Attachment 8 - Drawings 679-22-100.pdf
PDF 16 MB Posted
- Solicitation number
- 36C24726R0024
About this file
This file is an architectural drawing set (Attachment 8) for elevator upgrades at the Tuscaloosa Veterans Affairs Medical Center (VAMC) across six buildings: Buildings 1, 2, 5, 38, 135, and 137. The comprehensive set includes detailed architectural, mechanical, electrical, and fire alarm plans for modernizing multiple elevators, with each building having between one to three elevators targeted for renovation. The project involves comprehensive upgrades including new elevator interiors, control systems, hoistway doors, lighting, electrical components, and mechanical systems, with specific attention to maintaining fire safety, infection control, and building infrastructure integrity.
The drawings, dated February 6, 2025, cover multiple technical disciplines and provide extensive documentation for each building's specific elevator upgrade requirements. Key elements include replacing elevator controllers, installing new stainless steel hoistway doors, upgrading electrical systems, adding new sump pumps, implementing split system HVAC units, installing new lighting fixtures, and integrating fire alarm and access control systems. The project scope encompasses mechanical, electrical, plumbing, and architectural modifications, with careful consideration given to maintaining building operational continuity and adhering to VA healthcare facility standards throughout the renovation process.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R A M P
R A M P
BUILDING 137
ELEVATORS:
P-17 | 4,000 lb P-18 | 4,000 lb P-19 | 4,000 lb
BUILDING 38
ELEVATORS:
P-6 | 5,500 lb P-7 | 5,500 lb
BUILDING 5
ELEVATOR:
P-13 | 3,000 lb
BUILDING 1
ELEVATORS:
P-1 | 3,000 lb P-2 | 3,000 lb
BUILDING 135
ELEVATORS:
P-14 | 4,000 lb P-15 | 4,000 lb
BUILDING 2
ELEVATOR:
P-3 | 3,000 lb
GOV. VEHICLE PARKING AREA
QUARTERS
PARKING AREA
LO
O
P R O
AD
H A
G L E
R L
A N
E
PL#5
PL#4
PL#3
PL#6
PL#7
PL#10
PL#11
PL#11A
P L#9
PL#8
PL#2
TEMP. PL
1. DELETE ALL WORK AT BUILDING NUMBER 1
# ALTERNATE NOTES
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP
PROJECT LOCATION MAP
/4
/2
:2
:4
P M
C U s e rs
\c k u rk u l\ D o c u m e n ts
\S it e
-3
-V
A T u s c a lo o s a
-U p g ra d e
E le v a to rs
-A L c k u rk u lG V
Y H
.r v t
G-001
COVER SHEET & DRAWING LIST
1 8LBB
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
ELEVATOR UPGRADES IN BUILDINGS 1,
2, 5, 38, 135 & 137
TUSCALOOSA VAMC
VA PROJECT #: 679-22-100
DJR
Scale: 1" = 100'-0"
SITEPLAN
DRAWING LIST
GENERAL
G-001 COVER SHEET & DRAWING LIST 1 8
G-002 ICRA MATRIX AND DETAILS 2 8
1.GL100 BUILDING 1 OVERALL BASEMENT FLOOR PLAN 3 8
2.GL100 BUILDING 2 OVERALL GROUND FLOOR PLAN 4 8
5.GL100 BUILDING 5 OVERALL BASEMENT FLOOR PLAN 5 8
38.GL100 BUILDING 38 OVERALL BASEMENT FLOOR PLAN 6 8
135.GL100 BUILDING 135 OVERALL BASEMENT FLOOR PLAN 7 8
137.GL100 BUILDING 137 OVERALL GROUND FLOOR PLAN 8 8
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 21
1.A-100 BUILDING 1 PARTIAL FLOOR PLANS - P1 & P2 2 21
1.A-701 BUILDING 1 VERTICAL CIRCULATION SECTIONS & ELEVATIONS - P1 & P2 3 21
2.A-100 BUILDING 2 PARTIAL FLOOR PLANS & INT. ELEV. - P3 4 21
2.A-701 BUILDING 2 VERTICAL CIRCULATION SECTIONS AND ELEVATIONS - P3 5 21
5.A-100 BUILDING 5 PARTIAL FLOOR PLANS - P13 6 21
5.A-701 BUILDING 5 VERTICAL CIRCULATION SECTION AND ELEVATIONS - P13 7 21
38.A-100 BUILDING 38 PARTIAL FLOOR PLANS - P6 & P7 8 21
38.A-701 BUILDING 38 VERTICAL CIRCULATION SECTIONS AND ELEVATIONS - P6 & P7 9 21
135.A-100 BUILDING 135 PARTIAL FLOOR PLANS - P14 & P15 10 21
135.A-701 BUILDING 135 VERTICAL CIRCULATION SECTION AND ELEVATIONS - P14 & P15 11 21
137.A-100 BUILDING 137 PARTIAL FLOOR PLANS - P17-P19 12 21
137.A-101 BUILDING 137 PARTIAL FLOOR PLANS - P17-P19 13 21
137.A-701 BUILDING 137 VERTICAL CIRCULATION SECTIONS AND ELEVATIONS - P17-P19 14 21
A-601 DOOR SCHEDULE AND DETAILS AND ROOM FINISH SCHEDULE 15 21
A-801 BLDG 1 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 16 21
A-802 BLDG 2 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 17 21
A-803 BLDG 5 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 18 21
A-804 BLDG 38 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 19 21
A-805 BLDG 135 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 20 21
A-806 BLDG 137 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 21 21
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 10
M-002 PLUMBING GENERAL INFORMATION AND DETAILS 2 10
1.M-101 BUILDING 1 PARTIAL MECHANICAL FLOOR PLANS - P1 & P2 3 10
2.M-101 BUILDING 2 PARTIAL MECHANICAL FLOOR PLANS - P3 4 10
5.M-101 BUILDING 5 PARTIAL MECHANICAL FLOOR PLANS - P13 5 10
38.M-101 BUILDING 38 PARTIAL MECHANICAL FLOOR PLAN - P6 & P7 6 10
135.M-101 BUILDING 135 PARTIAL MECHANICAL PLANS - P14 & P15 7 10
137.M-101 BUILDING 137 PARTIAL MECHANICAL PLANS 8 10
M-501 MECHANICAL DETAILS 9 10
M-601 MECHANICAL SCHEDULES 10 10
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 16
E-002 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 16
1.ED101 BUILDING 1 PARTIAL MECHANICAL PENTHOUSE ELECTRICAL DEMOLITION PLANS - P1 & P2 3 16
1.EP101 BUILDING 1 PARTIAL MECHANICAL PENTHOUSE ELECTRICAL PLANS - P1 & P2 4 16
2.ED101 BUILDING 2 PARTIAL ATTIC ELECTRICAL DEMOLITION PLAN - P3 5 16
2.EP101 BUILDING 2 PARTIAL ATTIC AND ELEVATOR PIT ELECTRICAL PLANS - P3 6 16
5.ED101 BUILDING 5 PARTIAL BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - P13 7 16
5.EP101 BUILDING 5 PARTIAL BASEMENT FLOOR ELECTRICAL PLANS - P13 8 16
38.ED101 BUILDING 38 PARTIAL BASEMENT ELECTRICAL DEMOLITION PLANS - P6, P7 9 16
38.EP101 BUILDING 38 PARTIAL BASEMENT ELECTRICAL PLANS - P6, P7 10 16
135.ED101 BUILDING 135 PARTIAL BASEMENT ELECTRICAL DEMOLITION PLAN - P14, P15 11 16
135.EP101 BUILDING 135 PARTIAL BASEMENT AND ELEVATOR PIT ELECTRICAL PLANS - P14, P15 12 16
137.ED101 BUILDING 137 PARTIAL GROUND FLOOR ELECTRICAL DEMOLITION PLAN - P17, P18 & P19 13 16
137.EP101 BUILDING 137 PARTIAL GROUND, ELEVATOR PIT AND ROOF ELECTRICAL PLANS - P17, P18 & P19 14 16
E-201 ELEVATOR ELECTRICAL SECTIONS 15 16
E-501 ELECTRICAL DETAILS AND EQUIPMENT CONDUCTOR SCHEDULE 16 16
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 1
NORTH
0 4 8 16
NOTE:
1. CONTRACTOR TO REVIEW WITH COR:
A. PROJECT ACCESS
B. CONTRACTOR PARKING
C. CONTRACTOR STAGING AREA
D. FACILITY ICRA MATRIX
E. DISCUSS PHASING
CAMPUS LOCATION
PROJECT LOCATION
SIGNATURES REQUIRED
DIRECTOR:
______________________________________DATE:_________
ENERGY ENGINEER:
______________________________________DATE:_________
INFECTION CONTROL:
______________________________________DATE:_________
SAFETY MANAGER:
______________________________________DATE:_________
LAYDOWN AREA
BLDGS 1, 2, 5, 38, 135 & 137
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
Docusign Envelope ID: 3C50501C-ED34-40D1-A0BC-5347D6DC6504
2/5/2025
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
3 5/8" INSULATED
WALL WITH 16
GAUGE METAL
STUDS @ 16" O.C.
WALL TO EXTEND
TO UNDERSIDE OF
DECK
ONE LAYER 5/8"
TYPE X GYPSUM
BOARD - BOTH
SIDES - ICRA WALL
A1
EXISTING CEILING
SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF
EXISTING DECK
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
A1
FIRE RESISTANT
SEALANT, BOTH
SIDES
1-HR RATED
U.L. DESIGN NO. UL419
E X
IS
T
IN
G
N E
W
C O
N S
T R
U C
T
IO
N
A
NON-RATED
3 5/8" INSULATED
WALL WITH 16
GAUGE METAL
STUDS @ 16" O.C.
WALL TO EXTEND
TO UNDERSIDE OF
DECK
5/8" GYPSUM
BOARD
EXISTING CEILING
SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF
EXISTING DECK
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
E X
IS
T
IN
G
N
N S
T R
U C
T
IO
N 3 5/8" INSULATED
WALL WITH 16
GAUGE METAL
STUDS @ 16" O.C.
WALL TO EXTEND
TO UNDERSIDE OF
DECK
5/8" GYPSUM
BOARD
EXISTING CEILING
SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
B
E X
IS
T
IN
G
N
N S
T R
U C
T
IO
N
EXISTING
FLOOR
C
EXTENSION
POLE
PLASTIC
SHEET
N
N S
T R
U C
T
IO
N
E X
IS
T
IN
G
F
IE
L D
V E
R
IF
YTWO LAYERS 5/8" TYPE
X GYPSUM BOARD -
BOTH SIDES - ICRA
WALL A2
A2
2-HR RATED
U.L. DESIGN NO. UL419
UNDERSIDE OF
EXISTING DECK
PLASTIC
BARRIER
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE
KEPT CLEAN. FLOORS NOT
BEING REPLACED MUST BE
PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED
PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE EXISTING
WINDOW TO BE RE-INSTALLED
AFTER CONSTRUCTION IS
COMPLETE.
NOTE: CONTRACTOR TO FIND
ROUTING TO EXHAUST HEPA
FILTER TO OUTSIDE.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
ISOLATE AND COVER ALL
SUPPLY DIFFUSERS NOT
IN OPERAION DURING
PROJECT - COORDINATE
WITH COR
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
NOTE: CONTRACTOR
TO FIND ROUTING TO
EXHAUST HEPA
FILTER TO OUTSIDE.
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR MACHINE ROOM & ELEVATOR UPGRADES FOR
BUILDING 1, GROUND FLOOR
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
NOTE:
THIS PROJECT CONSTITUTES MULTIPLE BUILDINGS AND FLOORS.
REFER TO ARCHITECTURAL DRAWINGS FOR THE CORRESPONDING
BUILDING AND FLOOR WHERE ILSM SIGNAGE WILL BE LOCATED.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE
DESIGNATION FOR THIS PROJECT IS LEVEL (II) FOR THE CLASS OF
PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD
SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON
THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA
FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND
ACTIVE.
1A. THIS PROJECT MAY NEED AN ENTRY VESTIBULE FOR CLOTHING
CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR
THE PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM.
THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND
LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS
SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL
PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED
OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE
CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY
TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A
PERMANENT BARRIER.
AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A. (COORDINATE
DESIGNATION WITH COR.)
2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER
ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR
MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS
INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS
CONTROL
3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND
ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION
MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;
THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND
THE CONSTRUCTION STAGING/PREP AREA.
4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORT
SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON
TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE
REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE
USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR
(HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE
OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED
AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION
AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE
AREAS WITHOUT PRIOR APPROVAL OF THE COR.
4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE
INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
4C. ALL EQUIPMENT TO REMAIN SHALL BE COVERED AND PROTECTED
PRIOR STARTING EACH CONSTRUCTION PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
5. AIR SYSTEM FLOW: CONTRACTOR SHALL ACKNOWLEDGE WITH THE
COR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-
CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS
NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN
TO DIRTY AREAS.
5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA
SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE
AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE
(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A
PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-
CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED
AREAS
6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE
FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION
AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR
AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE
DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM
DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,
VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS
DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.
ICRA NOTES
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD; AMCU;
- Respiratory Isolation Rooms
- Surgery
III
TYPE DTYPE CTYPE B
Class IV or control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
8. Temporary ICRA enclosures must match and continue the fire rating for which it is enclosing. One hour fire rated walls must use partition type A1 with an A label solid core wood door and closer. Two hour fire rated walls must use partition type A2 with a B label solid core wood door and closer.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
E
F
P2
ELEVATOR
P1
ELEVATOR
P3
ELEVATOR
LOBBY
VESTIBULE
WALL TYPE C
60" MIN. CLEAR
CLEAR
3'-0" MIN.
C L E
A R
M
IN
PROVIDE STICKY MATS
(CHANGE END OF SHIFT OR
MORE IF NECESSARY TO
MAINTAIN CLEANLINESS)
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:2
:1
P M
C U s e rs
\c k u rk u l\ D o c u m e n ts
\A
-3
-V A
T u s c a lo o s a
-U p g ra d e E le v a to rs -A
L
B u ld in g
A d m in is tr a ti v e c k u rk u lG
V Y
H
.r v t
ICRA MATRIX AND DETAILS
2 8LBB
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
DJR
G-002
1, 2, 5, 38, 135 & 137
Scale: 3/8" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 3/8" = 1'-0"
CROSS SECTION "A"
Scale: 3/8" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: 1/4" = 1'-0"
TYPICAL ELEVATOR ICRA PLAN AT EACH LEVEL
NOTES:
1. ONLY ONE ELEVATOR RENOVATION PER BANK MAY BE COMPLETED AT ONE TIME.
2. INSTALLATION OF THE ICRA ENCLOSURE COMPLETION IS REQUIRED AT THE START OF EACH
RENOVATION.
3. WORK TO BE DONE DURING OFF HOURS.
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
UP
A
B
E
F
G
H
I
J
C
D
2 3 4 5 6 7
S5
SERVICE
ELEVATOR
S5
ELEVATOR
MACHINE ROOM
P2
ELEVATOR
P1
ELEVATOR
OFFICE
42D
OFFICE
42C
MALE TOILET
42B
FEMALE
TOILET
42A
CORRIDOR
42F
S
AELECTRICAL
RM.
ELEC./ MECH.
41R
DENTAL
OPERATORY
41Q
EXAM/
TREATMENT
41B
X-RAY
41D
CORRIDOR
52A
DENTAL
OPERATORY
41P
X-RAY
41E
STORAGE
41O
BIOHAZARD
41F
DENTAL
OPERATORY
41N
INSTRUMENT
PREPARATION
41G
DENTAL
OPERATORY
41H
OPERATORY
41M
OFFICE
41L
DENTAL
OPERATORY
41J
STO.
41K
OFFICE
WAITING
TEL. CLO.
CORRIDOR
52B
OFFICE
43A
LAB
43B
MECH
43C
OFFICE
43G
ELECTRICAL
43F
TRAVEL
OFFICE
OFFICE
42EOFFICE
TR
COMPUTER
MAINTENANCE
STO.
1A
TREATMENT
ROOM
2ELEC/
MECH
3A
ELEC/
MECH
OFFICE
4A
ELEC. / MECH.
MECH RM.
OFFICE
CORRIDOR
VESTIBULE
34 STAIRS 2
MECHANICAL
RM.
CORRIDOR
MECH. RM.
37A
WAITING
STO.
51A
35BTOILET
35A
OFFICE
OFFICE
CORRIDOR
50A
PC1WORK RM.
OFFICE
BREAK ROOM
WAITING
OFFICE
OFFICE
EXAM
8A
CORRIDOR
EXAM/
TREATMENT
RM.
8D
EXAM
8C
MECH RM.
EXAM
8B
CORRIDOR
MALE TLT.
FEMALE
TLT.
A
STAIRS 1
EXAM RM
EXAM RM
WAITING
CHECK IN
AUDIOLOGY
EXAM RM
EXAM RM
EXAM RM
EXAM RM
CORRIDOR
EXAM RM
EXAM RM
EXAM RM
OFFICE
EXAM RM
OFFICE
22A
OFFICE
MAIL RM.
51B
MAIL RM.
35D
MAIL RM.
35C
TOILET
36B
OFFICE
36A
OFFICE
36C
STAIRS 3
OFFICE
43E
OFFICE
43D
XFEB
XFEB
XFEB
XFEB
XFEB
XFEB
XFEB
XFEB
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
COMMON PATH OF TRAVEL = 19'-2"
TRAVEL DISTANCE = 179'-10" TRAVEL DISTANCE = 153'-3"
COMMON PATH OF
TRAVEL = 33'-0"
1.A-100
S5
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
EXISTING
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS -
ALWAYS UNLOCKED IN DIRECTION
OF EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
NOT IN PROJECT SCOPE
CA
DE
KB
XXX
XXX
XFEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/4
/2
:1
:0
P M
C U s e rs
\c k u rk u l\ D o c u m e n ts
\A
-3
-V A
T u s c a lo o s a
-U p g ra d e E le v a to rs -A
L
B u ld in g
A d m in is tr a ti v e c k u rk u lG
V Y
H
.r v t
BUILDING 1 OVERALL BASEMENT
FLOOR PLAN
3 8LBB
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
DJR
1.GL100
NO
RTH
0 4 8 16
Scale: 1/8" = 1'-0"
BUILDING 1 OVERALL BASEMENT FLOOR PLAN
LIFE SAFETY LEGEND
ICRA NOTES GROUND & UPPER FLOOR
LEVELS - BUILDING 1
(REFER TO ICRA MATRIX AND NOTES
ON G-002)
IC ACTIVITY TYPE: B
IC RISK GROUP: 2
IC CONSTRUCTION CLASS: II
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 PROVIDE ICRA ENCLOSURE TYPE C AT ELEVATORS.
SEE G-002 FOR ICRA NOTES AND DETAILS.
2 COORDINATE WITH COR FOR CONSTRUCTION
ACCESS ROUTE.
GENERAL NOTE 1
CONTRACTOR TO COMPLETE WORK ON
ONE ELEVATOR PER BUILDING AT A
TIME.
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
B
C
D
E
F
G
H
I
J
2 3 4 5 6 7 8 9 10
STAIRS
SG-2
UNION
COMPUTER
16A
CHIEF CREDIT
OFFICE
CREDIT UNION
OFFICE
CORRIDOR
CG2
SECRETARY
OFFICE
14 MECHANICAL
ROOM
17A
FILE ROOM
CREDIT UNION
OFFICE
STAFF OFFICE
GEN.
STORAGE
CORRIDOR
CG3
CLO.
18A
STAFF OFFICE
ELEV.
P3
ENTRANCE
CG4
ENTRANCE
CG5
HAC
22A
G E
N S
T O
0GEN. STO.
ELEC/MECH
RM.
8A
CORRIDOR
CG1
GE. STO.
TEL. CLO.
HAC
P
IP
E C
H A
S E
B
MALE TLT.
P
IP
E C
H A
S E
C
EQPT. STO.
EQPT. STO.
24A
CLERK OFFICE
CLERK OFFICE
CLO
STAFF TLT.
3A
STAFF TLT
1A
CLO
1BSTAFF OFFICE
STAFF OFFICE
LOBBY
1C
STAIRS
SG1
EXAM/
TREATMENT
RM.
26B
CHIEF OFFICE
26C
GROUP RM.
STAFF OFFICE
CHIEF OFFICE
SECRETARY
OFFICE
STAFF OFFICE
CORRIDOR
TO BLDG. 38
CORRIDOR
TO BLDG. 3
COMMON PATH OF TRAVEL DISTANCE = 75'-0"
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
2.A-100
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
EXISTING
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
NOT IN PROJECT SCOPE
CA
DE
KB
XXX
XXX
XFEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/4
/2
:2
:2
P M
C U s e rs
\c k u rk u l\ D o c u m e n ts
\A
-3
-V
A T u s c a lo o s a -U p g ra d e E le v a to rs
-A L
B u ld in g
A d d ic ti o n
R e h a b c k u rk u lG
V Y
H
.r v t
BUILDING 2 OVERALL GROUND FLOOR
PLAN
4 8LBB
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
DJR
2.GL100
Scale: 1/8" = 1'-0"
BUILDING 2 OVERALL GROUND FLOOR PLAN NO
RTH
0 4 8 16
LIFE SAFETY LEGEND
ICRA NOTES GROUND & UPPER FLOOR
LEVELS - BUILDING 2
(REFER TO ICRA MATRIX AND NOTES
ON G-002)
IC ACTIVITY TYPE: B
IC RISK GROUP: 2
IC CONSTRUCTION CLASS: II
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 PROVIDE ICRA ENCLOSURE TYPE C AT
ELEVATORS. SEE G-002 FOR ICRA NOTES AND
DETAILS.
2 COORDINATE WITH COR FOR CONSTRUCTION
ACCESS ROUTE.
GENERAL NOTE 1
CONTRACTOR TO COMPLETE WORK ON
ONE ELEVATOR PER BUILDING AT A
TIME.
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
DN
UP
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
EXISTING
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
NOT IN PROJECT SCOPE
CA
DE
KB
XXX
XXX
XFEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
A
2 4 5 6 7 H I J
B
C
D
N3
E
8A
OFFICE
TECHNICIAN
OFFICE
12D
STAIRWELL
12C
LOBBY
STORAGE
9A
ELEVATOR
MACHINE ROOM
STAFF OFFICE
12A
TELEPHONE
CLOSET
12B
HAC
7A
STAFF OFFICE
STAFF OFFICE
COPY ROOM
10A
TECHNICIAN
OFFICE
ENTRANCE
WAY
MECH RM
MECH RM
MALE TOILET
4B
FEMALE TOILET
ASST. CHIEF
OFFICE
12E
CORRIDOR
ELECTRICAL
MECH RM2
CHIEF OFFICE
CLERK OFFICE
1A
OFFICE
CORRIDOR
CORRIDOR
GENERAL
STORAGE
P13
ELEVATOR
TRAVEL DISTANCE = 131'-0"
XFEB
5A
COMMUNICATIONS
ACCESSIBLE
ENTRANCE
UP
C
E L E
C /M
E C
H
TRAVEL DISTANCE = 44'-3"
COMMON PATH OF TRAVEL = 16'-8"
5.A-100
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/4
/2
:2
:3
P M
C U s e rs
\c k u rk u l\ D o c u m e n ts \A
-3
-V A
T u s c a lo o s a
-U p g ra d e
E le v a to rs
-A L
B u ld in g c k u rk u lG
V Y
H
.r v t
BUILDING 5 OVERALL BASEMENT
FLOOR PLAN
5 8LBB
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
DJR
5.GL100
NO
RTH
0 4 8 16
LIFE SAFETY LEGEND
Scale: 1/8" = 1'-0"
BUILDING 5 OVERALL BASEMENT FLOOR PLAN
ICRA NOTES BASEMENT & UPPER
FLOOR LEVELS - BUILDING 5
(REFER TO ICRA MATRIX AND NOTES
ON G-002)
IC ACTIVITY TYPE: B
IC RISK GROUP: 2
IC CONSTRUCTION CLASS: II
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 PROVIDE ICRA ENCLOSURE TYPE C AT
ELEVATORS. SEE G-002 FOR ICRA NOTES
AND DETAILS.
2 COORDINATE WITH COR FOR
CONSTRUCTION ACCESS ROUTE.
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
S S
S S
S
SS SSS
S S
S S
S S
S S
SS SSS
SS SSSSSS
S S
S S
S SS S S
S SS S S S
A
2 3 4 5
B
C
D
E
F
G
H
I
J
K
L
M
N
6 7 8 9 10 11 12 13 14 15 16 17
ELECTRICAL
RM
B09
CANTEEN
STORAGE
B06
EQUIPMENT
ROOM
B05
CANTEEN
STORAGE
B01A
ELEV. EQPT.
RM.
B01C
MECHANICAL
B02
CANTEEN
STORAGE
B01B
EQUIPMENT
ROOM
B03A
ENTRANCE
B03
CRAWL
SPACE
HALLWAY
B07
EQUIPMENT
ROOM
B08 B04
ELEVATOR
MACHINE RM
ELEV. PIT
P7
ELEV. PIT
P6
DN
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
CRAWL
SPACE
CRAWL
SPACE
S11-C
STAIR 2
S11-D
STAIR 1
STORAGE
B01
HALLWAY
CRAWL
SPACE
COMMON PATH OF TRAVEL = 25'-7"
XFEB
P6
P7
S11
ELEVATOR
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
XFEB
DN
38.A-100
1 1
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
EXISTING
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
NOT IN PROJECT SCOPE
CA
DE
KB
XXX
XXX
XFEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/4
/2
:2
:1
P M
C U s e rs
\c k u rk u l\ D o c u m e n ts \A
-3
-V A
T u s c a lo o s a
-U p g ra d e
E le v a to rs
-A L
B u ld in g c k u rk u lG V
Y H
.r v t
BUILDING 38 OVERALL BASEMENT
FLOOR PLAN
6 8LBB
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
DJR
38.GL100
Scale: 1/8" = 1'-0"
BUILDING 38 OVERALL BASEMENT FLOOR PLAN
NO
RTH0 4 8 16
ICRA NOTES BASEMENT & UPPER
FLOOR LEVELS - BUILDING 38
(REFER TO ICRA MATRIX AND NOTES
ON G-002)
IC ACTIVITY TYPE: B
IC RISK GROUP: 2
IC CONSTRUCTION CLASS: II
LIFE SAFETY LEGEND
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 PROVIDE ICRA ENCLOSURE TYPE C AT
ELEVATORS. SEE G-002 FOR ICRA NOTES
AND DETAILS.
2 COORDINATE WITH COR FOR CONSTRUCTION
ACCESS ROUTE.
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
RELOCATED
EXISTING
REFRIGERATOR
LATERAL
FILE
LATERAL
FILE
LATERAL
FILE
LATERAL
FILE
LATERAL
FILE
LATERAL
FILE
LATERAL
FILE
LATERAL
FILE
LATERAL
FILE
C
2 3 4 5 6 7 8 9 10 11 12
B
A
D
E
F
G
H
I
ELEV
ELEV
ELEVATOR
LOBBY
CB-1
ELEVATOR
MACHINE
B-01
ELECT.
/MECH.
B-19
STAIRS
S-2
ELECT./MECH.
B-02
OFFICE
SECRETARY
OFFICE
B-04
Room Name B-05
STORAGE
VAULT,
CONTROL
DRUGS
B-03D
CLEAN
ROOM
B-03C
PHARMACY
SUPPORT
ELECT./MECH.
B-03E
STAIRS
S-1
Room Name
DW-103
GENERAL
STORAGE
B-03F
CHIEF
OFFICE
B-04A
STUDY /
RESEARCH
ROOM
B-06
FILE ROOM
STORAGE
B-08H
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
OFFICE
OFFICE
LAB
B-03A
SUPERVISOR
OFFICE
B-08G
OFFICE
OFFICE
OFFICE
CLERK
OFFICE
B-08F
TELEX/XEROX
ROOM
B-08E
TELEX/XEROX
ROOM
B-08D
ROOM
B-14
CORR.
CB-6
TELEPHONE
CLOSET
B-07
SECRETARY
OFFICE
B-08L
OFFICE
B-08A
COMPUTER
ROOM
B-08BOFFICE
B-08
WARD
ADMIN.
OFFICE
B-08C
TOILET
FEMALE
B-11
TOILET
MALE
B-09
CHIEF
OFFICE
B-10A
SECRETARY
OFFICE
B-10
CHIEF
OFFICE
B-10B
ELECT./MECH.
B-17A
ELECT. /
MECH.
B-18
STAIRS
BS-3
LOUNGE
B-12
HAC
B-13
ELECT./MECH.
B-17
CORR.
CB-3
CORR.
CB-2
VEST.
CB-4
ELECT./MECH.
B-15 ELECT./MECH.
B-16
ANTE ROOM
ELECT./MECH.
FILES
FILES
COMMON PATH OF
TRAVEL = 20'-6"
COMMON PATH OF TRAVEL = 42'-6"
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
TRAVEL DISTANCE = 152'-5"
TRAVEL DISTANCE = 127'-4"
ENTRANCE
CB-5
TRAVEL DISTANCE = 106'-3"
B-01
135.A-100
1 2 1
2 3
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
EXISTING
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
NOT IN PROJECT SCOPE
CA
DE
KB
XXX
XXX
XFEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/4
/2
:2
:4
P M
C U s e rs
\c k u rk u l\ D o c u m e n ts \A
-3
-V A
T u s c a lo o s a
-U p g ra d e
E le v a to rs
-A L
B u ld in g c k u rk u lG
V Y
H
.r v t
BUILDING 135 OVERALL BASEMENT
FLOOR PLAN
7 8LBB
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
DJR
135.GL100
NO
RTH
0 4 8 16
Scale: 1/8" = 1'-0"
BUILDING 135 OVERALL BASEMENT FLOOR PLAN
ICRA NOTES BASEMENT & UPPER
FLOOR LEVELS - BUILDING 135
(REFER TO ICRA MATRIX AND NOTES
ON G-002)
IC ACTIVITY TYPE: B
IC RISK GROUP: 2
IC CONSTRUCTION CLASS: II
LIFE SAFETY LEGEND
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 PROVIDE ICRA ENCLOSURE TYPE C AT
ELEVATORS. SEE G-002 FOR ICRA NOTES
AND DETAILS.
2 COORDINATE WITH COR FOR
CONSTRUCTION ACCESS ROUTE.
3 PROVIDE ICRA ENCLOSURE TYPE A1 AT
ELEVATOR MACHINE ROOMS. SEE G-002 FOR
ICRA NOTES AND DETAILS.
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
2 3 4 875
B
C
E
F
G
H
J
K
L
M
N
D
I
9 11106
MUSIC
H1-101
STORAGE
H1-101A
BILLARDS
H1-100
RECREATION
OFFICE
G1-110
OFFICE
G1-110A
CORRECTIVE
THERAPY
G1-109
EQUIP.
STOR.
G1-109A
OFFICE
G1-109B OFFICE
G1-105C
STORAGE
G1-105B
INCENTIVE
THERAPY
G1-106
OCCUPATIONAL
THERAPY
G1-105
STORAGE
G1-104 K
IL
N
S G
-1
A
CORRIDOR
C1-6
ARTS &
CRAFTS
G1-111
UNASSIGNED
G1-107A
H.K. AIDS
G1-108
UNASSIGNED
G1-107
TRASH
G1-101
SOILED LINEN
G1-100
ELECT.
G1-101
TELE.
G1-102
VESTIBULE
E1-102
STAIR 5
MUSIC
LISTEN
H1-101B
ELECT.
H1-101D
TELE.
H1-101C
CLINIC ADMIN.
H1-100A
KITCHEN
H1-102
T L T
H -1
B
T L T
H -1
A
RECREATION
H1-103
T R
A S
H H
-1
S O
IL
E
D L
IN
E
N H
-1
TELE
H1-106
RECREATION
H1-103C
EXCAVATED
PIPE
BASEMENT
I1-103
MECHANICAL
I1-102
ELECT
I1-101 RECREATION
STORAGE
I1-100
LOBBY
E1-103
C O
R R
ID
O
R C
-7
WEST ATRIUM
K1-100
TLT
K1-100C
TLT
F1-100
TLT
F1-101TLT
K1-100B
ACTIVITY
STORAGE
K1-100A
F1-104
C O
R R
ID
O
R C
-5
LOBBY
L1-104
S T
A
IR
PSYCH
TESTING
J1-100 O F
F
IC
E J -1
A
IN
T
E R
V
IE
W J -1
6 STOR.
J1-108
TELE
ELECT
ELEV.
LOBBY
J1-110
CORRIDOR
C1-1
PSYCH.
J1-101
PSYCH.
J1-102
PSYCH.
J1-103
PSYCH.
J1-104
PSYCH.
J1-105
PSYCH.
J1-107
PSYCH.
CHIEF
J1-109
MECH
A1-103
ELEV
S-20
ELEV
S-21
SER.
ELEV.
A1-103A
PASS. ELEV
EQUIP.
A1-103B
LOBBY
A1-101
STORAGE
A1-102
STORAGE
A1-102
SEATING
A1-103
ELEV. LOBBY
B1-100
ELEV
P-17
ELEV
P-18
ELEV
P-19
SEAMSTRESS
B1-101
CLOTHING
B1-101A
CLEAN
SORTING
B1-101B
LINEN
UNIFORM
ROOM
B1-101C
CORRIDOR
C1-2
S T
A
IR
STORAGE
B1-103
H.K. AIDS
B1-102
TELE.
D1-100
SOILED
LINEN
D1-101
TRASH
D1-102
TELE.
D1-110
ELECT
C1-101
STAIR 3
MECHANICAL
C1-100
G A
S D
-1
B.M. STORAGE
D1-104
C O
R R
ID
O
R C
-3
T L T
D -1
A
PRINT SHOP
D1-105
ELECT
D1-106
EAST ATRIUM
L1-100
LOADING
DOCK
SATELITE
PHARMACY
F1-103
EQUIP.
STOR.
F1-102
OFFICE
D1-105C
TELE
D1-107
O F
F
IC
E D
-1
D
POOL EQUIP.
D1-108A
MECHANICAL
D1-109
E1-106
CORRIDOR
C1-4
VENDING
E1-105
CORRIDOR
C1-8
VESTIBULE
E1-100
STAIR 4
TERRACE
THERAPEUTIC
POOL
E1-100A
V E
S T
E
-1
C
WOMEN
DRESSING
E1
CLEAN/ SOILED
SUITS
E1-100E
MEN
DRESSING
E1-100B
TRAVEL DISTANCE = 226'-0"
C O
M M
O N
P A
T H
O F
T R
A V
E L
TRAVEL
DISTANCE
= 135'-0"
TRAVEL DISTANCE = 226'-0"
FEC
FEC
FEC
FEC
137.GL100
3 3
137.A-100
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
EXISTING
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
NOT IN PROJECT SCOPE
CA
DE
KB
XXX
XXX
XFEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
SERVICE
ELEVATOR
S-21
ELEVATOR
P17
ELEVATOR
P18
ELEVATOR
P19
SERVICE
ELEVATOR
S-20
STAIRS 2
S-22
ELEVATOR
LOBBY
B1-100
CORRIDOR
C1-2
MECHANICAL
A1-103
A1-103B
PASSSENGER
ELEVATOR
EQPT. ROOM
1(P17)
1(P18)
1(P19)
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/4
/2
:3
:0
P M
C U s e rs
\c k u rk u l\ D o c u m e n ts \A
-3
-V A
T u s c a lo o s a
-U p g ra d e
E le v a to rs
-A L
B u ld in g c k u rk u lG
V Y
H
.r v t
BUILDING 137 OVERALL GROUND
FLOOR PLAN
8 8LBB
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
DJR
137.GL100
Scale: 1/16" = 1'-0"
BUILDING 137 OVERALL GROUND FLOOR PLAN
N O R
TH
0 4 8 16
ICRA NOTES GROUND & UPPER FLOOR
LEVELS - BUILDING 137
(REFER TO ICRA MATRIX AND NOTES
ON G-002)
IC ACTIVITY TYPE: B
IC RISK GROUP: 2
IC CONSTRUCTION CLASS: II
LIFE SAFETY LEGEND
Scale: 1/8" = 1'-0"
BLDG 137 ENLARGED PARTIAL GROUND FLOOR ICRA PLAN
N O R
TH
0 4 8 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 PROVIDE ICRA ENCLOSURE TYPE C AT
ELEVATORS. SEE G-002 FOR ICRA NOTES AND
DETAILS.
2 COORDINATE WITH COR FOR CONSTRUCTION
ACCESS ROUTE.
3 PROVIDE ICRA ENCLOSURE TYPE A1 AT
ELEVATOR MACHINE ROOMS. SEE G-002 FOR
ICRA NOTES AND DETAILS.
5070L
IC
E N
S E D A RC H I T ECT
DA
V ID J . REICHARD
NOR T H CA RO L I NA
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
XFE EXISTING FIRE EXTINGUISHER
XFEB EXSTING FIRE EXTINGUISHER BRACKET
CL
DEMOLITION KEYNOTE WINDOW TYPE
ROOF PITCH SYMBOLDOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS
PROJECT.
11. PROVIDE BACKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS
REQUIRED FOR COMPLETION OF THE WORK.
12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
14. IF AT ANY TIME DURING CONSTRUCTION, THE PRESENCE OF ANY CONTAMINATED MATERIALS APPEARS TO BE ENCOUNTERED, THE CONTRACTOR SHALL IMMEDIATELY CEASE WORK AND ALERT THE COR OF THE FINDINGS
VERBALLY AND IN WRITING WITHIN 12 HOURS OF ANY POTENTIAL DISCOVERY.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT
ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.
13. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
14. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE OWNER OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR
REINSTALLED FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.
15. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
16. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.
COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR
USE OF FREIGHT ELEVATOR (AS REQUIRED).
1. DELETE ALL WORK AT BUILIDNG NUMBER 1.
1 ALTERNATE NOTES
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
3/8" 3/8"1'-6"
M
A X
S P
/2
A
/2
1 1/4" 1 1/4"
1"
VARIES F.V.
SECTION - A
1. 3/8" x 2 1/2" STEEL BAR
2. WELD NON-SLIP STEEL RUNGS ALL AROUND
TO VERTICAL STEEL BARS
3. 3/4" ROUND NON-SLIP STEEL BAR RUNGS
4. 3/8" x 3" BENT PLATE, WELD TO VERT. RUNGS.
EXPANSION BOLT TO FOUNDATION WALL.
# PIT LADDER KEYNOTES
FOUNDATION
WALL4
• CONTRACTOR TO COMPLETE WORK ON ONE ELEVATOR PER BUILDING AT A TIME.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:1
:0
P M
C U s e…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .