Attachment 7 - Pricing Worksheet.xlsx
XLSX spreadsheet 3 MB Posted
- Solicitation number
- W912DY26RA002
About this file
This file is a detailed Pricing Worksheet for a Department of the Army fuels maintenance contract covering 16 Army sites across the South Atlantic Division, including locations in Virginia, North Carolina, South Carolina, Georgia, Florida, Alabama, Mississippi, Puerto Rico, and the U.S. Virgin Islands. The worksheet breaks down pricing across multiple Contract Line Item Numbers (CLINs) including quarterly, semi-annual, and annual preventative maintenance, corrective maintenance, other direct costs, irregular maintenance, and detachable pantograph maintenance for a base year and three option years with a potential 6-month extension.
The total estimated contract value is $44,538,415.00, with pricing structured across different maintenance categories such as equipment repairs, component replacements, markings, joint sealant, crack repair, and touch-up coating. The contract includes comprehensive maintenance for fuel storage and distribution systems, covering tasks like replacing valves, hoses, gauges, electrical components, and performing surface repairs. Key sites include Anniston Army Depot, Fort Blanding, Fort Benning, Fort Bragg, and multiple other military installations, with maintenance activities scheduled from August 2026 through February 2030.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| CONTRACTOR: | Input Contractor Name | |||||
| SOLICITATION REFERENCE NUMBER: | Input Solicitation Number | |||||
| DATE | Input Submittal Date | |||||
| INSTRUCTIONS- Complete instructions for each tab of the pricing worksheet. The Offeror is instructed to complete the provided fields in GREEN for each tab of the pricing worksheet. Pricing within the Summary tab is populated from the CLIN ROLL UP TAB. All pricing cells on this sheet are automated. | ||||||
| PREVENTATIVE AND CORRECTIVE MAINTENANCE SUMMARY | ||||||
| CLIN X001 - QUARTERLY PREVENTATIVE MAINTENANCE | Total | |||||
| BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT | CLIN X001 | |
| CLIN X001 TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - |
| CLIN X002 - SEMI ANNUAL PREVENTATIVE MAINTENANCE | Total | |||||
| BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT | CLIN X002 | |
| CLIN X002 TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - |
| CLIN X003 - ANNUAL PREVENTATIVE MAINTENANCE | Total | |||||||||||
| BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT | CLIN X003 | |||||||
| CLIN X003 TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - | 19512991.3333333 | |||||
| 20279510.9866667 | 19512991.3333333 | 20279510.9866667 | 21076691.4261333 | 21905759.0831787 | 22767989.4465058 | |||||||
| CLIN X004 - CORRECTIVE MAINTENANCE- DO NOT PRICE | Total | 21076691.4261333 | ||||||||||
| CLIN X004 TOTAL: | BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT | CLIN X004 | 21905759.0831787 | |||||
| $44,538,415.00 | 22767989.4465058 | |||||||||||
| ESTIMATED - FOR EVALUATION PURPOSES ONLY |
| CLIN X005 - OTHER DIRECT COSTS | Total | ||||||
| BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT | CLIN X005 | 0.05 | |
| CLIN X005 TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - |
| CLIN X006 - IRREGULAR PREVENTATIVE MAINTENANCE | Total | |||||
| BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT | CLIN X006 | |
| CLIN X006 TOTAL: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - |
| CLIN X007 - DETACHABLE PANTOGRAPH PREVENTATIVE MAINTENANCE | ||||||
| BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT | Total | |
| CLIN X007 TOTAL: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - |
TOTAL: $ - $ - $ - $ - $ - $ 44,538,415
CUI
POJ IGE
&A
CUI
CLIN ROLL UP
| INSTRUCTIONS - Complete the provided fields in GREEN. This section identifies a roll-up of all other sections in this pricing worksheet. Pricing at this level must be rounded to the nearest cent. The CLIN Roll-Up totals in this section are transferred to the summary section which identifies the overall cost proposed for this Task Order. Note: Pricing within this sheet is populated from pricing data from each CLIN tab. The Contractor is responsible for ensuring all pricing of CLINs, calculations, and other added cells are captured correctly in the CLIN Roll-Up section. The pricing presented here governs at award. | ||||||
| CLIN ROLL-UP | ||||||
| Contractor: | ||||||
| Solicitation Number: | ||||||
| Total Estimated Hours: | hrs | |||||
| CLIN X001 - QUARTERLY PREVENTATIVE MAINTENANCE | ||||||
| KEY PERSONNEL TOTALS: | BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SITE | DLA SITE CODE | RPSUID | SERVICE | BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT |
| TOTAL PREVENTATIVE MAINTENANCE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Anniston Army Depot | AAD | 3817 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CTA Camp McCain | CMG | 4606 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Morrisville | MSL | 6280 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Salisbury | SAL | 7134 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Rucker | RCK | 5046 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Benning | BNG | 4984 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Bragg | POP | 4987 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Santiago | STG | 6316 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Soto Cano | SCN | 170286 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Buchanan | BCH | 4988 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X002 - SEMI ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL TOTALS: | BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SITE | DLA SITE CODE | RPSUID | SERVICE | BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT |
| TOTAL PREVENTATIVE MAINTENANCE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Anniston Army Depot | AAD | 3817 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CTA Camp McCain | CMG | 4606 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Morrisville | MSL | 6280 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Salisbury | SAL | 7134 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Rucker | RCK | 5046 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Benning | BNG | 4984 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Bragg | POP | 4987 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Santiago | STG | 6316 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Soto Cano | SCN | 170286 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Buchanan | BCH | 4988 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X003 - ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL TOTALS: | BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SITE | DLA SITE CODE | RPSUID | SERVICE | BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT |
| TOTAL PREVENTATIVE MAINTENANCE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Anniston Army Depot | AAD | 3817 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CTA Camp McCain | CMG | 4606 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Morrisville | MSL | 6280 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Salisbury | SAL | 7134 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Rucker | RCK | 5046 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Benning | BNG | 4984 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Bragg | POP | 4987 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Santiago | STG | 6316 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Soto Cano | SCN | 170286 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Buchanan | BCH | 4988 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CORRECTIVE MAINTENANCE PRICE LIST | ||||||
| CATEGORY | BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT | |
| TOTAL: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Air eliminators | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Bollards - Repair includes Prep and Recoat one Bollard up to 6" diameter and 48" tall or provide plastic cover for same. Applicable markings are included as part of repair. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Deadman (Hydraulic) - Includes replacement of Deadman Handle and Cord/Hose. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Deadman (Electronic) - Includes replacement of Deadman Handle and Cord/Hose. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Dispenser Breakaway Connections - Includes Replacement of 1 Breakaway for Hoses ≤ 2". | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Dispenser Hose Retractors - Includes Replacement of 1 Retractor ≤ 10' in length. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Dispenser Hose Swivels - Includes Replacement of 1 Swivel for Hoses ≤ 2". | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Dispenser Nozzles - Includes Replacement of 1 Dispenser Nozzle for Hoses ≤ 2". | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Flange Isolation Kit - 1 Repair includes complete isolation kit for a flanged connection (Gasket, Sleeves, Insulating Washers, etc.) for up to 8" piping. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Flow Indicator Sight Glass Replacement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fuel Hoses 2-4 inches Diameter - Repair includes providing 1 hose 2 to 4 inches in diameter and less than 20 feet in length. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fuel hoses under 2 inches in diameter and less than 20 feet in length - Replacement. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Gauges - Replace 1 Differential Pressure Gauge Replacement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Gauges - Replace 1 Pressure or Pressure/Vacuum Gauges | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Ground Reel - Replace a single heavy duty Static Grounding reel to include 100 feet of 3/32" Nylon coated wire and a heavy duty ground clamp (MIL-C-83413/7). | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hardware Replacement - Repair includes all bolts, nuts, washers, etc. for a flanged connection for piping ≤ 8" in diameter. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hose End Pressure Regulator. Includes Replacing 1 Hose End Pressure Regulator | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Load, Offload, and Refueling Nozzle Replacement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Markings - Misc. System Components (Valves, Pumps, Meters, Hydrant Pit Covers, etc.). Repair Includes Providing Markings for 1 System Component. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Markings - Pipe Markings. A single marking is defined as all required product identification and | ||||||
| directional arrows along a minimum of 25 linear feet. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Markings - Tank Markings - Tanks 420,000 Gallons and Under. 1 Repair includes all markings on tank required by UFC 3-460-01. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Markings - Tank Markings - Tanks over 420,000 gallons. 1 Repair includes all markings on tank required by UFC 3-460-01. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hose and Hydrant System Nozzle / Hose Covers or Dust Caps. 1 Repair includes the hose end cover or dust caps for 1 hose. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes 4" or Less) - PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes > 4")- PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes 4" or Less)- Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure). | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes > 4") - Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure). | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Signage - Repair includes 1 Metal Sign up to 4 SF in Area. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Check Valves (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Check Valves (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Check Valves (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Diaphragm Control Valve (X ≤ 2 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Diaphragm Control Valve (2 Inches < X ≤ 4 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Double Block and Bleed Valve (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Double Block and Bleed Valve (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel). | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Manually Operated Plug (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Manually Operated Plug (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Manually Operated Plug (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel). | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Pressure Relief Valves or Thermal Relief Valves. Repair includes replacement of Pressure or Thermal Relief Valve. (Carbon) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valves, Pressure Relief Valves or Thermal Relief Valves. Repair includes replacement of Pressure or Thermal Relief Valve. (Stainless Steel) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Joint Sealant (Reference PWS 3.4.2.1) - ≤800 LF per Site (16 Sites) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Crack Repair (Reference PWS 3.4.2.1) - ≤800 LF per Site (16 Sites) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Touch-Up Coating Repair (Reference PWS 3.4.2.2) - 200 SF per Site (16 Sites) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X005 - OTHER DIRECT COSTS | ||||||||
| SITE | DLA SITE CODE | RPSUID | SERVICE | BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT |
| TOTAL: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Anniston Army Depot | AAD | 3817 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CTA Camp McCain | CMG | 4606 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Morrisville | MSL | 6280 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Salisbury | SAL | 7134 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Rucker | RCK | 5046 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Benning | BNG | 4984 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Bragg | POP | 4987 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Santiago | STG | 6316 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Soto Cano | SCN | 170286 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Buchanan | BCH | 4988 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X006 - IRREGULAR PREVENTATIVE MAINTENANCE | ||||||||
| SITE | DLA Site Code | RPSUID | SERVICE | BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT |
| TOTAL: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Anniston Army Depot | AAD | 3817 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CTA Camp McCain | CMG | 4606 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Morrisville | MSL | 6280 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Salisbury | SAL | 7134 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Rucker | RCK | 5046 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Benning | BNG | 4984 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Bragg | POP | 4987 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Santiago | STG | 6316 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Soto Cano | SCN | 170286 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Buchanan | BCH | 4988 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X007 - DETACHABLE PANTOGRAPH PREVENTATIVE MAINTENANCE PANTOGRAPH | ||||||||
| SITE | DLA SITE CODE | RPSUID | SERVICE | BASE YEAR | OPT 1 | OPT 2 | OPT 3 (6 MONTH) | 6 MONTH EXT |
| TOTAL PREVENTATIVE MAINTENANCE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Anniston Army Depot | AAD | 3817 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CTA Camp McCain | CMG | 4606 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Morrisville | MSL | 6280 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Salisbury | SAL | 7134 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Rucker | RCK | 5046 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Benning | BNG | 4984 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Bragg | POP | 4987 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MTA Camp Santiago | STG | 6316 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Soto Cano | SCN | 170286 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fort Buchanan | BCH | 4988 | ARMY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&A
CUI
CLIN X001 PM Qrtly INSTRUCTIONS - Complete the provided fields in GREEN. The worksheet is automated and will populate pricing for option years following the Base Year. Note the notice to proceed date for each site and propose according to that start date. After the notice to proceed date, the period of performance date for the site will align with the contract period of performance. Grayed out cells indicate no maintenance activity and should not be calculated (Refer to Appendix I and J). Please refer to the PWS section 1.5.0 Personnel Requirements for key personnel. These personnel are also provided within the Direct Labor Tab.
NOTE – “FAR 52.217-8 Option to Extend Services if exercised shall not exceed the last option year’s rates proposed by the offeror and shall reflect the appropriate level of effort for service activities in that period. The government reserves the right to exercise the “6-month” extension at the end of any ordering period which shall be subject to price adjustments that are commensurate with the appropriate level of effort and in accordance with the rates of the incumbent ordering period by bilateral modification.”
| Escalation Rate: | 0% | ||||
| CLIN 0001 - QUARTERLY PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| 16 | ARMY | $ - 0 | |||
| PREVENETATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-26 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-26 | ARMY | $ - 0 |
| CTA Camp McCain | CMG | 4606 | 7-Aug-26 | ARMY | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-26 | ARMY | $ - 0 |
| Morrisville | MSL | 6280 | 7-Aug-26 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-26 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-26 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-26 | ARMY | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-26 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-26 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-26 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-26 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-26 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-26 | ARMY | $ - 0 |
| Soto Cano | SCN | 170286 | 7-Aug-26 | ARMY | $ - 0 |
| Fort Buchanan | BCH | 4988 | 7-Aug-26 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 1001 - QUARTERLY PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| 16 | ARMY | $ - 0 | |||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-27 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-27 | ARMY | $ - 0 |
| CTA Camp McCain | CMG | 4606 | 7-Aug-27 | ARMY | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-27 | ARMY | $ - 0 |
| Morrisville | MSL | 6280 | 7-Aug-27 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-27 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-27 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-27 | ARMY | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-27 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-27 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-27 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-27 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-27 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-27 | ARMY | $ - 0 |
| Soto Cano | SCN | 170286 | 7-Aug-27 | ARMY | $ - 0 |
| Fort Buchanan | BCH | 4988 | 7-Aug-27 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 2001 - QUARTERLY PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| 16 | ARMY | $ - 0 | |||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-28 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-28 | ARMY | $ - 0 |
| CTA Camp McCain | CMG | 4606 | 7-Aug-28 | ARMY | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-28 | ARMY | $ - 0 |
| Morrisville | MSL | 6280 | 7-Aug-28 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-28 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-28 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-28 | ARMY | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-28 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-28 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-28 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-28 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-28 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-28 | ARMY | $ - 0 |
| Soto Cano | SCN | 170286 | 7-Aug-28 | ARMY | $ - 0 |
| Fort Buchanan | BCH | 4988 | 7-Aug-28 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 3001 (6MN OPTION PERIOD) - QUARTERLY PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| 16 | ARMY | $ - 0 | |||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-29 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-29 | ARMY | $ - 0 |
| CTA Camp McCain | CMG | 4606 | 7-Aug-29 | ARMY | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-29 | ARMY | $ - 0 |
| Morrisville | MSL | 6280 | 7-Aug-29 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-29 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-29 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-29 | ARMY | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-29 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-29 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-29 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-29 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-29 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-29 | ARMY | $ - 0 |
| Soto Cano | SCN | 170286 | 7-Aug-29 | ARMY | $ - 0 |
| Fort Buchanan | BCH | 4988 | 7-Aug-29 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 4001 (6 MN EXTENSION) - QUARTERLY PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| 16 | ARMY | $ - 0 | |||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Feb-30 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Feb-30 | ARMY | $ - 0 |
| CTA Camp McCain | CMG | 4606 | 7-Feb-30 | ARMY | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | 7-Feb-30 | ARMY | $ - 0 |
| Morrisville | MSL | 6280 | 7-Feb-30 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Feb-30 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Feb-30 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Feb-30 | ARMY | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | 7-Feb-30 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Feb-30 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Feb-30 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Feb-30 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Feb-30 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Feb-30 | ARMY | $ - 0 |
| Soto Cano | SCN | 170286 | 7-Feb-30 | ARMY | $ - 0 |
| Fort Buchanan | BCH | 4988 | 7-Feb-30 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
&A
CUI
CLIN X002 PM SemiAnnual INSTRUCTIONS - Complete the provided fields in GREEN. The worksheet is automated and will populate pricing for option years following the Base Year. Note the notice to proceed date for each site and propose according to that start date. After the notice to proceed date, the period of performance date for the site will align with the contract period of performance. Please note Site Names with * indicate sites that ONLY receive semi-annual meter calibration (Refer to Appendix I and J). Grayed out cells indicate no maintenance activity and should not be calculated (Refer to Appendix I and J). Please refer to the PWS section 1.5.0 Personnel Requirements for key personnel. These personnel are also provided within the Direct Labor Tab.
NOTE – “FAR 52.217-8 Option to Extend Services if exercised shall not exceed the last option year’s rates proposed by the offeror and shall reflect the appropriate level of effort for service activities in that period. The government reserves the right to exercise the “6-month” extension at the end of any ordering period which shall be subject to price adjustments that are commensurate with the appropriate level of effort and in accordance with the rates of the incumbent ordering period by bilateral modification.”
| Escalation Rate: | 0% | ||||
| CLIN 0002 - SEMI-ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| Key Personnel | 16 | ARMY | $ - 0 | ||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-26 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-26 | ARMY | |
| CTA Camp McCain | CMG | 4606 | 7-Aug-26 | ARMY | |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-26 | ARMY | |
| Morrisville | MSL | 6280 | 7-Aug-26 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-26 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-26 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-26 | ARMY | |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-26 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-26 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-26 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-26 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-26 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-26 | ARMY | |
| Soto Cano | SCN | 170286 | 7-Aug-26 | ARMY | |
| Fort Buchanan | BCH | 4988 | 7-Aug-26 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 1002 - SEMI-ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| Key Personnel | 16 | ARMY | $ - 0 | ||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-27 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-27 | ARMY | |
| CTA Camp McCain | CMG | 4606 | 7-Aug-27 | ARMY | |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-27 | ARMY | |
| Morrisville | MSL | 6280 | 7-Aug-27 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-27 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-27 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-27 | ARMY | |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-27 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-27 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-27 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-27 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-27 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-27 | ARMY | |
| Soto Cano | SCN | 170286 | 7-Aug-27 | ARMY | |
| Fort Buchanan | BCH | 4988 | 7-Aug-27 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 2002 - SEMI-ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| Key Personnel | 16 | ARMY | $ - 0 | ||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-28 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-28 | ARMY | |
| CTA Camp McCain | CMG | 4606 | 7-Aug-28 | ARMY | |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-28 | ARMY | |
| Morrisville | MSL | 6280 | 7-Aug-28 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-28 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-28 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-28 | ARMY | |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-28 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-28 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-28 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-28 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-28 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-28 | ARMY | |
| Soto Cano | SCN | 170286 | 7-Aug-28 | ARMY | |
| Fort Buchanan | BCH | 4988 | 7-Aug-28 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 3002 (6 MN OPTION PERIOD) - SEMI-ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| Key Personnel | 16 | ARMY | $ - 0 | ||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-29 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-29 | ARMY | |
| CTA Camp McCain | CMG | 4606 | 7-Aug-29 | ARMY | |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-29 | ARMY | |
| Morrisville | MSL | 6280 | 7-Aug-29 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-29 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-29 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-29 | ARMY | |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-29 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-29 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-29 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-29 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-29 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-29 | ARMY | |
| Soto Cano | SCN | 170286 | 7-Aug-29 | ARMY | |
| Fort Buchanan | BCH | 4988 | 7-Aug-29 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 4002 (6 MN EXTENSION) - SEMI-ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| Key Personnel | 16 | ARMY | $ - 0 | ||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Feb-30 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Feb-30 | ARMY | |
| CTA Camp McCain | CMG | 4606 | 7-Feb-30 | ARMY | |
| MTA Camp Shelby | SHB | 6317 | 7-Feb-30 | ARMY | |
| Morrisville | MSL | 6280 | 7-Feb-30 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Feb-30 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Feb-30 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Feb-30 | ARMY | |
| Camp Frank D. Merrill | DGA | 4632 | 7-Feb-30 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Feb-30 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Feb-30 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Feb-30 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Feb-30 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Feb-30 | ARMY | |
| Soto Cano | SCN | 170286 | 7-Feb-30 | ARMY | |
| Fort Buchanan | BCH | 4988 | 7-Feb-30 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
&A
CUI
CLIN X003 PM Annual INSTRUCTIONS - Complete the provided fields in GREEN. The worksheet is automated and will populate pricing for option years following the Base Year. Note the notice to proceed date for each site and propose according to that start date. After the notice to proceed date, the period of performance date for the site will align with the contract period of performance. Grayed out cells indicate no maintenance activity and should not be calculated (Refer to Appendix I and J). Please refer to the PWS section 1.5.0 Personnel Requirements for key personnel. These personnel are also provided within the Direct Labor Tab.
NOTE – “FAR 52.217-8 Option to Extend Services if exercised shall not exceed the last option year’s rates proposed by the offeror and shall reflect the appropriate level of effort for service activities in that period. . The government reserves the right to exercise the “6-month” extension at the end of any ordering period which shall be subject to price adjustments that are commensurate with the appropriate level of effort and in accordance with the rates of the incumbent ordering period by bilateral modification.” For Annual events scheduled to occur in the 6-month extension, event pricing shall not exceed the previous Option Year. Annual events executed within the 6-month extension shall be performed in entirety.
| Escalation Rate: | 0% | ||||
| CLIN 0003 - ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| Key Personnel | 16 | ARMY | $ - 0 | ||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-26 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-26 | ARMY | $ - 0 |
| CTA Camp McCain | CMG | 4606 | 7-Aug-26 | ARMY | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-26 | ARMY | $ - 0 |
| Morrisville | MSL | 6280 | 7-Aug-26 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-26 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-26 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-26 | ARMY | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-26 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-26 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-26 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-26 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-26 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-26 | ARMY | $ - 0 |
| Soto Cano | SCN | 170286 | 7-Aug-26 | ARMY | $ - 0 |
| Fort Buchanan | BCH | 4988 | 7-Aug-26 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 1003 - ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| Key Personnel | 16 | ARMY | $ - 0 | ||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-27 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-27 | ARMY | $ - 0 |
| CTA Camp McCain | CMG | 4606 | 7-Aug-27 | ARMY | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-27 | ARMY | $ - 0 |
| Morrisville | MSL | 6280 | 7-Aug-27 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-27 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-27 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-27 | ARMY | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-27 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-27 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-27 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-27 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-27 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-27 | ARMY | $ - 0 |
| Soto Cano | SCN | 170286 | 7-Aug-27 | ARMY | $ - 0 |
| Fort Buchanan | BCH | 4988 | 7-Aug-27 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 2003 - ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| Key Personnel | 16 | ARMY | $ - 0 | ||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-28 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-28 | ARMY | $ - 0 |
| CTA Camp McCain | CMG | 4606 | 7-Aug-28 | ARMY | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-28 | ARMY | $ - 0 |
| Morrisville | MSL | 6280 | 7-Aug-28 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-28 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-28 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-28 | ARMY | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-28 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-28 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-28 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-28 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-28 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-28 | ARMY | $ - 0 |
| Soto Cano | SCN | 170286 | 7-Aug-28 | ARMY | $ - 0 |
| Fort Buchanan | BCH | 4988 | 7-Aug-28 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 3003 (6 MN OPTION PERIOD) - ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| Key Personnel | 16 | ARMY | $ - 0 | ||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Aug-29 | ARMY | $ - 0 |
| MTC Camp Blanding | BLD | 6326 | 7-Aug-29 | ARMY | $ - 0 |
| CTA Camp McCain | CMG | 4606 | 7-Aug-29 | ARMY | $ - 0 |
| MTA Camp Shelby | SHB | 6317 | 7-Aug-29 | ARMY | $ - 0 |
| Morrisville | MSL | 6280 | 7-Aug-29 | ARMY | $ - 0 |
| Salisbury | SAL | 7134 | 7-Aug-29 | ARMY | $ - 0 |
| Fort Rucker | RCK | 5046 | 7-Aug-29 | ARMY | $ - 0 |
| Fort Benning | BNG | 4984 | 7-Aug-29 | ARMY | $ - 0 |
| Camp Frank D. Merrill | DGA | 4632 | 7-Aug-29 | ARMY | $ - 0 |
| Hunter Army Airfield | HUN | 5502 | 7-Aug-29 | ARMY | $ - 0 |
| Fort Bragg | POP | 4987 | 7-Aug-29 | ARMY | $ - 0 |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Aug-29 | ARMY | $ - 0 |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Aug-29 | ARMY | $ - 0 |
| MTA Camp Santiago | STG | 6316 | 7-Aug-29 | ARMY | $ - 0 |
| Soto Cano | SCN | 170286 | 7-Aug-29 | ARMY | $ - 0 |
| Fort Buchanan | BCH | 4988 | 7-Aug-29 | ARMY | $ - 0 |
| TOTALS: | $ - 0 |
| CLIN 4003 (6 MN EXTENSION) - ANNUAL PREVENTATIVE MAINTENANCE | |||||
| KEY PERSONNEL | |||||
| SITES | SERVICE | Total | |||
| Key Personnel | 0 | ARMY | $ - 0 | ||
| PREVENTATIVE MAINTENANCE | |||||
| SITE NAME | DLA SITE CODE | RPSUID | NOTICE TO PROCEED DATE | SERVICE | TOTAL |
| Anniston Army Depot | AAD | 3817 | 7-Feb-30 | ARMY | |
| MTC Camp Blanding | BLD | 6326 | 7-Feb-30 | ARMY | |
| CTA Camp McCain | CMG | 4606 | 7-Feb-30 | ARMY | |
| MTA Camp Shelby | SHB | 6317 | 7-Feb-30 | ARMY | |
| Morrisville | MSL | 6280 | 7-Feb-30 | ARMY | |
| Salisbury | SAL | 7134 | 7-Feb-30 | ARMY | |
| Fort Rucker | RCK | 5046 | 7-Feb-30 | ARMY | |
| Fort Benning | BNG | 4984 | 7-Feb-30 | ARMY | |
| Camp Frank D. Merrill | DGA | 4632 | 7-Feb-30 | ARMY | |
| Hunter Army Airfield | HUN | 5502 | 7-Feb-30 | ARMY | |
| Fort Bragg | POP | 4987 | 7-Feb-30 | ARMY | |
| Military Ocean Tml Sunny Point | SUN | 6203 | 7-Feb-30 | ARMY | |
| Army Aviation Support Facility (Isla Grande) | IGP | 3847 | 7-Feb-30 | ARMY | |
| MTA Camp Santiago | STG | 6316 | 7-Feb-30 | ARMY | |
| Soto Cano | SCN | 170286 | 7-Feb-30 | ARMY | |
| Fort Buchanan | BCH | 4988 | 7-Feb-30 | ARMY | |
| TOTALS: | $ - 0 |
&A
CUI
CLIN X004 CM NTE
| INSTRUCTIONS - DO NOT PRICE .The values for CLIN 4 Corrective Maintenance are provided by the Government as an estimate of service order work to be performed. This amount may increase or decrease depending on the needs that arise for unscheduled services. The Contractor is not guaranteed nor entitled to the full amount as estimated. | |
| Corrective Maintenance (Estimated) | |
| CLIN X004 (TOTAL) | $44,538,415.00 |
| Binding Service Order Markups | |
| Markups | Value |
| Profit (%) | 0.0% |
| SO Indirect Markup (Supporting Narrative Required) (%) | 0.0% |
| Total Service Order Fee (%) | 0.0% |
| Emergency Service Order Indirect Rate ($) | $0.00 |
&A
CUI
Service Order Fee Instructions:
In the box below, (1) Define the proposed profit for service orders and other markup percentage (2) Explain what markups are included in the Indirect SO Markup (Ex G&A, Overhead) and (3) Provide enough information to allow for the Contracting Officer to determine fair and reasonableness. All administrative, professional, and supervisory oversight required for SO execution, beyond PWS key personnel included in the FFP CLINs (CLINS 1, 2, 3, 6), are to be included in your service order fee. The Service Order Fee shall NOT include cost for work plan development or emergency service order fee per PWS 2.10.2.
A) All other pricing information shall be included within the offerors Basis of Estimate (BOE).
B) Do not provide duplicated markups within fully burdened labor rates and Service Order Fee. If there are special circumstances, provide an explanation.
Service Order Fee Explanation:
CM Price List
| INSTRUCTIONS- Complete the provided fields in GREEN. The Contractor shall provide unit prices for each category listed. This unit price shall include all costs associated with the repair. Refer to PWS paragraph 3.4.2 and Appendix H - Repairs Incidental to Maintentance Activities for more information. | |||
| Escalation Rate: | 0% | ||
| CORRECTIVE MAINTENANCE PRICE LIST | |||
| BASE YEAR - CORRECTIVE MAINTENANCE | |||
| CATEGORY | REPAIRS PER YEAR (EST FOR EVAL PURPOSES ONLY) | UNIT PRICE | TOTAL |
| Air eliminators | 4 | $ - 0 | $ - 0 | |
| Bollards - Repair includes Prep and Recoat one Bollard up to 6" diameter and 48" tall or provide plastic cover for same. Applicable markings are included as part of repair. | 30 | $ - 0 | $ - 0 | |
| Deadman (Hydraulic) - Includes replacement of Deadman Handle and Cord/Hose. | 2 | $ - 0 | $ - 0 | |
| Deadman (Electronic) - Includes replacement of Deadman Handle and Cord/Hose. | 2 | $ - 0 | $ - 0 | |
| Dispenser Breakaway Connections - Includes Replacement of 1 Breakaway for Hoses ≤ 2". | 10 | $ - 0 | $ - 0 | |
| Dispenser Hose Retractors - Includes Replacement of 1 Retractor ≤ 10' in length. | 10 | $ - 0 | $ - 0 | |
| Dispenser Hose Swivels - Includes Replacement of 1 Swivel for Hoses ≤ 2". | 10 | $ - 0 | $ - 0 | |
| Dispenser Nozzles - Includes Replacement of 1 Dispenser Nozzle for Hoses ≤ 2". | 10 | $ - 0 | $ - 0 | |
| Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel. | 5 | $ - 0 | $ - 0 | |
| Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel. | 5 | $ - 0 | $ - 0 | |
| Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel. | 5 | $ - 0 | $ - 0 | |
| Flange Isolation Kit - 1 Repair includes complete isolation kit for a flanged connection (Gasket, Sleeves, Insulating Washers, etc.) for up to 8" piping. | 4 | $ - 0 | $ - 0 | |
| Flow Indicator Sight Glass Replacement | 2 | $ - 0 | $ - 0 | |
| Fuel Hoses 2-4 inches Diameter - Repair includes providing 1 hose 2 to 4 inches in diameter and less than 20 feet in length. | 10 | $ - 0 | $ - 0 | |
| Fuel hoses under 2 inches in diameter and less than 20 feet in length - Replacement. | 10 | $ - 0 | $ - 0 | |
| Gauges - Replace 1 Differential Pressure Gauge Replacement | 2 | $ - 0 | $ - 0 | |
| Gauges - Replace 1 Pressure or Pressure/Vacuum Gauges | 15 | $ - 0 | $ - 0 | |
| Ground Reel - Replace a single heavy duty Static Grounding reel to include 100 feet of 3/32" Nylon coated wire and a heavy duty ground clamp (MIL-C-83413/7). | 10 | $ - 0 | $ - 0 | |
| Hardware Replacement - Repair includes all bolts, nuts, washers, etc. for a flanged connection for piping ≤ 8" in diameter. | 20 | $ - 0 | $ - 0 | |
| Hose End Pressure Regulator. Includes Replacing 1 Hose End Pressure Regulator | 2 | $ - 0 | $ - 0 | |
| Load, Offload, and Refueling Nozzle Replacement | 5 | $ - 0 | $ - 0 | |
| Markings - Misc. System Components (Valves, Pumps, Meters, Hydrant Pit Covers, etc.). Repair Includes Providing Markings for 1 System Component. | 20 | $ - 0 | $ - 0 | |
| Markings - Pipe Markings. A single marking is defined as all required product identification and | ||||
| directional arrows along a minimum of 25 linear feet. | 20 | $ - 0 | $ - 0 | |
| Markings - Tank Markings - Tanks 420,000 Gallons and Under. 1 Repair includes all markings on tank required by UFC 3-460-01. | 10 | $ - 0 | $ - 0 | |
| Markings - Tank Markings - Tanks over 420,000 gallons. 1 Repair includes all markings on tank required by UFC 3-460-01. | 0 | $ - 0 | $ - 0 | |
| Hose and Hydrant System Nozzle / Hose Covers or Dust Caps. 1 Repair includes the hose end cover or dust caps for 1 hose. | 10 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes 4" or Less) - PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate. | 10 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes > 4")- PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate. | 5 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes 4" or Less)- Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure). | 10 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes > 4") - Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure). | 5 | |||
| Signage - Repair includes 1 Metal Sign up to 4 SF in Area. | 20 | $ - 0 | $ - 0 | |
| Valves, Check Valves (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 5 | $ - 0 | $ - 0 | |
| Valves, Check Valves (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 4 | $ - 0 | $ - 0 | |
| Valves, Check Valves (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 2 | $ - 0 | $ - 0 | |
| Valves, Diaphragm Control Valve (X ≤ 2 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless) | 4 | $ - 0 | $ - 0 | |
| Valves, Diaphragm Control Valve (2 Inches < X ≤ 4 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless) | 2 | $ - 0 | $ - 0 | |
| Valves, Double Block and Bleed Valve (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 6 | $ - 0 | $ - 0 | |
| Valves, Double Block and Bleed Valve (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 4 | $ - 0 | $ - 0 | |
| Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 8 | $ - 0 | $ - 0 | |
| Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 4 | $ - 0 | $ - 0 | |
| Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel). | 1 | $ - 0 | $ - 0 | |
| Valves, Manually Operated Plug (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 2 | $ - 0 | $ - 0 | |
| Valves, Manually Operated Plug (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 2 | $ - 0 | $ - 0 | |
| Valves, Manually Operated Plug (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel). | 2 | $ - 0 | $ - 0 | |
| Valves, Pressure Relief Valves or Thermal Relief Valves. Repair includes replacement of Pressure or Thermal Relief Valve. (Carbon) | 12 | $ - 0 | $ - 0 | |
| Valves, Pressure Relief Valves or Thermal Relief Valves. Repair includes replacement of Pressure or Thermal Relief Valve. (Stainless Steel) | 12 | $ - 0 | $ - 0 | |
| Joint Sealant (Reference PWS 3.4.2.1) - ≤800 LF per Site (16 Sites) | 12,800 | $ - 0 | $ - 0 | |
| Crack Repair (Reference PWS 3.4.2.1) - ≤800 LF per Site (16 Sites) | 12,800 | $ - 0 | $ - 0 | |
| Touch-Up Coating Repair (Reference PWS 3.4.2.2) - 200 SF per Site (16 Sites) | 3,200 | $ - 0 | ||
| TOTALS: | $ - 0 |
| OPTION YEAR 1 | |||
| CATEGORY | REPAIRS PER YEAR | UNIT PRICE | TOTAL |
| Air eliminators | 4 | $ - 0 | $ - 0 | |
| Bollards - Repair includes Prep and Recoat one Bollard up to 6" diameter and 48" tall or provide plastic cover for same. Applicable markings are included as part of repair. | 30 | $ - 0 | $ - 0 | |
| Deadman (Hydraulic) - Includes replacement of Deadman Handle and Cord/Hose. | 2 | $ - 0 | $ - 0 | |
| Deadman (Electronic) - Includes replacement of Deadman Handle and Cord/Hose. | 2 | $ - 0 | $ - 0 | |
| Dispenser Breakaway Connections - Includes Replacement of 1 Breakaway for Hoses ≤ 2". | 10 | $ - 0 | $ - 0 | |
| Dispenser Hose Retractors - Includes Replacement of 1 Retractor ≤ 10' in length. | 10 | $ - 0 | $ - 0 | |
| Dispenser Hose Swivels - Includes Replacement of 1 Swivel for Hoses ≤ 2". | 10 | $ - 0 | $ - 0 | |
| Dispenser Nozzles - Includes Replacement of 1 Dispenser Nozzle for Hoses ≤ 2". | 10 | $ - 0 | $ - 0 | |
| Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel. | 5 | $ - 0 | $ - 0 | |
| Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel. | 5 | $ - 0 | $ - 0 | |
| Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel. | 5 | $ - 0 | $ - 0 | |
| Flange Isolation Kit - 1 Repair includes complete isolation kit for a flanged connection (Gasket, Sleeves, Insulating Washers, etc.) for up to 8" piping. | 4 | $ - 0 | $ - 0 | |
| Flow Indicator Sight Glass Replacement | 2 | $ - 0 | $ - 0 | |
| Fuel Hoses 2-4 inches Diameter - Repair includes providing 1 hose 2 to 4 inches in diameter and less than 20 feet in length. | 10 | $ - 0 | $ - 0 | |
| Fuel hoses under 2 inches in diameter and less than 20 feet in length - Replacement. | 10 | $ - 0 | $ - 0 | |
| Gauges - Replace 1 Differential Pressure Gauge Replacement | 2 | $ - 0 | $ - 0 | |
| Gauges - Replace 1 Pressure or Pressure/Vacuum Gauges | 15 | $ - 0 | $ - 0 | |
| Ground Reel - Replace a single heavy duty Static Grounding reel to include 100 feet of 3/32" Nylon coated wire and a heavy duty ground clamp (MIL-C-83413/7). | 10 | $ - 0 | $ - 0 | |
| Hardware Replacement - Repair includes all bolts, nuts, washers, etc. for a flanged connection for piping ≤ 8" in diameter. | 20 | $ - 0 | $ - 0 | |
| Hose End Pressure Regulator. Includes Replacing 1 Hose End Pressure Regulator | 2 | $ - 0 | $ - 0 | |
| Load, Offload, and Refueling Nozzle Replacement | 5 | $ - 0 | $ - 0 | |
| Markings - Misc. System Components (Valves, Pumps, Meters, Hydrant Pit Covers, etc.). Repair Includes Providing Markings for 1 System Component. | 20 | $ - 0 | $ - 0 | |
| Markings - Pipe Markings. A single marking is defined as all required product identification and | ||||
| directional arrows along a minimum of 25 linear feet. | 20 | $ - 0 | $ - 0 | |
| Markings - Tank Markings - Tanks 420,000 Gallons and Under. 1 Repair includes all markings on tank required by UFC 3-460-01. | 10 | $ - 0 | $ - 0 | |
| Markings - Tank Markings - Tanks over 420,000 gallons. 1 Repair includes all markings on tank required by UFC 3-460-01. | 0 | $ - 0 | $ - 0 | |
| Hose and Hydrant System Nozzle / Hose Covers or Dust Caps. 1 Repair includes the hose end cover or dust caps for 1 hose. | 10 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes 4" or Less) - PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate. | 10 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes > 4")- PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate. | 5 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes 4" or Less)- Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure). | 10 | $ - 0 | $ - 0 | |
| Pipe Support (Pipes > 4") - Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure). | 5 | $ - 0 | $ - 0 | |
| Signage - Repair includes 1 Metal Sign up to 4 SF in Area. | 20 | $ - 0 | $ - 0 | |
| Valves, Check Valves (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 5 | $ - 0 | $ - 0 | |
| Valves, Check Valves (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 4 | $ - 0 | $ - 0 | |
| Valves, Check Valves (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 2 | $ - 0 | $ - 0 | |
| Valves, Diaphragm Control Valve (X ≤ 2 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless) | 4 | $ - 0 | $ - 0 | |
| Valves, Diaphragm Control Valve (2 Inches < X ≤ 4 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless) | 2 | $ - 0 | $ - 0 | |
| Valves, Double Block and Bleed Valve (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 6 | $ - 0 | $ - 0 | |
| Valves, Double Block and Bleed Valve (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 4 | $ - 0 | $ - 0 | |
| Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 8 | $ - 0 | $ - 0 | |
| Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel) | 4 | $ - 0 | $ - 0 | |
| Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel). | 1 | $ - 0 | $ - 0 |