These are architectural floor plan drawings from West Point Engineers LLC for the Birmingham VA Medical Center, showing enlarged construction and demolition plans for the basement through fourth floors. The drawings detail partial floor plans with specific panel locations, construction notes, and demolition phase notes related to medical gas systems installation/modification work. Each floor plan includes ICRA (Infection Control Risk Assessment) requirements with different condition levels (A, B, C) specified for different work areas.
The drawings provide detailed technical specifications including demolition requirements, existing construction notes, and new construction notes for each area. Key elements include panel locations, corridor access requirements, wall modifications, plumbing and electrical work scopes, and specific ICRA containment requirements. The plans appear to be part of a larger set of construction documents (drawing numbers A-00 through A-05) and include architect/engineer stamps indicating these are official construction documents for the VA facility modernization project.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
BIRMINGHAM
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
BASEMENT FLOOR PARTIAL ENLARGED DEMO PLANBASEMENT PARTIAL ENLARGED NEW PLAN
BASEMENT FLOOR PARTIAL ENLARGED DEMO PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
BIRMINGHAM
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
BASEMENT FLOOR PARTIAL ENLARGED DEMO PLAN
AutoCAD SHX Text
MAP-1
AutoCAD SHX Text A-00
AutoCAD SHX Text
AB
AutoCAD SHX Text
BID DOCUMENTS FOR CONSTRUCTION
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE/UPGRADE MEDICAL GAS SYSTEM
AutoCAD SHX Text 521-21-106
AutoCAD SHX Text 07-07-2023
AutoCAD SHX Text
700 S. 19TH STREET, BIRMINGHAM, AL 35233
AutoCAD SHX Text
BIRMINGHAM VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANEL MAP-1
AutoCAD SHX Text 1A
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANEL MAP-1
AutoCAD SHX Text 1B
AutoCAD SHX Text
BASEMENT FLOOR ENLARGED ICRA PLANS
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
OXYGEN VALVE BOX
AutoCAD SHX Text 2A
AutoCAD SHX Text
BID DOCUMENTS FOR CONSTRUCTION
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE/UPGRADE MEDICAL GAS SYSTEM
AutoCAD SHX Text 521-21-106
AutoCAD SHX Text 07-07-2023
AutoCAD SHX Text
700 S. 19TH STREET, BIRMINGHAM, AL 35233
AutoCAD SHX Text
BIRMINGHAM VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text N1. INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) 58" TYPE "X" GWB) OVER 3-5/8" METAL STUD FRAMING AT 16" O.C.), EXTEND ASSEMBLY 4" ABOVE FINISH CEILING. N2. PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH ADJACENT CONSTRUCTION. SEE GI DRAWINGS FOR EXTENT OF PAINTING NOTE: "NEW WALL FINISH" N3. REINSTALL METAL CORNER GUARD. REINSTALL METAL CORNER GUARD. N4. REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REPAIR AND REPLACE TILE AND GRID AS REQUIRED. N5. INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO MATCH ADJACENT CONSTRUCTION. N6. P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED IN WALL. (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N7. THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N8. NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N9. NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER FINISH, PAINT AND CMU WALL ASSEMBLY TO MATCH ADJACENT CONSTRUCTION. N10. INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING CONSTRUCTION. PAINT TO MATCH ADJACENT CONSTRUCTION. N11. P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION UNIT (TRANSDUCERS ARE PART OF THE ZVB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N12. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. N13 E.C TO PROVIDE NEW ELECTRICAL CONDUIT FOR TRANSDUCER WIRE & OPEN AIR WIRE ON J-HOOKS; SEE ELECTRICAL WORK SCOPE. N14. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE FROM ZVB AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE. N15. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE TO REMOTE ALARM PANEL AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE.. N16 . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH NO TRANSDUCERS); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N17. PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING CONSTRUCTION. N18. INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N19 P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N20. INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO CORNER AND UNISTRUT TANK SUPPORT PAINT ALL WALLS WITH URETHANE PAINT; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. N21 INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. COORDINATE LOCATION WITH COR. N22. INSTALL NEW SUSPENDED 24" X 48" WASHABLE INSTALL NEW SUSPENDED 24" X 48" WASHABLE ACOUSTICAL CEILING ASSEMBLY AT SAME HEIGHT AS ORIGINAL CEILING. N23. NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT FINISH) TYPE TO MATCH ADJACENT CONSTRUCTION. N24. PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR FRAMES WITHIN THE NOTED AREA TO RECEIVE NEW PAINT ALL SIDES MATCH EXISTING COLOR. N25. PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO MATCH EXISTING. N26. CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS (DASHED AREA) WITH WASHABLE URETHANE PAINT. PAINT FLOORS AND EQUIPMENT PAD WITH EPOXY. REFER TO LIFE SAFETY PLAN KEYNOTE #4. N27. THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING WORK SCOPE. N28. REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REQUIRED FOR PLUMBING NEW LINES. REPLACE WITH MATCHING MATERIALS, NO EXPOSED FASTENERS. SEE 2 / A-13 THE VAMC REQUIRES ALL ROOMS DESIGNATED FOR TURNOVER TO THE CONTRACTOR TO BE RETURNED IN A CLEAN STATE. CREATE A SCHEDULE THAT INCLUDES TASKS FOR THE VAMC TO MOVE OUT AND TASKS FOR THE CONTRACTOR TO MOVE IN. ADDITIONALLY, PROVIDE TWO REPORTS EACH MONTH - ONE FILTERED TO ONLY SHOW THE VAMC MOVING TASKS AND ANOTHER FOR VAMC CLEANING TASKS. IF THE MOVING DATE CHANGES BY MORE THAN 1 DAY, SEND AN UPDATED REPORT TO THE COR. THE VAMC WILL PERFORM SURGICAL CLEANING AFTER ACCEPTANCE OF THE O.R. SPACES.
AutoCAD SHX Text
EXISTING CONSTRUCTION NOTES
AutoCAD SHX Text E1. EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING DEMOLITION WORK, PREP AS REQUIRED FOR NEW WALL FINISH. E2. THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO REMAIN AND SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE DAMAGED TILES AND GRID ASSEMBLY AS NEEDED. E3. PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME RETARDANT SURFACE PROTECTION. TAPE SEAMS AND EDGES. (BASIS OF DESIGN: TRIMACO AQUA SHIELD) E4. EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E5. EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO DETAIL 1/A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E6. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. E7. EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS REQUIRED FOR NEW FINISH. PHOTOGRAPH BOTH SIDES OF THE WALLS BEFORE STARTING WORK. E8. EXISTING HANDRAIL TO REMAIN. EXISTING HANDRAIL TO REMAIN. E9 EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL ASSEMBLY; SEE THE ELECTRICAL WORK SCOPE. E10. EXISTING DOOR TO REMAIN LOCKED DURING DEMOLITION AND NEW CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E11. EXISTING CONTROL PANEL TO REMAIN. EXISTING CONTROL PANEL TO REMAIN. E12 DOOR LEAF TO REMAIN CLOSED DURING CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E13. EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, SUSPEND ITEMS IN PLACE. PROVIDE ADDITIONAL HANGER SUPPORTS AS REQUIRE. REINSTALL ITEMS INTO NEW ACOUSTICAL CEILING. E14. EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING. E15. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. TO CLEAN LIGHTING AND DIFFUSERS. E16. EXISTING NITROGEN CONTROL BOX (NCB) TO BE REPLACED. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. SEE DETAIL 2/A-13 WHEN POSSIBLE MAKE REPAIRS FROM CORRIDOR SIDE OF WALL. E17. EXISTING BOLLARDS AND METAL BOX
AutoCAD SHX Text
DEMOLITION PHASE NOTES
AutoCAD SHX Text D1. REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. PREP AREA FOR NEW WALL ASSEMBLY. D2. REMOVE WALL BASE. REMOVE WALL BASE. D3. REMOVE/REINSTALL METAL CORNER GUARDS. REMOVE/REINSTALL METAL CORNER GUARDS. D4. PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; SEE PLUMBING AND ELECTRICAL WORK SCOPE. CEILING SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE ASSEMBLY AS NEEDED. D5. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. D6. P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D7. P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D8. P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D9. P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB BOX IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D10. ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D11. ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D12. WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER ENTRANCE. D13. REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D14. REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D15. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. D16. VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, MARKERBOARDS, ETC..) D17. EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF THE DOOR WITH 1HR-RATED PLASTIC. INSTALL TEMPORARY SIGNAGE. D18. REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS AND FRAMES FOR NEW FINISHES, REFER TO DETAIL 1/A-14. REMOVE EXISTING SUSPENDED CEILING ASSEMBLY AND INSTALL NEW SUSPENDED CEILING ASSEMBLY. D19. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. D20. INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; REMOVE AT THE END OF EACH PHASE. NOTE: THE INTEGRITY OF TEMPORARY CEILING ASSEMBLY NEEDS TO BE MAINTAINED DURING CONSTRUCTION. D21. REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. INSTALL 5/8" TYPE X FIRE RATED CEILING WHEN EMPLOYEES ARE NOT ACTIVELY WORKING. INSTALL FIRE RATED PLASTIC ABOVE CEILING AS NEEDED FOR ICRA TO MAINTAIN CORRECT ROOM PRESSURES. D22. REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. SEE DETAIL 2 / A-13 ALSO COORDINATE WITH THE COR IN EACH OPERATING ROOM TO GET UP TO TWO S.F. OF ADDITIONAL SOLID SURFACE REMOVAL AND REPAIR / FIXES TO EXISTING.
AutoCAD SHX Text
NEW CONSTRUCTION NOTES
AutoCAD SHX Text
DEMOLITION PHASE NOTES
AutoCAD SHX Text D23. VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO THE CONSTRUCTION CORRIDOR AND SELECT ROOMS. CONTRACTOR TO CONSTRUCT, CLEAN AND MAINTAIN A CHANGING AREA FOR THE VA STAFF TO RETURN TO A STERILE ENVIRONMENT. THE CONTRACTOR IS TO PROVIDE A HEPA FILTRATION SYSTEM TIED TO THE EXHAUST OR RETURN DIFFUSERS, CLEAN CORRIDORS FREE OF ANY HAZARDS, AND PROVIDE TRAINING TO THE VA STAFF TO ACCESS THE CONSTRUCTION SPACE G.C. TO PROVIDE A WARDROBE CABINET WITH SHELVES (SEE MCMASTER-CARR BEIGE 9705T17 AS BASIS OF DESIGN). VA WILL PROVIDE VA PERSONAL PPE SUPPLIES AND A CHAIR. D24. REMOVE EXISTING ALARM PANEL (AP) AND PATCH WALL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D25. REMOVE METAL FRAME WORK. PATCH WALLS. D26. REMOVE (2) EQUIPMENT PADS. RETURN FLOOR TO SMOOTH FINISH. D27. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. D28. REMOVE AND REPLACE EXISTING NITROGEN CONTROL BOX (NCB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. D29. RELOCATING ZVB VALVE TO A NEW LOCATION; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D30. REMOVE METAL BOX AND PATCH WALLS AS NEEDED. COORDINATE WITH PLUMBING CONTRACTOR.
AutoCAD SHX Text INSTALL STAINLESS STEEL SURFACE MOUNTED HMI COVER OVER EXISTING OXYGEN VALVE SEE PLUMBING FOR SCOPE OF WORK. PROVIDE SIGNAGE SEE DETAIL 5 / A-15
AutoCAD SHX Text
NTS
AutoCAD SHX Text
EMERGENCY OXYGEN RELOCATION
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING DOOR
AutoCAD SHX Text GENERAL NOTES THE EXISTING MEDICAL EMERGENCY GAS OXYGEN CABINET IS CURRENTLY LOCATED BELOW GRADE. P.C. TO RELOCATE THE EXISTING EMERGENCY OXYGEN CABINET AND ASSOCIATED PIPING TO THE NEW LOCATION ABOVE THE DELIVERY GROUND LEVEL. COORDINATE G.C TO INSTALL A NEW 6" BOLLARD FILL WITH CONCRETE AND PAINT TO MATCH VAMC SAFETY YELLOW COORDINATE THIS WORK WITH THE ADJACENT DOOR SWING. PLUMBING CONTRACTOR TO RELOCATE THE CABINET, ASSOCIATED PIPING, ALL HANGERS AND UNISTRUT. GENERAL TRADES CONTRACTOR TO INSTALL BOLLARD, MODIFY ANY EXISTING STRUCTURES AND PAINT. G.C. TO PERFORM GROUND TO PERFORM GROUND PENETRATING RADAR SURVEY PRIOR TO EXCAVATION AND COORDINATE WITH COR ON ALL LOCATIONS.
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
EXTEND OXYGEN PIPE BY P.C.
AutoCAD SHX Text
RELOCATE CABINET BY P.C.
AutoCAD SHX Text
EXISTING HOIST BRACE
AutoCAD SHX Text
EXISTING HANDRAIL
AutoCAD SHX Text NEW GALVANIZED UNISTRUT BY P.C. G.C. TO PAINT SAFETY YELLOWTO PAINT SAFETY YELLOW
AutoCAD SHX Text
EXISTING FENCE
AutoCAD SHX Text RELOCATED CABINET BY P.C. G.C TO PAINT SAFETY YELLOW STENCIL IN BLACK "EMERGENCY OXYGEN HOOKUP" IN 3" LETTERS
AutoCAD SHX Text
G.C. INSTALL 6" X 1/4" INSTALL 6" X 1/4" WALL BOLLARD PAINT SAFETY YELLOW
AutoCAD SHX Text
EXISTING HOIST BRACE
AutoCAD SHX Text
EXISTING HANDRAIL G.C. TO PAINT TO PAINT SAFETY YELLOW
AutoCAD SHX Text
EXISTING FENCE
AutoCAD SHX Text
G.C. PAINT CURB SAFETY YELLOW MATCH EXISTING
AutoCAD SHX Text RELOCATED CABINET BY P.C. THE G.C TO PAINT SAFETY YELLOW STENCIL IN BLACK "EMERGENCY OXYGEN HOOKUP" DETAIL 4 / A-15
AutoCAD SHX Text G.C. TO EPOXY A 24" #5 REINFORCEMENT BAR EVERY 10" INTO EXISTING SLAB 12". TIE A 10" X 10" MAT USING #5 REINFORCEMENT BAR 3" BELOW TOP OF CONCRETE.
AutoCAD SHX Text 2'-6"
AutoCAD SHX Text 3'-0"
AutoCAD SHX Text
BVG
NOTE:
PROVIDE ZIPPER
DOOR AND WALK
OFF MATS AT
PRIMARY
ENTRANCE.
RECYCLE AIR WITH
HEPA UNIT
EXHAUST TO
CORRIDOR
NOTE:
PROVIDE ZIPPER DOOR AND WALK OFF
MATS AT PRIMARY ENTRANCE. RECYCLE
AIR WITH HEPA UNIT EXHAUST TO
CORRIDOR. FLOORS HAVE OIL RESIDUE
PRESENT. REMOVE ALL OIL RESIDUE ON
FLOORS IN THIS ROOM.
NOTE:
PATCH AND PAINT
EXTERIOR AND
INTERIOR TO
MATCH EXISTING.
PAINT BOLLARDS
TO MATCH
EXISTING. SEE
PLUMBING PLAN
FOR NEW WORK.
GROUND FLOOR PARTIAL ENLARGED PLANGROUND FLOOR PARTIAL ENLARGED DEMO PLAN
GROUND PARTIAL ENLARGED NEW PLAN
GROUND FLOOR PARTIAL ENLARGED PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
BIRMINGHAM
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GROUND PARTIAL ENLARGED NEW PLAN
AutoCAD SHX Text
ZVB-G-1
AutoCAD SHX Text
AP-G-1
AutoCAD SHX Text
ELECTRO MECH G414
AutoCAD SHX Text
ELECTRO MECH G415
AutoCAD SHX Text
STAIR - 10
AutoCAD SHX Text
FAC
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
POLICE G405
AutoCAD SHX Text
POLICE G404
AutoCAD SHX Text
STORAGE/ SHOP G403
AutoCAD SHX Text
STOR G402
AutoCAD SHX Text
FAC
AutoCAD SHX Text
ELECTRO MECH G417
AutoCAD SHX Text
FIRE PUMP
AutoCAD SHX Text
STOR G418
AutoCAD SHX Text
ELECRO MECH G417
AutoCAD SHX Text
ELEVATOR 8
AutoCAD SHX Text
ELEVATOR 9
AutoCAD SHX Text D17
AutoCAD SHX Text A-01
AutoCAD SHX Text
AB
AutoCAD SHX Text
AutoCAD SHX Text
GROUND FLOOR ENLARGED ICRA PLANS
AutoCAD SHX Text
ZVB-G-2
AutoCAD SHX Text
AP-G-2
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS ZVB-G-1 AND AP-G-1
AutoCAD SHX Text 2A
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS ZVB-G-2 AND AP-G-2
AutoCAD SHX Text 2B
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS ZVB-G-2 AND AP-G-2
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text
EQUIPMENT AREA
AutoCAD SHX Text
BID DOCUMENTS FOR CONSTRUCTION
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE/UPGRADE MEDICAL GAS SYSTEM
AutoCAD SHX Text 521-21-106
AutoCAD SHX Text 07-07-2023
AutoCAD SHX Text
700 S. 19TH STREET, BIRMINGHAM, AL 35233
AutoCAD SHX Text
BIRMINGHAM VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text N1. INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) 58" TYPE "X" GWB) OVER 3-5/8" METAL STUD FRAMING AT 16" O.C.), EXTEND ASSEMBLY 4" ABOVE FINISH CEILING. N2. PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH ADJACENT CONSTRUCTION. SEE GI DRAWINGS FOR EXTENT OF PAINTING NOTE: "NEW WALL FINISH" N3. REINSTALL METAL CORNER GUARD. REINSTALL METAL CORNER GUARD. N4. REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REPAIR AND REPLACE TILE AND GRID AS REQUIRED. N5. INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO MATCH ADJACENT CONSTRUCTION. N6. P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED IN WALL. (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N7. THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N8. NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N9. NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER FINISH, PAINT AND CMU WALL ASSEMBLY TO MATCH ADJACENT CONSTRUCTION. N10. INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING CONSTRUCTION. PAINT TO MATCH ADJACENT CONSTRUCTION. N11. P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION UNIT (TRANSDUCERS ARE PART OF THE ZVB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N12. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. N13 E.C TO PROVIDE NEW ELECTRICAL CONDUIT FOR TRANSDUCER WIRE & OPEN AIR WIRE ON J-HOOKS; SEE ELECTRICAL WORK SCOPE. N14. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE FROM ZVB AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE. N15. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE TO REMOTE ALARM PANEL AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE.. N16 . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH NO TRANSDUCERS); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N17. PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING CONSTRUCTION. N18. INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N19 P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N20. INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO CORNER AND UNISTRUT TANK SUPPORT PAINT ALL WALLS WITH URETHANE PAINT; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. N21 INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. COORDINATE LOCATION WITH COR. N22. INSTALL NEW SUSPENDED 24" X 48" WASHABLE INSTALL NEW SUSPENDED 24" X 48" WASHABLE ACOUSTICAL CEILING ASSEMBLY AT SAME HEIGHT AS ORIGINAL CEILING. N23. NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT FINISH) TYPE TO MATCH ADJACENT CONSTRUCTION. N24. PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR FRAMES WITHIN THE NOTED AREA TO RECEIVE NEW PAINT ALL SIDES MATCH EXISTING COLOR. N25. PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO MATCH EXISTING. N26. CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS (DASHED AREA) WITH WASHABLE URETHANE PAINT. PAINT FLOORS AND EQUIPMENT PAD WITH EPOXY. REFER TO LIFE SAFETY PLAN KEYNOTE #4. N27. THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING WORK SCOPE. N28. REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REQUIRED FOR PLUMBING NEW LINES. REPLACE WITH MATCHING MATERIALS, NO EXPOSED FASTENERS. SEE 2 / A-13 THE VAMC REQUIRES ALL ROOMS DESIGNATED FOR TURNOVER TO THE CONTRACTOR TO BE RETURNED IN A CLEAN STATE. CREATE A SCHEDULE THAT INCLUDES TASKS FOR THE VAMC TO MOVE OUT AND TASKS FOR THE CONTRACTOR TO MOVE IN. ADDITIONALLY, PROVIDE TWO REPORTS EACH MONTH - ONE FILTERED TO ONLY SHOW THE VAMC MOVING TASKS AND ANOTHER FOR VAMC CLEANING TASKS. IF THE MOVING DATE CHANGES BY MORE THAN 1 DAY, SEND AN UPDATED REPORT TO THE COR. THE VAMC WILL PERFORM SURGICAL CLEANING AFTER ACCEPTANCE OF THE O.R. SPACES.
AutoCAD SHX Text
EXISTING CONSTRUCTION NOTES
AutoCAD SHX Text E1. EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING DEMOLITION WORK, PREP AS REQUIRED FOR NEW WALL FINISH. E2. THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO REMAIN AND SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE DAMAGED TILES AND GRID ASSEMBLY AS NEEDED. E3. PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME RETARDANT SURFACE PROTECTION. TAPE SEAMS AND EDGES. (BASIS OF DESIGN: TRIMACO AQUA SHIELD) E4. EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E5. EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO DETAIL 1/A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E6. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. E7. EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS REQUIRED FOR NEW FINISH. PHOTOGRAPH BOTH SIDES OF THE WALLS BEFORE STARTING WORK. E8. EXISTING HANDRAIL TO REMAIN. EXISTING HANDRAIL TO REMAIN. E9 EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL ASSEMBLY; SEE THE ELECTRICAL WORK SCOPE. E10. EXISTING DOOR TO REMAIN LOCKED DURING DEMOLITION AND NEW CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E11. EXISTING CONTROL PANEL TO REMAIN. EXISTING CONTROL PANEL TO REMAIN. E12 DOOR LEAF TO REMAIN CLOSED DURING CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E13. EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, SUSPEND ITEMS IN PLACE. PROVIDE ADDITIONAL HANGER SUPPORTS AS REQUIRE. REINSTALL ITEMS INTO NEW ACOUSTICAL CEILING. E14. EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING. E15. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. TO CLEAN LIGHTING AND DIFFUSERS. E16. EXISTING NITROGEN CONTROL BOX (NCB) TO BE REPLACED. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. SEE DETAIL 2/A-13 WHEN POSSIBLE MAKE REPAIRS FROM CORRIDOR SIDE OF WALL. E17. EXISTING BOLLARDS AND METAL BOX
AutoCAD SHX Text
DEMOLITION PHASE NOTES
AutoCAD SHX Text D1. REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. PREP AREA FOR NEW WALL ASSEMBLY. D2. REMOVE WALL BASE. REMOVE WALL BASE. D3. REMOVE/REINSTALL METAL CORNER GUARDS. REMOVE/REINSTALL METAL CORNER GUARDS. D4. PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; SEE PLUMBING AND ELECTRICAL WORK SCOPE. CEILING SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE ASSEMBLY AS NEEDED. D5. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. D6. P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D7. P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D8. P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D9. P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB BOX IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D10. ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D11. ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D12. WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER ENTRANCE. D13. REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D14. REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D15. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. D16. VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, MARKERBOARDS, ETC..) D17. EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF THE DOOR WITH 1HR-RATED PLASTIC. INSTALL TEMPORARY SIGNAGE. D18. REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS AND FRAMES FOR NEW FINISHES, REFER TO DETAIL 1/A-14. REMOVE EXISTING SUSPENDED CEILING ASSEMBLY AND INSTALL NEW SUSPENDED CEILING ASSEMBLY. D19. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. D20. INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; REMOVE AT THE END OF EACH PHASE. NOTE: THE INTEGRITY OF TEMPORARY CEILING ASSEMBLY NEEDS TO BE MAINTAINED DURING CONSTRUCTION. D21. REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. INSTALL 5/8" TYPE X FIRE RATED CEILING WHEN EMPLOYEES ARE NOT ACTIVELY WORKING. INSTALL FIRE RATED PLASTIC ABOVE CEILING AS NEEDED FOR ICRA TO MAINTAIN CORRECT ROOM PRESSURES. D22. REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. SEE DETAIL 2 / A-13 ALSO COORDINATE WITH THE COR IN EACH OPERATING ROOM TO GET UP TO TWO S.F. OF ADDITIONAL SOLID SURFACE REMOVAL AND REPAIR / FIXES TO EXISTING.
AutoCAD SHX Text
NEW CONSTRUCTION NOTES
AutoCAD SHX Text
DEMOLITION PHASE NOTES
AutoCAD SHX Text D23. VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO THE CONSTRUCTION CORRIDOR AND SELECT ROOMS. CONTRACTOR TO CONSTRUCT, CLEAN AND MAINTAIN A CHANGING AREA FOR THE VA STAFF TO RETURN TO A STERILE ENVIRONMENT. THE CONTRACTOR IS TO PROVIDE A HEPA FILTRATION SYSTEM TIED TO THE EXHAUST OR RETURN DIFFUSERS, CLEAN CORRIDORS FREE OF ANY HAZARDS, AND PROVIDE TRAINING TO THE VA STAFF TO ACCESS THE CONSTRUCTION SPACE G.C. TO PROVIDE A WARDROBE CABINET WITH SHELVES (SEE MCMASTER-CARR BEIGE 9705T17 AS BASIS OF DESIGN). VA WILL PROVIDE VA PERSONAL PPE SUPPLIES AND A CHAIR. D24. REMOVE EXISTING ALARM PANEL (AP) AND PATCH WALL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D25. REMOVE METAL FRAME WORK. PATCH WALLS. D26. REMOVE (2) EQUIPMENT PADS. RETURN FLOOR TO SMOOTH FINISH. D27. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. D28. REMOVE AND REPLACE EXISTING NITROGEN CONTROL BOX (NCB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. D29. RELOCATING ZVB VALVE TO A NEW LOCATION; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D30. REMOVE METAL BOX AND PATCH WALLS AS NEEDED. COORDINATE WITH PLUMBING CONTRACTOR.
AutoCAD SHX Text
EXT. WALL TYPE: PLASTER ON CMU
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
RELOCATE EM OXYGEN
AutoCAD SHX Text
AutoCAD SHX Text PLUMBING CONTRACTOR TO RELOCATE EMERGENCY OXYGEN HOOK UP AND ALL ASSOCIATED ITEMS. GENERAL CONTRACTOR TO INSTALL NEW BOLLARD AND PAINT CURB AND NON-SLIP STRIPING YELLOW SEE DETAIL 3 / A-00
AutoCAD SHX Text
BVG
AutoCAD SHX Text
ZVB-G-2
AP-G-2
AP 2-1
CONDITION B W/ NO ZVB
PLASTER ON CMU
PAINTING, SOFTWALL ICRA
REFERENCE SHEET A-12
( INSTALL NEW TRANSDUCER
TO AP-2-1 ABOVE CEILING)
AP 2-3
CONDITION B W/ NO ZVB
DRYWALL DEMO AND NEW
PAINTING, HARDWALL ICRA
REFERENCE SHEET A-12
AP 2-5
CONDITION C
ALARM PANEL ONLY
PLASTIC ICRA WALL
REFERENCE SHEET A-12
AP 2-6
CONDITION C
ALARM PANEL ONLY
PLASTIC ICRA WALL
REFERENCE SHEET A-12
AP 2-7
CONDITION C
ALARM PANEL ONLY
PLASTIC ICRA WALL
REFERENCE SHEET A-12
AP 2-8
CONDITION C
ALARM PANEL ONLY
PLASTIC ICRA WALL
REFERENCE SHEET A-12
AP 2-9
CONDITION A
REFERENCE SHEET A-12
AP 2-11
DEMO UNIT, NEW DRYWALL,
PAINT, CORNER GUARD
REINSTALLED
HARDWALL ICRA
REFERENCE SHEET A-12
2ND FLOOR PARTIAL ENLARGED PLAN2ND FLOOR PARTIAL ENLARGED PLAN
2ND FLOOR PARTIAL ENLARGED PLAN2ND FLOOR PARTIAL ENLARGED PLAN2ND FLOOR PARTIAL ENLARGED PLAN
2ND FLOOR PARTIAL ENLARGED PLAN2ND FLOOR PARTIAL ENLARGED PLAN
2ND FLOOR PARTIAL ENLARGED DEMO PLAN2ND FLOOR PARTIAL ENLARGED NEW PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
BIRMINGHAM
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
AutoCAD SHX Text
ZVB-2-1
AutoCAD SHX Text
AP-2-1
AutoCAD SHX Text
ZVB-2-3
AutoCAD SHX Text
AP-2-3
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
ZVB-2-5
AutoCAD SHX Text
AP-2-5
AutoCAD SHX Text D12
AutoCAD SHX Text D11
AutoCAD SHX Text
STORAGE 2369
AutoCAD SHX Text
ZVB-2-6
AutoCAD SHX Text
AP-2-6
AutoCAD SHX Text
ZVB-2-7
AutoCAD SHX Text
AP-2-7
AutoCAD SHX Text
ZVB-2-8
AutoCAD SHX Text
AP-2-8
AutoCAD SHX Text
PROSTODONTICS 2611
AutoCAD SHX Text
AP-2-9
AutoCAD SHX Text
ZVB-2-11
AutoCAD SHX Text
ZVB-2-11
AutoCAD SHX Text
SECOND FLOOR ENLARGED ICRA PLANS
AutoCAD SHX Text A-03
AutoCAD SHX Text
AB
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-2-1 AND ZVB-2-1
AutoCAD SHX Text
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS ZVB-2-3, AP-2-3
AutoCAD SHX Text
AutoCAD SHX Text 3A
AutoCAD SHX Text 3B
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-2-5 AND ZVB-2-5
AutoCAD SHX Text
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-2-6 AND ZVB-2-6
AutoCAD SHX Text
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-2-7 AND ZVB-2-7
AutoCAD SHX Text
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS-2-8 AND ZVB-2-8
AutoCAD SHX Text
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-2-9
AutoCAD SHX Text
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-2-11, ZVB -2-11
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-2-11, ZVB -2-11
AutoCAD SHX Text N1. INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) 58" TYPE "X" GWB) OVER 3-5/8" METAL STUD FRAMING AT 16" O.C.), EXTEND ASSEMBLY 4" ABOVE FINISH CEILING. N2. PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH ADJACENT CONSTRUCTION. SEE GI DRAWINGS FOR EXTENT OF PAINTING NOTE: "NEW WALL FINISH" N3. REINSTALL METAL CORNER GUARD. REINSTALL METAL CORNER GUARD. N4. REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REPAIR AND REPLACE TILE AND GRID AS REQUIRED. N5. INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO MATCH ADJACENT CONSTRUCTION. N6. P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED IN WALL. (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N7. THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N8. NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N9. NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER FINISH, PAINT AND CMU WALL ASSEMBLY TO MATCH ADJACENT CONSTRUCTION. N10. INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING CONSTRUCTION. PAINT TO MATCH ADJACENT CONSTRUCTION. N11. P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION UNIT (TRANSDUCERS ARE PART OF THE ZVB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N12. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. N13 E.C TO PROVIDE NEW ELECTRICAL CONDUIT FOR TRANSDUCER WIRE & OPEN AIR WIRE ON J-HOOKS; SEE ELECTRICAL WORK SCOPE. N14. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE FROM ZVB AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE. N15. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE TO REMOTE ALARM PANEL AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE.. N16 . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH NO TRANSDUCERS); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N17. PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING CONSTRUCTION. N18. INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N19 P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N20. INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO CORNER AND UNISTRUT TANK SUPPORT PAINT ALL WALLS WITH URETHANE PAINT; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. N21 INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. COORDINATE LOCATION WITH COR. N22. INSTALL NEW SUSPENDED 24" X 48" WASHABLE INSTALL NEW SUSPENDED 24" X 48" WASHABLE ACOUSTICAL CEILING ASSEMBLY AT SAME HEIGHT AS ORIGINAL CEILING. N23. NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT FINISH) TYPE TO MATCH ADJACENT CONSTRUCTION. N24. PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR FRAMES WITHIN THE NOTED AREA TO RECEIVE NEW PAINT ALL SIDES MATCH EXISTING COLOR. N25. PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO MATCH EXISTING. N26. CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS (DASHED AREA) WITH WASHABLE URETHANE PAINT. PAINT FLOORS AND EQUIPMENT PAD WITH EPOXY. REFER TO LIFE SAFETY PLAN KEYNOTE #4. N27. THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING WORK SCOPE. N28. REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REQUIRED FOR PLUMBING NEW LINES. REPLACE WITH MATCHING MATERIALS, NO EXPOSED FASTENERS. SEE 2 / A-13 THE VAMC REQUIRES ALL ROOMS DESIGNATED FOR TURNOVER TO THE CONTRACTOR TO BE RETURNED IN A CLEAN STATE. CREATE A SCHEDULE THAT INCLUDES TASKS FOR THE VAMC TO MOVE OUT AND TASKS FOR THE CONTRACTOR TO MOVE IN. ADDITIONALLY, PROVIDE TWO REPORTS EACH MONTH - ONE FILTERED TO ONLY SHOW THE VAMC MOVING TASKS AND ANOTHER FOR VAMC CLEANING TASKS. IF THE MOVING DATE CHANGES BY MORE THAN 1 DAY, SEND AN UPDATED REPORT TO THE COR. THE VAMC WILL PERFORM SURGICAL CLEANING AFTER ACCEPTANCE OF THE O.R. SPACES.
AutoCAD SHX Text
EXISTING CONSTRUCTION NOTES
AutoCAD SHX Text E1. EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING DEMOLITION WORK, PREP AS REQUIRED FOR NEW WALL FINISH. E2. THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO REMAIN AND SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE DAMAGED TILES AND GRID ASSEMBLY AS NEEDED. E3. PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME RETARDANT SURFACE PROTECTION. TAPE SEAMS AND EDGES. (BASIS OF DESIGN: TRIMACO AQUA SHIELD) E4. EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E5. EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO DETAIL 1/A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E6. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. E7. EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS REQUIRED FOR NEW FINISH. PHOTOGRAPH BOTH SIDES OF THE WALLS BEFORE STARTING WORK. E8. EXISTING HANDRAIL TO REMAIN. EXISTING HANDRAIL TO REMAIN. E9 EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL ASSEMBLY; SEE THE ELECTRICAL WORK SCOPE. E10. EXISTING DOOR TO REMAIN LOCKED DURING DEMOLITION AND NEW CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E11. EXISTING CONTROL PANEL TO REMAIN. EXISTING CONTROL PANEL TO REMAIN. E12 DOOR LEAF TO REMAIN CLOSED DURING CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E13. EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, SUSPEND ITEMS IN PLACE. PROVIDE ADDITIONAL HANGER SUPPORTS AS REQUIRE. REINSTALL ITEMS INTO NEW ACOUSTICAL CEILING. E14. EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING. E15. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. TO CLEAN LIGHTING AND DIFFUSERS. E16. EXISTING NITROGEN CONTROL BOX (NCB) TO BE REPLACED. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. SEE DETAIL 2/A-13 WHEN POSSIBLE MAKE REPAIRS FROM CORRIDOR SIDE OF WALL. E17. EXISTING BOLLARDS AND METAL BOX
AutoCAD SHX Text
DEMOLITION PHASE NOTES
AutoCAD SHX Text D1. REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. PREP AREA FOR NEW WALL ASSEMBLY. D2. REMOVE WALL BASE. REMOVE WALL BASE. D3. REMOVE/REINSTALL METAL CORNER GUARDS. REMOVE/REINSTALL METAL CORNER GUARDS. D4. PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; SEE PLUMBING AND ELECTRICAL WORK SCOPE. CEILING SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE ASSEMBLY AS NEEDED. D5. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. D6. P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D7. P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D8. P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D9. P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB BOX IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D10. ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D11. ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D12. WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER ENTRANCE. D13. REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D14. REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D15. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. D16. VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, MARKERBOARDS, ETC..) D17. EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF THE DOOR WITH 1HR-RATED PLASTIC. INSTALL TEMPORARY SIGNAGE. D18. REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS AND FRAMES FOR NEW FINISHES, REFER TO DETAIL 1/A-14. REMOVE EXISTING SUSPENDED CEILING ASSEMBLY AND INSTALL NEW SUSPENDED CEILING ASSEMBLY. D19. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. D20. INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; REMOVE AT THE END OF EACH PHASE. NOTE: THE INTEGRITY OF TEMPORARY CEILING ASSEMBLY NEEDS TO BE MAINTAINED DURING CONSTRUCTION. D21. REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. INSTALL 5/8" TYPE X FIRE RATED CEILING WHEN EMPLOYEES ARE NOT ACTIVELY WORKING. INSTALL FIRE RATED PLASTIC ABOVE CEILING AS NEEDED FOR ICRA TO MAINTAIN CORRECT ROOM PRESSURES. D22. REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. SEE DETAIL 2 / A-13 ALSO COORDINATE WITH THE COR IN EACH OPERATING ROOM TO GET UP TO TWO S.F. OF ADDITIONAL SOLID SURFACE REMOVAL AND REPAIR / FIXES TO EXISTING.
AutoCAD SHX Text
NEW CONSTRUCTION NOTES
AutoCAD SHX Text
DEMOLITION PHASE NOTES
AutoCAD SHX Text D23. VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO THE CONSTRUCTION CORRIDOR AND SELECT ROOMS. CONTRACTOR TO CONSTRUCT, CLEAN AND MAINTAIN A CHANGING AREA FOR THE VA STAFF TO RETURN TO A STERILE ENVIRONMENT. THE CONTRACTOR IS TO PROVIDE A HEPA FILTRATION SYSTEM TIED TO THE EXHAUST OR RETURN DIFFUSERS, CLEAN CORRIDORS FREE OF ANY HAZARDS, AND PROVIDE TRAINING TO THE VA STAFF TO ACCESS THE CONSTRUCTION SPACE G.C. TO PROVIDE A WARDROBE CABINET WITH SHELVES (SEE MCMASTER-CARR BEIGE 9705T17 AS BASIS OF DESIGN). VA WILL PROVIDE VA PERSONAL PPE SUPPLIES AND A CHAIR. D24. REMOVE EXISTING ALARM PANEL (AP) AND PATCH WALL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D25. REMOVE METAL FRAME WORK. PATCH WALLS. D26. REMOVE (2) EQUIPMENT PADS. RETURN FLOOR TO SMOOTH FINISH. D27. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. D28. REMOVE AND REPLACE EXISTING NITROGEN CONTROL BOX (NCB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. D29. RELOCATING ZVB VALVE TO A NEW LOCATION; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D30. REMOVE METAL BOX AND PATCH WALLS AS NEEDED. COORDINATE WITH PLUMBING CONTRACTOR.
AutoCAD SHX Text
BID DOCUMENTS FOR CONSTRUCTION
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE/UPGRADE MEDICAL GAS SYSTEM
AutoCAD SHX Text 521-21-106
AutoCAD SHX Text 07-07-2023
AutoCAD SHX Text
700 S. 19TH STREET, BIRMINGHAM, AL 35233
AutoCAD SHX Text
BIRMINGHAM VA MEDICAL CENTER
AutoCAD SHX Text
AP 3-1
CONDITION B
HARDWALL ICRA
REFERENCE SHEET A-12
VAMC NOTE:
ROOM 3231 TO BE
VACATED AND TURNED
OVER TO THE
CONTRACTOR
AP 3-2
CONDITION C
PLASTIC ICRA
REFERENCE SHEET A-12
AP 3-3
CONDITION C
PLASTIC ICRA
REFERENCE SHEET A-12
AP 3-4
CONDITION C
PLASTIC ICRA
REFERENCE SHEET A-12
AP 3-5
AP 3-5
CONDITION C
PLASTIC ICRA
REFERENCE SHEET A-12
AP 3-6
CONDITION C
DRYWALL
PLASTIC ICRA
REFERENCE SHEET A-12
AP 3-6
CONDITION C
AP 3-7
CONDITION C
DRYWALL
PLASTIC ICRA
REFERENCE SHEET A-12
AP 3-8
CONDITION C
DRYWALL
PLASTIC ICRA
REFERENCE SHEET A-12
NOTE:
CONTRACTOR TO ALLOW EMERGENCY
ACCESS FOR STAFF DURING
CONSTRUCTION. INCLUDE A PLAN THAT
TRAIN STAFF TO ACCESS THIS AREA.
AP 3-9
CONDITION C
DRYWALL
PLASTIC ICRA
REFERENCE SHEET A-12
AP 3-10
CONDITION C
DRYWALL
PLASTIC ICRA
REFERENCE SHEET A-12
AP 3-11
CONDITION C
PLASTER ON FRAMING
PLASTIC ICRA
REFERENCE SHEET A-12
3RD FLOOR PARTIAL ENLARGED DEMO PLAN3RD FLOOR PARTIAL ENLARGED NEW PLAN3RD FLOOR PARTIAL ENLARGED PLAN3RD FLOOR PARTIAL ENLARGED PLAN
3RD FLOOR PARTIAL ENLARGED PLAN
3RD FLOOR PARTIAL ENLARGED PLAN
3RD FLOOR PARTIAL ENLARGED PLAN3RD FLOOR PARTIAL ENLARGED PLAN
3RD FLOOR PARTIAL ENLARGED PLAN3RD FLOOR PARTIAL ENLARGED PLAN3RD FLOOR PARTIAL ENLARGED PLAN3RD FLOOR PARTIAL ENLARGED PLAN
3RD FLOOR PARTIAL ENLARGED DEMO PLAN3RD FLOOR PARTIAL ENLARGED NEW PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
BIRMINGHAM
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
AutoCAD SHX Text
AP-3-1
AutoCAD SHX Text
ZVB-3-1
AutoCAD SHX Text
ZVB-3-2
AutoCAD SHX Text
AP-3-2
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
ZVB-3-3
AutoCAD SHX Text
AP-3-3
AutoCAD SHX Text
ZVB-3-4
AutoCAD SHX Text
AP-3-4
AutoCAD SHX Text
ZVB-3-5
AutoCAD SHX Text
AP-3-5
AutoCAD SHX Text
ZVB-3-6
AutoCAD SHX Text
AP-3-6
AutoCAD SHX Text
ZVB-3-7
AutoCAD SHX Text
AP-3-7
AutoCAD SHX Text
ZVB-3-8
AutoCAD SHX Text
AP-3-8
AutoCAD SHX Text
ZVB-3-1
AutoCAD SHX Text
AP-3-1
AutoCAD SHX Text
ZVB-3-9
AutoCAD SHX Text
AP-3-9
AutoCAD SHX Text
ZVB-3-10
AutoCAD SHX Text
AP-3-10
AutoCAD SHX Text
ZVB-3-11
AutoCAD SHX Text
AP-3-11
AutoCAD SHX Text
LOCKERS/OFFICE/ BREAK RM 3313B
AutoCAD SHX Text
MAP
AutoCAD SHX Text MAP-2 IRCA HARDWALL, TYPE 1 REFERENCE SHEET A-12 OFFICE IS STAFFED TWENTY FOUR HOURS A DAY SEVEN DAYS A WEEK
AutoCAD SHX Text
LOCKERS/OFFICE/ BREAK RM 3313B
AutoCAD SHX Text
MAP
AutoCAD SHX Text
THIRD FLOOR ENLARGED ICRA FLOOR PLANS
AutoCAD SHX Text A-04
AutoCAD SHX Text
AB
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-3-1 AND ZVB-3-1
AutoCAD SHX Text 1A
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-3-1 AND ZVB-3-1
AutoCAD SHX Text 1B
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-3-2 AND ZVB-3-2
AutoCAD SHX Text
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-3-3 AND ZVB-3-3
AutoCAD SHX Text
AutoCAD SHX Text 3/8" = 1'-0"
AutoCAD SHX Text
PANELS AP-3-4 AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .