This document is a Structural Interior Design (SID) Type B-3 Submittal for the ME ANG Fuel Cell Hangar project at Bangor Air National Guard Base in Maine (Project No. FKNN159044), prepared by BlairRemy Architects and Otie Merrick in August 2025.
The submittal establishes comprehensive interior design standards for a new 101st Air Refueling Wing fuel cell hangar facility. The design incorporates a cool, analogous color scheme with materials prioritizing durability, appearance retention, and sustainability. Color blocking is utilized as a visual cue to maintain personnel flow from dirty to clean areas, with green-painted partitions in clean spaces and gray-painted partitions in dirty areas. Key interior finishes include lay-in acoustic ceiling tiles in offices and corridors; moisture and mold-resistant gypsum board in wet areas; exposed painted structure in the hangar bay, tool room, and support areas. Flooring specifications vary by space: 5-coat fuel-resistive epoxy with slip-resistant finish in vestibules, corridors, hangar bay, tool room, and restrooms per UFC 4-211-01; sheet linoleum in the supervisor's office; and static-dissipative vinyl tile in the communications room. Restrooms feature porcelain tile wainscot with full-height tile at lavatories, solid phenolic toilet partitions, acrylic shower basins, and solid surface material surrounds. The multipurpose room includes plastic laminate casework, solid surface countertops, and porcelain tile backsplash. Stainless-steel corner guards protect exposed gypsum board corners. Interior signage complies with UFC 3-120-01, including confined space, PSI notification, and eyewash/shower station signage within the hangar bay. The submittal includes finish material samples, architectural floor plans, interior elevations, room finish schedules, casework sections, and detailed signage specifications with mounting requirements and location plans across multiple areas of the facility.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ME ANG Fuel Cell Hangar
Bangor, Maine
Project Number: FKNN159044
SID Package— Type B-3 Submittal
AUGUST 2025
Prepared for:
Maine Air National Guard
Prepared by:
601 NE 63rd Street
Oklahoma City, OK 73105
5970 Greenwood Plaza Boulevard
Greenwood Village, CO 80111
This page intentionally left blank.
Structural Interior Design (SID)
Project No. FKNN159044
TABLE OF CONTENTS
PART 1— SID NARRATIVE
PART 2—INTERIOR FINISH SAMPLES
PART 3—DRAWINGS
Finish Materials List Floor Pattern Plans Striping Plans Room Finish Schedule Interior Elevations Casework Sections Signage
Project No. FKNN159044
PART 1
SID NARRATIVE
Project No. FKNN159044
SID NARRATIVE
DESIGN REFERENCES:
ANGETL 15-01 Air National Guard Design Policy
ANGETL 10-03 Air National Guard Design Objectives and Procedures
UFC 3-120-01 Design: Sign Standards, with Change 4
UFC 3-120-10 Interior Design, with Change 2
UFC 4-211-01 Aircraft Maintenance Hangars
UFC 4-211-02 Aircraft Corrosion Control and Paint Facilities
101 CES/CE Memorandum for Paint Standardization
101 CES/CE Memorandum for Flooring Standardization
101 CES/CE Memorandum for Acoustical Ceiling Tiles
INTRODUCTION:
This project will provide a Fuel Cell Hangar for the 101st Air Refueling Wing (101 ARW) of the Maine Air
National Guard (ME ANG). The new facility will include a Hangar Bay, clean and dirty restrooms and showers, Tool Room, Supervisor’s Office, Multipurpose Room which will function as both a break room and open office, and building support spaces.
COMPREHENSIVE INTERIOR DESIGN (CID)
The goal of the Comprehensive Interior Design (CID) for the new Fuel Cell Hangar is to create a safe, functional, and attractive space in which to carry out the mission of 101 ARW.
FURNITURE, FIXTURES AND EQUIPMENT (FF&E)
The FF&E package has been provided under a separate cover.
EXTERIOR FINISHES
The Exterior Finish package has been provided under a separate cover.
STRUCTURAL INTERIOR DESIGN (SID).
The design of the project includes the selection and coordination of interior and exterior materials and finishes.
These finishes have been selected from a cool, analogous color scheme compatible with the character of the surrounding facilities. Materials and finishes selected prioritize durability, appearance retention and sustainability.
Project No. FKNN159044
Color blocking has been utilized as a visual cue to assist in maintaining the flow of personnel from dirty to clean areas of the facility. Partitions in rooms designated as clean spaces will receive a green painted finish, and those occurring in rooms designated as dirty will receive gray.
Exposed outside gypsum wall board corners will receive stainless-steel corner guards.
Ceilings, Doors, and Windows
Lay-in Acoustic Ceiling Tile (ACT) will be provided in the Supervisor’s Office, Multipurpose Room, and
Corridors. Moisture and mold resistant gypsum board will be used in all wet areas, such as Restrooms, Showers, and Locker Rooms. Gypsum board will also be provided in the Vestibule and Comm Room. The
Hangar Bay, Tool Room, Janitor Closet, and building support areas will be exposed to the structure above and painted.
Doors will have metal leaves, and both doors and windows will have metal frames. All will receive a painted finish. Windows will receive an Soild Surface Material (SSM) sill to provide a durable and maintainable surface. Light filtering roller shades will be provided at all windows for visual privacy and glare control.
Vestibules and Corridors
Both corridors provide direct access to the Hangar Bay; they will receive a 5-coat, fuel-resistive epoxy flooring with slip resistant finish in accordance with UFC 4-211-01. A recessed entry mat will be provided at the Vestibule, and both spaces will receive resilient rubber wall base, and painted partitions.
Supervisor’s Office (Clean)
The private office will receive sheet linoleum flooring in accordance with Installation standards, along with resilient rubber wall base, and painted partitions.
Multipurpose Room
The multipurpose will serve as an open office space, and a break room. Finishes will include sheet linoleum flooring, resilient rubber wall base, painted partitions, plastic laminate casework, SSM countertops, and a porcelain tile backsplash.
Restrooms, Showers, and Locker Rooms
Restrooms, Showers, and Locker Rooms will receive epoxy flooring with slip resistant finish, and porcelain tile wainscot with painted moisture and mold resistant gypsum board above. Full height wall tile will be installed at lavatories to eliminate the need for spacers when installing mirrors and other wall mounted accessories.
SSM surround will be provided at shower stalls as well as acrylic shower basins. Toilet and urinal partitions will be solid phenolic material. Dual-height lockers and benches will be provided in the Locker Rooms.
Wall paint and partitions will follow the color blocking system described above.
Project No. FKNN159044
Hangar Bay and Tool Room
Both rooms will receive 5-coat, fuel-resistive epoxy flooring with slip resistant finish in accordance with UFC 4-211-
01. Partitions in the Hangar Bay will be concrete masonry units (CMU), with prefinished insulated metal panels above. CMU partitions have also been planned for the Tool Room. Masonry will receive a gray painted finish to better mask soiling and signs of wear, and wall base will not be provided as it is not necessary.
The Hangar Bay will be receive safety markings in accordance with UFC 4-211-01.
Janitor
The Janitor Closet will receive sealed concrete flooring, resilient rubber wall base, and painted partitions. A stainless-steel floor sink will be provided to minimize periodic maintenance as is required by terrazzo. Fiber-
Reinforced Plastic (FRP) panels will be used around the floor sink protect the surrounding wall board from impact and/or water damage.
Comm Room
The Comm Room will receive Static-Dissipative (SD) vinyl tile, resilient rubber wall base, painted partitions, and unpainted, fire-retardant plywood to serve as a substrate for wall mounted equipment.
Signage
Signage will be provided in the interior of the building in accordance with UFC 3-120-01. Confined space signage will be provided at the hangar door pockets, PSI notification signage will be provided at all air hose reel locations in the Hangar Bay, and eye wash/shower notification signage will be provided at all instances in the Hangar Bay.
Refer to the Exterior Finishes package for exterior signage.
Project No. FKNN159044
PART 2
INTERIOR FINISH SAMPLES
Project No. FKNN159044
PART 3
DRAWINGS
| Table of Contents |
| Part 1 - SID Narrative |
| Part 2 - Interior Finish Samples |
| Part 3 - Drawings |