This file is an Itemized Cost Breakdown worksheet for Solicitation No. 36C24726R0024, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7, for elevator upgrades in multiple buildings. The comprehensive cost template provides a detailed breakdown across 22 construction division categories, including General Requirements, Existing Conditions, Concrete, Metals, Wood and Plastic, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, and Communications.

The cost breakdown worksheet is structured to capture material, labor, equipment, and other costs for each division, with sections for subtotal, overhead, profit, and bonds/insurance. While the template is currently blank with zero dollar amounts, it is designed to allow a contractor to provide a comprehensive pricing structure for the elevator upgrade project spanning buildings 1, 2, 5, 38, 135, and 137. The solicitation indicates that detailed specifications are available in attachments 1-9, and the cost breakdown will be a critical component of the proposal evaluation process.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Solicitation No. 36C24726R0024 Attachment 4 – Cost/Price Breakdown Worksheet
DESCRIPTIONMATERIALLABOREQUIPMENTOTHERTOTAL
Division 01 - General Requirements
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 02 – Existing ConditionsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 03 – ConcreteMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 05 - MetalsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 06- Wood and PlasticMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 07- Thermal and Moisture ProtectionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 08- Openings (Doors and Windows)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 09- FinishesMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 10- SpecialtiesMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 11- EquipmentMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 12- FurnishingsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 13- Special ConstructionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 21- Fire SuppressionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 22- PlumbingMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 23- Heating, Ventilating, and Air conditioning (HVAC)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 26 ElectricalMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 27- CommunicationsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Other (If applicable)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Other Total$ - 0$ - 0$ - 0$ - 0$ - 0
MATERIALLABOREQUIPMENTOTHERTOTAL
SUB TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead$$$$$
Profit$$$$$
Bonds and Insurance$$$$$
Total Proposal$ - 0$ - 0$ - 0$ - 0$ - 0

File details come from the government source that posted it. Updated .