Elevator Upgrades in Buildings 1, 2, 5, 38, 135 & 137 - Tuscaloosa VAMC
This is a 100% Bid Document set for a federal construction project at the Tuscaloosa Veterans Affairs Medical Center (VAMC), VA Project #679-22-100, dated February 6, 2025. The project involves elevator upgrades across six buildings with a total of 11 elevators. Building 1 contains elevators P-1 and P-2 (3,000 lb capacity each); Building 2 has elevator P-3 (3,000 lb); Building 5 has elevator P-13 (3,000 lb); Building 38 has elevators P-6 and P-7 (5,500 lb each); Building 135 has elevators P-14 and P-15 (4,000 lb each); and Building 137 has elevators P-17, P-18, and P-19 (4,000 lb each). An Alternate Note (#1) specifies deletion of all work at Building Number 1. The documents are prepared by Apogee Consulting Group, P.A., headquartered in Cary, North Carolina, and designed by Architects and Engineers.
The bid documents include comprehensive architectural, mechanical, electrical, and fire alarm design specifications. All elevators require new two-speed side horizontal sliding car doors, stainless steel cabs with new handrails and crash rails, new operating panels, luxury vinyl tile flooring, LED lighting systems, and full interior enclosure modifications. High-impact wall coverings, epoxy paint finishes, and coordinated building systems integration are required. Fire alarm systems must comply with NFPA standards and include interface relays for elevator recall functions. Mechanical and electrical systems must be fully coordinated, with all new fire alarm devices synchronized with existing systems. The contractor must coordinate with the Contracting Officer Representative regarding project access, parking, staging areas, facility ICRA matrix compliance, and phasing requirements prior to commencing work.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R A M P
R A M P
BUILDING 137
ELEVATORS:
P-17 | 4,000 lb P-18 | 4,000 lb P-19 | 4,000 lb
BUILDING 38
ELEVATORS:
P-6 | 5,500 lb P-7 | 5,500 lb
BUILDING 5
ELEVATOR:
P-13 | 3,000 lb
BUILDING 1
ELEVATORS:
P-1 | 3,000 lb P-2 | 3,000 lb
BUILDING 135
ELEVATORS:
P-14 | 4,000 lb P-15 | 4,000 lb
BUILDING 2
ELEVATOR:
P-3 | 3,000 lb
GOV. VEHICLE PARKING AREA
QUARTERS
PARKING AREA
LO
O
P R O
AD
H A
G L E
R L
A N
E
PL#5
PL#4
PL#3
PL#6
PL#7
PL#10
PL#11
PL#11A
P L#9
PL#8
PL#2
TEMP. PL
1. DELETE ALL WORK AT BUILDING NUMBER 1
# ALTERNATE NOTES
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP
PROJECT LOCATION MAP
/1
/2
:0
:4
P
M C
U s e rs
\l b y rd
\D o c u m e n ts \S it e
-3
-V
A T u s c a lo o s a
-U p g ra d e
E le v a to rs -A
L lb y rd
V D
E K
F .r v t
G-001
COVER SHEET & DRAWING LIST
1 8LBB
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
ELEVATOR UPGRADES IN BUILDINGS 1,
2, 5, 38, 135 & 137
TUSCALOOSA VAMC
VA PROJECT #: 679-22-100
DJR
Scale: 1" = 100'-0"
SITEPLAN
DRAWING LIST
GENERAL
G-001 COVER SHEET & DRAWING LIST 1 8 1
G-002 ICRA MATRIX AND DETAILS 2 8
1.GL100 BUILDING 1 OVERALL BASEMENT FLOOR PLAN 3 8
2.GL100 BUILDING 2 OVERALL GROUND FLOOR PLAN 4 8
5.GL100 BUILDING 5 OVERALL BASEMENT FLOOR PLAN 5 8
38.GL100 BUILDING 38 OVERALL BASEMENT FLOOR PLAN 6 8
135.GL100 BUILDING 135 OVERALL BASEMENT FLOOR PLAN 7 8
137.GL100 BUILDING 137 OVERALL GROUND FLOOR PLAN 8 8
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 21
1.A-100 BUILDING 1 PARTIAL FLOOR PLANS - P1 & P2 2 21
1.A-701 BUILDING 1 VERTICAL CIRCULATION SECTIONS & ELEVATIONS - P1 & P2 3 21
2.A-100 BUILDING 2 PARTIAL FLOOR PLANS & INT. ELEV. - P3 4 21
2.A-701 BUILDING 2 VERTICAL CIRCULATION SECTIONS AND ELEVATIONS - P3 5 21
5.A-100 BUILDING 5 PARTIAL FLOOR PLANS - P13 6 21
5.A-701 BUILDING 5 VERTICAL CIRCULATION SECTION AND ELEVATIONS - P13 7 21
38.A-100 BUILDING 38 PARTIAL FLOOR PLANS - P6 & P7 8 21
38.A-701 BUILDING 38 VERTICAL CIRCULATION SECTIONS AND ELEVATIONS - P6 & P7 9 21
135.A-100 BUILDING 135 PARTIAL FLOOR PLANS - P14 & P15 10 21
135.A-701 BUILDING 135 VERTICAL CIRCULATION SECTION AND ELEVATIONS - P14 & P15 11 21
137.A-100 BUILDING 137 PARTIAL FLOOR PLANS - P17-P19 12 21
137.A-101 BUILDING 137 PARTIAL FLOOR PLANS - P17-P19 13 21
137.A-701 BUILDING 137 VERTICAL CIRCULATION SECTIONS AND ELEVATIONS - P17-P19 14 21
A-601 DOOR SCHEDULE AND DETAILS AND ROOM FINISH SCHEDULE 15 21 1
A-801 BLDG 1 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 16 21 1
A-802 BLDG 2 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 17 21 1
A-803 BLDG 5 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 18 21 1
A-804 BLDG 38 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 19 21 1
A-805 BLDG 135 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 20 21 1
A-806 BLDG 137 INTERIOR ELEVATOR TYPICAL PLAN AND ELEVATIONS 21 21 1
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 10
M-002 PLUMBING GENERAL INFORMATION AND DETAILS 2 10
1.M-101 BUILDING 1 PARTIAL MECHANICAL FLOOR PLANS - P1 & P2 3 10
2.M-101 BUILDING 2 PARTIAL MECHANICAL FLOOR PLANS - P3 4 10
5.M-101 BUILDING 5 PARTIAL MECHANICAL FLOOR PLANS - P13 5 10
38.M-101 BUILDING 38 PARTIAL MECHANICAL FLOOR PLAN - P6 & P7 6 10
135.M-101 BUILDING 135 PARTIAL MECHANICAL PLANS - P14 & P15 7 10
137.M-101 BUILDING 137 PARTIAL MECHANICAL PLANS 8 10
M-501 MECHANICAL DETAILS 9 10
M-601 MECHANICAL SCHEDULES 10 10
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 16
E-002 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 16
1.ED101 BUILDING 1 PARTIAL MECHANICAL PENTHOUSE ELECTRICAL DEMOLITION PLANS - P1 & P2 3 16
1.EP101 BUILDING 1 PARTIAL MECHANICAL PENTHOUSE ELECTRICAL PLANS - P1 & P2 4 16
2.ED101 BUILDING 2 PARTIAL ATTIC ELECTRICAL DEMOLITION PLAN - P3 5 16
2.EP101 BUILDING 2 PARTIAL ATTIC AND ELEVATOR PIT ELECTRICAL PLANS - P3 6 16
5.ED101 BUILDING 5 PARTIAL BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - P13 7 16
5.EP101 BUILDING 5 PARTIAL BASEMENT FLOOR ELECTRICAL PLANS - P13 8 16
