Attachment 8 - ICRA Template Approved 2025.pdf

PDF 280 KB Posted

Attached to
648-20-117 Correct FCA HVAC Deficiencies Bldg 2 Laundry Warehouse
Solicitation number
36C26025R0015
Issued by

About this file

This is an Infection Control Risk Assessment (ICRA) Permit template that must be posted at project entrances for work not covered by blanket ICRAs. The template is designed for construction projects in healthcare facilities, specifically for a Veterans Health Administration HVAC infrastructure upgrade project in Building 2 Laundry/Warehouse.

The permit template includes four levels of infection prevention and control precautions (I-IV), with increasingly stringent control measures for each level. Key requirements include dust control, barrier construction, negative air pressure maintenance, debris containment, and worker PPE protocols. The specific project referenced has an Activity Category D, High Patient Risk Category, and requires Level IV precautions - the most stringent level requiring hard barriers, anterooms, strict worker PPE protocols, and comprehensive dust control measures. The template requires signatures from both the Project Manager and Infection Preventionist, and includes a note specifying no TB risk, referring to PCRA for additional dust control planning details.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA-ICRA-2023-1.0

Infection Control Risk Assessment (ICRA) Permit This page must be posted at the entrance to the project area for all work not covered by the blanket ICRA.

Project number:

Location Project manager Project start date Contact phone number Completion date Contractor Permit expiration date

Activity Category (A, B, C, or D)

Overall Patient Risk Category (Low, Medium, High, or Highest)

Level of Infection Prevention and Control Precautions (I, II, III, or IV)

Level of Precautions

Control measures to be in place for the duration of the activity.

(Check the box for the activity’s level of precautions to indicate the control measures)

Level I

1. Perform work activity in a manner that does not create dust.

2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.

3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.

Level II

All control measures in Level I and the following:

1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system). Excavation work control measures: Keep wet/cover.

2. Ensure worker clothing is clean and free of visible dust before leaving the work area.

3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.

4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system.

5. Seal doors to prevent dust migration.

6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.

7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.

8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.

Level III

All control measures in Levels I and II and the following:

1. Ensure availability of equipment for cleaning hands.

2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.

4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

5. Maintain .01 inches/water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outline in Appendix A of the VHA ICRA template. These control measures must be maintained continuously 24/7 for the duration of the project. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited. Indicate exhaust method: Exterior or Alternative Interior

6. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

Level IV

All control measures in Levels I, II and III and the following:

1. Barriers must be hard barriers unless temporary to install final barrier.

2. Containment must include an anteroom to ensure pressure control: anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE, and cleaning.

3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.

4. Workers must wear shoe covers or have a method to clean shoes in anteroom Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.

Additional requirements: No TB risk. Refer to PCRA for dust control plan and additional detail.

Project Manager signature Date

Infection Preventionist signature Date

Project number:
Location:
Project manager:
Contact phone number:
Contractor:
Start date:
Completion date:
Expiration date:
Activity category: [D]
Patient Risk Category: [High]
Level of precautions: [IV]
Level II: Off
Level I: Off
Level III: Off
Level IV: Off
Additional requirements:

File details come from the government source that posted it. Updated .