Attachment 9 Bldg 23 - CLIN 0005 Opt 4.pdf

PDF 378 KB Posted

Attached to
Multiple Roof Repairs and/or Replacements at FLETC in Charleston, SC
Solicitation number
70LCHS26QPFB00034
Issued by

About this file

This is a Statement of Work (SOW) for roof repair and replacement services at Building 23 (B23), designated as CLIN 0005 under a federal contract with an undetermined contract number and task order number, dated 07 August 2026.

The contractor shall provide complete roof replacement services including demolition of the existing modified bitumen roof system, replacement with a new cold-applied modified bitumen roofing system, and related work to deliver a watertight roof with a 20-year no-dollar-limit (NDL) manufacturer warranty. Key deliverables include: conducting limited lead-based paint and asbestos surveys on all disturbed materials; demolishing existing roof coating, flashings, sheet metal drip edges, and rotted lumber; replacing an estimated 10 percent of roof decking; reinstalling lightning protection systems by certified engineers; installing new roofing comprising two 2-inch poly iso insulation layers, one ½-inch cover board (DensDeck or equivalent), cant strips, base sheet, cap sheet, adhesive, fasteners, and metal flashings; replacing two access ladders and one access hatch; demolishing and re-flashing existing HVAC equipment; trimming overhanging trees; ensuring proper positive slope and drainage; replacing gutters and downspouts with commercial-grade 5-inch box style downspouts and 6-inch gutters with aluminum mesh guards; and replacing all rotten lumber with pressure-treated materials. All roofing products must be Soprema, GAF, or equivalent, and work must comply with referenced specifications (07 01 50.19, 07 22 00, 07 52 00, 07 60 00, 07 71 00, 07 84 00, 07 92 00) and manufacturer specifications.

Required submittals include progress/construction schedule, activity hazard analysis, product data sheets, environmental surveys, 35 percent design with industry-standard details, crane lift plan, fall protection plan, and closeout documents including warranties. The contractor is responsible for site restoration, damage repair, all measurements and calculations, and compliance with federal, state, and local regulations and safety requirements including lock-out/tag-out procedures, hot work permits, and EM 385 1-1 fall protection plans.

View the file

Other files

File Type Posted
Attachment 45 Amendment 70LCHS26QPFB00034 0004 SF30.pdf PDF
Attachment 2 Combined Synopsis Solicitation.pdf PDF
Attachment 41 B16 Infrared.mp4 MP4 file
Attachment 40 Building 286 Part B Infrared.MP4 MP4 file
Attachment 44 Amendment 70LCHS26QPFB00034 0003 SF30.pdf PDF
Attachment 2 Combined Synopsis Solicitation.pdf PDF
Attachment 39 Building 286 Infrared.MP4 MP4 file
Attachment 42 B1 Part A Infrared.mp4 MP4 file
Attachment 43 B1 Part B Infrared.mp4 MP4 file
Attachment 22 B61 Roof 1 Penetrations.pdf PDF
Attachment 25 B23 Roof Penetrations.pdf PDF
Attachment 30 B61 Core Pictures.pdf PDF
Attachment 33 B16 Basis of Design Job Sheet.pdf PDF
Attachment 23 B61 Roof 2 Penetrations.pdf PDF
Attachment 28 B23 Roof Drawings.pdf PDF
Attachment 32 B286 Basis of Design Job Sheet.pdf PDF
Attachment 36 Amendment 70LCHS26QPFB00034 0001 SF30.pdf PDF
Attachment 37 Amendment 70LCHSQPFB00034 0002 SF30.pdf PDF
Attachment 18 Building 23 Infrared.MP4 MP4 file
Attachment 20 Building 46 Infrared.MP4 MP4 file
Attachment 24 B61 Roof 3 Penetrations.pdf PDF
Attachment 34 B46 Upper Roof Basis of Design Job Sheet.pdf PDF
Attachment 38 CLIN Structure Pricing Submission.pdf PDF
Attachment 2 Combined Synopsis Solicitation.pdf PDF
Attachment 17 Master RFI Log.xlsx XLSX spreadsheet
Attachment 19 Building 26 Infrared.MP4 MP4 file
Attachment 21 B26 Roof Penetrations.pdf PDF
Attachment 26 B46 Demo Penetrations.pdf PDF
Attachment 27 B16 Demo Penetrations.pdf PDF
Attachment 29 B286 Roof Drawings.pdf PDF
Attachment 31 B1 Basis of Design Job Sheet.pdf PDF
Attachment 35 B61 CLIN 0001 Base SOW REVISION.pdf PDF
70LCHS26QPFB00034_0001.pdf PDF
Attachment 17 RFI Log.xlsx XLSX spreadsheet
Attachment 16 Site Visit Attendance Sign-in Sheet.pdf PDF
Attachment 15 Bldg 1 - CLIN 0006 Opt 5.pdf PDF
Attachment 6 Bldg 16 - CLIN 0002 Opt 1.pdf PDF
Attachment 8 Bldg 1792 - CLIN 0004 Opt 3.pdf PDF
Attachment 11 FLETC Form 121-00-02 Visitor Access Request.pdf PDF
Attachment 5 Bldg 26 - CLIN 0001 Base.pdf PDF
Attachment 7 Bldg 286 - CLIN 0003 Opt 2.pdf PDF
Attachment 10 Construction Wage Determination.pdf PDF
Attachment 12 Division 01 General Requirements.pdf PDF
Attachment 13 Division 07 Specifications.pdf PDF
Attachment 1 SF 1449 - 70LCHS26QPFB00034.pdf PDF
Attachment 2 Combined Synopsis Solicitation.pdf PDF
Attachment 4 Bldg 46 - CLIN 0001 Base.pdf PDF
Attachment 3 Bldg 61 - CLIN 0001 Base.pdf PDF
Attachment 14 CATEX Memorandum.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Contract - TBD– TO# TBD Repair Various Roofs – B23

07 Aug 2026

CLIN 0005

I. Purpose:

Provide all material and labor to demolish existing roof, as the modified bitumen roof that Is existing has come to the end of its serviceable life and is in need of replacement. Building 23 will be CLIN 005 on this solicited contract and will be awarded at the Government’s discretion or availability of funding.

II. Scope or Mission:

Under this RFP, the contractor shall supply all tools, qualified labor, materials, equipment, supplies and supervision necessary to demolish the existing roof coating, flashings, sheet metal drip edge, and rotted nominal lumber and replace with like in kind for a weather tight roof with a 20 year NDL (No Dollar Limit) warranty from the manufacturer. All work shall be accomplished in strict compliance with all applicable federal, state, and local regulations, as well as manufacturer specifications and the requirements contained within the supplied contract documents and specifications. All equipment and materials shall be submitted for Government approval prior to procurement and installation.

The contractor shall be responsible for restoring construction site to its original or better condition.

Any damage done by the contractor or subcontractor to any existing pier, vessel, pavement, buildings, fences, curbs, streets, driveways, sidewalks, landscaping, utilities, structures, and other improvements shall be the sole responsibility of the contractor to repair or replace at the discretion of the Contracting Officer

III. Period of Performance:

See SF1449 for overall project PoP

IV. Background:

The Government has identified the roof at B23 as being at the end of its serviceable life and is in need of replacement. The roof has severe blistering throughout and is leaking in many places due to the age of the existing modified bitumen roof system.

V. Performance Objectives:

a. Contractor shall conduct a limited lead based paint and asbestos survey on ALL construction materials that will be disturbed under this solicitation to ensure no ACM (Asbestos Containing

Repair Various Roofs – B23

07 Aug 2026

CLIN 0005

Material) or LBP (Lead Based Paint) are present. Submit Limited ACM and LBP environmental survey to the Government for review.

b. Demolish existing modified bitumen roofing system to include cap sheet, base sheet, all fasteners, all sheet metal flashings associated with roof work, all poly iso insulation layers and cover boards to expose the roof decking for inspection. Demolish BUR (Built Up Roof) system in its entirety.

Replace any roof decking that is rusted or in need of repair. Government estimates that 10% of roof decking will need to be replaced or repaired. Any excess shall be a credit to the Government

c. Being that B23 is a complete roofing system replacement, no infrared moisture survey is required by the Government

d. All lightning protection systems that are removed during construction shall be re-installed by a company with a certified lightning protection engineer that can certify the system and provide documentation that the system is functional after re-installation

e. Contractor shall install new roofing system per manufacturer’s specifications. Contractor is responsible for all measurements and calculations for proposal purposes.

f. Demolish any existing roof penetrations that can be demolished not to return. Repair deck with like in kind decking material and fasteners per manufacturer specifications. Work with Government PM/CO to figure out which penetrations can be demolished.

g. Contractor to submit site specific 35% design with details for B23, include industry standard design details (wind uplift calculations, cricket design if necessary, terminations, expansion joints, flashing details, roof system cross section, parapet detail, curb detail, etc)

h. Contractor shall replace two (2) access ladders and paint with 2 coats of enamel paint (Safety Yellow). Access ladders shall conform to current safety standards, Government requiring caged access ladders with landing platform anchored to existing structural member.

i. Contractor shall provide and install new access hatch that is like in kind to existing at each building where required on this solicitation

j. Contractor shall demolish all existing roof mounted HVAC equipment to the nearest below roof termination point and appropriately cap at nearest junction box, duct joint, or pipe joint. Existing structural steel supports to remain. Contractor shall re-flash with like in kind flashing material.

k. Contractor shall trim all trees overhanging any roof on this solicitation to an appropriate distance away from the roof surface or building. Consult with COR prior to trimming any trees or bushes.

l. Contractor shall provide and install new cold applied modified bitumen roofing system to comprise of 2 – 2 inch layers of poly iso insulation, 1 – ½ inch cover board (cover board to be DensDeck or equivalent), new cant strips, base sheet, cap sheet, adhesive, fasteners, and any applicable metal flashings (termination bar, coping, gravel stop, fascia, z flashing, drip edge, wall to roof flashing, Repair Various Roofs – B23

07 Aug 2026

CLIN 0005

etc) to deliver a watertight roofing system with 20 year NDL warranty. All products utilized in roofing system shall be per manufacturers specifications. All products utilized in roofing system shall be Soprema, GAF, or equivalent.

m. All existing wall to roof flashings that are to be re-used shall be re-sealed with the proper sealant per industry standards. Existing sealant shall be removed prior to applying new sealant. All roof penetrations that are to remain, shall be flashed and sealed per manufacturer specifications with new like in kind materials.

n. Contractor shall ensure proper positive slope and drainage on all roofs in this solicitation per industry standards. Poly iso insulation may have to be tapered or crickets installed in specific locations to achieve positive drainage

o. At B23, contractor shall demolish all existing gutters, downspouts, and associated material.

Contractor shall install commercial grade 5 inch box style downspouts, 6 inch gutters, all necessary hangers, clips, strapping, fasteners, sealants, and all other associated materials to deliver a water tight gutter system to the Government. Gutters at B23 shall have aluminum mesh gutter guards installed in an effort to keep leaves and other debris out of gutters Contractor shall clean gutters prior to completion of roof to remove all debris. Contractor shall provide and install new concrete splash blocks where applicable.

p. Contractor shall replace all rotten lumber with new like in kind pressure treated nominal lumber. To include all bracing, supports, cleats, nailers, coping, framing, etc.

q. Provide and install warranty placard as outlined in specifications, location TBD by COR

VI. Operating Constraints:

a. Reference specifications provided

i) 07 01 50.19 Preparation for Re-Roofing

ii) 07 22 00 Roof and Deck Insulation

iii) 07 52 00 SBS Mod Bit Membrane Roofing

iv) 07 60 00 Flashing and Sheet Metal

v) 07 71 00 Roof Specialties

vi) 07 84 00 Firestopping

vii) 07 92 00 Joint Sealants

Repair Various Roofs – B23

07 Aug 2026

CLIN 0005

VII. Attachments:

VIII. Submittals:

a. Progress/Construction Schedule

b. Activity Hazard Analysis

c. Product Data/SDS’s

d. Environmental Survey (Asbestos/LBP)

e. Flashing Material

f. Pressure Treated Lumber

g. Gutters and Downspouts

h. Roof System (insulation, base sheet, cap sheet, adhesive)

i. Fasteners with Plates

j. Sealants (to include firestopping)

k. Cant Strips

l. 35% Design

m. Crane Lift Plan

n. Fall Protection Plan

o. Manufacturer Material Cut Sheets & Instructions

p. Test Reports, Wind Uplift Calculations

q. Closeout Documents (Section XI/Warranty)

IX. Environmental:

a. Toxic Substances Control Act of 1976

X. Safety:

a. Lock-out/Tag-out required prior to performing any electrical work.

b. Hot work permit required if cutting, welding, grinding, etc.

c. Crane lift plan required where applicable

d. EM 385 1-1 Fall Protection Plan Required (site specific for each roof)

e. Submit Activity Hazard Analysis (AHA) for activities not covered in the Contractor’s Accident

Prevention Plan (APP).

XI. Closeout Documents:

a. Equipment specifications

b. Operation & maintenance manuals (O&Ms)

c. Spare parts material list

d. Warranties