36C26025R0015 - 648-20-117.pdf
PDF 985 KB Posted
- Solicitation number
- 36C26025R0015
About this file
This is a Solicitation, Offer, and Award document (Standard Form 1442) and associated terms for a construction project to correct HVAC deficiencies in Building 2 Laundry/Warehouse at the Portland VA Medical Center - Vancouver Campus. The solicitation (36C26025R0015) is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) with an estimated value between $5-10 million.
The work includes general construction, alterations, electrical, mechanical, fire alarm, Direct Digital controls, commissioning, and removal of existing structures. Proposals are due by March 20, 2025 at 4:00 PM PST, with a performance period of 425 calendar days after notice to proceed. A site visit is scheduled for March 3, 2025 at 10:00 AM PST at Building 4. Questions are due by March 10, 2025 at 4:00 PM PST. The contractor must begin work within 10 days of receiving notice to proceed. A bid guarantee of 20% of the bid price or $3 million (whichever is less) is required, along with performance and payment bonds. The project will be administered by the NCO 20 Network Contracting Office in Vancouver, WA.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________
(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 84
36C26025R0015
X
TBD TBD
648-20-117
36C260
NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
Danyel Smith danyel.smith@va,gov
Project: 648-20-117 - Correct FCA HVAC Deficiencies Bldg 2 Laundry Warehouse CON Located at the Portland VA Medical Center - Vancouver Campus at 1601 E Fourth Plain Blvd. Vancouver, WA 98661
In the event of a discrepancy between this document and the specifications, this document takes precedence. Please see the attachments for the full scope of this project.
All questions must be submitted via email to danyel.smith@va.gov and colleen.nicholson@va.gov. All questions will be answered by amendment to the solicitation only. Questions asked elsewhere may render a party ineligible for award.
Information received by any other means has no bearing on this solicitation and does not alter the terms and conditions.
Proposals must be submitted to danyel.smith@va.gov only. Proposals not submitted directly to danyel.smith@va.gov are not considered submitted and will not be considered. Late proposals may not be considered. Incomplete proposals may be considered non-compliant with the solicitation and may not be considered for award.
This procurement is set aside for Small Business Administration Certified Service-Disabled Veteran Owned Small Businesses (SDVOSBs) only. Offers submitted by other than SDVOSBs for the NAICS code will not be considered.
IAW VAAR 836.204, the magnitude of this construction is between $5,000,000 and $10,000,000.
10 425
X X FAR 52.211-10
X 10
1 16:00 PST
03-20-2025
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C260
NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
Department of Veterans Affairs
FMS-VA-2(101)
Financial Services Center PO Box 149971 Austin TX 78714-9971
Colleen Nicholson Contracting Officer
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
PRICE SCHEDULE
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 SUPPLEMENTAL INSURANCE REQUIREMENTS
2.2 FAR 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)
2.3 FAR 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX
OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM
DESCRIPTIONS, FPMR PART 101-29 (SEP 2023)
2.4 FAR 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA
INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM
DESCRIPTIONS (JUN 1988)
2.5 FAR 52.211-4 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS NOT
LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND
COMMERCIAL ITEM DESCRIPTIONS (JUN 1988)
2.6 FAR 52.216-1 TYPE OF CONTRACT (APR 1984)
2.7 FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY
SITE OF THE WORK (MAY 2014)
2.8 FAR 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
2.9 FAR 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014) ALTERNATE I (MAY 2014)
2.10 FAR 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
ALTERNATE II (NOV 2023)
2.11 FAR 52.225-22 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL,
AND MANUFACTURED GOODS—BUY AMERICAN STATUTE—CONSTRUCTION
MATERIALS (JAN 2021)
2.12 FAR 52.225-24 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL,
AND MANUFACTURED GOODS—BUY AMERICAN STATUTE—CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS (JAN 2021)
2.13 FAR 52.228-1 BID GUARANTEE (SEP 1996)
2.14 FAR 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID
GUARANTEE) (FEB 2021)
2.15 FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.16 FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB
1995)
2.17 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
2.18 VAAR 852.223-70 INSTRUCTIONS TO OFFERORS—SUSTAINABLE
ACQUISITION PLAN (SEP 2019)
2.19 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
2.20 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY
ACCESSIBILITY NOTICE (FEB 2023)
2.21 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES
INCORPORATED BY REFERENCE (JAN 2008)
REPRESENTATIONS AND CERTIFICATIONS
3.1 FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)
3.2 FAR 52.204-24 REPRESENTATION REGARDING CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT
(NOV 2021)
3.3 FAR 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT
ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023)
3.4 FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT
2018)
3.5 FAR 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR
AGREEMENTS—CERTIFICATION (NOV 2021)
3.6 FAR 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS – NOTICE AND
REPRESENTATION (JUN 2020)
GENERAL CONDITIONS
4.1 FAR 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS
AND CERTIFICATIONS (DEC 2014)
4.2 FAR 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE,
SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB
COVERED ENTITIES (DEC 2023)
4.3 FAR 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT
ORDERS—PROHIBITION (DEC 2023)
4.4 FAR 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED
FOR DEBARMENT, OR VOLUNTARILY EXCLUDED (JAN 2025)
4.5 FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
4.6 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984) ALTERNATE I (APR 1984)
4.7 FAR 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REPRESENTATION
(JAN 2025)
4.8 FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
4.9 FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES
(JUN 2020)
4.10 FAR 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE
NATIONAL LABOR RELATIONS ACT (DEC 2010)
4.11 FAR 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2025)
4.12 FAR 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (NOV 2023)
4.13 FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (JAN 2025)
4.14 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.15 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
4.16 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)
4.17 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
4.18 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)
4.19 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)
(DEVIATION)
4.20 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)
(DEVIATION)
4.21 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
4.22 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
4.23 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (WITHOUT NAS–CPM) (NOV 2018) (ALTERNATE I)
4.24 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.25 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(APR 2019)
4.26 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.27 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
ALTERNATE I (APR 2019)
4.28 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT
ADMINISTRATION (OCT 2020)
4.29 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ...78
4.30 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT
(SEP 2019)
4.31 VAAR 852.246-71 REJECTED GOODS (OCT 2018)
4.32 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD
SERVICES (OCT 2018)
4.33 MANDATORY WRITTEN DISCLOSURES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
PRICE SCHEDULE
PRICE SCHEDULE SUMMARY
Bid Items
Description of Services Quantity
Unit Of
Issue
Price Summary
0001 ITEM I, GENERAL CONSTRUCTION: BASE BID
Work includes general construction, alterations, electrical, mechanical, fire alarm, Direct Digital controls, commissioning, necessary removal of existing structures and construction and certain other items per the plans and specifications.
JB
Total $
Period of Performance 425 Calendar Days
This does not constitute a billable deliverable. Final inspection, work acceptance by VA, and proper progress payments will be based on completion of the total project scope.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
INFORMATION REGARDING PROPOSAL MATERIALS
PROPOSAL INSTRUCTIONS
The following items are required to be submitted with the proposal for the proposal to be determined compliant. It is the responsibility of each offeror to ensure that its proposal reaches the designated point of submission in a timely manner. Proposals received that are not compliant may be removed from further substantive evaluation at the discretion of the Government.
For submission requirements designated as “shall” or “must,” failure to provide the requested information may be considered a deficiency. For submission requirements designated as “should,” failure to provide the requested information may result in a lower rating for the specified factor.
SUBMISSION PACKAGE CONTENTS
(a) Standard Form (SF) 1442 Solicitation, Offer, and Award:
The Offeror must complete and sign the “OFFER” section of the SF 1442. Please include your company’s Unique Entity Identifier associated with SAM.gov in block 14. Note:
Contractor’s signature shall be in accordance with FAR Part 4.102 (e.g., proper signature and format of person who is able to bind an individual, partnership, corporation, etc.).
(b) Acknowledgement of All Amendments:
The Offeror must acknowledge and sign the SF30(s), if any issued, and/or acknowledgement in Box 19 of the SF1442.
(c) Price Schedule 648-20-117:
Shall be fully completed in accordance with instructions to be determined compliant.
(d) Bid Guarantee:
The Offeror must furnish a bid guarantee (see FAR 52.228-1). The bid guarantee must be provided on Standard Form 24.
(e) Representations & Certifications:
As the provision at FAR 52.204-7 is included in the solicitation, FAR 52.204-8(d) applies and the fill-in for FAR 52.204-8(b)(2) does not need to be completed. The Offeror is required to complete the annual representations and certifications electronically at https://sam.gov/.
(f) Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment:
The Offeror must provide their response to FAR 52.204-24(d) Representation, unless the requirements in the first paragraph of this provision have been met.
(g) Information Regarding Responsibility Matters:
The Offeror must provide their response to FAR 52.209-7(b).
(h) Violation of Arms Control Treaties or Agreements:
The Offeror must provide their response to FAR 52.209-13(b) Certification.
(i) Post-Award Small Business Program Representation:
The Offeror must provide their response to FAR 52.219-28(h), if applicable.
(j) Tax on Certain Foreign Procurements—Notice and Representation:
The Offeror must provide their response to FAR 52.229-11(d).
(k) Notice to SB Joint Venture/Mentor Protegee:
Any Offeror submitting a proposal as a joint venture must provide a certification from each SB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture (1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402 and (2) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the Offeror’s proposal, may deem the proposal non-responsive.
(l) Past Performance Questionnaire:
Offers must complete and sign the Past Performance Questionnaire as required. The Past Performance Questionnaire can be found at Attachment 5 of the solicitation.
(m) Construction Questions for 648-20-117:
Offers must provide their responses to the Construction Questions that can be found on Attachment 6 of the solicitation.
(n) Price Breakout Rev:
Offers must complete and provide the Price Breakout Rev document that can be found on Attachment 7 of the solicitation.
(o) Limitations on Subcontracting:
The Offeror must complete and sign the VA Notice of Limitations on Subcontracting— Certificate of Compliance for Services and Construction required in VAAR 852.219-75 and return it with their submission. A copy of the clause to be completed and included with the proposal is attached as a separate document (Attachment 10 - Limitations on Subcontracting-Construction). The completed and signed form will become part of the official award documentation.
(p) Contractor Rules of Behavior:
Offers must complete the Contractor Rules of Behavior as required by VA Handbook
6500.6. Offers must initial and date each page and can be found at Attachment 11 of the solicitation.
EVALUATION FACTORS
1. GENERAL INFORMATION
The Government intends to award without discussions. In the event discussions with offerors are required, a competitive range may be established, and discussions conducted with all offerors in the competitive range.
2. BASIS FOR AWARD
The Government may reject any or all Proposals. Any informalities or minor irregularities in received proposals may be waived at the Government’s discretion.
The Government will evaluate offers in response to this solicitation in accordance with the Evaluation Factors below. The Government intends, if an award is made from this solicitation, to make award to the proposal that offers the overall best value to the Government and may award to other than lowest price offeror.
3. EVALUATION
Unless otherwise specified, the following definitions apply:
Recent - The project ended within the last five calendar years.
Relevant - A construction or alteration, of completed clinical, hospital, or other medical related space with a minimum contract value between $5,000,000 and $10,000,000.
Experience - Whether offerors have performed similar work before.
Performance - How well offerors perform/execute work contracted for.
3.1. Technical: Technical evaluates the quality of the offeror’s technical solution for meeting the Government’s requirement, and the risk associated with the technical approach.
3.1.1. Technical will consider each offeror’s demonstrated recent and relevant infection control, and technical record of performance. One technical assessment rating, and one risk assessment rating will be assigned for each offeror using Table 1 under 3.5, after evaluating the offeror’s recent infection control and technical, focusing on performance that is relevant to the requirement.
3.1.2. SUBFACTORS:
3.1.2.1. Infection Control: Provide an Infection Control plan that demonstrates compliance with the requirements outlined in specification 01 35 26 – Safety Requirements for safety and infection control requirement reference section (1.12 infection control). Moreover, see the attached ICRA permit, and explain how your organization will satisfy the permits based on based performance.
Provide a narrative describing infection control plan that your organization completed successfully for at least 2 contract projects and no more than 5 projects, with government agencies or private firms, where you recently (within the last 5 years) completed or substantially completed eighty percent (80%) of a construction renovation project, similar in scope and magnitude to this project.
3.1.2.2. Experience: Provide a narrative describing construction that serves patient care that your organization has completed successfully for at least 2 contract projects, and no more than 5 projects, with government agencies or private firms, where you recently (within the last 5 years) completed or substantially completed eighty percent (80%) of a construction renovation project, similar in scope and magnitude to this project.
Definition of Similar in Magnitude:
A project is similar in magnitude will have a final construction cost between $5,000,000 and $10,000,000.
Definition of Similar in Scope:
Similar scope includes building HVAC renovation.
Each narrative shall include the following information:
Project title and location.
Original contract award amount.
Original contract finish date.
Role of offeror on the project, including a clear designation of whether the Offeror was the prime contractor.
Project statistics including start and completion dates (original vs actual) and project cost (original vs actual). If original vs actual completion dates and project costs differ, please provide an explanation as to why they differ.
Problems encountered on identified contracts, if applicable, and the offeror’s corrective actions.
A reference (Point of Contract (POC) as well as one alternate POC: Name, job title, address, telephone number, and email address). The POC shall be familiar with the construction project but have no direct affiliation with the contractor (i.e. CO, Contracting Officer Representative of the project).
If the Offeror is a Joint Venture (JV) or a participant of Small Business Administration (SBA) Mentor-Protégé Program, recent relevant project experience should be submitted for projects completed by the Joint Venture entity or SBA Mentor-Protégé. If the JV or SBA Mentor-Protégé does not have shared experience, recent relevant projects should be submitted for each JV partner or for the Mentor and Protégé. Offerors who fail to submit experience for all JV partners or Mentor and Protégé may be not considered.
Offerors that have multiple recent and relevant prime contractor experience projects may be rated more favorably. Each contract project narrative shall be limited to two (2) pages (with no more than six (6) pages for all narratives), single spaced, Arial front size 11. The narrative shall describe the work performed, and successful completion in terms of cost control, quality of work, and compliance with the established schedule. Relevant Experience must be demonstrated as a Prime Contractor, and not as a subcontractor.
3.2. Past Performance: Past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. It considers each offerors demonstrated recent, and relevant record of performance in supplying products, and services that met the contract requirements. One performance confidence assessment rating is assigned for each offeror after evaluating the offeror's recent past performance, focusing on performance that is relevant to the contract requirements. (See FAR 15.305). There are two aspects to the past performance evaluation:
3.2.1. Past performance will consider each offeror’s demonstrated recent and relevant record of performance. One performance relevancy and one confidence assessment rating will be assigned for each offeror using Tables 2 and 3 under 3.6 after evaluating the offeror’s recent past performance, focusing on performance that is relevant to the requirement.
3.2.2. Offerors may submit up to five (5) past performance references on the provided past performance questionnaire of work as a prime contractor responsible for managing multiple subcontractors and coordinating with multiple stakeholders. In describing the effort, provide major or critical aspects of the requirement to demonstrate relevancy. The Past Performance Team will review this information to determine the quality and usefulness as it applies to the past performance questionnaire.
3.2.3. The Government will utilize one or any combination of the following methods to evaluate an Offeror’s past performance in addition to reviewing questionnaires submitted including:
Reporting data gathered from the Contractor Performance Assessment Reporting System (CPARS).
Reporting data gathered from the System for Award Management Exclusions in accordance with FAR 9.404.
3.2.4. For each project not able to be verified, the Government may query references provided on questionnaires or elsewhere in the offer to evaluate past performance.
3.2.5. If the Offeror has no past performance, it shall be stated in the proposal.
Offerors with no past performance will be rated as neutral.
3.3. Price:
3.3.1. Price will be evaluated on a basis of reasonableness only. Offerors are required to review their proposal to ensure their price is complete and accurate prior to submitting to the government. If there is an assumed mistake in its price, the company will be offered to: 1. Perform at the original price, or 2. Withdraw their proposal submission.
3.4. Factors and Subfactors Order of Importance:
Sub factor infection control is more important than sub factor Experience. Technical when compared to Past Performance is more important. All evaluation factors, other than price, when combined, are significantly more important than price.
3.5. Rating Methodology: The technical rating evaluates the quality of the offeror’s technical solution for meeting the Government’s requirement. The risk rating considers the risk associated with the technical approach in meeting the requirement.
Table 1. Technical Ratings
RATING DESCRIPTION
Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Marginal Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable
3.6. Rating Methodology: Past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. Table 2 considers each offerors demonstrated recent and relevant performance efforts applied to the same or similar scope and magnitude of effort for previous or present requirements. Table 3 outlines the confidence assessment rating that is assigned to each offeror after evaluating the offeror's recent or relevant past performance record in conjunction with performing the required effort (See FAR 15.305).
Table 2. Past Performance Relevancy Ratings
RATING DESCRIPTION
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Table 3. Performance Confidence Assessments
RATING DESCRIPTION
Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence
(Neutral)
No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
2.1 SUPPLEMENTAL INSURANCE REQUIREMENTS
In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:
(a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
(b) General Liability: $500,000.00 per occurrences.
(c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage.
(d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.
(End of Clause)
2.2 FAR 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)
(a) All actual and potential offerors are encouraged to provide feedback on the preaward and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https:// www.acquisition.gov/360.
(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government constructive feedback about the preaward and debriefing processes, as applicable, used for a specific acquisition.
(End of Clause)
2.3 FAR 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF
FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS,
FPMR PART 101-29 (SEP 2023)
(a) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101–29, and copies of Federal specifications, standards, and product descriptions can be downloaded from the ASSIST website at https://assist.dla.mil.
(b) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained from the ASSIST website identified in paragraph (a) of this provision.
(End of Provision)
2.4 FAR 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX
OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS
(JUN 1988)
The specifications cited in this solicitation may be obtained from: the organizations indicated in the attached specifications.
The request should identify the solicitation number and the specification requested by date, title, and number, as cited in the solicitation.
(End of Provision)
2.5 FAR 52.211-4 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS NOT LISTED
IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL
ITEM DESCRIPTIONS (JUN 1988)
The specifications cited in this solicitation are not available for distribution. However, they may be examined at the following location(s):
DEPARMENT OF VETERANS AFFAIRS
Office of Construction & Facilities Management Facilities Quality Service (00CFM1A) 425 Eye Street N.W, (sixth floor) Washington, DC 20001
Telephone Number: (202) 632-5249 or (202) 632-5178 Times(s) for Viewing: Between 9:00 AM - 3:00 PM
(End of Provision)
2.6 FAR 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.7 FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.8 FAR 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
4.6 % 6.9 % These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
Portland Medical Center - Vancouver Campus Vancouver, Washington
2.9 FAR 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014) ALTERNATE I (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.10 FAR 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE II (NOV 2023)
(a) Definitions. "Bahraini, Mexican, or Omani construction material," "commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, except foreign construction material from a designated country other than Bahrain, Mexico, or Oman that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material other than Bahraini, Mexican, or Omani construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material other than Bahraini, Mexican, or Omani construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.11 FAR 52.225-22 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL, AND
MANUFACTURED GOODS—BUY AMERICAN STATUTE—CONSTRUCTION MATERIALS
(JAN 2021)
(a) Definitions. "Construction material," "domestic construction material," "foreign construction material," "manufactured construction material," "steel," and "unmanufactured construction material," as used in this provision, are defined in the clause of this solicitation entitled "Required Use of Iron, Steel, and Manufactured Goods—Buy American Statute—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-21).
(b) Requests for determinations of inapplicability. An Offeror requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) or the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The Offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-21 in the request. If an Offeror has not requested a determination regarding the inapplicability of section 1605 of the Recovery Act or the Buy American statute before submitting its offer, or has not received a response to a previous request, the Offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies in accordance with FAR 25.604, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American statute by adding to the offered price of the contract—
(i) 25 percent of the offered price of the contract, if foreign manufactured construction material is incorporated in the offer based on an exception for unreasonable cost of comparable manufactured domestic construction material; and
(ii) 20 percent of the cost of foreign unmanufactured construction material included in the offer based on an exception for the unreasonable cost of comparable domestic unmanufactured construction material.
(2) If the solicitation specifies award on the basis of factors in addition to cost or price, the Contracting Officer will apply the evaluation factors as specified in paragraph (c)(1) of this provision and use the evaluated price in determining the offer that represents the best value to the Government.
(3) Unless paragraph (c)(2) of this provision applies, if two or more offers are equal in price, the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the Offeror on the basis of unreasonable cost of comparable domestic construction material.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(3) of the clause at FAR 52.225-21, the Offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the Offeror shall submit a separate Standard Form 1442 for the alternate offer and a separate cost comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-21 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-21 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the Offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
2.12 FAR 52.225-24 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL, AND
MANUFACTURED GOODS—BUY AMERICAN STATUTE—CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS (JAN 2021)
(a) Definitions. "Construction material," "domestic construction material," "foreign construction material," "manufactured construction material," "Recovery Act designated country construction material," "steel," and "unmanufactured construction material," as used in this provision, are defined in the clause of this solicitation entitled "Required Use of Iron, Steel, and Manufactured Goods—Buy American Statute—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-23).
(b) Requests for determination of inapplicability. An Offeror requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) or the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The Offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-23 in the request. If an Offeror has not requested a determination regarding the inapplicability of section 1605 of the Recovery Act or the Buy American statute before submitting its offer, or has not received a response to a previous request, the Offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies in accordance with FAR 25.604, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American statute by adding to the offered price of the contract—
(i) 25 percent of the offered price of the contract, if foreign manufactured construction material is included in the offer based on an exception for the unreasonable cost of comparable manufactured domestic construction material; and
(ii) 20 percent of the cost of foreign unmanufactured construction material included in the offer based on an exception for the unreasonable cost of comparable domestic unmanufactured construction material.
(2) If the solicitation specifies award on the basis of factors in addition to cost or price, the Contracting Officer will apply the evaluation factors as specified in paragraph (c)(1) of this provision and use the evaluated cost or price in determining the offer that represents the best value to the Government.
(3) Unless paragraph (c)(2) of this provision applies, if two or more offers are equal in price, the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the Offeror on the basis of unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, other than Recovery Act designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-23, the Offeror also may submit an alternate offer based…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .