Attachment 7 - Template - AF 3064 - Progress Schedule.xlsx

XLSX spreadsheet 60 KB Posted

Attached to
Design and Build Covered Parking Structure for Fighter Aircraft
Solicitation number
FA664826Q0009
Issued by

About this file

This is a template for the Air Force Form 3064, Contract Progress Schedule, which contractors must submit to track and report work progress on construction and service contracts.

The form serves as a planning and monitoring tool for contract performance, requiring contractors to identify major work elements, assign percentage allocations to each element based on their proportion of the total job, and plot planned progress across the contract performance period in weekly or other specified intervals. Contractors must submit three copies of the completed form to the contracting officer at times specified in the contract. The form includes 16 lines for work elements (such as excavation, concrete work, carpentry, engineering, and installation), with columns A through Q representing contract periods. The instructions require contractors to show cumulative progress using a dotted or broken line graph overlay, with the line beginning at the lower left corner and extending to 100% completion at the anticipated end date. If contract modifications alter the original schedule, completion date, or scope of work, contractors must submit a revised progress schedule for contracting officer approval and clearly mark it as "First Revised Schedule," "Second Revised Schedule," and so forth. Contractors are also required to submit AF Form 3065, Contract Progress Report, at intervals established by the contracting officer to document the actual percentage of work accomplished for each element during reporting periods. The form includes spaces for contract number, starting and completion dates, project title, purchase request number, project number, actual starting and completion dates, contractor name and signature, and approval signatures from the installations engineer and contracting officer.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF3064 PAGE 1

CONTRACT PROGRESS SCHEDULEForm Approved
(See Contractor's Instructions on Reverse)OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response. Including the time for reviewing instructions, searching existing data sources, gathering maintaining the data needed, and completing and reviewing
the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department Defense of Washington Headquarters Services, Directorate for information
Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188. Washington DC 20503. Please DO NOT RETURN your (form questionnaire) to
either of these addresses. Send your completed (form questionnaire) to: SAF AQCO. Washington DC 20330-1000.
1. CONTRACT NO.8. PROJECT TITLE10. APPROVAL RECOMMENDED BY:
Aircraft Fire Training Facility (B218) HARB, FLDATE SIGNEDINSTALLATIONS ENGINEERS'S SIGNATURE
2. STARTING DATE
3. COMPLETION DATE9. SUBMITTED BY:
4. PURCHASE REQUEST NO.DATE SIGNEDCONTRACTOR'S NAME (Last, First, Middle Initial)CONTRACTOR'S SIGNATURE11. APPROVED BY:
5. PROJECT NO.ADDRESS (Street, City, State, Zip Code)DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE
6. ACTUAL STARTING DATE
7. ACTUAL COMPETION DATE
LINE NO.WORK ELEMENTS%0/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/2019
ABCDEFGHIJKLMNOPQ
1Work Elements

2 Work Elements

3 Work Elements

4 Work Elements

5 Work Elements

6 Work Elements

7 Work Elements

8 Work Elements

9 Work Elements

10 Work Elements

11 Work Elements

12 Work Elements

13 Work Elements

14 Work Elements

15 Work Elements

16 Work Elements

17 Work Elements

18 Work Elements

19 Work Elements

20 Work Elements

21 Work Elements

22 Work Elements

27 Work Elements

28 Work Elements

29 Work Elements

PER PERIOD0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
TOTAL0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
AF Form 3064, JUN 90 PREVIOUS EDITION IS OBSOLETE

AF3064 PAGE 2

CONTRACT PROGRESS SCHEDULEForm Approved
(See Contractor's Instructions on Reverse)OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response. Including the time for reviewing instructions, searching existing data sources, gathering maintaining the data needed, and completing and reviewing
the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department Defense of Washington Headquarters Services, Directorate for information
Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188. Washington DC 20503. Please DO NOT RETURN your (form questionnaire) to
either of these addresses. Send your completed (form questionnaire) to: SAF AQCO. Washington DC 20330-1000.
1. CONTRACT NO.8. PROJECT TITLE10. APPROVAL RECOMMENDED BY:
MHMV 170086 Repair Oil/Water Separator, H1001DATE SIGNEDINSTALLATIONS ENGINEERS'S SIGNATURE
2. STARTING DATE
3. COMPLETION DATE9. SUBMITTED BY:
4. PURCHASE REQUEST NO.DATE SIGNEDCONTRACTOR'S NAME (Last, First, Middle Initial)CONTRACTOR'S SIGNATURE11. APPROVED BY:
5. PROJECT NO.ADDRESS (Street, City, State, Zip Code)DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE
6. ACTUAL STARTING DATE
7. ACTUAL COMPETION DATE
LINE NO.WORK ELEMENTS%0/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/20190/0/2019
ABCDEFGHIJKLMNOPQ
1Work Elements

2 Work Elements

3 Work Elements

4 Work Elements

5 Work Elements

6 Work Elements

7 Work Elements

8 Work Elements

9 Work Elements

10 Work Elements

11 Work Elements

12 Work Elements

13 Work Elements

14 Work Elements

15 Work Elements

16 Work Elements

17 Work Elements

18 Work Elements

19 Work Elements

20 Work Elements

21 Work Elements

22 Work Elements

27 Work Elements

28 Work Elements

29 Work Elements

PER PERIOD0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
TOTAL0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
AF Form 3064, JUN 90 PREVIOUS EDITION IS OBSOLETE

AF3064 Back

INSTRUCTIONS TO CONTRACTORS
1. Prepare three copies of AF Form 3064, in accordance with these instructions and submit to the contracting officer at the time stated in the contract or as established
by the contracting officer.

2. Blocks 1,2, and 3. Enter the contract number, starting date, and completion date as shown on the contract.

3. Block 8. Enter the title of the project as shown on the contract.

4. Block 9. Enter the name and address of your firm. The three copies submitted to the contracting officer must be dated and signed by the contractor or an authorized
representative of the firm.
5. Lines 1 through 16. Major elements of work (whether unit price or lump sum contract) such as excavation, concrete work, carpentry, engineering, installation of
communication electronic facilities, etc., will be shown in Column B in logical sequence and in sufficient detail to identify the element.
6. The percentage of each listed work element to the complete job will be shown opposite each element in Column C. As an example, if 3 work elements are shown:
excavation, concrete work, and backfill, and it is estimated that excavation is 50% of the total job, concrete 30%, and backfill 20%, these percentages will be shown
opposite each element. The total must equal 100%.
7. Columns D through Q will be used to show planned periodic progress, as required by the contracting officer, during the period of the contract. Only the top half of the
space under these columns will be used by contractors. Using the example cited above and assuming that the contract period for performance is 8 weeks, and it
is planned to accomplish 10% of the excavation work the 1st week and 20% each week until excavation is complete, 10 would be shown in the upper half of Line 1
under Column D, 20 under Column E and 20 under Column F for a total of 50%. If it is planned to accomplish the concrete work during the 4th, 5th, and 6th weeks
in equal amounts, 10 would be enteredd under columns G, H, and I on Line 2. Assuming the backfill will be accomplished during the 7th and 8th weeks, 10 would be
entered under Columns J and K on Line 3. If the contract extends beyond 14 weeks, additional copies of AF Form 3064, with appropriate alterations, may be spliced on
as a continuation of performance record.
8. Total amount or work planned at intervals as shown in Columns D through Q will be totaled and entered in the top half of the space under the appropriate column on
Line 16. Again, using the example cited above, the totals under Column D through K would read 10, 20, 20, 10, 10, 10, 10, 10, for a total of 100%. These totals will be
used to lot an overlay graph using Lines 67 through 15, beginning with Column D and extending to the right that number of columns (weeks) authorized by the contract
for performance time.
9. Beginning at the lower left corner, Line 15, Column D, the graph will be plotted using a broken or dotted line showing the cumulative total progress for planned intervals.
Again, using the example cited above, the dotted line would, for the 1st week, extend from Line 15 to Line 14 under Column D for 10%. The second week the dotted line
would extend from Line 14 to Line 12 under Column E for 20%, making a cumulative total of 30%. The dotted line should end (100%) at the intersection of Line 5 and
Column K.
10. In the event the contract is modified by the contracting officer under terms of the contract, changing the progress of work as originally scheduled, adding or deleting
work or changing the original completion date, a revised progress schedule will be prepared and submitted to the contracting officer for approval. In preparing the revised
schedule, the amount of work completed will be considered, together with the changed new completion date set forth in the contract modification. Considering these
factors, the work under the contract will be rescheduled over the new total performance time in the same The new completion date will be entered in Block 3.
"First Revised Schedule," "Second Revised Schedule," etc., will be entered immediately underneath the form title. Time of submission of the revised schedule will be
determined by the contracting officer.
11. At such, intervals as may be established by the contracting officer, the contractor will submit to the contracting officer AF Form 3065 "Contract Progress Report,"
indicating the percentage of work accomplished for each work element during the established reporting period. Accurate reports are of the utmost importance to the
contractor and th the Government, since the percentage of completion, or progress, thus reported is used in administration of the contract and maybe used in connection
with approval of partial payments under the contract. Care should be taken to plan the work in such manner that it can be accomplished as stated in this schedule. If for
any reason it becomes known that any part of the progess under this contract will be delayed, this fact should be reported to the contracting officer immediately.

AF FORM 3064, JUN 90 (REVERSE)