The document is a detailed Service Order Form template for a federal maintenance contract, specifically designed for fuels infrastructure maintenance. The form provides comprehensive instructions for completing service order documentation, covering critical sections such as service order information, authorization, safety requirements, and quality of work evaluation. Key components include blocks for capturing service order type, contractor details, facility information, maintenance category, priority level, and specific work descriptions.

The form is structured to support preventive and corrective maintenance activities, with specific emphasis on safety documentation, work complexity assessment, and performance tracking. Notable features include dropdown menus for service order types, military service selection, mandatory safety document listings, and a complexity matrix to determine the level of supporting information required. The template appears closely linked to the related federal contract opportunity for Fuels South Atlantic Division maintenance services, which covers maintenance work in Virginia, North Carolina, South Carolina, Georgia, Florida, Alabama, Mississippi, Puerto Rico, and the U.S. Virgin Islands.

View the file

Other files

File Type Posted
Attachment 5 Instructions and Evaluation Factors.docx DOCX document
Draft Solicitation Fuels SAD-A W912DY26RA002 31 OCT 25.pdf PDF
PWS Appendix F _FMP BCH_08.12.25.xlsx XLSX spreadsheet
CDRL Set 9 33-36.pdf PDF
CDRL Set 11 41-44.pdf PDF
CDRL Set 8 29-32.pdf PDF
CDRL Set 12 45-48.pdf PDF
Attachment 1 Performance Work Statement SAD-A.pdf PDF
PWS Appendix F _FMP DGA_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP RCK (NVL)_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP STG_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP IGP_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP SUN_08.12.25.xlsx XLSX spreadsheet
CDRL Set 15 57-60.pdf PDF
CDRL Set 10 37-40.pdf PDF
CDRL Set 2 5-8.pdf PDF
CDRL Set 1 1-4.pdf PDF
CDRL Set 3 9-12.pdf PDF
CDRL Set 7 25-28.pdf PDF
CDRL Set 16 60-64.pdf PDF
CDRL Set 13 49-52.pdf PDF
CDRL Set 17 65-67.pdf PDF
PWS Appendix F _FMP HUN_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP SCN_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP CMG_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP POP (LIB)_08.12.25.xlsx XLSX spreadsheet
PWS Appendix F _FMP MSL_08.12.25.xlsx XLSX spreadsheet
Attachment 3 Technical Evaluation Form.docx DOCX document
Attachment 7 - Pricing Worksheet.xlsx XLSX spreadsheet
Attachment 6 Draft QASP.pdf PDF
Attachment 4 - PPQ Sample.pdf PDF
PWS Appendix F - FMP AAD_08.12.25.xlsx XLSX spreadsheet
CDRL Set 4 13-16.pdf PDF
CDRL Set 5 17-20.pdf PDF
CDRL Set 14 53-56.pdf PDF
CDRL Set 6 21-24.pdf PDF
12.0 Appendix K DLA RP SAD-A_2025-10-28.xlsx XLSX spreadsheet
Attachment 8 Small Business Participation Plan Template.pdf PDF
PWS Appendix F _FMP SAL_08.12.25.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

SERVICE ORDER FORM INSTRUCTIONS

FMSR Form: SO Validation

All service order information should be put into this sheet. All other sheets will be populated from this sheet
PART I
Block C3: Service Order number will be provided by the government. It is the three letter site code, contractor three letter abbreviation, and service order number.
Block E3: Insert the SO initiation Revision # if any
Block C4: Insert the full Prime Contractor's name.
Block C5: Insert Facility Number(s). Use Alt-Enter to add rows.
Block D5: Insert Facility Name(s). Use Alt-Enter to add rows.
Block C6: Insert the three letter site code.
Block D6: Insert the Site Name.
Block C7: Insert the date that the service order was initiated by the FMSR.
Block C8: Select Yes or no depending if the service order is required due to a Notice of Violation (NOV) or to prevent a NOV.
Block D8: Insert the description of the NOV.
Block C9: Select Yes or no depending if the service order is related to a Natural Disaster
Block D9: Insert Name of the disaster (e.g., Hurricane, Tsunami, Flood, etc.)
Block H3: Select the service order type from the drop down menu. Normally this is determined by the FMSR on the service order initiation form.
Block H4: Insert the contract number.
Block H5: Insert the task order number.
Block H6: Select the military service from the drop down menu. This will be the service that actually owns the real property fuel systems.
Block I6: Insert the abbreviated Army Corps Military District such as POD-H, POD-J, NAD-AF, SPD-N1, etc.
Block H7: Insert the funding CLIN for the particular service order.
Block H8: Insert the maintenance category (DLA Work Category) that most represents the majority of the work being performed under this service order. This can be found in the Facility Maintenance Plan.
Block H9: Select service order priority level as designated by the FMSR.
Block A11: Insert service order description and utilize SO description continuation sheet at bottom of form as necessary. As part of SO description, please list the required safety documents. Use Alt-Enter to add rows.
PART II
Block D13: Insert FMSR full Name
Block D14: FMSR digitally signs/dates initial validation of Service Order authorizing repair.
Block D15: FMSR digitally signs/dates initial validation of Service Order authorizing repair.
Block D17: FMSR digitally signs/dates final validation of Service Order authorizing repair.
Block D18: FMSR digitally signs/dates final validation of satisfactory completion of Service Order repair.
PART III
Rows 20-29: FMSR should use this section to report on Contractor's Quality of Work. Part III will be used for final evaluation of Contractor performance.
Block A30: Use the comment section for any box checked "NO" to explain Contractor deficiency in the quality of work. Other comments negative or positive are encouraged.
Additional Instructions for Contractor:
1. Once sheet is filled out it must be converted to stand alone PDF document.
2. The PDF FMSR sheet needs to have text boxes, check boxes, and Digital signature fields added to the appropriate area.
3. The FMSR Form is the only form to be sent to the FMSR.

KO Form: SO Submission

PART I
Block C3: Populates from FMSR Form
Block E3: Insert the SO submission Revision # if any. Block A25 will be the log of all revisions for this SO.
Block C4: Populates from FMSR Form
Block C5: Insert the full Sub-Contractor's name
Block E5: Populates from FMSR Form
Block C6: Populates from FMSR Form
Block D6: Populates from FMSR Form
Block C7: Populates from FMSR Form
Block D7: Populates from FMSR Form
Block B8: Insert the date that the service order was submitted by the Contractor.
Block E8: Select Yes or No depending if the service order contains a long lead item as described in PWS Appendix A.
Block B9: Insert the estimated time of arrival of the long lead item
Block E9: Insert expected start work date for the service order
Block C10: Populates from FMSR Form
Block D10: Populates from FMSR Form
Block C11: Populates from FMSR Form
Block D11: Populates from FMSR Form
Block H3: Populates from FMSR Form
Block H4: Populates from FMSR Form
Block H5: Populates from FMSR Form
Block H6: Populates from FMSR Form
Block I6: Populates from FMSR Form
Block H7: Populates from FMSR Form
Block H8: Populates from FMSR Form
Block H9: Insert the UFC 3-460-03 Section Reference Number associated with the Maintenance Category as described in the Facility Maintenance Plan.
Block G10: Insert the Component Unique Identifier(s) (CUID) associated with the component as described in the Facility Maintenance Plan. Use Alt-Enter to add rows
Block J10: Insert the Contractor's Deficiency Unique Identifier (DUID) as identified on the deficiency report. Use Alt-Enter to add rows.
Blaock B12: Insert Yes or No if CMITM was used in SO.
Block G11: CEHNC will select Yes or No if a WP has been approved based on the Contractor's request.
Block J11: Populates from FMSR Form
Block E11: Populates SO complexity
Block B12: Populates if any CMITM items were used in the SO
Block D12: Populates the CMITM item used
Block G12: Populates the quantity of CMITM items used
Block J12: Populates the total quantity of CMITM items within that category for the option year
PART II
Block C14: Insert the name of the Task Order Safety Manager.
Block H14: Insert the name of the expected person who will perform the duties of the on-site safety and health officer (SHO). If the actual person on-site changes redline this block with the actual person on-site.
Block C15: Select the level of the required on-site SHO from the drop down menu (Based on TOSM determination). The levels are defined in the contract PWS. If the actual the actual SHO on-site changes redline this block with the actual person (same level) on-site.
Block H15: Designate whether supporting documents for the jobsite SHO are included in the service order, already accepted in the APP, or not applicable.
Block C16: Provide a justification for the selected level of on-site SHO. The contractor is required to have an individual responsible for safety on all jobsites. The Task Order Safety Manager shall make this determination and provide justification to the Government Designated authority (GDA) for acceptance.
Block C17: Enter Qualified / Competent Person's name.
Block H17: Designate whether supporting documents for the Qualified / Competent Person are included in the service order, already accepted in the APP, or not applicable.
Block C18: Select yes if there are new, or updated plans added to the service order that were not included in the APP. Reference EM385-1-1 APPENDIX A for a list of plans requiring an individual safety plan.
Block A21-22: List all safety plans required for SO (See Appendix A).
Block H18: Select Yes if all AHAs on this service order have been pre-accepted. Select No if there are new AHAs (not previously accepted).
Block F21-22: List all AHAs required for this service order. Every Service order submitted must have AHA/s tailored to the service order.
Block D24-25: The Task Order Safety Manager needs to e-sign and date this form prior to submittal. Signature verifies SO safety documentation has been reviewed and approved. Approved means documentation meets all contract, OSHA, and regulatory requirements prior to submittal.
Block A26: Service Order Revision Log ADD or DELETE ROW. This allows the Contractor to click the button to add cells or remove cells from this section.
Block A27-A:29: Insert the Revision Number and small description of what was revised.
Block K27-K29: Insert Date of submission for each revision.
Block A31: Populates from FMSR Service Order Form
PART III
Instructions for Contractor
Block D33-34: The Contract Safety Manager needs to e-sign and date this form prior to submittal. Signature verifies SO safety documentation has been reviewed and approved. Approved means documentation meets all contract, OSHA, and regulatory requirements prior to submittal.
Block D35-36: Project Manager needs to e-sign and date this form prior to submittal. Signature verifies that SO Package has been reviewed and approved. Approved means package meets all contract requirements prior to submittal.
Block D37-40: For Government Use Only.
1. The form allows the Contractor to add or delete cells by clicking the ADD or DELETE ROW buttons in each section.
2. All labor rates shall be fully burdened labor rates in accordance with Contractor's accepted proposal documents.
3. ALL prime contractor costs associated with the service order shall be included in the service order fee. The prime contractor service order fee shall be applied to the total subcontracted costs, prime contractor material costs, and on-site prime contractor labor cost. This means the contractor can self-perform the service order and still apply the SO fee to their own labor. The service order fee will not be applied to

travel and tax. Labor shall be fully burdened.

4. Travel/Travel Labor/Per Diem for NTE/ESOs will be included on the Travel Expense Report and submitted in accordance with the PWS Appendix A.
5. Taxes on the KO form are dependent upon work location and shall be input in the appropriate cell for the work location.
6. Cells not applicable should be left blank.
7. When ready to submit for approval the Contractor will convert this to a pdf document and the Contractor's authorized representatives (including the Safety Manager) will digitally sign the form

COMPLEXITY MATRIX:

This is a guide to help the contractor determine the amount of supporting information that will be required as part of the SO

When form is complete it will be converted to a pdf document to be included with the service order

SUBMITTING THE SERVICE ORDER:

The contractor will make a PDF Portfolio and add the following PDF documents to the portfolio:

FMSR Form with initial validation signature

KO Form with all required Contractor's signatures

Complexity matrix

AHA Sheet

UFC Work Type Category - Government use only.

This Excel file will also be included in its raw filled out state

Work Plan-If approved by Government

FMSR Form

SERVICE ORDER FORM
PART I - SERVICE ORDER INFORMATION
SERVICE ORDER NUM.:XYZ-KTR-100REV #SERVICE ORDER TYPE:Routine
CONTRACTOR:Contractor NameCONTRACT NUMBER:Contract #
FACILITY NUM./NAME:
(Use ALT-Enter to add rows)6AA

XXXX

T2-468

TEXTRA47

9999 aaa

STOR JET FL

EXAMPLE NAME 2

JP-8 Fuel Tank Terminal 2 Terminal 3 Terminal 4 Terminal 5

Pier 17TASK ORDER NUMBER:Task Order #
SITE CODE/SITE NAME:XYZSite NameSERVICE & PHASE:Air ForceSAD-AF2
SERVICE ORDER INITIATION DATE:26-Oct-20FUNDING CLIN:0004AA
Notice of Violation (NOV) Related?NoMAINTENANCE CATEGORY:Air Compressors
Is the SO related to Natural Disaster?NoSO PRIORITY LEVEL:P2
DETAILED SO DESCRIPTION: (Use ALT-Enter to add rows or new paragraphs)
Replace PRT Pump/Motor Assembly - CUIDs: ROB-4302-CENPT-0002 & ROB-4302-ELEMT-0002.

Per the FMSR, the PRT pump/motor assembly for Tank #23 (FAC 4302) requires replacement. It has been noted that the motor is defective as well as the pump.

Ktr to replace the defective pump/motor assembly. A qualified electrician will be present for all efforts to make electrical disconnects and final terminations as required. Work will be IAW NFPA 780 article 500.

MORE INFO

MORE INFO More and Better Info.

PART II - AUTHORIZATION
FMSRNAME (First and Last):
FMSRINITIAL VALIDATION:
E-SIGNED & DATED
By signing below, I certify that the services under the above Service Order have been satisfactorily completed.
FMSRFINAL VALIDATION:
E-SIGNED & DATED
PART III - QUALITY OF WORK
Was work performed in a quality manner?YESNO
Was work performed safely?YESNO
Was work performed in a timely manner?YESNO
Did the prime contractor successfully manage the subcontractor?YESNO
Did contractor communicate with you prior to and upon completion of work?YESNO
Was the work area kept clean during and upon completion of work?YESNO
Did contractor have all necessary certifications?YESNO
Were there any issues with the work performed?YESNO
Did contractor arrive with all parts, materials, and tools needed to complete the repair?YESNO
FMSR COMMENTS: Any box checked "NO" requires a comment, other comments encouraged. If contractor performed in a manner worth noting (positive or negative), please provide comments.
X

KO Form

PRIME CONTRACTOR
PART I - SERVICE ORDER INFORMATION
SERVICE ORDER NUM.:XYZ-KTR-100REV #SERVICE ORDER TYPE:Routine
CONTRACTOR:Contractor NameCONTRACT NUMBER:Contract #
SUB-CONTRACTOR(S):Sub-Contractor NameDLA Wortk Type Category or UFC Section Ref Work Cat.Air Compressors
FACILITY NUM./NAME:6AA

XXXX

T2-468

TEXTRA47

9999 aaa

STOR JET FL

EXAMPLE NAME 2

JP-8 Fuel Tank Terminal 2 Terminal 3 Terminal 4 Terminal 5

Pier 17SERVICE & PHASE:Air ForceSAD-AF2
SITE CODE/SITE NAME:XYZSite NameFUNDING CLIN:0004AA
SERVICE ORDER SUBMISSION DATE:29-Mar-21Does SO Include Long Lead Items?NoMAINTENANCE CATEGORY:Air Compressors
Expected Deliver Date of LL item:9-Mar-21Expected Start Work Date:29-Apr-21UFC REFERENCE:Sections 7-2 through 7-10
Notice of Violation Related?NoCUID:ROB-4302-CENPT-000
ROB-4302-ELEMT-0002DUID:DUID
Is the SO related to Natural Disaster?NoCOMPLEXITY:LowWork Plan Required (Yes/No):NoSO Priority Level:P2
CMITM Used: (Yes/No):YesITEM(S) USED:JOINT SEALANT/CRACK REPAIRCONTRACT CMITM QUANTITY:800 LFSO QUANTITY TOTAL:200/800 or 900/800
PART II - SERVICE ORDER SAFETY INFORMATION
TOSM NAME:John DoeJOBSITE SHO NAME:John Doe
REQUIRED SHO LEVEL:L2 - Dual Hatted SafetySHO PROOF OF QUALIFICATION?Included in SO
JUSTIFICATION FOR LEVEL OF SHO:TEST
QUALIFIED/COMPETENT PERSON'S NAME:John DoeQP/CP PROOF OF QUALIFICATION?Included in SO
ANY NEW PLANS REQUIRE SAFETY REVIEW?YesALL AHAs ARE PREACCEPTED?Yes
AHA AttachedNo
LIST INCLUDED PLANS (SEE EM385-1-1 APPENDIX A):LIST INCLUDED AHAs:
Testtest
By signing below, I certify that I have reviewed the safety documents for this service order and they meet all contract, OSHA, and regulatory requirements.
TASK ORDER SAFETY MANAGER SIGNATURE: (MUST BE E-SIGNED AND DATED)
Service Order Revision Log: Add Drop Down for Rev #
Description:Date:
Last Revision
SO DESCRIPTION:
Replace PRT Pump/Motor Assembly - CUIDs: ROB-4302-CENPT-0002 & ROB-4302-ELEMT-0002.

Per the FMSR, the PRT pump/motor assembly for Tank #23 (FAC 4302) requires replacement. It has been noted that the motor is defective as well as the pump.

Ktr to replace the defective pump/motor assembly. A qualified electrician will be present for all efforts to make electrical disconnects and final terminations as required. Work will be IAW NFPA 780 article 500.

MORE INFO

MORE INFO More and Better Info.

PART III - SERVICE ORDER PRICING
Contractor Safety Manager
E-SIGNED & DATED
CONTRACTOR (Project Manager):
E-SIGNED & DATED
CONTRACTING OFFICER OR SOA:
Fair and Reasonable - FAR 15.404-1 Technical Analysis
Fair and Reasonable - FAR 15.404-1 Price Analysis
E-SIGNED & DATED
TOTAL COST OF SERVICE ORDER:$108,955.00
PRIME FULLY BURDENED LABOR
TOTAL MHHOURLY RATETOTAL COST
Labor Category / Description: Confirm All Rates are in Accordance with TO Proposed Rates.
Site Superintendant - 1-10 hr day10.00$100.00$1,000.00
Doing Work5.00$17.75$88.75
Labor Sub-Totals$ 1,088.75
PRIME MATERIAL/EQUIPMENT/OTHER
QTY.UNIT COSTTOTAL COST
Item Description
Item DescriptionManufacturerMan. Part No.Vendor Part No.Catalog/VendorCatalog #Vendor Price
Pump/Motor AssemblyR S Corcoran Co.3000 D (AA05)R S Corcoran Co.$5,000.001.00$5,000.00$5,000.00
$600.0010.00$600.00$6,000.00
PRIME Material/Equipment/Other Sub-Totals$11,000.00
Subcontractor Total Cost
Subcontractor(s) Name/Task:
Subcontractor A - Remove Defective Pump/Motor Assembly$100.00
Something Cool but Not Cheap$8,000.00
3rd Thing$0.17
Subcontractor Sub-Totals$8,100.17
Travel Total Cost
Travel (NTE’s/ESOs Only):
Travel A$800.00
Travel B$11.30
Travel C$87,000.00
Travel Sub-Totals$87,811.30
Prime Labor$1,088.75
Prime Materials/Equipment/Other$11,000.00
Tax (MSE) (example percentage)5%$550.00
Subcontractor Cost$8,100.17
Travel Cost$87,811.30
SO Fee (Labor, MSE, Sub) (example percentage)2%$403.78
ESO Fee ($1) (example Fee)$1.00
TOTAL$108,955.00

Add Row Add Row Add Row Delete Row Delete Row Delete Row Add Row Delete Row Add Row Delete Row

Complexity Matrix

COMPLEXITY DETERMINATION SHEET
Instructions: Contractor should initially estimate the complexity of the service order. PLACE AN "X" IN THE BOX FOR LOW, MEDIUM, OR HIGH FOR EACH FACTOR. Depending on complexity, ensure the cooresponding required content is submitted with service order.

This is meant to be a guide only. Final determination of complexity as well as what is required to be included with each service order will be determined by USACE.

TASKImpactsComplexity Rating
LikelihoodMinorModerateMajor
Coordination with other trades, other contractors, customer, owner/operators, or regulatoryUnlikely0131
Moderate123
Likely233
Technical complexity of equipment being serviced.Unlikely0131
Moderate123
Likely233
Required fuel system outages or outages of supporting utilitiesUnlikely0131
Moderate123
Likely233
Level of unknowns or undefined conditionsUnlikely0131
Moderate123
Likely233
Logistical difficulty accessing the site or obtaining materialsUnlikely0131
Moderate123
Likely233
OVERALL COMPLEXITY RATING5
Low = 1-5
Moderate = 6-10
High = 11-15
Required Content*Complexity
LowMediumHigh
Scope of WorkYesYesYes
Estimated Duration in Calendar DaysYesYesYes
PicturesYesYesYes
Cost ProposalsYesYesYes
SSAPPYesYesYes
AHAYesYesYes
Manufacturers DataA/RYesYes
WORK PLAN REQUIRED FOR MEDIUM AND HIGH COMPLEXITY
Table of Contents*YesYes
Work Plan Narrative*YesYes
Sketches*YesYes
Detailed Drawings*A/RA/R
Project Specific Schedule*A/RYes
Specifications*A/RYes
Project Specific Quality Control Plan*A/RA/R
Work Plan Review Meeting/Pre-Con*A/RA/R
Site Investigation Report*A/RA/R
As Required by the Government = *

AHA

Activity Hazard Analysis (AHA)
AHA NumberOverall Risk Assessment Code (RAC) - Use Highest RAC from Tasks BelowM
SERVICE ORDER NUMBERXYZ-KTR-100Rev #Risk Assessment Code (RAC) Matrix
TASK ORDER SAFETY MANAGER NAME:
CONTRACT NUMBER:Contract #SeverityProbability
TASK ORDER/DELIVERY #:Task Order #
PRIME CONTRACTOR:Contractor NameFrequentLikelyOccasionalSeldomUnlikely
SUBCONTRACTOR:
JOBSITE SAFETY & HEALTH OFFICER:CatastrophicEEHHM
CONTRACTOR QUALIFIED PERSON:CriticalEHHML
CONTRACTOR COMPETENT PERSON:MarginalHMMLL
NegligibleMLLLL
RAC CHART and ACCEPTANCE BY GOVERNMENT DESIGNATED AUTHORITYReview each “Hazard” with identified safety “Controls” and determine (RAC)
E = EXTREMELY HIGH (PWO/OICC/ROICC)Identify the RAC (Probability/Severity) as E, H, M, or L for each “Hazard”. Place the highest RAC at the top of AHA. This is the overall risk assessment code for this activity
H = HIGH RISK (FEAD DIRECTOR)“Severity” is the outcome/degree if an incident, near miss, or accident did occur and identified as: Catastrophic, Critical, Marginal, or Negligible after controls are in place
M = MODERATE RISK (CM or ET or PAR)“Probability” is the likelihood to cause an incident, near miss, or accident did occur and identified as: Frequent, Likely, Occasional, Seldom, or Unlikely after controls are put in place.
L = LOW RISK (ET or PAR)
Job StepsHazardsControlsRAC
E
H
M
L

Work Type Category

Component Unique Identifier:Site Code-Facility #-Component Acronym-Sequential #Air CompressorsAboveground Field-Erected Tanks (Section 8-4)
Example:AAD-00063A-RCVL-0001AlarmsAboveground Piping (Section 6-1.3)
NOTE: If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This
CUID shall be the standard for all DLA capitalized equipmentBollardAboveground Piping and Equipment Coatings (Section 6- 10.1)
DLA Work Type CategoryUFC Section Reference Work Category
(Revised per Change 1, 29 April 2021)Component
AcronymBuildingAboveground Shop Fabricated Tanks (Section 8-5.1)
Air CompressorsAir CompressorsAIRCContainment/JointsAir Compressors
AlarmsExternally Mounted Level Alarms (Section 8-9.9.1)EMLACorrosion Control/CoatingsAir Eliminator Tanks (Section 3-10.1)
Internally Mounted Level Alarms (Section 8-9.9.3)IMLAElectrical/LightingAircraft Fueling Hoses (Section 4-7.5)
BollardBollardsBLRDElectrical/PowerAluminum Honeycomb Floating Pans (Section 8-9.1.1)
BuildingBuilding HVACBHVACElectrical/ProtectionAPI 510 Inspections
Building Domestic Water SystemBWTREyewash/ShowerAPI 653 or STI Inspection
Building Waste WaterBWSWFencing/ GatesAutomatic Air Vents (Section 3-10.2)
Building - LightingBLTGFiltrationAutomatic Line Leak Detector (Section 7-19.1.2)
Building - ArchitecturalBARCHFire Suppression EquipmentBack Pressure Control Valves (Section 4-4.2.6)
Building - Fire Sprinkler SystemBFIREFuel LaboratoriesBack-Up Power Generators
Containment/JointsContainment Systems (General) (Section 8-10.1)CSGENGaugesBall Valves (Section 6-6.2.4)
Concrete and Cement Brick Dike/Berm Walls (Section 8-
10.2.1)DKBWGeneratorsBasket Strainers (Section 3-6.4)
Dike/Berm Floors (Section 8-10.2.2)DKBFHeating CoilsBollards
Earthen Dike Walls (Section 8-10.3)ETHDWHosesBoom Reels (Section 5-9)
Self-Diking or Vaulted Tank Containment (Section 8-10.4)SDVTCSHydrazineBreakaways (Section 7-4)
Flexible Membrane Liners (Section 8-10.5)FXMLInspectionsBuilding - Architectural
Fuel Truck and Rail Car Containment Areas (Section 11-1.1)FTKRCCIssue/Receive - GroundBuilding - Fire Sprinkler System
Remote Spill Containment (Section 11-1.2)RSCSIssue/Receive - MarineBuilding - Lighting
Piers and Wharves Fuel Containment Systems (Section 5- 1.2) - TestingFPWCTLiquefied PetroleumBuilding Domestic Water System
Fuel Pier/Wharf Containment (PWS Section 3)FPWCMeter/ calibrationsBuilding HVAC
Corrosion Control/CoatingsAboveground Piping and Equipment Coatings (Section 6- 10.1)AGPCTMiscellaneousBuilding Waste Water
MiscellaneousMiscellaneous Deactivated Components (Section 12-5)MDEACNatural DisasterButterfly Valves (Section 6-6.2.6)
Electrical/LightingLighting (Section 9-1.8)LIGHTNatural GasCanopies (Section 11-2.2)
Electrical/PowerElectrical Equipment (Section 9-1.2)ELEQNozzleCard and Key Locks (Section 9-3)
Power Cables (Section 9-1.3)PWRCBLOtherCathodic Protection (Section 9-2.1)
Motor Controls (Section 9-1.4)MTRCTPantographCentrifugal Pumps (Section 3-8.1)
Panelboards (Section 9-1.5)PNLBPipingCheck Valves (Section 6-6.2.8)
Electric Motors (Section 9-1.7)ELEMTPressure/Temperature ControlCNG Compressors (Section 10-2.2)
Electronic Equipment (9-1.9)ELTREQPumpCNG Dispenser Hoses (Section 10-2.5)
Card and Key Locks (Section 9-3)CKLKSignage/MarkingsCNG Dispensers (Section 10-2.4)
Electrical/ProtectionPower Grounding Systems (Section 9-1.6.1)PWRGSStructuresCNG Piping (Section 10-2.1)
Static Grounding Systems (Section 9-1.6.2)STGSTankCNG Storage (Section 10-2.3)
Cathodic Protection (Section 9-2.1)CPTestingCoatings Condition Survey
Lightning Surge Arresters (Section 9-2.2.1)LSARUnderground PitsCombination Dual Rate-of-Flow Control and Solenoid Valves (Section 4-3.3.1)
Lightning Protection Systems (Section 9-4)LPTSValvesConcrete and Cement Brick Dike/Berm Walls (Section 8-

10.2.1)

Ground Verification System (Section 9-5)GRVSWasteContainment Systems (General) (Section 8-10.1)
Electronic Overfill Protection Systems (Section 9-6)EOPSCranes and Hoists (Section 11-6)
Eyewash/ShowerEmergency Eyewash/Showers (Section 11-3)EMEWSHDeactivated Petroleum Fuel Pipelines (Section 12-3)
Fencing/ GatesFencingFENCDeactivated Petroleum Fuel Pumps (Section 12-4)
GatesGATEDeactivated Petroleum Fuel Tanks (Section 12-2)
FiltrationPre-Filters (Section 3-6.1)PFVSLDefuel Control Valve (Section 4-3.2.7)
Filter Separators (Section 3-6.2)FLSPDefuel/Flush Valves (Section 4-4.2.3)
Haypack Filters (Section 3-6.3)HPKFDetachable Pantographs (Section 4-7.1.2)
Basket Strainers (Section 3-6.4)BSTRDial Thermometer (Section 6-9.1)
Filter Separator Sump Heaters (Section 3-6.5)FSSHDiaphragm Pumps (Section 3-8.7)
Sidestream Filtration Systems (Section 8-9.11)SSFTSDifferential Pressure Gauges (Section 6-7.2)
Fire Suppression EquipmentFlame Arrestors (Section 8-9.5)FLMARRDifferential Pressure Transmitters (Section 6-7.4)
Foam Fire Protection Systems (Section 8-9.15)FFPSDike/Berm Floors (Section 8-10.2.2)
Fire Protection Systems - Wet PipeFPRSDispenser Cabinet (Section 7-7)
Fuel LaboratoriesVentilation Hoods (Section 11-4.1)VENTHDDispenser Filters (Section 7-9)
GaugesPressure and Pressure/Vacuum Gauges (Section 6-7.1)PVGADispenser Hoses (Section 7-3)
Differential Pressure Gauges (Section 6-7.2)DPGADispenser Meters (Section 7-8)
Mechanical Tape Gauges (Section 8-9.7)MTGADispenser Nozzles (Section 7-2)
Mechanically Operated Tape Gauge (Section 8-9.8.1)MOTGADispenser Strainers (Section 7-10)
Magnetostrictive Probes (Section 8-9.8.2)MRPRBDispenser Sumps (Section 7-13)
Servo Gauge (Section 8-9.8.3)SRVGADouble Block and Bleed Valves (Section 6-6.2.5)
GeneratorsBack-Up Power GeneratorsBGENDouble-Wall Piping (Section 6-1.4)
Heating CoilsSteam Type Heating Coils (Section 8-9.16.1)STHCDouble-Walled Underground Shop-Fabricated Tanks (Section

8-5.4.2) Thermal Fluid Type Heating Coils (Section 8-9.16.2) TFTHC Dual Pressure Relief, Solenoid Shutoff, and Check Valves (Section 4-3.3.2)

Electric Rod Type Heating (Section 8-9.16.3)ERTHDual Rate-of-Flow Control Valves (Section 4-3.2.8)
HosesLoading Fuel Hoses (Section 3-9.1)LDHSEarthen Dike Walls (Section 8-10.3)
Offloading Fuel Hoses (Section 3-9.2)OLHSEFSO Systems (Section 7-16)
Aircraft Fueling Hoses (Section 4-7.5)ACFHSElectric Motors (Section 9-1.7)
HydrazineHydrazine Charging Units (Section 10-3)HDZCUElectric Rod Type Heating (Section 8-9.16.3)
InspectionsTrouble ShootTRBSTElectrical Equipment (Section 9-1.2)
API 510 InspectionsAPI510Electronic Equipment (9-1.9)
API 653 or STI InspectionAPI653Electronic Overfill Protection Systems (Section 9-6)
Coatings Condition SurveyCCSEmergency Eyewash/Showers (Section 11-3)
Dispenser Nozzles (Section 7-2)DSNZEmergency Shut-off Valves (Section 4-4.2.9)
Dispenser Hoses (Section 7-3)DSHSEmergency Shutoff Valves (Shear Valves) (Section 7-12)
Breakaways (Section 7-4)DSBWEmergency Vents (Section 8-9.4)
Swivels (Section 7-5)DSSWExternal High Level Shutoff Valves (HLSO) (Section 8-9.6.1)
Hose Retriever (Section 7-6)HSRTVExternally Mounted Level Alarms (Section 8-9.9.1)
Dispenser Cabinet (Section 7-7)DSCBFencing
Dispenser Meters (Section 7-8)DSMTRFill Ports (Section 8-9.12)
Dispenser Filters (Section 7-9)DSFLRFilter Separator Control Valves (Section 4-4.2.2)
Dispenser Strainers (Section 7-10)DSSTRFilter Separator Sump Heaters (Section 3-6.5)
Ground Vehicle Fuel Piping (Section 7-11)GVFPFilter Separators (Section 3-6.2)
Component Unique Identifier:Site Code-Facility #-Component Acronym-Sequential #Fire Protection Systems - Wet Pipe
Example:AAD-00063A-RCVL-0001Fire Valves (Section 6-6.4.1)
NOTE: If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This
CUID shall be the standard for all DLA capitalized equipmentFixed Pantographs (Section 4-7.1.1)
DLA Work Type CategoryUFC Section Reference Work Category
(Revised per Change 1, 29 April 2021)Component
AcronymFlame Arrestors (Section 8-9.5)
Issue/Receive - GroundEmergency Shutoff Valves (Shear Valves) (Section 7-12)ESHVLFlexible Ball Joints (Section 6-8)
Dispenser Sumps (Section 7-13)DSSMPFlexible Membrane Liners (Section 8-10.5)
Transition Sumps (Section 7-14)TRSMPFloating Roof and Pan Legs (Section 8-9.1.6)
Remote Dispenser Pumps (Section 7-15.1)RDSPFloating Roof and Pan Pressure/Vacuum Vents (Section 8- 9.1.5)
Self-Contained Dispenser Pumps (Section 7-15.2)SCDSPFloating Roofs (Section 8-9.1.4)
EFSO Systems (Section 7-16)EFSOFloating Suction Lines (Section 8-9.14)
Stage I Vapor Recovery (Section 7-17.1)SIVPFoam Fire Protection Systems (Section 8-9.15)
Stage II Vapor Recovery (Section 7-17.2)SIIVPFoundations (Section 8-4.3)
Vapor Burners (Section 7-17.3)VPBNRFuel Additive Injectors (Section 3-11)
Point Sensor - Dry (Section 7-19.1.1)PSDRYFuel Pier/Wharf Containment (PWS Section 3)
Automatic Line Leak Detector (Section 7-19.1.2)ALLDFuel Truck and Rail Car Containment Areas (Section 11-1.1)
Visual Monitoring (Section 7-20.1)VSLMFueling Nozzles (Section 4-7.3)
Issue/Receive - MarineMarine Receipt (Section 5-2)MRNRCPFusible Link Butterfly Valves (Section 6-6.4.2)
Marine Issue (Section 5-3)MRNISUGate Valves (Section 6-6.2.3)
Marine Loading Arms (Section 5-4)MRNLAGates
Marine Transfer Hoses (Section 5-5.1)MBTHSGear Pumps (Section 3-8.6)
Underwater Hoses (Section 5-5.2)UWHSGearboxes (Section 3-8.9)
Single Point Mooring Systems (Section 5-7.1)SPMSSGeneral System Control Valves (Section 4-3.2.1)
Multi Point Mooring Systems (Section 5-7.2)MPMSSGeodesic Dome Roofs (Section 8-4.2)
Submerged Piping Systems (Section 5-8)SMPSGlobe Valves (Section 6-6.2.7)
Boom Reels (Section 5-9)BMRLGround Vehicle Fuel Piping (Section 7-11)
Liquefied PetroleumLiquefied Petroleum Tanks (Section 10-1.1)LPTANKGround Verification System (Section 9-5)
Liquefied Petroleum Pipelines (Section 10-1.2)LPPIPEHaypack Filters (Section 3-6.3)
Liquefied Petroleum Vapor Lines (Section 10-1.3)LPVPLHigh Point Vent Pits (Section 6-11.3)
LPG Vaporizers (Section 10-1.4)LPGVPZHigh Point Vents (Section 6-12.2)
Petroleum Gas Regulators (Section 10-1.5)PGREGHose Retriever (Section 7-6)
Liquefied Petroleum Gas Hoses (Section 10-1.6)LPGHSHydrant Adapters (Section 4-7.2)
Meter/ calibrationsPositive Displacement Meters (Section 3-7.1)PDMTHydrant Control Valves (Section 4-4.2.8)
Turbine Flow Meters (Section 3-7.2)TBFMTHydrant Fuel Pits (Section 6-11.2)
Orifice Flow Meters (Section 3-7.3)OFMTHydrazine Charging Units (Section 10-3)
Natural DisasterNatural DisasterInternal Combustion Drives (Section 3-8.8)
Natural GasCNG Piping (Section 10-2.1)NGPIPEInternal HLSO Valves (Section 8-9.6.2)
CNG Compressors (Section 10-2.2)NGCOMPInternally Mounted Level Alarms (Section 8-9.9.3)
CNG Storage (Section 10-2.3)NGSTORIsolation Valve Pits (Section 6-11.1)
CNG Dispensers (Section 10-2.4)NGDSIssue Venturi (Section 4-4.2.4)
CNG Dispenser Hoses (Section 10-2.5)NGDSHSLateral Control Pits (Section 6-11.5)
NozzleHydrant Adapters (Section 4-7.2)HADPLighting (Section 9-1.8)
Fueling Nozzles (Section 4-7.3)FLNZLightning Protection Systems (Section 9-4)
OtherFuel Additive Injectors (Section 3-11)FAIJLightning Surge Arresters (Section 9-2.2.1)
PantographFixed Pantographs (Section 4-7.1.1)FXPNTLine Blanks, Ring Spacers, and Spectacle Blinds (Section 6- 6.2.9)
Detachable Pantographs (Section 4-7.1.2)DTPNTLiquefied Petroleum Gas Hoses (Section 10-1.6)
PipingOn-Base Pipelines (Section 6-1.1)OBPLLiquefied Petroleum Pipelines (Section 10-1.2)
Non-DOT Regulated (Section 6-1.2.1)NDPLLiquefied Petroleum Tanks (Section 10-1.1)
Aboveground Piping (Section 6-1.3)AGPLLiquefied Petroleum Vapor Lines (Section 10-1.3)
Double-Wall Piping (Section 6-1.4)DWPLLoading Fuel Hoses (Section 3-9.1)
Low Point Drains (Section 6-12.1)LPDNLow Point Drain Pits (Section 6-11.4)
High Point Vents (Section 6-12.2)HPVTLow Point Drains (Section 6-12.1)
Sight Flow Indicators (Section 6-12.3)SFNDLPG Vaporizers (Section 10-1.4)
Rope Sensor Systems (Section 6-13.1.1)RPSSMagnetostrictive Probes (Section 8-9.8.2)
Point Sensor - Dry (Section 6-13.1.2)PSDRYManual Valve Gear Operators (Section 6-6.2.10)
Visual Monitoring (Section 6-14.1)VSLMMarine Issue (Section 5-3)
Pipe Penetrations (Section 8-10.6)PPENMarine Loading Arms (Section 5-4)
Deactivated Petroleum Fuel Pipelines (Section 12-3)DEACPLMarine Receipt (Section 5-2)
Pressure/Temperature ControlAir Eliminator Tanks (Section 3-10.1)AELTMarine Transfer Hoses (Section 5-5.1)
Automatic Air Vents (Section 3-10.2)AAVTMechanical Tape Gauges (Section 8-9.7)
Surge Suppressors (Section 4-7.4)SRGSPMechanically Operated Tape Gauge (Section 8-9.8.1)
Thermal and Pressure Relief Valves (Section 6-6.3)TPRVLMiscellaneous Deactivated Components (Section 12-5)
Pressure Transmitters (Section 6-7.3)PRTRMotor Controls (Section 9-1.4)
Differential Pressure Transmitters (Section 6-7.4)DPTRMotor Operators (Section 6-6.6)
Flexible Ball Joints (Section 6-8)FBLJTMulti Point Mooring Systems (Section 5-7.2)
Dial Thermometer (Section 6-9.1)DTHMRNatural Disaster
Emergency Vents (Section 8-9.4)EMGVTNon-DOT Regulated (Section 6-1.2.1)
PumpCentrifugal Pumps (Section 3-8.1)CENPNon-Surge Check Valves (Section 4-4.2.1)
Vertical Inline Pumps (Section 3-8.2)VILPOffloading Fuel Hoses (Section 3-9.2)
Vertical Turbine/Submerged Turbine Pumps (Section 3-8.3)VTSPOil/Water Separators (Section 11-5)
Sliding Vane Pumps (Section 3-8.5)SLVPOn-Base Pipelines (Section 6-1.1)
Gear Pumps (Section 3-8.6)GERPOrifice Flow Meters (Section 3-7.3)
Diaphragm Pumps (Section 3-8.7)DIAPOverfill Valve for Product Recovery Tanks (Section 4-8.1)
Internal Combustion Drives (Section 3-8.8)ICDRPanelboards (Section 9-1.5)
Gearboxes (Section 3-8.9)GRBXPantograph Control Valves (Section 4-5.2.12)
Deactivated Petroleum Fuel Pumps (Section 12-4)DEACPPantograph Pressure Control Valves (Section 4-5.2.13)
Signage/MarkingsSignage and Markings (Section 2-7)SIGNPetroleum Gas Regulators (Section 10-1.5)
StructuresPumphouse/Filter Buildings (Section 11-2.1)PFBLDGPiers and Wharves Fuel Containment Systems (Section 5- 1.2) - Testing
Canopies (Section 11-2.2)CNPYPipe Penetrations (Section 8-10.6)
Cranes and Hoists (Section 11-6)CRNHSTPlug Valves - Lubricated (Section 6-6.2.1)
Aboveground Field-Erected Tanks (Section 8-4)AGFETPlug Valves - Non-lubricated (Section 6-6.2.2)
Geodesic Dome Roofs (Section 8-4.2)GEODRPoint Sensor - Dry (Section 6-13.1.2)
Foundations (Section 8-4.3)FOUNDPoint Sensor - Dry (Section 7-19.1.1)
Component Unique Identifier:Site Code-Facility #-Component Acronym-Sequential #Point Sensor - Dry (Section 8-9.13.1)
Example:AAD-00063A-RCVL-0001Point Sensor - Pressure/Vacuum (Section 8-9.13.3)
NOTE: If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This
CUID shall be the standard for all DLA capitalized equipmentPoint Sensor - Wet (Section 8-9.13.2)
DLA Work Type CategoryUFC Section Reference Work Category
(Revised per Change 1, 29 April 2021)Component
AcronymPontoon Floating Pans (Section 8-9.1.3)
TankAboveground Shop Fabricated Tanks (Section 8-5.1)AGSFPPositive Displacement Meters (Section 3-7.1)
Self-Diking or Vaulted Tanks (Section 8-5.2)SDVTPower Cables (Section 9-1.3)
Rectangular Concrete-Encased Tanks (Section 8-5.3)RCETPower Grounding Systems (Section 9-1.6.1)
Single-Walled Underground Shop-Fabricated Tanks (Section 8-5.4.1)UGSSFTPre-Filters (Section 3-6.1)
Double-Walled Underground Shop-Fabricated Tanks (Section
8-5.4.2)UGDSFTPressure and Pressure/Vacuum Gauges (Section 6-7.1)
Underground Field-Constructed Tanks (Cut and Cover Tanks) (Section 8-6)UGFETPressure Control Valves (Section 4-4.2.7)
Tank Cleaning (Section 8-7)TCLEANPressure Relief Valves (Section 4-3.2.6)
Aluminum Honeycomb Floating Pans (Section 8-9.1.1)AHFPPressure Testing
Steel Floating Pans (Section 8-9.1.2)STLFPPressure Transmitters (Section 6-7.3)
Pontoon Floating Pans (Section 8-9.1.3)PTNFPProduct Saver Tanks (Section 8-9.10)
Floating Roofs (Section 8-9.1.4)FLTRFPumphouse/Filter Buildings (Section 11-2.1)
Floating Roof and Pan Pressure/Vacuum Vents (Section 8- 9.1.5)FPPVVRectangular Concrete-Encased Tanks (Section 8-5.3)
Floating Roof and Pan Legs (Section 8-9.1.6)FRPLGRefuel Control Valves (Section 4-3.2.5)
Secondary Tank Bottoms (Section 8-9.2)SNDTBRemote Dispenser Pumps (Section 7-15.1)
Tank Pressure/Vacuum Vents (Section 8-9.3)TPVVTRemote Spill Containment (Section 11-1.2)
Product Saver Tanks (Section 8-9.10)PRDSTReturn Venturi (Section 4-4.2.5)
Fill Ports (Section 8-9.12)FPRTRope Sensor Systems (Section 6-13.1.1)
Point Sensor - Dry (Section 8-9.13.1)PSDRYSecondary Tank Bottoms (Section 8-9.2)
Point Sensor - Wet (Section 8-9.13.2)PSWETSelf-Contained Dispenser Pumps (Section 7-15.2)
Point Sensor - Pressure/Vacuum (Section 8-9.13.3)PSPVSelf-Diking or Vaulted Tank Containment (Section 8-10.4)
Visual Leak Detection (Section 8-9.13.4)VSLLDSelf-Diking or Vaulted Tanks (Section 8-5.2)
Floating Suction Lines (Section 8-9.14)FLTSLServo Gauge (Section 8-9.8.3)
Stilling Wells (Section 8-9.17)STGWSidestream Filtration Systems (Section 8-9.11)
Deactivated Petroleum Fuel Tanks (Section 12-2)DEACTSight Flow Indicators (Section 6-12.3)
TestingPressure TestingSignage and Markings (Section 2-7)
Underground PitsIsolation Valve Pits (Section 6-11.1)ISVLPSingle Point Mooring Systems (Section 5-7.1)
Hydrant Fuel Pits (Section 6-11.2)HDFPSingle-Walled Underground Shop-Fabricated Tanks (Section 8-5.4.1)
High Point Vent Pits (Section 6-11.3)HPVPSliding Vane Pumps (Section 3-8.5)
Low Point Drain Pits (Section 6-11.4)LPDPStage I Vapor Recovery (Section 7-17.1)
Lateral Control Pits (Section 6-11.5)LTCPStage II Vapor Recovery (Section 7-17.2)
ValvesGeneral System Control Valves (Section 4-3.2.1)GSCVLStatic Grounding Systems (Section 9-1.6.2)
Refuel Control Valves (Section 4-3.2.5)RCVLSteam Type Heating Coils (Section 8-9.16.1)
Pressure Relief Valves (Section 4-3.2.6)PRCVLSteel Floating Pans (Section 8-9.1.2)
Defuel Control Valve (Section 4-3.2.7)DFCVLStilling Wells (Section 8-9.17)
Dual Rate-of-Flow Control Valves (Section 4-3.2.8)DRFCVLSubmerged Piping Systems (Section 5-8)
Combination Dual Rate-of-Flow Control and Solenoid Valves (Section 4-3.3.1)CFSCVLSurge Suppressors (Section 4-7.4)
Dual Pressure Relief, Solenoid Shutoff, and Check Valves
(Section 4-3.3.2)DPSCVLSwivels (Section 7-5)
Non-Surge Check Valves (Section 4-4.2.1)NSCKVLTank Cleaning (Section 8-7)
Filter Separator Control Valves (Section 4-4.2.2)FSCVLTank Pressure/Vacuum Vents (Section 8-9.3)
Defuel/Flush Valves (Section 4-4.2.3)DFFCVLThermal and Pressure Relief Valves (Section 6-6.3)
Issue Venturi (Section 4-4.2.4)ISVTRThermal Fluid Type Heating Coils (Section 8-9.16.2)
Return Venturi (Section 4-4.2.5)RTVTRTransition Sumps (Section 7-14)
Back Pressure Control Valves (Section 4-4.2.6)BPCVLTrouble Shoot
Pressure Control Valves (Section 4-4.2.7)PCVLTruck Fill Valves (Section 6-6.5.1)
Hydrant Control Valves (Section 4-4.2.8)HCVLTurbine Flow Meters (Section 3-7.2)
Emergency Shut-off Valves (Section 4-4.2.9)ESOVLUnderground Field-Constructed Tanks (Cut and Cover Tanks) (Section 8-6)
Pantograph Control Valves (Section 4-5.2.12)PTCVLUnderwater Hoses (Section 5-5.2)
Pantograph Pressure Control Valves (Section 4-5.2.13)PTPCVLVapor Burners (Section 7-17.3)
Overfill Valve for Product Recovery Tanks (Section 4-8.1)OVLPRTVentilation Hoods (Section 11-4.1)
Plug Valves - Lubricated (Section 6-6.2.1)PLVLVertical Inline Pumps (Section 3-8.2)
Plug Valves - Non-lubricated (Section 6-6.2.2)NPLVLVertical Turbine/Submerged Turbine Pumps (Section 3-8.3)
Gate Valves (Section 6-6.2.3)GTVLVisual Leak Detection (Section 8-9.13.4)
Ball Valves (Section 6-6.2.4)BLVLVisual Monitoring (Section 6-14.1)
Double Block and Bleed Valves (Section 6-6.2.5)DBBVLVisual Monitoring (Section 7-20.1)
Butterfly Valves (Section 6-6.2.6)BFVL
Globe Valves (Section 6-6.2.7)GLVL
Check Valves (Section 6-6.2.8)CKVL
Line Blanks, Ring Spacers, and Spectacle Blinds (Section 6- 6.2.9)BLIND
Manual Valve Gear Operators (Section 6-6.2.10)MVLGO
Fire Valves (Section 6-6.4.1)FRVL
Fusible Link Butterfly Valves (Section 6-6.4.2)FLBFVL
Truck Fill Valves (Section 6-6.5.1)TFVL
Motor Operators (Section 6-6.6)MTROP
External High Level Shutoff Valves (HLSO) (Section 8-9.6.1)EHLSVL
Internal HLSO Valves (Section 8-9.6.2)IHLSVL
WasteOil/Water Separators (Section 11-5)OWS

File details come from the government source that posted it. Updated .