38.ED101 BUILDING 38 PARTIAL BASEMENT ELECTRICAL DEMOLITION PLANS - P6, P7 9 16
38.EP101 BUILDING 38 PARTIAL BASEMENT ELECTRICAL PLANS - P6, P7 10 16
135.ED101 BUILDING 135 PARTIAL BASEMENT ELECTRICAL DEMOLITION PLAN - P14, P15 11 16
135.EP101 BUILDING 135 PARTIAL BASEMENT AND ELEVATOR PIT ELECTRICAL PLANS - P14, P15 12 16
137.ED101 BUILDING 137 PARTIAL GROUND FLOOR ELECTRICAL DEMOLITION PLAN - P17, P18 & P19 13 16
137.EP101 BUILDING 137 PARTIAL GROUND, ELEVATOR PIT AND ROOF ELECTRICAL PLANS - P17, P18 & P19 14 16
E-201 ELEVATOR ELECTRICAL SECTIONS 15 16
E-501 ELECTRICAL DETAILS AND EQUIPMENT CONDUCTOR SCHEDULE 16 16
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 1 1
NORTH
0 4 8 16
NOTE:
1. CONTRACTOR TO REVIEW WITH COR:
A. PROJECT ACCESS
B. CONTRACTOR PARKING
C. CONTRACTOR STAGING AREA
D. FACILITY ICRA MATRIX
E. DISCUSS PHASING
CAMPUS LOCATION
PROJECT LOCATION
SIGNATURES REQUIRED
DIRECTOR:
______________________________________DATE:_________
ENERGY ENGINEER:
______________________________________DATE:_________
INFECTION CONTROL:
______________________________________DATE:_________
SAFETY MANAGER:
______________________________________DATE:_________
LAYDOWN AREA
BLDGS 1, 2, 5, 38, 135 & 137
1 ASI #1 02/17/2026
Docusign Envelope ID: 15DFC381-282B-46E5-A49E-AEA7B21AACAB
2/17/2026
DOOR AND FRAME -
SEE DOOR SCHEDULE
CAULK BOTH SIDES OF
DOOR - CONTINUOUS
(2) METAL STUDS TO
FORM HEADER
TYPES
SEE PARTITION
DOOR AND
FRAME - SEE
DOOR
SCHEDULE
CAULK BOTH
SIDES OF DOOR -
CONTINUOUS
(2) METAL
STUDS TO
FORM JAMB
T Y
P E
S
S E
E P
A R
T
IT
IO
N
F
S E
E S
C H
E D
U L E
SCHEDULE
SEE
ROOM FINISH LEGEND
1 PASSENGER P1 & P2
FINISH LEGEND
SS #4 BRUSHED STAINLESS STEEL
PROVIDE FINISHES LISTED AS BASIS OF DESIGN OR APPROVED EQUAL
BUILDING # ELEVATOR/ROOM # FLOOR BASE
WALLS
EAST NORTH SOUTH WEST
CEILING
FINISH
REMARKS
LVT-1 SS SS & HIW SS & HIW SS & HIW SS & HIW SS
2 LVT-1 SS SS & HIW SS & HIW SS & HIW SS & HIW SS
5 LVT-1 SS SS & HIW SS & HIW SS & HIW SS & HIW SS
38 LVT-1 SS SS & HIW SS & HIW SS & HIW SS & HIW SS
135 LVT-1 SS SS & HIW SS & HIW SS & HIW SS & HIW SS
137 LVT-1 SS SS & HIW SS & HIW SS & HIW SS & HIW SS
HIW-2 INPRO FULLY WRAPPED PANELS, INPRO RICOCHET, RC-STR-R610 SAFARI
PASSENGER P3
PASSENGER P13
PASSENGER P6 & P7
PASSENGER P14 & P15
PASSENGER P18, P19 &
P20
HANDRAILS STAINLESS STEEL, INPRO ASCEND, 4" FLAT WITH TURNED-IN ENDS
LVT-1 TARKETT, EVENT+ STONE, SLATE ESL, ROCK RIDGE 11197, 12X24
BASE #4 SATIN STAINLESS STEEL - 18 GAUGE/304 ALLOY
CRASH RAIL
NOTE: ELEVATOR CONTROLS PER ELEVATOR SPECIFICATION DIVISION 14
CEILING ISLAND, LED DOWNLIGHTS, #4 BRUSHED STAINLESS STEEL MIRRORED FINISH, GRAIN TO RUN FRONT OF CAB TO REAR
STAINLESS STEEL, INPRO ASCEND, 8" FLAT WITH TURNED-IN ENDS
P-2 BENJAMIN MOORE BASE, SEMI-GLOSS, COLOR TO MATCH CAMPUS STANDARD DOOR FRAME PAINT
P-1 BENJAMIN MOORE EPOXY PAINT BASE, EGGSHELL, WHITE DOVE OC-17
1 MECH PENTHOUSE P001 EFP-1 RB-1 P-1 P-1 P-1 P-1 EXP
2 EFP-1 RB-1 P-1 P-1 P-1 P-1 EXPELEV. MACHINE
PENTHOUSE 101
2 EFP-1 RB-1 P-1 P-1 P-1 P-1 EXPELEV. PENTHOUSE 100
5 EFP-1 RB-1 P-1 P-1 P-1 P-1 EXPELEVATOR MACHINE
ROOM 9A
38 EFP-1 RB-1 P-1 P-1 P-1 P-1 EXPELEVATOR MACHINE
ROOM B04
135 EFP-1 RB-1 P-1 P-1 P-1 P-1 EXPELEVATOR MACHINE
B-01
137 EFP-1 RB-1 P-1 P-1 P-1 P-1 EXPPASSENGER
ELEVATOR EQPT
ROOM A1-103A
HIW-1 INPRO FULLY WRAPPED PANELS, INPRO ANTIQUE BRONZE, 5M002
RB-1 TARKETT, BLACK, TRADITIONAL 4"H COVE
EFP-1 EPOXY PAINT/SHERWIN WILLIAMS/ARMORSEAL 100 HS HIGH SOLIDS, HEAVY DUTY TWO COMPONENT EPOXY COATING WITH SKID INHIBITING
ADDITIVE/COLOR TO BE GREY THROUGHOUT WITH SAFETY YELLOW AT EQUIPMENT PADS
PAINT
PAINT
RUBBER
BASE
HIGH IMPACT
WALLCOVERING
STAINLESS
STEEL
LUXURY
VINYL TILE
EPOXY
FLOOR PAINT
HIGH IMPACT
WALLCOVERING
REVEALS -
FLAT & CORNER
#4 BRUSHED STAINLESS STEEL
TYPE A
S E
E S
C H
E D
U L E
2"
SCHEDULE
SEE 2"
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:0
:5
P
M C
U s e rs
\l b y rd
\D o c u m e n ts \S it e
-3
-V
A T u s c a lo o s a
-U p g ra d e
E le v a to rs -A
L lb y rd
V D
E K
F .r v t
A-601
DOOR SCHEDULE AND DETAILS AND
ROOM FINISH SCHEDULE
15 21LBB/ENP
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
DJR
DOOR SCHEDULE
DOOR DOOR FRAME HEAD
DETAIL NO.
JAMB
DETAIL NO.
THRESH
DETAIL NO. LBL
HDWR
SET REMARKSNO. WIDTH HEIGHT THICK MAT'L ELEV MAT'L ELEV
BLDG 1
S5 3' - 0" 7' - 0" 2" HM F HM A H1 J1 60 SH-3
BLDG 2
P3 3' - 0" 7' - 0" 2" HM F HM A H1 J1 90 SH-3
BLDG 5
9A 3' - 0" 7' - 0" 2" HM F HM A H1 J1 60 SH-3
BLDG 135
B-01 3' - 6" 7' - 0" 2" HM F HM A H1 J1 60 SH-3
EXIST= EXISTING
HM= HOLLOW METAL
PNT= PAINT
STN= STAIN
WD= SOLID CORE WOOD
Scale: 1 1/2" = 1'-0" H1
HEAD DETAIL @ METAL STUD
Scale: 1 1/2" = 1'-0"
J1
JAMB DETAIL @ METAL STUD
DOOR ELEVATIONS FRAME ELEVATIONS
ABBREVIATIONS:
BLDGS 1, 2, 5, 38, 135 & 137
NOTE: REFER TO COLD FORM METAL
MANUFACTURING FOR SHOP DRAWINGS
1 ASI #1 02/17/2026
4'-5"
1" 1"
EQ. 1/2" EQ. TOP OF CAB
PROVIDE NEW HIW-2 PANELS.
PROVIDE A NEW CAR ENCLOSURE WITH HANDRAILS AT
CENTERLINES OF 30" AND 42" ABOVE THE CAR FLOOR.
CONCEAL ALL HANDRAIL FASTENINGS. HANDRAILS
SHALL BE REMOVABLE FROM THE INSIDE OF THE CAR
ENCLOSURE. LOCATE HANDRAILS 1-1/2" FROM CAB
WALL. PROVIDE FLAT STOCK HANDRAILS WITH THE
ENDS AT THE ENTRANCE TURNED BACK TO THE WALL.
1" HORIZONTAL REVEAL, TYP.
PROVIDE HIW-1 PANEL
PROVIDE NEW 8" TALL CRASH RAIL @
12" ABOVE CAR FLOOR. CONCEAL ALL
CRASH RAIL FASTENINGS. CRASH RAIL
SHALL BE REMOVABLE FROM THE
INSIDE OF THE CAB.
4" SS BASE
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-801
PROVIDE HIW-1 PANEL
C E
IL
IN
G
STAINLESS STEEL PANEL,SS
WITH STAINLESS STEEL PAD
STUDS
PROVIDE NEW MAIN CAR
OPERATING PANEL IN THE CAR
ENCLOSURE AT THE FRONT
RETURN PANEL. CONTRACTOR
TO VERIFY LOCATION PER CAB
INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
PROVIDE CAB WITH NEW TWO-
SPEED SIDE HORIZONTAL
SLIDING ELEVATOR CAR DOORS.
REFINISH EXISTING STAINLESS
STEEL ENTRANCE FRAME AT
HEAD AND BOTH JAMBS.
A-801
SIMILAR
6'-11"
7'-6"
PROVIDE NEW AUXILIARY CAR
OPERATING PANEL IN THE CAR
ENCLOSURE AT THE SIDE PANEL.
CONTRACTOR TO VERIFY
LOCATION PER CAB INTERIOR.
SEE ELEVATOR SPECIFICATIONS.
1"EQ1/2"EQ1"
4'-5"
C E
IL
IN
G
TOP OF CAB
PROVIDE NEW STAINLESS STEEL
PANELS ABOVE AND TO THE
SIDES OF ELEVATOR DOORS
PROVIDE NEW MAIN CAR
OPERATING PANEL IN THE CAR
ENCLOSURE AT THE FRONT
RETURN PANEL. CONTRACTOR
TO VERIFY LOCATION PER CAB
INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-801
PROVIDE NEW STAINLESS
STEEL DOORS
C E
IL
IN
G
TOP OF CAB
PROVIDE NEW HIW-2 PANELS.
PROVIDE A NEW CAR ENCLOSURE WITH
HANDRAILS AT CENTERLINES OF 30" AND 42"
ABOVE THE CAR FLOOR. CONCEAL ALL HANDRAIL
FASTENINGS. HANDRAILS SHALL BE REMOVABLE
FROM THE INSIDE OF THE CAR ENCLOSURE.
LOCATE HANDRAILS 1-1/2" FROM CAB WALL.
PROVIDE FLAT STOCK HANDRAILS WITH THE ENDS
AT THE ENTRANCE TURNED BACK TO THE WALL.
1" HORIZONTAL REVEAL, TYP.
PROVIDE HIW-1 PANEL
PROVIDE NEW CAR ENCLOSURE WITH CRASH RAIL
AT 12" ABOVE CAR FLOOR. CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL BE REMOVABLE
FROM THE INSIDE OF THE CAR ENCLOSURE.
PROVIDE FLAT STOCK CRASH RAILS WITH THE ENDS
AT THE ENTRANCE TURNED BACK TO THE WALL.
4" SS BASE
AUXILARY
CONTROL PANEL
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-801 2
/2
PROVIDE HIW-1 PANEL
6'-11"
1" EQ 1/2" EQ 1/2" EQ 1"
NOTE: OPPOSITE HAND SIDE WALL IS TYPICAL
WITHOUT AUXILARY OPERATING PANEL
STAINLESS STEEL PANEL,SS
WITH STAINLESS STEEL PAD
STUDS
1. DELETE ALL WORK IN BUILDING NUMBER 1
1 ALTERNATE NOTES
1"
EQ
1/2"
EQ
1/2"
EQ
1"
PROVIDE (6) LED ILLUMINATED
CAR LIGHT FIXTURES ABOVE THE
CEILING. MAINTAIN A MINIMUM
LIGHT LEVEL OF 50-FOOT
CANDLES AT (36") ABOVE THE
FINISHED FLOOR.
COORDINATE EMERGENCY
EXIT HATCH WITH CAB CEILING
E Q
/2
E Q
6'-11"
PROVIDE S.S HANGING CEILING
FRAME. CONSTRUCT FRAME
OF .125" X 1.50" "T" AND "L" SECTIONS
ISLAND, #4 BRUSHED STAINLESS
STEEL MIRRORED FINISH, GRAIN TO
RUN FRONT OF CAB TO REAR.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:3
P
M C
U s e rs
\j k o le n d a
\D o c u m e n ts \A
-3
-V A
T u s c a lo o s a
-U p g ra d e
E le v a to rs -A
L B u ld in g
A d m in is tr a ti v e jk o le n d a
Z H
V G
.r v t
BLDG 1 INTERIOR ELEVATOR TYPICAL
PLAN AND ELEVATIONS
16 21KJC/ENP
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
JK
A-801
Scale: 3/4" = 1'-0"
ELEVATOR CAB REAR ELEVATION (P1 & P2)
Scale: 3/4" = 1'-0"
BUILDING 1 TYPICAL ELEVATOR FLOOR PLAN (P1 & P2)
Scale: 3/4" = 1'-0"
ELEVATOR CAB FRONT ELEVATION (P1 & P2)
Scale: 3/4" = 1'-0"
ELEVATOR CAB SIDE ELEVATION (P1 & P2)
NO
RTH
0 4 8 16
NO
RTH
0 4 8 16
Scale: 3/4" = 1'-0"
BUILDING 1 TYPICAL ELEVATOR REFLECTED CEILING PLAN (P1 & P2)
1 PROVIDE NEW CAR ENCLOSURE WITH NEW
FLOORING, LVT-1.
A. ALL ELECTRICAL WORK REQUIRED BY THIS
MODIFICAATION IS THE RESPONSIBILITY OF THE
ELEVATOR CONTRACTOR. IF ANY WORK
REQUIRES A LICENSED ELECTRICIAN, THIS SHALL
BE INCLUDED IN THE RESPONSIBILITY OF THE
ELEVATOR COMPANY TO RETAIN AND PROVIDE
SUCH AN INDIVIDUAL IF NECESSARY.
B. SEE ELEVATOR SCHEDULE ON A-001 FOR
ADDITIONAL INFORMATION.
1 ASI #1 02/17/2026
PROVIDE NEW AUXILIARY CAR OPERATING
PANEL IN THE CAR ENCLOSURE AT THE SIDE
PANEL. CONTRACTOR TO VERIFY LOCATION
PER CAB INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
REFINISH EXISTING STAINLESS
STEEL ENTRANCE FRAME AT
HEAD AND BOTH JAMBS.
PROVIDE CAB WITH NEW TWO-
SPEED SIDE HORIZONTAL
SLIDING ELEVATOR CAR DOORS.
PROVIDE NEW MAIN CAR
OPERATING PANEL IN THE CAR
ENCLOSURE AT THE FRONT
RETURN PANEL. CONTRACTOR
TO VERIFY LOCATION PER CAB
INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
A-8022
SIMILAR
7'-0"
6'-6 7/8"
/8
1"EQ1/2"EQ1"
4'-6 3/8"
C E
IL
IN
G
TOP OF CAB
PROVIDE NEW STAINLESS
STEEL PANELS ABOVE AND TO
THE SIDES OF ELEVATOR
DOORS
PROVIDE NEW MAIN CAR
OPERATING PANEL IN THE CAR
ENCLOSURE AT THE FRONT
RETURN PANEL. CONTRACTOR
TO VERIFY LOCATION PER CAB
INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-802
PROVIDE NEW STAINLESS
STEEL DOORS
C E
IL
IN
G
TOP OF CAB
PROVIDE NEW HIW-2 PANELS.
PROVIDE A NEW CAR ENCLOSURE WITH HANDRAILS AT
CENTERLINES OF 30" AND 42" ABOVE THE CAR FLOOR.
CONCEAL ALL HANDRAIL FASTENINGS. HANDRAILS
SHALL BE REMOVABLE FROM THE INSIDE OF THE CAR
ENCLOSURE. LOCATE HANDRAILS 1-1/2" FROM CAB
WALL. PROVIDE FLAT STOCK HANDRAILS WITH THE
ENDS AT THE ENTRANCE TURNED BACK TO THE WALL.
1" HORIZONTAL REVEAL, TYP.
PROVIDE HIW-1 PANEL
PROVIDE NEW CAR ENCLOSURE WITH CRASH RAIL
AT 12" ABOVE CAR FLOOR. CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL BE REMOVABLE
FROM THE INSIDE OF THE CAR ENCLOSURE.
PROVIDE FLAT STOCK CRASH RAILS WITH THE ENDS
AT THE ENTRANCE TURNED BACK TO THE WALL.
4" SS BASE
AUXILARY
CONTROL PANEL
PROVIDE NEW STIANLESS
STEEL CEILING. SEE 3/A-802 2
/2
PROVIDE HIW-1 PANEL
6'-6 7/8"
NOTE: OPPOSITE HAND SIDE WALL IS TYPICAL
WITHOUT AUXILARY OPERATING PANEL
1" EQ 5/8" EQ 1/2" EQ 1"
STAINLESS STEEL PANEL,SS
WITH STAINLESS STEEL PAD
STUDS
4'-6 3/8"
TOP OF CAB
PROVIDE NEW HIW-2 PANELS.
PROVIDE NEW 4" HANDRAILS @ CENTERLINES OF
42" AND 32" ABOVE THE CAR FLOOR. CONCEAL ALL
HANDRAIL FASTENINGS. HANDRAILS SHALL BE
REMOVABLE FROM THE INSIDE OF THE CAB.
LOCATE HANDRAILS 1-1/2" FROM CAB WALL.
PROVIDE FLAT STOCK HANDRAILS WITH THE ENDS
AT THE ENTRANCE TURNED BACK TO THE WALL.
1" HORIZONTAL REVEAL, TYP.
PROVIDE HIW-1 PANEL
PROVIDE NEW CAR ENCLOSURE WITH CRASH RAIL
AT 12" ABOVE CAR FLOOR. CONCEAL ALL CRASH
RAIL FASTENINGS. CRASH RAIL SHALL BE
REMOVABLE FROM THE INSIDE OF THE CAR
ENCLOSURE. PROVIDE FLAT STOCK CRASH RAILS
WITH THE ENDS AT THE ENTRANCE TURNED BACK
TO THE WALL.
4" SS BASE
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-802
PROVIDE HIW-1 PANEL
1" 1"
C E
IL
IN
G
EQ. 1/2" EQ.
STAINLESS STEEL PANEL,SS
WITH STAINLESS STEEL PAD
STUDS
E Q
/2
E Q
1"
EQ
1/2"
EQ
1/2"
EQ
1"
/8
6'-6 7/8"
PROVIDE S.S HANGING
CEILING FRAME. CONSTRUCT
FRAME OF .125" X 1.50" "T"
AND "L" SECTIONS
PROVIDE (6) LED ILLUMINATED
CAR LIGHT FIXTURES ABOVE
THE CEILING. MAINTAIN A
MINIMUM LIGHT LEVEL OF 50-
FOOT CANDLES AT (36")
ABOVE THE FINISHED FLOOR.
ISLAND, #4 BRUSHED
STAINLESS STEEL MIRRORED
FINISH, GRAIN TO RUN FRONT
OF CAB TO REAR.
COORDINATE EMERGENCY
EXIT HATCH WITH CAB CEILING
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:2
P
M C
U s e rs
\j k o le n d a
\D o c u m e n ts \A
-3
-V A
T u s c a lo o s a -U p g ra d e E le v a to rs
-A L
B u ld in g
A d d ic ti o n R e h a b jk o le n d a
Z H
V G
.r v t
BLDG 2 INTERIOR ELEVATOR TYPICAL
PLAN AND ELEVATIONS
17 21KJC/ENP
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
JK
A-802
Scale: 3/4" = 1'-0"
BUILDING 2 TYPICAL ELEVATOR FLOOR PLAN (P3)
Scale: 3/4" = 1'-0"
ELEVATOR CAB FRONT ELEVATION (P3)
Scale: 3/4" = 1'-0"
ELEVATOR CAB SIDE ELEVATION (P3)
Scale: 3/4" = 1'-0"
ELEVATOR CAB REAR ELEVATION (P3)
NO
RTH
0 4 8 16 NO
RTH
0 4 8 16
Scale: 3/4" = 1'-0"
BUILDING 2 TYPICAL ELEVATOR REFLECTED CEILING PLAN (P3)
1 PROVIDE NEW CAR ENCLOSURE WITH NEW
FLOORING, LVT-1.
A. ALL ELECTRICAL WORK REQUIRED BY THIS
MODIFICAATION IS THE RESPONSIBILITY OF THE
ELEVATOR CONTRACTOR. IF ANY WORK
REQUIRES A LICENSED ELECTRICIAN, THIS SHALL
BE INCLUDED IN THE RESPONSIBILITY OF THE
ELEVATOR COMPANY TO RETAIN AND PROVIDE
SUCH AN INDIVIDUAL IF NECESSARY.
B. SEE ELEVATOR SCHEDULE ON A-001 FOR
ADDITIONAL INFORMATION.
1 ASI #1 02/17/2026
1"
EQ
1/2"
EQ
1"
SEE SCHEDULE
C E
IL
IN
G
TOP OF CAB
PROVIDE NEW STAINLESS
STEEL PANELS ABOVE AND TO
THE SIDES OF ELEVATOR
DOORS
PROVIDE NEW MAIN/AUXILIARY
CAR OPERATING PANEL IN THE
CAR ENCLOSURE AT THE FRONT
RETURN PANEL. CONTRACTOR
TO VERIFY LOCATION PER CAB
INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-803
PROVIDE NEW STAINLESS
DOOR
SEE SCHEDULE
C E
IL
IN
G
TOP OF CAB
PROVIDE NEW HIW-2 PANELS.
PROVIDE NEW 4" HANDRAILS @ CENTERLINES
OF 42" AND 32" ABOVE THE CAR FLOOR.
CONCEAL ALL HANDRAIL FASTENINGS.
HANDRAILS SHALL BE REMOVABLE FROM THE
INSIDE OF THE CAB. LOCATE HANDRAILS 1-1/2"
FROM CAB WALL. PROVIDE FLAT STOCK
HANDRAILS WITH THE ENDS AT THE
ENTRANCE TURNED BACK TO THE WALL.
1/2" HORIZONTAL REVEAL, TYP.
PROVIDE HIW-1 PANEL
PROVIDE NEW 8" TALL CRASH RAIL @
12" ABOVE CAR FLOOR. CONCEAL ALL
CRASH RAIL FASTENINGS. CRASH RAIL
SHALL BE REMOVABLE FROM THE
INSIDE OF THE CAB.
4" SS BASE
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-803
/2
PROVIDE HIW-1 PANEL
1"
EQ 1/2" EQ 1/2" EQ
1"
NOTE: OPPOSITE HAND SIDE WALL IS TYPICAL
WITHOUT AUXILARY OPERATING PANEL
STAINLESS STEEL PANEL,SS
WITH STAINLESS STEEL PAD
STUDS
A-803
OPPOSITE
HAND
PROVIDE NEW MAIN CAR
OPERATING PANEL IN THE
CAR ENCLOSURE ON THE
FRONT RETURN PANEL.
CONTRACTOR TO VERIFY
LOCATION PER CAB
INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
PROVIDE AN AUXILIARY CAR
OPERATING IN THE SIDE
WALL OF THE ELEVATOR.
CONTRACTOR TO VERIFY
LOCATION PER CAB
INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
PROVIDE NEW TWO-SPEED
SIDE HORIZONTAL SLIDING
ELEVATOR CAR DOORS.
REPLACE STAINLESS STEEL
ENTRANCE FRAME AT HEAD
AND BOTH JAMBS.
FOR PLATFORM SIZE SEE ELEVATOR
MATRIX ON SHEET A-001
PROVIDE CAB WITH NEW
TWO-SPEED SIDE
HORIZONTAL SLIDING
ELEVATOR CAR DOORS.
REPLACE STAINLESS STEEL
ENTRANCE FRAME AT HEAD
AND BOTH JAMBS.
SIMILAR
1"
EQ.
1/2"
EQ.
1"
E Q
/2
E Q
/2
E Q
SEE SCHEDULE
S E
E S
C H
E D
U L E
COORDINATE EMERGENCY EXIT HATCH
WITH CAB CEILING
PROVIDE S.S HANGING CEILING FRAME.
CONSTRUCT FRAME OF .125" X 1.50" "T"
AND "L" SECTIONS
PROVIDE (6) LED ILLUMINATED CAR LIGHT
FIXTURES ABOVE THE CEILING. MAINTAIN A
MINIMUM LIGHT LEVEL OF 50-FOOT CANDLES
AT (36") ABOVE THE FINISHED FLOOR.
ISLAND, #4 BRUSHED STAINLESS STEEL
MIRRORED FINISH, GRAIN TO RUN FRONT
OF CAB TO REAR.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:1
P
M C
U s e rs
\j k o le n d a \D o c u m e n ts
\A
-3
-V A
T u s c a lo o s a
-U p g ra d e
E le v a to rs
-A L
B u ld in g jk o le n d a
Z
H V
G .r v t
BLDG 5 INTERIOR ELEVATOR TYPICAL
PLAN AND ELEVATIONS
18 21KJC/ENP
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
JK
A-803
Scale: 3/4" = 1'-0"
ELEVATOR CAB FRONT/BACK ELEVATION (P13)
Scale: 3/4" = 1'-0"
ELEVATOR CAB SIDE ELEVATION (P13)
Scale: 3/4" = 1'-0"
BUILDING 5 TYPICAL ELEVATOR FLOOR PLAN (P13)
NO
RTH
0 4 8 16
NO
RTH
0 4 8 16
Scale: 3/4" = 1'-0"
BUILDING 5 ELEVATOR REFLECTED CEILING PLAN (P13)
1 ASI #1 02/17/2026
1 PROVIDE NEW CAR ENCLOSURE WITH NEW
FLOORING, LVT-1.
A. ALL ELECTRICAL WORK REQUIRED BY THIS
MODIFICAATION IS THE RESPONSIBILITY OF THE
ELEVATOR CONTRACTOR. IF ANY WORK
REQUIRES A LICENSED ELECTRICIAN, THIS SHALL
BE INCLUDED IN THE RESPONSIBILITY OF THE
ELEVATOR COMPANY TO RETAIN AND PROVIDE
SUCH AN INDIVIDUAL IF NECESSARY.
B. SEE ELEVATOR SCHEDULE ON A-001 FOR
ADDITIONAL INFORMATION.
S SSS
S
A-8045
PROVIDE CAB WITH NEW
TWO-SPEED SIDE
HORIZONTAL SLIDING
ELEVATOR CAR DOORS.
REFINISH EXISTING
STAINLESS STEEL
ENTRANCE FRAME AT
HEAD AND BOTH JAMBS.
PROVIDE NEW AUXILIARY CAR
OPERATING PANEL IN THE CAR
ENCLOSURE AT THE SIDE PANEL.
CONTRACTOR TO VERIFY
LOCATION PER CAB INTERIOR.
SEE ELEVATOR SPECIFICATIONS.
PROVIDE NEW MAIN CAR
OPERATING PANEL IN THE CAR
ENCLOSURE AT THE FRONT
RETURN PANEL. CONTRACTOR
TO VERIFY LOCATION PER CAB
INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
SIMILAR
8'-9"
9'-6"
1" EQ. 1/2" 2'-8 1/4" 1"
5'-10"
C E
IL
IN
G
TOP OF CAB
PROVIDE NEW STAINLESS STEEL
PANELS ABOVE AND TO THE
SIDES OF ELEVATOR DOORS
PROVIDE NEW MAIN CAR
OPERATING PANEL IN THE CAR
ENCLOSURE AT THE FRONT
RETURN PANEL. CONTRACTOR
TO VERIFY LOCATION PER CAB
INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
PROVIDE NEW STAINLESS STEEL
DOOR.
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-804
C E
IL
IN
G
TOP OF CAB
PROVIDE NEW HIW-2 PANELS.
PROVIDE A NEW CAR ENCLOSURE WITH HANDRAILS AT
CENTERLINES OF 30" AND 42" ABOVE THE CAR FLOOR.
CONCEAL ALL HANDRAIL FASTENINGS. HANDRAILS
SHALL BE REMOVABLE FROM THE INSIDE OF THE CAR
ENCLOSURE. LOCATE HANDRAILS 1-1/2" FROM CAB
WALL. PROVIDE FLAT STOCK HANDRAILS WITH THE
ENDS AT THE ENTRANCE TURNED BACK TO THE WALL.
1" HORIZONTAL REVEAL, TYP.
PROVIDE HIW-1 PANEL
PROVIDE NEW CAR ENCLOSURE WITH CRASH RAIL AT
12" ABOVE CAR FLOOR. CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL BE REMOVABLE FROM
THE INSIDE OF THE CAR ENCLOSURE. PROVIDE FLAT
STOCK CRASH RAILS WITH THE ENDS AT THE
ENTRANCE TURNED BACK TO THE WALL.
4" SS BASE
AUXILARY
CONTROL PANEL
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-804
/2
PROVIDE HIW-1 PANEL
8'-9"
1"
EQ.
1/2"
EQ.
1/2"
EQ.
1"
NOTE: OPPOSITE HAND SIDE WALL IS TYPICAL
WITHOUT AUXILARY OPERATING PANEL
STAINLESS STEEL PANEL,SS
WITH STAINLESS STEEL PAD
STUDS
5'-10"
TOP OF CAB
PROVIDE NEW HIW-2 PANELS.
PROVIDE A NEW CAR ENCLOSURE WITH HANDRAILS AT
CENTERLINES OF 30" AND 42" ABOVE THE CAR FLOOR.
CONCEAL ALL HANDRAIL FASTENINGS. HANDRAILS
SHALL BE REMOVABLE FROM THE INSIDE OF THE CAR
ENCLOSURE. LOCATE HANDRAILS 1-1/2" FROM CAB
WALL. PROVIDE FLAT STOCK HANDRAILS WITH THE
ENDS AT THE ENTRANCE TURNED BACK TO THE WALL.
1" HORIZONTAL REVEAL, TYP.
PROVIDE HIW-1 PANEL
PROVIDE NEW CAR ENCLOSURE WITH CRASH RAIL AT
12" ABOVE CAR FLOOR. CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL BE REMOVABLE
FROM THE INSIDE OF THE CAR ENCLOSURE. PROVIDE
FLAT STOCK CRASH RAILS WITH THE ENDS AT THE
ENTRANCE TURNED BACK TO THE WALL.
4" SS BASE
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-804
PROVIDE HIW-1 PANEL
/2
1" 1"
C E
IL
IN
G
EQ
1/2"
EQ
STAINLESS STEEL PANEL,SS
WITH STAINLESS STEEL PAD
STUDS
E Q
/2
E Q
1"
EQ
1/2"
EQ
1/2"
EQ
1"
S E
E S
C H
E D
U L E
8'-9"
PROVIDE (6) LED ILLUMINATED
CAR LIGHT FIXTURES ABOVE
THE CEILING. MAINTAIN A
MINIMUM LIGHT LEVEL OF 50-
FOOT CANDLES AT (36") ABOVE
THE FINISHED FLOOR.
COORDINATE EMERGENCY
EXIT HATCH WITH CAB
CEILING
PROVIDE S.S HANGING
CEILING FRAME.
CONSTRUCT FRAME
OF .125" X 1.50" "T" AND "L"
SECTIONS
ISLAND, #4 BRUSHED
STAINLESS STEEL
MIRRORED FINISH, GRAIN
TO RUN FRONT OF CAB TO
REAR.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:2
P
M C
U s e rs
\j k o le n d a \D o c u m e n ts
\A
-3
-V
A T u s c a lo o s a
-U p g ra d e
E le v a to rs
-A L
B u ld in g jk o le n d a
Z
H V
G .r v t
BLDG 38 INTERIOR ELEVATOR TYPICAL
PLAN AND ELEVATIONS
19 21KJC/ENP
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
JK
A-804
Scale: 3/4" = 1'-0"
BUILDING 38 TYPICAL ELEVATOR FLOOR PLAN (P6 - P7)
Scale: 3/4" = 1'-0"
ELEVATOR CAB FRONT ELEVATION (P6 & P7)
Scale: 3/4" = 1'-0"
ELEVATOR CAB SIDE ELEVATION (P6 & P7)
Scale: 3/4" = 1'-0"
ELEVATOR CAB REAR ELEVATION (P6 & P7)
NO
RTH0 4 8 16
NO
RTH0 4 8 16
Scale: 3/4" = 1'-0"
BUILDING 38 TYPICAL ELEVATOR REFLECTED CEILING PLAN (P6 & P7)
1 ASI #1 02/17/2026
1 PROVIDE NEW CAR ENCLOSURE WITH NEW
FLOORING, LVT-1.
A. ALL ELECTRICAL WORK REQUIRED BY THIS
MODIFICAATION IS THE RESPONSIBILITY OF THE
ELEVATOR CONTRACTOR. IF ANY WORK
REQUIRES A LICENSED ELECTRICIAN, THIS SHALL
BE INCLUDED IN THE RESPONSIBILITY OF THE
ELEVATOR COMPANY TO RETAIN AND PROVIDE
SUCH AN INDIVIDUAL IF NECESSARY.
B. SEE ELEVATOR SCHEDULE ON A-001 FOR
ADDITIONAL INFORMATION.
A-805 4
FOR PLATFORM SIZE SEE ELEVATOR
MATRIX ON SHEET A-001.
PROVIDE NEW MAIN CAR
OPERATING PANEL IN THE CAR
ENCLOSURE AT THE FRONT RETURN
PANEL. CONTRACTOR TO VERIFY
LOCATION PER CAB INTERIOR. SEE
ELEVATOR SPECIFICATIONS.
PROVIDE NEW AUXILIARY CAR
OPERATING PANEL IN THE CAR
ENCLOSURE AT THE SIDE PANEL.
CONTRACTOR TO VERIFY LOCATION
PER CAB INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
REFINISH EXISTING STAINLESS
STEEL ENTRANCE FRAME AT HEAD
AND BOTH JAMBS.
PROVIDE CAB WITH NEW TWO-
SPEED SIDE HORIZONTAL SLIDING
ELEVATOR CAR DOORS.
OH
PROVIDE CAB WITH NEW TWO-
SPEED SIDE HORIZONTAL SLIDING
ELEVATOR CAR DOORS.
1/2"EQ.1/2"EQ.
SEE SCHEDULE
C E
IL
IN
G
TOP OF CAB
PROVIDE NEW STAINLESS
STEEL PANELS ABOVE
ELEVATOR DOOR AND
SIDES.
PROVIDE NEW MAIN/AUXILIARY
CAR OPERATING PANEL IN THE
CAR ENCLOSURE AT THE FRONT
RETURN PANEL. CONTRACTOR
TO VERIFY LOCATION PER CAB
INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-805.
1/2"
PROVIDE NEW STAINLESS
STEEL DOOR
SEE SCHEDULE
C E
IL
IN
G
TOP OF CAB
PROVIDE NEW HIW-2 PANELS.
PROVIDE A NEW CAR ENCLOSURE WITH HANDRAILS AT
CENTERLINES OF 30" AND 42" ABOVE THE CAR FLOOR.
CONCEAL ALL HANDRAIL FASTENINGS. HANDRAILS
SHALL BE REMOVABLE FROM THE INSIDE OF THE CAR
ENCLOSURE. LOCATE HANDRAILS 1-1/2" FROM CAB
WALL. PROVIDE FLAT STOCK HANDRAILS WITH THE
ENDS AT THE ENTRANCE TURNED BACK TO THE WALL.
1/2" HORIZONTAL REVEAL, TYP.
PROVIDE HIW-1 PANEL
PROVIDE NEW CAR ENCLOSURE WITH CRASH RAIL AT
12" ABOVE CAR FLOOR. CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL BE REMOVABLE
FROM THE INSIDE OF THE CAR ENCLOSURE. PROVIDE
FLAT STOCK CRASH RAILS WITH THE ENDS AT THE
ENTRANCE TURNED BACK TO THE WALL.
4" SS BASE
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-805
/2
PROVIDE HIW-1 PANEL
1"
EQ
1/2"
EQ
1/2"
EQ
1"
1"
EQ
1"
EQ
1"
STAINLESS STEEL PANEL,SS
WITH STAINLESS STEEL PAD
STUDS
1"
EQ
1/2"
EQ
1"
E Q
/2
E
Q
/2
E Q
SEE SCHEDULE
S E
E S
C H
E D
U L E
COORDINATE EMERGENCY EXIT
HATCH WITH CAB CEILING
PROVIDE S.S HANGING CEILING
FRAME. CONSTRUCT FRAME
OF .125" X 1.50" "T" AND "L"
SECTIONS
PROVIDE (6) LED ILLUMINATED
CAR LIGHT FIXTURES ABOVE
THE CEILING. MAINTAIN A
MINIMUM LIGHT LEVEL OF 50-
FOOT CANDLES AT (36") ABOVE
THE FINISHED FLOOR.
ISLAND, #4 BRUSHED STAINLESS
STEEL MIRRORED FINISH, GRAIN
TO RUN FRONT OF CAB TO REAR.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:4
P
M C
U s e rs
\j k o le n d a
\D o c u m e n ts \A
-3
-V A
T u s c a lo o s a
-U p g ra d e
E le v a to rs -A
L B u ld in g jk o le n d a
Z H
V G
.r v t
BLDG 135 INTERIOR ELEVATOR
TYPICAL PLAN AND ELEVATIONS
20 21KJC/ENP
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
JK
A-805
Scale: 3/4" = 1'-0"
BUILDING 135 TYPICAL ELEVATOR FLOOR PLAN (P14 & P15)
Scale: 3/4" = 1'-0"
ELEVATOR CAB FRONT ELEVATION (P14 & P15)
Scale: 3/4" = 1'-0"
ELEVATOR CAB SIDE ELEVATION (P14 & P15)
NO
RTH
0 4 8 16
NO
RTH
0 4 8 16
Scale: 3/4" = 1'-0"
BUILDING 135 TYPICAL ELEVATOR REFLECTED CEILING PLAN (P14 & P15)
1 ASI #1 02/17/2026
1 PROVIDE NEW CAR ENCLOSURE WITH NEW
FLOORING, LVT-1.
A. ALL ELECTRICAL WORK REQUIRED BY THIS
MODIFICAATION IS THE RESPONSIBILITY OF THE
ELEVATOR CONTRACTOR. IF ANY WORK
REQUIRES A LICENSED ELECTRICIAN, THIS SHALL
BE INCLUDED IN THE RESPONSIBILITY OF THE
ELEVATOR COMPANY TO RETAIN AND PROVIDE
SUCH AN INDIVIDUAL IF NECESSARY.
B. SEE ELEVATOR SCHEDULE ON A-001 FOR
ADDITIONAL INFORMATION.
A-806 55
PROVIDE NEW MAIN CAR OPERATING
PANEL IN THE CAR ENCLOSURE ON
THE FRONT RETURN PANEL.
CONTRACTOR TO VERIFY LOCATION
PER CAB INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
PROVIDE AN AUXILIARY CAR OPERATING
IN THE SIDE WALL OF THE ELEVATOR.
CONTRACTOR TO VERIFY LOCATION PER
CAB INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
REFINISH EXISTING STAINLESS STEEL
ENTRANCE FRAME AT HEAD AND
BOTH JAMBS.
PROVIDE CAB WITH NEW TWO-SPEED
SIDE HORIZONTAL SLIDING ELEVATOR
CAR DOORS.
SIMILAR
7'-6 1/2"
8'-0"
1"
EQ
1/2"
EQ
1/2"
EQ
1"
7'-6 1/2"
TOP OF CAB
PROVIDE NEW STAINLESS
STEEL PANELS ABOVE AND
TO THE SIDES OF ELEVATOR
DOORS
PROVIDE NEW MAIN CAR
OPERATING PANEL IN THE
CAR ENCLOSURE AT THE
FRONT RETURN PANEL.
CONTRACTOR TO VERIFY
LOCATION PER CAB
INTERIOR. SEE ELEVATOR
SPECIFICATIONS.
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-806.
PROVIDE NEW STAINLESS
STEEL DOOR
TOP OF CAB
PROVIDE NEW HIW-2 PANELS.
PROVIDE A NEW CAR ENCLOSURE WITH HANDRAILS AT
CENTERLINES OF 30" AND 42" ABOVE THE CAR FLOOR.
CONCEAL ALL HANDRAIL FASTENINGS. HANDRAILS
SHALL BE REMOVABLE FROM THE INSIDE OF THE CAR
ENCLOSURE. LOCATE HANDRAILS 1-1/2" FROM CAB
WALL. PROVIDE FLAT STOCK HANDRAILS WITH THE
ENDS AT THE ENTRANCE TURNED BACK TO THE WALL.
1" HORIZONTAL REVEAL, TYP.
PROVIDE HIW-1 PANEL
PROVIDE NEW CAR ENCLOSURE WITH CRASH RAIL AT
12" ABOVE CAR FLOOR. CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL BE REMOVABLE
FROM THE INSIDE OF THE CAR ENCLOSURE. PROVIDE
FLAT STOCK CRASH RAILS WITH THE ENDS AT THE
ENTRANCE TURNED BACK TO THE WALL.
4" SS BASE
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-8061
PROVIDE HIW-1 PANEL
C E
IL
IN
G
7'-6 1/2"
1"
EQ
1/2"
EQ
1/2"
EQ
1"
/2
STAINLESS STEEL PANEL,SS
WITH STAINLESS STEEL PAD
STUDS
5'-2"
TOP OF CAB
PROVIDE NEW HIW-2 PANELS.
PROVIDE A NEW CAR ENCLOSURE WITH HANDRAILS AT
CENTERLINES OF 30" AND 42" ABOVE THE CAR FLOOR.
CONCEAL ALL HANDRAIL FASTENINGS. HANDRAILS
SHALL BE REMOVABLE FROM THE INSIDE OF THE CAR
ENCLOSURE. LOCATE HANDRAILS 1-1/2" FROM CAB
WALL. PROVIDE FLAT STOCK HANDRAILS WITH THE
ENDS AT THE ENTRANCE TURNED BACK TO THE WALL.
1" HORIZONTAL REVEAL, TYP.
PROVIDE HIW-1 PANEL
PROVIDE NEW CAR ENCLOSURE WITH CRASH RAIL AT
12" ABOVE CAR FLOOR. CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL BE REMOVABLE
FROM THE INSIDE OF THE CAR ENCLOSURE. PROVIDE
FLAT STOCK CRASH RAILS WITH THE ENDS AT THE
ENTRANCE TURNED BACK TO THE WALL.
4" SS BASE
PROVIDE NEW STAINLESS
STEEL CEILING. SEE 3/A-806
PROVIDE HIW-1 PANEL
/2
1"
AUXILIARY CONTROL PANEL
C E
IL
IN
G
1"
EQ.
1/2"
EQ.
NOTE: OPPOSITE HAND SIDE WALL IS TYPICAL
WITHOUT AUXILARY OPERATING PANEL
STAINLESS STEEL PANEL,SS
WITH STAINLESS STEEL PAD
STUDS
E Q
/2
E
Q
1"
EQ
1/2"
EQ
1/2"
EQ
1"
7'-6 1/2"
COORDINATE EMERGENCY
EXIT HATCH WITH CAB
CEILING
PROVIDE S.S HANGING CEILING
FRAME. CONSTRUCT FRAME
OF .125" X 1.50" "T" AND "L"
SECTIONS
PROVIDE (6) LED ILLUMINATED
CAR LIGHT FIXTURES ABOVE
THE CEILING. MAINTAIN A
MINIMUM LIGHT LEVEL OF 50-
FOOT CANDLES AT (36") ABOVE
THE FINISHED FLOOR.
ISLAND, #4 BRUSHED
STAINLESS STEEL MIRRORED
FINISH, GRAIN TO RUN FRONT
OF CAB TO REAR.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:5
P
M C
U s e rs
\j k o le n d a
\D o c u m e n ts \A
-3
-V A
T u s c a lo o s a
-U p g ra d e
E le v a to rs -A
L B u ld in g jk o le n d a
Z H
V G
.r v t
A-806
BLDG 137 INTERIOR ELEVATOR
TYPICAL PLAN AND ELEVATIONS
21 21KJC/ENP
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
JK
Scale: 3/4" = 1'-0"
BUILDING 137 TYPICAL ELEVATOR FLOOR PLAN (P17 - P19)
Scale: 3/4" = 1'-0"
ELEVATOR CAB FRONT ELEVATION (P17 - P19)
Scale: 3/4" = 1'-0"
ELEVATOR CAB REAR ELEVATION (P17 - P19)
Scale: 3/4" = 1'-0"
ELEVATOR CAB SIDE ELEVATION (P17 - P19)
N O R
TH
0 4 8 16
N O R
TH
0 4 8 16
1 PROVIDE NEW CAR ENCLOSURE WITH NEW
FLOORING, LVT-1.
A. ALL ELECTRICAL WORK REQUIRED BY THIS
MODIFICAATION IS THE RESPONSIBILITY OF THE
ELEVATOR CONTRACTOR. IF ANY WORK
REQUIRES A LICENSED ELECTRICIAN, THIS SHALL
BE INCLUDED IN THE RESPONSIBILITY OF THE
ELEVATOR COMPANY TO RETAIN AND PROVIDE
SUCH AN INDIVIDUAL IF NECESSARY.
B. SEE ELEVATOR SCHEDULE ON A-001 FOR
ADDITIONAL INFORMATION.
Scale: 3/4" = 1'-0"
BUILDING 137 TYPICAL ELEVATOR REFLECTED CEILING PLAN (P17 - P19)
1 ASI #1 02/17/2026
1. PROVIDE FIRE ALARM SYSTEM AND COMPONENTS COMPLYING WITH THE LATEST:
A. NFPA 13- STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS.
B. NFPA 14- STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM.
C. NFPA 20- STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION.
D. NFPA 70 NATIONAL ELECTRICAL CODE.
E. NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE.
F. NFPA 90A STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS.
G. NFPA 101 LIFE SAFETY CODE.
H. VA FIRE PROTECTION DESIGN MANUAL.
I. ANSI S3.41 AUDIBLE EMERGENCY EVACUATION SIGNAL.
2. FIRE ALARM SYSTEM SHALL COMPLY WITH FACTORY MUTUAL RESEARCH CORPORATION (FM).
3. PROVIDE FIRE ALARM WIRING IN CONDUIT, FACTORY PAINTED RED.
4. BEFORE STARTING WORK, TEST EXISTING FIRE ALARM SYSTEM IN WORK AREA AND ADJACENT AREAS.
5. NOTIFY COR REGARDING DEFICIENCIES AND NON-OPERATING COMPONENTS. VA WILL MAKE REPAIRS.
6. CONTRACTOR TO ENSURE THAT ALL NEW FIRE ALARM SPEAKERS, TONES, AND STROBES ARE IN-SYNC WITH ALL ADJACENT AREAS BEYOND THE AREA OF WORK. WHEN WORK IS COMPLETE, TEST EXISTING FIRE ALARM SYSTEM IN WORK
AREA AND ADJACENT AREAS.
7. MAKE REPAIRS TO RESOLVE INCORRECT SYSTEM OPERATIONS AT NO ADDITIONAL COST.
8. THE FIRE ALARM SYSTEM VENDOR/CONTRACTOR SHALL TERMINATE, TEST AND PROGRAM ALL NEW FIRE ALARM DEVICES.
COORDINATE WITH COR.
9. CONNECT SPRINKLER SYSTEM SUPERVISORY DEVICES TO THE FIRE ALARM SYSTEM. COORDINATE LOCATION WITH THE
SPRINKLER CONTRACTOR.
10. CONNECT ALL ELECTROMAGNETIC DOOR HOLD OPEN DEVICES TO THE FIRE ALARM SYSTEM. COORDINATE WITH THE
DOOR HARDWARE CONTRACTOR.
11. PROVIDE RELAY CONTROL MODULES FOR PACS, COORDINATE WITH PHYSICAL ACCESS CONTROL SYSTEM (PACS), CONTRACTOR AND COR.
12. PROVIDE RELAY CONTROL MODULES FOR COOKING POWER SUPPLY SHUT OFF.
13. PROVIDE RELAY CONTROL MODULES FOR KITCHEN HOOD FIRE SUPPRESSION SYSTEM.
14. THE OPERABLE PART OF A MANUAL ACTUATED ALARM INITIATING DEVICE SHALL BE NOT LESS THAN 42" (1.07M) AND NOT
MORE THAN 48" (1.22M) FROM FINISH FLOOR.
15. FOR LOCATION (CORRIDOR, ROOM OR ADJACENT SPACE) WITH TWO OR MORE VISIBLE FIRE ALARM NOTIFICATION APPLIANCES WITHIN THE FIELD OF VIEW, PROGRAM VISIBLE TO FLASH IN SYNCHRONIZATION.
16. THE "FIRE ALARM INTERFACE WITH ELEVATORS" DETAIL ON THIS SHEET IS A TYPICAL DETAIL WHICH APPLIES TO ALL
ELEVATORS.
ACC ACCESSIBLE
ACLG ABOVE CEILING
A/E ARCHITECT/ENGINEER
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
APPRX APPROXIMATELY
ARCH ARCHITECT, ARCHITECTURAL
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
BOD BASIS OF DESIGN
C CONDUIT
CAB CABINET
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR-FURNISHED
CKT CIRCUIT
CLG CEILING
CO CONTRACTING OFFICE
COR CONTRACTING OFFICER
REPRESENTATIVE
dB DECIBEL
DN DOWN
DVC DIGITAL VOICE COMMAND
E EXISTING DEVICES
ELEV ELEVATOR
ETR EXISTING TO REMAIN
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAGAP FIRE ALARM GRAPHIC
ANNUNCIATOR PANEL
FO FIBER OPTIC
J-BOX JUNCTION BOX
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
METAL-CLAD (CONDUIT)
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MT MOUNT
N NEW DEVICES
NAC NETWORK APPLIANCE CIRCUIT
PANEL
NCA NETWORK CONTROL ANNUNCIATOR
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
PA PUBLIC ADDRESS
PB PULL BOX OR PUSHBUTTON
PIV POST INDICATING VALVE
PVC POLYVINYL CHLORIDE (CONDUIT)
QTY QUANTITY
R REMOVE AND REPLACE IN NEW
LOCATION
RCP REFLECTED CEILING PLAN
REQD REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
SC SURFACE CONDUIT
SF SQUARE FEET/FOOT
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SIM SIMILAR
SPEC SPECIFICATION
SPKR SPEAKER
SR SURFACE RACEWAY
SS STAINLESS STEEL
STD STANDARD
SURF SURFACE MOUNTED
SYM SYMMETRICAL
SYS SYSTEM
TC TIMECLOCK
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TR TAMPER RESISTANT
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
UTP UNSHIELDED TWISTED PAIR
FIRE ALARM PULL STATION
SYMBOL HEIGHT DESCRIPTION
ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.
TOP: HEIGHT TO TOP OF DEVICE
ANY HEIGHTS INDICATED IN PLANS SHALL SUPERSEDE THOSE LISTED HERE.
F
F
S
FIRE ALARM SPEAKER
FIRE ALARM STROBE
FIRE ALARM SPEAKER AND STROBE
FIRE ALARM DOOR OPEN HOLDER
FIRE ALARM PHOTOELECTRIC SMOKE DETECTOR
FIRE ALARM CEILING MOUNTED SPEAKER
DD FIRE ALARM DUCT SMOKE DETECTOR
FIRE ALARM HEAT DETECTOR
42"-48"
90"
90"
90"
FIRE ALARM CONTROL PANEL
FIRE ALARM NAC PANEL
FIRE ALARM ANNUNCIATOR PANEL
FLOW SWITCH
FACP
NAC
FAAP
TAMPER SWITCH
POST INDICATOR VALVEPIV
REMOTE LIGHT/TEST SWITCH FOR DUCT DETECTORS
F FIRE ALARM BELL90"
XX - CANDELA
XX - CANDELA
XX - WATTAGEF
S
F
S
HD
SD
WALL
CEILING
CEILING
CEILING
6'
6'
6'
6'
FIRE ALARM GRAPHIC ANNUNCIATOR PANELFAGAP 6'
FS
TS
KNOX BOX
RELAYS
KB
R
60"
60"
HD
INTERFACE RELAYS INSTALL WITHIN 3' OF
ELEVATOR CONTROLLER
R1
EQL
R2
EQL
R3
EQL
SHUNT TRIP
BREAKER
R4
EQL
HOT NEUTRAL
120 VAC CIRCUIT
(POWER TO OPERATE
SHUNT TRIP BREAKER)
FROM EMERGENCY
POWER SOURCE
R5
EQL
FIRE ALARM CONTROL UNIT
SCC1 SCC2 SCC3 SCC4
ACTUARION
CAUSES
RECALL TO
ALTERNATE
LEVEL
ACTUARION
CAUSES
RECALL TO
DESIGNATED
LEVEL
ACTUARION
CAUSES
FLASHING
OF
WARNING
SIGNAL
ACTUARION
CAUSES
DISCONNECT
OF MAIN LINE
ELEVATOR
POWER
IDC1
(SUPERVISORY)
ACTUARION
CAUSES
SUPERVISORY
SIGNAL
CONVENTIONAL OR
ADDRESSABLE
ZONE / CIRCUIT
MODULE
HD
EXISTING
ELEVATOR
HOISTWAY HEAT
DETECTOR(S)
EXISTING
ELEVATOR
MACHINE ROOM
HEAT DETECTOR(S)
EXISTING
ELEVATOR
MACHINE ROOM
SMOKE
DETECTOR(S)
SD SD
EXISTING ELEVATOR
LOBBY SMOKE
DETECTOR (ALL
FLOORS AND ALL
LOBBIES)
NOTE:
1. FIRE ALARM CIRCUITS ARE TO BE DESIGNED AND
INSTALLED IN ACCORDANCE WITH NFPA 72, NATIONAL FIRE
ALARM CODE AND NEC 70, NATIONAL ELECTRICAL CODE.
2. FOR ALL EXISTING HEAT DETECTORS IN BUILDINGS 1, 2, 5,
38, 135, AND 137 PITS AND SHAFTS, PROVIDE CABLING IN
CONDUIT FROM THE HEAT DETECTORS TO THE ELEVATOR
MACHINE ROOM FOR TESTING PURPOSES. TERMINATE
CONDUCTORS IN A WALL MOUNTED JUNCTION BOX.
3. PROVIDE ALL RELAYS/MONITORING MODULES AND
ASSOCIATED CIRCUITS SHOWN IN THIS DETAIL FOR ALL
ELEVATORS.
R1 SIGNAL TO ELEVATOR CONTROLLER FOR RECALL TO DESIGNATED LEVEL.
R2 SIGNAL TO ELEVATOR CONTROLLER TO RECALL TO ALTERNATE LEVEL.
R3 SIGNAL TO ELEVATOR CONTROLLER FOR RECALL TO ALTERNATE LEVEL.
R4 SIGNAL TO ACTIVATE SHUNT TRIP RELAY.
R5 SUPERVISORY RELAY TO MONITOR PRESENCE OF VOLTAGE (POWER) TO OPERATE SHUNT
TRIP BREAKER
SCC1 SUPERVISED CONTROL CIRCUIT FOR OPERATING R1.
SCC2 SUPERVISED CONTROL CIRCUIT FOR OPERATING R2.
SCC3 SUPERVISED CONTROL CIRCUIT FOR OPERATING R3.
SCC4 SUPERVISED CONTROL CIRCUIT FOR OPERATING R4.
IDC1 INITIATING DEVICE CIRCUIT TO SUPERVISE R5 CONTACTS (MONITORING POWER TO OPERATE
SHUNT TRIP BREAKER).
COMPONENT FUNCTION
NEW CONDUIT AND
CABLING FROM
EXISTING HEAT
DETECTORS IN
ELEVATOR PIT TO THE
MACHINE ROOM.
CONDUIT
INSTALL PER
NATIONAL ELECTRIC CODE
AIR SUPPLY
DIFFUSER OR
RETURN AIR
OPENINGSMOKE/HEAT
DETECTORCEILING
FINISHED
FLOOR
NOTIFICATION DEVICE
(STROBE OR HORN/STROBE)
HORN SMOKE/HEAT
DETECTOR
CONTROL PANEL
GRAPHIC
ANNUNCIATOR
MANUAL PULL
STATION
15'-0" MAX 3'-0" MIN
6" MIN 4" MIN
1'-0" MAX
96" MAX
TOP OF
DEVICE
80" MIN
BOTTOM OF
DEVICE
5'-6"
3'-8"
(3'-6" MIN)
(4'-0" MAX)
5'-0" MAX
EXIT
JUNCTION BOX
(SEAL TIGHT
FLEX MAX 6')
CONDUIT
JUNCTION BOX
(SEAL TIGHT
FLEX MAX 6')
5"
DOOR
WIDTH
DOOR
HOLDER
15'-0" MAX
DETAIL NOTES:
A. MOUNT ALL AUDIBLE & VISUAL DEVICES IN APPROVED BOXES.
B. ALL ABOVE CEILING DEVICES TO BE MOUNTED IN ACCESSIBLE LOCATION.
NOTES:
1. PROVIDE SMOKE DETECTORS IN EACH ELEV. LOBBY FOR ELEV. RECALL.
2. ALL FIRE ALARM WIRING SHALL BE IN FACTORY PAINTED "RED" EMT
CONDUIT.
3. ALL WIRING SHALL BE AS RECOMMENDED BY MANUFACTURER.
4. PROVIDE ELEVATOR RELAYS FOR EACH ELEVATOR. (RELAY SHALL BE
WITHIN 3 FEET OF EACH ELEVATOR CONTROLLER)
a. PRIMARY RECALL.
b. ALTERATIVE RECALL.
c. EMERGENCY SHUNT.
d. EMERGENCY SHUNT POWER SUPERVISION.
e. IN CAB NOTIFICATIONS/FIRE FIGHTER.
5. PROVIDE POWER AMPLIFIERS FOR ALL SPEAKERS.
6. THE NEW FIRE ALARM SYSTEM SHALL MATCH THE EXISTING SIMPLEX
4120 SERIES (VOICE) FIRE ALARM SYSTEM
EXISTING FACP
FIRE ALARM
CONTROL
PANEL (FACP)
TO ADDITIONAL
INDICATING
APPLIANCES
FF
S
F
S
R R
TO ADDITIONAL
ELEVATOR
RECALLS
TO ADDITIONAL
INITIATING DEVICES
S S S TO ADDITIONAL FIRE
ALARM SPEAKERS
F SD HD
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:1
P
M C
U s e rs
\a ri c h a rd s \D o c u m e n ts \E
-3
-V A
T u s c a lo o s a
-U p g ra d e E le v a to rs
-A L
B u ld in g
A d m in is tr a ti v e a ri c h a rd s P
K P
J .r v t
FIRE ALARM GENERAL NOTES,
SYMBOL LEGEND, AND RISER
1 1PDN
ELEVATOR UPGRADES IN
BUILDINGS 1, 2, 5, 38, 135 &
TUSCALOOSA VAMC, VISN 7
FEBRUARY 6, 2025
100% BID DOCUMENTS
679-22-10021-344
JKM
FA001
FIRE ALARM GENERAL NOTES
FIRE ALARM ABBREVIATIONS LIST
FIRE ALARM SYMBOL LEGEND
Scale: No Scale
FIRE ALARM INTERFACE WITH ELEVATORS
Scale: No Scale
FIRE ALARM DEVICE MOUNTING HEIGHTS
Scale: No Scale
FIRE ALARM RISER TYPICAL
1 ASI #1 02/17/2026
Docusign Envelope ID: C9737749-625D-4215-9C34-71B484BC5088
2/17/2026 2/17/2026
File details come from the government source that posted it. Updated .