ASI 1 Summary Sheet.docx

DOCX document 121 KB Posted

Attached to
Y1DA--679-22-100 | Elevator Upgrades in buildings 1, 2, 5, 38, 135 and 137
Solicitation number
36C24726R0024
Issued by

About this file

This is an Addendum to Solicitation Instructions (ASI #1) issued on February 17, 2026, by Apogee Consulting Group, Inc., for the Department of Veterans Affairs Project 679-22-100 regarding elevator upgrades in Buildings 1, 2, 5, 38, 135, and 137 at Tuscaloosa VAMC in Tuscaloosa, Alabama. The ASI provides supplemental instructions that form part of the contract documents and clarifies that any changes to contract sum or contract time must be resolved with the VA before proceeding. The document includes revisions to multiple drawings to address design clarifications and technical specifications.

The revised drawings address three primary areas: drawing A-601 updates the finish legend to clarify paint specifications, base type and height, and materials for HIW-1 and HIW-2 panels and reveals; drawings A-801 through A-806 update elevations to reflect stainless steel top panels with stainless steel pad studs; and drawing FA001 adds clarification regarding fire alarm interface with elevators and updates the corresponding detail to better illustrate the scope of fire alarm integration. Contractors are required to incorporate these revisions into their work execution in accordance with all contract documents.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASI #1

Date: 02/17/2026

RE:Department of Veteran Affairs
Project 679-22-100

Elevator Upgrades in Buildings 1, 2, 5, 38, 135 & 137 Tuscaloosa, AL, Tuscaloosa VAMC

From: Apogee Consulting Group, Inc.

NOTICE TO CONTRACTOR: The following supplemental instructions are issued as part of the Contract Documents. The work shall be carried out in accordance with the Contract Documents including these clarifications. Any change in Contract Sum or Contract Time must be resolved with the VA before proceeding with the Work in accordance with these instructions.

Attached are revised drawings:

1. A-601

a. Updated Finish Legend to clarify paint and base type & height, updated information for HIW-1 & HIW-2 panels and discontinued color replacement and added material information for flat and corner reveals.

2. A-801 - A806

a. Elevations updated to reflect stainless steel top panel with stainless steel pad studs.

3. FA001

a. General note added to clarify how the detail “FIRE ALARM INTERFACE WITH ELEVATORS” applies to the Contract Documents.

b. Updated “FIRE ALARM INTERFACE WITH ELEVATORS” detail to better show the scope of the Fire Alarm interface with the elevators.

–End of Document

Raleigh | Indianapolis | Fort Collins | Las Vegas | Charlotte | Minneapolis www.acg-pa.com www.acg-pa.com Document Type 3 image1.png

File details come from the government source that posted it. Updated .