ACCESS PANEL 2/I-203
SB4 3' - 0" 22"H x 23"D ADA SLOPED BASE CABINET 1/I-203
SB5 3' - 0" 34"H x 23"D SINK BASE UNIT, TWO DOOR 2/I-203
T1 4' - 0" 84"H x 24"D TALL STORAGE UNIT, TWO DOOR, ONE FIXED
SHELF, FOUR ADJ. SHELVES
12/I-203
T2 2' - 9" 84"H x 24"D TALL STORAGE UNIT, TWO DOOR, ONE FIXED
SHELF, FOUR ADJ. SHELVES
12/I-203
T3 3' - 6" 84"H x 24"D TALL STORAGE UNIT, TWO DOOR, ONE FIXED
SHELF, FOUR ADJ. SHELVES
12/I-203
W1 3' - 0" 15"H x 15"D TWO DOOR WALL STORAGE UNIT 7/I-203
W2 3' - 3" 15"H x 15"D TWO DOOR WALL STORAGE UNIT 7/I-203
W4 2' - 3" 15"H x 15"D TWO DOOR WALL STORAGE UNIT 7/I-203
W5 2' - 6" 18"H x 15"D TWO DOOR WALL STORAGE UNIT 7/I-203
W6 2' - 9" 18"H x 15"D TWO DOOR WALL STORAGE UNIT 7/I-203
W7 2' - 3" 25"H x 15"D TWO DOOR WALL STORAGE UNIT 8/I-203
W8 2' - 6" 25"H x 15"D TWO DOOR WALL STORAGE UNIT 8/I-203
W9 2' - 9" 25"H x 15"D TWO DOOR WALL STORAGE UNIT 8/I-203
W10 3' - 0" 25"H x 15"D TWO DOOR WALL STORAGE UNIT 8/I-203
W11 2' - 9" 12"H x 15"D WALL STORAGE UNIT, TWO DOOR 7/I-203
Scale: 3/8" = 1'-0"
EXAM 08 - EAST
Scale: 3/8" = 1'-0"
MEDS 07 - EAST
Scale: 3/8" = 1'-0"
STAFF LOUNGE 19 - EAST
Scale: 3/8" = 1'-0"
RECEPTION/CHECK-IN 04 - WEST
Scale: 3/8" = 1'-0"
COMMUNITY ROOM 52 - SOUTH
Scale: 3/8" = 1'-0"
OCCUPATIONAL THERAPY ROOM 53 - WEST
Scale: 3/8" = 1'-0"
TRAINING TOILET 53B - WEST
Scale: 3/8" = 1'-0"
TYPICAL RESTROOM
I-202 2A I-2022B
I-202
2C
I-202
2C
OH
2'-0" 1'-6"
3'-6"
E Q
E Q
C
B.11
RECEPTION/CHECK-IN
I-202
1A
I-202
1B
25'-3 3/4"
5'-8 3/4" 5" 6'-4 1/4" 6'-6 3/4" 5" 5'-10 1/2"
/2
R =9
1/ 2"I-202 1C
OH 4
/2
/4
1'-9 1/4"
44 4 4
I-203
2'-8"2'-6"
5"
1'-2 3/4"3'-0"2'-11"1'-4 3/4"3'-0"1'-4 1/2"
5"
2'-7 1/2"2'-8"
24'-2 1/4"
3 3
44 4 4
8 8 8 8
5'-9 1/4"5"5'-8 1/4"
11'-10 1/4"11'-5 1/2"
5'-7" 5" 5'-5 1/2"
14 14
/2
/2
/2
/2
/2
2°
R
/4
4" 4'-0 1/4"
4'-4 1/4"
/2
2'-8 3/4"
68°
/2
I-203
/4
B1 SB3 B1
3'-0" 3'-0" 3'-0"
9'-0"
24 24 24
1'-6" 3'-0" 3'-0" 1'-6"
9'-0"
1'-6"2'-0"
3'-6"
2'-0"
5"
1'-1"
3'-0"
10 1/4"9"
1'-7 1/4"
I-202
/2
3'-0"
6 1/4"1'-3 3/4"
M A
T C
H I D
1'-10"
/2
HOUSTON VAMC
OUTPATIENT MENTAL HEALTH CLINIC
VIF
17'-4 3/4"
V
IF
4'-0"4'-0"4'-0"
12'-0" 23
FIRST FLOOR
0' - 0"
1/2"10
2"
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:3
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-202
CASEWORK AND MILLWORK
ELEVATIONS
5 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
Scale: 1/2" = 1'-0"
ENLARGED COMMUNITY ROOM ISLAND - 52
Scale: 1/2" = 1'-0"
ENLARGED RECEPTION/CHECK-IN - 04
Scale: 3/8" = 1'-0" 1A
RECEPTION/CHECK-IN DESK 04 - EAST
Scale: 3/8" = 1'-0" 1B
RECEPTION/CHECK-IN DESK 04 - WEST
Scale: 1/2" = 1'-0"
RECEPTION/CHECK-IN DESK
04 - SOUTH
1C
