This file contains architectural and mechanical drawings for correcting HVAC deficiencies in Building 2 (Laundry/Warehouse) at the VA Portland Healthcare System's Vancouver campus. The drawings detail the demolition and new installation of HVAC equipment including air handling units (AHUs), exhaust fans, return fans, pumps, and associated electrical work.
The drawings show detailed plans for replacing multiple air handling units (AH-1 through AH-9), exhaust fans (EF-6, EF-7), return fans (RF-1 through RF-4), and chilled water pumps (CHP-1, CHP-2). The electrical drawings indicate new panel installations and power connections required for the equipment upgrades. The mechanical drawings include equipment schedules, system zone plans, airflow balancing diagrams, and detailed installation specifications for ductwork, piping, and controls. The work spans multiple areas including the laundry processing area, warehouse space, mechanical rooms, and roof level of Building 2. Specific technical requirements are provided for equipment sizing, locations, connections, and control integration.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
LOCATION ON CAMPUS
PRINCIPAL IN CHARGE: Blue Trident, LLC Emmanuel (Manny) Bautista, PE*, F.SAME (206) 972-0645 PROJECT MANAGER: Blue Trident, LLC Lauri Strauss, AIA, LEED AP BD&C (907) 317-5040 ARCHITECT: Blue Trident, LLC Lauri Strauss, AIA, LEED AP BD&C (907) 317-5040 STRUCTURAL ENGINEER: SCBC Engineering, PLLC Brian Moll, PE, SE (206) 351-2217 MECHANICAL ENGINEER: Notkin P2S, inc Peter Eberle, PE (425) 387-4179 ELECTRICAL ENGINEER: SAZAN Group Daniel Touger, PE (503) 416-2082 MECHANICAL SPECIALIST Blue trident, LLC Wade Botting (425) 408-1200 COST ESTIMATOR: OCMI Conor Clark (206) 395-9738
PROJECT TEAM
BUILDING FOOTPRINT
N
WAREHOUSELAUNDRY
1. COORDINATE WITH ALL PLANS FOR CLARIFICATIONS OF
DEMOLITION SCOPE PRIOR TO PROCEEDING.
2. FIELD VERIFY AREA OF WORK. NOTIFY RESIDENT
ENGINEER IMMEDIATELY OF ANY DISCREPANCIES
BETWEEN DEMOLITION PLAN AND FIELD CONDITIONS.
3. ALL DEMOLISHED ELECTRICAL DEVICES, HVAC
DEVICES, AND PLUMBING LINES NOT BEING REUSED TO BE
REMOVED AND TERMINATED AT THEIR SOURCE.
REFERENCE MECHANICAL (M) AND ELECTRICAL (E)
DRAWING SHEETS FOR INFO.
4. FIRE SPRINKLER SYSTEM AND LIFE SAFETY SYSTEM TO
REMAIN OPERATIONAL DURING CONSTRUCTION.
5. PROTECT ALL EXISTING CONSTRUCTION TO REMAIN.
PATCH AND REPAIR ALL DAMAGE DUE TO DEMOLITION
AND/OR NEW WORK. PREPARE SURFACES TO RECEIVE
NEW FINISHES IN ACCORDANCE WITH MANUFACTURE'S
RECOMMENDATIONS. ALL DAMAGE CAUSED BY THE
CONTRACTOR, WHETHER RELATED TO DEMOLITION OR
NEW CONSTRUCTION, SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE TO MATCH EXISTING ADJACENT
FINISH CONDITION. THIS INCLUDES AREAS OF THE
BUILDING RELATED TO THE PROJECT BUT NOT DIRECTLY
IN THE SCOPE OF WORK, SUCH AS LAY-DOWN AREAS,
STORAGE AREAS, AND AREAS WHERE MOVEMENT OF
EQUIPMENT AND MATERIALS TAKES PLACE.
1. THESE DRAWINGS ARE SUPPLIED TO THE CONTRACTOR AND
OTHERS FOR THEIR USE FOR THIS SPECIFIC PROJECT.
2. THE ORGANIZATION OF DOCUMENTS ARE NOT INTENDED TO
CONTROL THE DIVISION OF WORK. DIVISION OF WORK SHALL BE
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
3. DIMENSIONS ARE TO FACE OF FINISH AT EXISTING REMAINING
WALLS, FACE OF STUD AT NEW WALLS, OR CENTERLINE OF
COLUMNS, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL VERIFY DIMENSIONS, REQUIRED
CLEARANCES, AND POWER AND HVAC REQUIREMENTS FOR ALL
ITEMS. NOTIFY RESIDENT ENGINEER OF ANY DISCREPANCIES
PRIOR TO COMMENCEMENT OF WORK.
5. DO NOT SCALE DRAWINGS; VERIFY ALL DIMENSIONS PRIOR TO
CONSTRUCTION.
6. VERIFY ALL ROUGH IN DIMENSIONS FOR HVAC ITEMS AND
ELECTRICAL APPURTENANCES.
7. FIRE PROTECTION SYSTEM MUST REMAIN FULLY OPERATIONAL
DURING CONSTRUCTION.
8. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE
DONE TO SPRINKLER HEADS OR OTHER SYSTEM
APPURTANENCES DURING CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE FOR RELOCATION OF HEADS REQUIRED TO BE
MOVED FOR NEW CONSTRUCTION. A LICENSED FIRE PROTECTION
CONTRACTOR SHALL BE RETAINED FOR ALL WORK TO BE DONE
ON THE FIRE PROTECTION SYSTEM.
9. A RATED CONSTRUCTION BARRIER MUST BE PROVIDED
UNLESS THE AUTHORITY HAVING JURISDICTION (VISN SAFETY
ENGINEER) CONCURS THAT THE CONSTRUCTION WORK IS NO
MORE HAZARDOUS THAN NORMAL OPERATIONS. EXISTING WALLS
CREDITED AS PART OF A RATED CONSTRUCTION BARRIER MUST
BE CONFIRMED TO EXTEND TO THE DECK ABOVE WITH ALL
PENETRATIONS FIRESTOPPED. IF WALL UPGRADES ARE
REQUIRED TO ESTABLISH THE RATED CONSTRUCTION BARRIER,
IDENTIFY THIS WORK ON THIS DRAWING.
(ICRA BARRIER REQUIREMENTS ARE DETERMINED BY THE
MEDICAL CENTER’S INFECTION CONTROL PROCESS.)
THE RATED BARRIER REQUIREMENT CAN BE ELIMINATED IF THE
SPRINKLERS IN THE CONSTRUCTION AREAS REMAIN IN SERVICE,
BUT CEILING REMOVAL WOULD RENDER THEM INEFFECTIVE SUCH
THAT TEMPORARY UPRIGHT SPRINKLERS WOULD HAVE TO BE
INSTALLED IF CEILING REMOVAL LASTS MORE THAN A SHIFT.
10. MATERIALS SUSPECTED TO CONTAIN ASBESTOS SHALL BE
TESTED BEFORE DEMOLITION BY THE CONSTRUCITON
CONTRACTOR. CONTRACTOR TO INCLUDE THIS COST IN THEIR
BID AND PERFORM PER THE CONTRACT DOCUMENTS.
11. CONTRACTOR SHALL PATCH AND REPAIR ALL FINISHES
WHERE DEMOLITION AND/OR NEW WORK IS TAKING PLACE. THIS
INCLUDES WALL SUBSTRATES AND FINISHES, CEILING MATERIALS
AND FINISHES, AND FLOOR SUBSTRATES AND FINISHES. WHERE
NOT INDICATED OTHERWISE, REPAIR SHALL MATCH ADJACENT
SUBSTRATE, MATERIALS, TEXTURE, PATTERN, COLOR, AND
FINISH. WHERE PATCHED AREA FINISHES DO NOT MATCH
EXACTLY, THE ENTIRE AREA SHALL BE REPAIRED / REPLACED /
REFINISHED TO PROVIDE A UNIFORM FINISH.
PHASING PLAN:
BUILDING WILL REMAIN OCCUPIED WHILE THE VA PERFORMS
NORMAL BUSINESS OPERATIONS THOUGHOUT THE DURATION
OF THIS PROJECT. MOST SCOPE ITEMS WILL NOT REQUIRE
SPECIFIC PHASING AS THEY CAN BE DONE WITHOUT
INTERRUPTING THE OPERATION OF THE FACILITY.
CONTRACTOR IS RESPONSIBLE TO PERFORM ALL WORK SO THE
NORMAL BUSINESS OPERATIONS CAN OCCUR UNIMPEDED.
CONTRACTOR IS RESPONSIBLE TO PERFORM ALL WORK SO THE
FIRE AND LIFE SAFETY DEVICES REMAIN FUNTIONAL.
LAUNDRY:
AHU -3 WILL BE THE MOST COMPLICATED UNIT TO REPLACE AS
THE LAUNDRY OPERATIONS ARE DEPENDENT ON THAT UNIT.
THERE ARE SEVERAL WAYS TO REPLACE THAT UNIT. THE
DESIGNERS OF THIS PROJECT, IN COLLABORATION WITH THE
VA, HAVE PROPOSED THE FOLLOWING PHASING. THE GC MAY
PROPOSE OTHER PHASING OPTIONS FOR CONSIDERATION BY
THE VA.
REMOVE EXISTING UNIT AND INSTALL NEW UNIT IN SAME PLACE
(W/ TEMP AHU)
PROVIDE TEMPORARY AIR HANDLER LOCATED OUTSIDE IN
LOCATION DIRECTED BY THE VA.
CONNECT TEMP AHU TO EXISTING DUCTWORK. (THIS
SHOULD BE PLANNED TO BE DONE AFTER HOURS OF
OPERATION FOR MINIMAL DISRUPTION.)
REMOVE AND SALVAGE OTHER APPURTENANCES IN
FRONT OF THE EXTERIOR DOUBLE DOOR.
INSTALL NEW UNITS IN MECHANICAL ROOM.
REINSTALL SALVAGED PIECES.
REMOVE TEMPORARY AHU CONNECTIONS AND CONNECT
NEW UNIT. (THIS SHOULD BE PLANNED TO BE DONE AFTER
HOURS OF OPERATION FOR MINIMAL DISRUPTION.)
WAREHOUSE:
MOST SCOPE ITEMS WILL NOT REQUIRE SPECIFIC PHASING AS
THEY CAN BE DONE WITHOUT INTERRUPTING THE OPERATION
OF THE FACILITY.
THE CONTRACTOR WILL NEED TO WORK AROUND THE EXISTING
WAREHOUSE SHELVING LAYOUT AS SHELVES WILL BE FULL AND
WILL NOT BE RELOCATED FOR THIS PROJECT. PROVIDE
PROTECTION OF SHELVING AND STORED ITEMS FROM NEW
CONSTRUCTION AND DEMOLITION ACTIVITIES.
PROVIDE STRUCTURAL STRENGTHENING OF THE ROOF FRAMING
PRIOR TO PLACING THE NEW UNITS ON THE ROOF.
INSTALL ROOF TOP UNITS, DUCTWORK, AND NEW ELECTRICAL
PANEL.
INSTALL THE NEW AHU OVER REPROGRAPHICS ROOM. ENSURE
NEW SYSTEM IS OPERATIONAL PRIOR TO REMOVING THE
EXISTING UNIT FROM THE ROOF TO MINIMIZE DOWNTIME.
REMOVE AND REPLACE EXISTING AHU IN MEZZANINE.
DEMOLISH AND REMOVE EXISTING CEILING MOUNTED HEATING
UNITS.
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
Fully Sprinklered
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc ou ve r L au nd ry
H
VA
C \0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VN
C
VR
H
VA
C F
C A.
rv t
2/
/2
:4 6:
P
M
G101
COVER SHEET
BLUE TRIDENT, LLC
7829 NE Esperione LN Bainbridge Island, WA 98110
(206) 972-0645
CORRECT HVAC FCA DEFICIENCIES
Vancouver Campus, Building 2
648-20-117
02/15/2024
SB lms
CORRECT HVAC FCA DEFICIENCIES
DEPARTMENT OF VETERANS AFFAIRS
VA PORTLAND HEALTHCARE SYSTEM
PROJECT # 648-20-117
KEY PLAN
DRAWING INDEX
# SHEET NAME SHEET DESCRIPTION
GEBERAL
1 G101 COVER SHEET
ARCHITECTURAL
2 A100 OVERALL FLOOR PLAN
3 A110 LAUNDRY FLOOR PLAN
4 A111 WAREHOUSE FLOOR PLAN
5 A130 ROOF PLAN
6 A500 ROOF DETAILS
STRUCTURAL
7 S100 STRUCTURAL DETAILS
MECHANICAL
8 M001 MECHANICAL LEGEND AND DRAWING INDEX
MECHANICAL
9 MD110 LAUNDRY DEMOLITION PLAN
10 MD111 WAREHOUSE DEMOLITION PLAN
11 MD130 ROOF DEMOLITION PLAN
12 MD401 MECH RM ENLG DEMOLITION PLAN
13 MD402 WAREHOUSE OFFICES ENLG DEMO PLAN
MECHANICAL
14 M110 LAUNDRY MECHANICAL PLAN
15 M111 WAREHOUSE MECHANICAL PLAN
16 M130 ROOF MECHANICAL PLAN
17 M401 MECHANICAL RM ENLG PLAN
18 M402 WAREHOUSE OFFICES ENLG PLAN
19 M501 MECHANICAL DETAILS
20 M502 MECHANICAL DETAILS
21 M503 MECHANICAL DETAILS
22 M504 MECHANICAL DETAILS
23 M601 MECHANICAL SCHEDULES
24 M602 MECHANICAL SCHEDULES
25 M603 MECHANICAL SCHEDULES
26 M701 HVAC SYSTEM ZONE PLAN
27 M702 AIRFLOW BALANCE PLAN
28 M703 CHILLED WATER DIAGRAMS
29 M801 CONTROLS
30 M802 CONTROLS
31 M803 CONTROLS
32 M804 CONTROLS
ELECTRICAL
33 E000 ELECTRICAL GENERAL NOTES, ABB, AND INDEX
35 E001 ELECTRICAL SCHEDULES
34 E002 ELECTRICAL SCHEDULES
36 E100 LEVEL 1 - OVERALL ELECTRICAL
37 E110 LEVEL 1 - LAUNDRY - ELECTRICAL
38 E111 LEVEL 1 - WAREHOUSE - ELECTRICAL
39 E130 ROOF PLAN - ELECTRICAL
SCALE: 1/4" = 1'-0"
DEMOLITION NOTES
SCALE: 1/4" = 1'-0"
GENERAL NOTES
Revisions: Date:
SCALE
DOCK
LIFT
DOCK
LIFT
DOCK
LIFT
DOCK
LIFT SCALE
LOADING
AREA
W
AR
EH
O
U
SE
RECEIVING
AREA
Ramp
TELEPHONE
EQUIPMENT
BL
D
G
2-
B
PUMP CONTROL
PANEL
LS
SUMP PUMP
'P1'
BRINE
TANK
SOFTENER SOFTENER
LEVEL
SENSOR
Cart Wash Ctrl
BAGGING
MACHINE
BLANKET FOLDING
MACHINE
TUNNEL
FINISHER
36 x 60
TABLE
DESK
WASHER
BRAUN
ALPHA
FEEDER
BRAUN
DELTA
IRONER
BRAUN
OMEGA
FOLDER
FOLDERS FOLDERS FOLDERS
DRYER
DRYER
DRYER
RETURN
SYSTEM
CBW
CHEM
Steam Pit
F.D. F.D.
EMER.
SHOWER.
CURB
DNUP
DN
DN
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF 49
SF
SF
SF
SF
SF
SF
B-114 B-100
C1-2
B-106
C1-5 B-112
C1-4
B-111
B-114a
B-113
B-110
B-109
B-108
C1-6
C1-3
B-107 B-104
B-105
B-103 B-102 B-101
B-115
SORT/WASH AREA FINISH AREA
CORRIDOR
SUPERVISOR
CORRIDOR STAFF
CORRIDOR
MAINT. REPAIR
LIQUID SUPPLY & STORAGE
WATER REUSE
LUNCH ROOM
MEN
WOMEN
CORRIDOR
CORRIDOR
HAC
TELE/COM
MECHANICAL ROOM
STERILE PACK STORAGE MENDING
FINISH AREA
DOCK
LIFT
DOCK
LEV.
DOCK
LEV.
DOCK
LEV.
LO
U V E R
FIRE SPRINKLER
RISERS
D.F.
UP
DN
DN
SHIP
LADDER
sqft
13,951 sqft sqft sqft sqft sqft sqft sqft126 sqft sqft40 sqft sqft sqft sqft sqft sqft
S.F.
sqft 533 sqft sqft sqft sqft sqft sqft sqft sqft sqft sqft
A-100a
A-100b
A-100c
A-100d A-103
A-100
A-102
A-101
A-106
A-106a
A-104b
A-104c
A-105
A-104a
A-104
A-100d
C1-2
C-104
C-105
C-106
C-107
C1.10
C1.11
C1.12C-102
C-101
C-103
C-100
ENTRY
LOADING DOCK
REPROGRAPHICS
STORAGE
VAULT
OFFICE
FORMS STORAGE/OFFICE
GENERAL STORES
STORAGE
Admin Office
FACILITIES
WAREHOUSEWOMEN
MEN
LOUNGE
HAC
CONFERENCE
SUPERVISOR
LOGISTIC MGR
CORRIDOR
Storage, SPD
Preparation
Soiled Receiving
HAC
Corridor
Hall 2
Hall 1Lockers
Shower
Lockers
Shower
A A
B B
C C
D D
12' - 11" 44' - 0" 44' - 0" 44' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0" 40' - 0"
344' - 11"
3'
4"
WORK AREA WITHIN
CHANILINK FENCED
AREA OF
WAREHOUSE
BUILDING FOOTPRINT
N
WAREHOUSELAUNDRY
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
Fully Sprinklered
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc ou ve r L au nd ry
H
VA
C \0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VN
C
VR
H
VA
C F
C A.
rv t
2/
/2
:4 6:
P
M
A100
OVERALL FLOOR PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE, ISLAND, WA 98110
206-972-0645
CORRECT HVAC FCA DEFICIENCIES
Vancouver Campus, Building 2
648-20-117
02/15/2024
SB lms
SCALE: 3/32" = 1'-0"F1 1/16" OVERALL FLOOR PLAN
SCALE: 1" = 100'-0"
KEY PLAN
LIFT
DOCK
LIFT
DOCK
LIFT
DOCK
LIFT SCALE
A
B
C D
E
LOADING
AREA
W
AR
EH
O
U
SE
RECEIVING
AREA
Ramp
TELEPHONE
EQUIPMENT
BL
D
G
2-
B
PUMP CONTROL
PANEL
LS
SUMP PUMP
'P1'
BRINE
TANK
SOFTENER SOFTENER
LEVEL
SENSOR
Cart Wash Ctrl
BAGGING
MACHINE
BLANKET FOLDING
MACHINE
TUNNEL
FINISHER
36 x 60
TABLE
DESK
WASHER
BRAUN
ALPHA
FEEDER
BRAUN
DELTA
IRONER
BRAUN
OMEGA
FOLDER
FOLDERS FOLDERS FOLDERS
DRYER
DRYER
DRYER
RETURN
SYSTEM
CBW
CHEM
Steam Pit
F.D. F.D.
EMER.
SHOWER.
CURB
DNUP
DN
DN
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF 49
SF
SF
SF
SF
SF
SF
B-114 B-100
C1-2
B-106
C1-5 B-112
C1-4
B-111
B-114a
B-113
B-110
B-109
B-108
C1-6
C1-3
B-107 B-104
B-105
B-103 B-102 B-101
B-115
SORT/WASH AREA FINISH AREA
CORRIDOR
SUPERVISOR
CORRIDOR STAFF
CORRIDOR
MAINT. REPAIR
LIQUID SUPPLY & STORAGE
WATER REUSE
LUNCH ROOM
MEN
WOMEN
CORRIDOR
CORRIDOR
HAC
TELE/COM
MECHANICAL ROOM
STERILE PACK STORAGE MENDING
FINISH AREA
DOCK
LIFT
DOCK
LEV.
DOCK
LEV.
DOCK
LEV.
F
G H I J
K L
2.1
LO
U V E R
FIRE SPRINKLER
RISERS
D.F.
UP
DN
DN
SHIP
LADDER
sqft
13,951 sqft sqft sqft sqft sqft sqft sqft126 sqft sqft40 sqft sqft sqft sqft sqft sqft
S.F.
sqft 533 sqft sqft sqft sqft sqft sqft sqft sqft sqft sqft
A-100a
A-100b
A-100c
A-100d A-103
A-100
A-102
A-101
A-106
A-106a
A-104b
A-104c
A-105
A-104a
A-104
A-100d
C1-2
C-104 C-105
C-106
C-107
C1.10
C1.11
C1.12C-102
C-101
C-103
C-100
ENTRY
LOADING DOCK
REPROGRAPHICS
STORAGE
VAULT
OFFICE
FORMS STORAGE/OFFICE
GENERAL STORES
STORAGE
Admin Office
FACILITIES
WAREHOUSEWOMEN
MEN
LOUNGE
HAC
CONFERENCE
SUPERVISOR
LOGISTIC MGR
CORRIDOR
Storage, SPD
Preparation
Soiled Receiving
HAC
Corridor
Hall 2
Hall 1Lockers
Shower
Lockers
Shower
BUILDING FOOTPRINT
N
WAREHOUSELAUNDRY
A
B
C
D
0 1 2 3 4
PATCH HOLES, CLEAN
WALLS AND TOUCH UP
PAINT ONCE AHU's
HAVE BEEN
REMOVED - PRIOR TO
INSTALLING NEW UNIT
3'
4"
12' - 11" 44' - 0" 44' - 0" 44' - 0"
132' - 0"
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
Fully Sprinklered
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc ou ve r L au nd ry
H
VA
C \0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VN
C
VR
H
VA
C F
C A.
rv t
2/
/2
:4 6:
P
M
A110
LAUNDRY FLOOR PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE, ISLAND, WA 98110
206-972-0645
CORRECT HVAC FCA DEFICIENCIES
Vancouver Campus, Building 2
648-20-117
02/15/2024
SB LMS
N
SCALE: 1" = 100'-0"
KEY PLAN
SCALE: 1/8" = 1'-0"F1 LAUNDRY FLOOR PLAN
LIFT
DOCK
LIFT
DOCK
LIFT
DOCK
LIFT SCALE
A
B
C D
E
LOADING
AREA
W
AR
EH
O
U
SE
RECEIVING
AREA
Ramp
TELEPHONE
EQUIPMENT
BL
D
G
2-
B
PUMP CONTROL
PANEL
LS
SUMP PUMP
'P1'
BRINE
TANK
SOFTENER SOFTENER
LEVEL
SENSOR
Cart Wash Ctrl
BAGGING
MACHINE
BLANKET FOLDING
MACHINE
TUNNEL
FINISHER
36 x 60
TABLE
DESK
WASHER
BRAUN
ALPHA
FEEDER
BRAUN
DELTA
IRONER
BRAUN
OMEGA
FOLDER
FOLDERS FOLDERS FOLDERS
DRYER
DRYER
DRYER
RETURN
SYSTEM
CBW
CHEM
Steam Pit
F.D. F.D.
EMER.
SHOWER.
CURB
DNUP
DN
DN
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF 49
SF
SF
SF
SF
SF
SF
B-114 B-100
C1-2
B-106
C1-5 B-112
C1-4
B-111
B-114a
B-113
B-110
B-109
B-108
C1-6
C1-3
B-107 B-104
B-105
B-103 B-102 B-101
B-115
SORT/WASH AREA FINISH AREA
CORRIDOR
SUPERVISOR
CORRIDOR STAFF
CORRIDOR
MAINT. REPAIR
LIQUID SUPPLY & STORAGE
WATER REUSE
LUNCH ROOM
MEN
WOMEN
CORRIDOR
CORRIDOR
HAC
TELE/COM
MECHANICAL ROOM
STERILE PACK STORAGE MENDING
FINISH AREA
F
G H I J
K L
2.1
D.F.
UP
DN
DN
SHIP
LADDER
sqft sqft sqft sqft sqft sqft sqft40 sqft sqft sqft sqft sqft sqft
S.F.
sqft 533 sqft sqft sqft sqft sqft sqft sqft sqft sqft sqft
A-100a
A-100b
A-100c
A-100d A-103
A-106
A-106a
A-104b
A-104c
A-105
A-104a
A-104
A-100d
C1-2
C-104 C-105
C-106
C-107
C1.10
C1.11
C1.12C-102
C-101
C-103
C-100
ENTRY
REPROGRAPHICS
STORAGE
VAULT
OFFICE
FORMS STORAGE/OFFICE
FACILITIES
WAREHOUSEWOMEN
MEN
LOUNGE
HAC
CONFERENCE
SUPERVISOR
LOGISTIC MGR
CORRIDOR
Storage, SPD
Preparation
Soiled Receiving
HAC
Corridor
Hall 2
Hall 1Lockers
Shower
Lockers
Shower
BUILDING FOOTPRINT
N
WAREHOUSELAUNDRY
A
B
C
D
5 6 7 8 9
40' - 0" 40' - 0" 40' - 0" 40' - 0"
160' - 0"
3'
4"
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
Fully Sprinklered
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc ou ve r L au nd ry
H
VA
C \0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VN
C
VR
H
VA
C F
C A.
rv t
2/
/2
:4 6:
P
M
A111
WAREHOUSE FLOOR PLAN
BLUE TRIDENT, LLC
7829 ne ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
(206) 972-0645
CORRECT HVAC FCA DEFICIENCIES
Vancouver Campus, Building 2
648-20-117
02/15/2024
Checker Author
SCALE: 1" = 100'-0"
KEY PLAN
SCALE: 1/8" = 1'-0"F3 WAREHOUSE FLOOR PLAN
GL
PARTIAL PLAN
AHU SEE MECH
MAX WEIGHT = 5466 LBS
PLAN NOTES:
1.AHU SHALL BE CENTERED
OVER EXISTING COL AS
INDICATED, WITH THE LONG
DIMENSION RUNNING
NORTH-SOUTH.
2. AHU MAY MOVE 12"
MAX IN THE EAST-WEST
(TRANSVERSE) DIRECTION
ONLY
8'
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#22X6 DF#22X6 DF#2 2X6 DF#2
TYP
TYP
EQ EQ
2'-9"
2'-9"
(E) 8 3/4" X 36" GLB(E) 8 3/4" X 36" GLB
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E) 8∅ STD PIPE COL
GL
GL
PARTIAL PLAN
AHU SEE MECH
MAX WEIGHT = 5466 LBS
PLAN NOTES:
1.AHU SHALL BE CENTERED
OVER EXISTING COL AS
INDICATED, WITH THE LONG
DIMENSION RUNNING
NORTH-SOUTH.
2. AHU MAY MOVE 12"
MAX IN THE EAST-WEST
(TRANSVERSE) DIRECTION
ONLY
8'
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
TYP
TYP
EQ EQ
2'-9"
2'-9"
(E) 8 3/4" X 36" GLB(E) 8 3/4" X 36" GLB
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E) 8∅ STD PIPE COL
GL
GL
PARTIAL PLAN
AHU SEE MECH
MAX WEIGHT = 5466 LBS
PLAN NOTES:
1.AHU SHALL BE CENTERED
OVER EXISTING COL AS
INDICATED, WITH THE LONG
DIMENSION RUNNING
NORTH-SOUTH.
2. AHU MAY MOVE 12"
MAX IN THE EAST-WEST
(TRANSVERSE) DIRECTION
ONLY
8'
2X6 DF#22X6 DF#22X6 DF#2 2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
TYP
TYP
EQ EQ
2'-9"
2'-9"
(E) 8 3/4" X 36" GLB(E) 8 3/4" X 36" GLB
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E) 8∅ STD PIPE COL
GL
GL
PARTIAL PLAN
AHU SEE MECH
MAX WEIGHT = 5466 LBS
PLAN NOTES:
1.AHU SHALL BE CENTERED
OVER EXISTING COL AS
INDICATED, WITH THE LONG
DIMENSION RUNNING
NORTH-SOUTH.
2. AHU MAY MOVE 12"
MAX IN THE EAST-WEST
(TRANSVERSE) DIRECTION
ONLY
8'
2X6 DF#22X6 DF#22X6 DF#2 2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
TYP
TYP
EQ EQ
2'-9"
2'-9"
(E) 8 3/4" X 36" GLB(E) 8 3/4" X 36" GLB
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E) 8∅ STD PIPE COL
BUILDING FOOTPRINT
N
WAREHOUSELAUNDRY
A
B
C
D
0 1 2 3 4 5 6 7 8 9
REMOVE EXISTING ROOFTOP UNIT -
REMOVE SUPPORTING CURBS UNDER
THIS UNIT - REPLACE WITH NEW CURBS
PER DETAIL F1(C6) - REMOVE ALL PIPING
AND WIRING AND CAP OFF HOOD
PATCH HOLES IN ROOF WHERE DUCTS
AND AHU UNIT ARE REMOVE AND
RELOCATED - REMOVE ALL PIPING AND
WIRING AND CAP OFF HOOD
B7
A130
CUT NEW HOLE(s) IN ROOF DECKING
(BETWEEN JOISTS AND BEAMS) FOR
DUCT FROM NEW AHU. TYPICAL
F1
A500
C6
TYP.
PROVIDE NEW SUPPORT
CURBS FOR NEW AHU's
REF S100 FOR
STRUCTURAL
UPGRADES
CUT NEW HOLE(s) IN ROOF DECKING
(BETWEEN JOISTS AND BEAMS) FOR
DUCT FROM RELOCATED AHU.
TYPICAL - PROVIDE PIPING HOOD
SIMILAR TO EXISTING FOR NEW
WIRING AND PIPES
CURBS TO REMAIN -
REMOVE PIPING AND
WIRING AND CAP OFF
PIPING HOOD
C9
A500
C9
A500
C9
A500
F1
A500
EXISTING EQPT PLATFORM TO
REMAIN - PATCH WITH NEW SHEET
OF ROOFING FULL WIDTH AND
HEIGHT OF PLATFORM
EXISTING ROOF
CURBS AND
OPENINGS TO
REMAIN AND BE
REUSED FOR NEW
EXHAUST FANS -
PATCH AND REPAIR
WITH NEW ROOFING
AND FLASHING
CUT NEW HOLE(s) IN ROOF DECKING
(BETWEEN JOISTS AND BEAMS) FOR
DUCT FROM RELOCATED AHU.
TYPICAL - PROVIDE PIPING HOOD
SIMILAR TO EXISTING FOR NEW
WIRING AND PIPES
ADD 2X BLOCKING IN EXISTING OPENING
AT MAX. 16" O.C. AS REQUIRED
EXISTING WOOD FRAMED ROOF
STRUCTURE AND DECKING TO REMAIN
INFILL OPENING WITH EXT GRADE PLYWOOD ROOF
DECKING and POLYISO ROOF INSULATION (MATCH
EXISTING THICKNESS) PER MANUF DETAILS
PATCH OPENING WITH TPO MEMBRANE TO
MATCH EXISTING PER MANUFACTURER'S
RECOMMENDATIONS - MIN 6" OVERLAP ALL
AROUND - SEAM WELD TO EXISTING MEMBRANE
EXISTING AHU AND DUCT TO BE REMOVED
6"
6"
REMOVE EXISTING CURBS ONLY IF THEY ARE
CONT. AND WILL PREVENT FLOW TO ROOF DRAINS
2"
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
Fully Sprinklered
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc ou ve r L au nd ry
H
VA
C \0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VN
C
VR
H
VA
C F
C A.
rv t
2/
/2
:4 6:
P
M
A130
ROOF PLAN
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
(206) 972-0645
CORRECT HVAC FCA DEFICIENCIES
Vancouver Campus, Building 2
648-20-117
02/15/2024
SB lms
N
SCALE: 1" = 100'-0"
KEY PLAN
SCALE: 3/32" = 1'-0"F1 ROOF PLAN
SCALE: 1 1/2" = 1'-0"B7 ROOF PATCH DETAIL
NOTE - INFORMATION IN THIS
DETAILS IS FROM ORIGINAL
DESIGN DOCS - EXACT ROOF
CONIGURATION COULD VARY
SLIGHTLY
EXISTING ROOFING
INSULATION
EXISTING MEMBRANE
FULLY ADHERED W/
BONDING ADHESIVE
EXISTING WOOD
DECK TO REMAIN
NEW ROFING
MEMBRANE WHERE
OCCURS
SEAM TAPE
EXISTING COVER BOARD
OVERLAP MIN.
0' - 6"
ROOF ASSEMBLY AS INDICATED.
STAINLESS STEEL CLAMPING STRAP
PROTECTIVE STRIP OF PVC ROOFING
LAP SEALANT TYP.
DUCT AS INDICATED - REMOVE ALL
LEAD AND OTHER FLASHING BEFORE
INSTALLING FIELD FABRICATED
FLASHING
ROOFING MEMBRANE
SEAL FLASHING TO ROOFING
MEMBRANE PER MANUFACTURER'S
RECOMMENDATION
EXISTING WOOD DECK
AND DECK PENETRATION
(2) LAYERS PRESSURE-SENSITIVE
ELASTOFORM FLASHING IN
CONJUNCTION W/ PVC PRIMER
BY
W
AR
RA
NT
Y
PR
OV
ID
ER
8" O R
AS
A
PP
RO
VE
D
F2 - RECT. PENETRATION EXG UNIT F4 - RECT. PENETRATION NEW UNIT F6 - HEAT STACK PENETRATION
C6 - UNIT SUPPORT CURBC4 - INSULATED PIPE PENETRATIONC2 - ROUND PIPE PENETRATION
Cont. blocking as required
8" M
IN
ROOF ASSEMBLY AS INDICATED.
REMOVE ALL PIPING AND WIRING
FROM PENETRATION PER
MECHANICAL DETAILS
ROOFING MEMBRANE TO
REMAIN
EXISTING GALV STEEL COVER W/
INTERNAL BAFFLE - REMOVE RUST
AND PAINT ALL EXPOSED METAL
WITH RUST INHIBITOR PAINT
FILL GAP BEHIND
BAFFEL WITH HIGH
EXPANSION CLOSED
CELL FOAM INSULATION
EXISTING CURB
TO REMAIN
REMOVE ALL PIPING AND WIRING
FROM PENETRATION PER
MECHANICAL DETAILS
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
Fully Sprinklered
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc ou ve r L au nd ry
H
VA
C \0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VN
C
VR
H
VA
C F
C A.
rv t
2/
/2
:4 6:
P
M
A500
ROOF DETAILS
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
(206) 972-0645
CORRECT HVAC FCA DEFICIENCIES
Vancouver Campus, Building 2
648-20-117
02/15/2024
Checker Author
SCALE: 6" = 1'-0"F9 ROOF ASSEMBLY
SCALE: 1 1/2" = 1'-0"E9 SQUARE DUCT PENETRATION AT ROOF
SCALE: 12" = 1'-0"F1 DUROLAST TYPICAL DETAILS
SCALE: 1 1/2" = 1'-0"C9 PIPING HOOD
PARTIAL PLAN
AHU SEE MECH
MAX WEIGHT = 5466 LBS
PLAN NOTES:
1.AHU SHALL BE CENTERED
OVER EXISTING COL AS
INDICATED, WITH THE LONG
DIMENSION RUNNING
NORTH-SOUTH.
2. AHU MAY MOVE 12"
MAX IN THE EAST-WEST
(TRANSVERSE) DIRECTION
ONLY
8'
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
TYP
TYP
EQ EQ
2'-9"
2'-9"
(E) 8 3/4" X 36" GLB(E) 8 3/4" X 36" GLB
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E) 8∅ STD PIPE COL
GL
GL
PARTIAL PLAN
AHU SEE MECH
MAX WEIGHT = 5466 LBS
PLAN NOTES:
1.AHU SHALL BE CENTERED
OVER EXISTING COL AS
INDICATED, WITH THE LONG
DIMENSION RUNNING
NORTH-SOUTH.
2. AHU MAY MOVE 12"
MAX IN THE EAST-WEST
(TRANSVERSE) DIRECTION
ONLY
8'
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
TYP
TYP
EQ EQ
2'-9"
2'-9"
(E) 8 3/4" X 36" GLB(E) 8 3/4" X 36" GLB
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E) 8∅ STD PIPE COL
GL
GL
PARTIAL PLAN
AHU SEE MECH
MAX WEIGHT = 5466 LBS
PLAN NOTES:
1.AHU SHALL BE CENTERED
OVER EXISTING COL AS
INDICATED, WITH THE LONG
DIMENSION RUNNING
NORTH-SOUTH.
2. AHU MAY MOVE 12"
MAX IN THE EAST-WEST
(TRANSVERSE) DIRECTION
ONLY
8'
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
TYP
TYP
EQ EQ
2'-9"
2'-9"
(E) 8 3/4" X 36" GLB(E) 8 3/4" X 36" GLB
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E) 8∅ STD PIPE COL
GL
GL
PARTIAL PLAN
AHU SEE MECH
MAX WEIGHT = 5466 LBS
PLAN NOTES:
1.AHU SHALL BE CENTERED
OVER EXISTING COL AS
INDICATED, WITH THE LONG
DIMENSION RUNNING
NORTH-SOUTH.
2. AHU MAY MOVE 12"
MAX IN THE EAST-WEST
(TRANSVERSE) DIRECTION
ONLY
8'
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
TYP
TYP
EQ EQ
2'-9"
2'-9"
(E) 8 3/4" X 36" GLB(E) 8 3/4" X 36" GLB
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E) 8∅ STD PIPE COL
GL
GL
PARTIAL PLAN
AHU SEE MECH
MAX WEIGHT = 5466 LBS
PLAN NOTES:
1.AHU SHALL BE CENTERED
OVER EXISTING COL AS
INDICATED, WITH THE LONG
DIMENSION RUNNING
NORTH-SOUTH.
2. AHU MAY MOVE 12"
MAX IN THE EAST-WEST
(TRANSVERSE) DIRECTION
ONLY
8'
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
2X6 DF#2
TYP
TYP
EQ EQ
2'-9"
2'-9"
(E) 8 3/4" X 36" GLB(E) 8 3/4" X 36" GLB
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E) 2X6 SUBPURLIN
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E ) 5
/8
" X
GL
B (E
) 5
/8 " X
GL
B
(E) 8∅ STD PIPE COL
(E)2X6 SUBPURLIN 2X6 DF#2 SISTERED
TO EXIST 2X
(E)5 1/8"X
GLULAM
BEYOND
SIMPSON SDWS22300DB
WD SCREW @16"OC ALT T&B
CONSTRUCTION ADHESIVE
FOR LUMBER & PLYWD
CONT AT TOP OF 2X
2X6 DF#2 SISTERED
TO EXIST 2X
SIMPSON SDWS22300DB
WD SCREW @16"OC ALT T&B
(E)5 1_
" X GLULAM
SIMPSON A23
CLIP EA END
2"
3"
ES
I
TA
ROF
P
BR
S
LLOF WASH
ER
ES I ONAL NG
I N
E
I
TE
28283
NGTON
ME
AN
. O
AL
S
TRUCTUR ENG
I N
EE
R
F1 S100
C1 S100
A
B
C
D
5 6 7 8 9
S100
C5 TYP
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
Fully Sprinklered
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc ou ve r L au nd ry
H
VA
C \0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VN
C
VR
H
VA
C F
C A.
rv t
2/
/2
:4 6:
P
M
S100
STRUCTURAL DETAILS
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
(206) 972-0645
CORRECT HVAC FCA DEFICIENCIES
Vancouver Campus, Building 2
648-20-117
02/15/2024
BEM LMS
SCALE: 1/2" = 1'-0"C5 STRUCTURAL STRENGTHENING AT HVAC UNIT
SCALE: 3/32" = 1'-0"F5 WAREHOUSE ROOF FRAMING PLAN - PARTIAL
SCALE: 3" = 1'-0"F1 SUBPURLIN SECTION
SCALE: 3" = 1'-0"C1 GLULAM SECTION
A. THE EXISTING CONDITIONS SHOWN WERE TAKEN FROM AVAILABLE RECORD INFORMATION. FIELD VERIFY ALL CONDITIONS THAT MAY AFFECT CONSTRUCTION. IF ANY DISCREPANCIES ARE DISCOVERED, NOTIFY THE
ENGINEER IN WRITING AND REQUEST DIRECTION PRIOR TO COMMENCING WORK.
B. EXISTING LIGHT FIXTURES SHALL BE CAREFULLY REMOVED (DO NOT DAMAGE) AND RETURNED TO THE OWNER.
C. ANY AND ALL EQUIPMENT HAVING ELECTRICAL CONNECTIONS THAT REQUIRE DISCONNECTING AND/OR RE- CONNECTING AS A RESULT OF CONSTRUCTION SHALL BE INCLUDED AS A PART OF THIS CONTRACT.
D. THE EXISTING ELECTRICAL DEVICES, CONDUIT, AND/OR EQUIPMENT THAT FOR ANY REASON OBSTRUCTS CONSTRUCTION SHALL BE RELOCATED UNLESS OTHERWISE NOTED. LOCATION IS TO BE AS CLOSE AS
POSSIBLE TO THE ORIGINAL LOCATION.
E. ALL CIRCUITS, CONDUIT AND WIRE THAT ARE NOT TO REMAIN IN SERVICE SHALL BE REMOVED BACK TO THE FIRST ACCESSIBLE JUNCTION BOX WHERE IT SHALL BE TIED OFF AND LABELED AS SPARE WITH CIRCUIT
NUMBER INDICATED.
F. REMOVE ALL ABANDONED WIRE AND CABLING.
DEMOLITION NOTES
1. SYMBOLS LEGENDS ARE PROVIDED FOR REFERENCE PURPOSES ONLY. THE SYMBOLS REPRESENT THE TYPE OF DEVICES THAT MAY BE REQUIRED IN THE WORK; QUANTITIES AND LOCATIONS ARE AS SHOWN ON THE PLAN
SHEETS.
2. PROVIDE 3/4" CONDUIT & #12 CONDUCTORS UNLESS NOTED OTHERWISE. PROVIDE ONE NEUTRAL CONDUCTOR FOR EACH UNGROUNDED CONDUCTOR OF SINGLE PHASE LINE-NEUTRAL BRANCH CIRCUITS. DO NOT SHARE
NEUTRAL CONDUCTORS.
3. EACH FEEDER AND BRANCH CIRCUIT CONDUIT SHALL HAVE AN EQUIPMENT GROUNDING CONDUCTOR SIZED IN
ACCORDANCE WITH NFPA 70, ARTICLE 250.
4. ALL ELECTRICAL EQUIPMENT IN PORTIONS OF THE BUILDING NOT BEING REMODELED SHALL BE LEFT IN
WORKING CONDITION. RESTORE ANY CIRCUITS INTERRUPTED.
5. ALL NEW LIGHT FIXTURES AND FIXTURES IN AREAS ADJACENT DEMOLITION & CONSTRUCTION AREAS ARE TO
BE THOROUGHLY CLEANED IMMEDIATELY PRIOR TO NOTICE OF SUBSTANTIAL COMPLETION.
6. THE FOLLOWING IS PART OF THIS PROJECT AND ALL COSTS PERTAINING THERETO SHALL BE INCLUDED IN THE
BASE BID:
A. NEW ELECTRICAL EQUIPMENT AND APPARATUS SHALL BE COORDINATED AND CONNECTED INTO THE
EXISTING SYSTEM AS REQUIRED.
B. POWER WIRING AND CABLE INSTALLATIONS SHALL BE CONCEALED ABOVE ACCESSIBLE CEILINGS AND IN
WALLS. EXPOSED WIRING SHALL BE INSTALLED IN APPROVED SURFACE METAL RACEWAY WHERE
INDICATED.
C. WHERE EXISTING CONDUITS ARE INDICATED FOR REUSE, FIELD VERIFY INTEGRITY OF REUSED RACEWAYS PRIOR TO INSTALLATION OF CONDUCTORS. PROVIDE NEW RACEWAYS WHERE EXISTING ARE UNUSABLE.
D. LOCATIONS OF ALL WALL MOUNTED DEVICES SUCH AS SWITCHES, RECEPTACLES, AND OUTLETS ARE
SHOWN DIAGRAMMATICALLY.DETERMINE EXACT DEVICE LOCATIONS IN FIELD; COORDINATE
INSTALLATIONS WITH FIXED CASEWORK, DOORS AND RELITES.
E. PROVIDE PENETRATIONS THROUGH WALLS, FLOORS, AND CEILINGS AS REQUIRED. PROVIDE SUITABLE FIRE RATED MATERIALS AND SEAL ALL CEILING, FLOOR, AND WALL PENETRATIONS TO MATCH FIRE RATING
OF SURFACES PENETRATED.
GENERAL NOTES
@ AT
A/C AIR CONDITIONING(ER)
A (AMP) AMPERE
AC ABOVE COUNTER, ALTERNATING
CURRENT
ADJ ADJUSTABLE
ADJT ADJACENT
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
ANN ANNUNCIATOR
ARCH ARCHITECT; ARCHITECTURAL
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AWG AMERICAN WIRE GAUGE
BKBD BACKBOARD
BKR BREAKER
BLDG BUILDING
C CONDUIT
CAP CAPACITY
CB CIRCUIT BREAKER
CKT CIRCUIT
CLG CEILING
CLR CLEAR
COL COLUMN
COM COMMUNICATION
CPS CYCLES PER SECOND
CT CURRENT TRANSFORMER
CTL CONTROL
CU COPPER
DC DIRECT CURRENT
DISC SW DISCONNECT SWITCH
DISC DISCONNECT
DN DOWN
DWG DRAWING
E EXIST, EAST
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
EGC EQUIPMENT GROUNDING CONDUCTOR
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EM EMERGENCY
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
ENTR ENTRANCE
EP EXPLOSION PROOF
EPO EMERGENCY POWER OFF
EQUIP/EQP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXH EXHAUST
EXT EXTERIOR
EXIST EXISTING
F FAHRENHEIT/FUSE
FA FIRE ALARM
FAA FIRE ALARM ANNUNCIATOR
FAP FIRE ALARM PANEL
FC FOOTCANDLE
FCU FAN COIL UNIT
FD FIRE DAMPER
FDR FEEDER
FIXT FIXTURE
FLA FULL LOAD AMPS
FSD FIRE/SMOKE DAMPER
GEC GROUNDING ELECTRODE CONDUCTOR
GEN GENERATOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
GFR GROUND FAULT RELAY
H HEIGHT
HOA HAND OFF AUTOMATIC
HOR HORIZONTAL
HP HORSEPOWER
HR HOUR
HT HEIGHT
HW HOT WATER
HZ HERTZ
IBC INTERNATIONAL BUILDING CODE
IC INTERCOM
IES ILLUMINATING ENGINEERING SOCIETY
IEEE INSTITUTE OF ELECTRICAL AND
ELECTRONIC ENGINEERS
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
IN INCH
JB JUNCTION BOX
KCMIL THOUSAND CIRCULAR MILLS
KVA KILOVOLT AMPERES
KVAR KILOVOLT AMPERES REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
LBS POUNDS
LF LINEAR FEET (FEET)
LRA LOCKED ROTOR AMPS
LS LIFE SAFETY
LT LIGHT
LTG LIGHTING
LV LOW VOLTAGE
ABBREVIATIONS
MAG MAGNETIC
MAN MANUAL
MAT MATERIAL
MAX MAXIMUM
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MECH MECHANICAL
MEZZ MEZZANINE
MG MOTOR GENERATOR
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUG ONLY
MOCP MAXIMUM OVERCURRENT PROTECTION
MS MAGNETIC STARTER
MTD MOUNTED
MTG MOUNTING
MTR MOTOR
N NORTH; NEUTRAL
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NESC NATIONAL ELECTRICAL SAFETY CODE
NEUT NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOC.
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OFCI OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
OL OVERLOAD
OS OPTIONAL STANDBY
P PRIMARY
PA PUBLIC ADDRESS
PAR PARALLEL
PB PULL BOX
PE PHOTO ELECTRIC
PF POWER FACTOR
PH PHASE
PIV POST INDICATOR VALVE
PNL PANEL
POC POINT OF CONNECTION
PWR POWER
QTY QUANTITY
R (R) RELOCATE (D)
RAD RADIUS
RECPT RECEPTACLE
REF REFRIGERATOR
RLA RATED LOAD AMPS
RPM REVOLUTIONS PER MINUTE
S SOUTH
SC SECURITY
SD SMOKE DETECTOR
SECT SECTION
SF SUPPLY FAN
SHT SHEET
SPEC SPECIFICATION
SPL SPECIAL
SQ SQUARE
STOR STORAGE
SPD SURGE PROTECTION DEVICE
SW SWITCH
SWBD SWITCHBOARD
SYM SYMMETRICAL
SYS SYSTEM
T THERMOSTAT
TB TERMINAL BOX
TC TIME CLOCK
TEL TELEPHONE
TV TELEVISION
TYP TYPICAL
UFC UNIFORM FIRE CODE
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
UV UNIT VENTILATOR
V VOLT
VAV VARIABLE AIR VOLUME
VEL VELOCITY
VM VOLTMETER
VOL VOLUME
W WATT, WEST
W/ WITH
W/O WITHOUT
WH WATER HEATER
WHM WATTHOUR METER
WP WEATHERPROOF
X REACTANCE
XFMR TRANSFORMER
XMTR TRANSMITTER
Z IMPEDANCE
& AND
IE: THAT IS
M
DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
MOTOR-RATED SWITCH - SIZE OL PER MOTOR REQUIREMENTS
3-POLE UNLESS NOTED OTHERWISE
3-POLE UNLESS NOTED OTHERWISE
XX
480Y/277V, 3Ø, 4W PANELBOARD
208Y/120V, 3Ø, 4W PANELBOARD
EQUIPMENT CABINET - TYPE AS NOTED
PANELBOARD
FEEDER TAG - REFER TO FEEDER SCHEDULE
T
M
SYMBOLS LEGEND - POWER
DESCRIPTIONSYMBOL
TRANSFORMER
METER
CURRENT TRANSFORMER
CIRCUIT BREAKER
ST - INDICATES SHUNT TRIP
CB
CONDUIT CONCEALED IN CEILING SPACE OR IN WALL. PROVIDE MINIMUM
3/4" WITH #12 AWG CONDUCTORS AND DEDICATED NEUTRAL EACH
CIRCUIT UNLESS OTHERWISE NOTED ON PLAN. PROVIDE EQUIPMENT
GROUNDING CONDUCTORS SIZED PER NFPA 70.
CONDUIT - CONCEALED IN OR UNDER FLOOR
CONDUIT OR CABLE VERTICAL DOWN
CONDUIT OR CABLE VERTICAL UP
CONDUIT STUB - TERMINATE WITH BUSHING OR CAP IF UNDERGROUND
BRANCH CIRCUIT NUMBERS
PANEL DESIGNATION
HOME RUN TO SOURCE OF SUPPLY
A-1,3,5
SYMBOLS LEGEND - WIRING DEVICES
DESCRIPTION
NEMA 5-20R, +18" AFF UON
NEMA 5-20R W/ GROUND FAULT CIRCUIT INTERRUPTER, +18" AFF UON
SYMBOLS LEGEND - GENERAL
DESCRIPTIONSYMBOL
X-XX
X
XX.XX
X
XX.XX
X
XX.XX
N
DRAWING CONSTRUCTION ("FLAG") NOTE
EQUIPMENT IDENTIFIER
MATCHLINE
REVISION CLOUD (ENCIRCLES DRAWING CHANGES MADE SINCE THE
PREVIOUS RELEASE)
REVISION REFERENCE
EXISTING TO BE REMOVED (HATCH)
HEAVY LINEWEIGHT INDICATES NEW WORK
LIGHT LINEWEIGHT INDICATES EXISTING INFORMATION
DETAIL REFERENCE
DETAIL IDENTIFICATION NUMBER
SHEET WHERE DETAIL IS DRAWN
ELEVATION REFERENCE
ELEVATION IDENTIFICATION
NUMBER SHEET WHERE ELEVATION IS DRAWN
SECTION REFERENCE SECTION
IDENTIFICATION NUMBER
SHEET WHERE SECTION IS DRAWN
NORTH REFERENCE
Project No.
Drawing Number
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD
600 Stewart St., Ste. 1400 Seattle, Washington 98101
Tel 206.267.1700 Fax 206.267.1701
SAZAN# 735-21013
Drawing Title
Approved: Pjoj Eng
DateProject Title
Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr. Building Number Checked By/Proj.Mgr Drawn By
LocationApproved: VAPORHCS DirectorApproved: Chief Facilities MgmtApproved: Service Chief
VA Portland Health Care System
(VAPORHCS)
STAMP
Vancouver Campus, Building 2
Fully Sprinklered
A u to d e s k D o c s /P
D X
-2
-2
-1
C o rr e c t H
V A
C F
C A
D e fi c ie n c ie s /7
-2
C H
F D
E L
E C
C e n tr a l v
.r v t
/1
/2
:4
:4
P
M
E000
648-20-117
GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX 10/25/2022CORRECT HVAC FCA DEFICIENCIES
Revisions: Date:
Feb 15, 2024
ELECTRICAL SHEET INDEX
E000 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX
E001 ELECTRICAL SCHEDULES
E002 ELECTRICAL SCHEDULES
E100 LEVEL 1 - OVERALL ELECTRICAL
E110 LEVEL 1 - LAUNDRY - ELECTRICAL
E111 LEVEL 1 - WAREHOUSE - ELECTRICAL
E130 ROOF PLAN - ELECTRICAL
02/12/2024
Project No.
Drawing Number
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD
600 Stewart St., Ste. 1400 Seattle, Washington 98101
Tel 206.267.1700 Fax 206.267.1701
SAZAN# 735-21013
Drawing Title
Approved: Pjoj Eng
DateProject Title
Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr. Building Number Checked By/Proj.Mgr Drawn By
LocationApproved: VAPORHCS DirectorApproved: Chief Facilities MgmtApproved: Service Chief
VA Portland Health Care System
(VAPORHCS)
STAMP
Vancouver Campus, Building 2
Fully Sprinklered
A u to d e s k D o c s /P
D X
-2
-2
-1
C o rr e c t H
V A
C F
C A
D e fi c ie n c ie s /7
-2
C H
F D
E L
E C
C e n tr a l v
.r v t
/1
/2
:4
:4
P
M
E001
648-20-117
ELECTRICAL SCHEDULES 10/25/2022CORRECT HVAC FCA DEFICIENCIES
Total Est. Demand Current: 546 A
Total Conn. Current: 546 A
Total Est. Demand: 453739 VA
Spare 328242 VA 100.00% 328242 VA Total Conn. Load: 453739 VA
HVAC 125497 VA 100.00% 125497 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Amps: 546 A 546 A 546 A
Total Load: 151246 VA 151246 VA 151246 VA
41 -- -- -- -- 5817 VA 42
39 -- -- -- -- 5817 VA 40
37 2-CHP-1 30 A 3 5817 VA 38
35 -- -- -- -- 5817 VA 36
33 -- -- -- -- 5817 VA 34
31 2-CHP-2 30 A 3 5817 VA 32
29 -- -- -- -- 20775 VA 33932 VA -- -- -- -- 30
27 -- -- -- -- 20775 VA 33932 VA -- -- -- -- 28
25 PANEL MDP / NEW ROOF PENTHOUSE 200 A 3 20775 VA 33932 VA 3 175 A CU-2 26
23 -- -- -- -- 20775 VA 33932 VA -- -- -- -- 24
21 -- -- -- -- 20775 VA 33932 VA -- -- -- -- 22
19 TEMP TRAILERS 200 A 3 20775 VA 33932 VA 3 175 A CU-1 20
17 -- -- -- -- 6005 VA 18
15 -- -- -- -- 6005 VA 16
13 2-AH 9 50 A 3 6005 VA 14
11 -- -- -- -- 6005 VA 6005 VA -- -- -- -- 12
9 -- -- -- -- 6005 VA 6005 VA -- -- -- -- 10
7 2-AH 6 50 A 3 6005 VA 6005 VA 3 50 A 2-AH 8 8
5 -- -- -- -- 6177 VA 6005 VA -- -- -- -- 6
3 -- -- -- -- 6177 VA 6005 VA -- -- -- -- 4
1 2-AH 5 30 A 3 6177 VA 6005 VA 3 50 A 2-AH 7 2
C K T
# ITEM
N O T E
A M P S
P O L E A B C
P O L E
A M P S
N O T
E ITEM
C K T
MCB
600 A
MOUNTING: SURFACE
LOCATION: FED FROM: VOLTAGE: 480/277 Wye 3-PH, 4-WIRE
PANEL P-1 SCHEDULE
Total Est. Demand Current: 143 A
Total Conn. Current: 143 A
Spare 91130 VA 100.00% 91130 VA Total Est. Demand: 118631 VA
Receptacle 900 VA 100.00% 900 VA Total Conn. Load: 118631 VA
HVAC 26601 VA 100.00% 26601 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Amps: 152 A 144 A 135 A
Total Load: 41740 VA 39445 VA 37446 VA
41 -- -- -- -- 147 VA 6094 VA -- -- -- -- 42
39 -- -- -- -- 147 VA 6094 VA -- -- -- -- 40
37 DOOR OPENERS 15 A 3 147 VA 6094 VA 3 30 A CARDBOARD COMPACTOR 38
35 -- -- -- -- 1440 VA 2007 VA -- -- -- -- 36
33 -- -- -- -- 1440 VA 2007 VA -- -- -- -- 34
31 DOCK LEVELER 15 A 3 1440 VA 2007 VA 3 20 A SCISSOR LIFT 32
29 -- -- -- -- 886 VA 480 VA -- -- -- -- 30
27 -- -- -- -- 886 VA 480 VA -- -- -- -- 28
25 2AH-1 15 A 3 886 VA 480 VA 3 15 A 2-RF1 26
23 -- -- -- -- 0 VA 10790 VA -- -- -- -- 24
21 -- -- -- -- 0 VA 10667 VA -- -- -- -- 22
19 SPARE 20 A 3 0 VA 11960 VA 3 50 A PNL WL VIA XFMR 20
17 -- -- -- -- 4931 VA 0 VA -- -- -- -- 18
15 -- -- -- -- 4931 VA 0 VA -- -- -- -- 16
13 PNL WHB 100 A 3 4931 VA 0 VA 3 15 A SPARE 14
11 LTG CORRIDORS 20 A 1 300 VA 8940 VA -- -- -- -- 12
9 LTG OFFICES, RESTROOM 20 A 1 400 VA 11175 VA -- -- -- -- 10
7 EXIT LTG 20 A 1 30 VA 12120 VA 3 100 A XFMR WHA 8
5 WAREHOUSE LTG 20 A 1 1055 VA 376 VA 1 20 A WAREHOUSE LTG 6
3 WAREHOUSE LTG 20 A 1 745 VA 473 VA 1 20 A WAREHOUSE LTG 4
1 WAREHOUSE LTG 20 A 1 900 VA 745 VA 1 20 A LIGHTING RMS A100A, A100B 2
C K T
# ITEM
N O T E
A M P S
P O L E A B C
P O L E
A M P S
N O T
E ITEM
C K T
MLO
225 A
MOUNTING: RECESSED
LOCATION: FED FROM: VOLTAGE: 480/277 Wye 3-PH, 4-WIRE
PANEL WH SCHEDULE
Total Est. Demand Current: 89 A
Total Conn. Current: 89 A
Spare 27675 VA 100.00% 27675 VA Total Est. Demand: 32235 VA
Receptacle 900 VA 100.00% 900 VA Total Conn. Load: 32235 VA
HVAC 3660 VA 100.00% 3660 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Amps: 104 A 96 A 75 A
Total Load: 12120 VA 11175 VA 8940 VA
41 E WALL RCPT 20 A 1 720 VA 1385 VA -- -- -- -- 42
39 E WALL RCPT 20 A 1 720 VA 1385 VA -- -- -- -- 40
37 E WALL RCPT 20 A 1 720 VA 1385 VA 3 15 A HIGH SPEED DOOR 38
35 E WALL RCPT 20 A 1 720 VA 36
33 -- -- -- -- 720 VA 720 VA -- -- -- -- 34
31 208V POWER POLE NORTH 30 A 2 720 VA 720 VA 2 20 A 208V EAST WALL 32
29 RCPT N WALL 20 A 1 720 VA 1000 VA -- -- -- -- 30
27 RCPT N WALL 20 A 1 720 VA 1000 VA -- -- -- -- 28
25 COLOR COPIER 20 A 1 1200 VA 1000 VA 3 30 A T/L RCPT 26
23 EAST WALL RCPTS 20 A 1 720 VA 1200 VA 1 20 A 1 COLOR COPIER 24
21 -- -- -- -- 1200 VA 720 VA -- -- -- -- 22
19 POWER POLE/BIZ HUB PRINTER 958 20 A 2 1200 VA 720 VA 2 30 A 208V EAST WALL 20
17 915 VA -- -- -- -- 18
15 -- -- -- -- 720 VA 915 VA 2 20 A 2-P8 16
13 208V POWER POLE 20 A 2 720 VA 900 VA 1 20 A ROOF RCPT 14
11 PAPER CUTTER 20 A 1 120 VA 0 VA -- -- -- -- 12
9 OFFICE RCPTS 20 A 1 720 VA 0 VA -- -- -- -- 10
7 COUNTER RCPTS 20 A 1 720 VA 0 VA 3 20 A AC-100 8
5 COUNTER RCPTS 20 A 1 720 VA 720 VA 1 20 A SOUTH POST 6
3 -- -- -- -- 915 VA 720 VA 1 20 A NORTH POST 4
1 2-P5 20 A 2 915 VA 1200 VA 1 20 A COLLATOR - CENTER POST 2
C K T
# ITEM
N O T E
A M P S
P O L E A B C
P O L E
A M P S
N O T
E ITEM
C K T
MCB
225 A
WH VIA XFMR MOUNTING: RECESSED
LOCATION: FED FROM: VOLTAGE: 120/208 Wye 3-PH, 4-WIRE
PANEL WHA SCHEDULE
Total Est. Demand Current: 93 A
Total Conn. Current: 93 A
Total Est. Demand: 33417 VA
Spare 27927 VA 100.00% 27927 VA Total Conn. Load: 33417 VA
HVAC 5490 VA 100.00% 5490 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Amps: 100 A 89 A 90 A
Total Load: 11960 VA 10667 VA 10790 VA
41 -- -- -- -- 1830 VA 0 VA 1 20 A SPARE 42
39 -- -- -- -- 1830 VA 200 VA 1 20 A ACX - ATTIC 40
37 PNL WLB 60 A 3 1830 VA 200 VA 1 20 A DAS 38
35 720 VA 1 20 A SPD RCPTS 36
33 DOOR/DOCK ALARMS/RCPTS 20 A 1 720 VA 150 VA 1 20 A SPD LIGHTS 34
31 NW WALL 20 A 1 720 VA 720 VA 1 20 A WEST WALL 32
29 WAREHOUSE CLERIC WORK STATIONS 20 A 1 720 VA 720 VA 1 20 A RCPT A103 30
27 -- -- -- -- 2000 VA 2000 VA -- -- -- -- 28
25 BATTERY CHARGER 30 A 2 2000 VA 2000 VA 2 30 A BATTERY CHARGER 26
23 -- -- -- -- 1500 VA 0 VA 1 20 A SPARE 24
21 WATER HEATER 30 A 2 1500 VA 720 VA 1 20 A RCPT A100B 22
19 RCPT OFFICES 20 A 1 720 VA 720 VA 1 20 A RCPT A100A EAST WH WALL 20
17 RCPT REST ROOM 20 A 1 360 VA 720 VA 1 20 A RCPT SOUTH WALL WH 18
15 -- -- -- -- 0 VA 200 VA 1 20 A FIRE ALARM CAB 16
13 BATTERY CHARGER (OFF) 20 A 2 0 VA 2000 VA -- -- -- -- 14
11 VENDING+MICRO HALL 20 A 1 500 VA 2000 VA 2 30 A BATTERY CHARGER 12
9 RCPT DOCK 20 A 1 720 VA 500 VA 1 20 A 2-EF-11 10
7 VENDING (POP) HALL 20 A 1 500 VA 400 VA 1 20 A 2UH-12,13 UNIT HEATER 8
5 2 UH-11 & AH5 UNIT HEATERS 20 A 1 1000 VA 720 VA 1 20 A RCPT A-103 6
3 ENTRY LIGHT 20 A 1 127 VA 4
1 LIGHTING RMS A101, A102 20 A 1 150 VA 2
C K T
# ITEM
N O T E
A M P S
P O L E A B C
P O L E
A M P S
N O T
E ITEM
C K T
MCB
150 A
WH VIA ATTIC XFMR MOUNTING: RECESSED
LOCATION: FED FROM: VOLTAGE: 120/208 Wye 3-PH, 4-WIRE
PANEL WL SCHEDULE
FLA:
HP:
KVA:
KW:
MCA:
MOCP:
OFOI:
OFCI:
W:
WP:
VA:
FULL LOAD AMPERES
HORSEPOWER
KILOVOLT-AMPERES
KILOWATTS
MINIMUM CIRCUIT AMPACITY
MAXIMUM OVERCURRENT PROTECTIVE DEVICE
OWNER-FURNISHED, OWNER-INSTALLED
OWNER-FURNISHED, CONTRACTOR-INSTALLED
WATTS
WEATHERPROOF
VOLT-AMPERS
1) DISCONNECTS ARE SHOWN AS FRAME RATING / FUSE SIZE.
2) PROVIDE DUCT SMOKE DETECTORS FOR ALL HVAC UNITS SUPPLYING 2,000 CFM OR
MORE. COORDINATE WITH FIRE ALARM CONTRACTOR.
3) ALL 120V, 15A AND 20A RECEPTACLES AND/OR EQUIPMENT CIRCUITS SHALL BE GFCI
PROTECTED PER NOTE 2, UNLESS NOTED OTERWISE/
SCHEDULE NOTES: ABBREVIATION: SCHEDULE GENERAL NOTES
EQUIPMENT CONNECTION SCHEDULE
NO. EQUIPMENT DESCRIPTION LOCATION VA
HP
MCA MOCP VOLTAGE
PHASES
CONDUIT
SIZE
WIRE SIZE DISC/FUSE/POLES CIRCUIT NUMBER NOTES
2-AH 1 AIR HANDLER MEZZANINE 2659 0 4.0 15 A 480 3 3/4" 3#12, 1#12 GND 30/-/3 WH - 25,27,29
2-AH 2 AIR HANDLER B-105 MECH 9972 0 15.0 20 A 480 3 3/4" 3#12, 1#12 GND 30/-/3 LHB.2 - 79,81,83
2-AH 3 AIR HANDLER B-105 MECH 49860 0 0.0 0 A 480 3 1-1/4" 3#3, 1#8 GND 60/-/3 LHB.2 - 80,82,84
2-AH 4 AIR HANDLER B-105 MECH 17285 0 26.0 45 A 480 3 3/4" 3#10, 1#10 GND 30/-/3 LHB.3 - 85,87,89
2-AH 5 AIR HANDLER ROOF 18531 5.33 27.9 35 A 480 3 3/4" 3#10, 1#10 GND 30/-/3 P-1 - 1,3,5
2-AH 6 AIR HANDLER ROOF 18016 0 27.1 35 A 480 3 3/4" 3#10, 1#10 GND 60/-/3 P-1 - 7,9,11
2-AH 7 AIR HANDLER ROOF 18016 0 27.1 35 A 480 3 3/4" 3#10, 1#10 GND 60/-/3 P-1 - 2,4,6
2-AH 8 AIR HANDLER ROOF 18016 0 27.1 35 A 480 3 3/4" 3#10, 1#10 GND 60/-/3 P-1 - 8,10,12
2-AH 9 AIR HANDLER ROOF 18016 0 27.1 35 A 480 3 3/4" 3#10, 1#10 GND 60/-/3 P-1 - 13,15,17
2-CHP-1 PUMP 17451 15 0.0 0 A 480 3 1" 3#10, 1#10 GND 30/-/3 P-1 - 37,39,41
2-CHP-2 PUMP 17451 15 0.0 0 A 480 3 1" 3#10, 1#10 GND 30/-/3 P-1 - 31,33,35
2-CU 1 CONDENSOR ROOF 11966 0 18.0 25 A 480 3 3/4" 3#10, 1#10 GND 30/-/3 WHB - 1,3,5
2-P5 PUMP A-100B STORAGE 1830 1 0.0 0 A 208 1 3/4" 2#12, 1#12 GND 30/-/2 WHA - 1,3
2-P6 PUMP WAREHOUSE 1830 1 0.0 0 A 208 1 3/4" 2#12, 1#12 GND 30/-/2 WLB - 5,7
2-P7 PUMP WAREHOUSE 1830 1 0.0 0 A 208 1 3/4" 2#12, 1#12 GND 30/-/2 WLB - 9,11
2-P8 PUMP WAREHOUSE 1830 1 0.0 0 A 208 1 3/4" 2#12, 1#12 GND 30/-/2 WHA - 16,18
2-P9 PUMP A-103 OFFICE 1830 1 0.0 0 A 208 1 3/4" 2#12, 1#12 GND 30/-/2 WLB - 1,3
2-RF 1 RETURN FAN MEZZANINE 2825 0 0.0 0 A 480 3 3/4" 3#12, 1#12 GND 30/-/3 WHB - 7,9,11
2-RF 2 RETURN FAN B-105 MECH 9141 0 0.0 0 A 480 3 3/4" 3#10, 1#10 GND 30/-/3 LHB.3 - 121,123,125
2-RF 3 RETURN FAN B-105 MECH 22437 0 33.8 40 A 480 3 1" 3#8, 1#10 GND 60/-/3 LHB.3 - 91,93,95
2-RF 4 RETURN FAN B-105 MECH 11634 0 0.0 0 A 480 3 3/4" 3#12, 1#12 GND 30/-/3 LHB.3 - 127,129,131
EF-6 EXHAUST FAN ROOF 3989 0 0.0 0 A 480 3 3/4" 3#12, 1#12 GND 30/-/3 LHB.3 - 97,99,101
EF-7 EXHAUST FAN ROOF 6316 0 0.0 0 A 480 3 3/4" 3#12, 1#12 GND 30/-/3 LHB.3 - 86,88,90
Revisions: Date:
Total Est. Demand Current: 18 A
Total Conn. Current: 18 A
Total Est. Demand: 14792 VA
Total Conn. Load: 14792 VA
HVAC 14792 VA 100.00% 14792 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Amps: 18 A 18 A 18 A
Total Load: 4931 VA 4931 VA 4931 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 SPARE 20 A 1 0 VA 30
27 SPARE 20 A 1 0 VA 28
25 SPARE 20 A 1 0 VA 26
23 -- -- -- -- 0 VA 24
21 -- -- -- -- 0 VA 22
19 SPARE 20 A 3 0 VA 20
17 -- -- -- -- 0 VA 18
15 -- -- -- -- 0 VA 16
13 SPARE 20 A 3 0 VA 14
11 -- -- -- -- 942 VA 12
9 -- -- -- -- 942 VA 10
7 2-RF 1 20 A 3 942 VA 8
5 -- -- -- -- 3989 VA 6
3 -- -- -- -- 3989 VA 4
1 2-CU 1 20 A 3 3989 VA 2
C K T
# ITEM
N O T E
A M P S
P O L E A B C
P O L E
A M P S
N O T
E ITEM
C K T
MLO
100 A
WH MOUNTING: SURFACE
LOCATI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .