Attachment 5 DRAFT TE-3 Monthly Progress Report Format 20240428.pdf

PDF 280 KB Posted

Attached to
RFP Fort Cavazos Roofing
Solicitation number
W912DY25R0008
Issued by

About this file

This document is a monthly progress report template for a roofing services contract with the U.S. Army Corps of Engineers at Fort Cavazos. The template provides a structured format for reporting on various aspects of the contract, including current available funds, service order overview, preventative maintenance tracking, safety incidents, photographs of work, project scheduling, and top maintenance repair items. The report is designed to be submitted monthly and includes sections for documenting service order metrics, maintenance visits, safety training, and contact information.

Key sections of the template include comprehensive tracking of service orders by category (e.g., routine, emergency, urgent), maintenance visit completions across different frequencies (monthly, quarterly, semi-annual, annual), safety incident reporting, and photographic documentation of maintenance and repair work. The template is specifically tailored for the Fort Cavazos Roofing Services contract (Solicitation Number W912DY25R0008), which aims to provide preventive and corrective maintenance for roofing and facility management services at Fort Cavazos, Texas, under the Department of the Army Corps of Engineers Engineering Support Center Huntsville.

View the file

Other files

File Type Posted
Attachment 19 questions and answers ROOFING 1.pdf PDF
Attachment 20 Information Paper - Roofing Gutters Downspouts Hatches Skylights Specifications ProjNet attachment.pdf PDF
Ft Cavazos Solicitation RFP Amendment 1 _W912DY25R0008.pdf PDF
Attachment 2 Fort Cavazos Roofing Pricing Workbook.xlsx XLSX spreadsheet
Attachment 16 Appendix G Acronyms and Definitions 20240428.pdf PDF
Attachment 18 Wage Determinations DBA 2.pdf PDF
Attachment 17 Appendix H Service Order Process 20240830.pdf PDF
Attachment 5 TE-3 Monthly Progress Report Format 20240428.pdf PDF
Attachment 8 TE-6 Roof Preventive Maintenance Checklists 20240814.pdf PDF
Attachment 13 Appendix D Required Submittal Reports Meetings.pdf PDF
Attachment 15 Appendix F Applicable Codes Standards and Regs 20240428.pdf PDF
Attachment 18 Wage Determinations Service Contract Act.pdf PDF
Attachment 9 Appendix A Technical Exhibits.pdf PDF
Attachment 11 Appendix B.2 APP Worksheet Eng_Form_6293_Aug 2024 - FINAL (1).pdf PDF
Attachment 10 Appendix B.1 SSHO_Designation_Eng_Form_6282_2023Aug28 (1).pdf PDF
Attachment 4 TE-2 Roof Preventive Maintenance Requirements 20240814.pdf PDF
Attachment 3 TE-1 Roofing Inventory Updated 20241219 (1).xlsx XLSX spreadsheet
Attachment 6 TE-4 Service Order Forms 20240428.pdf PDF
Attachment 1 PWS - FY25 B1 Fort Cavazos Roofing Services 20240830.pdf PDF
Attachment 12 Appendix C Performance Requirement Summary.pdf PDF
Attachment 18 Wage Determinations DBA 1.pdf PDF
Attachment 7 TE-5 Engineer Form 3394 20240428.pdf PDF
Attachment 14 Appendix E RMS 20240428.pdf PDF
Ft Cavazos Roofing Solicitation RFP.pdf PDF
Attachment 3 DRAFT TE-1 Roofing Inventory Updated 20241219 (1).xlsx XLSX spreadsheet
Attachment 18 Wage Determinations SCA.pdf PDF
Attachment 2 DRAFT Fort Cavazos Roofing Pricing Workbook.xlsx XLSX spreadsheet
Attachment 15 DRAFT Appendix F Applicable Codes Standards and Regs 20240428.pdf PDF
Attachment 13 DRAFT Appendix D Required Submittal Reports Meetings.pdf PDF
Attachment 7 DRAFT TE-5 Engineer Form 3394 20240428.pdf PDF
Attachment 16 DRAFT Appendix G Acronyms and Definitions 20240428.pdf PDF
Attachment 18 Wage Determinations DBA 1.pdf PDF
Attachment 9 DRAFT Appendix A Technical Exhibits.pdf PDF
Attachment 8 DRAFT TE-6 Roof Preventive Maintenance Checklists 20240814.pdf PDF
Attachment 17 DRAFT Appendix H Service Order Process 20240830.pdf PDF
Attachment 10 DRAFT Appendix B.1 SSHO_Designation_Eng_Form_6282_2023Aug28 (1).pdf PDF
Attachment 14 DRAFT Appendix E RMS 20240428.pdf PDF
Attachment 4 DRAFT TE-2 Roof Preventive Maintenance Requirements 20240814.pdf PDF
Attachment 11 DRAFT Appendix B.2 APP Worksheet Eng_Form_6293_Aug 2024 - FINAL (1).pdf PDF
DRAFT Ft Cavazos Solicitation RFP W912DY25R0008.pdf PDF
Attachment 6 DRAFT TE-4 Service Order Forms 20240428.pdf PDF
Attachment 12 DRAFT Appendix C Performance Requirement Summary.pdf PDF
Attachment 18 Wage Determinations DBA 2.pdf PDF
Attachment 1 DRAFT PWS - FY25 B1 Fort Cavazos Roofing Services 20240830.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Technical Exhibit 4 FY25 B1 Fort Cavazos Roofing Services Monthly Progress Report

Monthly Report Template

Base Ops Program U.S. Army Corps of Engineers- Engineering and Support Center, Huntsville

Monthly Status Report

Contract No. W912DY-XX-X-XXXX

Submission Date: Date/ Month/ Year

Submitted By:

Company Name

Digital Signature

TABLE OF CONTENTS

1.0 CURRENT AVAILABLE FUNDS

2.0 SERVICE ORDER OVERVIEW

3.0 PREVENTATIVE MAINTENANCE OVERVIEW

4.0 SAFETY

5.0 PHOTOGRAPHS

6.0 SCHEDULE

7.0 TOP 10 MAINTENANCE REPAIR ITEMS (to identify trends)

8.0 POINTS OF CONTACT

9.0 APPENDICES

Appendix A - Safety Report Appendix B - Photographs (Before and after with SO# and short description) Appendix C - Schedule

1.0 CURRENT AVAILABLE FUNDS

CLIN Amount Balance (Approved

SOs) Balance

(Submitted SOs)

Comments

2.0 SERVICE ORDER OVERVIEW

Service Order Overview- Up to date current option

SO Category Number of SOs

Total Cost

Requested by /Submitted to Customer In preparation (working to submit) Submitted to HNC Approved by HNC Executed (work completed) Disapproved / Cancelled by customer or HNC In-Progress (working in field) Average Days of Completion

Service Order Metrics- During this Period SO Category RSO ESO Urgent Long Lead Total Cost

Requested by /Submitted to Customer In preparation (working to submit) Submitted to HNC:

Approved by HNC Executed (work completed) Disapproved / Cancelled by customer or HNC In-Progress (working in field) Average Days of Completion

3.0 PREVENTATIVE MAINTENANCE OVERVIEW

Table 1 Required & Completed Maintenance Visits Up to Date Current Option

Description Facility

ID

Monthly Quarterly Semi-Annual Annual Required Completed

Required Completed Required Completed Required Completed

Table 1 Required & Completed Maintenance Visits Completed during this period

Description Facility

ID

Monthly Quarterly Semi-Annual Annual Required Completed

Required Completed Required Completed Required Completed

4.0 SAFETY

A. Reportable Incidents this period:

B. Safety training/briefings this period and attendees: Safety reports are included in Appendix A.

5.0 PHOTOGRAPHS

Representative photographs of maintenance repair work are included in Appendix B.

6.0 SCHEDULE

The updated schedule for anticipated CM work is included in Appendix C.

7.0 TOP 10 MAINTENANCE REPAIR ITEMS (to identify trends)

Rank Maintenance/Repair Number

8.0 POINTS OF CONTACT

Contractor Maintenance Manager - Johnny Smith, 555-555-5555, johnny.smith@abc.com

9.0 APPENDICES

Appendix A - Safety Report

Appendix B - Photographs (Before and after with SO# and short description)

Appendix C - Schedule

1.0 CURRENT AVAILABLE FUNDS
2.0 SERVICE ORDER OVERVIEW
3.0 PREVENTATIVE MAINTENANCE OVERVIEW
4.0 SAFETY
5.0 PHOTOGRAPHS
6.0 SCHEDULE
7.0 TOP 10 MAINTENANCE REPAIR ITEMS (to identify trends)
8.0 POINTS OF CONTACT
9.0 APPENDICES
Appendix A - Safety Report
Appendix B - Photographs (Before and after with SO# and short description)
Appendix C - Schedule

File details come from the government source that posted it. Updated .