Scale: 1/2" = 1'-0" 2A
COMMUNITY ROOM ISLAND 52 - NORTH
Scale: 1/2" = 1'-0"
2B
COMMUNITY ROOM ISLAND 52 - SOUTH
Scale: 1/2" = 1'-0"
COMMUNITY ROOM 52 -
WEST
2C
N O
R T H
0 4 8 16
N O
R T H
0 4 8 16
1 24"D SOLID SURFACE COUNTERTOP WITH BACK/END
SPLASH, SS-1
2 METAL SUPPORTS
3 RESIN PANEL RP-1
4 2 3/8"W GROMMET
5 WATERFALL SS-1, SOLID SURFACE EDGE
6 PL-1, PLASTIC LAMINATE
7 RB-1 RUBBER BASE
8 HIW-1, HIGH IMPACT WALLCOVERING
9 PL-2, PLASTIC LAMINATE PANEL WITH FINISHED PL-2
EDGES
10 1/2"D THICK BRUSHED ALUMINUM DIMENSIONAL
NUMBER, ADHERED TO PLASTIC LAMINATE PANEL
11 PWT-1 PORCELAIN WALL TILE 16"X48"
12 FACILITY SIGNAGE, DIMENSIONAL LETTERS ON 1"
STANDOFFS IN MATTE BLACK
13 HIW-2, HIGH IMPACT WALLCOVERING
14 ALIGN
17 4'X9' PANELS EQUALLY SPACED WITH CUSTOM
GRAPHICS SUPPLIED BY OTHERS, VIVISPECTRA
SPECTRUM LAMINATED GLASS, REFLECT
CONFIGURATION WITH PEARLEX+ FINISH SUPPLIED
BY BASIS OF DESIGN MANUFACTUERER
FORMS+SURFACES. ATTACHMENT METHOD
FORMS+SURFACES SLIM CLEAT. SEE SPECIFICATIONS
FOR MORE INFORMATION
18 SOLID SURFACE, SS-3 30"x144" PANEL 1/2" THICK
19 SLIM CLEATS BY PANEL MANUFACTURER, BASIS OF
DESIGN: FORMS AND SURFACES
20 U-CHANNEL TO MATCH RESIN PANEL THICKNESS,
MOUNTED W/ RUBBER GASKET
21 GWT-1, GLASS WALL TILE BAND
22 SCHLUTER METAL TRIM CAP
23 FINAL FINISHED WALL DIMENSION TO BE 12' TO
ACCOMIDATE PANELS PROPERLY
24 PL-3 PLASTIC LAMINATE
25 24"D SOLID SURFACE COUNTERTOP WITH BACK/END
SPLASH, SS-2
Scale: 3/8" = 1'-0"
GROUP ROOM 1 ID
Scale: 3/8" = 1'-0"
GROUP ROOM 2 ID
Scale: 3/8" = 1'-0"
LOBBY - 03 TILE WALL
Scale: 3/8" = 1'-0"
WAITING AREA - 02 DRINKING FOUNTAINS
Scale: 3/4" = 1'-0"
SIGNAGE WALL DETAIL
ADA SINK APRON AND PANELS
CONSTRUCTED WITH 3/4" INDUSTRIAL
GRADE PARTICLEBOARD
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
ADA ACCESSIBLE SINK AND FIXTURES.
REFER TO PLUMBING DRAWINGS FOR
FAUCET, STAINLESS STEEL SINK AND
CONNECTIONS.
REMOVABLE ADA OPERABLE PLUMBING
SHIELD CONSTRUCTED W/ 3/4"
INDUSTRIAL GRADE PARTICLEBOARD.
PROVIDE (4) KEKU CLIPS PER PANEL
AND ATTACH TO ADA SIDE PANEL TO
BE PLASTIC LAMINATE FACED.
PROVIDE AND INSTALL SUPPORT
BRACKET AS REQUIRED TO KEEP
CABINET FROM RACKING
OPEN
16 GA METAL BACKING TYPICAL
SEALANT, COLOR TO MATCH ADJACENT WALL
SIDES CONSTRUCTED WITH 3/4" INDUSTRIAL
GRADE PARTICLEBOARD. SIDES ARE
DADOED TO RECEIVE TOPS, BOTTOMS AND
BACKS.
NOTE:
ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD
FACES AND EDGES TO RECIEVE HIGH PRESSURE
LAMINATE. CABINET BODY EDGES 1MM PVC
EDGING.
INSULATED PIPING BY PLUMBING
CONTRACTOR
2'-0"
6"
1'-5"
1'-11"
BOTTOM CONSTRUCTED WITH 3/4"
INDUSTRIAL GRADE PARTICLEBOARD
DOWELED INTO CABINET SIDES.
BASE, SEE FINISH PLANS
SEALANT, COLOR TO MATCH ADJACENT WALL
2x BLOCKING
1x RAIL STRETCHER, TYPICAL
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
FALSE FRONT CONSTRUCTED
WITH 3/4" INDUSTRIAL GRADE
PARTICLEBOARD BACK CONSTRUCTED WITH 1/2" INDUSTRIAL
GRADE PARTICLEBOARD BACKS TO FIT INTO
CABINET SIDE DADOES
TOE KICK CONSTRUCTED OF 3/4" PLYWOOD
TOE BOARD
REMOVABLE PANEL, ATTACH TO CLEATS
WITH NICKEL PLATED SCREWS AND
FINISH WASHERS. MATCH REVEAL AND
EDGE TREATMENT OF DOORS AND
DRAWERS.
ADA ACCESSIBLE SINK AND FIXTURES.
REFER TO PLUMBING DRAWINGS FOR
FAUCET. STAINLESS STEEL SINK
PROVIDED BY PLUMBING.
SIDES CONSTRUCTED WITH 3/4"
INDUSTRIAL GRADE
PARTICLEBOARD. SIDES ARE
DADOED TO RECEIVE TOPS,
BOTTOMS AND BACKS.
NOTE:
ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD
FACES AND EDGES TO RECIEVE HIGH PRESSURE
LAMINATE. CABINET BODY EDGES AND THE SHELF
EDGE TO RECEIVE 1MM PVC EDGING. DOORS AND
DRAWERS TO RECEIVE 3MM PVC EDGING
16 GA METAL BLOCKING, TYPICAL
1'-11"
2'-0"
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
FULL OVERLAY DOOR
CONSTRUCTED W/ 3/4"
INDUSTRIAL GRADE
PARTICLEBOARD
ADJUSTABLE SHELF CONSTRUCTED
WITH 3/4" INDUSTRIAL GRADE
PARTICLEBOARD WITH INJECTION
MOLDED, CLEAR POLYCARBONATE
WITH TWO INTEGRAL PINS.
32mm CENTER
BACK CONSTRUCTED WITH 1/2" INDUSTRIAL
GRADE PARTICLEBOARD. BACKS TO FIT INTO
CABINET SIDE DADOES
BASE, SEE FINISH PLANS
BOTTOM CONSTRUCTED W/ 3/4" INDUSTRIAL
GRADE PARTICLEBOARD DOWELED INTO
CABINET SIDES
SEALANT, COLOR TO MATCH ADJACENT WALL
2x BLOCKING
1x RAIL STRETCHER, TYPICAL
SIDES CONSTRUCTED WITH 3/4"
INDUSTRIAL GRADE PARTICLEBOARD.
SIDES ARE DADOED TO RECEIVE TOPS,
BOTTOMS AND BACKS.
TOE KICK CONSTRUCTED OF 3/4" PLYWOOD
TOE BOARD
WIRE PULL
2'-0"
CONCEALED HINGES AT 120
DEGREES SELF-CLOSING
NOTE:
ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD
FACES AND EDGES TO RECIEVE HIGH PRESSURE
LAMINATE. CABINET BODY EDGES AND THE SHELF
EDGE TO RECEIVE 1MM PVC EDGING. DOORS AND
DRAWERS TO RECEIVE 3MM PVC EDGING
16 GA METAL BACKING, TYPICAL
1'-11"
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
FULL OVERLAY DOOR CONSTRUCTED
WITH 3/4" INDUSTRIAL GRADE
PARTICLEBOARD
ADJUSTABLE SHELF CONSTRUCTED
WITH 3/4" INDUSTRIAL GRADE
PARTICLEBOARD WITH INJECTION
MOLDED, CLEAR POLYCARBONATE
WITH TWO INTEGRAL PINS.
32mm CENTER
BACK CONSTRUCTED WITH 1/2" INDUSTRIAL
GRADE PARTICLEBOARD. BACKS TO FIT
INTO CABINET SIDE DADOES
BASE, SEE FINISH PLANS
BOTTOM CONSTRUCTED WITH 3/4"
INDUSTRIAL GRADE PARTICLEBOARD
DOWELED INTO CABINET SIDES
SEALANT, COLOR TO MATCH ADJACENT WALL
2x BLOCKING
1x RAIL STRETCHER, TYPICAL
SIDES CONSTRUCTED WITH 3/4"
INDUSTRIAL GRADE PARTICLEBOARD.
SIDES ARE DADOED TO RECEIVE TOPS,
BOTTOMS AND BACKS.
TOE KICK CONSTRUCTED OF 3/4" PLYWOOD
TOE BOARD
WIRE PULL
CONCEALED HINGES AT 120
DEGREES SELF-CLOSING
NOTE:
ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD
FACES AND EDGES TO RECIEVE HIGH PRESSURE
LAMINATE. CABINET BODY EDGES AND THE SHELF
EDGE TO RECEIVE 1MM PVC EDGING. DOORS AND
DRAWERS TO RECEIVE 3MM PVC EDGING
16 GA METAL BACKING TYPICAL
2'-0"
1'-11"
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
(3) DRAWER UNITS CONSTRUCTED
WITH 1/2" INDUSTRIAL GRADE
PARTICLEBOARD SIDES. 3/4" FRONTS
& BACKS & 1/2" FULLY CAPTURED
BOTTOM. DRAWER FACES
CONSTRUCTED OF 3/4" INDUSTRIAL
GRADE PARTICLEBOARD.
BACK CONSTRUCTED W/ 1/2" INDUSTRIAL
GRADE PARTICLEBOARD. BACKS TO FIT INTO
CABINET SIDE DADOES
BASE, SEE FINISH PLANS
BOTTOM CONSTRUCTED W/ 3/4" INDUSTRIAL
GRADE PARTICLEBOARD. DOWELED INTO
CABINET SIDES
SEALANT, COLOR TO MATCH ADJACENT WALL
2x BLOCKING
1x RAIL STRETCHER, TYPICAL
TOE KICK CONSTRUCTED OF 3/4" PLYWOOD
TOE BOARD
(3) WIRE PULL
2'-0"SIDES CONSTRUCTED W/ 3/4"
INDUSTRIAL GRADE PARTICLEBOARD.
SIDES ARE DADOED TO RECEIVE
TOPS, BOTTOMS AND BACKS.
NOTE:
ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD
FACES AND EDGES TO RECIEVE HIGH PRESSURE
LAMINATE. CABINET BODY EDGES AND THE SHELF EDGE
TO RECEIVE 1MM PVC EDGING. DOORS AND DRAWERS
TO RECEIVE 3MM PVC EDGING
16 GA METAL BACKING, TYPICAL
1'-11"
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
(4) DRAWER UNITS CONSTRUCTED
WITH 1/2" INDUSTRIAL GRADE
PARTICLEBOARD SIDES. 3/4" FRONTS
& BACKS & 1/2" FULLY CAPTURED
BOTTOM. DRAWER FACES
CONSTRUCTED OF 3/4" INDUSTRIAL
GRADE PARTICLEBOARD
BACK CONSTRUCTED WITH 1/2"
PARTICLEBOARD. BACKS TO FIT INTO
CABINET SIDE DADOES
BASE, SEE FINISH PLANS
BOTTOM CONSTRUCTED WITH 3/4"
INDUSTRIAL GRADE PARTICLEBOARD
DOWELED INTO CABINET SIDES
SEALANT, COLOR TO MATCH ADJACENT WALL
2x BLOCKING
1x RAIL STRETCHER, TYPICAL
TOE KICK CONSTRUCTED OF 3/4" PLYWOOD
TOE BOARD
(4) WIRE PULL
2'-0"
SIDES CONSTRUCTED WITH 3/4"
INDUSTRIAL GRADE
PARTICLEBOARD. SIDES ARE
DADOED TO RECEIVE TOPS,
BOTTOMS AND BACKS.
NOTE:
ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD FACES
AND EDGES TO RECIEVE HIGH PRESSURE LAMINATE.
CABINET BODY EDGES AND THE SHELF EDGE TO RECEIVE
1MM PVC EDGING. DOORS AND DRAWERS TO RECEIVE
3MM PVC EDGING
16 GA METAL BACKING TYPICAL
1'-11"
WIRE PULL
BACK CONSTRUCTED W/ 1/2" INDUSTRIAL
GRADE PARTICLEBOARD. BACKS TO FIT INTO
CABINET SIDE DADOES
FULL OVERLAY DOOR CONSTRUCTED
W/ 3/4" PARTICLEBOARD
1'-3"
SLOPED TOP OR GYP. BD. SOFFIT.
REFER TO CEILING PLANS &
ELEVATIONS
16 GA METAL BACKING, TYPICAL
CONCEALED HINGES AT 120
DEGREES SELF-CLOSING
NOTE:
ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD
FACES AND EDGES TO RECIEVE HIGH PRESSURE
LAMINATE. CABINET BODY EDGES AND THE SHELF
EDGE TO RECEIVE 1MM PVC EDGING. DOORS AND
DRAWERS TO RECEIVE 3MM PVC EDGING.
1x RAIL STRETCHER, TYPICAL
BOTTOM CONSTRUCTED W/ 3/4" INDUSTRIAL
GRADE PARTICLEBOARD DOWELED INTO
CABINET SIDES.
SIDES CONSTRUCTED W/ 3/4" INDUSTRIAL
GRADE PARTICLEBOARD SIDES ARE
DADOED TO RECEIVE TOPS, BOTTOMS AND
BACKS
V A
R
IE
S
LIGHT VALANCE AT ALL WALL
CABINETS (UNO)
WIRE PULL
32MM CENTERS
BACK CONSTRUCTED W/ 1/2" INDUSTRIAL GRADE
PARTICLEBOARD. BACKS TO FIT INTO CABINET
SIDE DADOES
SLOPED TOP OR GYP. BD. SOFFIT.
REFER TO CEILING PLANS &
ELEVATIONS
16 GA METAL BACKING, TYPICAL
CONCEALED HINGES AT 120
DEGREES SELF-CLOSING
NOTE:
ALL EXPOSED MDF FACES AND EDGES TO RECIEVE
HIGH PRESSURE LAMINATE. CABINET BODY EDGES
AND THE SHELF EDGE TO RECEIVE 1MM PVC
EDGING. DOORS TO RECEIVE 3MM PVC EDGING
ADJUSTABLE SHELF CONSTRUCTED
WITH 3/4" INDUSTRIAL GRADE
PARTICLEBOARD WITH INJECTION
MOLDED, CLEAR POLYCARBONATE
WITH TWO INTEGRAL PINS. 1x RAIL STRETCHER, TOP & BOTTOM
FULL OVERLAY DOOR CONSTRUCTED
W/ 3/4" INDUSTRIAL GRADE
PARTICLEBOARD
BOTTOM CONSTRUCTED W/ 3/4" INDUSTRIAL
GRADE PARTICLEBOARD DOWELED INTO CABINET
SIDES.
SIDES CONSTRUCTED W/ 3/4" PLYWOOD
SIDES ARE DADOED TO RECEIVE TOPS,
BOTTOMS AND BACKS
1'-3"
UNDER-CABINET LIGHT FIXTURE.
VERIFY LOCATIONS ON ELECTRICAL
DRAWINGS
3/4" ANGLE
BRACE @ 36" O.C
ANGLE CLIPS
FINISHED
CEILING LINE
COND. @
SLOPED PLAM TOP
1"
1"1"
EXTENDED SOFFIT FIN.
END PANEL PASSED
CAB. FIN. END 3/8"H MIN.
2" DIA. GROMMET
WITH COVER AND
SLEEVE
2"
GROMMET DETAIL
EASED EDGE AT THE
INTEGRAL BACK SPLASH
EXPOSED EDGES TO
BE EASEDCAULK
1" R. ALL EXPOSED
CORNERS
EXPOSED EDGE
OPEN END ELEVATION
OPEN END PLAN
COUNTERTOP-CAULK
TO SPLASH
ALL TOPS SHALL BE
SCRIBED TO WALL
PRIOR TO INSTALLATION
& CAULKED
SPLASH END ELEVATION
SPLASH END PLAN
1/2"
/2
2'-0"
1/2"
/2
2'-0"
R 1"
3/4" PLYWOOD
SLOPED TOP OR GYP. BD.
SOFFIT. REFER TO CEILING
PLANS & ELEVATIONS
2'-0"
3/4" FIXED DIVIDER,
CENTERED FOR 2-
DOOR CABINETS
FIXED SHELF CONSTRUCTED WITH
3/4" PLYWOOD. EDGES TO RECEIVE
MATCHING .018 PVC BANDING
TOP CONSTRUCTED W/ 3/4"
PLYWOOD DOWELED INTO
CABINET SIDES.
BACK CONSTRUCTED W/ 1/2"
PLYWOOD. BACKS TO FIT INTO
CABINET SIDE DADOES
BOTTOM CONSTRUCTED W/ 3/4"
PLYWOOD DOWELED INTO
CABINET SIDES.
FULL OVERLAY DOOR
CONSTRUCTED W/ 3/4" PLYWOOD
BASE, SEE FINISH PLANS
2x BLOCKING
1x BLOCKING, TOP & BOTTOM
2x IN-WALL BLOCKING, TYP
TOE KICK CONSTRUCTED OF
3/4" PLYWOOD TOE BOARD
WIRE PULL
NOTE:
ALL EXPOSED MDF FACES AND
EDGES TO RECIEVE HIGH
PRESSURE LAMINATE. CABINET
BODY EDGES AND THE SHELF
EDGE TO RECEIVE 1MM PVC
EDGING. DOORS AND DRAWERS
TO RECEIVE 3MM PVC EDGING
ADJUSTABLE SHELF CONSTRUCTED WITH 3/4"
PARTICLEBOARD WITH INJECTION MOLDED, CLEAR
POLYCARBONATE WITH TWO INTEGRAL PINS.
32mm CENTER
BACKER SHEET CLADDED WITH
PLASTIC LAMINATE (TYP) FOR
EXPOSED SURFACES
MOUNT OUTLET IN CASEWORK; COORDINATE
WITH ELECTRICAL
SEALANT,COLOR TO MATCH ADJACENT WALL
WIRE PULL
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
BASE, SEE FINISH PLANS
BOTTOM CONSTRUCTED WITH 3/4"
PARTICLEBOARD DOWELED INTO CABINET
SIDES
2x BLOCKING
1x RAIL STRETCHER, TYPICAL
TOE KICK CONSTRUCTED OF 3/4" PLYWOOD
TOE BOARD
MICROWAVE. VERIFY SIZE AND MANF.
INSTALLATION PRIOR TO FABRICATION
OF CASEWORK TO CONFIRM SHELF
DEPTH REQUIRED BY.
2'-0"
SIDES CONSTRUCTED WITH 3/4"
PARTICLEBOARD SIDES ARE DADOED TO
RECEIVE TOPS, BOTTOMS AND BACKS.
BACK CONSTRUCTED WITH 1/2"
PARTICLEBOARD. BACKS TO FIT
INTO CABINET SIDE DADOES
1'-11"
NOTE:
ALL EXPOSED MDF FACES AND EDGES TO RECIEVE HIGH
PRESSURE LAMINATE. CABINET BODY EDGES AND THE
SHELF EDGE TO RECEIVE 1MM PVC EDGING. DOORS AND
DRAWERS TO RECEIVE 3MM PVC EDGING
"DRAWER UNIT CONSTRUCTED WITH 1/2"
PARTICLEBOARD SIDES. 3/4" FRONTS &
BACKS & 1/2" FULLY CAPTURED BOTTOM.
DRAWER FACE CONSTRUCTED OF 3/4"
PARTICLEBOARD.
16 GA METAL BACKING, TYPICAL
U CHANNEL
WITH RUBBER
GASKET
RESIN PANEL
U CHANNEL
WITH RUBBER
GASKET
SS-1 SOLID SURFACE
PL-1 VENEER
RB-1 RB-1 2
PL-1 VENEER
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:3
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-203
CASEWORK DETAILS
6 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
Scale: 3/4" = 1'-0"
ADA SINK BASE-SLOPED
Scale: 3/4" = 1'-0"
SINK BASE CABINET
Scale: 3/4" = 1'-0"
BASE CABINET WITH ONE DOOR UNIT
Scale: 3/4" = 1'-0"
BASE CABINET WITH DRAWER & DOOR
Scale: 3/4" = 1'-0"
BASE CABINET WITH 3 EQUAL DRAWERS
Scale: 3/4" = 1'-0"
DRAWER BASE WITH 4 EQUAL DRAWERS
Scale: 3/4" = 1'-0"
TYPICAL 12-18" WALL CABINET
Scale: 3/4" = 1'-0"
TYPICAL 30"H WALL CABINET
Scale: 3/4" = 1'-0"
WALL CABINET SLOPED TOP
Scale: 3/4" = 1'-0"
GROMMET DETAIL
Scale: 3/4" = 1'-0"
COUNTERTOP OPEN END VIEWS
Scale: 3/4" = 1'-0"
TALL CABINET
Scale: 3/4" = 1'-0"
CASEWORK BASE - MICROWAVE
Scale: 3/8" = 1'-0"
RECEPTION DESK LAMINATE
HR-1
BR-1
51 52 53 54
403933C01
HR-1
BR-1
HR-1
BR-1
07080910
DOOR
SWING
48495004B HR-1
BR-1 3
HR-1
BR-1
04A4745 46
HR-1
BR-1
44 43
HR-1
BR-1
38 37
HR-1
BR-1
36 35 34
HR-1
BR-1
HR-1
BR-1
CORRIDOR 03 CORRIDOR 04
HR-1
BR-1
HR-1
BR-1
1112131417 42 15181920A
HIW-1
HIW-1
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:3
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-401
INTERIOR ELEVATIONS - WALL
PROTECTION
7 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
Scale: 1/4" = 1'-0"
CORRIDOR 01 - EAST
Scale: 1/4" = 1'-0"
CORRIDOR C01 - WEST
Scale: 1/4" = 1'-0"
CORRIDOR C02 - NORTH
Scale: 1/4" = 1'-0"
CORRIDOR C02 - SOUTH
Scale: 1/4" = 1'-0"
CORRIDOR C03 - NORTH
Scale: 1/4" = 1'-0"
CORRIDOR C03 - SOUTH
Scale: 1/4" = 1'-0"
CORRIDOR C04 - NORTH
Scale: 1/4" = 1'-0"
CORRIDOR C04 - SOUTH
Scale: 1/4" = 1'-0"
CORRIDOR C05 - NORTH
Scale: 1/4" = 1'-0"
CORRIDOR C05 - SOUTH
Scale: 1/4" = 1'-0"
CORRIDOR C06 - EAST
Scale: 1/4" = 1'-0"
CORRIDOR C06 - WEST
Scale: 1/4" = 1'-0"
TYPICAL HIGH IMPACT WALLCOVERING
TYPICAL FOR
ROOMS:
HAC 17,
SOILED 18,
CLEAN
SUPPLY 07A
Scale: 1/4" = 1'-0"
TYPICAL GROUP ROOM HIGH IMPACT WALLCOVERING
TYPICAL FOR
ROOMS:
GROUP ROOM
1, GROUP
ROOM 2
U0022 F3200
M1803
4'-5 1/4"
F3200 M1803 A5077
2'-10 1/4"
A5075 A5080A5145
A5080 A5135
A5080
A5075
A5080 A5075K1552
K4660 K4660
A5077
A5080 A5075
M3150M
R5135
F3050F3200
U0007
A5080 A5075
A5080
A5135
A5077A5075A5080
U0007
A5080 A5075K4500K4660 R6100
K3401
U0002
F3200 U0007
U0014
M7802 A5210
M7802
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:4
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-402
INTERIOR ELEVATIONS - EQUIPMENT
8 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
Scale: 1/4" = 1'-0"
EXAM - 08 - EAST
Scale: 1/4" = 1'-0"
EXAM - 08 - SOUTH
Scale: 1/4" = 1'-0"
EXAM - 08 - WEST
Scale: 1/4" = 1'-0"
HAC - 17 - WEST
Scale: 1/4" = 1'-0"
SOILED - 18 - SOUTH
Scale: 1/4" = 1'-0"
STAFF LOUNGE - 19 - EAST
Scale: 1/4" = 1'-0"
TYPICAL HAND SANITIZER
Scale: 1/4" = 1'-0"
MEDS - 07 - EAST
Scale: 1/4" = 1'-0"
OFFICE - 32 - EAST
Scale: 1/4" = 1'-0"
OCCUPATIONAL THERAPY - 53 - NORTH
Scale: 1/4" = 1'-0"
HAC - 17 - SOUTH
Scale: 1/4" = 1'-0"
OCCUPATIONAL THERAPY - 53 - WEST
Scale: 1/4" = 1'-0"
COMMUNITY ROOM - 52 - NORTH
Scale: 1/4" = 1'-0"
COMMUNITY ROOM - 52 - SOUTH
Scale: 1/4" = 1'-0"
GROUP ROOM 1 - 40 - WEST
Scale: 1/4" = 1'-0"
WAITING - 02 - EAST
Scale: 1/4" = 1'-0"
STAFF LOUNGE - 19 - NORTH
2 3 4 5 6
B
D
C
1.7
E
A.5
B.11 B.10
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
TR
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
GROUP ROOM 2
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
OFFICE/CONSULT
TLT
OFFICE/CONSULT
HAC
STAFF TLT
TOILET
OFFICE
OFFICE
OFFICE
ELEC
SOILED
FAMILY
CONSULT
TOILET
STAFF
CONFERENCE
ROOM
OCCUPATIONAL
THERAPY
COMMUNITY
ROOM 51
RESOURCE/
COMPUTERS
OFFICE
FAMILY
CONSULT
EXAM
OFFICE
OFFICE
STAFF LOUNGE
VEST
MECHANICAL
MEDS
OPEN OFFICE 40
GROUP ROOM 1
RECEPTION/CHECK-IN
VEST
WAITING
C06
CORRIDOR
C04
CORRIDOR
C05
CORRIDOR
C03
CORRIDOR
C02
CORRIDOR
C01
CORRIDOR
LOBBY
FIRE RISER
ROOM
STORAGE
I-423
2_____ I-423
I-422
I-422
I-431
I-422
I-421
I-421
I-421
I-431
I-424
I-422
I-421
1 _____ I-421
2 _____ I-421
I-424
I-431
I-432
07A
CLEAN SUPPLY
53B
TRAINING
TOILET
53C
STOR
I-422
TR
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:4
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-411
FIRST FLOOR OVERALL EQUIPMENT
PLAN
9 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
Scale: 1/8" = 1'-0"
FIRST FLOOR OVERALL EQUIPMENT PLAN N
O
R T H
0 4 8 16
A
STAFF LOUNGE
F0225
F0225
F0225
F0225F0225
F0225
F0225
F0225
A5075 A5080 K1552
F0225
F0225
F2015
F0225
F0225
F0795
F0795
F0795
K4660 K4660
I-402 17
I-402
F3200
A5145
M7802
A5210
AA
SOILED
M2055
A5104M
F2020
A5080
A5075
A5077
I-4026
I-402
AA
HAC
M2055 A5075
A5080
A5077
I-402
I-402
M2055
A
A.5
B.10
FAMILY
CONSULT
F0375
F0255
F0205
F0205
U0004A
U0006
M1801
F2420
F0740
F2000
U0020A
I-40215
F3200
5 B.11
OFFICE/CONSULT
F3200
U0006
U0004A
F2420 F2010
F0275
F2000
A5077
U0020AA1015
F0305
F0305
M1801
I-402 15
I-40217
B
B.10
EXAM
F2000
A5080A5075
F0305
F0340M
A5180Ma
M7401
U0022
M9025
F3200
M1803
I-4022
A5145
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:4
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-421
ENLARGED EQUIPMENT PLANS
10 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
Scale: 1/2" = 1'-0"
ENLARGED STAFF LOUNGE - 19
Scale: 1/2" = 1'-0"
ENLARGED SOILED - 18
Scale: 1/2" = 1'-0"
ENLARGED HAC - 17
Scale: 1/2" = 1'-0"
ENLARGED FAMILY CONSULT - 10
Scale: 1/2" = 1'-0"
TYPICAL OFFICE/CONSULT - 48
Scale: 1/2" = 1'-0"
ENLARGED EXAM - 08
N O
R T H
0 4 8 16N O
R T H
0 4 8 16N O
R T H
0 4 8 16
N O
R T H
0 4 8 16N O
R T H
0 4 8 16N O
R T H
0 4 8 16
D
OCCUPATIONAL
THERAPY
F0275
A1015
F2000
M1801
F0865
A5080 A5075
U0002
U0002
U0002
U0002
F0795M
U0007
I-402
I-402 10
53B
TRAINING
TOILET
53C
STOR
F0795M
F0795M
U0002 U0002
U0002U0002
U0002
U0002
U0002U0002
A5200 A1066 A5170
F2020M
6B.10
MEDS
M3150M
F2010
A5080A5075
R5135
I-402
A5106 F3200
D
STAFF
CONFERENCE
ROOM
F0220MF0220M
F0765 F0765
F0220M
F0220M
F0220M
F0220M
F0220M
F0220M
F0765
F0765F0765
F0765
F0220M F0220M
F0275
F0220M
F0220M
F0220M
F0220M
F0220M
F0220M
A1015
F2000 F3200
U0007
U0014
M1801
A1015
F2000 F0865
A5145 A5145 A5145
B
OFFICE
F0305
F0305
M1801
F0275
F2000
U0020A
A1015
F3200
I-402
D
B.10
I-202
F0305
F0740
F0305
F0305
F0740
F0206
F0740
F0305
F0305
M7802
A5210
F0305 F0305
F0305 F0305
F0740 F0740
F0206 F0206
F0740 F0740
F0305 F0305
F0305 F0305
F0740 F0740
F0305 F0305
I-402
F2020M
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:5
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-422
ENLARGED EQUIPMENT PLANS
11 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
Scale: 1/2" = 1'-0"
ENLARGED OCCUPATIONAL THERAPY - 53/ TRAINING
TOILET 53B
Scale: 1/2" = 1'-0"
ENLARGED MEDS - 07
Scale: 1/2" = 1'-0"
ENLARGED STAFF CONFERENCE ROOM - 54
Scale: 1/2" = 1'-0"
TYPICAL OFFICE - 32
N O
R T H
0 4 8 16N O
R T H
0 4 8 16 N
O R
T H
0 4 8 16 N O
R T H
0 4 8 16
Scale: 1/2" = 1'-0"
WAITING - 02 N
O
R T H
0 4 8 16
D
COMMUNITY
ROOM
F0225
F0795 F0795
F0795 F0795
F0795
M1801 M1801
A1015A1015
F2000 F2000
F0275 F0275
F0865 F0865
M1810
F0225
F0225F0225F0225
F0225 F0225F0225
U0007
F0225
F0225 F0225
F0225F0225
F0225
F0225
F0225 F0225
F0225
F0225
F0225
U0001
U0001
U0001
U0001
R6100
A5075
A5080
K4500
K4660
I-40213
I-402 12
F3200
F2020MA5145A5145A5145
D
RESOURCE/
COMPUTERS
M1810
F0275
F0275
F0275
F0795M
U0002
F0795M
U0002
F0275F0275
F0275
M1801
M1801
F0865
F0865
M1801
M1801
F0865
F0865
M1801 M1801
F0865F0865
F2020M
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:5
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-423
ENLARGED EQUIPMENT PLANS
12 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
Scale: 1/2" = 1'-0"
COMMUNITY ROOM - 52
Scale: 1/2" = 1'-0"
RESOURCE/ COMPUTERS - 51 N
O R
T H
0 4 8 16N O
R T H
0 4 8 16
C
GROUP ROOM 1
A5077
E0945 F3200
F2000
U0007
U0007
U0003A
U0003A
U0003A
U0003A
U0003A
U0003A
U0003A
U0003A
U0003A
U0003A
U0003A
U0003A
U0003A U0003A
I-402
I-402
F2105
1 1.71
F2000 A1015M1801
F0275 F0275 F0275 F0275
F0275F0275F0275F0275
A1015 M1801 F2000 A1015 A1015 F2000F0865
M1801
M1801
F0865
F0865
F2000A1015A1015F2000 M1801 F0865F2000M1801 A1015F0865A1015M1801F2000
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: ARCHITECT/ENGINEER OF RECORD
Date Checked Drawn
FULLY SPRINKLERED
U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
ACG Project Number
/2
/2
:0
:5
A
M C
U s e rs
\e d ig g s \D o c u m e n ts
\I
-0
-B C
L C
V A
-B L
D G
F F
E e d ig g s D
X N
.r v t
I-424
ENLARGED EQUIPMENT PLANS
13 20EMD
REPLACE BUILDING 121
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 JANUARY 24, 2025
100% CONSTRUCTION DOCUMENTS
580-324
EMD
22-021
Scale: 1/2" = 1'-0"
TYPICAL GROUP ROOM - 40
Scale: 1/2" = 1'-0"
TYPICAL POD N
O R
T H
0 4 8 16N O
R T H
0 4 8 16
B.11
I-4311C
1D
1A
1B
TLT
A5109 A5200 A5090
A5082
F2010
A1067
A5075
A5145
U0001
C
B.10
I-431
A5109
A5090
A5200
A5075A1067A5082 F2010
A5145 A4995
2C
2A
2D 2B
U0001
A1067 A5075A5082A5109
A
B.11
" 5
A5145
A
U0001
A5109
A5200
A5090
B.11
A5075
A1067
A5082
F2010
A5200 A5090
A5145
I-4313C
3D
3A
3B
STAFF TLT
A5109U0001
A5090 A5200
A1067A5075 A5082
F2010
A51…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .