These are architectural and engineering drawings for a medical gas systems project at the Birmingham VA Medical Center, focusing on demolition and new construction plans across multiple floors. The drawings detail the phasing and installation of medical gas systems, including zone valve boxes, alarm panels, and piping layouts on the 4th, 6th, 8th, and 9th floors.

The drawings include detailed specifications for infection control risk assessment (ICRA) requirements with three types of barrier systems (Type I Hardwall, Type II Softwall, and Mobile Containment Cart), equipment pad details, and specific instructions for medical gas cylinder storage. Key features include phasing plans showing contractor access routes, demolition notes, new construction requirements, and detailed sketches for signage placement. The drawings also contain general notes regarding contractor responsibilities for maintaining infection control measures, dust control, and coordination with VA staff during construction activities.

View the file

Other files

File Type Posted
36C24725R0020 0008.docx DOCX document
36C24725R0020 0007.docx DOCX document
36C24725R0020 0006.docx DOCX document
Attachment 0005B_Med Gas Annual Inspection 2024.pdf PDF
36C24725R0020 0005.docx DOCX document
Attachment 0005A_RFI Clarifications.docx DOCX document
36C24725R0020 0004.pdf PDF
Attachment 0003A_RFI Answers_36C24725R0020.docx DOCX document
36C24725R0020 0003.docx DOCX document
Attachment 0003B_Asbestos Inspection Report_36C24725R0020.pdf PDF
Attachment 0003C_Photos_36C24725R0020.zip ZIP file
36C24725R0020 0002.docx DOCX document
Attachment 0002 - PROPOSAL PREPARATION AND EVALUATION INFORMATION_Rev1 521-21-106.pdf PDF
Site Visit Attendance Sheet 521-21-106.pdf PDF
36C24725R0020_0001.pdf PDF
Attachment 8 Drawings 521-21-106_Part6.pdf PDF
Attachment 8 Drawings 521-21-106_Part2.pdf PDF
Attachment 7 Specifications 521-21-106.pdf PDF
Attachment 8 Drawings 521-21-106_Part5.pdf PDF
Attachment 8 Drawings 521-21-106_Part4.pdf PDF
36C24725R0020_RFP.pdf PDF
Attachment 6 INVOICING.docx DOCX document
Attachment 8 Drawings 521-21-106_Part7.pdf PDF
Attachment 1 Experience Modification Rate Form.pdf PDF
Attachment 8 Drawings 521-21-106_Part1.pdf PDF
Attachment 3 Past Performance Questionnaire -PPQ.docx DOCX document
Attachment 4 Itemized Cost Breakdown.xlsx XLSX spreadsheet
Attachment 5 Wage Determination AL20250087 1.3.2025.pdf PDF
Attachment 2 VAAR 852.219-75 Jan 2023 Deviation.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AP 5-2

CONDITION A

ICRA TYPE I

HARDWALL

REFERENCE SHEET A-12

AP 5-1

ICRA TYPE I

HARDWALL

REFERENCE SHEET A-12

AP 5-3

CONDITION C

ICRA TYPE II

SOFTWALL

REFERENCE SHEET A-12

5TH FLOOR PARTIAL ENLARGED PLAN

5TH FLOOR PARTIAL ENLARGED PLAN

5TH FLOOR PARTIAL ENLARGED PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

BIRMINGHAM

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

AutoCAD SHX Text

STORAGE 5105

AutoCAD SHX Text

ZVB-5-2

AutoCAD SHX Text

AP-5-2

AutoCAD SHX Text

ZVB-5-1

AutoCAD SHX Text

AP-5-1

AutoCAD SHX Text

STORAGE 5225

AutoCAD SHX Text

ZVB-5-3

AutoCAD SHX Text

AP-5-3

AutoCAD SHX Text

FIFTH FLOOR ENLARGED ICRA PLANS

AutoCAD SHX Text A-07

AutoCAD SHX Text

AB

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PLANS AP-5-2 AND ZVB-5-2

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-5-1 AND ZVB-5-1

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-5-3 AND ZVB-5-3

AutoCAD SHX Text

AutoCAD SHX Text N1. INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) 58" TYPE "X" GWB) OVER 3-5/8" METAL STUD FRAMING AT 16" O.C.), EXTEND ASSEMBLY 4" ABOVE FINISH CEILING. N2. PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH ADJACENT CONSTRUCTION. SEE GI DRAWINGS FOR EXTENT OF PAINTING NOTE: "NEW WALL FINISH" N3. REINSTALL METAL CORNER GUARD. REINSTALL METAL CORNER GUARD. N4. REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REPAIR AND REPLACE TILE AND GRID AS REQUIRED. N5. INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO MATCH ADJACENT CONSTRUCTION. N6. P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED IN WALL. (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N7. THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N8. NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N9. NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER FINISH, PAINT AND CMU WALL ASSEMBLY TO MATCH ADJACENT CONSTRUCTION. N10. INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING CONSTRUCTION. PAINT TO MATCH ADJACENT CONSTRUCTION. N11. P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION UNIT (TRANSDUCERS ARE PART OF THE ZVB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N12. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. N13 E.C TO PROVIDE NEW ELECTRICAL CONDUIT FOR TRANSDUCER WIRE & OPEN AIR WIRE ON J-HOOKS; SEE ELECTRICAL WORK SCOPE. N14. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE FROM ZVB AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE. N15. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE TO REMOTE ALARM PANEL AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE.. N16 . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH NO TRANSDUCERS); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N17. PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING CONSTRUCTION. N18. INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N19 P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N20. INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO CORNER AND UNISTRUT TANK SUPPORT PAINT ALL WALLS WITH URETHANE PAINT; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. N21 INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. COORDINATE LOCATION WITH COR. N22. INSTALL NEW SUSPENDED 24" X 48" WASHABLE INSTALL NEW SUSPENDED 24" X 48" WASHABLE ACOUSTICAL CEILING ASSEMBLY AT SAME HEIGHT AS ORIGINAL CEILING. N23. NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT FINISH) TYPE TO MATCH ADJACENT CONSTRUCTION. N24. PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR FRAMES WITHIN THE NOTED AREA TO RECEIVE NEW PAINT ALL SIDES MATCH EXISTING COLOR. N25. PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO MATCH EXISTING. N26. CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS (DASHED AREA) WITH WASHABLE URETHANE PAINT. PAINT FLOORS AND EQUIPMENT PAD WITH EPOXY. REFER TO LIFE SAFETY PLAN KEYNOTE #4. N27. THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING WORK SCOPE. N28. REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REQUIRED FOR PLUMBING NEW LINES. REPLACE WITH MATCHING MATERIALS, NO EXPOSED FASTENERS. SEE 2 / A-13 THE VAMC REQUIRES ALL ROOMS DESIGNATED FOR TURNOVER TO THE CONTRACTOR TO BE RETURNED IN A CLEAN STATE. CREATE A SCHEDULE THAT INCLUDES TASKS FOR THE VAMC TO MOVE OUT AND TASKS FOR THE CONTRACTOR TO MOVE IN. ADDITIONALLY, PROVIDE TWO REPORTS EACH MONTH - ONE FILTERED TO ONLY SHOW THE VAMC MOVING TASKS AND ANOTHER FOR VAMC CLEANING TASKS. IF THE MOVING DATE CHANGES BY MORE THAN 1 DAY, SEND AN UPDATED REPORT TO THE COR. THE VAMC WILL PERFORM SURGICAL CLEANING AFTER ACCEPTANCE OF THE O.R. SPACES.

AutoCAD SHX Text

EXISTING CONSTRUCTION NOTES

AutoCAD SHX Text E1. EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING DEMOLITION WORK, PREP AS REQUIRED FOR NEW WALL FINISH. E2. THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO REMAIN AND SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE DAMAGED TILES AND GRID ASSEMBLY AS NEEDED. E3. PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME RETARDANT SURFACE PROTECTION. TAPE SEAMS AND EDGES. (BASIS OF DESIGN: TRIMACO AQUA SHIELD) E4. EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E5. EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO DETAIL 1/A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E6. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. E7. EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS REQUIRED FOR NEW FINISH. PHOTOGRAPH BOTH SIDES OF THE WALLS BEFORE STARTING WORK. E8. EXISTING HANDRAIL TO REMAIN. EXISTING HANDRAIL TO REMAIN. E9 EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL ASSEMBLY; SEE THE ELECTRICAL WORK SCOPE. E10. EXISTING DOOR TO REMAIN LOCKED DURING DEMOLITION AND NEW CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E11. EXISTING CONTROL PANEL TO REMAIN. EXISTING CONTROL PANEL TO REMAIN. E12 DOOR LEAF TO REMAIN CLOSED DURING CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E13. EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, SUSPEND ITEMS IN PLACE. PROVIDE ADDITIONAL HANGER SUPPORTS AS REQUIRE. REINSTALL ITEMS INTO NEW ACOUSTICAL CEILING. E14. EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING. E15. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. TO CLEAN LIGHTING AND DIFFUSERS. E16. EXISTING NITROGEN CONTROL BOX (NCB) TO BE REPLACED. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. SEE DETAIL 2/A-13 WHEN POSSIBLE MAKE REPAIRS FROM CORRIDOR SIDE OF WALL. E17. EXISTING BOLLARDS AND METAL BOX

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D1. REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. PREP AREA FOR NEW WALL ASSEMBLY. D2. REMOVE WALL BASE. REMOVE WALL BASE. D3. REMOVE/REINSTALL METAL CORNER GUARDS. REMOVE/REINSTALL METAL CORNER GUARDS. D4. PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; SEE PLUMBING AND ELECTRICAL WORK SCOPE. CEILING SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE ASSEMBLY AS NEEDED. D5. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. D6. P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D7. P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D8. P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D9. P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB BOX IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D10. ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D11. ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D12. WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER ENTRANCE. D13. REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D14. REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D15. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. D16. VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, MARKERBOARDS, ETC..) D17. EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF THE DOOR WITH 1HR-RATED PLASTIC. INSTALL TEMPORARY SIGNAGE. D18. REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS AND FRAMES FOR NEW FINISHES, REFER TO DETAIL 1/A-14. REMOVE EXISTING SUSPENDED CEILING ASSEMBLY AND INSTALL NEW SUSPENDED CEILING ASSEMBLY. D19. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. D20. INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; REMOVE AT THE END OF EACH PHASE. NOTE: THE INTEGRITY OF TEMPORARY CEILING ASSEMBLY NEEDS TO BE MAINTAINED DURING CONSTRUCTION. D21. REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. INSTALL 5/8" TYPE X FIRE RATED CEILING WHEN EMPLOYEES ARE NOT ACTIVELY WORKING. INSTALL FIRE RATED PLASTIC ABOVE CEILING AS NEEDED FOR ICRA TO MAINTAIN CORRECT ROOM PRESSURES. D22. REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. SEE DETAIL 2 / A-13 ALSO COORDINATE WITH THE COR IN EACH OPERATING ROOM TO GET UP TO TWO S.F. OF ADDITIONAL SOLID SURFACE REMOVAL AND REPAIR / FIXES TO EXISTING.

AutoCAD SHX Text

NEW CONSTRUCTION NOTES

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D23. VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO THE CONSTRUCTION CORRIDOR AND SELECT ROOMS. CONTRACTOR TO CONSTRUCT, CLEAN AND MAINTAIN A CHANGING AREA FOR THE VA STAFF TO RETURN TO A STERILE ENVIRONMENT. THE CONTRACTOR IS TO PROVIDE A HEPA FILTRATION SYSTEM TIED TO THE EXHAUST OR RETURN DIFFUSERS, CLEAN CORRIDORS FREE OF ANY HAZARDS, AND PROVIDE TRAINING TO THE VA STAFF TO ACCESS THE CONSTRUCTION SPACE G.C. TO PROVIDE A WARDROBE CABINET WITH SHELVES (SEE MCMASTER-CARR BEIGE 9705T17 AS BASIS OF DESIGN). VA WILL PROVIDE VA PERSONAL PPE SUPPLIES AND A CHAIR. D24. REMOVE EXISTING ALARM PANEL (AP) AND PATCH WALL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D25. REMOVE METAL FRAME WORK. PATCH WALLS. D26. REMOVE (2) EQUIPMENT PADS. RETURN FLOOR TO SMOOTH FINISH. D27. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. D28. REMOVE AND REPLACE EXISTING NITROGEN CONTROL BOX (NCB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. D29. RELOCATING ZVB VALVE TO A NEW LOCATION; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D30. REMOVE METAL BOX AND PATCH WALLS AS NEEDED. COORDINATE WITH PLUMBING CONTRACTOR.

AutoCAD SHX Text

BID DOCUMENTS FOR CONSTRUCTION

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE/UPGRADE MEDICAL GAS SYSTEM

AutoCAD SHX Text 521-21-106

AutoCAD SHX Text 07-07-2023

AutoCAD SHX Text

700 S. 19TH STREET, BIRMINGHAM, AL 35233

AutoCAD SHX Text

BIRMINGHAM VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text

BVG

AP 6-1

ICRA TYPE II

REFERENCE SHEET A-12

AP 6-1A

ICRA TYPE I

REFERENCE

SHEET A-12

VAMC NOTE:

ROOM 6136 TO BE VACATED AND

TURNED OVER TO THE

CONTRACTOR

GC NOTE:

CONTRACTOR TO INSTALL NEW

UNIT NEXT TO OLD UNIT WHILE

ALLOWING ACCESS TO THE OLD

UNIT. BARRIER MAY CHANGE AS

PROGRESS BEING MADEOLD ZVB 6-1B, ZVB 6-1C

CONDITION B

ICRA TYPE I

REFERENCE SHEET A-12

VAMC NOTE:

ROOMS 6101, 6332A, AND 6333A TO

BE VACATED AND TURNED OVER TO

THE CONTRACTOR.

VAMC TO REMOVE ART WORK

NEW ZVB 6-1B

CONDITION B

ICRA TYPE I

REFERENCE SHEET A-12

SIZE NEW ZVB-6-1B TO TAKE THE

PLACE OF THE OLD ZVB-6-1A AND

ZVB-6-1B

AP 6-2

CONDITION A

ICRA TYPE II

REFERENCE SHEET A-12

OLD ZVB-6-3

CONDITION B

ICRA TYPE I

REFERENCE SHEET A-12

VAMC NOTE:

ROOMS 6325, AND 6326A TO BE

VACATED AND TURNED OVER TO

THE CONTRACTOR.

GC NOTE:

EXISTING PANEL ZVB6-3 WILL BE

REMOVED AFTER THE PANEL

INSTALLED IN NEW LOCATION

NEW ZVB-6-3

CONDITION B

ICRA TYPE I

REFERENCE SHEET A-12

G.C. NOTE:

COORDINATE LOCATION WITH

EXISTING AP. KEEP EXISTING AP

OERATIONAL UNTIL NEW AP IS

WORKING THEN DEMO OLD AP.

MAINTAIN STAFF ACCESS TO PANEL

ZVB-6-4

CONDITION B

ICRA TYPE I

REFERENCE SHEET A-12

VAMC NOTE:

ROOMS 6314 & 6316 TO BE

VACATED AND TURNED

OVER TO THE CONTRACTOR

INSTALL ELECTRIC

TO REMOTE

LOCATED ALARM

PANEL

TUCK POINT CMU USING

TYPE N MORTAR

ABOVE CEILING 20 LF.

BY 3' BOTH SIDES OF

WALL. COORDINATE WITH

COR.

ZVB-6-5

CONDITION B

ICRA TYPE I

REFERENCE SHEET A-12

BARRIER MAY NEED

MODIFIED TO ALLOW

STAFF ACCESS.

VAMC NOTE:

ROOMS 6325, AND 6326A TO BE

VACATED AND TURNED OVER TO

THE CONTRACTOR.

GC NOTE:

EXISTING PANEL ZVB6-3 WILL BE

REMOVED AFTER THE PANEL

INSTALLED IN NEW LOCATION

AP 6-3

CONDITION B (ALARM

PANEL ONLY)

ICRA TYPE I

REFERENCE SHEET A-12

VAMC NOTE:

ROOM 6321 TO BE VACATED

AND TURNED OVER TO THE

CONTRACTOR

6TH FLOOR PARTIAL ENLARGED REFERENCE PLAN

6TH FLOOR PARTIAL ENLARGED DEMO PLAN6TH FLOOR PARTIAL ENLARGED PLAN

6TH FLOOR PARTIAL ENLARGED DEMO PLAN

6TH FLOOR PARTIAL ENLARGED DEMO PLAN6TH FLOOR PARTIAL ENLARGED REFERENCE PLAN

6TH FLOOR PARTIAL ENLARGED DEMO PLAN

6TH FLOOR PARTIAL ENLARGED DEMO PLAN

6TH FLOOR PARTIAL ENLARGED REFERENCE PLAN

6TH FLOOR PARTIAL ENLARGED REFERENCE PLAN6TH FLOOR PARTIAL ENLARGED DEMO PLAN

6TH FLOOR PARTIAL ENLARGED REFERENCE PLAN

6TH FLOOR PARTIAL ENLARGED DEMO PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

BIRMINGHAM

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

AutoCAD SHX Text

AP-6-1

AutoCAD SHX Text

ZVB-6-1A

AutoCAD SHX Text

ZVB-6-1A

AutoCAD SHX Text

ZVB-6-1B

AutoCAD SHX Text

ZVB-6-1C

AutoCAD SHX Text

ZVB-6-1B

AutoCAD SHX Text

STORAGE 6225

AutoCAD SHX Text

AP-6-2

AutoCAD SHX Text

ZVB-6-3

AutoCAD SHX Text

ZVB-6-3

AutoCAD SHX Text

AP-6-3

AutoCAD SHX Text

ZVB-6-4

AutoCAD SHX Text E12

AutoCAD SHX Text

ZVB-6-5

AutoCAD SHX Text

BREAK RM 6136

AutoCAD SHX Text

ZVB-6-1A

AutoCAD SHX Text

ZVB-6-3

AutoCAD SHX Text

ZVB-6-3

AutoCAD SHX Text

AP-6-3

AutoCAD SHX Text E12

AutoCAD SHX Text

ZVB-6-4

AutoCAD SHX Text

AP-6-4

AutoCAD SHX Text

ZVB-6-5

AutoCAD SHX Text

SIXTH FLOOR ENLARGED ICRA PLANS

AutoCAD SHX Text A-08

AutoCAD SHX Text

AB

AutoCAD SHX Text

BVG

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL AP-6-1

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL ZVB-6-1A

AutoCAD SHX Text 2A

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS ZVB-6-1B AND ZVB-6-1C

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL AP 6-2

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL ZVB-6-3

AutoCAD SHX Text 5A

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL AP-6-3

AutoCAD SHX Text 6B

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL ZVB-6-4

AutoCAD SHX Text 7A

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL ZVB-6-5

AutoCAD SHX Text 8A

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL ZVB-6-1A

AutoCAD SHX Text 2B

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL ZVB-6-3

AutoCAD SHX Text 5B

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL AP-6-3

AutoCAD SHX Text 6A

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL ZVB-6-4

AutoCAD SHX Text 7B

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL ZVB-6-5

AutoCAD SHX Text 8B

AutoCAD SHX Text N1. INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) 58" TYPE "X" GWB) OVER 3-5/8" METAL STUD FRAMING AT 16" O.C.), EXTEND ASSEMBLY 4" ABOVE FINISH CEILING. N2. PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH ADJACENT CONSTRUCTION. SEE GI DRAWINGS FOR EXTENT OF PAINTING NOTE: "NEW WALL FINISH" N3. REINSTALL METAL CORNER GUARD. REINSTALL METAL CORNER GUARD. N4. REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REPAIR AND REPLACE TILE AND GRID AS REQUIRED. N5. INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO MATCH ADJACENT CONSTRUCTION. N6. P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED IN WALL. (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N7. THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N8. NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N9. NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER FINISH, PAINT AND CMU WALL ASSEMBLY TO MATCH ADJACENT CONSTRUCTION. N10. INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING CONSTRUCTION. PAINT TO MATCH ADJACENT CONSTRUCTION. N11. P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION UNIT (TRANSDUCERS ARE PART OF THE ZVB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N12. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. N13 E.C TO PROVIDE NEW ELECTRICAL CONDUIT FOR TRANSDUCER WIRE & OPEN AIR WIRE ON J-HOOKS; SEE ELECTRICAL WORK SCOPE. N14. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE FROM ZVB AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE. N15. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE TO REMOTE ALARM PANEL AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE.. N16 . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH NO TRANSDUCERS); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N17. PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING CONSTRUCTION. N18. INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N19 P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N20. INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO CORNER AND UNISTRUT TANK SUPPORT PAINT ALL WALLS WITH URETHANE PAINT; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. N21 INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. COORDINATE LOCATION WITH COR. N22. INSTALL NEW SUSPENDED 24" X 48" WASHABLE INSTALL NEW SUSPENDED 24" X 48" WASHABLE ACOUSTICAL CEILING ASSEMBLY AT SAME HEIGHT AS ORIGINAL CEILING. N23. NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT FINISH) TYPE TO MATCH ADJACENT CONSTRUCTION. N24. PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR FRAMES WITHIN THE NOTED AREA TO RECEIVE NEW PAINT ALL SIDES MATCH EXISTING COLOR. N25. PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO MATCH EXISTING. N26. CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS (DASHED AREA) WITH WASHABLE URETHANE PAINT. PAINT FLOORS AND EQUIPMENT PAD WITH EPOXY. REFER TO LIFE SAFETY PLAN KEYNOTE #4. N27. THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING WORK SCOPE. N28. REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REQUIRED FOR PLUMBING NEW LINES. REPLACE WITH MATCHING MATERIALS, NO EXPOSED FASTENERS. SEE 2 / A-13 THE VAMC REQUIRES ALL ROOMS DESIGNATED FOR TURNOVER TO THE CONTRACTOR TO BE RETURNED IN A CLEAN STATE. CREATE A SCHEDULE THAT INCLUDES TASKS FOR THE VAMC TO MOVE OUT AND TASKS FOR THE CONTRACTOR TO MOVE IN. ADDITIONALLY, PROVIDE TWO REPORTS EACH MONTH - ONE FILTERED TO ONLY SHOW THE VAMC MOVING TASKS AND ANOTHER FOR VAMC CLEANING TASKS. IF THE MOVING DATE CHANGES BY MORE THAN 1 DAY, SEND AN UPDATED REPORT TO THE COR. THE VAMC WILL PERFORM SURGICAL CLEANING AFTER ACCEPTANCE OF THE O.R. SPACES.

AutoCAD SHX Text

EXISTING CONSTRUCTION NOTES

AutoCAD SHX Text E1 EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING DEMOLITION WORK, PREP AS REQUIRED FOR NEW WALL FINISH. E2 THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO REMAIN AND SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE DAMAGED TILES AND GRID ASSEMBLY AS NEEDED. E3 PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME RETARDANT SURFACE PROTECTION. TAPE SEAMS AND EDGES. (BASIS OF DESIGN: TRIMACO AQUA SHIELD) E4 EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E5 EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO DETAIL 1/A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E6 EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. E7 EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS REQUIRED FOR NEW FINISH. PHOTOGRAPH BOTH SIDES OF THE WALLS BEFORE STARTING WORK. E8 EXISTING HANDRAIL TO REMAIN. EXISTING HANDRAIL TO REMAIN. E9 EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL ASSEMBLY; SEE THE ELECTRICAL WORK SCOPE. E10 EXISTING DOOR TO REMAIN LOCKED DURING DEMOLITION AND EXISTING DOOR TO REMAIN LOCKED DURING DEMOLITION AND NEW CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E11 EXISTING CONTROL PANEL TO REMAIN. EXISTING CONTROL PANEL TO REMAIN. E12 DOOR LEAF TO REMAIN CLOSED DURING CONSTRUCTION, DOOR LEAF TO REMAIN CLOSED DURING CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E13 EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, SUSPEND ITEMS IN PLACE. PROVIDE ADDITIONAL HANGER SUPPORTS AS REQUIRE. REINSTALL ITEMS INTO NEW ACOUSTICAL CEILING. E14 EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING. E15 EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. TO CLEAN LIGHTING AND DIFFUSERS. E16 EXISTING NITROGEN CONTROL BOX (NCB) TO BE REPLACED. EXISTING NITROGEN CONTROL BOX (NCB) TO BE REPLACED. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. SEE DETAIL 2/A-13 WHEN POSSIBLE MAKE REPAIRS FROM CORRIDOR SIDE OF WHEN POSSIBLE MAKE REPAIRS FROM CORRIDOR SIDE OF WALL. E17 EXISTING BOLLARDS AND METAL BOX EXISTING BOLLARDS AND METAL BOX EXISTING BOLLARDS AND METAL BOX

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D1. REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. PREP AREA FOR NEW WALL ASSEMBLY. D2. REMOVE WALL BASE. REMOVE WALL BASE. D3. REMOVE/REINSTALL METAL CORNER GUARDS. REMOVE/REINSTALL METAL CORNER GUARDS. D4. PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; SEE PLUMBING AND ELECTRICAL WORK SCOPE. CEILING SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE ASSEMBLY AS NEEDED. D5. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. D6. P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D7. P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D8. P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D9. P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB BOX IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D10. ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D11. ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D12. WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER ENTRANCE. D13. REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D14. REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D15. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. D16. VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, MARKERBOARDS, ETC..) D17. EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF THE DOOR WITH 1HR-RATED PLASTIC. INSTALL TEMPORARY SIGNAGE. D18. REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS AND FRAMES FOR NEW FINISHES, REFER TO DETAIL 1/A-14. REMOVE EXISTING SUSPENDED CEILING ASSEMBLY AND INSTALL NEW SUSPENDED CEILING ASSEMBLY. D19. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. D20. INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; REMOVE AT THE END OF EACH PHASE. NOTE: THE INTEGRITY OF TEMPORARY CEILING ASSEMBLY NEEDS TO BE MAINTAINED DURING CONSTRUCTION. D21. REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. INSTALL 5/8" TYPE X FIRE RATED CEILING WHEN EMPLOYEES ARE NOT ACTIVELY WORKING. INSTALL FIRE RATED PLASTIC ABOVE CEILING AS NEEDED FOR ICRA TO MAINTAIN CORRECT ROOM PRESSURES. D22. REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. SEE DETAIL 2 / A-13 ALSO COORDINATE WITH THE COR IN EACH OPERATING ROOM TO GET UP TO TWO S.F. OF ADDITIONAL SOLID SURFACE REMOVAL AND REPAIR / FIXES TO EXISTING.

AutoCAD SHX Text

NEW CONSTRUCTION NOTES

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D23. VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO THE CONSTRUCTION CORRIDOR AND SELECT ROOMS. CONTRACTOR TO CONSTRUCT, CLEAN AND MAINTAIN A CHANGING AREA FOR THE VA STAFF TO RETURN TO A STERILE ENVIRONMENT. THE CONTRACTOR IS TO PROVIDE A HEPA FILTRATION SYSTEM TIED TO THE EXHAUST OR RETURN DIFFUSERS, CLEAN CORRIDORS FREE OF ANY HAZARDS, AND PROVIDE TRAINING TO THE VA STAFF TO ACCESS THE CONSTRUCTION SPACE G.C. TO PROVIDE A WARDROBE CABINET WITH SHELVES (SEE MCMASTER-CARR BEIGE 9705T17 AS BASIS OF DESIGN). VA WILL PROVIDE VA PERSONAL PPE SUPPLIES AND A CHAIR. D24. REMOVE EXISTING ALARM PANEL (AP) AND PATCH WALL; SEE REMOVE EXISTING ALARM PANEL (AP) AND PATCH WALL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D25. REMOVE METAL FRAME WORK. PATCH WALLS. REMOVE METAL FRAME WORK. PATCH WALLS. D26. REMOVE (2) EQUIPMENT PADS. RETURN FLOOR TO SMOOTH REMOVE (2) EQUIPMENT PADS. RETURN FLOOR TO SMOOTH FINISH. D27. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. D28. REMOVE AND REPLACE EXISTING NITROGEN CONTROL BOX REMOVE AND REPLACE EXISTING NITROGEN CONTROL BOX (NCB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. D29. RELOCATING ZVB VALVE TO A NEW LOCATION; SEE PLUMBING RELOCATING ZVB VALVE TO A NEW LOCATION; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D30. REMOVE METAL BOX AND PATCH WALLS AS NEEDED. REMOVE METAL BOX AND PATCH WALLS AS NEEDED. COORDINATE WITH PLUMBING CONTRACTOR.

AutoCAD SHX Text

BID DOCUMENTS FOR CONSTRUCTION

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE/UPGRADE MEDICAL GAS SYSTEM

AutoCAD SHX Text 521-21-106

AutoCAD SHX Text 07-07-2023

AutoCAD SHX Text

700 S. 19TH STREET, BIRMINGHAM, AL 35233

AutoCAD SHX Text

BIRMINGHAM VA MEDICAL CENTER

AP-6-7

ICRA TYPE II

REFERENCE SHEET A-12

AP-6-5

CONDITION A

ICRA TYPE II

REFERENCE SHEET A-12

OLD ZVB-6-6, OLD AP-6-6

CONDITION B

ICRA TYPE I

REFERENCE SHEET A-12

VAMC NOTE:

ROOMS 6426 & 6427 TO BE

VACATED AND TURNED

OVER TO THE CONTRACTOR

NEW ZVB-6-6

CONDITION B (ALARM IN

REMOTE LOCATION)

ICRA TYPE I

REFERENCE SHEET A-12

NEW AP-6-6

CONDITION B

ICRA TYPE I

REFERENCE SHEET A-12

ZVB-6-7

CONDITION B (NO ALARM

NO COMBO ZVB)

ICRA TYPE I

REFERENCE SHEET A-12

6TH FLOOR PARTIAL ENLARGED REFERENCE PLAN

6TH FLOOR PARTIAL ENLARGED DEMO PLAN

6TH FLOOR PARTIAL ENLARGED DEMO PLAN

6TH FLOOR PARTIAL ENLARGED REFERENCE PLAN

6TH FLOOR PARTIAL ENLARGED REFERENCE PLAN

6TH FLOOR PARTIAL ENLARGED REFERENCE PLAN

6TH FLOOR PARTIAL ENLARGED REFERENCE PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

BIRMINGHAM

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

AutoCAD SHX Text

AutoCAD SHX Text

ICE MACH

AutoCAD SHX Text

AP-6-7

AutoCAD SHX Text

AP-6-5

AutoCAD SHX Text

ZVB-6-6

AutoCAD SHX Text

AP-6-6

AutoCAD SHX Text

ZVB-6-7

AutoCAD SHX Text

READING RM 6424

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

STORAGE 6432A

AutoCAD SHX Text

RECEPTION WORK

AutoCAD SHX Text

AP-6-6

AutoCAD SHX Text

ZVB-6-6

AutoCAD SHX Text

ZVB-6-7

AutoCAD SHX Text

SIXTH FLOOR ENLARGED ICRA PLANS

AutoCAD SHX Text A-09

AutoCAD SHX Text

AB

AutoCAD SHX Text

BVG

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL AP-6-5

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-6-6 AND ZVB-6-6

AutoCAD SHX Text 10A

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL ZVB-6-7

AutoCAD SHX Text 11A

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL AP-6-7

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

RISER VALVES ABOVE CEILING

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-6-6 AND ZVB-6-6

AutoCAD SHX Text 10B

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL ZVB-6-7

AutoCAD SHX Text 11B

AutoCAD SHX Text N1. INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) 58" TYPE "X" GWB) OVER 3-5/8" METAL STUD FRAMING AT 16" O.C.), EXTEND ASSEMBLY 4" ABOVE FINISH CEILING. N2. PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH ADJACENT CONSTRUCTION. SEE GI DRAWINGS FOR EXTENT OF PAINTING NOTE: "NEW WALL FINISH" N3. REINSTALL METAL CORNER GUARD. REINSTALL METAL CORNER GUARD. N4. REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REPAIR AND REPLACE TILE AND GRID AS REQUIRED. N5. INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO MATCH ADJACENT CONSTRUCTION. N6. P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED IN WALL. (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N7. THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N8. NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N9. NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER FINISH, PAINT AND CMU WALL ASSEMBLY TO MATCH ADJACENT CONSTRUCTION. N10. INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING CONSTRUCTION. PAINT TO MATCH ADJACENT CONSTRUCTION. N11. P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION UNIT (TRANSDUCERS ARE PART OF THE ZVB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N12. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. N13 E.C TO PROVIDE NEW ELECTRICAL CONDUIT FOR TRANSDUCER WIRE & OPEN AIR WIRE ON J-HOOKS; SEE ELECTRICAL WORK SCOPE. N14. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE FROM ZVB AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE. N15. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE TO REMOTE ALARM PANEL AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE.. N16 . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH NO TRANSDUCERS); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N17. PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING CONSTRUCTION. N18. INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N19 P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N20. INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO CORNER AND UNISTRUT TANK SUPPORT PAINT ALL WALLS WITH URETHANE PAINT; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. N21 INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. COORDINATE LOCATION WITH COR. N22. INSTALL NEW SUSPENDED 24" X 48" WASHABLE INSTALL NEW SUSPENDED 24" X 48" WASHABLE ACOUSTICAL CEILING ASSEMBLY AT SAME HEIGHT AS ORIGINAL CEILING. N23. NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT FINISH) TYPE TO MATCH ADJACENT CONSTRUCTION. N24. PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR FRAMES WITHIN THE NOTED AREA TO RECEIVE NEW PAINT ALL SIDES MATCH EXISTING COLOR. N25. PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO MATCH EXISTING. N26. CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS (DASHED AREA) WITH WASHABLE URETHANE PAINT. PAINT FLOORS AND EQUIPMENT PAD WITH EPOXY. REFER TO LIFE SAFETY PLAN KEYNOTE #4. N27. THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING WORK SCOPE. N28. REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REQUIRED FOR PLUMBING NEW LINES. REPLACE WITH MATCHING MATERIALS, NO EXPOSED FASTENERS. SEE 2 / A-13 THE VAMC REQUIRES ALL ROOMS DESIGNATED FOR TURNOVER TO THE CONTRACTOR TO BE RETURNED IN A CLEAN STATE. CREATE A SCHEDULE THAT INCLUDES TASKS FOR THE VAMC TO MOVE OUT AND TASKS FOR THE CONTRACTOR TO MOVE IN. ADDITIONALLY, PROVIDE TWO REPORTS EACH MONTH - ONE FILTERED TO ONLY SHOW THE VAMC MOVING TASKS AND ANOTHER FOR VAMC CLEANING TASKS. IF THE MOVING DATE CHANGES BY MORE THAN 1 DAY, SEND AN UPDATED REPORT TO THE COR. THE VAMC WILL PERFORM SURGICAL CLEANING AFTER ACCEPTANCE OF THE O.R. SPACES.

AutoCAD SHX Text

EXISTING CONSTRUCTION NOTES

AutoCAD SHX Text E1 EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING DEMOLITION WORK, PREP AS REQUIRED FOR NEW WALL FINISH. E2 THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO REMAIN AND SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE DAMAGED TILES AND GRID ASSEMBLY AS NEEDED. E3 PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME RETARDANT SURFACE PROTECTION. TAPE SEAMS AND EDGES. (BASIS OF DESIGN: TRIMACO AQUA SHIELD) E4 EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E5 EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO DETAIL 1/A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E6 EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. E7 EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS REQUIRED FOR NEW FINISH. PHOTOGRAPH BOTH SIDES OF THE WALLS BEFORE STARTING WORK. E8 EXISTING HANDRAIL TO REMAIN. EXISTING HANDRAIL TO REMAIN. E9 EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL ASSEMBLY; SEE THE ELECTRICAL WORK SCOPE. E10 EXISTING DOOR TO REMAIN LOCKED DURING DEMOLITION AND EXISTING DOOR TO REMAIN LOCKED DURING DEMOLITION AND NEW CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E11 EXISTING CONTROL PANEL TO REMAIN. EXISTING CONTROL PANEL TO REMAIN. E12 DOOR LEAF TO REMAIN CLOSED DURING CONSTRUCTION, DOOR LEAF TO REMAIN CLOSED DURING CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E13 EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, SUSPEND ITEMS IN PLACE. PROVIDE ADDITIONAL HANGER SUPPORTS AS REQUIRE. REINSTALL ITEMS INTO NEW ACOUSTICAL CEILING. E14 EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING. E15 EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. TO CLEAN LIGHTING AND DIFFUSERS. E16 EXISTING NITROGEN CONTROL BOX (NCB) TO BE REPLACED. EXISTING NITROGEN CONTROL BOX (NCB) TO BE REPLACED. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. SEE DETAIL 2/A-13 WHEN POSSIBLE MAKE REPAIRS FROM CORRIDOR SIDE OF WHEN POSSIBLE MAKE REPAIRS FROM CORRIDOR SIDE OF WALL. E17 EXISTING BOLLARDS AND METAL BOX EXISTING BOLLARDS AND METAL BOX EXISTING BOLLARDS AND METAL BOX

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D1. REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. PREP AREA FOR NEW WALL ASSEMBLY. D2. REMOVE WALL BASE. REMOVE WALL BASE. D3. REMOVE/REINSTALL METAL CORNER GUARDS. REMOVE/REINSTALL METAL CORNER GUARDS. D4. PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; SEE PLUMBING AND ELECTRICAL WORK SCOPE. CEILING SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE ASSEMBLY AS NEEDED. D5. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. D6. P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D7. P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D8. P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D9. P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB BOX IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D10. ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D11. ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D12. WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER ENTRANCE. D13. REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D14. REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D15. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. D16. VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, MARKERBOARDS, ETC..) D17. EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF THE DOOR WITH 1HR-RATED PLASTIC. INSTALL TEMPORARY SIGNAGE. D18. REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS AND FRAMES FOR NEW FINISHES, REFER TO DETAIL 1/A-14. REMOVE EXISTING SUSPENDED CEILING ASSEMBLY AND INSTALL NEW SUSPENDED CEILING ASSEMBLY. D19. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. D20. INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; REMOVE AT THE END OF EACH PHASE. NOTE: THE INTEGRITY OF TEMPORARY CEILING ASSEMBLY NEEDS TO BE MAINTAINED DURING CONSTRUCTION. D21. REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. INSTALL 5/8" TYPE X FIRE RATED CEILING WHEN EMPLOYEES ARE NOT ACTIVELY WORKING. INSTALL FIRE RATED PLASTIC ABOVE CEILING AS NEEDED FOR ICRA TO MAINTAIN CORRECT ROOM PRESSURES. D22. REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. SEE DETAIL 2 / A-13 ALSO COORDINATE WITH THE COR IN EACH OPERATING ROOM TO GET UP TO TWO S.F. OF ADDITIONAL SOLID SURFACE REMOVAL AND REPAIR / FIXES TO EXISTING.

AutoCAD SHX Text

NEW CONSTRUCTION NOTES

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D23. VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO THE CONSTRUCTION CORRIDOR AND SELECT ROOMS. CONTRACTOR TO CONSTRUCT, CLEAN AND MAINTAIN A CHANGING AREA FOR THE VA STAFF TO RETURN TO A STERILE ENVIRONMENT. THE CONTRACTOR IS TO PROVIDE A HEPA FILTRATION SYSTEM TIED TO THE EXHAUST OR RETURN DIFFUSERS, CLEAN CORRIDORS FREE OF ANY HAZARDS, AND PROVIDE TRAINING TO THE VA STAFF TO ACCESS THE CONSTRUCTION SPACE G.C. TO PROVIDE A WARDROBE CABINET WITH SHELVES (SEE MCMASTER-CARR BEIGE 9705T17 AS BASIS OF DESIGN). VA WILL PROVIDE VA PERSONAL PPE SUPPLIES AND A CHAIR. D24. REMOVE EXISTING ALARM PANEL (AP) AND PATCH WALL; SEE REMOVE EXISTING ALARM PANEL (AP) AND PATCH WALL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D25. REMOVE METAL FRAME WORK. PATCH WALLS. REMOVE METAL FRAME WORK. PATCH WALLS. D26. REMOVE (2) EQUIPMENT PADS. RETURN FLOOR TO SMOOTH REMOVE (2) EQUIPMENT PADS. RETURN FLOOR TO SMOOTH FINISH. D27. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. D28. REMOVE AND REPLACE EXISTING NITROGEN CONTROL BOX REMOVE AND REPLACE EXISTING NITROGEN CONTROL BOX (NCB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. D29. RELOCATING ZVB VALVE TO A NEW LOCATION; SEE PLUMBING RELOCATING ZVB VALVE TO A NEW LOCATION; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D30. REMOVE METAL BOX AND PATCH WALLS AS NEEDED. REMOVE METAL BOX AND PATCH WALLS AS NEEDED. COORDINATE WITH PLUMBING CONTRACTOR.

AutoCAD SHX Text

BID DOCUMENTS FOR CONSTRUCTION

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE/UPGRADE MEDICAL GAS SYSTEM

AutoCAD SHX Text 521-21-106

AutoCAD SHX Text 07-07-2023

AutoCAD SHX Text

700 S. 19TH STREET, BIRMINGHAM, AL 35233

AutoCAD SHX Text

BIRMINGHAM VA MEDICAL CENTER

8TH FLOOR PARTIAL ENLARGED REFERENCE PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

BIRMINGHAM

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

AutoCAD SHX Text

HAC 7115

AutoCAD SHX Text

ZVB-7-1

AutoCAD SHX Text

AP-7-1

AutoCAD SHX Text

SEVENTH FLOOR ENLARGED ICRA PLANS

AutoCAD SHX Text A-10

AutoCAD SHX Text

AB

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-7-1 AND ZVB-7-1

AutoCAD SHX Text

AutoCAD SHX Text N1. INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) 58" TYPE "X" GWB) OVER 3-5/8" METAL STUD FRAMING AT 16" O.C.), EXTEND ASSEMBLY 4" ABOVE FINISH CEILING. N2. PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH ADJACENT CONSTRUCTION. SEE GI DRAWINGS FOR EXTENT OF PAINTING NOTE: "NEW WALL FINISH" N3. REINSTALL METAL CORNER GUARD. REINSTALL METAL CORNER GUARD. N4. REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REPAIR AND REPLACE TILE AND GRID AS REQUIRED. N5. INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO MATCH ADJACENT CONSTRUCTION. N6. P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED IN WALL. (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N7. THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N8. NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N9. NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER FINISH, PAINT AND CMU WALL ASSEMBLY TO MATCH ADJACENT CONSTRUCTION. N10. INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING CONSTRUCTION. PAINT TO MATCH ADJACENT CONSTRUCTION. N11. P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION UNIT (TRANSDUCERS ARE PART OF THE ZVB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N12. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. N13 E.C TO PROVIDE NEW ELECTRICAL CONDUIT FOR TRANSDUCER WIRE & OPEN AIR WIRE ON J-HOOKS; SEE ELECTRICAL WORK SCOPE. N14. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE FROM ZVB AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE. N15. THE E.C.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .