Attachment 5 - Construction Cost Estimate.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Design and Build Covered Parking Structure for Fighter Aircraft
Solicitation number
FA664826Q0009
Issued by

About this file

This is a construction cost estimate template in spreadsheet format for a design-build covered parking structure project. The document outlines the bid form structure and line items that contractors must use when submitting pricing proposals for Solicitation FA6648-26-Q-0009, issued by the Department of the Air Force Reserve Command for Homestead Air Reserve Base in Homestead, Florida. The cost estimate template breaks down major project phases and activities, including site investigation and visits, concept design through final design (65%, 95%, and 100% completion stages), mobilization, and construction activities such as excavation, soil grading and compaction, footings, columns, lightning protection, canopy installation, striping and ground work, and final inspection and closeout. Contractors are required to provide rationale and technical approach documentation alongside their bid form activity costs and must address bonding requirements as separate line items. This template establishes the standardized format for pricing the two covered aircraft parking structures being procured under the 100% Competitive Small Business Set Aside with a size standard of $45 million, under NAICS code 236220 for Commercial and Institutional Building Construction, with an estimated period of performance of 365 calendar days from the Notice to Proceed.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

ActivityCostsRationale / Technical Approach
Bonding
Site Visit / Investigations
Concept Design
65% Design
95% Design
100% Design (IFC)
Mobilization
Excavation
Soil grading & compaction
Footings
Columns
Lightning Protection
Canopy
Striping & Ground work
Final Inspection & Closeout

Total