Attachment 8 - Drawings 679-22-100.pdf

PDF 16 MB Posted

Attached to
Y1DA--679-22-100 | Elevator Upgrades in buildings 1, 2, 5, 38, 135 and 137
Solicitation number
36C24726R0024
Issued by

About this file

This file is an architectural drawing set (Attachment 8) for elevator upgrades at the Tuscaloosa Veterans Affairs Medical Center (VAMC) across six buildings: Buildings 1, 2, 5, 38, 135, and 137. The comprehensive set includes detailed architectural, mechanical, electrical, and fire alarm plans for modernizing multiple elevators, with each building having between one to three elevators targeted for renovation. The project involves comprehensive upgrades including new elevator interiors, control systems, hoistway doors, lighting, electrical components, and mechanical systems, with specific attention to maintaining fire safety, infection control, and building infrastructure integrity.

The drawings, dated February 6, 2025, cover multiple technical disciplines and provide extensive documentation for each building's specific elevator upgrade requirements. Key elements include replacing elevator controllers, installing new stainless steel hoistway doors, upgrading electrical systems, adding new sump pumps, implementing split system HVAC units, installing new lighting fixtures, and integrating fire alarm and access control systems. The project scope encompasses mechanical, electrical, plumbing, and architectural modifications, with careful consideration given to maintaining building operational continuity and adhering to VA healthcare facility standards throughout the renovation process.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R A M P

R A M P

BUILDING 137

ELEVATORS:

P-17 | 4,000 lb P-18 | 4,000 lb P-19 | 4,000 lb

BUILDING 38

ELEVATORS:

P-6 | 5,500 lb P-7 | 5,500 lb

BUILDING 5

ELEVATOR:

P-13 | 3,000 lb

BUILDING 1

ELEVATORS:

P-1 | 3,000 lb P-2 | 3,000 lb

BUILDING 135

ELEVATORS:

P-14 | 4,000 lb P-15 | 4,000 lb

BUILDING 2

ELEVATOR:

P-3 | 3,000 lb

GOV. VEHICLE PARKING AREA

QUARTERS

PARKING AREA

LO

O

P R O

AD

H A

G L E

R L

A N

E

PL#5

PL#4

PL#3

PL#6

PL#7

PL#10

PL#11

PL#11A

P L#9

PL#8

PL#2

TEMP. PL

1. DELETE ALL WORK AT BUILDING NUMBER 1

# ALTERNATE NOTES

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP

PROJECT LOCATION MAP

/4

/2

:2

:4

P M

C U s e rs

\c k u rk u l\ D o c u m e n ts

\S it e

-3

-V

A T u s c a lo o s a

-U p g ra d e

E le v a to rs

-A L c k u rk u lG V

Y H

.r v t

G-001

COVER SHEET & DRAWING LIST

1 8LBB

ELEVATOR UPGRADES IN

BUILDINGS 1, 2, 5, 38, 135 &

TUSCALOOSA VAMC

FEBRUARY 6, 2025

100% BID DOCUMENTS

679-22-10021-344

ELEVATOR UPGRADES IN BUILDINGS 1,

2, 5, 38, 135 & 137

TUSCALOOSA VAMC

VA PROJECT #: 679-22-100

DJR

Scale: 1" = 100'-0"

SITEPLAN

DRAWING LIST

GENERAL

G-001 COVER SHEET & DRAWING LIST 1 8

G-002 ICRA MATRIX AND DETAILS 2 8

1.GL100 BUILDING 1 OVERALL BASEMENT FLOOR PLAN 3 8

2.GL100 BUILDING 2 OVERALL GROUND FLOOR PLAN 4 8

5.GL100 BUILDING 5 OVERALL BASEMENT FLOOR PLAN 5 8

38.GL100 BUILDING 38 OVERALL BASEMENT FLOOR PLAN 6 8

135.GL100 BUILDING 135 OVERALL BASEMENT FLOOR PLAN 7 8

137.GL100 BUILDING 137 OVERALL GROUND FLOOR PLAN 8 8

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 21

1.A-100 BUILDING 1 PARTIAL FLOOR PLANS - P1 & P2 2 21

1.A-701 BUILDING 1 VERTICAL CIRCULATION SECTIONS & ELEVATIONS - P1 & P2 3 21

2.A-100 BUILDING 2 PARTIAL FLOOR PLANS & INT. ELEV. - P3 4 21

2.A-701 BUILDING 2 VERTICAL CIRCULATION SECTIONS AND ELEVATIONS - P3 5 21

5.A-100 BUILDING 5 PARTIAL FLOOR PLANS - P13 6 21

5.A-701 BUILDING 5 VERTICAL CIRCULATION SECTION AND ELEVATIONS - P13 7 21

38.A-100 BUILDING 38 PARTIAL FLOOR PLANS - P6 & P7 8 21

38.A-701 BUILDING 38 VERTICAL CIRCULATION SECTIONS AND ELEVATIONS - P6 & P7 9 21

135.A-100 BUILDING 135 PARTIAL FLOOR PLANS - P14 & P15 10 21

135.A-701 BUILDING 135 VERTICAL CIRCULATION SECTION AND ELEVATIONS - P14 & P15 11 21

137.A-100 BUILDING 137 PARTIAL FLOOR PLANS - P17-P19 12 21

137.A-101 BUILDING 137 PARTIAL FLOOR PLANS - P17-P19 13 21

137.A-701 BUILDING 137 VERTICAL CIRCULATION SECTIONS AND ELEVATIONS - P17-P19 14 21

A-601 DOOR SCHEDULE AND DETAILS AND ROOM FINISH SCHEDULE 15 21

A-801 BLDG 1 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 16 21

A-802 BLDG 2 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 17 21

A-803 BLDG 5 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 18 21

A-804 BLDG 38 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 19 21

A-805 BLDG 135 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 20 21

A-806 BLDG 137 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 21 21

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 10

M-002 PLUMBING GENERAL INFORMATION AND DETAILS 2 10

1.M-101 BUILDING 1 PARTIAL MECHANICAL FLOOR PLANS - P1 & P2 3 10

2.M-101 BUILDING 2 PARTIAL MECHANICAL FLOOR PLANS - P3 4 10

5.M-101 BUILDING 5 PARTIAL MECHANICAL FLOOR PLANS - P13 5 10

38.M-101 BUILDING 38 PARTIAL MECHANICAL FLOOR PLAN - P6 & P7 6 10

135.M-101 BUILDING 135 PARTIAL MECHANICAL PLANS - P14 & P15 7 10

137.M-101 BUILDING 137 PARTIAL MECHANICAL PLANS 8 10

M-501 MECHANICAL DETAILS 9 10

M-601 MECHANICAL SCHEDULES 10 10

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 16

E-002 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 16

1.ED101 BUILDING 1 PARTIAL MECHANICAL PENTHOUSE ELECTRICAL DEMOLITION PLANS - P1 & P2 3 16

1.EP101 BUILDING 1 PARTIAL MECHANICAL PENTHOUSE ELECTRICAL PLANS - P1 & P2 4 16

2.ED101 BUILDING 2 PARTIAL ATTIC ELECTRICAL DEMOLITION PLAN - P3 5 16

2.EP101 BUILDING 2 PARTIAL ATTIC AND ELEVATOR PIT ELECTRICAL PLANS - P3 6 16

5.ED101 BUILDING 5 PARTIAL BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - P13 7 16

5.EP101 BUILDING 5 PARTIAL BASEMENT FLOOR ELECTRICAL PLANS - P13 8 16

38.ED101 BUILDING 38 PARTIAL BASEMENT ELECTRICAL DEMOLITION PLANS - P6, P7 9 16

38.EP101 BUILDING 38 PARTIAL BASEMENT ELECTRICAL PLANS - P6, P7 10 16

135.ED101 BUILDING 135 PARTIAL BASEMENT ELECTRICAL DEMOLITION PLAN - P14, P15 11 16

135.EP101 BUILDING 135 PARTIAL BASEMENT AND ELEVATOR PIT ELECTRICAL PLANS - P14, P15 12 16

137.ED101 BUILDING 137 PARTIAL GROUND FLOOR ELECTRICAL DEMOLITION PLAN - P17, P18 & P19 13 16

137.EP101 BUILDING 137 PARTIAL GROUND, ELEVATOR PIT AND ROOF ELECTRICAL PLANS - P17, P18 & P19 14 16

E-201 ELEVATOR ELECTRICAL SECTIONS 15 16

E-501 ELECTRICAL DETAILS AND EQUIPMENT CONDUCTOR SCHEDULE 16 16

FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 1

NORTH

0 4 8 16

NOTE:

1. CONTRACTOR TO REVIEW WITH COR:

A. PROJECT ACCESS

B. CONTRACTOR PARKING

C. CONTRACTOR STAGING AREA

D. FACILITY ICRA MATRIX

E. DISCUSS PHASING

CAMPUS LOCATION

PROJECT LOCATION

SIGNATURES REQUIRED

DIRECTOR:

______________________________________DATE:_________

ENERGY ENGINEER:

______________________________________DATE:_________

INFECTION CONTROL:

______________________________________DATE:_________

SAFETY MANAGER:

______________________________________DATE:_________

LAYDOWN AREA

BLDGS 1, 2, 5, 38, 135 & 137

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

Docusign Envelope ID: 3C50501C-ED34-40D1-A0BC-5347D6DC6504

2/5/2025

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H E

IG

H

T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

3 5/8" INSULATED

WALL WITH 16

GAUGE METAL

STUDS @ 16" O.C.

WALL TO EXTEND

TO UNDERSIDE OF

DECK

ONE LAYER 5/8"

TYPE X GYPSUM

BOARD - BOTH

SIDES - ICRA WALL

A1

EXISTING CEILING

SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF

EXISTING DECK

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

A1

FIRE RESISTANT

SEALANT, BOTH

SIDES

1-HR RATED

U.L. DESIGN NO. UL419

E X

IS

T

IN

G

N E

W

C O

N S

T R

U C

T

IO

N

A

NON-RATED

3 5/8" INSULATED

WALL WITH 16

GAUGE METAL

STUDS @ 16" O.C.

WALL TO EXTEND

TO UNDERSIDE OF

DECK

5/8" GYPSUM

BOARD

EXISTING CEILING

SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF

EXISTING DECK

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

E X

IS

T

IN

G

N

N S

T R

U C

T

IO

N 3 5/8" INSULATED

WALL WITH 16

GAUGE METAL

STUDS @ 16" O.C.

WALL TO EXTEND

TO UNDERSIDE OF

DECK

5/8" GYPSUM

BOARD

EXISTING CEILING

SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

B

E X

IS

T

IN

G

N

N S

T R

U C

T

IO

N

EXISTING

FLOOR

C

EXTENSION

POLE

PLASTIC

SHEET

N

N S

T R

U C

T

IO

N

E X

IS

T

IN

G

F

IE

L D

V E

R

IF

YTWO LAYERS 5/8" TYPE

X GYPSUM BOARD -

BOTH SIDES - ICRA

WALL A2

A2

2-HR RATED

U.L. DESIGN NO. UL419

UNDERSIDE OF

EXISTING DECK

PLASTIC

BARRIER

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE

KEPT CLEAN. FLOORS NOT

BEING REPLACED MUST BE

PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED

PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE EXISTING

WINDOW TO BE RE-INSTALLED

AFTER CONSTRUCTION IS

COMPLETE.

NOTE: CONTRACTOR TO FIND

ROUTING TO EXHAUST HEPA

FILTER TO OUTSIDE.

V .I

.F

V .I

.F

V.I.F.

V .I .F

E X

IS

T

IN

G

W A

L L

V .I .F

E X

IS

T

IN

G

W A

L L

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

ISOLATE AND COVER ALL

SUPPLY DIFFUSERS NOT

IN OPERAION DURING

PROJECT - COORDINATE

WITH COR

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

F L E

X D

U C

T

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

NOTE: CONTRACTOR

TO FIND ROUTING TO

EXHAUST HEPA

FILTER TO OUTSIDE.

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR MACHINE ROOM & ELEVATOR UPGRADES FOR

BUILDING 1, GROUND FLOOR

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

NOTE:

THIS PROJECT CONSTITUTES MULTIPLE BUILDINGS AND FLOORS.

REFER TO ARCHITECTURAL DRAWINGS FOR THE CORRESPONDING

BUILDING AND FLOOR WHERE ILSM SIGNAGE WILL BE LOCATED.

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE

DESIGNATION FOR THIS PROJECT IS LEVEL (II) FOR THE CLASS OF

PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD

SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON

THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA

FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND

ACTIVE.

1A. THIS PROJECT MAY NEED AN ENTRY VESTIBULE FOR CLOTHING

CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR

THE PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM.

THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND

LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS

SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL

PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED

OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE

CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY

TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE

TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A

PERMANENT BARRIER.

AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A. (COORDINATE

DESIGNATION WITH COR.)

2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER

ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR

MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS

INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS

CONTROL

3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.

3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES

SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;

DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND

ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE

CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC

AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.

4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION

MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;

THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND

THE CONSTRUCTION STAGING/PREP AREA.

4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH

TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORT

SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON

TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE

REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE

USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR

(HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE

OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED

AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION

AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE

AREAS WITHOUT PRIOR APPROVAL OF THE COR.

4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE

INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.

4C. ALL EQUIPMENT TO REMAIN SHALL BE COVERED AND PROTECTED

PRIOR STARTING EACH CONSTRUCTION PHASE.

VENTILATION AND ENVIRONMENTAL CONTROLS

5. AIR SYSTEM FLOW: CONTRACTOR SHALL ACKNOWLEDGE WITH THE

COR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-

CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS

NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN

TO DIRTY AREAS.

5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA

SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO

DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE

AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL

PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER

CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE

(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY

VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A

PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO

PREVENT CONTAMINATION OF THE DUCTS.

5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND

INTACT CEILING SHALL BE VERIFIED DAILY.

5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND

CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL

AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-

CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA

ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE

PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED

AREAS

6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE

FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION

AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR

AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE

DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE

APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR

ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT

(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS

TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM

DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR

REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL

HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,

VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS

DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.

ICRA NOTES

III/IVLOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

II

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 IV

IV

IV

III/IV

III/IV

III

III/IV

I

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLCs

- SPD; AMCU;

- Respiratory Isolation Rooms

- Surgery

III

TYPE DTYPE CTYPE B

Class IV or control procedures are necessary.

C

LA

S S

IV

C

LA

S

S

II

During Construction Project

C L-

I C

LA

S

S

II

I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

8. Temporary ICRA enclosures must match and continue the fire rating for which it is enclosing. One hour fire rated walls must use partition type A1 with an A label solid core wood door and closer. Two hour fire rated walls must use partition type A2 with a B label solid core wood door and closer.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

E

F

P2

ELEVATOR

P1

ELEVATOR

P3

ELEVATOR

LOBBY

VESTIBULE

WALL TYPE C

60" MIN. CLEAR

CLEAR

3'-0" MIN.

C L E

A R

M

IN

PROVIDE STICKY MATS

(CHANGE END OF SHIFT OR

MORE IF NECESSARY TO

MAINTAIN CLEANLINESS)

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/4

/2

:2

:1

P M

C U s e rs

\c k u rk u l\ D o c u m e n ts

\A

-3

-V A

T u s c a lo o s a

-U p g ra d e E le v a to rs -A

L

B u ld in g

A d m in is tr a ti v e c k u rk u lG

V Y

H

.r v t

ICRA MATRIX AND DETAILS

2 8LBB

ELEVATOR UPGRADES IN

BUILDINGS 1, 2, 5, 38, 135 &

TUSCALOOSA VAMC

FEBRUARY 6, 2025

100% BID DOCUMENTS

679-22-10021-344

DJR

G-002

1, 2, 5, 38, 135 & 137

Scale: 3/8" = 1'-0"

ICRA MOBILE CONTAINMENT CART

Scale: 3/4" = 1'-0"

ICRA BARRIER WALL TYPE

Scale: 3/8" = 1'-0"

CROSS SECTION "A"

Scale: 3/8" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

Scale: 1/4" = 1'-0"

TYPICAL ELEVATOR ICRA PLAN AT EACH LEVEL

NOTES:

1. ONLY ONE ELEVATOR RENOVATION PER BANK MAY BE COMPLETED AT ONE TIME.

2. INSTALLATION OF THE ICRA ENCLOSURE COMPLETION IS REQUIRED AT THE START OF EACH

RENOVATION.

3. WORK TO BE DONE DURING OFF HOURS.

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

UP

A

B

E

F

G

H

I

J

C

D

2 3 4 5 6 7

S5

SERVICE

ELEVATOR

S5

ELEVATOR

MACHINE ROOM

P2

ELEVATOR

P1

ELEVATOR

OFFICE

42D

OFFICE

42C

MALE TOILET

42B

FEMALE

TOILET

42A

CORRIDOR

42F

S

AELECTRICAL

RM.

ELEC./ MECH.

41R

DENTAL

OPERATORY

41Q

EXAM/

TREATMENT

41B

X-RAY

41D

CORRIDOR

52A

DENTAL

OPERATORY

41P

X-RAY

41E

STORAGE

41O

BIOHAZARD

41F

DENTAL

OPERATORY

41N

INSTRUMENT

PREPARATION

41G

DENTAL

OPERATORY

41H

OPERATORY

41M

OFFICE

41L

DENTAL

OPERATORY

41J

STO.

41K

OFFICE

WAITING

TEL. CLO.

CORRIDOR

52B

OFFICE

43A

LAB

43B

MECH

43C

OFFICE

43G

ELECTRICAL

43F

TRAVEL

OFFICE

OFFICE

42EOFFICE

TR

COMPUTER

MAINTENANCE

STO.

1A

TREATMENT

ROOM

2ELEC/

MECH

3A

ELEC/

MECH

OFFICE

4A

ELEC. / MECH.

MECH RM.

OFFICE

CORRIDOR

VESTIBULE

34 STAIRS 2

MECHANICAL

RM.

CORRIDOR

MECH. RM.

37A

WAITING

STO.

51A

35BTOILET

35A

OFFICE

OFFICE

CORRIDOR

50A

PC1WORK RM.

OFFICE

BREAK ROOM

WAITING

OFFICE

OFFICE

EXAM

8A

CORRIDOR

EXAM/

TREATMENT

RM.

8D

EXAM

8C

MECH RM.

EXAM

8B

CORRIDOR

MALE TLT.

FEMALE

TLT.

A

STAIRS 1

EXAM RM

EXAM RM

WAITING

CHECK IN

AUDIOLOGY

EXAM RM

EXAM RM

EXAM RM

EXAM RM

CORRIDOR

EXAM RM

EXAM RM

EXAM RM

OFFICE

EXAM RM

OFFICE

22A

OFFICE

MAIL RM.

51B

MAIL RM.

35D

MAIL RM.

35C

MAIL

TOILET

36B

OFFICE

36A

OFFICE

36C

STAIRS 3

OFFICE

43E

OFFICE

43D

XFEB

XFEB

XFEB

XFEB

XFEB

XFEB

XFEB

XFEB

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

COMMON PATH OF TRAVEL = 19'-2"

TRAVEL DISTANCE = 179'-10" TRAVEL DISTANCE = 153'-3"

COMMON PATH OF

TRAVEL = 33'-0"

1.A-100

S5

EGRESS PATH

EGRESS PATH TAG

EGRESS PATH TAG - COMMON PATH

EGRESS IDENTIFICATION

AREA OF REFUGE

HAZARDOUS LOCATION

EXISTING

FIRE EXTINGUISHER BRACKET

FIRE EXTINGUISHER CABINET

FIRE BLANKET CABINET

EMERGENCY RESPONSE REFERENCE

CONTROLLED ACCESS -

ALWAYS UNLOCKED IN DIRECTION

OF EGRESS

KNOX BOX

DELAYED EGRESS W/ ALARM

NOT IN PROJECT SCOPE

CA

DE

KB

XXX

XXX

XFEB

FEC

FBC

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS

CAPACITY

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/4

/2

:1

:0

P M

C U s e rs

\c k u rk u l\ D o c u m e n ts

\A

-3

-V A

T u s c a lo o s a

-U p g ra d e E le v a to rs -A

L

B u ld in g

A d m in is tr a ti v e c k u rk u lG

V Y

H

.r v t

BUILDING 1 OVERALL BASEMENT

FLOOR PLAN

3 8LBB

ELEVATOR UPGRADES IN

BUILDINGS 1, 2, 5, 38, 135 &

TUSCALOOSA VAMC

FEBRUARY 6, 2025

100% BID DOCUMENTS

679-22-10021-344

DJR

1.GL100

NO

RTH

0 4 8 16

Scale: 1/8" = 1'-0"

BUILDING 1 OVERALL BASEMENT FLOOR PLAN

LIFE SAFETY LEGEND

ICRA NOTES GROUND & UPPER FLOOR

LEVELS - BUILDING 1

(REFER TO ICRA MATRIX AND NOTES

ON G-002)

IC ACTIVITY TYPE: B

IC RISK GROUP: 2

IC CONSTRUCTION CLASS: II

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 PROVIDE ICRA ENCLOSURE TYPE C AT ELEVATORS.

SEE G-002 FOR ICRA NOTES AND DETAILS.

2 COORDINATE WITH COR FOR CONSTRUCTION

ACCESS ROUTE.

GENERAL NOTE 1

CONTRACTOR TO COMPLETE WORK ON

ONE ELEVATOR PER BUILDING AT A

TIME.

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

B

C

D

E

F

G

H

I

J

2 3 4 5 6 7 8 9 10

STAIRS

SG-2

UNION

COMPUTER

16A

CHIEF CREDIT

OFFICE

CREDIT UNION

OFFICE

CORRIDOR

CG2

SECRETARY

OFFICE

14 MECHANICAL

ROOM

17A

FILE ROOM

CREDIT UNION

OFFICE

STAFF OFFICE

GEN.

STORAGE

CORRIDOR

CG3

CLO.

18A

STAFF OFFICE

ELEV.

P3

ENTRANCE

CG4

ENTRANCE

CG5

HAC

22A

G E

N S

T O

0GEN. STO.

ELEC/MECH

RM.

8A

CORRIDOR

CG1

GE. STO.

TEL. CLO.

HAC

P

IP

E C

H A

S E

B

MALE TLT.

P

IP

E C

H A

S E

C

EQPT. STO.

EQPT. STO.

24A

CLERK OFFICE

CLERK OFFICE

CLO

STAFF TLT.

3A

STAFF TLT

1A

CLO

1BSTAFF OFFICE

STAFF OFFICE

LOBBY

1C

STAIRS

SG1

EXAM/

TREATMENT

RM.

26B

CHIEF OFFICE

26C

GROUP RM.

STAFF OFFICE

CHIEF OFFICE

SECRETARY

OFFICE

STAFF OFFICE

CORRIDOR

TO BLDG. 38

CORRIDOR

TO BLDG. 3

COMMON PATH OF TRAVEL DISTANCE = 75'-0"

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

2.A-100

EGRESS PATH

EGRESS PATH TAG

EGRESS PATH TAG - COMMON PATH

EGRESS IDENTIFICATION

AREA OF REFUGE

HAZARDOUS LOCATION

EXISTING

FIRE EXTINGUISHER BRACKET

FIRE EXTINGUISHER CABINET

FIRE BLANKET CABINET

EMERGENCY RESPONSE REFERENCE

CONTROLLED ACCESS - ALWAYS

UNLOCKED IN DIRECTION OF EGRESS

KNOX BOX

DELAYED EGRESS W/ ALARM

NOT IN PROJECT SCOPE

CA

DE

KB

XXX

XXX

XFEB

FEC

FBC

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS

CAPACITY

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/4

/2

:2

:2

P M

C U s e rs

\c k u rk u l\ D o c u m e n ts

\A

-3

-V

A T u s c a lo o s a -U p g ra d e E le v a to rs

-A L

B u ld in g

A d d ic ti o n

R e h a b c k u rk u lG

V Y

H

.r v t

BUILDING 2 OVERALL GROUND FLOOR

PLAN

4 8LBB

ELEVATOR UPGRADES IN

BUILDINGS 1, 2, 5, 38, 135 &

TUSCALOOSA VAMC

FEBRUARY 6, 2025

100% BID DOCUMENTS

679-22-10021-344

DJR

2.GL100

Scale: 1/8" = 1'-0"

BUILDING 2 OVERALL GROUND FLOOR PLAN NO

RTH

0 4 8 16

LIFE SAFETY LEGEND

ICRA NOTES GROUND & UPPER FLOOR

LEVELS - BUILDING 2

(REFER TO ICRA MATRIX AND NOTES

ON G-002)

IC ACTIVITY TYPE: B

IC RISK GROUP: 2

IC CONSTRUCTION CLASS: II

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 PROVIDE ICRA ENCLOSURE TYPE C AT

ELEVATORS. SEE G-002 FOR ICRA NOTES AND

DETAILS.

2 COORDINATE WITH COR FOR CONSTRUCTION

ACCESS ROUTE.

GENERAL NOTE 1

CONTRACTOR TO COMPLETE WORK ON

ONE ELEVATOR PER BUILDING AT A

TIME.

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

DN

UP

EGRESS PATH

EGRESS PATH TAG

EGRESS PATH TAG - COMMON PATH

EGRESS IDENTIFICATION

AREA OF REFUGE

HAZARDOUS LOCATION

EXISTING

FIRE EXTINGUISHER BRACKET

FIRE EXTINGUISHER CABINET

FIRE BLANKET CABINET

EMERGENCY RESPONSE REFERENCE

CONTROLLED ACCESS - ALWAYS

UNLOCKED IN DIRECTION OF EGRESS

KNOX BOX

DELAYED EGRESS W/ ALARM

NOT IN PROJECT SCOPE

CA

DE

KB

XXX

XXX

XFEB

FEC

FBC

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS

CAPACITY

A

2 4 5 6 7 H I J

B

C

D

N3

E

8A

OFFICE

TECHNICIAN

OFFICE

12D

STAIRWELL

12C

LOBBY

STORAGE

9A

ELEVATOR

MACHINE ROOM

STAFF OFFICE

12A

TELEPHONE

CLOSET

12B

HAC

7A

STAFF OFFICE

STAFF OFFICE

COPY ROOM

10A

TECHNICIAN

OFFICE

ENTRANCE

WAY

MECH RM

MECH RM

MALE TOILET

4B

FEMALE TOILET

ASST. CHIEF

OFFICE

12E

CORRIDOR

ELECTRICAL

MECH RM2

CHIEF OFFICE

CLERK OFFICE

1A

OFFICE

CORRIDOR

CORRIDOR

GENERAL

STORAGE

P13

ELEVATOR

TRAVEL DISTANCE = 131'-0"

XFEB

5A

COMMUNICATIONS

ACCESSIBLE

ENTRANCE

UP

C

E L E

C /M

E C

H

TRAVEL DISTANCE = 44'-3"

COMMON PATH OF TRAVEL = 16'-8"

5.A-100

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/4

/2

:2

:3

P M

C U s e rs

\c k u rk u l\ D o c u m e n ts \A

-3

-V A

T u s c a lo o s a

-U p g ra d e

E le v a to rs

-A L

B u ld in g c k u rk u lG

V Y

H

.r v t

BUILDING 5 OVERALL BASEMENT

FLOOR PLAN

5 8LBB

ELEVATOR UPGRADES IN

BUILDINGS 1, 2, 5, 38, 135 &

TUSCALOOSA VAMC

FEBRUARY 6, 2025

100% BID DOCUMENTS

679-22-10021-344

DJR

5.GL100

NO

RTH

0 4 8 16

LIFE SAFETY LEGEND

Scale: 1/8" = 1'-0"

BUILDING 5 OVERALL BASEMENT FLOOR PLAN

ICRA NOTES BASEMENT & UPPER

FLOOR LEVELS - BUILDING 5

(REFER TO ICRA MATRIX AND NOTES

ON G-002)

IC ACTIVITY TYPE: B

IC RISK GROUP: 2

IC CONSTRUCTION CLASS: II

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 PROVIDE ICRA ENCLOSURE TYPE C AT

ELEVATORS. SEE G-002 FOR ICRA NOTES

AND DETAILS.

2 COORDINATE WITH COR FOR

CONSTRUCTION ACCESS ROUTE.

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

S S

S S

S

SS SSS

S S

S S

S S

S S

SS SSS

SS SSSSSS

S S

S S

S SS S S

S SS S S S

A

2 3 4 5

B

C

D

E

F

G

H

I

J

K

L

M

N

6 7 8 9 10 11 12 13 14 15 16 17

ELECTRICAL

RM

B09

CANTEEN

STORAGE

B06

EQUIPMENT

ROOM

B05

CANTEEN

STORAGE

B01A

ELEV. EQPT.

RM.

B01C

MECHANICAL

B02

CANTEEN

STORAGE

B01B

EQUIPMENT

ROOM

B03A

ENTRANCE

B03

CRAWL

SPACE

HALLWAY

B07

EQUIPMENT

ROOM

B08 B04

ELEVATOR

MACHINE RM

ELEV. PIT

P7

ELEV. PIT

P6

DN

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

CRAWL

SPACE

CRAWL

SPACE

S11-C

STAIR 2

S11-D

STAIR 1

STORAGE

B01

HALLWAY

CRAWL

SPACE

COMMON PATH OF TRAVEL = 25'-7"

XFEB

P6

P7

S11

ELEVATOR

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

XFEB

DN

38.A-100

1 1

EGRESS PATH

EGRESS PATH TAG

EGRESS PATH TAG - COMMON PATH

EGRESS IDENTIFICATION

AREA OF REFUGE

HAZARDOUS LOCATION

EXISTING

FIRE EXTINGUISHER BRACKET

FIRE EXTINGUISHER CABINET

FIRE BLANKET CABINET

EMERGENCY RESPONSE REFERENCE

CONTROLLED ACCESS - ALWAYS

UNLOCKED IN DIRECTION OF EGRESS

KNOX BOX

DELAYED EGRESS W/ ALARM

NOT IN PROJECT SCOPE

CA

DE

KB

XXX

XXX

XFEB

FEC

FBC

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS

CAPACITY

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/4

/2

:2

:1

P M

C U s e rs

\c k u rk u l\ D o c u m e n ts \A

-3

-V A

T u s c a lo o s a

-U p g ra d e

E le v a to rs

-A L

B u ld in g c k u rk u lG V

Y H

.r v t

BUILDING 38 OVERALL BASEMENT

FLOOR PLAN

6 8LBB

ELEVATOR UPGRADES IN

BUILDINGS 1, 2, 5, 38, 135 &

TUSCALOOSA VAMC

FEBRUARY 6, 2025

100% BID DOCUMENTS

679-22-10021-344

DJR

38.GL100

Scale: 1/8" = 1'-0"

BUILDING 38 OVERALL BASEMENT FLOOR PLAN

NO

RTH0 4 8 16

ICRA NOTES BASEMENT & UPPER

FLOOR LEVELS - BUILDING 38

(REFER TO ICRA MATRIX AND NOTES

ON G-002)

IC ACTIVITY TYPE: B

IC RISK GROUP: 2

IC CONSTRUCTION CLASS: II

LIFE SAFETY LEGEND

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 PROVIDE ICRA ENCLOSURE TYPE C AT

ELEVATORS. SEE G-002 FOR ICRA NOTES

AND DETAILS.

2 COORDINATE WITH COR FOR CONSTRUCTION

ACCESS ROUTE.

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

RELOCATED

EXISTING

REFRIGERATOR

LATERAL

FILE

LATERAL

FILE

LATERAL

FILE

LATERAL

FILE

LATERAL

FILE

LATERAL

FILE

LATERAL

FILE

LATERAL

FILE

LATERAL

FILE

C

2 3 4 5 6 7 8 9 10 11 12

B

A

D

E

F

G

H

I

ELEV

ELEV

ELEVATOR

LOBBY

CB-1

ELEVATOR

MACHINE

B-01

ELECT.

/MECH.

B-19

STAIRS

S-2

ELECT./MECH.

B-02

OFFICE

SECRETARY

OFFICE

B-04

Room Name B-05

STORAGE

VAULT,

CONTROL

DRUGS

B-03D

CLEAN

ROOM

B-03C

PHARMACY

SUPPORT

ELECT./MECH.

B-03E

STAIRS

S-1

Room Name

DW-103

GENERAL

STORAGE

B-03F

CHIEF

OFFICE

B-04A

STUDY /

RESEARCH

ROOM

B-06

FILE ROOM

STORAGE

B-08H

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

LAB

B-03A

SUPERVISOR

OFFICE

B-08G

OFFICE

OFFICE

OFFICE

CLERK

OFFICE

B-08F

TELEX/XEROX

ROOM

B-08E

TELEX/XEROX

ROOM

B-08D

MAIL

ROOM

B-14

CORR.

CB-6

TELEPHONE

CLOSET

B-07

SECRETARY

OFFICE

B-08L

OFFICE

B-08A

COMPUTER

ROOM

B-08BOFFICE

B-08

WARD

ADMIN.

OFFICE

B-08C

TOILET

FEMALE

B-11

TOILET

MALE

B-09

CHIEF

OFFICE

B-10A

SECRETARY

OFFICE

B-10

CHIEF

OFFICE

B-10B

ELECT./MECH.

B-17A

ELECT. /

MECH.

B-18

STAIRS

BS-3

LOUNGE

B-12

HAC

B-13

ELECT./MECH.

B-17

CORR.

CB-3

CORR.

CB-2

VEST.

CB-4

ELECT./MECH.

B-15 ELECT./MECH.

B-16

ANTE ROOM

ELECT./MECH.

FILES

FILES

COMMON PATH OF

TRAVEL = 20'-6"

COMMON PATH OF TRAVEL = 42'-6"

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

TRAVEL DISTANCE = 152'-5"

TRAVEL DISTANCE = 127'-4"

ENTRANCE

CB-5

TRAVEL DISTANCE = 106'-3"

B-01

135.A-100

1 2 1

2 3

EGRESS PATH

EGRESS PATH TAG

EGRESS PATH TAG - COMMON PATH

EGRESS IDENTIFICATION

AREA OF REFUGE

HAZARDOUS LOCATION

EXISTING

FIRE EXTINGUISHER BRACKET

FIRE EXTINGUISHER CABINET

FIRE BLANKET CABINET

EMERGENCY RESPONSE REFERENCE

CONTROLLED ACCESS - ALWAYS

UNLOCKED IN DIRECTION OF EGRESS

KNOX BOX

DELAYED EGRESS W/ ALARM

NOT IN PROJECT SCOPE

CA

DE

KB

XXX

XXX

XFEB

FEC

FBC

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS

CAPACITY

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/4

/2

:2

:4

P M

C U s e rs

\c k u rk u l\ D o c u m e n ts \A

-3

-V A

T u s c a lo o s a

-U p g ra d e

E le v a to rs

-A L

B u ld in g c k u rk u lG

V Y

H

.r v t

BUILDING 135 OVERALL BASEMENT

FLOOR PLAN

7 8LBB

ELEVATOR UPGRADES IN

BUILDINGS 1, 2, 5, 38, 135 &

TUSCALOOSA VAMC

FEBRUARY 6, 2025

100% BID DOCUMENTS

679-22-10021-344

DJR

135.GL100

NO

RTH

0 4 8 16

Scale: 1/8" = 1'-0"

BUILDING 135 OVERALL BASEMENT FLOOR PLAN

ICRA NOTES BASEMENT & UPPER

FLOOR LEVELS - BUILDING 135

(REFER TO ICRA MATRIX AND NOTES

ON G-002)

IC ACTIVITY TYPE: B

IC RISK GROUP: 2

IC CONSTRUCTION CLASS: II

LIFE SAFETY LEGEND

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 PROVIDE ICRA ENCLOSURE TYPE C AT

ELEVATORS. SEE G-002 FOR ICRA NOTES

AND DETAILS.

2 COORDINATE WITH COR FOR

CONSTRUCTION ACCESS ROUTE.

3 PROVIDE ICRA ENCLOSURE TYPE A1 AT

ELEVATOR MACHINE ROOMS. SEE G-002 FOR

ICRA NOTES AND DETAILS.

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

2 3 4 875

B

C

E

F

G

H

J

K

L

M

N

D

I

9 11106

MUSIC

H1-101

STORAGE

H1-101A

BILLARDS

H1-100

RECREATION

OFFICE

G1-110

OFFICE

G1-110A

CORRECTIVE

THERAPY

G1-109

EQUIP.

STOR.

G1-109A

OFFICE

G1-109B OFFICE

G1-105C

STORAGE

G1-105B

INCENTIVE

THERAPY

G1-106

OCCUPATIONAL

THERAPY

G1-105

STORAGE

G1-104 K

IL

N

S G

-1

A

CORRIDOR

C1-6

ARTS &

CRAFTS

G1-111

UNASSIGNED

G1-107A

H.K. AIDS

G1-108

UNASSIGNED

G1-107

TRASH

G1-101

SOILED LINEN

G1-100

ELECT.

G1-101

TELE.

G1-102

VESTIBULE

E1-102

STAIR 5

MUSIC

LISTEN

H1-101B

ELECT.

H1-101D

TELE.

H1-101C

CLINIC ADMIN.

H1-100A

KITCHEN

H1-102

T L T

H -1

B

T L T

H -1

A

RECREATION

H1-103

T R

A S

H H

-1

S O

IL

E

D L

IN

E

N H

-1

TELE

H1-106

RECREATION

H1-103C

EXCAVATED

PIPE

BASEMENT

I1-103

MECHANICAL

I1-102

ELECT

I1-101 RECREATION

STORAGE

I1-100

LOBBY

E1-103

C O

R R

ID

O

R C

-7

WEST ATRIUM

K1-100

TLT

K1-100C

TLT

F1-100

TLT

F1-101TLT

K1-100B

ACTIVITY

STORAGE

K1-100A

F1-104

C O

R R

ID

O

R C

-5

LOBBY

L1-104

S T

A

IR

PSYCH

TESTING

J1-100 O F

F

IC

E J -1

A

IN

T

E R

V

IE

W J -1

6 STOR.

J1-108

TELE

ELECT

ELEV.

LOBBY

J1-110

CORRIDOR

C1-1

PSYCH.

J1-101

PSYCH.

J1-102

PSYCH.

J1-103

PSYCH.

J1-104

PSYCH.

J1-105

PSYCH.

J1-107

PSYCH.

CHIEF

J1-109

MECH

A1-103

ELEV

S-20

ELEV

S-21

SER.

ELEV.

A1-103A

PASS. ELEV

EQUIP.

A1-103B

LOBBY

A1-101

STORAGE

A1-102

STORAGE

A1-102

SEATING

A1-103

ELEV. LOBBY

B1-100

ELEV

P-17

ELEV

P-18

ELEV

P-19

SEAMSTRESS

B1-101

CLOTHING

B1-101A

CLEAN

SORTING

B1-101B

LINEN

UNIFORM

ROOM

B1-101C

CORRIDOR

C1-2

S T

A

IR

STORAGE

B1-103

H.K. AIDS

B1-102

TELE.

D1-100

SOILED

LINEN

D1-101

TRASH

D1-102

TELE.

D1-110

ELECT

C1-101

STAIR 3

MECHANICAL

C1-100

G A

S D

-1

B.M. STORAGE

D1-104

C O

R R

ID

O

R C

-3

T L T

D -1

A

PRINT SHOP

D1-105

ELECT

D1-106

EAST ATRIUM

L1-100

LOADING

DOCK

SATELITE

PHARMACY

F1-103

EQUIP.

STOR.

F1-102

OFFICE

D1-105C

TELE

D1-107

O F

F

IC

E D

-1

D

POOL EQUIP.

D1-108A

MECHANICAL

D1-109

E1-106

CORRIDOR

C1-4

VENDING

E1-105

CORRIDOR

C1-8

VESTIBULE

E1-100

STAIR 4

TERRACE

THERAPEUTIC

POOL

E1-100A

V E

S T

E

-1

C

WOMEN

DRESSING

E1

CLEAN/ SOILED

SUITS

E1-100E

MEN

DRESSING

E1-100B

TRAVEL DISTANCE = 226'-0"

C O

M M

O N

P A

T H

O F

T R

A V

E L

TRAVEL

DISTANCE

= 135'-0"

TRAVEL DISTANCE = 226'-0"

FEC

FEC

FEC

FEC

137.GL100

3 3

137.A-100

EGRESS PATH

EGRESS PATH TAG

EGRESS PATH TAG - COMMON PATH

EGRESS IDENTIFICATION

AREA OF REFUGE

HAZARDOUS LOCATION

EXISTING

FIRE EXTINGUISHER BRACKET

FIRE EXTINGUISHER CABINET

FIRE BLANKET CABINET

EMERGENCY RESPONSE REFERENCE

CONTROLLED ACCESS - ALWAYS

UNLOCKED IN DIRECTION OF EGRESS

KNOX BOX

DELAYED EGRESS W/ ALARM

NOT IN PROJECT SCOPE

CA

DE

KB

XXX

XXX

XFEB

FEC

FBC

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS

CAPACITY

SERVICE

ELEVATOR

S-21

ELEVATOR

P17

ELEVATOR

P18

ELEVATOR

P19

SERVICE

ELEVATOR

S-20

STAIRS 2

S-22

ELEVATOR

LOBBY

B1-100

CORRIDOR

C1-2

MECHANICAL

A1-103

A1-103B

PASSSENGER

ELEVATOR

EQPT. ROOM

1(P17)

1(P18)

1(P19)

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/4

/2

:3

:0

P M

C U s e rs

\c k u rk u l\ D o c u m e n ts \A

-3

-V A

T u s c a lo o s a

-U p g ra d e

E le v a to rs

-A L

B u ld in g c k u rk u lG

V Y

H

.r v t

BUILDING 137 OVERALL GROUND

FLOOR PLAN

8 8LBB

ELEVATOR UPGRADES IN

BUILDINGS 1, 2, 5, 38, 135 &

TUSCALOOSA VAMC

FEBRUARY 6, 2025

100% BID DOCUMENTS

679-22-10021-344

DJR

137.GL100

Scale: 1/16" = 1'-0"

BUILDING 137 OVERALL GROUND FLOOR PLAN

N O R

TH

0 4 8 16

ICRA NOTES GROUND & UPPER FLOOR

LEVELS - BUILDING 137

(REFER TO ICRA MATRIX AND NOTES

ON G-002)

IC ACTIVITY TYPE: B

IC RISK GROUP: 2

IC CONSTRUCTION CLASS: II

LIFE SAFETY LEGEND

Scale: 1/8" = 1'-0"

BLDG 137 ENLARGED PARTIAL GROUND FLOOR ICRA PLAN

N O R

TH

0 4 8 16

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 PROVIDE ICRA ENCLOSURE TYPE C AT

ELEVATORS. SEE G-002 FOR ICRA NOTES AND

DETAILS.

2 COORDINATE WITH COR FOR CONSTRUCTION

ACCESS ROUTE.

3 PROVIDE ICRA ENCLOSURE TYPE A1 AT

ELEVATOR MACHINE ROOMS. SEE G-002 FOR

ICRA NOTES AND DETAILS.

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

AFF ABOVE FINISHED FLOOR

ACP/APC ACOUSTIC CEILING PANEL/

ACOUSTIC PANEL CEILING

ACT ACOUSTIC(AL) TILE

ADJ ADJUSTABLE

ADT'L ADDITIONAL

AGG AGGREGATE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

ASPH ASPHALT

AUTO AUTOMATIC

B/O BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CJ CONTROL JOINT

CLL CONTRACT LIMIT LINE

CEM CEMENT(ITIOUS)

CMU CONCRETE MASONRY UNIT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CTR CENTER(ED)

DF DRINKING FOUNTAIN

DS DOWNSPOUT

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DWG(S) DRAWING(S)

E EAST

EC ELECTRICAL CONTRACTOR

EHO ELECTRICAL HOLD OPEN

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FDN FOUNDATION

FIN FINISH

FLSHG FLASHING

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HM HOLLOW METAL

HDWR HARDWARE

HOL HOLLOW

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION/AIR

CONDITIONING

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LAV LAVATORY

LB(S) POUND(S)

L/S LANDSCAPE

LT LIGHT

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PEB PRE-ENGINEERED BUILDING

PJF PREFORMED JOINT FILLER

PT PRESSURE TREATED

PERIM PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT

PR PAIR

PTD PAINTED

PWR POWER

RB RUBBER BASE

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

S SOUTH

SB SPLASH BLOCK

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

T/O TOP OF

TELE TELEPHONE

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VERT VERTICAL

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WWF WELDED WIRE FABRIC

WD WOOD

WH WATER HEATER

WT WEIGHT

XFE EXISTING FIRE EXTINGUISHER

XFEB EXSTING FIRE EXTINGUISHER BRACKET

CL

DEMOLITION KEYNOTE WINDOW TYPE

ROOF PITCH SYMBOLDOOR NUMBER

TYPICAL KEYNOTE CEILING/ SOFFIT

HEIGHT

MATL

1'-0"

1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND

CONTRACTOR BEFORE THE START OF THE WORK.

2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.

PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO

WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.

3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO

BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER

QUANTITY OF WORK.

5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE

DRAWINGS AND SPECIFICATIONS.

6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND

ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.

7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL

GOVERN.

8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.

9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS

PROJECT.

11. PROVIDE BACKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS

REQUIRED FOR COMPLETION OF THE WORK.

12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED

FACE OF EXISTING WALL SURFACE.

13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.

14. IF AT ANY TIME DURING CONSTRUCTION, THE PRESENCE OF ANY CONTAMINATED MATERIALS APPEARS TO BE ENCOUNTERED, THE CONTRACTOR SHALL IMMEDIATELY CEASE WORK AND ALERT THE COR OF THE FINDINGS

VERBALLY AND IN WRITING WITHIN 12 HOURS OF ANY POTENTIAL DISCOVERY.

1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT

PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.

2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO

PROCEEDING WITH NEW CONSTRUCTION.

3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE

WITH COR.

4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.

5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.

6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH

EXISTING.

7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)

REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.

8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE

COMPLETION OF THE PROJECT.

9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.

10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL

SYSTEMS.

11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.

12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT

ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.

13. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY

CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.

14. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE OWNER OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR

REINSTALLED FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.

15. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE

MATERIALS AND FINISHES TO MATCH EXISTING.

16. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.

COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR

USE OF FREIGHT ELEVATOR (AS REQUIRED).

1. DELETE ALL WORK AT BUILIDNG NUMBER 1.

1 ALTERNATE NOTES

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

3/8" 3/8"1'-6"

M

A X

S P

/2

A

/2

1 1/4" 1 1/4"

1"

VARIES F.V.

SECTION - A

1. 3/8" x 2 1/2" STEEL BAR

2. WELD NON-SLIP STEEL RUNGS ALL AROUND

TO VERTICAL STEEL BARS

3. 3/4" ROUND NON-SLIP STEEL BAR RUNGS

4. 3/8" x 3" BENT PLATE, WELD TO VERT. RUNGS.

EXPANSION BOLT TO FOUNDATION WALL.

# PIT LADDER KEYNOTES

FOUNDATION

WALL4

• CONTRACTOR TO COMPLETE WORK ON ONE ELEVATOR PER BUILDING AT A TIME.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/4

/2

:1

:0

P M

C U s e…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .