Attachment 8 Drawings 521-21-106_Part2.pdf

PDF 7 MB Posted

Attached to
Y1DA--521-21-106 | Medical Gas Systems
Solicitation number
36C24725R0020
Issued by

About this file

These are architectural floor plan drawings from West Point Engineers LLC for the Birmingham VA Medical Center, showing enlarged construction and demolition plans for the basement through fourth floors. The drawings detail partial floor plans with specific panel locations, construction notes, and demolition phase notes related to medical gas systems installation/modification work. Each floor plan includes ICRA (Infection Control Risk Assessment) requirements with different condition levels (A, B, C) specified for different work areas.

The drawings provide detailed technical specifications including demolition requirements, existing construction notes, and new construction notes for each area. Key elements include panel locations, corridor access requirements, wall modifications, plumbing and electrical work scopes, and specific ICRA containment requirements. The plans appear to be part of a larger set of construction documents (drawing numbers A-00 through A-05) and include architect/engineer stamps indicating these are official construction documents for the VA facility modernization project.

View the file

Other files

File Type Posted
36C24725R0020 0008.docx DOCX document
36C24725R0020 0007.docx DOCX document
36C24725R0020 0006.docx DOCX document
Attachment 0005B_Med Gas Annual Inspection 2024.pdf PDF
36C24725R0020 0005.docx DOCX document
Attachment 0005A_RFI Clarifications.docx DOCX document
36C24725R0020 0004.pdf PDF
Attachment 0003A_RFI Answers_36C24725R0020.docx DOCX document
36C24725R0020 0003.docx DOCX document
Attachment 0003B_Asbestos Inspection Report_36C24725R0020.pdf PDF
Attachment 0003C_Photos_36C24725R0020.zip ZIP file
36C24725R0020 0002.docx DOCX document
Attachment 0002 - PROPOSAL PREPARATION AND EVALUATION INFORMATION_Rev1 521-21-106.pdf PDF
Site Visit Attendance Sheet 521-21-106.pdf PDF
36C24725R0020_0001.pdf PDF
Attachment 8 Drawings 521-21-106_Part6.pdf PDF
Attachment 7 Specifications 521-21-106.pdf PDF
Attachment 8 Drawings 521-21-106_Part5.pdf PDF
Attachment 8 Drawings 521-21-106_Part4.pdf PDF
36C24725R0020_RFP.pdf PDF
Attachment 6 INVOICING.docx DOCX document
Attachment 8 Drawings 521-21-106_Part7.pdf PDF
Attachment 1 Experience Modification Rate Form.pdf PDF
Attachment 8 Drawings 521-21-106_Part1.pdf PDF
Attachment 3 Past Performance Questionnaire -PPQ.docx DOCX document
Attachment 8 Drawings 521-21-106_Part3.pdf PDF
Attachment 4 Itemized Cost Breakdown.xlsx XLSX spreadsheet
Attachment 5 Wage Determination AL20250087 1.3.2025.pdf PDF
Attachment 2 VAAR 852.219-75 Jan 2023 Deviation.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

BIRMINGHAM

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

BASEMENT FLOOR PARTIAL ENLARGED DEMO PLANBASEMENT PARTIAL ENLARGED NEW PLAN

BASEMENT FLOOR PARTIAL ENLARGED DEMO PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

BIRMINGHAM

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

BASEMENT FLOOR PARTIAL ENLARGED DEMO PLAN

AutoCAD SHX Text

MAP-1

AutoCAD SHX Text A-00

AutoCAD SHX Text

AB

AutoCAD SHX Text

BID DOCUMENTS FOR CONSTRUCTION

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE/UPGRADE MEDICAL GAS SYSTEM

AutoCAD SHX Text 521-21-106

AutoCAD SHX Text 07-07-2023

AutoCAD SHX Text

700 S. 19TH STREET, BIRMINGHAM, AL 35233

AutoCAD SHX Text

BIRMINGHAM VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL MAP-1

AutoCAD SHX Text 1A

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANEL MAP-1

AutoCAD SHX Text 1B

AutoCAD SHX Text

BASEMENT FLOOR ENLARGED ICRA PLANS

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

OXYGEN VALVE BOX

AutoCAD SHX Text 2A

AutoCAD SHX Text

BID DOCUMENTS FOR CONSTRUCTION

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE/UPGRADE MEDICAL GAS SYSTEM

AutoCAD SHX Text 521-21-106

AutoCAD SHX Text 07-07-2023

AutoCAD SHX Text

700 S. 19TH STREET, BIRMINGHAM, AL 35233

AutoCAD SHX Text

BIRMINGHAM VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text N1. INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) 58" TYPE "X" GWB) OVER 3-5/8" METAL STUD FRAMING AT 16" O.C.), EXTEND ASSEMBLY 4" ABOVE FINISH CEILING. N2. PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH ADJACENT CONSTRUCTION. SEE GI DRAWINGS FOR EXTENT OF PAINTING NOTE: "NEW WALL FINISH" N3. REINSTALL METAL CORNER GUARD. REINSTALL METAL CORNER GUARD. N4. REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REPAIR AND REPLACE TILE AND GRID AS REQUIRED. N5. INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO MATCH ADJACENT CONSTRUCTION. N6. P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED IN WALL. (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N7. THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N8. NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N9. NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER FINISH, PAINT AND CMU WALL ASSEMBLY TO MATCH ADJACENT CONSTRUCTION. N10. INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING CONSTRUCTION. PAINT TO MATCH ADJACENT CONSTRUCTION. N11. P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION UNIT (TRANSDUCERS ARE PART OF THE ZVB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N12. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. N13 E.C TO PROVIDE NEW ELECTRICAL CONDUIT FOR TRANSDUCER WIRE & OPEN AIR WIRE ON J-HOOKS; SEE ELECTRICAL WORK SCOPE. N14. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE FROM ZVB AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE. N15. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE TO REMOTE ALARM PANEL AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE.. N16 . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH NO TRANSDUCERS); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N17. PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING CONSTRUCTION. N18. INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N19 P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N20. INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO CORNER AND UNISTRUT TANK SUPPORT PAINT ALL WALLS WITH URETHANE PAINT; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. N21 INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. COORDINATE LOCATION WITH COR. N22. INSTALL NEW SUSPENDED 24" X 48" WASHABLE INSTALL NEW SUSPENDED 24" X 48" WASHABLE ACOUSTICAL CEILING ASSEMBLY AT SAME HEIGHT AS ORIGINAL CEILING. N23. NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT FINISH) TYPE TO MATCH ADJACENT CONSTRUCTION. N24. PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR FRAMES WITHIN THE NOTED AREA TO RECEIVE NEW PAINT ALL SIDES MATCH EXISTING COLOR. N25. PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO MATCH EXISTING. N26. CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS (DASHED AREA) WITH WASHABLE URETHANE PAINT. PAINT FLOORS AND EQUIPMENT PAD WITH EPOXY. REFER TO LIFE SAFETY PLAN KEYNOTE #4. N27. THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING WORK SCOPE. N28. REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REQUIRED FOR PLUMBING NEW LINES. REPLACE WITH MATCHING MATERIALS, NO EXPOSED FASTENERS. SEE 2 / A-13 THE VAMC REQUIRES ALL ROOMS DESIGNATED FOR TURNOVER TO THE CONTRACTOR TO BE RETURNED IN A CLEAN STATE. CREATE A SCHEDULE THAT INCLUDES TASKS FOR THE VAMC TO MOVE OUT AND TASKS FOR THE CONTRACTOR TO MOVE IN. ADDITIONALLY, PROVIDE TWO REPORTS EACH MONTH - ONE FILTERED TO ONLY SHOW THE VAMC MOVING TASKS AND ANOTHER FOR VAMC CLEANING TASKS. IF THE MOVING DATE CHANGES BY MORE THAN 1 DAY, SEND AN UPDATED REPORT TO THE COR. THE VAMC WILL PERFORM SURGICAL CLEANING AFTER ACCEPTANCE OF THE O.R. SPACES.

AutoCAD SHX Text

EXISTING CONSTRUCTION NOTES

AutoCAD SHX Text E1. EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING DEMOLITION WORK, PREP AS REQUIRED FOR NEW WALL FINISH. E2. THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO REMAIN AND SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE DAMAGED TILES AND GRID ASSEMBLY AS NEEDED. E3. PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME RETARDANT SURFACE PROTECTION. TAPE SEAMS AND EDGES. (BASIS OF DESIGN: TRIMACO AQUA SHIELD) E4. EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E5. EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO DETAIL 1/A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E6. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. E7. EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS REQUIRED FOR NEW FINISH. PHOTOGRAPH BOTH SIDES OF THE WALLS BEFORE STARTING WORK. E8. EXISTING HANDRAIL TO REMAIN. EXISTING HANDRAIL TO REMAIN. E9 EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL ASSEMBLY; SEE THE ELECTRICAL WORK SCOPE. E10. EXISTING DOOR TO REMAIN LOCKED DURING DEMOLITION AND NEW CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E11. EXISTING CONTROL PANEL TO REMAIN. EXISTING CONTROL PANEL TO REMAIN. E12 DOOR LEAF TO REMAIN CLOSED DURING CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E13. EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, SUSPEND ITEMS IN PLACE. PROVIDE ADDITIONAL HANGER SUPPORTS AS REQUIRE. REINSTALL ITEMS INTO NEW ACOUSTICAL CEILING. E14. EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING. E15. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. TO CLEAN LIGHTING AND DIFFUSERS. E16. EXISTING NITROGEN CONTROL BOX (NCB) TO BE REPLACED. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. SEE DETAIL 2/A-13 WHEN POSSIBLE MAKE REPAIRS FROM CORRIDOR SIDE OF WALL. E17. EXISTING BOLLARDS AND METAL BOX

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D1. REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. PREP AREA FOR NEW WALL ASSEMBLY. D2. REMOVE WALL BASE. REMOVE WALL BASE. D3. REMOVE/REINSTALL METAL CORNER GUARDS. REMOVE/REINSTALL METAL CORNER GUARDS. D4. PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; SEE PLUMBING AND ELECTRICAL WORK SCOPE. CEILING SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE ASSEMBLY AS NEEDED. D5. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. D6. P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D7. P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D8. P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D9. P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB BOX IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D10. ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D11. ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D12. WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER ENTRANCE. D13. REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D14. REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D15. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. D16. VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, MARKERBOARDS, ETC..) D17. EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF THE DOOR WITH 1HR-RATED PLASTIC. INSTALL TEMPORARY SIGNAGE. D18. REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS AND FRAMES FOR NEW FINISHES, REFER TO DETAIL 1/A-14. REMOVE EXISTING SUSPENDED CEILING ASSEMBLY AND INSTALL NEW SUSPENDED CEILING ASSEMBLY. D19. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. D20. INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; REMOVE AT THE END OF EACH PHASE. NOTE: THE INTEGRITY OF TEMPORARY CEILING ASSEMBLY NEEDS TO BE MAINTAINED DURING CONSTRUCTION. D21. REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. INSTALL 5/8" TYPE X FIRE RATED CEILING WHEN EMPLOYEES ARE NOT ACTIVELY WORKING. INSTALL FIRE RATED PLASTIC ABOVE CEILING AS NEEDED FOR ICRA TO MAINTAIN CORRECT ROOM PRESSURES. D22. REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. SEE DETAIL 2 / A-13 ALSO COORDINATE WITH THE COR IN EACH OPERATING ROOM TO GET UP TO TWO S.F. OF ADDITIONAL SOLID SURFACE REMOVAL AND REPAIR / FIXES TO EXISTING.

AutoCAD SHX Text

NEW CONSTRUCTION NOTES

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D23. VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO THE CONSTRUCTION CORRIDOR AND SELECT ROOMS. CONTRACTOR TO CONSTRUCT, CLEAN AND MAINTAIN A CHANGING AREA FOR THE VA STAFF TO RETURN TO A STERILE ENVIRONMENT. THE CONTRACTOR IS TO PROVIDE A HEPA FILTRATION SYSTEM TIED TO THE EXHAUST OR RETURN DIFFUSERS, CLEAN CORRIDORS FREE OF ANY HAZARDS, AND PROVIDE TRAINING TO THE VA STAFF TO ACCESS THE CONSTRUCTION SPACE G.C. TO PROVIDE A WARDROBE CABINET WITH SHELVES (SEE MCMASTER-CARR BEIGE 9705T17 AS BASIS OF DESIGN). VA WILL PROVIDE VA PERSONAL PPE SUPPLIES AND A CHAIR. D24. REMOVE EXISTING ALARM PANEL (AP) AND PATCH WALL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D25. REMOVE METAL FRAME WORK. PATCH WALLS. D26. REMOVE (2) EQUIPMENT PADS. RETURN FLOOR TO SMOOTH FINISH. D27. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. D28. REMOVE AND REPLACE EXISTING NITROGEN CONTROL BOX (NCB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. D29. RELOCATING ZVB VALVE TO A NEW LOCATION; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D30. REMOVE METAL BOX AND PATCH WALLS AS NEEDED. COORDINATE WITH PLUMBING CONTRACTOR.

AutoCAD SHX Text INSTALL STAINLESS STEEL SURFACE MOUNTED HMI COVER OVER EXISTING OXYGEN VALVE SEE PLUMBING FOR SCOPE OF WORK. PROVIDE SIGNAGE SEE DETAIL 5 / A-15

AutoCAD SHX Text

NTS

AutoCAD SHX Text

EMERGENCY OXYGEN RELOCATION

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING DOOR

AutoCAD SHX Text GENERAL NOTES THE EXISTING MEDICAL EMERGENCY GAS OXYGEN CABINET IS CURRENTLY LOCATED BELOW GRADE. P.C. TO RELOCATE THE EXISTING EMERGENCY OXYGEN CABINET AND ASSOCIATED PIPING TO THE NEW LOCATION ABOVE THE DELIVERY GROUND LEVEL. COORDINATE G.C TO INSTALL A NEW 6" BOLLARD FILL WITH CONCRETE AND PAINT TO MATCH VAMC SAFETY YELLOW COORDINATE THIS WORK WITH THE ADJACENT DOOR SWING. PLUMBING CONTRACTOR TO RELOCATE THE CABINET, ASSOCIATED PIPING, ALL HANGERS AND UNISTRUT. GENERAL TRADES CONTRACTOR TO INSTALL BOLLARD, MODIFY ANY EXISTING STRUCTURES AND PAINT. G.C. TO PERFORM GROUND TO PERFORM GROUND PENETRATING RADAR SURVEY PRIOR TO EXCAVATION AND COORDINATE WITH COR ON ALL LOCATIONS.

AutoCAD SHX Text

EXISTING BUILDING

AutoCAD SHX Text

EXTEND OXYGEN PIPE BY P.C.

AutoCAD SHX Text

RELOCATE CABINET BY P.C.

AutoCAD SHX Text

EXISTING HOIST BRACE

AutoCAD SHX Text

EXISTING HANDRAIL

AutoCAD SHX Text NEW GALVANIZED UNISTRUT BY P.C. G.C. TO PAINT SAFETY YELLOWTO PAINT SAFETY YELLOW

AutoCAD SHX Text

EXISTING FENCE

AutoCAD SHX Text RELOCATED CABINET BY P.C. G.C TO PAINT SAFETY YELLOW STENCIL IN BLACK "EMERGENCY OXYGEN HOOKUP" IN 3" LETTERS

AutoCAD SHX Text

G.C. INSTALL 6" X 1/4" INSTALL 6" X 1/4" WALL BOLLARD PAINT SAFETY YELLOW

AutoCAD SHX Text

EXISTING HOIST BRACE

AutoCAD SHX Text

EXISTING HANDRAIL G.C. TO PAINT TO PAINT SAFETY YELLOW

AutoCAD SHX Text

EXISTING FENCE

AutoCAD SHX Text

G.C. PAINT CURB SAFETY YELLOW MATCH EXISTING

AutoCAD SHX Text RELOCATED CABINET BY P.C. THE G.C TO PAINT SAFETY YELLOW STENCIL IN BLACK "EMERGENCY OXYGEN HOOKUP" DETAIL 4 / A-15

AutoCAD SHX Text G.C. TO EPOXY A 24" #5 REINFORCEMENT BAR EVERY 10" INTO EXISTING SLAB 12". TIE A 10" X 10" MAT USING #5 REINFORCEMENT BAR 3" BELOW TOP OF CONCRETE.

AutoCAD SHX Text 2'-6"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text

BVG

NOTE:

PROVIDE ZIPPER

DOOR AND WALK

OFF MATS AT

PRIMARY

ENTRANCE.

RECYCLE AIR WITH

HEPA UNIT

EXHAUST TO

CORRIDOR

NOTE:

PROVIDE ZIPPER DOOR AND WALK OFF

MATS AT PRIMARY ENTRANCE. RECYCLE

AIR WITH HEPA UNIT EXHAUST TO

CORRIDOR. FLOORS HAVE OIL RESIDUE

PRESENT. REMOVE ALL OIL RESIDUE ON

FLOORS IN THIS ROOM.

NOTE:

PATCH AND PAINT

EXTERIOR AND

INTERIOR TO

MATCH EXISTING.

PAINT BOLLARDS

TO MATCH

EXISTING. SEE

PLUMBING PLAN

FOR NEW WORK.

GROUND FLOOR PARTIAL ENLARGED PLANGROUND FLOOR PARTIAL ENLARGED DEMO PLAN

GROUND PARTIAL ENLARGED NEW PLAN

GROUND FLOOR PARTIAL ENLARGED PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

BIRMINGHAM

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GROUND PARTIAL ENLARGED NEW PLAN

AutoCAD SHX Text

ZVB-G-1

AutoCAD SHX Text

AP-G-1

AutoCAD SHX Text

ELECTRO MECH G414

AutoCAD SHX Text

ELECTRO MECH G415

AutoCAD SHX Text

STAIR - 10

AutoCAD SHX Text

FAC

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

POLICE G405

AutoCAD SHX Text

POLICE G404

AutoCAD SHX Text

STORAGE/ SHOP G403

AutoCAD SHX Text

STOR G402

AutoCAD SHX Text

FAC

AutoCAD SHX Text

ELECTRO MECH G417

AutoCAD SHX Text

FIRE PUMP

AutoCAD SHX Text

STOR G418

AutoCAD SHX Text

ELECRO MECH G417

AutoCAD SHX Text

ELEVATOR 8

AutoCAD SHX Text

ELEVATOR 9

AutoCAD SHX Text D17

AutoCAD SHX Text A-01

AutoCAD SHX Text

AB

AutoCAD SHX Text

AutoCAD SHX Text

GROUND FLOOR ENLARGED ICRA PLANS

AutoCAD SHX Text

ZVB-G-2

AutoCAD SHX Text

AP-G-2

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS ZVB-G-1 AND AP-G-1

AutoCAD SHX Text 2A

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS ZVB-G-2 AND AP-G-2

AutoCAD SHX Text 2B

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS ZVB-G-2 AND AP-G-2

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

EQUIPMENT AREA

AutoCAD SHX Text

BID DOCUMENTS FOR CONSTRUCTION

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE/UPGRADE MEDICAL GAS SYSTEM

AutoCAD SHX Text 521-21-106

AutoCAD SHX Text 07-07-2023

AutoCAD SHX Text

700 S. 19TH STREET, BIRMINGHAM, AL 35233

AutoCAD SHX Text

BIRMINGHAM VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text N1. INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) 58" TYPE "X" GWB) OVER 3-5/8" METAL STUD FRAMING AT 16" O.C.), EXTEND ASSEMBLY 4" ABOVE FINISH CEILING. N2. PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH ADJACENT CONSTRUCTION. SEE GI DRAWINGS FOR EXTENT OF PAINTING NOTE: "NEW WALL FINISH" N3. REINSTALL METAL CORNER GUARD. REINSTALL METAL CORNER GUARD. N4. REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REPAIR AND REPLACE TILE AND GRID AS REQUIRED. N5. INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO MATCH ADJACENT CONSTRUCTION. N6. P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED IN WALL. (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N7. THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N8. NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N9. NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER FINISH, PAINT AND CMU WALL ASSEMBLY TO MATCH ADJACENT CONSTRUCTION. N10. INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING CONSTRUCTION. PAINT TO MATCH ADJACENT CONSTRUCTION. N11. P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION UNIT (TRANSDUCERS ARE PART OF THE ZVB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N12. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. N13 E.C TO PROVIDE NEW ELECTRICAL CONDUIT FOR TRANSDUCER WIRE & OPEN AIR WIRE ON J-HOOKS; SEE ELECTRICAL WORK SCOPE. N14. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE FROM ZVB AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE. N15. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE TO REMOTE ALARM PANEL AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE.. N16 . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH NO TRANSDUCERS); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N17. PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING CONSTRUCTION. N18. INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N19 P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N20. INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO CORNER AND UNISTRUT TANK SUPPORT PAINT ALL WALLS WITH URETHANE PAINT; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. N21 INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. COORDINATE LOCATION WITH COR. N22. INSTALL NEW SUSPENDED 24" X 48" WASHABLE INSTALL NEW SUSPENDED 24" X 48" WASHABLE ACOUSTICAL CEILING ASSEMBLY AT SAME HEIGHT AS ORIGINAL CEILING. N23. NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT FINISH) TYPE TO MATCH ADJACENT CONSTRUCTION. N24. PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR FRAMES WITHIN THE NOTED AREA TO RECEIVE NEW PAINT ALL SIDES MATCH EXISTING COLOR. N25. PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO MATCH EXISTING. N26. CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS (DASHED AREA) WITH WASHABLE URETHANE PAINT. PAINT FLOORS AND EQUIPMENT PAD WITH EPOXY. REFER TO LIFE SAFETY PLAN KEYNOTE #4. N27. THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING WORK SCOPE. N28. REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REQUIRED FOR PLUMBING NEW LINES. REPLACE WITH MATCHING MATERIALS, NO EXPOSED FASTENERS. SEE 2 / A-13 THE VAMC REQUIRES ALL ROOMS DESIGNATED FOR TURNOVER TO THE CONTRACTOR TO BE RETURNED IN A CLEAN STATE. CREATE A SCHEDULE THAT INCLUDES TASKS FOR THE VAMC TO MOVE OUT AND TASKS FOR THE CONTRACTOR TO MOVE IN. ADDITIONALLY, PROVIDE TWO REPORTS EACH MONTH - ONE FILTERED TO ONLY SHOW THE VAMC MOVING TASKS AND ANOTHER FOR VAMC CLEANING TASKS. IF THE MOVING DATE CHANGES BY MORE THAN 1 DAY, SEND AN UPDATED REPORT TO THE COR. THE VAMC WILL PERFORM SURGICAL CLEANING AFTER ACCEPTANCE OF THE O.R. SPACES.

AutoCAD SHX Text

EXISTING CONSTRUCTION NOTES

AutoCAD SHX Text E1. EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING DEMOLITION WORK, PREP AS REQUIRED FOR NEW WALL FINISH. E2. THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO REMAIN AND SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE DAMAGED TILES AND GRID ASSEMBLY AS NEEDED. E3. PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME RETARDANT SURFACE PROTECTION. TAPE SEAMS AND EDGES. (BASIS OF DESIGN: TRIMACO AQUA SHIELD) E4. EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E5. EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO DETAIL 1/A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E6. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. E7. EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS REQUIRED FOR NEW FINISH. PHOTOGRAPH BOTH SIDES OF THE WALLS BEFORE STARTING WORK. E8. EXISTING HANDRAIL TO REMAIN. EXISTING HANDRAIL TO REMAIN. E9 EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL ASSEMBLY; SEE THE ELECTRICAL WORK SCOPE. E10. EXISTING DOOR TO REMAIN LOCKED DURING DEMOLITION AND NEW CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E11. EXISTING CONTROL PANEL TO REMAIN. EXISTING CONTROL PANEL TO REMAIN. E12 DOOR LEAF TO REMAIN CLOSED DURING CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E13. EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, SUSPEND ITEMS IN PLACE. PROVIDE ADDITIONAL HANGER SUPPORTS AS REQUIRE. REINSTALL ITEMS INTO NEW ACOUSTICAL CEILING. E14. EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING. E15. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. TO CLEAN LIGHTING AND DIFFUSERS. E16. EXISTING NITROGEN CONTROL BOX (NCB) TO BE REPLACED. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. SEE DETAIL 2/A-13 WHEN POSSIBLE MAKE REPAIRS FROM CORRIDOR SIDE OF WALL. E17. EXISTING BOLLARDS AND METAL BOX

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D1. REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. PREP AREA FOR NEW WALL ASSEMBLY. D2. REMOVE WALL BASE. REMOVE WALL BASE. D3. REMOVE/REINSTALL METAL CORNER GUARDS. REMOVE/REINSTALL METAL CORNER GUARDS. D4. PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; SEE PLUMBING AND ELECTRICAL WORK SCOPE. CEILING SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE ASSEMBLY AS NEEDED. D5. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. D6. P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D7. P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D8. P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D9. P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB BOX IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D10. ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D11. ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D12. WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER ENTRANCE. D13. REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D14. REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D15. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. D16. VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, MARKERBOARDS, ETC..) D17. EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF THE DOOR WITH 1HR-RATED PLASTIC. INSTALL TEMPORARY SIGNAGE. D18. REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS AND FRAMES FOR NEW FINISHES, REFER TO DETAIL 1/A-14. REMOVE EXISTING SUSPENDED CEILING ASSEMBLY AND INSTALL NEW SUSPENDED CEILING ASSEMBLY. D19. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. D20. INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; REMOVE AT THE END OF EACH PHASE. NOTE: THE INTEGRITY OF TEMPORARY CEILING ASSEMBLY NEEDS TO BE MAINTAINED DURING CONSTRUCTION. D21. REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. INSTALL 5/8" TYPE X FIRE RATED CEILING WHEN EMPLOYEES ARE NOT ACTIVELY WORKING. INSTALL FIRE RATED PLASTIC ABOVE CEILING AS NEEDED FOR ICRA TO MAINTAIN CORRECT ROOM PRESSURES. D22. REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. SEE DETAIL 2 / A-13 ALSO COORDINATE WITH THE COR IN EACH OPERATING ROOM TO GET UP TO TWO S.F. OF ADDITIONAL SOLID SURFACE REMOVAL AND REPAIR / FIXES TO EXISTING.

AutoCAD SHX Text

NEW CONSTRUCTION NOTES

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D23. VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO THE CONSTRUCTION CORRIDOR AND SELECT ROOMS. CONTRACTOR TO CONSTRUCT, CLEAN AND MAINTAIN A CHANGING AREA FOR THE VA STAFF TO RETURN TO A STERILE ENVIRONMENT. THE CONTRACTOR IS TO PROVIDE A HEPA FILTRATION SYSTEM TIED TO THE EXHAUST OR RETURN DIFFUSERS, CLEAN CORRIDORS FREE OF ANY HAZARDS, AND PROVIDE TRAINING TO THE VA STAFF TO ACCESS THE CONSTRUCTION SPACE G.C. TO PROVIDE A WARDROBE CABINET WITH SHELVES (SEE MCMASTER-CARR BEIGE 9705T17 AS BASIS OF DESIGN). VA WILL PROVIDE VA PERSONAL PPE SUPPLIES AND A CHAIR. D24. REMOVE EXISTING ALARM PANEL (AP) AND PATCH WALL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D25. REMOVE METAL FRAME WORK. PATCH WALLS. D26. REMOVE (2) EQUIPMENT PADS. RETURN FLOOR TO SMOOTH FINISH. D27. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. D28. REMOVE AND REPLACE EXISTING NITROGEN CONTROL BOX (NCB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. D29. RELOCATING ZVB VALVE TO A NEW LOCATION; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D30. REMOVE METAL BOX AND PATCH WALLS AS NEEDED. COORDINATE WITH PLUMBING CONTRACTOR.

AutoCAD SHX Text

EXT. WALL TYPE: PLASTER ON CMU

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

RELOCATE EM OXYGEN

AutoCAD SHX Text

AutoCAD SHX Text PLUMBING CONTRACTOR TO RELOCATE EMERGENCY OXYGEN HOOK UP AND ALL ASSOCIATED ITEMS. GENERAL CONTRACTOR TO INSTALL NEW BOLLARD AND PAINT CURB AND NON-SLIP STRIPING YELLOW SEE DETAIL 3 / A-00

AutoCAD SHX Text

BVG

AutoCAD SHX Text

ZVB-G-2

AP-G-2

AP 2-1

CONDITION B W/ NO ZVB

PLASTER ON CMU

PAINTING, SOFTWALL ICRA

REFERENCE SHEET A-12

( INSTALL NEW TRANSDUCER

TO AP-2-1 ABOVE CEILING)

AP 2-3

CONDITION B W/ NO ZVB

DRYWALL DEMO AND NEW

PAINTING, HARDWALL ICRA

REFERENCE SHEET A-12

AP 2-5

CONDITION C

ALARM PANEL ONLY

PLASTIC ICRA WALL

REFERENCE SHEET A-12

AP 2-6

CONDITION C

ALARM PANEL ONLY

PLASTIC ICRA WALL

REFERENCE SHEET A-12

AP 2-7

CONDITION C

ALARM PANEL ONLY

PLASTIC ICRA WALL

REFERENCE SHEET A-12

AP 2-8

CONDITION C

ALARM PANEL ONLY

PLASTIC ICRA WALL

REFERENCE SHEET A-12

AP 2-9

CONDITION A

REFERENCE SHEET A-12

AP 2-11

DEMO UNIT, NEW DRYWALL,

PAINT, CORNER GUARD

REINSTALLED

HARDWALL ICRA

REFERENCE SHEET A-12

2ND FLOOR PARTIAL ENLARGED PLAN2ND FLOOR PARTIAL ENLARGED PLAN

2ND FLOOR PARTIAL ENLARGED PLAN2ND FLOOR PARTIAL ENLARGED PLAN2ND FLOOR PARTIAL ENLARGED PLAN

2ND FLOOR PARTIAL ENLARGED PLAN2ND FLOOR PARTIAL ENLARGED PLAN

2ND FLOOR PARTIAL ENLARGED DEMO PLAN2ND FLOOR PARTIAL ENLARGED NEW PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

BIRMINGHAM

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

AutoCAD SHX Text

ZVB-2-1

AutoCAD SHX Text

AP-2-1

AutoCAD SHX Text

ZVB-2-3

AutoCAD SHX Text

AP-2-3

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

ZVB-2-5

AutoCAD SHX Text

AP-2-5

AutoCAD SHX Text D12

AutoCAD SHX Text D11

AutoCAD SHX Text

STORAGE 2369

AutoCAD SHX Text

ZVB-2-6

AutoCAD SHX Text

AP-2-6

AutoCAD SHX Text

ZVB-2-7

AutoCAD SHX Text

AP-2-7

AutoCAD SHX Text

ZVB-2-8

AutoCAD SHX Text

AP-2-8

AutoCAD SHX Text

PROSTODONTICS 2611

AutoCAD SHX Text

AP-2-9

AutoCAD SHX Text

ZVB-2-11

AutoCAD SHX Text

ZVB-2-11

AutoCAD SHX Text

SECOND FLOOR ENLARGED ICRA PLANS

AutoCAD SHX Text A-03

AutoCAD SHX Text

AB

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-2-1 AND ZVB-2-1

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS ZVB-2-3, AP-2-3

AutoCAD SHX Text

AutoCAD SHX Text 3A

AutoCAD SHX Text 3B

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-2-5 AND ZVB-2-5

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-2-6 AND ZVB-2-6

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-2-7 AND ZVB-2-7

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS-2-8 AND ZVB-2-8

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-2-9

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-2-11, ZVB -2-11

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-2-11, ZVB -2-11

AutoCAD SHX Text N1. INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) INSTALLED NEW PARTITION WALL ASSEMBLY ( " TYPE "X" GWB) 58" TYPE "X" GWB) OVER 3-5/8" METAL STUD FRAMING AT 16" O.C.), EXTEND ASSEMBLY 4" ABOVE FINISH CEILING. N2. PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH PAINT NEW WALL ASSEMBLY, COLOR AND FINISH TO MATCH ADJACENT CONSTRUCTION. SEE GI DRAWINGS FOR EXTENT OF PAINTING NOTE: "NEW WALL FINISH" N3. REINSTALL METAL CORNER GUARD. REINSTALL METAL CORNER GUARD. N4. REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REINSTALL EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY, REPAIR AND REPLACE TILE AND GRID AS REQUIRED. N5. INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO INSTALL NEW VINYL WALL BASE; SIZE, TYPE AND COLOR TO MATCH ADJACENT CONSTRUCTION. N6. P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED P.C. TO PROVIDE NEW MASTER ALARM PANEL FLUSH MOUNTED IN WALL. (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N7. THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND THE P.C. TO PROVIDE NEW ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N8. NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK NEW ALARM PANEL (AP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N9. NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER NEW PLASTER FINISH AND CMU WALL ASSEMBLY, PLASTER FINISH, PAINT AND CMU WALL ASSEMBLY TO MATCH ADJACENT CONSTRUCTION. N10. INSTALLED NEW DRYWALL FINISH, TYPE TO MATCH EXISTING CONSTRUCTION. PAINT TO MATCH ADJACENT CONSTRUCTION. N11. P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION P.C. TO INSTALL NEW ZONE VALVE BOX (ZVB) COMBINATION UNIT (TRANSDUCERS ARE PART OF THE ZVB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N12. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. REINSTALL HANDRAIL AND BUMPER RAIL ASSEMBLY. N13 E.C TO PROVIDE NEW ELECTRICAL CONDUIT FOR TRANSDUCER WIRE & OPEN AIR WIRE ON J-HOOKS; SEE ELECTRICAL WORK SCOPE. N14. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE FROM ZVB AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE. N15. THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL THE E.C. TO PROVIDE NEW ELECTRICAL CONDUIT AND PULL WIRE TO REMOTE ALARM PANEL AND OPEN AIR WIRE J-HOOKS; SEE ELECTRICAL WORK SCOPE.. N16 . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH . P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH P.C TO PROVIDE NEW ZONE VALVE BOX (STANDARD BOX WITH NO TRANSDUCERS); SEE PLUMBING AND ELECTRICAL WORK SCOPE. N17. PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING PATCH EXISTING PARTITION, NEW ASSEMBLY TO MATCH EXISTING CONSTRUCTION. N18. INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; INSTALL NEW RETRO ALARM PANEL, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N19 P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK P.C. INSTALL VALVES; SEE PLUMBING AND ELECTRICAL WORK SCOPE. N20. INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO INSTALL NEW FIRE-RATED PLYWOOD SHEATHING CORNER TO CORNER AND UNISTRUT TANK SUPPORT PAINT ALL WALLS WITH URETHANE PAINT; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. N21 INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL INSTALL WALL MOUNTED METAL CABINET; REFER TO DETAIL 1/A-14 FOR ADDITIONAL INFORMATION. COORDINATE LOCATION WITH COR. N22. INSTALL NEW SUSPENDED 24" X 48" WASHABLE INSTALL NEW SUSPENDED 24" X 48" WASHABLE ACOUSTICAL CEILING ASSEMBLY AT SAME HEIGHT AS ORIGINAL CEILING. N23. NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT NEW DRYWALL CEILING ASSEMBLY (URETHANE GLOSS PAINT FINISH) TYPE TO MATCH ADJACENT CONSTRUCTION. N24. PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR PAINT WALLS, COLOR AND FINISH TO MATCH EXISTING. DOOR FRAMES WITHIN THE NOTED AREA TO RECEIVE NEW PAINT ALL SIDES MATCH EXISTING COLOR. N25. PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO PAINT EXISTING COLUMN ALL SIDES, COLOR AND FINISH TO MATCH EXISTING. N26. CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS CLEAN AND PAINT DOOR FRAMES ALL SIDES AND WALLS (DASHED AREA) WITH WASHABLE URETHANE PAINT. PAINT FLOORS AND EQUIPMENT PAD WITH EPOXY. REFER TO LIFE SAFETY PLAN KEYNOTE #4. N27. THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING THE P.C. TO PROVIDE NEW MANIFOLD SYSTEM; SEE PLUMBING WORK SCOPE. N28. REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REPAIR SOLID-SURFACE WALLS AFFECTED BY DEMOLITION REQUIRED FOR PLUMBING NEW LINES. REPLACE WITH MATCHING MATERIALS, NO EXPOSED FASTENERS. SEE 2 / A-13 THE VAMC REQUIRES ALL ROOMS DESIGNATED FOR TURNOVER TO THE CONTRACTOR TO BE RETURNED IN A CLEAN STATE. CREATE A SCHEDULE THAT INCLUDES TASKS FOR THE VAMC TO MOVE OUT AND TASKS FOR THE CONTRACTOR TO MOVE IN. ADDITIONALLY, PROVIDE TWO REPORTS EACH MONTH - ONE FILTERED TO ONLY SHOW THE VAMC MOVING TASKS AND ANOTHER FOR VAMC CLEANING TASKS. IF THE MOVING DATE CHANGES BY MORE THAN 1 DAY, SEND AN UPDATED REPORT TO THE COR. THE VAMC WILL PERFORM SURGICAL CLEANING AFTER ACCEPTANCE OF THE O.R. SPACES.

AutoCAD SHX Text

EXISTING CONSTRUCTION NOTES

AutoCAD SHX Text E1. EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING EXISTING WALL ASSEMBLY TO REMAIN, PROTECT DURING DEMOLITION WORK, PREP AS REQUIRED FOR NEW WALL FINISH. E2. THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO THE EXISTING SUSPENDED ACOUSTICAL CEILING ASSEMBLY IS TO REMAIN AND SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE DAMAGED TILES AND GRID ASSEMBLY AS NEEDED. E3. PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME PROTECT EXISTING FLOORING USING A SLIP RESISTANT, FLAME RETARDANT SURFACE PROTECTION. TAPE SEAMS AND EDGES. (BASIS OF DESIGN: TRIMACO AQUA SHIELD) E4. EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET EXISTING ALARM PANEL (AP) TO BE RETROFIT, REFER TO SHEET A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E5. EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO EXISTING ZONE VALVE BOX (ZVB) TO BE RETROFIT, REFER TO DETAIL 1/A-12; SEE PLUMBING AND ELECTRICAL WORK SCOPE. E6. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. EXISTING ZONE VALVE BOX (ZVB) TO REMAIN. E7. EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS EXISTING PLASTER FINISH OVER CMU WALL ASSEMBLY, PREP AS REQUIRED FOR NEW FINISH. PHOTOGRAPH BOTH SIDES OF THE WALLS BEFORE STARTING WORK. E8. EXISTING HANDRAIL TO REMAIN. EXISTING HANDRAIL TO REMAIN. E9 EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL EXISTING ELECTRICAL SERVICE TO BE RELOCATED TO NEW WALL ASSEMBLY; SEE THE ELECTRICAL WORK SCOPE. E10. EXISTING DOOR TO REMAIN LOCKED DURING DEMOLITION AND NEW CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E11. EXISTING CONTROL PANEL TO REMAIN. EXISTING CONTROL PANEL TO REMAIN. E12 DOOR LEAF TO REMAIN CLOSED DURING CONSTRUCTION, PROVIDE SIGNAGE AS NECESSARY. E13. EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, EXISTING LIGHT FIXTURES AND A/V EQUIPMENT TO REMAIN, SUSPEND ITEMS IN PLACE. PROVIDE ADDITIONAL HANGER SUPPORTS AS REQUIRE. REINSTALL ITEMS INTO NEW ACOUSTICAL CEILING. E14. EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING DRYWALL CEILING TO REMAIN, PAINT TO MATCH EXISTING. E15. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. EXISTING O.R. LIGHTING AND HVAC DIFFUSERS TO REMAIN, G.C. TO CLEAN LIGHTING AND DIFFUSERS. E16. EXISTING NITROGEN CONTROL BOX (NCB) TO BE REPLACED. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. SEE DETAIL 2/A-13 WHEN POSSIBLE MAKE REPAIRS FROM CORRIDOR SIDE OF WALL. E17. EXISTING BOLLARDS AND METAL BOX

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D1. REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING REMOVE EXISTING PARTITION WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. PREP AREA FOR NEW WALL ASSEMBLY. D2. REMOVE WALL BASE. REMOVE WALL BASE. D3. REMOVE/REINSTALL METAL CORNER GUARDS. REMOVE/REINSTALL METAL CORNER GUARDS. D4. PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; PROVIDE ACCESS ABOVE THE SUSPENDED ACOUSTICAL CEILING; SEE PLUMBING AND ELECTRICAL WORK SCOPE. CEILING SHALL BE MAINTAINED AS A FIRE BARRIER WHEN NOT SUPERVISED BY THE CONTRACTOR. REPAIR OR REPLACE ASSEMBLY AS NEEDED. D5. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. REMOVE/REINSTALL OFFICE MODULAR FURNITURE UNIT. D6. P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE P.C. WILL REMOVE THE MASTER ALARM PANEL (MAP); SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D7. P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND P.C WILL REMOVE ALARM PANEL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C TO DEMO AND PATCH AS NEEDED. D8. P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL P.C. WILL REMOVE ALARM PANEL (AP); AFTER NEW AP PANEL IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D9. P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB P.C. WILL REMOVE ZONE VALVE BOX (ZVB) AFTER NEW ZVB BOX IS INSTALLED; SEE PLUMBING AND ELECTRICAL WORK SCOPE. G.C. TO DEMO AND PATCH AS NEEDED. D10. ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ICRA HARDWALL, TYPE I; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D11. ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ICRA SOFTWALL, TYPE II; REFERENCE SHEET A-12 FOR ADDITIONAL INFORMATION. D12. WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER WALKOFF MAT, INSTALLED ON EACH SIDE OF ICRA BARRIER ENTRANCE. D13. REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY REMOVE EXISTING PLASTER FINISH AND CMU WALL ASSEMBLY AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D14. REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF REMOVE DRYWALL WALL AS REQUIRED FOR INSTALLATION OF PLUMBING AND ELECTRICAL WORK SCOPE. D15. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. REMOVE/REINSTALL EXISTING HANDRAIL AND BUMPER RAIL. D16. VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, VAMC TO REMOVE WALL-MOUNTED ACCESSORIES (I.E, ARTWORK, MARKERBOARDS, ETC..) D17. EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF EXISTING DOOR TO ACT AS CONSTRUCTION BARRIER. TAPE OFF THE DOOR WITH 1HR-RATED PLASTIC. INSTALL TEMPORARY SIGNAGE. D18. REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS REMOVE EXISTING WOOD WALL RAIL SYSTEM, PREP ALL WALLS AND FRAMES FOR NEW FINISHES, REFER TO DETAIL 1/A-14. REMOVE EXISTING SUSPENDED CEILING ASSEMBLY AND INSTALL NEW SUSPENDED CEILING ASSEMBLY. D19. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. REMOVE SUSPENDED ACOUSTICAL CEILING ASSEMBLY. D20. INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; INSTALL 1 HOUR RATED PLASTIC ABOVE CEILING TO THE DECK; REMOVE AT THE END OF EACH PHASE. NOTE: THE INTEGRITY OF TEMPORARY CEILING ASSEMBLY NEEDS TO BE MAINTAINED DURING CONSTRUCTION. D21. REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING REMOVE SELECT DRYWALL CEILING ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. INSTALL 5/8" TYPE X FIRE RATED CEILING WHEN EMPLOYEES ARE NOT ACTIVELY WORKING. INSTALL FIRE RATED PLASTIC ABOVE CEILING AS NEEDED FOR ICRA TO MAINTAIN CORRECT ROOM PRESSURES. D22. REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND REMOVE SOLID SURFACE WALL ASSEMBLY; SEE PLUMBING AND ELECTRICAL WORK SCOPE. SEE DETAIL 2 / A-13 ALSO COORDINATE WITH THE COR IN EACH OPERATING ROOM TO GET UP TO TWO S.F. OF ADDITIONAL SOLID SURFACE REMOVAL AND REPAIR / FIXES TO EXISTING.

AutoCAD SHX Text

NEW CONSTRUCTION NOTES

AutoCAD SHX Text

DEMOLITION PHASE NOTES

AutoCAD SHX Text D23. VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO VA STAFF WILL NEED ACCESS DURING REGULAR HOURS TO THE CONSTRUCTION CORRIDOR AND SELECT ROOMS. CONTRACTOR TO CONSTRUCT, CLEAN AND MAINTAIN A CHANGING AREA FOR THE VA STAFF TO RETURN TO A STERILE ENVIRONMENT. THE CONTRACTOR IS TO PROVIDE A HEPA FILTRATION SYSTEM TIED TO THE EXHAUST OR RETURN DIFFUSERS, CLEAN CORRIDORS FREE OF ANY HAZARDS, AND PROVIDE TRAINING TO THE VA STAFF TO ACCESS THE CONSTRUCTION SPACE G.C. TO PROVIDE A WARDROBE CABINET WITH SHELVES (SEE MCMASTER-CARR BEIGE 9705T17 AS BASIS OF DESIGN). VA WILL PROVIDE VA PERSONAL PPE SUPPLIES AND A CHAIR. D24. REMOVE EXISTING ALARM PANEL (AP) AND PATCH WALL; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D25. REMOVE METAL FRAME WORK. PATCH WALLS. D26. REMOVE (2) EQUIPMENT PADS. RETURN FLOOR TO SMOOTH FINISH. D27. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. EXISTING ROOM TO SERVICE AS CONSTRUCTION BARRIER. D28. REMOVE AND REPLACE EXISTING NITROGEN CONTROL BOX (NCB); SEE PLUMBING AND ELECTRICAL WORK SCOPE. D29. RELOCATING ZVB VALVE TO A NEW LOCATION; SEE PLUMBING AND ELECTRICAL WORK SCOPE. D30. REMOVE METAL BOX AND PATCH WALLS AS NEEDED. COORDINATE WITH PLUMBING CONTRACTOR.

AutoCAD SHX Text

BID DOCUMENTS FOR CONSTRUCTION

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

REPLACE/UPGRADE MEDICAL GAS SYSTEM

AutoCAD SHX Text 521-21-106

AutoCAD SHX Text 07-07-2023

AutoCAD SHX Text

700 S. 19TH STREET, BIRMINGHAM, AL 35233

AutoCAD SHX Text

BIRMINGHAM VA MEDICAL CENTER

AutoCAD SHX Text

AP 3-1

CONDITION B

HARDWALL ICRA

REFERENCE SHEET A-12

VAMC NOTE:

ROOM 3231 TO BE

VACATED AND TURNED

OVER TO THE

CONTRACTOR

AP 3-2

CONDITION C

PLASTIC ICRA

REFERENCE SHEET A-12

AP 3-3

CONDITION C

PLASTIC ICRA

REFERENCE SHEET A-12

AP 3-4

CONDITION C

PLASTIC ICRA

REFERENCE SHEET A-12

AP 3-5

AP 3-5

CONDITION C

PLASTIC ICRA

REFERENCE SHEET A-12

AP 3-6

CONDITION C

DRYWALL

PLASTIC ICRA

REFERENCE SHEET A-12

AP 3-6

CONDITION C

AP 3-7

CONDITION C

DRYWALL

PLASTIC ICRA

REFERENCE SHEET A-12

AP 3-8

CONDITION C

DRYWALL

PLASTIC ICRA

REFERENCE SHEET A-12

NOTE:

CONTRACTOR TO ALLOW EMERGENCY

ACCESS FOR STAFF DURING

CONSTRUCTION. INCLUDE A PLAN THAT

TRAIN STAFF TO ACCESS THIS AREA.

AP 3-9

CONDITION C

DRYWALL

PLASTIC ICRA

REFERENCE SHEET A-12

AP 3-10

CONDITION C

DRYWALL

PLASTIC ICRA

REFERENCE SHEET A-12

AP 3-11

CONDITION C

PLASTER ON FRAMING

PLASTIC ICRA

REFERENCE SHEET A-12

3RD FLOOR PARTIAL ENLARGED DEMO PLAN3RD FLOOR PARTIAL ENLARGED NEW PLAN3RD FLOOR PARTIAL ENLARGED PLAN3RD FLOOR PARTIAL ENLARGED PLAN

3RD FLOOR PARTIAL ENLARGED PLAN

3RD FLOOR PARTIAL ENLARGED PLAN

3RD FLOOR PARTIAL ENLARGED PLAN3RD FLOOR PARTIAL ENLARGED PLAN

3RD FLOOR PARTIAL ENLARGED PLAN3RD FLOOR PARTIAL ENLARGED PLAN3RD FLOOR PARTIAL ENLARGED PLAN3RD FLOOR PARTIAL ENLARGED PLAN

3RD FLOOR PARTIAL ENLARGED DEMO PLAN3RD FLOOR PARTIAL ENLARGED NEW PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

BIRMINGHAM

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

AutoCAD SHX Text

AP-3-1

AutoCAD SHX Text

ZVB-3-1

AutoCAD SHX Text

ZVB-3-2

AutoCAD SHX Text

AP-3-2

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

ZVB-3-3

AutoCAD SHX Text

AP-3-3

AutoCAD SHX Text

ZVB-3-4

AutoCAD SHX Text

AP-3-4

AutoCAD SHX Text

ZVB-3-5

AutoCAD SHX Text

AP-3-5

AutoCAD SHX Text

ZVB-3-6

AutoCAD SHX Text

AP-3-6

AutoCAD SHX Text

ZVB-3-7

AutoCAD SHX Text

AP-3-7

AutoCAD SHX Text

ZVB-3-8

AutoCAD SHX Text

AP-3-8

AutoCAD SHX Text

ZVB-3-1

AutoCAD SHX Text

AP-3-1

AutoCAD SHX Text

ZVB-3-9

AutoCAD SHX Text

AP-3-9

AutoCAD SHX Text

ZVB-3-10

AutoCAD SHX Text

AP-3-10

AutoCAD SHX Text

ZVB-3-11

AutoCAD SHX Text

AP-3-11

AutoCAD SHX Text

LOCKERS/OFFICE/ BREAK RM 3313B

AutoCAD SHX Text

MAP

AutoCAD SHX Text MAP-2 IRCA HARDWALL, TYPE 1 REFERENCE SHEET A-12 OFFICE IS STAFFED TWENTY FOUR HOURS A DAY SEVEN DAYS A WEEK

AutoCAD SHX Text

LOCKERS/OFFICE/ BREAK RM 3313B

AutoCAD SHX Text

MAP

AutoCAD SHX Text

THIRD FLOOR ENLARGED ICRA FLOOR PLANS

AutoCAD SHX Text A-04

AutoCAD SHX Text

AB

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-3-1 AND ZVB-3-1

AutoCAD SHX Text 1A

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-3-1 AND ZVB-3-1

AutoCAD SHX Text 1B

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-3-2 AND ZVB-3-2

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-3-3 AND ZVB-3-3

AutoCAD SHX Text

AutoCAD SHX Text 3/8" = 1'-0"

AutoCAD SHX Text

PANELS AP-3-4 AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .