Attachment 7 - Pricing Worksheet.xlsx

XLSX spreadsheet 3 MB Posted

Attached to
Draft Solicitation: Fuels South Atlantic Division - Army (SAD-A)
Solicitation number
W912DY26RA002
Issued by

About this file

This file is a detailed Pricing Worksheet for a Department of the Army fuels maintenance contract covering 16 Army sites across the South Atlantic Division, including locations in Virginia, North Carolina, South Carolina, Georgia, Florida, Alabama, Mississippi, Puerto Rico, and the U.S. Virgin Islands. The worksheet breaks down pricing across multiple Contract Line Item Numbers (CLINs) including quarterly, semi-annual, and annual preventative maintenance, corrective maintenance, other direct costs, irregular maintenance, and detachable pantograph maintenance for a base year and three option years with a potential 6-month extension.

The total estimated contract value is $44,538,415.00, with pricing structured across different maintenance categories such as equipment repairs, component replacements, markings, joint sealant, crack repair, and touch-up coating. The contract includes comprehensive maintenance for fuel storage and distribution systems, covering tasks like replacing valves, hoses, gauges, electrical components, and performing surface repairs. Key sites include Anniston Army Depot, Fort Blanding, Fort Benning, Fort Bragg, and multiple other military installations, with maintenance activities scheduled from August 2026 through February 2030.

View the file

Other files

File Type Posted
Attachment 5 Instructions and Evaluation Factors.docx DOCX document
Draft Solicitation Fuels SAD-A W912DY26RA002 31 OCT 25.pdf PDF
PWS Appendix F _FMP BCH_08.12.25.xlsx XLSX spreadsheet
CDRL Set 9 33-36.pdf PDF
CDRL Set 11 41-44.pdf PDF
CDRL Set 8 29-32.pdf PDF
CDRL Set 12 45-48.pdf PDF
Attachment 1 Performance Work Statement SAD-A.pdf PDF
PWS Appendix F _FMP DGA_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP RCK (NVL)_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP STG_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP IGP_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP SUN_08.12.25.xlsx XLSX spreadsheet
CDRL Set 15 57-60.pdf PDF
CDRL Set 10 37-40.pdf PDF
CDRL Set 2 5-8.pdf PDF
CDRL Set 1 1-4.pdf PDF
CDRL Set 3 9-12.pdf PDF
CDRL Set 7 25-28.pdf PDF
CDRL Set 16 60-64.pdf PDF
CDRL Set 13 49-52.pdf PDF
CDRL Set 17 65-67.pdf PDF
PWS Appendix F _FMP HUN_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP SCN_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP CMG_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP POP (LIB)_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP MSL_08.12.25.xlsx XLSX spreadsheet
Attachment 2 Sample Service Order Form.xlsx XLSX spreadsheet
Attachment 3 Technical Evaluation Form.docx DOCX document
Attachment 6 Draft QASP.pdf PDF
Attachment 4 - PPQ Sample.pdf PDF
PWS Appendix F - FMP AAD_08.12.25.xlsx XLSX spreadsheet
CDRL Set 4 13-16.pdf PDF
CDRL Set 5 17-20.pdf PDF
CDRL Set 14 53-56.pdf PDF
CDRL Set 6 21-24.pdf PDF
12.0 Appendix K DLA RP SAD-A_2025-10-28.xlsx XLSX spreadsheet
Attachment 8 Small Business Participation Plan Template.pdf PDF
PWS Appendix F _FMP SAL_08.12.25.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

CONTRACTOR:Input Contractor Name
SOLICITATION REFERENCE NUMBER:Input Solicitation Number
DATEInput Submittal Date
INSTRUCTIONS- Complete instructions for each tab of the pricing worksheet. The Offeror is instructed to complete the provided fields in GREEN for each tab of the pricing worksheet. Pricing within the Summary tab is populated from the CLIN ROLL UP TAB. All pricing cells on this sheet are automated.
PREVENTATIVE AND CORRECTIVE MAINTENANCE SUMMARY
CLIN X001 - QUARTERLY PREVENTATIVE MAINTENANCETotal
BASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXTCLIN X001
CLIN X001 TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ -
CLIN X002 - SEMI ANNUAL PREVENTATIVE MAINTENANCETotal
BASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXTCLIN X002
CLIN X002 TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ -
CLIN X003 - ANNUAL PREVENTATIVE MAINTENANCETotal
BASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXTCLIN X003
CLIN X003 TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ -19512991.3333333
20279510.986666719512991.333333320279510.986666721076691.426133321905759.083178722767989.4465058
CLIN X004 - CORRECTIVE MAINTENANCE- DO NOT PRICETotal21076691.4261333
CLIN X004 TOTAL:BASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXTCLIN X00421905759.0831787
$44,538,415.0022767989.4465058
ESTIMATED - FOR EVALUATION PURPOSES ONLY
CLIN X005 - OTHER DIRECT COSTSTotal
BASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXTCLIN X0050.05
CLIN X005 TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ -
CLIN X006 - IRREGULAR PREVENTATIVE MAINTENANCETotal
BASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXTCLIN X006
CLIN X006 TOTAL:$ - 0$ - 0$ - 0$ - 0$ - 0$ -
CLIN X007 - DETACHABLE PANTOGRAPH PREVENTATIVE MAINTENANCE
BASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXTTotal
CLIN X007 TOTAL:$ - 0$ - 0$ - 0$ - 0$ - 0$ -

TOTAL: $ - $ - $ - $ - $ - $ 44,538,415

CUI

POJ IGE

&A

CUI

CLIN ROLL UP

INSTRUCTIONS - Complete the provided fields in GREEN. This section identifies a roll-up of all other sections in this pricing worksheet. Pricing at this level must be rounded to the nearest cent. The CLIN Roll-Up totals in this section are transferred to the summary section which identifies the overall cost proposed for this Task Order. Note: Pricing within this sheet is populated from pricing data from each CLIN tab. The Contractor is responsible for ensuring all pricing of CLINs, calculations, and other added cells are captured correctly in the CLIN Roll-Up section. The pricing presented here governs at award.
CLIN ROLL-UP
Contractor:
Solicitation Number:
Total Estimated Hours:hrs
CLIN X001 - QUARTERLY PREVENTATIVE MAINTENANCE
KEY PERSONNEL TOTALS:BASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXT
$ - 0$ - 0$ - 0$ - 0$ - 0
SITEDLA SITE CODERPSUIDSERVICEBASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXT
TOTAL PREVENTATIVE MAINTENANCE:$ - 0$ - 0$ - 0$ - 0$ - 0
Anniston Army DepotAAD3817ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTC Camp BlandingBLD6326ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
CTA Camp McCainCMG4606ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp ShelbySHB6317ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MorrisvilleMSL6280ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
SalisburySAL7134ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort RuckerRCK5046ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BenningBNG4984ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Camp Frank D. MerrillDGA4632ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Hunter Army AirfieldHUN5502ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BraggPOP4987ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Military Ocean Tml Sunny PointSUN6203ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Army Aviation Support Facility (Isla Grande)IGP3847ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp SantiagoSTG6316ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Soto CanoSCN170286ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BuchananBCH4988ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN X002 - SEMI ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL TOTALS:BASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXT
$ - 0$ - 0$ - 0$ - 0$ - 0
SITEDLA SITE CODERPSUIDSERVICEBASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXT
TOTAL PREVENTATIVE MAINTENANCE:$ - 0$ - 0$ - 0$ - 0$ - 0
Anniston Army DepotAAD3817ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTC Camp BlandingBLD6326ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
CTA Camp McCainCMG4606ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp ShelbySHB6317ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MorrisvilleMSL6280ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
SalisburySAL7134ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort RuckerRCK5046ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BenningBNG4984ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Camp Frank D. MerrillDGA4632ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Hunter Army AirfieldHUN5502ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BraggPOP4987ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Military Ocean Tml Sunny PointSUN6203ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Army Aviation Support Facility (Isla Grande)IGP3847ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp SantiagoSTG6316ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Soto CanoSCN170286ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BuchananBCH4988ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN X003 - ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL TOTALS:BASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXT
$ - 0$ - 0$ - 0$ - 0$ - 0
SITEDLA SITE CODERPSUIDSERVICEBASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXT
TOTAL PREVENTATIVE MAINTENANCE:$ - 0$ - 0$ - 0$ - 0$ - 0
Anniston Army DepotAAD3817ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTC Camp BlandingBLD6326ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
CTA Camp McCainCMG4606ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp ShelbySHB6317ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MorrisvilleMSL6280ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
SalisburySAL7134ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort RuckerRCK5046ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BenningBNG4984ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Camp Frank D. MerrillDGA4632ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Hunter Army AirfieldHUN5502ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BraggPOP4987ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Military Ocean Tml Sunny PointSUN6203ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Army Aviation Support Facility (Isla Grande)IGP3847ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp SantiagoSTG6316ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Soto CanoSCN170286ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BuchananBCH4988ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
CORRECTIVE MAINTENANCE PRICE LIST
CATEGORYBASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXT
TOTAL:$ - 0$ - 0$ - 0$ - 0$ - 0
Air eliminators$ - 0$ - 0$ - 0$ - 0$ - 0
Bollards - Repair includes Prep and Recoat one Bollard up to 6" diameter and 48" tall or provide plastic cover for same. Applicable markings are included as part of repair.$ - 0$ - 0$ - 0$ - 0$ - 0
Deadman (Hydraulic) - Includes replacement of Deadman Handle and Cord/Hose.$ - 0$ - 0$ - 0$ - 0$ - 0
Deadman (Electronic) - Includes replacement of Deadman Handle and Cord/Hose.$ - 0$ - 0$ - 0$ - 0$ - 0
Dispenser Breakaway Connections - Includes Replacement of 1 Breakaway for Hoses ≤ 2".$ - 0$ - 0$ - 0$ - 0$ - 0
Dispenser Hose Retractors - Includes Replacement of 1 Retractor ≤ 10' in length.$ - 0$ - 0$ - 0$ - 0$ - 0
Dispenser Hose Swivels - Includes Replacement of 1 Swivel for Hoses ≤ 2".$ - 0$ - 0$ - 0$ - 0$ - 0
Dispenser Nozzles - Includes Replacement of 1 Dispenser Nozzle for Hoses ≤ 2".$ - 0$ - 0$ - 0$ - 0$ - 0
Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel.$ - 0$ - 0$ - 0$ - 0$ - 0
Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel.$ - 0$ - 0$ - 0$ - 0$ - 0
Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel.$ - 0$ - 0$ - 0$ - 0$ - 0
Flange Isolation Kit - 1 Repair includes complete isolation kit for a flanged connection (Gasket, Sleeves, Insulating Washers, etc.) for up to 8" piping.$ - 0$ - 0$ - 0$ - 0$ - 0
Flow Indicator Sight Glass Replacement$ - 0$ - 0$ - 0$ - 0$ - 0
Fuel Hoses 2-4 inches Diameter - Repair includes providing 1 hose 2 to 4 inches in diameter and less than 20 feet in length.$ - 0$ - 0$ - 0$ - 0$ - 0
Fuel hoses under 2 inches in diameter and less than 20 feet in length - Replacement.$ - 0$ - 0$ - 0$ - 0$ - 0
Gauges - Replace 1 Differential Pressure Gauge Replacement$ - 0$ - 0$ - 0$ - 0$ - 0
Gauges - Replace 1 Pressure or Pressure/Vacuum Gauges$ - 0$ - 0$ - 0$ - 0$ - 0
Ground Reel - Replace a single heavy duty Static Grounding reel to include 100 feet of 3/32" Nylon coated wire and a heavy duty ground clamp (MIL-C-83413/7).$ - 0$ - 0$ - 0$ - 0$ - 0
Hardware Replacement - Repair includes all bolts, nuts, washers, etc. for a flanged connection for piping ≤ 8" in diameter.$ - 0$ - 0$ - 0$ - 0$ - 0
Hose End Pressure Regulator. Includes Replacing 1 Hose End Pressure Regulator$ - 0$ - 0$ - 0$ - 0$ - 0
Load, Offload, and Refueling Nozzle Replacement$ - 0$ - 0$ - 0$ - 0$ - 0
Markings - Misc. System Components (Valves, Pumps, Meters, Hydrant Pit Covers, etc.). Repair Includes Providing Markings for 1 System Component.$ - 0$ - 0$ - 0$ - 0$ - 0
Markings - Pipe Markings. A single marking is defined as all required product identification and
directional arrows along a minimum of 25 linear feet.$ - 0$ - 0$ - 0$ - 0$ - 0
Markings - Tank Markings - Tanks 420,000 Gallons and Under. 1 Repair includes all markings on tank required by UFC 3-460-01.$ - 0$ - 0$ - 0$ - 0$ - 0
Markings - Tank Markings - Tanks over 420,000 gallons. 1 Repair includes all markings on tank required by UFC 3-460-01.$ - 0$ - 0$ - 0$ - 0$ - 0
Hose and Hydrant System Nozzle / Hose Covers or Dust Caps. 1 Repair includes the hose end cover or dust caps for 1 hose.$ - 0$ - 0$ - 0$ - 0$ - 0
Pipe Support (Pipes 4" or Less) - PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate.$ - 0$ - 0$ - 0$ - 0$ - 0
Pipe Support (Pipes > 4")- PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate.$ - 0$ - 0$ - 0$ - 0$ - 0
Pipe Support (Pipes 4" or Less)- Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure).$ - 0$ - 0$ - 0$ - 0$ - 0
Pipe Support (Pipes > 4") - Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure).$ - 0$ - 0$ - 0$ - 0$ - 0
Signage - Repair includes 1 Metal Sign up to 4 SF in Area.$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Check Valves (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Check Valves (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Check Valves (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Diaphragm Control Valve (X ≤ 2 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Diaphragm Control Valve (2 Inches < X ≤ 4 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Double Block and Bleed Valve (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Double Block and Bleed Valve (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel).$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Manually Operated Plug (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Manually Operated Plug (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Manually Operated Plug (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel).$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Pressure Relief Valves or Thermal Relief Valves. Repair includes replacement of Pressure or Thermal Relief Valve. (Carbon)$ - 0$ - 0$ - 0$ - 0$ - 0
Valves, Pressure Relief Valves or Thermal Relief Valves. Repair includes replacement of Pressure or Thermal Relief Valve. (Stainless Steel)$ - 0$ - 0$ - 0$ - 0$ - 0
Joint Sealant (Reference PWS 3.4.2.1) - ≤800 LF per Site (16 Sites)$ - 0$ - 0$ - 0$ - 0$ - 0
Crack Repair (Reference PWS 3.4.2.1) - ≤800 LF per Site (16 Sites)$ - 0$ - 0$ - 0$ - 0$ - 0
Touch-Up Coating Repair (Reference PWS 3.4.2.2) - 200 SF per Site (16 Sites)$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN X005 - OTHER DIRECT COSTS
SITEDLA SITE CODERPSUIDSERVICEBASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXT
TOTAL:$ - 0$ - 0$ - 0$ - 0$ - 0
Anniston Army DepotAAD3817ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTC Camp BlandingBLD6326ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
CTA Camp McCainCMG4606ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp ShelbySHB6317ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MorrisvilleMSL6280ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
SalisburySAL7134ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort RuckerRCK5046ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BenningBNG4984ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Camp Frank D. MerrillDGA4632ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Hunter Army AirfieldHUN5502ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BraggPOP4987ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Military Ocean Tml Sunny PointSUN6203ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Army Aviation Support Facility (Isla Grande)IGP3847ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp SantiagoSTG6316ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Soto CanoSCN170286ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BuchananBCH4988ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN X006 - IRREGULAR PREVENTATIVE MAINTENANCE
SITEDLA Site CodeRPSUIDSERVICEBASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXT
TOTAL:$ - 0$ - 0$ - 0$ - 0$ - 0
Anniston Army DepotAAD3817ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTC Camp BlandingBLD6326ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
CTA Camp McCainCMG4606ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp ShelbySHB6317ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MorrisvilleMSL6280ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
SalisburySAL7134ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort RuckerRCK5046ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BenningBNG4984ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Camp Frank D. MerrillDGA4632ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Hunter Army AirfieldHUN5502ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BraggPOP4987ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Military Ocean Tml Sunny PointSUN6203ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Army Aviation Support Facility (Isla Grande)IGP3847ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp SantiagoSTG6316ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Soto CanoSCN170286ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BuchananBCH4988ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
CLIN X007 - DETACHABLE PANTOGRAPH PREVENTATIVE MAINTENANCE PANTOGRAPH
SITEDLA SITE CODERPSUIDSERVICEBASE YEAROPT 1OPT 2OPT 3 (6 MONTH)6 MONTH EXT
TOTAL PREVENTATIVE MAINTENANCE:$ - 0$ - 0$ - 0$ - 0$ - 0
Anniston Army DepotAAD3817ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTC Camp BlandingBLD6326ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
CTA Camp McCainCMG4606ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp ShelbySHB6317ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MorrisvilleMSL6280ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
SalisburySAL7134ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort RuckerRCK5046ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BenningBNG4984ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Camp Frank D. MerrillDGA4632ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Hunter Army AirfieldHUN5502ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BraggPOP4987ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Military Ocean Tml Sunny PointSUN6203ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Army Aviation Support Facility (Isla Grande)IGP3847ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
MTA Camp SantiagoSTG6316ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Soto CanoSCN170286ARMY$ - 0$ - 0$ - 0$ - 0$ - 0
Fort BuchananBCH4988ARMY$ - 0$ - 0$ - 0$ - 0$ - 0

&A

CUI

CLIN X001 PM Qrtly INSTRUCTIONS - Complete the provided fields in GREEN. The worksheet is automated and will populate pricing for option years following the Base Year. Note the notice to proceed date for each site and propose according to that start date. After the notice to proceed date, the period of performance date for the site will align with the contract period of performance. Grayed out cells indicate no maintenance activity and should not be calculated (Refer to Appendix I and J). Please refer to the PWS section 1.5.0 Personnel Requirements for key personnel. These personnel are also provided within the Direct Labor Tab.

NOTE – “FAR 52.217-8 Option to Extend Services if exercised shall not exceed the last option year’s rates proposed by the offeror and shall reflect the appropriate level of effort for service activities in that period. The government reserves the right to exercise the “6-month” extension at the end of any ordering period which shall be subject to price adjustments that are commensurate with the appropriate level of effort and in accordance with the rates of the incumbent ordering period by bilateral modification.”

Escalation Rate:0%
CLIN 0001 - QUARTERLY PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
16ARMY$ - 0
PREVENETATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-26ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-26ARMY$ - 0
CTA Camp McCainCMG46067-Aug-26ARMY$ - 0
MTA Camp ShelbySHB63177-Aug-26ARMY$ - 0
MorrisvilleMSL62807-Aug-26ARMY$ - 0
SalisburySAL71347-Aug-26ARMY$ - 0
Fort RuckerRCK50467-Aug-26ARMY$ - 0
Fort BenningBNG49847-Aug-26ARMY$ - 0
Camp Frank D. MerrillDGA46327-Aug-26ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-26ARMY$ - 0
Fort BraggPOP49877-Aug-26ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-26ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-26ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-26ARMY$ - 0
Soto CanoSCN1702867-Aug-26ARMY$ - 0
Fort BuchananBCH49887-Aug-26ARMY$ - 0
TOTALS:$ - 0
CLIN 1001 - QUARTERLY PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-27ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-27ARMY$ - 0
CTA Camp McCainCMG46067-Aug-27ARMY$ - 0
MTA Camp ShelbySHB63177-Aug-27ARMY$ - 0
MorrisvilleMSL62807-Aug-27ARMY$ - 0
SalisburySAL71347-Aug-27ARMY$ - 0
Fort RuckerRCK50467-Aug-27ARMY$ - 0
Fort BenningBNG49847-Aug-27ARMY$ - 0
Camp Frank D. MerrillDGA46327-Aug-27ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-27ARMY$ - 0
Fort BraggPOP49877-Aug-27ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-27ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-27ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-27ARMY$ - 0
Soto CanoSCN1702867-Aug-27ARMY$ - 0
Fort BuchananBCH49887-Aug-27ARMY$ - 0
TOTALS:$ - 0
CLIN 2001 - QUARTERLY PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-28ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-28ARMY$ - 0
CTA Camp McCainCMG46067-Aug-28ARMY$ - 0
MTA Camp ShelbySHB63177-Aug-28ARMY$ - 0
MorrisvilleMSL62807-Aug-28ARMY$ - 0
SalisburySAL71347-Aug-28ARMY$ - 0
Fort RuckerRCK50467-Aug-28ARMY$ - 0
Fort BenningBNG49847-Aug-28ARMY$ - 0
Camp Frank D. MerrillDGA46327-Aug-28ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-28ARMY$ - 0
Fort BraggPOP49877-Aug-28ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-28ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-28ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-28ARMY$ - 0
Soto CanoSCN1702867-Aug-28ARMY$ - 0
Fort BuchananBCH49887-Aug-28ARMY$ - 0
TOTALS:$ - 0
CLIN 3001 (6MN OPTION PERIOD) - QUARTERLY PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-29ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-29ARMY$ - 0
CTA Camp McCainCMG46067-Aug-29ARMY$ - 0
MTA Camp ShelbySHB63177-Aug-29ARMY$ - 0
MorrisvilleMSL62807-Aug-29ARMY$ - 0
SalisburySAL71347-Aug-29ARMY$ - 0
Fort RuckerRCK50467-Aug-29ARMY$ - 0
Fort BenningBNG49847-Aug-29ARMY$ - 0
Camp Frank D. MerrillDGA46327-Aug-29ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-29ARMY$ - 0
Fort BraggPOP49877-Aug-29ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-29ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-29ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-29ARMY$ - 0
Soto CanoSCN1702867-Aug-29ARMY$ - 0
Fort BuchananBCH49887-Aug-29ARMY$ - 0
TOTALS:$ - 0
CLIN 4001 (6 MN EXTENSION) - QUARTERLY PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Feb-30ARMY$ - 0
MTC Camp BlandingBLD63267-Feb-30ARMY$ - 0
CTA Camp McCainCMG46067-Feb-30ARMY$ - 0
MTA Camp ShelbySHB63177-Feb-30ARMY$ - 0
MorrisvilleMSL62807-Feb-30ARMY$ - 0
SalisburySAL71347-Feb-30ARMY$ - 0
Fort RuckerRCK50467-Feb-30ARMY$ - 0
Fort BenningBNG49847-Feb-30ARMY$ - 0
Camp Frank D. MerrillDGA46327-Feb-30ARMY$ - 0
Hunter Army AirfieldHUN55027-Feb-30ARMY$ - 0
Fort BraggPOP49877-Feb-30ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Feb-30ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Feb-30ARMY$ - 0
MTA Camp SantiagoSTG63167-Feb-30ARMY$ - 0
Soto CanoSCN1702867-Feb-30ARMY$ - 0
Fort BuchananBCH49887-Feb-30ARMY$ - 0
TOTALS:$ - 0

&A

CUI

CLIN X002 PM SemiAnnual INSTRUCTIONS - Complete the provided fields in GREEN. The worksheet is automated and will populate pricing for option years following the Base Year. Note the notice to proceed date for each site and propose according to that start date. After the notice to proceed date, the period of performance date for the site will align with the contract period of performance. Please note Site Names with * indicate sites that ONLY receive semi-annual meter calibration (Refer to Appendix I and J). Grayed out cells indicate no maintenance activity and should not be calculated (Refer to Appendix I and J). Please refer to the PWS section 1.5.0 Personnel Requirements for key personnel. These personnel are also provided within the Direct Labor Tab.

NOTE – “FAR 52.217-8 Option to Extend Services if exercised shall not exceed the last option year’s rates proposed by the offeror and shall reflect the appropriate level of effort for service activities in that period. The government reserves the right to exercise the “6-month” extension at the end of any ordering period which shall be subject to price adjustments that are commensurate with the appropriate level of effort and in accordance with the rates of the incumbent ordering period by bilateral modification.”

Escalation Rate:0%
CLIN 0002 - SEMI-ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
Key Personnel16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-26ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-26ARMY
CTA Camp McCainCMG46067-Aug-26ARMY
MTA Camp ShelbySHB63177-Aug-26ARMY
MorrisvilleMSL62807-Aug-26ARMY$ - 0
SalisburySAL71347-Aug-26ARMY$ - 0
Fort RuckerRCK50467-Aug-26ARMY$ - 0
Fort BenningBNG49847-Aug-26ARMY
Camp Frank D. MerrillDGA46327-Aug-26ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-26ARMY$ - 0
Fort BraggPOP49877-Aug-26ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-26ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-26ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-26ARMY
Soto CanoSCN1702867-Aug-26ARMY
Fort BuchananBCH49887-Aug-26ARMY$ - 0
TOTALS:$ - 0
CLIN 1002 - SEMI-ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
Key Personnel16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-27ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-27ARMY
CTA Camp McCainCMG46067-Aug-27ARMY
MTA Camp ShelbySHB63177-Aug-27ARMY
MorrisvilleMSL62807-Aug-27ARMY$ - 0
SalisburySAL71347-Aug-27ARMY$ - 0
Fort RuckerRCK50467-Aug-27ARMY$ - 0
Fort BenningBNG49847-Aug-27ARMY
Camp Frank D. MerrillDGA46327-Aug-27ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-27ARMY$ - 0
Fort BraggPOP49877-Aug-27ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-27ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-27ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-27ARMY
Soto CanoSCN1702867-Aug-27ARMY
Fort BuchananBCH49887-Aug-27ARMY$ - 0
TOTALS:$ - 0
CLIN 2002 - SEMI-ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
Key Personnel16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-28ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-28ARMY
CTA Camp McCainCMG46067-Aug-28ARMY
MTA Camp ShelbySHB63177-Aug-28ARMY
MorrisvilleMSL62807-Aug-28ARMY$ - 0
SalisburySAL71347-Aug-28ARMY$ - 0
Fort RuckerRCK50467-Aug-28ARMY$ - 0
Fort BenningBNG49847-Aug-28ARMY
Camp Frank D. MerrillDGA46327-Aug-28ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-28ARMY$ - 0
Fort BraggPOP49877-Aug-28ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-28ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-28ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-28ARMY
Soto CanoSCN1702867-Aug-28ARMY
Fort BuchananBCH49887-Aug-28ARMY$ - 0
TOTALS:$ - 0
CLIN 3002 (6 MN OPTION PERIOD) - SEMI-ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
Key Personnel16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-29ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-29ARMY
CTA Camp McCainCMG46067-Aug-29ARMY
MTA Camp ShelbySHB63177-Aug-29ARMY
MorrisvilleMSL62807-Aug-29ARMY$ - 0
SalisburySAL71347-Aug-29ARMY$ - 0
Fort RuckerRCK50467-Aug-29ARMY$ - 0
Fort BenningBNG49847-Aug-29ARMY
Camp Frank D. MerrillDGA46327-Aug-29ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-29ARMY$ - 0
Fort BraggPOP49877-Aug-29ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-29ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-29ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-29ARMY
Soto CanoSCN1702867-Aug-29ARMY
Fort BuchananBCH49887-Aug-29ARMY$ - 0
TOTALS:$ - 0
CLIN 4002 (6 MN EXTENSION) - SEMI-ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
Key Personnel16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Feb-30ARMY$ - 0
MTC Camp BlandingBLD63267-Feb-30ARMY
CTA Camp McCainCMG46067-Feb-30ARMY
MTA Camp ShelbySHB63177-Feb-30ARMY
MorrisvilleMSL62807-Feb-30ARMY$ - 0
SalisburySAL71347-Feb-30ARMY$ - 0
Fort RuckerRCK50467-Feb-30ARMY$ - 0
Fort BenningBNG49847-Feb-30ARMY
Camp Frank D. MerrillDGA46327-Feb-30ARMY$ - 0
Hunter Army AirfieldHUN55027-Feb-30ARMY$ - 0
Fort BraggPOP49877-Feb-30ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Feb-30ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Feb-30ARMY$ - 0
MTA Camp SantiagoSTG63167-Feb-30ARMY
Soto CanoSCN1702867-Feb-30ARMY
Fort BuchananBCH49887-Feb-30ARMY$ - 0
TOTALS:$ - 0

&A

CUI

CLIN X003 PM Annual INSTRUCTIONS - Complete the provided fields in GREEN. The worksheet is automated and will populate pricing for option years following the Base Year. Note the notice to proceed date for each site and propose according to that start date. After the notice to proceed date, the period of performance date for the site will align with the contract period of performance. Grayed out cells indicate no maintenance activity and should not be calculated (Refer to Appendix I and J). Please refer to the PWS section 1.5.0 Personnel Requirements for key personnel. These personnel are also provided within the Direct Labor Tab.

NOTE – “FAR 52.217-8 Option to Extend Services if exercised shall not exceed the last option year’s rates proposed by the offeror and shall reflect the appropriate level of effort for service activities in that period. . The government reserves the right to exercise the “6-month” extension at the end of any ordering period which shall be subject to price adjustments that are commensurate with the appropriate level of effort and in accordance with the rates of the incumbent ordering period by bilateral modification.” For Annual events scheduled to occur in the 6-month extension, event pricing shall not exceed the previous Option Year. Annual events executed within the 6-month extension shall be performed in entirety.

Escalation Rate:0%
CLIN 0003 - ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
Key Personnel16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-26ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-26ARMY$ - 0
CTA Camp McCainCMG46067-Aug-26ARMY$ - 0
MTA Camp ShelbySHB63177-Aug-26ARMY$ - 0
MorrisvilleMSL62807-Aug-26ARMY$ - 0
SalisburySAL71347-Aug-26ARMY$ - 0
Fort RuckerRCK50467-Aug-26ARMY$ - 0
Fort BenningBNG49847-Aug-26ARMY$ - 0
Camp Frank D. MerrillDGA46327-Aug-26ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-26ARMY$ - 0
Fort BraggPOP49877-Aug-26ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-26ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-26ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-26ARMY$ - 0
Soto CanoSCN1702867-Aug-26ARMY$ - 0
Fort BuchananBCH49887-Aug-26ARMY$ - 0
TOTALS:$ - 0
CLIN 1003 - ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
Key Personnel16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-27ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-27ARMY$ - 0
CTA Camp McCainCMG46067-Aug-27ARMY$ - 0
MTA Camp ShelbySHB63177-Aug-27ARMY$ - 0
MorrisvilleMSL62807-Aug-27ARMY$ - 0
SalisburySAL71347-Aug-27ARMY$ - 0
Fort RuckerRCK50467-Aug-27ARMY$ - 0
Fort BenningBNG49847-Aug-27ARMY$ - 0
Camp Frank D. MerrillDGA46327-Aug-27ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-27ARMY$ - 0
Fort BraggPOP49877-Aug-27ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-27ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-27ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-27ARMY$ - 0
Soto CanoSCN1702867-Aug-27ARMY$ - 0
Fort BuchananBCH49887-Aug-27ARMY$ - 0
TOTALS:$ - 0
CLIN 2003 - ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
Key Personnel16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-28ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-28ARMY$ - 0
CTA Camp McCainCMG46067-Aug-28ARMY$ - 0
MTA Camp ShelbySHB63177-Aug-28ARMY$ - 0
MorrisvilleMSL62807-Aug-28ARMY$ - 0
SalisburySAL71347-Aug-28ARMY$ - 0
Fort RuckerRCK50467-Aug-28ARMY$ - 0
Fort BenningBNG49847-Aug-28ARMY$ - 0
Camp Frank D. MerrillDGA46327-Aug-28ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-28ARMY$ - 0
Fort BraggPOP49877-Aug-28ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-28ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-28ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-28ARMY$ - 0
Soto CanoSCN1702867-Aug-28ARMY$ - 0
Fort BuchananBCH49887-Aug-28ARMY$ - 0
TOTALS:$ - 0
CLIN 3003 (6 MN OPTION PERIOD) - ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
Key Personnel16ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Aug-29ARMY$ - 0
MTC Camp BlandingBLD63267-Aug-29ARMY$ - 0
CTA Camp McCainCMG46067-Aug-29ARMY$ - 0
MTA Camp ShelbySHB63177-Aug-29ARMY$ - 0
MorrisvilleMSL62807-Aug-29ARMY$ - 0
SalisburySAL71347-Aug-29ARMY$ - 0
Fort RuckerRCK50467-Aug-29ARMY$ - 0
Fort BenningBNG49847-Aug-29ARMY$ - 0
Camp Frank D. MerrillDGA46327-Aug-29ARMY$ - 0
Hunter Army AirfieldHUN55027-Aug-29ARMY$ - 0
Fort BraggPOP49877-Aug-29ARMY$ - 0
Military Ocean Tml Sunny PointSUN62037-Aug-29ARMY$ - 0
Army Aviation Support Facility (Isla Grande)IGP38477-Aug-29ARMY$ - 0
MTA Camp SantiagoSTG63167-Aug-29ARMY$ - 0
Soto CanoSCN1702867-Aug-29ARMY$ - 0
Fort BuchananBCH49887-Aug-29ARMY$ - 0
TOTALS:$ - 0
CLIN 4003 (6 MN EXTENSION) - ANNUAL PREVENTATIVE MAINTENANCE
KEY PERSONNEL
SITESSERVICETotal
Key Personnel0ARMY$ - 0
PREVENTATIVE MAINTENANCE
SITE NAMEDLA SITE CODERPSUIDNOTICE TO PROCEED DATESERVICETOTAL
Anniston Army DepotAAD38177-Feb-30ARMY
MTC Camp BlandingBLD63267-Feb-30ARMY
CTA Camp McCainCMG46067-Feb-30ARMY
MTA Camp ShelbySHB63177-Feb-30ARMY
MorrisvilleMSL62807-Feb-30ARMY
SalisburySAL71347-Feb-30ARMY
Fort RuckerRCK50467-Feb-30ARMY
Fort BenningBNG49847-Feb-30ARMY
Camp Frank D. MerrillDGA46327-Feb-30ARMY
Hunter Army AirfieldHUN55027-Feb-30ARMY
Fort BraggPOP49877-Feb-30ARMY
Military Ocean Tml Sunny PointSUN62037-Feb-30ARMY
Army Aviation Support Facility (Isla Grande)IGP38477-Feb-30ARMY
MTA Camp SantiagoSTG63167-Feb-30ARMY
Soto CanoSCN1702867-Feb-30ARMY
Fort BuchananBCH49887-Feb-30ARMY
TOTALS:$ - 0

&A

CUI

CLIN X004 CM NTE

INSTRUCTIONS - DO NOT PRICE .The values for CLIN 4 Corrective Maintenance are provided by the Government as an estimate of service order work to be performed. This amount may increase or decrease depending on the needs that arise for unscheduled services. The Contractor is not guaranteed nor entitled to the full amount as estimated.
Corrective Maintenance (Estimated)
CLIN X004 (TOTAL)$44,538,415.00
Binding Service Order Markups
MarkupsValue
Profit (%)0.0%
SO Indirect Markup (Supporting Narrative Required) (%)0.0%
Total Service Order Fee (%)0.0%
Emergency Service Order Indirect Rate ($)$0.00

&A

CUI

Service Order Fee Instructions:

In the box below, (1) Define the proposed profit for service orders and other markup percentage (2) Explain what markups are included in the Indirect SO Markup (Ex G&A, Overhead) and (3) Provide enough information to allow for the Contracting Officer to determine fair and reasonableness. All administrative, professional, and supervisory oversight required for SO execution, beyond PWS key personnel included in the FFP CLINs (CLINS 1, 2, 3, 6), are to be included in your service order fee. The Service Order Fee shall NOT include cost for work plan development or emergency service order fee per PWS 2.10.2.

A) All other pricing information shall be included within the offerors Basis of Estimate (BOE).

B) Do not provide duplicated markups within fully burdened labor rates and Service Order Fee. If there are special circumstances, provide an explanation.

Service Order Fee Explanation:

CM Price List

INSTRUCTIONS- Complete the provided fields in GREEN. The Contractor shall provide unit prices for each category listed. This unit price shall include all costs associated with the repair. Refer to PWS paragraph 3.4.2 and Appendix H - Repairs Incidental to Maintentance Activities for more information.
Escalation Rate:0%
CORRECTIVE MAINTENANCE PRICE LIST
BASE YEAR - CORRECTIVE MAINTENANCE
CATEGORYREPAIRS PER YEAR (EST FOR EVAL PURPOSES ONLY)UNIT PRICETOTAL
Air eliminators4$ - 0$ - 0
Bollards - Repair includes Prep and Recoat one Bollard up to 6" diameter and 48" tall or provide plastic cover for same. Applicable markings are included as part of repair.30$ - 0$ - 0
Deadman (Hydraulic) - Includes replacement of Deadman Handle and Cord/Hose.2$ - 0$ - 0
Deadman (Electronic) - Includes replacement of Deadman Handle and Cord/Hose.2$ - 0$ - 0
Dispenser Breakaway Connections - Includes Replacement of 1 Breakaway for Hoses ≤ 2".10$ - 0$ - 0
Dispenser Hose Retractors - Includes Replacement of 1 Retractor ≤ 10' in length.10$ - 0$ - 0
Dispenser Hose Swivels - Includes Replacement of 1 Swivel for Hoses ≤ 2".10$ - 0$ - 0
Dispenser Nozzles - Includes Replacement of 1 Dispenser Nozzle for Hoses ≤ 2".10$ - 0$ - 0
Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel.5$ - 0$ - 0
Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel.5$ - 0$ - 0
Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel.5$ - 0$ - 0
Flange Isolation Kit - 1 Repair includes complete isolation kit for a flanged connection (Gasket, Sleeves, Insulating Washers, etc.) for up to 8" piping.4$ - 0$ - 0
Flow Indicator Sight Glass Replacement2$ - 0$ - 0
Fuel Hoses 2-4 inches Diameter - Repair includes providing 1 hose 2 to 4 inches in diameter and less than 20 feet in length.10$ - 0$ - 0
Fuel hoses under 2 inches in diameter and less than 20 feet in length - Replacement.10$ - 0$ - 0
Gauges - Replace 1 Differential Pressure Gauge Replacement2$ - 0$ - 0
Gauges - Replace 1 Pressure or Pressure/Vacuum Gauges15$ - 0$ - 0
Ground Reel - Replace a single heavy duty Static Grounding reel to include 100 feet of 3/32" Nylon coated wire and a heavy duty ground clamp (MIL-C-83413/7).10$ - 0$ - 0
Hardware Replacement - Repair includes all bolts, nuts, washers, etc. for a flanged connection for piping ≤ 8" in diameter.20$ - 0$ - 0
Hose End Pressure Regulator. Includes Replacing 1 Hose End Pressure Regulator2$ - 0$ - 0
Load, Offload, and Refueling Nozzle Replacement5$ - 0$ - 0
Markings - Misc. System Components (Valves, Pumps, Meters, Hydrant Pit Covers, etc.). Repair Includes Providing Markings for 1 System Component.20$ - 0$ - 0
Markings - Pipe Markings. A single marking is defined as all required product identification and
directional arrows along a minimum of 25 linear feet.20$ - 0$ - 0
Markings - Tank Markings - Tanks 420,000 Gallons and Under. 1 Repair includes all markings on tank required by UFC 3-460-01.10$ - 0$ - 0
Markings - Tank Markings - Tanks over 420,000 gallons. 1 Repair includes all markings on tank required by UFC 3-460-01.0$ - 0$ - 0
Hose and Hydrant System Nozzle / Hose Covers or Dust Caps. 1 Repair includes the hose end cover or dust caps for 1 hose.10$ - 0$ - 0
Pipe Support (Pipes 4" or Less) - PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate.10$ - 0$ - 0
Pipe Support (Pipes > 4")- PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate.5$ - 0$ - 0
Pipe Support (Pipes 4" or Less)- Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure).10$ - 0$ - 0
Pipe Support (Pipes > 4") - Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure).5
Signage - Repair includes 1 Metal Sign up to 4 SF in Area.20$ - 0$ - 0
Valves, Check Valves (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel)5$ - 0$ - 0
Valves, Check Valves (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel)4$ - 0$ - 0
Valves, Check Valves (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel)2$ - 0$ - 0
Valves, Diaphragm Control Valve (X ≤ 2 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless)4$ - 0$ - 0
Valves, Diaphragm Control Valve (2 Inches < X ≤ 4 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless)2$ - 0$ - 0
Valves, Double Block and Bleed Valve (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel)6$ - 0$ - 0
Valves, Double Block and Bleed Valve (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel)4$ - 0$ - 0
Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel)8$ - 0$ - 0
Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel)4$ - 0$ - 0
Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel).1$ - 0$ - 0
Valves, Manually Operated Plug (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel)2$ - 0$ - 0
Valves, Manually Operated Plug (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel)2$ - 0$ - 0
Valves, Manually Operated Plug (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel).2$ - 0$ - 0
Valves, Pressure Relief Valves or Thermal Relief Valves. Repair includes replacement of Pressure or Thermal Relief Valve. (Carbon)12$ - 0$ - 0
Valves, Pressure Relief Valves or Thermal Relief Valves. Repair includes replacement of Pressure or Thermal Relief Valve. (Stainless Steel)12$ - 0$ - 0
Joint Sealant (Reference PWS 3.4.2.1) - ≤800 LF per Site (16 Sites)12,800$ - 0$ - 0
Crack Repair (Reference PWS 3.4.2.1) - ≤800 LF per Site (16 Sites)12,800$ - 0$ - 0
Touch-Up Coating Repair (Reference PWS 3.4.2.2) - 200 SF per Site (16 Sites)3,200$ - 0
TOTALS:$ - 0
OPTION YEAR 1
CATEGORYREPAIRS PER YEARUNIT PRICETOTAL
Air eliminators4$ - 0$ - 0
Bollards - Repair includes Prep and Recoat one Bollard up to 6" diameter and 48" tall or provide plastic cover for same. Applicable markings are included as part of repair.30$ - 0$ - 0
Deadman (Hydraulic) - Includes replacement of Deadman Handle and Cord/Hose.2$ - 0$ - 0
Deadman (Electronic) - Includes replacement of Deadman Handle and Cord/Hose.2$ - 0$ - 0
Dispenser Breakaway Connections - Includes Replacement of 1 Breakaway for Hoses ≤ 2".10$ - 0$ - 0
Dispenser Hose Retractors - Includes Replacement of 1 Retractor ≤ 10' in length.10$ - 0$ - 0
Dispenser Hose Swivels - Includes Replacement of 1 Swivel for Hoses ≤ 2".10$ - 0$ - 0
Dispenser Nozzles - Includes Replacement of 1 Dispenser Nozzle for Hoses ≤ 2".10$ - 0$ - 0
Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel.5$ - 0$ - 0
Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel.5$ - 0$ - 0
Emergency Fuel Shutoff (EFSO) Pushbutton Station - Includes Replacement and Wiring of Emergency Shuttoff Pushbutton Switch and Cover. Does not include troubleshooting or replacing wiring between EFSO Pushbutton and control panel.5$ - 0$ - 0
Flange Isolation Kit - 1 Repair includes complete isolation kit for a flanged connection (Gasket, Sleeves, Insulating Washers, etc.) for up to 8" piping.4$ - 0$ - 0
Flow Indicator Sight Glass Replacement2$ - 0$ - 0
Fuel Hoses 2-4 inches Diameter - Repair includes providing 1 hose 2 to 4 inches in diameter and less than 20 feet in length.10$ - 0$ - 0
Fuel hoses under 2 inches in diameter and less than 20 feet in length - Replacement.10$ - 0$ - 0
Gauges - Replace 1 Differential Pressure Gauge Replacement2$ - 0$ - 0
Gauges - Replace 1 Pressure or Pressure/Vacuum Gauges15$ - 0$ - 0
Ground Reel - Replace a single heavy duty Static Grounding reel to include 100 feet of 3/32" Nylon coated wire and a heavy duty ground clamp (MIL-C-83413/7).10$ - 0$ - 0
Hardware Replacement - Repair includes all bolts, nuts, washers, etc. for a flanged connection for piping ≤ 8" in diameter.20$ - 0$ - 0
Hose End Pressure Regulator. Includes Replacing 1 Hose End Pressure Regulator2$ - 0$ - 0
Load, Offload, and Refueling Nozzle Replacement5$ - 0$ - 0
Markings - Misc. System Components (Valves, Pumps, Meters, Hydrant Pit Covers, etc.). Repair Includes Providing Markings for 1 System Component.20$ - 0$ - 0
Markings - Pipe Markings. A single marking is defined as all required product identification and
directional arrows along a minimum of 25 linear feet.20$ - 0$ - 0
Markings - Tank Markings - Tanks 420,000 Gallons and Under. 1 Repair includes all markings on tank required by UFC 3-460-01.10$ - 0$ - 0
Markings - Tank Markings - Tanks over 420,000 gallons. 1 Repair includes all markings on tank required by UFC 3-460-01.0$ - 0$ - 0
Hose and Hydrant System Nozzle / Hose Covers or Dust Caps. 1 Repair includes the hose end cover or dust caps for 1 hose.10$ - 0$ - 0
Pipe Support (Pipes 4" or Less) - PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate.10$ - 0$ - 0
Pipe Support (Pipes > 4")- PTFE (Teflon) Pipe Support Pads or Bearing Plates. Repair includes 1 PTFE pipe support or bearing plate.5$ - 0$ - 0
Pipe Support (Pipes 4" or Less)- Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure).10$ - 0$ - 0
Pipe Support (Pipes > 4") - Misc. Hardware - Replace Missing/Corroded/Damaged Bolts or U-Bolts on Pipe Support System (1 Repair includes either 2 Plastic coated U-bolts to restrain pipe or 1 set of hardware to anchor pipe support to concrete or other foundation/substructure).5$ - 0$ - 0
Signage - Repair includes 1 Metal Sign up to 4 SF in Area.20$ - 0$ - 0
Valves, Check Valves (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel)5$ - 0$ - 0
Valves, Check Valves (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel)4$ - 0$ - 0
Valves, Check Valves (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel)2$ - 0$ - 0
Valves, Diaphragm Control Valve (X ≤ 2 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless)4$ - 0$ - 0
Valves, Diaphragm Control Valve (2 Inches < X ≤ 4 Inches). Repair includes rebuilding only of valve. (Carbon Steel or Stainless)2$ - 0$ - 0
Valves, Double Block and Bleed Valve (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel)6$ - 0$ - 0
Valves, Double Block and Bleed Valve (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel)4$ - 0$ - 0
Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (X ≤ 2 Inches). Repair includes replacement of 1 valve. (Carbon Steel)8$ - 0$ - 0
Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (2 Inches < X ≤ 4 Inches). Repair includes replacement of 1 valve. (Carbon Steel)4$ - 0$ - 0
Valves, Manually Operated (ie Ball, Gate, Butterfly etc) (4 Inches < X ≤ 8 Inches). Repair includes replacement of 1 valve. (Carbon Steel).1$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .