Attachment 4 - AF66 Schedule of Material Submittal.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Design and Build Covered Parking Structure for Fighter Aircraft
Solicitation number
FA664826Q0009
Issued by

About this file

This is a Schedule of Material Submittals form (AF Form 66) template used to track and manage contractor submissions throughout a construction project lifecycle. The form is designed for the Air Force and serves as a control document for monitoring required documentation from contractors, including shop drawings, samples, certifications, calculations, test reports, warranties, and as-built documentation. The schedule identifies 11 primary submittal line items relevant to the covered aircraft parking structure project, including framing components, structural calculations, compaction reports, concrete testing, steel coating, pavement striping, roof fabric, grounding systems, as-built drawings, operations and maintenance manuals, and warranties.

The form requires the project engineer and contract administrator to complete project identification information and specifies submission requirements by item type and number of copies needed. Each line item includes columns for tracking the submission date, date received by contracting, date forwarded to civil engineering, return suspense date, submittal numbers, contractor notification date, resubmittal dates, and final approval status with remarks. The form explicitly notes that submittals are not limited to the listed items and that contractors must submit all documents required by the relevant overarching contract, Air Force Instructions (AFIs), Unified Facilities Criteria (UFCs), and Unified Facilities Guides Specifications (UFGS). This control mechanism ensures compliance with design specifications and contract requirements throughout the design and construction phases of the covered parking structure project.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER : PROJECT TITLE: SOLICITATION CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSREPORTOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS-APPROVED
1Framing Componantsxxx
2Structural Calculationsx
3Compaction Reportsx
4Concrete Testingx
5Steel Coatingxx
6Pavement Stripingxx
7Roof Fabricxx
8Ground Rods and Conductorsx
9As-Builtsx
10O&M Manualsx
11Warrantyx
NOTE: SUBMITTALS ARE NOT LIMITED TO ITEMS ON THIS LIST. CONTRACTOR SHALL SUBMIT TO GOVERNMENT ALL DOCUMENTS REQUIRED BY RELEVANT OVERARCHING CONTRACT, AFIs, UFCs AND UFGS'.

&"Small Fonts,Bold"&6AF Form 66, Oct 89 &"Small Fonts,Regular"&5PREVIOUS EDITION WILL BE USED