Attachment 8 - Drawings Interior.pdf

PDF 17 MB Posted

Attached to
Y1DA--580-324 | Replace/Construct Bldg 121 | Houston, TX Federal contract opportunity
Solicitation number
36C77625R0030_1
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

These are architectural and engineering interior design drawings for the replacement of Building 121 at the Michael E. Debakey VA Medical Center in Houston, Texas. The 20-page drawing set (pages I-001 through I-903) provides detailed interior design plans for a new 14,977 square foot Psychosocial Rehabilitation and Recovery Center (PRRC), including comprehensive documentation for room finishes, equipment schedules, wall protection, signage, casework, and axonometric views of key spaces.

The drawings specify intricate design details for multiple room types including offices, consultation rooms, group rooms, staff areas, medical supply spaces, and support facilities. Key design elements include specific floor and wall finishes (such as luxury vinyl tile, porcelain tile, and paint specifications), detailed casework and millwork elevations, equipment placement, ADA compliance considerations, and specialized area requirements like static dissipative tile in technical rooms. The drawings are part of a design-bid-build project intended to consolidate and relocate the VA medical center's psychosocial rehabilitation practice into a modern, purpose-designed facility.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--580-324 | Replace/Construct Bldg 121 | Houston, TX, newest first.
File Type Posted
Amendment 0006.pdf PDF
Amendment 0006 - Att.pdf PDF
Amendment 0006 - Att.pdf PDF
Amendment 0006 - Att 4 - Updated RFI Log 6-20-25.docx DOCX document
Amendment 0006 - Att. 1 - Mechanical Addendum.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004 - Att. 2 - Bldg. 121 Geotech Report.pdf PDF
Amendment 0004 - Att. 1 RFI Log.docx DOCX document
Amendment 0004.pdf PDF
Amendment 0004 - Att. 6 - RFI 43 Bldg. 121 Floor Plan.pdf PDF
Amendment 0004 - Att. 4 - RFI 55 Contractor Map.png PNG image
Amendment 0004 - Att. 3 - RFI 53 Construction Fence Limit 121.png PNG image
Amendment 0004 - Att. 5 - RFI 48 11 41 00 Food Storage Equipment.docx DOCX document
Attachment A - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Site Visit Sign-in-sheet..pdf PDF
Site Visit Agenda.pdf PDF
Bldg. 121 Floor plan.pdf PDF
Amendment 0001.pdf PDF
Attachment 13 - Drawings Technology.pdf PDF
Attachment 4 - Drawings Civil.pdf PDF
Attachment 11 - Drawings Mechanical.pdf PDF
Attachment 12 - Drawings Electrical.pdf PDF
Attachment 10 - Drawings Plumbing.pdf PDF
Attachment 14 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 1 - Houston Bldg 121 - Specs - Vol 1.pdf PDF
Attachment 5 - Drawings Landscape.pdf PDF
Attachment 3 - Drawings General.pdf PDF
36C77625R0030_1.pdf PDF
Attachment 7 - Drawings Architectural.pdf PDF
Attachment 2 - Houston Bldg 121 - Specs - Vol 2.pdf PDF
Attachment 15 - Wage Determination Harris County.pdf PDF
Attachment 6 - Drawings Structural.pdf PDF
Attachment 9 - Drawings Fire Suppression.pdf PDF
Attachment 16 - PPQ.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S SS

GENERAL

1. THE CONTRACTOR SHALL PROVIDE ALL ITEMS AND MATERIALS SHOWN, INDICATED, OR REQUIRED FOR A

COMPLETE INSTALLATION (UNO).

2. REFERENCE ROOM FINISH SCHEDULE, FINISH MATERIAL LEGEND, AND SPECIFICATION SECTION 09 06 00

SCHEDULE OF FINISHES FOR MORE INFORMATION.

3. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL CEILING INFORMATION.

4. REFER TO DETAIL SHEET I-501 FOR FLOORING TRANSITIONS AND OTHER DETAILS.

5. PREPARE FLOOR AND WALL CONSTRUCTION TO RECEIVE NEW FINISHES IN ACCORDANCE WITH

MANUFACTURER’S RECOMMENDED INSTALLATION METHODS AND MATERIALS.

6. PRIOR TO THE INSTALLATION OF NEW FINISHES, THE CONTRACTOR SHALL INSPECT ALL SUBSTRATES. IF A SUBSTRATE IS DEEMED UNACCEPTABLE, THE CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO RECTIFY THE SITUATION OR CONTACT THE COR WITH THE CONCERN. STARTING WORK CONSTITUTES ACCEPTANCE OF

EXISTING CONDITIONS.

ALL WORK

1. USE MANUFACTURER'S RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL FINISHES.

2. TILE FLOORING SYSTEM ASSEMBLIES TO BE PROVIDED BY THE FLOORING CONTRACTOR. SYSTEM ASSEMBLIE COMPONENTS TO BE FROM THE SAME MANUFACTURER. THE INSTALLER SHALL BE APPROVED BY

FLOORING MANUFACTURER.

3. FLOORING TRANSITIONS SHALL COMPLY WITH ADA GUIDELINES. AS PART OF THE SUBMITTAL PROCESS THE FLOORING CONTRACTOR SHALL SUBMIT A DIAGRAM SHOWING FLOORING TRANSITION LOCATIONS FOR

DESIGNERS APPROVAL PRIOR TO INSTALLATION.

4. FLOOR TRANSITIONS BETWEEN DISLIKE MATERIALS SHALL BE STAINLESS STEEL METAL TRIM. LOCATE AT

CENTERLINE OF DOOR WHEN IN THE CLOSED POSITION.

5. OUTSIDE AND INSIDE CORNERS OF WALL TILE SHALL BE STAINLESS STEEL METAL TRIM.

6. TRANSITIONS BETWEEN WALL AND FLOOR TILE SHALL BE STAINLESS STEEL COVE PROFILE METAL TRIM.

7. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT DOORS (UNO).

8. FLOOR FINISHES SHALL EXTEND UNDER NEW BUILT-IN CABINETS.

9. PROVIDE LEVEL 4 FINISH ON GYPSUM. BOARD. WALLS, CEILINGS, AND SOFFITS (UNO).

10. PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE PRIMER COAT AND (2) TWO TOP COATS.

11. USE MPI GLOSS LEVEL 3 PAINT FOR ALL WALLS (UNO). USE MPI GLOSS LEVEL 5 PAINT FOR ALL WET AREA

WALLS, METAL DOORS AND METAL FRAMES (UNO).

12. PAINT ALL EXPOSED METAL SURFACES, SUCH AS GRILLES, ACCESS PANELS, ELECTRICAL PANELS, ETC. TO MATCH ADJACENT SURFACE. ELECTRICAL PANELS WITHIN TELECOM SPACES TO BE LEFT UNPAINTED.

13. PAINT INTERIOR SURFACES OF AIR DUCTS THAT ARE VISIBLE THROUGH GRILLES AND LOUVERS WITH ONE

COAT OF MPI GLOSS LEVEL 1 BLACK PAINT.

14. CAULK AROUND ALL NEW AND EXISTING WINDOWS, WINDOWSILLS, DOORS, AND AT NEW FINISHES AROUND

ELEVATORS.

FINISH

1. ALL PAINTED WALLS TO BE PAINTED P-1 (UNO).

2. ALL GYPSUM BOARD CEILINGS TO BE PAINTED P-1 (UNO).

3. ALL EXISTING AND NEW HOLLOW METAL DOORS AND WINDOW FRAMES IN SCOPE OF WORK TO BE PAINTED P-7

(UNO).

4. ALL SIDES OF GYPSUM BOARD BULKHEAD TO BE PAINTED THE SAME COLOR, PAINT P-1 (UNO).

5. ALL EXISTING AND NEW EXPOSED STRUCTURE, DECK, AND DUCTWORK TO BE PAINTED P-1 (UNO).

6. EXTEND STATIC DISSIPATIVE TILE IN TELECOM AND DEMARK ROOMS UNDER THE DOOR TO EXISTING

FLOORING.

7. ALL ADJACENT AREAS TO TELECOM ROOMS AFFECTED BY INFILL OF EXISTING DOORS, NEW DOORS AND/OR NEW WALLS SHALL HAVE FLOORING, CEILINGS, BASE, PAINT, AND WALL PROTECTION PATCHED AND MADE READY TO RECEIVE NEW WORK. NEW WORK TO MATCH EXISTING. VA INTERIOR DESIGNER TO GIVE DIRECTION

ON NEW FINISHES OR EXISTING FINISHES TO MATCH.

8. INSTALL WINDOW FILM (WF-1) AT TELECOM ROOMS THAT HAVE EXPOSED WINDOWS.

FINISH

ALL PLYWOOD BACKER BOARD IN TELECOM ROOMS SHALL BE PAINTED WITH 3 COATS OF FIRE RETARDANT PAINT, COLOR: P-1. LEAVE ONE STAMP ON PLYWOOD EXPOSED

GENERAL

1. THE CONTRACTOR SHALL PROVIDE ALL ITEMS AND MATERIALS SHOWN, INDICATED, OR REQUIRED FOR A

COMPLETE INSTALLATION (UNO).

2. SEE TYPICAL DETAIL SECTIONS ON SHEET I-101.

ALL WORK

1. ALL CORNER GUARDS TO BE FROM TOP OF BASE TO 8'-0"H.

2. PROVIDE 16 GAUGE BACKING IN WALLS FOR ALL HANDRAILS, CRASH RAILS, BUMPER RAILS AND CHAIR RAILS.

3. TYPICAL HIGH IMPACT WALLCOVERING HEIGHT IS 4'-0"H IN ROOMS. CORRIDORS ARE 3’-0” HIGH (UNO).

4. STOP HIGH IMPACT WALLCOVERING WAINSCOTS AT CASEWORK.

5. HOLD BACK HANDRAIL AND BUMPER OR CRASH RAILS 2" FROM CORNER GUARDS AND DOOR FRAMES.

6. DO NOT INSTALL HANDRAILS BEHIND DOORS. INSTALATION TO START 6" AWAY FROM FRONT EDGE OF DOOR

WHEN OPEN 180 DEGREES.

7. USE .040” THICK STANDARD HIGH IMPACT WALLCOVERING SHEETS FOR DRYWALL APPLICATIONS USE 0.60”

THICK SHEETS FOR BRICK/CMU.

8. SEE SPECIFICATION 09 06 00 SCHEDULE OF FINISHES FOR MATERIALS AND FINISHES.

ABBREVIATION LEGEND

BR: BUMPER RAIL

CG: CORNER GUARD

HR: HANDRAIL

HIW: HIGH IMPACT WALLCOVERING

GENERAL

1. THE CONTRACTOR SHALL PROVIDE ALL ITEMS AND MATERIALS SHOWN, INDICATED, OR REQUIRED FOR A COMPLETE INSTALLATION (UNO) THIS PACKAGE IS TO INCLUDE A COMPREHENSIVE SIGNAGE SCHEDULE CONSISTING OF: ROOM NUMBERS, SIGN TYPES, SIGN TYPES, QUANTITIES, AND LOCATIONS FOR ALL FLOORS

2. SIGNAGE VENDOR TO REVIEW PROJECT DRAWINGS AND DETERMINE NECESSARY SIGNAGE LOCATIONS AND

QUANTITIES.

3. ALL SIGNAGE TO MEET VA SIGNAGE GUIDELINES AND ADA INSTALLATION HEIGHTS. CONTRACTOR TO COORDINATE THE TEXT OF SIGN INSERTS WITH COR AND PROVIDE A ROOM SIGNAGE SCHEDULE WITH CONSTRUCTION SUBMITTAL FOR COR TO GIVE FINAL APPROVAL OF ALL SIGNAGE TEXT, DESIGN, AND LOCATIONS.

ALL WORK

1. SIGNS TO MATCH MICHAEL E DEBAKEY VAMC CAMPUS SIGNAGE STANDARDS. COLORS AND STYLES TO BE

DETERMINED BY FACILITIES.

2. SIGNAGE SHALL BE CONTRACTOR FURNISHED AND INSTALLED (UNO).

3. PERMANENT ROOM SIGNAGE MUST INCLUDE RAISED LETTERS AND BRAILLE AND MEET ADA GUIDELINES.

4. IF WALL SPACE IS NOT AVAILABLE FOR SIGNAGE ON LATCH SIDE OF DOOR PER MOUNTING STANDARDS, SIGNS

SHALL BE INSTALLED PER CURRENT ADA STANDARDS ON NEAREST ADJACENT WALL.

5. ALL NEW TELECOM SIGNAGE SHALL BE NUMBERS ONLY.

6. CONTRACTOR TO TURN OVER ALL SIGNAGE NOT REUSED TO VA COR.

GENERAL

1. CONTRACTOR IS RESPONSIBLE FOR REMOVING AND RELOCATING ALL EXISTING FURNITURE, FIXTURES AND

EQUIPMENT FOR RENOVATION PROJECTS PRIOR TO CONSTRUCTION.

2. FURNITURE, FIXTURES AND EQUIPMENT DESIGNATED “VV” ON PLANS AND SCHEDULES ARE FOR COORDINATION

AND SPATIAL PURPOSES ONLY AND NOT TO BE USED FOR ACTUAL PURCHASING QUANTITIES.

3. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, FIRE ALARM AND TECHNOLOGY DRAWINGS FOR ADDITIONAL

UTILITY CONNECTIONS AND LOCATIONS.

4. REFER TO G-002 FOR STANDARD MOUNTING HEIGHTS. REFER TO EQUIPMENT DRAWINGS FOR LOCATIONS AND ADDITIONAL DIMENSIONS. PROVIDE 16 GAUGE BACKING FOR ALL WALL MOUNTED EQUIPMENT OR AS REQUIRED BY

THE MANUFACTURER’S REQUIREMENTS FOR INSTALLATION.

5. REFER TO SHEETS I-431 THRU I-432 FOR ENLARGED TOILET ROOMS AND ELEVATIONS.

6. REFER TO REFLECTED CEILING PLAN A-110 FOR CUBICLE CURTAIN TRACKS, LIFT AND ALL OTHER

CEILING MOUNTED EQUIPMENT ITEMS.

7. SEE ENLARGED EQUIPMENT PLANS ON SHEETS I-421 TO I-424.

8. SEE EQUIPMENT SCHEDULES ON SHEET I-601 FOR SPECIFICS ON EQUIPMENT.

ALL WORK

1. ITEM TAGS INCLUDE ACQUISITION AND INSTALLATION RESPONSIBILITIES (ACQ.), DENOTED AS FOLLOWS:

"VV" = VA FURNISHED & VA INSTALLED

"VC" = VA FURNISHED & CONTRACTOR INSTALLED

“CC" = CONTRACTOR FURNISHED & CONTRACTOR INSTALLED

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

PLASTIC LAMINATE CASEWORK GENERAL NOTES

GENERAL

1. THE CONTRACTOR SHALL PROVIDE ALL ITEMS AND MATERIALS SHOWN, INDICATED, OR REQUIRED FOR A

COMPLETE INSTALLATION (UNO).

2. THE FOLLOWING NOTES ARE SPECIFIC TO CASEWORK AND ARE IN ADDITION TO THE GENERAL FINISH NOTES.

3. DIMENSIONS FOR CASEWORK SHALL BE FIELD VERIFIED PRIOR TO FABRICATION AND INSTALLATION.

4. CONTRACTOR SHALL COORDINATE INSTALLATION OF CASEWORK WITH SINKS / PLUMBING FIXTURES AND

ASSOCIATED PIPINGS AND FITTINGS.

5. SEE SHEET I-210 FOR TYPICAL CABINET SECTIONS.

6. PROVIDE 16 GAUGE BACKING FOR ITEMS THAT ARE REQUIRED TO BE SECURED TO THE WALLS. REFERENCE MECHANICAL, PLUMBING, ELECTRICAL AND TECHNOLOGY DRAWINGS. COORDINATE WITH FURNITURE SUPPLIER

WHERE APPROPRIATE.

ALL WORK

1. ALL BASE CABINETS TO BE 23" DEEP WITH 24” DEEP COUNTERTOP INCLUDING BACKSPLASH (UNO).

2. ALL WALL CABINETS TO BE 15" DEEP OUT TO OUT (UNO). PROVIDE LIGHT VALANCES WHERE UNDERCABINET

LIGHTS ARE SHOWN.

3. ALL WALL CABINETS WITHOUT SOFFITS ARE TO HAVE SLOPE TOPS.

4. ALL SHELVING SHOWN AS DASHED LINES IN ELEVATIONS ARE TO BE ADJUSTABLE.

5. WHEN FILLER PANELS ARE REQUIRED AT BOTH ENDS OF CASEWORK BOTH FILLER PANELS SHALL BE EQUAL WIDTH (UNO). ADD FILLER PANEL AS NEEDED AT ALL CABINETS TO ENSURE FULL DOOR SWING AND DRAWER

OPERATION (UNO).

6. PROVIDE FINISHED END PANEL AT EXPOSED CASEWORK ENDS AND BACKS AS NEEDED. PANEL TO MATCH

PLASTIC LAMINATE. END PANEL SUPPORTS SHALL BE 1-1/2” WIDE.

7. ALL COUNTERTOPS TO BE SOLID SURFACE INTEGRAL ONE PIECE DESIGN WITH EASED EDGE AT ALL EXPOSED EDGES, WITH 1/2" RADIUS AT EXPOSED CORNERS.). ALL JOINTS IN COUNTERTOPS, SPLASHES AND CURBS SHALL ALIGN AND BE SMOOTH. ALL COUNTERTOPS ARE 1-1/2" THICK WITH 4" HIGH BACK/SIDE SPLASHES (UNO).

8. SEALANT JOINTS AT COUNTERTOPS, TRANSACTION TOPS, BACK / SIDE SPLASHES, AND END TO THE WALLSHALL HAVE CLASS 50 SILICONE SEALANT. SEALANT TO BE CLEAR OR COORDINATING COLOR. COLOR TO BE SELECTED

BY DESIGNER FROM MANUFACTURER’S CUSTOM RANGE.

9. ALL COUNTERTOPS TO EXTEND 1" BEYOND FRONT OF CABINET DOOR FACE AND OPEN SIDES.

10. BEYOND BASE CABINET PROVIDE HYBRID THIN WALL BRACKET COUNTERTOP SUPPORTS AT 36" O.C. MAX..

11. COUNTERTOP SUPPORT END PANELS SHALL BE 1-1/2” THICK.

12. WHERE INDICATED ON DRAWINGS PROVIDE 2-1/2" DIAMETER GROMMETS.

13. PROVIDE PIPE WRAP AT EXPOSED PIPES.

14. GLASS FRONTS TO BE 1/4" THICK CLEAR TEMPERED GLASS (UNO).

15. PROVIDE HORIZONTAL FILE RAILINGS TO SUPPORT HANGING FOLDERS AT ALL BUILT- IN FILING CABINETS.

16. PROVIDE LOCKS AT ALL CABINETS AS INDICATED ON ELEVATIONS. KEY ALIKE PER ROOM.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:1

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-001

GENERAL NOTES, ABBREVIATIONS

AND ROOM FINISH SCHEDULE

1 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

FINISH ABBREVIATIONS

ACT ACOUSTICAL CEILING TILE

ADJ ADJACENT

AFF ABOVE FINISHED FLOOR

AL ALUMINUM

BR BUMPER RAIL

CC CUBICLE CURTAIN

CR CRASH RAIL

CG CORNER GUARD

CJ CONTROL JOINT

CMU CONCRETE MASONRY UNIT

CON CONCRETE FLOORING

CR CARD READER

CPT CARPET

EP EPOXY PAINT

EX EXISTING

EXJ EXPANSION JOINT

EXP EXPOSED

G GROUT

GYP GYPSUM WALL BOARD

GWT GLASS WALL TILE

HR HAND RAIL

HIW HIGH IMPACT WALLCOVERING

LF LINEAR FEET (FOOT)

LVT LUXURY VINYL TILE

LWC LINEAR WOOD CEILING

MTL METAL

MISC MISCELLANEOUS

NA NOT APPLICABLE

P PAINT

PFIN PREFINISHED

PL PLASTIC LAMINATE

PT PORCELAIN TILE

RB RUBBER BASE

RP RESIN PANEL SYSTEM

SC SEALED CONCRETE

SDT STATIC DISSAPATIVE TILE

SF SQUARE FEET (FOOT)

SS SOLID SURFACE

SST STAINLESS STEEL

TYP TYPICAL

TR TRIM

TZT TERAZZO TILE FLOORING

UFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VIF VERIFY IN FIELD

WSF WELDED SHEET FLOORING

WSFB WELDED SHEET FLOORING BASE

WOC WALK-OFF CARPET

ROOM FINISH SCHEDULE

ROOM NO. NAME FLOOR BASE

WALLS WAINSCOT CEILING

REMARKSEAST NORTH SOUTH WEST FINISH HEIGHT FINISH

01 VEST WOC-1 RB-1 P-1 P-1 P-1 P-1 GYP-1/P-1

02 WAITING TZT-1 RB-1 P-1 P-1 P-1 GP-1, SS-3,

GWT-1

LWC-1 REFERENCE ELEVATION 4/I-202 FOR

LOCATIONS

03 LOBBY TZT-1 RB-1 P-1 P-1 PWT-1 P-1 LWC-1 / ACT-1

04 RECEPTION/CHECK-IN LVT-1 RB-1 P-1 P-1 P-1 P-7 GYP / ACT-1

06 TOILET PT-1 TR-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 GYP-1/P-1

07 MEDS/CLEAN SUPPLY WSF-1 WSFB-1 EP-1/HIW-2 EP-1/HIW-2 EP-1/HIW-2 EP-1/HIW-2 HIW-2 4' ACT-1

07A CLEAN SUPPLY WSF-1 WSFB-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 HIW-1 4' ACT-2

08 EXAM WSF-1 WSFB-1 P-1 P-5 P-1 P-1 ACT-1

09 FAMILY CONSULT LVT-1 RB-1 P-1 P-1 P-1 P-6 ACT-1

10 FAMILY CONSLT LVT-1 RB-1 P-5 P-1 P-1 P-1 ACT-1

11 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-4 P-1 ACT-1

12 TLT PT-1 TR-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 GYP

13 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-6 P-1 ACT-1

14 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-6 P-1 ACT-1

15 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-6 P-1 ACT-1

16 OFFICE/CONSULT LVT-1 RB-1 P-6 P-6 P-6 P-6 EXPOSED STRUCTURE

17 HAC WSF-1 WSFB-1 EP-1/HIW-3 EP-1/HIW-3 EP-1/HIW-3 EP-1/HIW-3 HIW-3 4' GYP-1/EP-1

18 SOILED WSF-1 WSFB-1 EP-1/HIW-3 EP-1/HIW-3 EP-1/HIW-3 EP-1/HIW-3 HIW-3 4' GYP-1/EP-1

19 STAFF LOUNGE LVT-1 RB-1 P-1/CWT-1 P-1 P-1 P-2 ACT-1 CWT-1 BACKSPLASH AT CASEWORK, REFERENCE I-201

20 VEST WOC-1 RB-1 P-1 P-1 P-1 P-1 GYP

21 FIRE RISER ROOM EPF-1 RB-1 P-1 P-1 P-1 P-1 EXPOSED STRUCTURE

22 STORAGE LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

23 MECHANICAL EPF-1 RB-1 P-1 P-1 P-1 P-1 EXPOSED STRUCTURE

24 ELEC EPF-1 RB-1 P-1 P-1 P-1 P-1 EXPOSED STRUCTURE

25 OPEN OFFICE LVT-1 RB-1 P-4 P-1 P-1 P-4 ACT-1

26 OFFICE LVT-1 RB-1 P-1 P-1 P-1 P-6 ACT-1

27 OFFICE LVT-1 RB-1 P-6 P-1 P-1 P-1 ACT-1

29 OFFICE LVT-1 RB-1 P-1 P-3 P-1 P-1 ACT-1

30 OFFICE LVT-1 RB-1 P-6 P-1 P-1 P-1 ACT-1

31 OFFICE LVT-1 RB-1 P-1 P-1 P-1 P-6 ACT-1

32 OFFICE LVT-1 RB-1 P-6 P-1 P-1 P-1 ACT-1

33 TOILET PT-1 TR-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 GYP-1/P-1

34 STAFF TLT PT-1 TR-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 PT-2/GWT-1/EP-1 GYP-1/P-1

35 OFFICE/CONSULT LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1

36 OFFICE/CONSULT LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1

37 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1

38 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1

39 GROUP ROOM 2 LVT-1 RB-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 HIW-1 4' ACT-1

40 GROUP ROOM 1 LVT-1 RB-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 HIW-1 4' ACT-1

41 OFFICE/CONSULT LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1

42 TR SDT-1 RB-1 P-8 P-8 P-8 P-8 EXPOSED STRUCTURE COVER ALL 6 SIDES WITH 2

COATS, EXPOSE ONLY 1 STAMP

ON ALL PLYWOOD IN TELECOM

ROOMS

43 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1

44 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1

45 OFFICE/CONSULT LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1

46 OFFICE/CONSULT LVT-1 RB-1 P-1 P-2 P-1 P-1 ACT-1

47 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-1 P-2 ACT-1

48 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1

49 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-2 P-1 ACT-1

50 OFFICE/CONSULT LVT-1 RB-1 P-1 P-1 P-1 P-2 ACT-1

51 RESOURCE/ COMPUTERS LVT-1 RB-1 P-1 P-1 P-4 P-1 ACT-1

52 COMMUNITY ROOM LVT-1 RB-1 P-1 P-1 P-4/ CWT-1 P-1 ACT-1 CWT-1 BACKSPLASH AT CASEWORK, REFERENCE I-201

53 OCCUPATIONAL THERAPY LVT-1 RB-1 P-1 P-1 P-1 P-4/CWT-1 ACT-1 CWT-1 BACKSPLASH AT CASEWORK, REFERENCE I-201

53B TRAINING TOILET LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

54 STAFF CONFERENCE ROOM LVT-1 RB-1 P-1 P-4 P-1 P-1 ACT-1

C01 CORRIDOR LVT-1 RB-1 HIW-2 P-1 P-1 HIW-1 HIW-1/2 FULL HEIGHT FLOOR

TO CEILING WITH

RB-1

ACT-1

C02 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

C03 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

C04 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

C05 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

C06 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1

FINISH GENERAL NOTES

WALL PROTECTION GENERAL NOTES

SIGNAGE GENERAL NOTES

EQUIPMENT GENERAL NOTES

WALL RATING LEGEND

Docusign Envelope ID: 4A451C82-CA71-46CA-A562-A3A832916AE1

1/27/2025

A

2 3 4 5 6

B

D

C

1.7

E

A.5

B.11 B.10

1 1 1 1

1 1 1

11 11 11

1 1

I-202

I-202

I-201

I-2011

I-201

I-201

I-201

I-201

I-401

I-401

I-4016 5

I-40110 9

I-40112 11

OPEN OFFICE

OFFICE

OFFICE

53B

TRAINING

TOILET

STAFF

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

MECHANICAL

ELEC

STORAGE

FIRE RISER

ROOM 20

VEST

STAFF LOUNGE

OFFICE/CONSULT

OFFICE/CONSULT

TR

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

C03

CORRIDOR

C06

CORRIDOR

C04

CORRIDOR

C02

CORRIDOR

OFFICE/CONSULT

OFFICE/CONSULT

GROUP ROOM 1

GROUP ROOM 2

COMMUNITY

ROOM

RESOURCE/

COMPUTERS

RECEPTION/CHECK-IN

LOBBY

C01

CORRIDOR

TOILET

STAFF TLT

WAITING

VEST

MEDS/CLEAN

SUPPLY

FAMILY

CONSULT

EXAM

FAMILY CONSLT

OFFICE/CONSULT

SOILED

HAC

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

TLT

C05

CORRIDOR

7 7

7 5

5 5

5 5

5 5

5 5

9 9 9 7

I-2023

I-201

OCCUPATIONAL

THERAPY

53C

STOR 1 1

07A

CLEAN SUPPLY

TOILET

I-202

I-401

I-401 14

I-201

I-201 8

I-201 8

I-201 8

FINISHED FLOOR

VINYL BASE (4") OR SHEET

VINYL BASE (6")

FINISHED WALL

S E

E E

L E

V A

T

IO

N

V A

R

IE

S

HIGH IMPACT

WALLCOVERING OR

FLEXIBLE WALLCOVERING

METAL CAP BY WALL

PROTECTION MFR.

(REF ELEVATIONS FOR MATERIALS AND

HEIGHTS)

V A

R

IE

S

CONTINUOUS CAULK APPLIED TO TOP INSIDE CORNER

3"

1/4"

METAL STUDS

GYPSUM BOARD

REGRIND RETAINER

(24U026000)

#6 X 1 5/8" BUGLE HD SMS

18" [457.2mm] MAX.

R1/4" [R6.4mm]

PETG COVER

NEOPRENE CUSHION AT

EACH FASTENING

FINISHED FLOOR

BASE

FINISHED WALL

HANDRAIL

/2

RESILIENT BUMPER RAILT

O

P O

F H

A N

D R

A

IL

" 16 GA METAL BLOCKING

16 GA METAL BLOCKING

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:2

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-101

FIRST FLOOR FINISH AND WALL

PROTECTION PLAN

2 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

N O

R T H

0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR FINISH AND WALL PROTECTION PLAN

1 CONTRACTO TO PROVIDE AND INSTALL FULL

HEIGHT CORNER GUARD

2 PWT-1 PORCELAIN WALL TILE

3 HIW-1, HIGH IMPACT WALLCOVERING FLOOR TO

CEILING WITH RB-1, DRYWALL FINISH LEVEL TO

MATCH MANUFACTURER RECOMMENDATIONS

4 HIW-2 HIGH IMPACT WALLCOVERING FLOOR TO

CEILING WITH RB-1, DRYWALL FINISH LEVEL TO

MATCH MANUFACTURER RECOMMENDATIONS

5 PAINT: P-2, REFERENCE SPECIFICATIONS FOR

COLOR

6 PAINT: P-3, REFERENCE SPECIFICATIONS FOR

COLOR

7 PAINT: P-4, REFERENCE SPECIFICATIONS FOR

COLOR

8 PAINT: P-5, REFERENCE SPECIFICATIONS FOR

COLOR

9 PAINT: P-6, REFERENCE SPECIFICATIONS FOR

COLOR

10 CONTRACTOR TO PROVIDE AND INSTALL FULL

HEIGHT 135 DEGREE CORNER GUARD

12 PLYWOOD TO BE PAINTED P-1

Scale: 1" = 1'-0"

TYPICAL WALL PROTECTION

Scale: 6" = 1'-0"

CORNER GUARD DETAIL

Scale: 1" = 1'-0"

TYPICAL HANDRAIL/BUMPER SECTION

2 3 4 5 6

B

D

C

1.7

E

A.5

B.11 B.10

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

TR

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

GROUP ROOM 2

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

TLT

OFFICE/CONSULT17

HAC

STAFF TLT

TOILET

OFFICE

OFFICE

OFFICE

ELEC

SOILED

FAMILY

CONSULT

STAFF

CONFERENCE

ROOM 53

OCCUPATIONAL

THERAPY

COMMUNITY

ROOM

RESOURCE/

COMPUTERS

OFFICE

FAMILY

CONSULT

EXAM

OFFICE

OFFICE

STAFF LOUNGE

VEST

MECHANICAL

MEDS

OPEN OFFICE 40

GROUP ROOM 1

RECEPTION/CHECK-IN

VEST

WAITING

C06

CORRIDOR

C04

CORRIDOR

C05

CORRIDOR

C03

CORRIDOR

C02

CORRIDOR

C01

CORRIDOR

LOBBY

FIRE RISER

ROOM

STORAGE

1 1

1 12

44 1

6 6

53B

TRAINING

TOILET

53C

STOR

07A

CLEAN SUPPLY

16 16

TOILET

IN-03.01

ROOM NUMBER

IDENTIFICATION

MICHAEL E. DEBAKEY MEMORIAL VA MEDICAL CENTER CAMPUS STANDARD

IN-04.02

SECONDARY ROOM

IDENTIFICATION WITH INSERT

IN-04.01

PRIMARY ROOM

IDENTIFICATION WITH INSERT

IN-01.31

FIRE EXTINGUISHER

IDENTIFICATION FLAG SIGN

IN-01.03

FIRE PROCEDURE "R.A.C.E."

SIGN

IN-11.04

PERMANENT MESSAGE

SIGN 'PUSH BUTTON TO

OPEN DOOR'

IN-01.38

EMERGENCY EYE WASH

STATION SIGN

IN-01.22

BIOHAZARD WARNING SIGN

IN-09.06

RESTROOM IDENTIFICATION

IN-09.07

REQUIRED RESTROOM

POSTING

IN-13.01

PERPENDICULAR FLAG

MOUNT - LAYOUT A

IN-02.07.03

POLICIES AND

DIRECTIVES

IN-02.07.04

NOTICE OF PRIVACY

PRACTICES

IN-02.07.03

POLICIES AND

DIRECTIVES

IN-02.07.02

RIGHTS AND

RESPONSIBILITIES OF FAMILY

MEMBERS OF VA PATIENTS

IN-02.07.01

RIGHTS AND

RESPONSIBILITIES OF VA

PATIENTS

GROUPED MANDATORY

SIGNAGE - SINGLE PANEL

IN-02.01

CONSENT TO INSPECTION

IN-02.10

NO WEAPONS NOTICE

IN-02.03

NO WEAPONS POLICY

IN-02.14

VIDEO SURVEILLANCE

IN-02.15

SERVICE DOGS

IN-02.02

NO SMOKING, NO VAPING

MANDATORY ENTRANCE SIGN GROUP LAYOUT

IN-02.04.01

BUSINESS HOURS &

VIDEO SURVEILLANCE

SIGN - VINYL

EN-06.04

WALL MOUNTED

BUILDING IDENTIFICATION

MEDIUM - LAYOUT B

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:2

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-141

FIRST FLOOR SIGNAGE PLAN

3 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

Scale: 1/8" = 1'-0"

FIRST FLOOR SIGNAGE PLAN N

O

R T H

0 4 8 16

1 PRIMARY ROOM IDENTIFICATION SIGN WITH

INSERT, IN-04.01

2 ALL-GENDER RESTROOM IDENTIFICATION SIGN,

IN-09.03

3 FLAG MOUNTED RESTROOM SIGN, IN-13.01

LAYOUT A

4 SECONDARY ROOM IDENTIFICATION SIGN WITH

INSERT, IN-04.02

5 ROOM NUMBER IDENTIFICATION SIGN, IN-03.01

6 SECONDARY ROOM IDENTIFICATION, EXTERIOR

GRADE, IN-04.02

7 MANDATORY ENTRANCE SIGNS, GROUP LAYOUT

B - SEE SIGN TYPE DETAIL FOR SPECIFIC SIGN

TYPES REQUIRED IN GROUP LAYOUT

8 FIRE EXTINGUISHER IDENTIFICATION FLAG SIGN,

IN-01.31

9 FIRE EXTINGUISHER IDENTIFICATION TAG, CLEAN

AGENT

10 CHANGING STATION RESTROOM POSTING,

IN-09.07

11 <varies>

12 FIRE PROCEDURE R.A.C.E. SIGN, IN-01.03

13 POLICIES AND DIRECTIVES SIGN, IN-02.07.03

14 NOTICE OF PRIVACY PRACTICES, IN-02.07.04

15 EMERGENCY EYEWASH STATION SIGN, IN-01.38

16 PERMANENT MESSAGE SIGN, IN-11.04

17 BUSINESS HOURS AND VIDEO SURVEILLANCE

VINYL SIGN, IN-02.04.01

18 WALL MOUNTED BUILDING IDENTIFICATION -

MEDIUM, EN-06.04

Scale: 12" = 1'-0"

SIGNAGE TYPES

2'-6" 3'-0" 1 3/4"

1 3/4"3'-0"2'-6"

5'-7 3/4"

W5 W10

SB1 B1

5'-7 3/4"

7 7

1 1/2"2'-6"3'-0"2'-2 1/2"1"

1 1/2"2'-6"3'-0"2'-3"

B3 SB2

W7 W10 W5

7 7

2'-6"2'-6"2'-6"5'-2 3/4"

12'-8 3/4"

2'-0" 2'-6" 2'-6" 2'-6"

9'-6"

W4 W8 W8 W5

SB2B2B2B4

W11

7 7 7 7

7 7 7 7

B3 B3 B3

3'-0" 3'-0" 3'-0"

9'-0"

4" 2'-9" 4'-0" 2'-6" 2'-9" 2'-9" 2'-3" 3'-0" 3'-3" 10 3/4"

24'-5 3/4"

T2 T1 W8 W6 W9 W7 W1 W2

SB4B3B2

2'-6" 2'-8" 3'-0" 2'-1" 3'-0"

13'-3"

"663

7 7 7 7 7 7 7 7

T3 W10 W10 W5

SB1B3B3

2'-6"3'-0"3'-0"3'-6"3"

12'-3"

3'-0" 3'-0" 2'-6"

8'-6"

3 53

7 7 7

7 7 7

SB5

3'-0" 2"

3'-2"

SB1

2'-6"

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:3

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-201

CASEWORK AND MILLWORK

ELEVATIONS

4 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

1 24"D SOLID SURFACE COUNTERTOP WITH

BACK/END SPLASH, SS-1

2 FINISHED END PANEL

3 FILLER PANEL

5 CABINET SLOPE TOP

6 24"D SOLID SURFACE COUNTERTOP WITH

BACK/END SPLASH, SS-2

7 PL-3 PLASTIC LAMINATE

8 CWT-1, CERAMIC WALL TILE 4X8

9 PL-1 PLASTIC LAMINATE

10 KEYED LOCKS, COORDINATE WITH VA COR

AND INTERIOR DESIGNER ON TYPE,

QUANTITY AND LOCATION

PLASTIC LAMINATE CASEWORK SCHEDULE

MARK WIDTH DESCRIPTION SECTION REFERENCE

B1 3' - 0" 34"H x 23"D BASE STORAGE CABINET, 1 DRAWER, 2 DOORS, 1

ADJ. SHELF

4/I-203

B2 2' - 6" 34"H x 23"D OPEN BASE STORAGE UNIT, 1 FIXED SHELF, MICROWAVE

13/I-203

B3 3' - 0" 34"H x 23"D BASE STORAGE UNIT, TWO DRAWER, TWO DOOR, 1

ADJ. SHELF

4/I-203

B4 2' - 0" 34"H x 23"D THREE EQUAL DRAWER BASE 5/I-203

SB1 2' - 6" 22"H x 23"D ADA SLOPED BASE CABINET <varies>

SB2 2' - 6" 34"H x 23"D SINK BASE, W/ REMOVABLE PANEL 2/I-203

SB3 3' - 0" 34"H x 23"D SINK BASE WITH ACCESS PANEL 2/I-203

SB4 3' - 0" 22"H x 23"D ADA SLOPED BASE CABINET 1/I-203

SB5 3' - 0" 34"H x 23"D SINK BASE UNIT, TWO DOOR 2/I-203

T1 4' - 0" 84"H x 24"D TALL STORAGE UNIT, TWO DOOR, ONE FIXED

SHELF, FOUR ADJ. SHELVES

12/I-203

T2 2' - 9" 84"H x 24"D TALL STORAGE UNIT, TWO DOOR, ONE FIXED

SHELF, FOUR ADJ. SHELVES

12/I-203

T3 3' - 6" 84"H x 24"D TALL STORAGE UNIT, TWO DOOR, ONE FIXED

SHELF, FOUR ADJ. SHELVES

12/I-203

W1 3' - 0" 15"H x 15"D TWO DOOR WALL STORAGE UNIT 7/I-203

W2 3' - 3" 15"H x 15"D TWO DOOR WALL STORAGE UNIT 7/I-203

W4 2' - 3" 15"H x 15"D TWO DOOR WALL STORAGE UNIT 7/I-203

W5 2' - 6" 18"H x 15"D TWO DOOR WALL STORAGE UNIT 7/I-203

W6 2' - 9" 18"H x 15"D TWO DOOR WALL STORAGE UNIT 7/I-203

W7 2' - 3" 25"H x 15"D TWO DOOR WALL STORAGE UNIT 8/I-203

W8 2' - 6" 25"H x 15"D TWO DOOR WALL STORAGE UNIT 8/I-203

W9 2' - 9" 25"H x 15"D TWO DOOR WALL STORAGE UNIT 8/I-203

W10 3' - 0" 25"H x 15"D TWO DOOR WALL STORAGE UNIT 8/I-203

W11 2' - 9" 12"H x 15"D WALL STORAGE UNIT, TWO DOOR 7/I-203

Scale: 3/8" = 1'-0"

EXAM 08 - EAST

Scale: 3/8" = 1'-0"

MEDS 07 - EAST

Scale: 3/8" = 1'-0"

STAFF LOUNGE 19 - EAST

Scale: 3/8" = 1'-0"

RECEPTION/CHECK-IN 04 - WEST

Scale: 3/8" = 1'-0"

COMMUNITY ROOM 52 - SOUTH

Scale: 3/8" = 1'-0"

OCCUPATIONAL THERAPY ROOM 53 - WEST

Scale: 3/8" = 1'-0"

TRAINING TOILET 53B - WEST

Scale: 3/8" = 1'-0"

TYPICAL RESTROOM

I-202 2A I-2022B

I-202

2C

I-202

2C

OH

2'-0" 1'-6"

3'-6"

E Q

E Q

C

B.11

RECEPTION/CHECK-IN

I-202

1A

I-202

1B

25'-3 3/4"

5'-8 3/4" 5" 6'-4 1/4" 6'-6 3/4" 5" 5'-10 1/2"

/2

R =9

1/ 2"I-202 1C

OH 4

/2

/4

1'-9 1/4"

44 4 4

I-203

2'-8"2'-6"

5"

1'-2 3/4"3'-0"2'-11"1'-4 3/4"3'-0"1'-4 1/2"

5"

2'-7 1/2"2'-8"

24'-2 1/4"

3 3

44 4 4

8 8 8 8

5'-9 1/4"5"5'-8 1/4"

11'-10 1/4"11'-5 1/2"

5'-7" 5" 5'-5 1/2"

14 14

/2

/2

/2

/2

/2

2°

R

/4

4" 4'-0 1/4"

4'-4 1/4"

/2

2'-8 3/4"

68°

/2

I-203

/4

B1 SB3 B1

3'-0" 3'-0" 3'-0"

9'-0"

24 24 24

1'-6" 3'-0" 3'-0" 1'-6"

9'-0"

1'-6"2'-0"

3'-6"

2'-0"

5"

1'-1"

3'-0"

10 1/4"9"

1'-7 1/4"

I-202

/2

3'-0"

6 1/4"1'-3 3/4"

M A

T C

H I D

1'-10"

/2

HOUSTON VAMC

OUTPATIENT MENTAL HEALTH CLINIC

VIF

17'-4 3/4"

V

IF

4'-0"4'-0"4'-0"

12'-0" 23

FIRST FLOOR

0' - 0"

1/2"10

2"

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:3

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-202

CASEWORK AND MILLWORK

ELEVATIONS

5 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

Scale: 1/2" = 1'-0"

ENLARGED COMMUNITY ROOM ISLAND - 52

Scale: 1/2" = 1'-0"

ENLARGED RECEPTION/CHECK-IN - 04

Scale: 3/8" = 1'-0" 1A

RECEPTION/CHECK-IN DESK 04 - EAST

Scale: 3/8" = 1'-0" 1B

RECEPTION/CHECK-IN DESK 04 - WEST

Scale: 1/2" = 1'-0"

RECEPTION/CHECK-IN DESK

04 - SOUTH

1C

Scale: 1/2" = 1'-0" 2A

COMMUNITY ROOM ISLAND 52 - NORTH

Scale: 1/2" = 1'-0"

2B

COMMUNITY ROOM ISLAND 52 - SOUTH

Scale: 1/2" = 1'-0"

COMMUNITY ROOM 52 -

WEST

2C

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

1 24"D SOLID SURFACE COUNTERTOP WITH BACK/END

SPLASH, SS-1

2 METAL SUPPORTS

3 RESIN PANEL RP-1

4 2 3/8"W GROMMET

5 WATERFALL SS-1, SOLID SURFACE EDGE

6 PL-1, PLASTIC LAMINATE

7 RB-1 RUBBER BASE

8 HIW-1, HIGH IMPACT WALLCOVERING

9 PL-2, PLASTIC LAMINATE PANEL WITH FINISHED PL-2

EDGES

10 1/2"D THICK BRUSHED ALUMINUM DIMENSIONAL

NUMBER, ADHERED TO PLASTIC LAMINATE PANEL

11 PWT-1 PORCELAIN WALL TILE 16"X48"

12 FACILITY SIGNAGE, DIMENSIONAL LETTERS ON 1"

STANDOFFS IN MATTE BLACK

13 HIW-2, HIGH IMPACT WALLCOVERING

14 ALIGN

17 4'X9' PANELS EQUALLY SPACED WITH CUSTOM

GRAPHICS SUPPLIED BY OTHERS, VIVISPECTRA

SPECTRUM LAMINATED GLASS, REFLECT

CONFIGURATION WITH PEARLEX+ FINISH SUPPLIED

BY BASIS OF DESIGN MANUFACTUERER

FORMS+SURFACES. ATTACHMENT METHOD

FORMS+SURFACES SLIM CLEAT. SEE SPECIFICATIONS

FOR MORE INFORMATION

18 SOLID SURFACE, SS-3 30"x144" PANEL 1/2" THICK

19 SLIM CLEATS BY PANEL MANUFACTURER, BASIS OF

DESIGN: FORMS AND SURFACES

20 U-CHANNEL TO MATCH RESIN PANEL THICKNESS,

MOUNTED W/ RUBBER GASKET

21 GWT-1, GLASS WALL TILE BAND

22 SCHLUTER METAL TRIM CAP

23 FINAL FINISHED WALL DIMENSION TO BE 12' TO

ACCOMIDATE PANELS PROPERLY

24 PL-3 PLASTIC LAMINATE

25 24"D SOLID SURFACE COUNTERTOP WITH BACK/END

SPLASH, SS-2

Scale: 3/8" = 1'-0"

GROUP ROOM 1 ID

Scale: 3/8" = 1'-0"

GROUP ROOM 2 ID

Scale: 3/8" = 1'-0"

LOBBY - 03 TILE WALL

Scale: 3/8" = 1'-0"

WAITING AREA - 02 DRINKING FOUNTAINS

Scale: 3/4" = 1'-0"

SIGNAGE WALL DETAIL

ADA SINK APRON AND PANELS

CONSTRUCTED WITH 3/4" INDUSTRIAL

GRADE PARTICLEBOARD

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

ADA ACCESSIBLE SINK AND FIXTURES.

REFER TO PLUMBING DRAWINGS FOR

FAUCET, STAINLESS STEEL SINK AND

CONNECTIONS.

REMOVABLE ADA OPERABLE PLUMBING

SHIELD CONSTRUCTED W/ 3/4"

INDUSTRIAL GRADE PARTICLEBOARD.

PROVIDE (4) KEKU CLIPS PER PANEL

AND ATTACH TO ADA SIDE PANEL TO

BE PLASTIC LAMINATE FACED.

PROVIDE AND INSTALL SUPPORT

BRACKET AS REQUIRED TO KEEP

CABINET FROM RACKING

OPEN

16 GA METAL BACKING TYPICAL

SEALANT, COLOR TO MATCH ADJACENT WALL

SIDES CONSTRUCTED WITH 3/4" INDUSTRIAL

GRADE PARTICLEBOARD. SIDES ARE

DADOED TO RECEIVE TOPS, BOTTOMS AND

BACKS.

NOTE:

ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD

FACES AND EDGES TO RECIEVE HIGH PRESSURE

LAMINATE. CABINET BODY EDGES 1MM PVC

EDGING.

INSULATED PIPING BY PLUMBING

CONTRACTOR

2'-0"

6"

1'-5"

1'-11"

BOTTOM CONSTRUCTED WITH 3/4"

INDUSTRIAL GRADE PARTICLEBOARD

DOWELED INTO CABINET SIDES.

BASE, SEE FINISH PLANS

SEALANT, COLOR TO MATCH ADJACENT WALL

2x BLOCKING

1x RAIL STRETCHER, TYPICAL

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

FALSE FRONT CONSTRUCTED

WITH 3/4" INDUSTRIAL GRADE

PARTICLEBOARD BACK CONSTRUCTED WITH 1/2" INDUSTRIAL

GRADE PARTICLEBOARD BACKS TO FIT INTO

CABINET SIDE DADOES

TOE KICK CONSTRUCTED OF 3/4" PLYWOOD

TOE BOARD

REMOVABLE PANEL, ATTACH TO CLEATS

WITH NICKEL PLATED SCREWS AND

FINISH WASHERS. MATCH REVEAL AND

EDGE TREATMENT OF DOORS AND

DRAWERS.

ADA ACCESSIBLE SINK AND FIXTURES.

REFER TO PLUMBING DRAWINGS FOR

FAUCET. STAINLESS STEEL SINK

PROVIDED BY PLUMBING.

SIDES CONSTRUCTED WITH 3/4"

INDUSTRIAL GRADE

PARTICLEBOARD. SIDES ARE

DADOED TO RECEIVE TOPS,

BOTTOMS AND BACKS.

NOTE:

ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD

FACES AND EDGES TO RECIEVE HIGH PRESSURE

LAMINATE. CABINET BODY EDGES AND THE SHELF

EDGE TO RECEIVE 1MM PVC EDGING. DOORS AND

DRAWERS TO RECEIVE 3MM PVC EDGING

16 GA METAL BLOCKING, TYPICAL

1'-11"

2'-0"

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

FULL OVERLAY DOOR

CONSTRUCTED W/ 3/4"

INDUSTRIAL GRADE

PARTICLEBOARD

ADJUSTABLE SHELF CONSTRUCTED

WITH 3/4" INDUSTRIAL GRADE

PARTICLEBOARD WITH INJECTION

MOLDED, CLEAR POLYCARBONATE

WITH TWO INTEGRAL PINS.

32mm CENTER

BACK CONSTRUCTED WITH 1/2" INDUSTRIAL

GRADE PARTICLEBOARD. BACKS TO FIT INTO

CABINET SIDE DADOES

BASE, SEE FINISH PLANS

BOTTOM CONSTRUCTED W/ 3/4" INDUSTRIAL

GRADE PARTICLEBOARD DOWELED INTO

CABINET SIDES

SEALANT, COLOR TO MATCH ADJACENT WALL

2x BLOCKING

1x RAIL STRETCHER, TYPICAL

SIDES CONSTRUCTED WITH 3/4"

INDUSTRIAL GRADE PARTICLEBOARD.

SIDES ARE DADOED TO RECEIVE TOPS,

BOTTOMS AND BACKS.

TOE KICK CONSTRUCTED OF 3/4" PLYWOOD

TOE BOARD

WIRE PULL

2'-0"

CONCEALED HINGES AT 120

DEGREES SELF-CLOSING

NOTE:

ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD

FACES AND EDGES TO RECIEVE HIGH PRESSURE

LAMINATE. CABINET BODY EDGES AND THE SHELF

EDGE TO RECEIVE 1MM PVC EDGING. DOORS AND

DRAWERS TO RECEIVE 3MM PVC EDGING

16 GA METAL BACKING, TYPICAL

1'-11"

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

FULL OVERLAY DOOR CONSTRUCTED

WITH 3/4" INDUSTRIAL GRADE

PARTICLEBOARD

ADJUSTABLE SHELF CONSTRUCTED

WITH 3/4" INDUSTRIAL GRADE

PARTICLEBOARD WITH INJECTION

MOLDED, CLEAR POLYCARBONATE

WITH TWO INTEGRAL PINS.

32mm CENTER

BACK CONSTRUCTED WITH 1/2" INDUSTRIAL

GRADE PARTICLEBOARD. BACKS TO FIT

INTO CABINET SIDE DADOES

BASE, SEE FINISH PLANS

BOTTOM CONSTRUCTED WITH 3/4"

INDUSTRIAL GRADE PARTICLEBOARD

DOWELED INTO CABINET SIDES

SEALANT, COLOR TO MATCH ADJACENT WALL

2x BLOCKING

1x RAIL STRETCHER, TYPICAL

SIDES CONSTRUCTED WITH 3/4"

INDUSTRIAL GRADE PARTICLEBOARD.

SIDES ARE DADOED TO RECEIVE TOPS,

BOTTOMS AND BACKS.

TOE KICK CONSTRUCTED OF 3/4" PLYWOOD

TOE BOARD

WIRE PULL

CONCEALED HINGES AT 120

DEGREES SELF-CLOSING

NOTE:

ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD

FACES AND EDGES TO RECIEVE HIGH PRESSURE

LAMINATE. CABINET BODY EDGES AND THE SHELF

EDGE TO RECEIVE 1MM PVC EDGING. DOORS AND

DRAWERS TO RECEIVE 3MM PVC EDGING

16 GA METAL BACKING TYPICAL

2'-0"

1'-11"

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

(3) DRAWER UNITS CONSTRUCTED

WITH 1/2" INDUSTRIAL GRADE

PARTICLEBOARD SIDES. 3/4" FRONTS

& BACKS & 1/2" FULLY CAPTURED

BOTTOM. DRAWER FACES

CONSTRUCTED OF 3/4" INDUSTRIAL

GRADE PARTICLEBOARD.

BACK CONSTRUCTED W/ 1/2" INDUSTRIAL

GRADE PARTICLEBOARD. BACKS TO FIT INTO

CABINET SIDE DADOES

BASE, SEE FINISH PLANS

BOTTOM CONSTRUCTED W/ 3/4" INDUSTRIAL

GRADE PARTICLEBOARD. DOWELED INTO

CABINET SIDES

SEALANT, COLOR TO MATCH ADJACENT WALL

2x BLOCKING

1x RAIL STRETCHER, TYPICAL

TOE KICK CONSTRUCTED OF 3/4" PLYWOOD

TOE BOARD

(3) WIRE PULL

2'-0"SIDES CONSTRUCTED W/ 3/4"

INDUSTRIAL GRADE PARTICLEBOARD.

SIDES ARE DADOED TO RECEIVE

TOPS, BOTTOMS AND BACKS.

NOTE:

ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD

FACES AND EDGES TO RECIEVE HIGH PRESSURE

LAMINATE. CABINET BODY EDGES AND THE SHELF EDGE

TO RECEIVE 1MM PVC EDGING. DOORS AND DRAWERS

TO RECEIVE 3MM PVC EDGING

16 GA METAL BACKING, TYPICAL

1'-11"

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

(4) DRAWER UNITS CONSTRUCTED

WITH 1/2" INDUSTRIAL GRADE

PARTICLEBOARD SIDES. 3/4" FRONTS

& BACKS & 1/2" FULLY CAPTURED

BOTTOM. DRAWER FACES

CONSTRUCTED OF 3/4" INDUSTRIAL

GRADE PARTICLEBOARD

BACK CONSTRUCTED WITH 1/2"

PARTICLEBOARD. BACKS TO FIT INTO

CABINET SIDE DADOES

BASE, SEE FINISH PLANS

BOTTOM CONSTRUCTED WITH 3/4"

INDUSTRIAL GRADE PARTICLEBOARD

DOWELED INTO CABINET SIDES

SEALANT, COLOR TO MATCH ADJACENT WALL

2x BLOCKING

1x RAIL STRETCHER, TYPICAL

TOE KICK CONSTRUCTED OF 3/4" PLYWOOD

TOE BOARD

(4) WIRE PULL

2'-0"

SIDES CONSTRUCTED WITH 3/4"

INDUSTRIAL GRADE

PARTICLEBOARD. SIDES ARE

DADOED TO RECEIVE TOPS,

BOTTOMS AND BACKS.

NOTE:

ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD FACES

AND EDGES TO RECIEVE HIGH PRESSURE LAMINATE.

CABINET BODY EDGES AND THE SHELF EDGE TO RECEIVE

1MM PVC EDGING. DOORS AND DRAWERS TO RECEIVE

3MM PVC EDGING

16 GA METAL BACKING TYPICAL

1'-11"

WIRE PULL

BACK CONSTRUCTED W/ 1/2" INDUSTRIAL

GRADE PARTICLEBOARD. BACKS TO FIT INTO

CABINET SIDE DADOES

FULL OVERLAY DOOR CONSTRUCTED

W/ 3/4" PARTICLEBOARD

1'-3"

SLOPED TOP OR GYP. BD. SOFFIT.

REFER TO CEILING PLANS &

ELEVATIONS

16 GA METAL BACKING, TYPICAL

CONCEALED HINGES AT 120

DEGREES SELF-CLOSING

NOTE:

ALL EXPOSED INDUSTRIAL GRADE PARTICLEBOARD

FACES AND EDGES TO RECIEVE HIGH PRESSURE

LAMINATE. CABINET BODY EDGES AND THE SHELF

EDGE TO RECEIVE 1MM PVC EDGING. DOORS AND

DRAWERS TO RECEIVE 3MM PVC EDGING.

1x RAIL STRETCHER, TYPICAL

BOTTOM CONSTRUCTED W/ 3/4" INDUSTRIAL

GRADE PARTICLEBOARD DOWELED INTO

CABINET SIDES.

SIDES CONSTRUCTED W/ 3/4" INDUSTRIAL

GRADE PARTICLEBOARD SIDES ARE

DADOED TO RECEIVE TOPS, BOTTOMS AND

BACKS

V A

R

IE

S

LIGHT VALANCE AT ALL WALL

CABINETS (UNO)

WIRE PULL

32MM CENTERS

BACK CONSTRUCTED W/ 1/2" INDUSTRIAL GRADE

PARTICLEBOARD. BACKS TO FIT INTO CABINET

SIDE DADOES

SLOPED TOP OR GYP. BD. SOFFIT.

REFER TO CEILING PLANS &

ELEVATIONS

16 GA METAL BACKING, TYPICAL

CONCEALED HINGES AT 120

DEGREES SELF-CLOSING

NOTE:

ALL EXPOSED MDF FACES AND EDGES TO RECIEVE

HIGH PRESSURE LAMINATE. CABINET BODY EDGES

AND THE SHELF EDGE TO RECEIVE 1MM PVC

EDGING. DOORS TO RECEIVE 3MM PVC EDGING

ADJUSTABLE SHELF CONSTRUCTED

WITH 3/4" INDUSTRIAL GRADE

PARTICLEBOARD WITH INJECTION

MOLDED, CLEAR POLYCARBONATE

WITH TWO INTEGRAL PINS. 1x RAIL STRETCHER, TOP & BOTTOM

FULL OVERLAY DOOR CONSTRUCTED

W/ 3/4" INDUSTRIAL GRADE

PARTICLEBOARD

BOTTOM CONSTRUCTED W/ 3/4" INDUSTRIAL

GRADE PARTICLEBOARD DOWELED INTO CABINET

SIDES.

SIDES CONSTRUCTED W/ 3/4" PLYWOOD

SIDES ARE DADOED TO RECEIVE TOPS,

BOTTOMS AND BACKS

1'-3"

UNDER-CABINET LIGHT FIXTURE.

VERIFY LOCATIONS ON ELECTRICAL

DRAWINGS

3/4" ANGLE

BRACE @ 36" O.C

ANGLE CLIPS

FINISHED

CEILING LINE

COND. @

SLOPED PLAM TOP

1"

1"1"

EXTENDED SOFFIT FIN.

END PANEL PASSED

CAB. FIN. END 3/8"H MIN.

2" DIA. GROMMET

WITH COVER AND

SLEEVE

2"

GROMMET DETAIL

EASED EDGE AT THE

INTEGRAL BACK SPLASH

EXPOSED EDGES TO

BE EASEDCAULK

1" R. ALL EXPOSED

CORNERS

EXPOSED EDGE

OPEN END ELEVATION

OPEN END PLAN

COUNTERTOP-CAULK

TO SPLASH

ALL TOPS SHALL BE

SCRIBED TO WALL

PRIOR TO INSTALLATION

& CAULKED

SPLASH END ELEVATION

SPLASH END PLAN

1/2"

/2

2'-0"

1/2"

/2

2'-0"

R 1"

3/4" PLYWOOD

SLOPED TOP OR GYP. BD.

SOFFIT. REFER TO CEILING

PLANS & ELEVATIONS

2'-0"

3/4" FIXED DIVIDER,

CENTERED FOR 2-

DOOR CABINETS

FIXED SHELF CONSTRUCTED WITH

3/4" PLYWOOD. EDGES TO RECEIVE

MATCHING .018 PVC BANDING

TOP CONSTRUCTED W/ 3/4"

PLYWOOD DOWELED INTO

CABINET SIDES.

BACK CONSTRUCTED W/ 1/2"

PLYWOOD. BACKS TO FIT INTO

CABINET SIDE DADOES

BOTTOM CONSTRUCTED W/ 3/4"

PLYWOOD DOWELED INTO

CABINET SIDES.

FULL OVERLAY DOOR

CONSTRUCTED W/ 3/4" PLYWOOD

BASE, SEE FINISH PLANS

2x BLOCKING

1x BLOCKING, TOP & BOTTOM

2x IN-WALL BLOCKING, TYP

TOE KICK CONSTRUCTED OF

3/4" PLYWOOD TOE BOARD

WIRE PULL

NOTE:

ALL EXPOSED MDF FACES AND

EDGES TO RECIEVE HIGH

PRESSURE LAMINATE. CABINET

BODY EDGES AND THE SHELF

EDGE TO RECEIVE 1MM PVC

EDGING. DOORS AND DRAWERS

TO RECEIVE 3MM PVC EDGING

ADJUSTABLE SHELF CONSTRUCTED WITH 3/4"

PARTICLEBOARD WITH INJECTION MOLDED, CLEAR

POLYCARBONATE WITH TWO INTEGRAL PINS.

32mm CENTER

BACKER SHEET CLADDED WITH

PLASTIC LAMINATE (TYP) FOR

EXPOSED SURFACES

MOUNT OUTLET IN CASEWORK; COORDINATE

WITH ELECTRICAL

SEALANT,COLOR TO MATCH ADJACENT WALL

WIRE PULL

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

BASE, SEE FINISH PLANS

BOTTOM CONSTRUCTED WITH 3/4"

PARTICLEBOARD DOWELED INTO CABINET

SIDES

2x BLOCKING

1x RAIL STRETCHER, TYPICAL

TOE KICK CONSTRUCTED OF 3/4" PLYWOOD

TOE BOARD

MICROWAVE. VERIFY SIZE AND MANF.

INSTALLATION PRIOR TO FABRICATION

OF CASEWORK TO CONFIRM SHELF

DEPTH REQUIRED BY.

2'-0"

SIDES CONSTRUCTED WITH 3/4"

PARTICLEBOARD SIDES ARE DADOED TO

RECEIVE TOPS, BOTTOMS AND BACKS.

BACK CONSTRUCTED WITH 1/2"

PARTICLEBOARD. BACKS TO FIT

INTO CABINET SIDE DADOES

1'-11"

NOTE:

ALL EXPOSED MDF FACES AND EDGES TO RECIEVE HIGH

PRESSURE LAMINATE. CABINET BODY EDGES AND THE

SHELF EDGE TO RECEIVE 1MM PVC EDGING. DOORS AND

DRAWERS TO RECEIVE 3MM PVC EDGING

"DRAWER UNIT CONSTRUCTED WITH 1/2"

PARTICLEBOARD SIDES. 3/4" FRONTS &

BACKS & 1/2" FULLY CAPTURED BOTTOM.

DRAWER FACE CONSTRUCTED OF 3/4"

PARTICLEBOARD.

16 GA METAL BACKING, TYPICAL

U CHANNEL

WITH RUBBER

GASKET

RESIN PANEL

U CHANNEL

WITH RUBBER

GASKET

SS-1 SOLID SURFACE

PL-1 VENEER

RB-1 RB-1 2

PL-1 VENEER

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:3

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-203

CASEWORK DETAILS

6 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

Scale: 3/4" = 1'-0"

ADA SINK BASE-SLOPED

Scale: 3/4" = 1'-0"

SINK BASE CABINET

Scale: 3/4" = 1'-0"

BASE CABINET WITH ONE DOOR UNIT

Scale: 3/4" = 1'-0"

BASE CABINET WITH DRAWER & DOOR

Scale: 3/4" = 1'-0"

BASE CABINET WITH 3 EQUAL DRAWERS

Scale: 3/4" = 1'-0"

DRAWER BASE WITH 4 EQUAL DRAWERS

Scale: 3/4" = 1'-0"

TYPICAL 12-18" WALL CABINET

Scale: 3/4" = 1'-0"

TYPICAL 30"H WALL CABINET

Scale: 3/4" = 1'-0"

WALL CABINET SLOPED TOP

Scale: 3/4" = 1'-0"

GROMMET DETAIL

Scale: 3/4" = 1'-0"

COUNTERTOP OPEN END VIEWS

Scale: 3/4" = 1'-0"

TALL CABINET

Scale: 3/4" = 1'-0"

CASEWORK BASE - MICROWAVE

Scale: 3/8" = 1'-0"

RECEPTION DESK LAMINATE

HR-1

BR-1

51 52 53 54

403933C01

HR-1

BR-1

HR-1

BR-1

07080910

DOOR

SWING

48495004B HR-1

BR-1 3

HR-1

BR-1

04A4745 46

HR-1

BR-1

44 43

HR-1

BR-1

38 37

HR-1

BR-1

36 35 34

HR-1

BR-1

HR-1

BR-1

CORRIDOR 03 CORRIDOR 04

HR-1

BR-1

HR-1

BR-1

1112131417 42 15181920A

HIW-1

HIW-1

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:3

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-401

INTERIOR ELEVATIONS - WALL

PROTECTION

7 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

Scale: 1/4" = 1'-0"

CORRIDOR 01 - EAST

Scale: 1/4" = 1'-0"

CORRIDOR C01 - WEST

Scale: 1/4" = 1'-0"

CORRIDOR C02 - NORTH

Scale: 1/4" = 1'-0"

CORRIDOR C02 - SOUTH

Scale: 1/4" = 1'-0"

CORRIDOR C03 - NORTH

Scale: 1/4" = 1'-0"

CORRIDOR C03 - SOUTH

Scale: 1/4" = 1'-0"

CORRIDOR C04 - NORTH

Scale: 1/4" = 1'-0"

CORRIDOR C04 - SOUTH

Scale: 1/4" = 1'-0"

CORRIDOR C05 - NORTH

Scale: 1/4" = 1'-0"

CORRIDOR C05 - SOUTH

Scale: 1/4" = 1'-0"

CORRIDOR C06 - EAST

Scale: 1/4" = 1'-0"

CORRIDOR C06 - WEST

Scale: 1/4" = 1'-0"

TYPICAL HIGH IMPACT WALLCOVERING

TYPICAL FOR

ROOMS:

HAC 17,

SOILED 18,

CLEAN

SUPPLY 07A

Scale: 1/4" = 1'-0"

TYPICAL GROUP ROOM HIGH IMPACT WALLCOVERING

TYPICAL FOR

ROOMS:

GROUP ROOM

1, GROUP

ROOM 2

U0022 F3200

M1803

4'-5 1/4"

F3200 M1803 A5077

2'-10 1/4"

A5075 A5080A5145

A5080 A5135

A5080

A5075

A5080 A5075K1552

K4660 K4660

A5077

A5080 A5075

M3150M

R5135

F3050F3200

U0007

A5080 A5075

A5080

A5135

A5077A5075A5080

U0007

A5080 A5075K4500K4660 R6100

K3401

U0002

F3200 U0007

U0014

M7802 A5210

M7802

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:4

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-402

INTERIOR ELEVATIONS - EQUIPMENT

8 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

Scale: 1/4" = 1'-0"

EXAM - 08 - EAST

Scale: 1/4" = 1'-0"

EXAM - 08 - SOUTH

Scale: 1/4" = 1'-0"

EXAM - 08 - WEST

Scale: 1/4" = 1'-0"

HAC - 17 - WEST

Scale: 1/4" = 1'-0"

SOILED - 18 - SOUTH

Scale: 1/4" = 1'-0"

STAFF LOUNGE - 19 - EAST

Scale: 1/4" = 1'-0"

TYPICAL HAND SANITIZER

Scale: 1/4" = 1'-0"

MEDS - 07 - EAST

Scale: 1/4" = 1'-0"

OFFICE - 32 - EAST

Scale: 1/4" = 1'-0"

OCCUPATIONAL THERAPY - 53 - NORTH

Scale: 1/4" = 1'-0"

HAC - 17 - SOUTH

Scale: 1/4" = 1'-0"

OCCUPATIONAL THERAPY - 53 - WEST

Scale: 1/4" = 1'-0"

COMMUNITY ROOM - 52 - NORTH

Scale: 1/4" = 1'-0"

COMMUNITY ROOM - 52 - SOUTH

Scale: 1/4" = 1'-0"

GROUP ROOM 1 - 40 - WEST

Scale: 1/4" = 1'-0"

WAITING - 02 - EAST

Scale: 1/4" = 1'-0"

STAFF LOUNGE - 19 - NORTH

2 3 4 5 6

B

D

C

1.7

E

A.5

B.11 B.10

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

TR

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

GROUP ROOM 2

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

OFFICE/CONSULT

TLT

OFFICE/CONSULT

HAC

STAFF TLT

TOILET

OFFICE

OFFICE

OFFICE

ELEC

SOILED

FAMILY

CONSULT

TOILET

STAFF

CONFERENCE

ROOM

OCCUPATIONAL

THERAPY

COMMUNITY

ROOM 51

RESOURCE/

COMPUTERS

OFFICE

FAMILY

CONSULT

EXAM

OFFICE

OFFICE

STAFF LOUNGE

VEST

MECHANICAL

MEDS

OPEN OFFICE 40

GROUP ROOM 1

RECEPTION/CHECK-IN

VEST

WAITING

C06

CORRIDOR

C04

CORRIDOR

C05

CORRIDOR

C03

CORRIDOR

C02

CORRIDOR

C01

CORRIDOR

LOBBY

FIRE RISER

ROOM

STORAGE

I-423

2_____ I-423

I-422

I-422

I-431

I-422

I-421

I-421

I-421

I-431

I-424

I-422

I-421

1 _____ I-421

2 _____ I-421

I-424

I-431

I-432

07A

CLEAN SUPPLY

53B

TRAINING

TOILET

53C

STOR

I-422

TR

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:4

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-411

FIRST FLOOR OVERALL EQUIPMENT

PLAN

9 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

Scale: 1/8" = 1'-0"

FIRST FLOOR OVERALL EQUIPMENT PLAN N

O

R T H

0 4 8 16

A

STAFF LOUNGE

F0225

F0225

F0225

F0225F0225

F0225

F0225

F0225

A5075 A5080 K1552

F0225

F0225

F2015

F0225

F0225

F0795

F0795

F0795

K4660 K4660

I-402 17

I-402

F3200

A5145

M7802

A5210

AA

SOILED

M2055

A5104M

F2020

A5080

A5075

A5077

I-4026

I-402

AA

HAC

M2055 A5075

A5080

A5077

I-402

I-402

M2055

A

A.5

B.10

FAMILY

CONSULT

F0375

F0255

F0205

F0205

U0004A

U0006

M1801

F2420

F0740

F2000

U0020A

I-40215

F3200

5 B.11

OFFICE/CONSULT

F3200

U0006

U0004A

F2420 F2010

F0275

F2000

A5077

U0020AA1015

F0305

F0305

M1801

I-402 15

I-40217

B

B.10

EXAM

F2000

A5080A5075

F0305

F0340M

A5180Ma

M7401

U0022

M9025

F3200

M1803

I-4022

A5145

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:4

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-421

ENLARGED EQUIPMENT PLANS

10 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

Scale: 1/2" = 1'-0"

ENLARGED STAFF LOUNGE - 19

Scale: 1/2" = 1'-0"

ENLARGED SOILED - 18

Scale: 1/2" = 1'-0"

ENLARGED HAC - 17

Scale: 1/2" = 1'-0"

ENLARGED FAMILY CONSULT - 10

Scale: 1/2" = 1'-0"

TYPICAL OFFICE/CONSULT - 48

Scale: 1/2" = 1'-0"

ENLARGED EXAM - 08

N O

R T H

0 4 8 16N O

R T H

0 4 8 16N O

R T H

0 4 8 16

N O

R T H

0 4 8 16N O

R T H

0 4 8 16N O

R T H

0 4 8 16

D

OCCUPATIONAL

THERAPY

F0275

A1015

F2000

M1801

F0865

A5080 A5075

U0002

U0002

U0002

U0002

F0795M

U0007

I-402

I-402 10

53B

TRAINING

TOILET

53C

STOR

F0795M

F0795M

U0002 U0002

U0002U0002

U0002

U0002

U0002U0002

A5200 A1066 A5170

F2020M

6B.10

MEDS

M3150M

F2010

A5080A5075

R5135

I-402

A5106 F3200

D

STAFF

CONFERENCE

ROOM

F0220MF0220M

F0765 F0765

F0220M

F0220M

F0220M

F0220M

F0220M

F0220M

F0765

F0765F0765

F0765

F0220M F0220M

F0275

F0220M

F0220M

F0220M

F0220M

F0220M

F0220M

A1015

F2000 F3200

U0007

U0014

M1801

A1015

F2000 F0865

A5145 A5145 A5145

B

OFFICE

F0305

F0305

M1801

F0275

F2000

U0020A

A1015

F3200

I-402

D

B.10

I-202

F0305

F0740

F0305

F0305

F0740

F0206

F0740

F0305

F0305

M7802

A5210

F0305 F0305

F0305 F0305

F0740 F0740

F0206 F0206

F0740 F0740

F0305 F0305

F0305 F0305

F0740 F0740

F0305 F0305

I-402

F2020M

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:5

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-422

ENLARGED EQUIPMENT PLANS

11 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

Scale: 1/2" = 1'-0"

ENLARGED OCCUPATIONAL THERAPY - 53/ TRAINING

TOILET 53B

Scale: 1/2" = 1'-0"

ENLARGED MEDS - 07

Scale: 1/2" = 1'-0"

ENLARGED STAFF CONFERENCE ROOM - 54

Scale: 1/2" = 1'-0"

TYPICAL OFFICE - 32

N O

R T H

0 4 8 16N O

R T H

0 4 8 16 N

O R

T H

0 4 8 16 N O

R T H

0 4 8 16

Scale: 1/2" = 1'-0"

WAITING - 02 N

O

R T H

0 4 8 16

D

COMMUNITY

ROOM

F0225

F0795 F0795

F0795 F0795

F0795

M1801 M1801

A1015A1015

F2000 F2000

F0275 F0275

F0865 F0865

M1810

F0225

F0225F0225F0225

F0225 F0225F0225

U0007

F0225

F0225 F0225

F0225F0225

F0225

F0225

F0225 F0225

F0225

F0225

F0225

U0001

U0001

U0001

U0001

R6100

A5075

A5080

K4500

K4660

I-40213

I-402 12

F3200

F2020MA5145A5145A5145

D

RESOURCE/

COMPUTERS

M1810

F0275

F0275

F0275

F0795M

U0002

F0795M

U0002

F0275F0275

F0275

M1801

M1801

F0865

F0865

M1801

M1801

F0865

F0865

M1801 M1801

F0865F0865

F2020M

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:5

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-423

ENLARGED EQUIPMENT PLANS

12 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

Scale: 1/2" = 1'-0"

COMMUNITY ROOM - 52

Scale: 1/2" = 1'-0"

RESOURCE/ COMPUTERS - 51 N

O R

T H

0 4 8 16N O

R T H

0 4 8 16

C

GROUP ROOM 1

A5077

E0945 F3200

F2000

U0007

U0007

U0003A

U0003A

U0003A

U0003A

U0003A

U0003A

U0003A

U0003A

U0003A

U0003A

U0003A

U0003A

U0003A U0003A

I-402

I-402

F2105

1 1.71

F2000 A1015M1801

F0275 F0275 F0275 F0275

F0275F0275F0275F0275

A1015 M1801 F2000 A1015 A1015 F2000F0865

M1801

M1801

F0865

F0865

F2000A1015A1015F2000 M1801 F0865F2000M1801 A1015F0865A1015M1801F2000

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: ARCHITECT/ENGINEER OF RECORD

Date Checked Drawn

FULLY SPRINKLERED

U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

ACG Project Number

/2

/2

:0

:5

A

M C

U s e rs

\e d ig g s \D o c u m e n ts

\I

-0

-B C

L C

V A

-B L

D G

F F

E e d ig g s D

X N

.r v t

I-424

ENLARGED EQUIPMENT PLANS

13 20EMD

REPLACE BUILDING 121

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BOULEVARD

HOUSTON, TX 77030 JANUARY 24, 2025

100% CONSTRUCTION DOCUMENTS

580-324

EMD

22-021

Scale: 1/2" = 1'-0"

TYPICAL GROUP ROOM - 40

Scale: 1/2" = 1'-0"

TYPICAL POD N

O R

T H

0 4 8 16N O

R T H

0 4 8 16

B.11

I-4311C

1D

1A

1B

TLT

A5109 A5200 A5090

A5082

F2010

A1067

A5075

A5145

U0001

C

B.10

I-431

A5109

A5090

A5200

A5075A1067A5082 F2010

A5145 A4995

2C

2A

2D 2B

U0001

A1067 A5075A5082A5109

A

B.11

" 5

A5145

A

U0001

A5109

A5200

A5090

B.11

A5075

A1067

A5082

F2010

A5200 A5090

A5145

I-4313C

3D

3A

3B

STAFF TLT

A5109U0001

A5090 A5200

A1067A5075 A5082

F2010

A51…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .