Attachment 8 DRAFT TE-6 Roof Preventive Maintenance Checklists 20240814.pdf

PDF 299 KB Posted

Attached to
RFP Fort Cavazos Roofing
Solicitation number
W912DY25R0008
Issued by

About this file

This document is a Technical Exhibit (TE-6) detailing Roof Preventive Maintenance Checklists for the Fort Cavazos Roofing Services contract. The checklists provide comprehensive inspection guidelines for two roof types: PVC and Duro-Last roofing systems. For both roof types, the maintenance steps include routine inspections, post-severe weather assessments, debris removal, and detailed examinations of critical roof components such as metal flashings, sealants, masonry, rooftop equipment, and drainage systems.

The maintenance protocol requires contractors to create and update roof plans, mark deficiencies, inspect seams, curbs, penetrations, and drains, and ensure proper securement and termination of roofing elements. Specific tasks include checking for rust, detachment, deteriorated sealants, cracks in mortar joints, and potential water infiltration points around equipment like air conditioners, vents, skylights, and solar panels. Cleaning requirements mandate regular debris removal using push brooms or plastic shovels, with strict instructions to avoid solvent-based cleaners and follow manufacturer guidance.

View the file

Other files

File Type Posted
Attachment 20 Information Paper - Roofing Gutters Downspouts Hatches Skylights Specifications ProjNet attachment.pdf PDF
Ft Cavazos Solicitation RFP Amendment 1 _W912DY25R0008.pdf PDF
Attachment 19 questions and answers ROOFING 1.pdf PDF
Attachment 18 Wage Determinations Service Contract Act.pdf PDF
Attachment 9 Appendix A Technical Exhibits.pdf PDF
Attachment 11 Appendix B.2 APP Worksheet Eng_Form_6293_Aug 2024 - FINAL (1).pdf PDF
Attachment 10 Appendix B.1 SSHO_Designation_Eng_Form_6282_2023Aug28 (1).pdf PDF
Attachment 4 TE-2 Roof Preventive Maintenance Requirements 20240814.pdf PDF
Attachment 17 Appendix H Service Order Process 20240830.pdf PDF
Attachment 5 TE-3 Monthly Progress Report Format 20240428.pdf PDF
Attachment 8 TE-6 Roof Preventive Maintenance Checklists 20240814.pdf PDF
Attachment 13 Appendix D Required Submittal Reports Meetings.pdf PDF
Attachment 15 Appendix F Applicable Codes Standards and Regs 20240428.pdf PDF
Attachment 2 Fort Cavazos Roofing Pricing Workbook.xlsx XLSX spreadsheet
Attachment 16 Appendix G Acronyms and Definitions 20240428.pdf PDF
Attachment 18 Wage Determinations DBA 2.pdf PDF
Attachment 3 TE-1 Roofing Inventory Updated 20241219 (1).xlsx XLSX spreadsheet
Attachment 6 TE-4 Service Order Forms 20240428.pdf PDF
Attachment 1 PWS - FY25 B1 Fort Cavazos Roofing Services 20240830.pdf PDF
Attachment 12 Appendix C Performance Requirement Summary.pdf PDF
Attachment 18 Wage Determinations DBA 1.pdf PDF
Attachment 7 TE-5 Engineer Form 3394 20240428.pdf PDF
Attachment 14 Appendix E RMS 20240428.pdf PDF
Ft Cavazos Roofing Solicitation RFP.pdf PDF
Attachment 5 DRAFT TE-3 Monthly Progress Report Format 20240428.pdf PDF
Attachment 9 DRAFT Appendix A Technical Exhibits.pdf PDF
Attachment 17 DRAFT Appendix H Service Order Process 20240830.pdf PDF
Attachment 10 DRAFT Appendix B.1 SSHO_Designation_Eng_Form_6282_2023Aug28 (1).pdf PDF
Attachment 14 DRAFT Appendix E RMS 20240428.pdf PDF
Attachment 4 DRAFT TE-2 Roof Preventive Maintenance Requirements 20240814.pdf PDF
Attachment 11 DRAFT Appendix B.2 APP Worksheet Eng_Form_6293_Aug 2024 - FINAL (1).pdf PDF
DRAFT Ft Cavazos Solicitation RFP W912DY25R0008.pdf PDF
Attachment 15 DRAFT Appendix F Applicable Codes Standards and Regs 20240428.pdf PDF
Attachment 13 DRAFT Appendix D Required Submittal Reports Meetings.pdf PDF
Attachment 7 DRAFT TE-5 Engineer Form 3394 20240428.pdf PDF
Attachment 16 DRAFT Appendix G Acronyms and Definitions 20240428.pdf PDF
Attachment 18 Wage Determinations DBA 1.pdf PDF
Attachment 3 DRAFT TE-1 Roofing Inventory Updated 20241219 (1).xlsx XLSX spreadsheet
Attachment 18 Wage Determinations SCA.pdf PDF
Attachment 2 DRAFT Fort Cavazos Roofing Pricing Workbook.xlsx XLSX spreadsheet
Attachment 6 DRAFT TE-4 Service Order Forms 20240428.pdf PDF
Attachment 12 DRAFT Appendix C Performance Requirement Summary.pdf PDF
Attachment 18 Wage Determinations DBA 2.pdf PDF
Attachment 1 DRAFT PWS - FY25 B1 Fort Cavazos Roofing Services 20240830.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS TE-6 FY25 B1 Fort Cavazos Roofing Services

Technical Exhibit 6 (TE-6) Roof Preventive Maintenance Checklists

1.0 General Requirements:

The Contractor shall incorporate the following checklists for each type of roof into their checklists.

The Contractor shall include the checklists on page 1 and page 2 of this document with each checklist submission.

2.0 Sample Checklists:

PVC Roof Preventive Maintenance

Steps: What to Inspect:

Step 1 Inspect the perimeter.

Update the roof plan to show the location of all curbs, penetrations, drains, etc. Focus on securement and termination.

Mark deficiencies on the roof plan as they are found.

Step 2 Inspect all seams on the roof level.

Focus on plate placement and proper seaming.

Step 3 Inspect all curbs, penetrations, drains, etc.

Focus on one detail at a time, confirming proper securement, termination, and flashing

Step 4 Perform a General Check.

Walk across the roof, update areas in need of repair, and perform a general check of the system.

Step 5 Clean Roof as Necessary.

Clean gutters, downspouts, drains and scuppers.

Remove debris regularly using a push broom or plastic shovel. Clean roof per industry/manufacture guidance.

Duro-Last Roof Preventative Maintenance

Steps: What to Inspect:

Step 1 Conduct Routine Inspections.

Inspect at least once/twice per year; in the spring and fall using the Inspection Maintenance Checklist provided in this guide.

Step 2 Inspect After Severe Weather

Always inspect the roof for damage after severe weather such as hailstorms, heavy rains, high winds, etc.

Service Call Only - DMO/SO Driven

Step 3 Inspect Roof Free of Debris

Remove debris from roof with a push broom or plastic shovel, such as:

• Leaves, branches, dirt, rocks, bottles, etc.

• Trash from other trades, etc.

Keep gutters, downspouts, drains, scuppers and the surrounding roof area clean to ensure proper drainage.

Step 4 Inspect Metal Flashings and Sealants, ensure it is in Good Condition

Examine all metal flashings, Examine all metal flashings, Counter flashings, expansion joints and pitch pockets for:

• Rust

• Detachment or damage

• Deteriorated sealant Reattach loose metalwork, replace sealant as necessary; repair metal as necessary; and prepare and paint any rusted metal.

Step 5 Inspect Masonry, ensure it is in Good Condition

Examine masonry walls and copings for:

• Cracks at the mortar joints

• Deteriorated sealants

• Loose coping stones

• Indications of water Repair all such conditions to prevent water infiltration.

Step 6 Examine rooftop equipment for any problems

Inspect Around Rooftop around Equipment that may allow water infiltration, including:

• Air conditioners, vents and ductwork

• Equipment stands or screens

• Skylights

• Satellite dishes and antennas

• Solar panels and mounting equipment

Step 7 Clean Roof as Necessary.

Clean gutters, downspouts, drains and scuppers.

Remove debris regularly using a push broom or plastic shovel. Clean roof per industry/manufacture guidance.

Clean Roof as necessary of dirt and environmental debris. Solvent-based cleaners cannot be used.

File details come from the government source that posted it. Updated .