Attachment 7 - Price Breakout Rev.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C26025R0015
About this file
This is a pricing template spreadsheet for contractors to break down costs for an HVAC infrastructure upgrade project at Building 2 Laundry/Warehouse at the Portland VA Medical Center's Vancouver Campus in Washington. The template includes line items across multiple construction divisions including General Requirements, Existing Conditions, Metals, Woods/Plastics/Composites, Thermal/Moisture Protection, Special Construction, HVAC, Electric, and Electronic Safety & Security.
The pricing breakdown requires contractors to itemize direct construction costs by division, plus insurance/bonds, taxes/fees, O&M manuals/red line drawings, overhead, subcontract markup, and profit. The template specifies that all pricing must be fixed price, and that field office overhead and general conditions costs should only be applied once. While the breakdown is for informational purposes and doesn't constitute separate billable deliverables, contractors are responsible for verifying formula accuracy and correctly transferring totals to the Price Summary.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| 648-20-117 |
Correct FCA HVAC Deficiencies Bldg 2 Laundry Warehouse CON Portland VA Medical Center - Vancouver Campus, Vancouver, Washington
| Rates | Base Item | |
| General Requirements & Facility Construction | Price | |
| Division Item 1 General Requirements (furnish and install) | N/A | $0.00 |
| Division Item 2 Existing Conditions (furnish and install) | N/A | $0.00 |
| Division Item 5 Metals (furnish and install) | N/A | $0.00 |
| Division Item 6 Woods, Plastic and Composites (furnish and install) | N/A | $0.00 |
| Division Item 7 Thermal and Moisture Protection (furnish and install) | N/A | $0.00 |
| Division Item 13 Special Construction (furnish and install) | N/A | $0.00 |
| Facility Services Subgroup | ||
| Division Item 23 Heating, Ventilating and A/C (furnish and install) | N/A | $0.00 |
| Division Item 26 Electric | N/A | $0.00 |
| Division Item 28 Electronic Safety & Security | N/A | $0.00 |
TOTAL DIVISIONS $0.00
| Insurance / Bonds | $0.00 |
| Taxes / Other Fees (provide itemized list) | $0.00 |
| O&M Manuals and Red Line Drawings | $0.00 |
| Overhead | $0.00 |
| SubContract Mark-Up | $0.00 |
| Profit | $0.00 |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
| CONTRACT TOTALS | $0.00 | |
| TOAL | $0.00 |