ATTACHMENT 7 - Mechanical Drawings.pdf

PDF 15 MB Posted

Attached to
Y1BG--EHRM Infrastructure Upgrades Construction John Cochran Federal contract opportunity
Solicitation number
36C77623B0034
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal contract solicitation to upgrade infrastructure at the St. Louis John Cochran Veterans Affairs Medical Center. The solicitation seeks a general contractor to construct twenty-four new telecommunication rooms to improve the electrical, communication, security, and fiber optic infrastructure throughout Building 1 on the medical center campus. Specific upgrades include electrical panel replacement and expansion, upgrading power systems to include normal and emergency supplies, bonding and grounding, UPS installation, integrating with the building management system, assessing and renovating HVAC systems, expanding and renovating existing spaces through demolition and new construction, building a new exterior telecommunication tower, installing new data outlets and upgrading network cabling to Category 6A, and conducting hazardous material abatement as required. The selected contractor will furnish all labor, materials, tools and equipment to complete the upgrades. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1BG--EHRM Infrastructure Upgrades Construction John Cochran, newest first.
File Type Posted
36C77623B0034 0004.pdf PDF
52.204-27 Prohibition on a ByteDance Covered App - June 2023.pdf PDF
36C77623B0034 0003.pdf PDF
000110 21-154 TOC.pdf PDF
MN_Oncam_C-12_Indoor_EN_10-2021.pdf PDF
SubReg May 2023.xlsx XLSX spreadsheet
36C77623B0034 0002.pdf PDF
271510.1 Existing Data Port Survey.pdf PDF
Technical Questions - FINAL - St. Louis 6-23-23.pdf PDF
21-124_Mech_Pre-Bid_Resub.pdf PDF
028211 Trad Asbestos Abate (002)230620.pdf PDF
271510 Data Port.pdf PDF
271510.2 New Data Ports.pdf PDF
MN_ONCAM_C-8_Indoor_DS_EN_08-2022_HR.pdf PDF
21-124 Elec Pre-Bid Resub.pdf PDF
21-124_Geotech Report_Signed.pdf PDF
028211.1 Terracon Asbestos Report.pdf PDF
36C77623B0034 0001.pdf PDF
Site Visit Sign-in Sheet - St. Louis 6-1-23.pdf PDF
Site Visit Sign-in Sheet - St. Louis 5-31-23.pdf PDF
36C77623B0034 - 5-11-23.pdf PDF
ATTACHMENT 2 - Specifications Volume 2 of 2.pdf PDF
ATTACHMENT 4 - Architectural Drawings.pdf PDF
ATTACHMENT 8 - Structural Drawings.pdf PDF
ATTACHMENT 12 - Site Visit Registration.pdf PDF
ATTACHMENT 3 - General Drawings.pdf PDF
ATTACHMENT 9 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 10 - Construction Wage Rates - St. Louis 4-14-23.pdf PDF
ATTACHMENT 11 - Contractor Safety - Environmental Form.docx DOCX document
ATTACHMENT 6 - Electrical Drawings.pdf PDF
ATTACHMENT 1 - Specifications Volume 1 of 2.pdf PDF
ATTACHMENT 5 - Civil Drawings.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR-COOLED CONDENSER

ACCH AIR-COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,TWO

POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT

EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BSC BIOLOGICAL SAFETY CABINETS

BT BUFFER TANK

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CH CHILLER

CHWP CHILLED WATER PUMP

CHW CHILLER WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CHWCC CHILLED WATER COOLING COIL

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

D-4 ECONOMIZER OUTDOOR AIR

DAMPER

dB DECIBELS Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE

ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

H HUMIDIFIER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HHW HEATING HOT WATER

HHWC HEATING HOT WATER COIL

HHWP HEATING HOT WATER PUMP

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM

CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

Hz HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IV INLET VANES

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LH LATENT HEAT

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPS LOW PRESSURE SUPPLY (STEAM)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL

PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM

CONDENSATE)

MPS MEDIUM PRESSURE SUPPLY (STEAM)

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OR OPERATING ROOM

OSA OUTSIDE SUPPLY AIR

(CONDITIONED)

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PHCP PREHEAT COIL PUMP

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

R/E RETURN OR EXHAUST

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND

DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSR SOLID SEPARATOR

ST STEAM TRAP

SV STEAM SAFETY VALVE

SVS STEAM VENT SILENCER

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TP TRAP

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UC UNDER CUT

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

Wb WET-BULB (TEMPERATURE)

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

XT EXPANSION TANK

YR YEAR

MECHANICAL ABBREVIATIONS

EXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

DIFFUSER TAG: TAG CALLOUT : CFM

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

EQUIPMENT TAG

ANNOTATION SYMBOLS

##-VAV-#

SD-## ###

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR/VA REGARDING CONFLICTS BEFORE PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR/VA DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY

GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS

NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR/VA. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR/VA FOR REVIEW AND APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT OR CORE DRILL CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW MECHANICAL WORK AND WORK OF OTHER

TRADES.

MECHANICAL DEMOLITION GENERAL NOTES

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.

4. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE

REQUIRED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR/VA. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR/VA.

6. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).

7. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

8. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.

9. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.

10. PROVIDE SUPPORTS FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.

11. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.

12. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.

13. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK

AND PIPING IN THE FIELD.

14. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.

15. NOTIFY COR/VA REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.

16. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.

17. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL

COST.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.

20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

21. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH

COR/VA.

22. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.

23. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL

RUNS ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.

24. INSTALL PIPING FREE OF SAGS AND BENDS.

25. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.

26. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS UNLESS THE PIPING SERVES THE ROOM.

27. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.

A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.

B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.

C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR/VA FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH

DIRECTIONS GIVEN.

D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.

28. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK

LACKING COORDINATION AT NO ADDITIONAL COST.

29. ALL HUMIDITY AND TEMPERATURE SENSORS SHALL BE LOCATED ON THE RETURN SIDE OF THE HVAC EQUIPMENT.

MECHANICAL GENERAL NOTES

CO2 CARBON DIOXIDE SENSOR

HUMIDISTAT OR HUMIDITY SENSOR

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

ROUND FLEX DUCT

LINEAR SLOT DIFFUSER

BALANCING DAMPER

FIRE DAMPER

SMOKE DAMPER

D

R INCLINED RISE, IN

DIRECTION OF AIRFLOW

INCLINED DROP, IN DIRECTION

OF AIRFLOW

CONNECT NEW DUCT

TO EXISTING

LIMIT OF DEMOLITION

VANED ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW

(LONG RADIUS)

10x8 NEW DUCT (INSIDE

DIMENSIONS: WIDTH X DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE

DEMOLISHED

DUCT TRANSITION

END MOUNTED OR SIDEWALL GRILLE

SUPPLY

RETURN45°

45°

DN

DN

UP

UP

DNUP

STANDARD BRANCH SUPPLY OR

RETURN, NO SPLITTER (45° TAP)

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

S-60

S-15

CR-15

CHWS/CHS

CHWR/CHR

HIGH PRESSURE STEAM

PIPING (60 PSI)

LOW PRESSURE STEAM PIPING

(15 PSI AND BELOW)

LOW PRESSURE STEAM

CONDENSATE RETURN

CHILLED WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

PIPE UP

PIPE DOWN

BOTTOM CONNECTION

TOP CONNECTION

CAPPED OR PLUGGED PIPE

GLOBE VALVE

GATE VALVE

BALL VALVE

STEAM SAFETY VALVE

PRESSURE REGULATING VALVE

WYE STRAINER VALVE

BALANCING VALVE

MODULATING TWO-WAY CONTROL

VALVE

STEAM TRAP

D CONDENSATE DRAIN LINE

CR-60 HIGH PRESSURE STEAM

CONDENSATE RETURN

HWS

HWR

HEATING HOT WATER SUPPLY

PIPING

HEATING HOT WATER RETURN PIPING

RLS REFRIGERANT LINE SET (LIQUID

AND SUCTION)

CONNECT TO EXISTING PIPE

LIMIT OF DEMOLITION

INLINE CENTRIFUGAL PUMP

STEAM PRESSURE REDUCING

VALVE

DRAIN VALVE

TEST PLUG

SUPPLY

TERMINAL UNIT SUPPLY

DUCT BRANCH (CONICAL

TAP)

CHECK VALVE

FIRE / SMOKE DAMPER

VANED ELBOW (SHORT RADIUS) S-30

CR-30

MEDIUM PRESSURE STEAM

PIPING (16 PSI AND 59 PSI)

MEDIUM PRESSURE STEAM

CONDENSATE RETURN

THERMOSTAT OR TEMPERATURE SENSOR

TWO POSITION CONTROL VALVE

MODULATING THREE-WAY

CONTROL VALVE

T

H

F

SD

FS

MECHANICAL LEGEND

MOTORIZED DAMPER GS GLYCOL SUPPLY

GR GLYCOL RETURN

AIR VENT - MANUAL

AIR VENT - AUTOMATIC

DIRECTION OF FLOW ARROW

Engineers Architects th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

C R e v it p ro je c ts

\M P

F

-1

S T

L -J

C -E

H R

M

G e n e ra l_ tb u d a i.

rv t

/2

/2

:0 :5

P

M

21-124 MECHANICAL GENERAL

INFORMATION

EHRM INFRASTRUCTURE UPGRADES 657-21-700JC

BID DOCUMENTS

SMHNOVEMBER 28, 2022 RBK

1 43

00-M-001

TELECOMMUNICATION ROOM

(TR)

70 [ 21 ] 95 [ 35 ] 90 [ 32 ] 80 41 [ 5 ] 28 [ -2 ] 8 NA NA

INDOOR AREA DESIGN CONDITIONS

OUTDOOR DESIGN

CONDITIONS

NA NA 95.5 [ 35 ] 76.8 [ 25 ] NA 6.6 [ -14 ] NA NA -5 [ -21 ]

°F [°C] °F [°C] °F [°C] °F [°C] °F [°C] °F [°C]

TEMP WET BULB TEMP

% HUMIDITY

TEMP DEWPOINT TEMP

% HUMIDITY

DESIGN CONDITIONS

ROOM

SETPOINT

TEMPERATURE

SUMMER WINTER

LOWEST AVERAGE

ANNUAL DEWPOINT

HVAC DESIGN DATA

DocuSign Envelope ID: EEF24117-071F-4ECB-9003-96B00DAFAB5F

11/22/2022

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PASCAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH -

ABSOLUTE

PSIG POUNDS PER SQUARE INCH - GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DA DENTAL COMPRESSED AIR

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DV DENTAL VACUUM

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

PLUMBING ABBREVIATIONS

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR/VA REGARDING CONFLICTS BEFORE PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR/VA DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY

GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS

NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR/VA . SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR/VA FOR REVIEW AND APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING WORK AND WORK OF OTHER TRADES.

PLUMBING DEMOLITION GENERAL NOTES

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR/VA. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR/VA.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE

THE CEILING OR WITHIN WALLS UNLESS NOTED OTHERWISE.

8. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S

RECOMMENDATIONS.

9. CONTRACTOR TO FIRESTOP AND SEAL PIPING PENETRATIONS, EXISTING AND CONSTRUCTED, THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS. THE CONTRACTOR SHALL ENSURE ALL PENETRATIONS, FOUND TO EXIST, OR CONSTRUCTED DURING THE PROJECT, HAVE FIRE STOPPING PLACED AND

PENETRATIONS ARE SEALED PRIOR TO CLAIMING ALL WORK IS COMPLETED.

10. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

11. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

12. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH EXISTING CONDITIONS.

13. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND

DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.

14. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR/VA 3 WEEKS IN ADVANCE.

15. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

16. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

17. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

PLUMBING GENERAL NOTES

DCWR

DHW

PIPING SYSTEM

NG NATURAL GAS

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

DCW DOMESTIC COLD WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

CO2 CARBON DIOXIDE

DHW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

DHWR DOMESTIC HW RECIRCULATION

NG

ST

PD

OFD

GW

OW

SAN

CD

CA

AW

N2

N2O

MA

O2

WAGD

VAC

CO2

PG

V

OV

AV

HW 140

SCW

NPCW

DI

RO

PLUMBING SYMBOLS

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CONTROL VALVE

GATE VALVE

GLOBE VALVE

SAFETY RELIEF VALVE

TWO POSITION CONTROL VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

PLUG VALVE

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT - ROUND OR SQUARE

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

OR

CO

PIPE SLOPE ARROW

AV

F

P

T

M

CIRCUIT SETTER

PLUMBING SYMBOLS

EXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

EQUIPMENT TAG

ANNOTATION SYMBOLS

##-X-#

P-###

P-### NEW FIXTURE: BOLD UNDERLINED TEXT

EXISTING FIXTURE: ITALICIZED TEXT

RISER MARK

RISER NUMBER

RISER SYSTEM

XXX

Engineers Architects th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

C R e v it p ro je c ts

\M P

F

-1

S T

L -J

C -E

H R

M

G e n e ra l_ tb u d a i.

rv t

/2

/2

:0 :5

P

M

21-124 PLUMBING SYMBOLS,

ABBREVIATIONS AND NOTES

EHRM INFRASTRUCTURE UPGRADES 657-21-700JC

BID DOCUMENTS

SMHNOVEMBER 28, 2022 RBK

2 43

00-M-002

FLUSHING CONNECTION

FEED OR CROSS MAIN.

TYPICAL TEE WITH

CROSS MAIN PITCH

TOWARDS FEED MAIN.

NOTE: INSTALL FLUSHING

CONNECTION AT END OF

CROSS MAINS.

2" NIPPLE 4" LONG

WITH CAP.

MECHANICAL TEE

NEW PIPING

MECHANICAL TEE

SCREWED END

STEEL BEAM

RETAINING STRAP

C-CLAMP

THREADED HANGER ROD

ADJUSTABLE RING HANGER

NOTE:

HANGING DETAILS SHOWN ARE SUBJECT TO REQUIREMENTS OF SEISMIC DESIGN.

EXPANSION ANCHOR HILT QUIK

BOLT TZ OR APPROVED EQUAL.

EXPANSION ANCHOR SHALL BE

QUALIFIED FOR USE IN CRACKED

CONCRETE PER ACI 355.2

EXISTING CONCRETE SLAB

AUTO. SPRINKLER PIPE

SET SCREW

SURGE RESTRAINER

1" X ARMOVER

1" 90 EL

1" X DROP

DROP NIPPLE

1" x 1/2" R.C. REDUCER

NOTE:

1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.

2. ALL EXPOSED PIPING SHALL BE PAINTED RED.

SUSPENDED CEILING

HANGERS SHALL

BE PROVIDED AS

REQUIRED BY

NFPA 13 TYPICAL

1" x 2" NIPPLE

BRANCH LINE

PENDENT SPRINKLER HEAD

DUCTWORK OR OTHER

OBSTRUCTION OVER

48" IN WIDTH.

UPRIGHT HEAD

SPRINKLER BRANCH LINE

ALL EXPOSED

SPRINKLER PIPING

SHALL BE PAINTED RED.

UPRIGHT HEAD.

PROVIDE GUARD.

NOTE:

1. PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR OTHER OBSTRUCTION OVER 48" IN WIDTH.

2. COORDINATE SPRINKLER PIPE ROUTING AND LOCATION WITH COR AND ALL PARTIES INVOLVED WITH

INSTALLATION OF THE OBSTRUCTION.

3. PROVIDE PIPE SUPPORTS THAT COMPLY WITH NFPA 13 REQUIREMENTS. INCLUDE COST OF ADDITIONAL

SUPPORTS AS REQUIRED.

4. ATTACH PIPE SUPPORTS TO BUILDING STRUCTURE OR PROVIDE SUPPLEMENTAL STEEL ANCHOR POINTS. DO NOT ATTACH PIPE SUPPORTS TO DUCTWORK, PIPES, CONDUIT, OR EXISTING HANGER RODS FOR OTHER

EQUIPMENT.

INSTALL INSULATION AFTER

CAULKING SLEEVE, SEAL

ANNULAR SPACE.

FIRE RATED WALL AND OR SLAB.

STEEL PIPE SLEEVE TERMINATE

SLEEVE FLUSH WITH FINISHED

SURFACE.

UL-LISTED FIRESTOPPING

FINISHED ESCUTCHEON PLATE

FLUSH AGAINST WALL AND OF

SIZE TO COMPLETELY COVER

OPENING.

APPROVED TYPE FIRE SAFE &

SMOKE TIGHT CAULKING SEALER

BETWEEN BARE PIPE AND SLEEVE.

NOTE:

MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF CONCRETE OR CMU WALLS

SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC REQUIREMENTS.

NOTES:

1. ALL EXPOSED PIPING SHALL BE PAINTED RED.

2. PROVIDE GUARDS ON UPRIGHT SPRINKLERS UNLESS OTHERWISE NOTED.

THREADED

HANGER ROD

SURGE

RESTRAINER

ADJUSTABLE

RING HANGER

BRANCHLINE

AUTO. SPRINKLER FEED

UPRIGHT AUTOMATIC

SPRINKLER, FM APPROVED,

QUICK RESPONSE

REDUCER

RISER NIPPLE

REDUCING TEE

LISTED WIRE GUARD

(RED COLOR)

1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES PRIOR

TO START OF WORK.

2. COORDINATE WITH COR FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE.

GIVE THE COR THREE (3) DAYS NOTICE PRIOR TO PLANNED SHUTDOWN OR INTERRUPTION.

3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED.

PROTECT OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.

4. FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN

OFFSITE AND DISPOSED OF.

FIRE SUPPRESSION DEMOLITION GENERAL NOTES

1. USE NFPA-13 (2019), CHAPTER 27, “PLANS AND CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR

THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM.

2. COMPLY WITH THE INTERNATIONAL BUILDING CODE (LATEST ADOPTED EDITION). INSTALLATION SHALL COMPLY WITH VA REQUIREMENTS. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL REQUIRED PLUMBING CODES.

3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS. COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS. LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA

REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.

4. THIS FACILITY IS FULLY SPRINKLERED. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA

AND VA REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.

5. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13

AND VA STANDARDS.

6. PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND OPERABLE SYSTEM IN ACCORDANCE

WITH NFPA AND VA REQUIREMENTS.

7. FIRE PROTECTION CONTRACTOR SHALL OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW, STATIC PRESSURE AVAILABLE WITH NO FLOW, AND RESIDUAL PRESSURE AT FULL FLOW TO THE FACILITY. SUBMIT PLANS RELATED TO

A MINIMUM OF 1 REMOTE AREA FOR REVIEW.

8. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING.

SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER

TRADES TO AVOID CONFLICT.

9. SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION

LOADS AT PRIMARY BUILDING STRUCTURAL MEMBERS.

10. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS IN ACCORDANCE WITH NFPA REQUIREMENTS.

11. CLEAN ENTIRE WORK AREA OF ALL DUST, DIRT, AND OTHER DEBRIS. MAINTAIN WORK AREA IN CLEAN CONDITION.

12. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM

AS SPECIFIED AND INDICATED ON THE DRAWINGS.

13. SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A

PROFESSIONAL ENGINEER.

14. REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE WORK AT NO ADDITIONAL COST TO THE VA.

15. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.

16. FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES IN ACCORDANCE WITH NFPA-13.

17. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONNECTION AT TOP OF PIPE.

18. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS OR

CORRIDORS. LOCATE CENTERED IN CEILING TILE WHERE POSSIBLE.

19. CONTRACTOR SHALL ASSESS THE ADEQUACY OF THE EXISTING WATER SUPPLY. PERFORM WATER SUPPLY FLOW

TESTING OF FIRE HYDRANTS AND/OR FIRE PUMP IF NECESSARY.

FIRE SUPPRESSION GENERAL NOTES

NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT

SEMI-RECESSED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

FIRE LINEFL

CONCEALED SPRINKLER HEAD

PENDANT SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

FIRE DEPARTMENT CONNECTION (FDC)

FIRE DRAINDRAIN

POINT OF NEW CONNECTION

LIMIT OF DEMOLITION

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

FIRE PROTECTION CONTRACTORFPC

TAMPER SWITCH

FLOW SWITCH

CHECK VALVE

GATE VALVE

EXTERIOR ALARM GONG (WATER ACTIVATED)

TEST AND DRAIN ASSEMBLY

BACKFLOW PREVENTER

T&D

TS

FS

ORDINARY HAZARD

GROUP 1 OCCUPANCY

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

ORDINARY HAZARD

GROUP 2 OCCUPANCY

LIGHT HAZARD

FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS

1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND

WRITTEN DUST CONTROL PLAN.

2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE

MAINTAINED.

3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS. PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY

MEASURES.

4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC

PATHOGENS.

5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S

ACCEPTANCE.

INFECTION CONTROL MEASURES

1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS OUT OF COMMISSION, CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY IN ACCORDANCE WITH VA REQUIREMENTS. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION. REFER TO INTERNATIONAL FIRE

CODE CHAPTER 9, SECTION 901.7.

2. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE

PERSONS PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.

3. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED

IN ITS USE.

4. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND ROOM OF THE FIRE AREA IS COVERED.

BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF FIRE

PROTECTION SERVICE

THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA

13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE

PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS

DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE

PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION

SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS

DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE

BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING

CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING

CODE, NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION

REQUIREMENTS.

Engineers Architects th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

C R e v it p ro je c ts

\M P

F

-1

S T

L -J

C -E

H R

M

G e n e ra l_ tb u d a i.

rv t

/2

/2

:1 :0

P

M

21-124 FIRE SUPPRESSION SYMBOLS,

ABBREVIATIONS AND NOTES

EHRM INFRASTRUCTURE UPGRADES 657-21-700JC

BID DOCUMENTS

SMHNOVEMBER 28, 2022 RBK

3 43

00-M-003

Scale: No Scale

MECHANICAL TEE AND FLUSHING CONNECTION DETAIL

Scale: No Scale

PIPE HANGER SUPPORT DETAIL

Scale: No Scale

SEMI-RECESSED PENDENT SPRINKLER DETAIL

Scale: No Scale

SPRINKLER ABOVE AND BELOW DUCT DETAIL

Scale: No Scale

SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL DETAIL

Scale: No Scale

UPRIGHT AUTOMATIC SPRINKLER WITH GUARD DETAIL

S S

S S

S S

S S

S S

S S

S S

S SS S S

S S

S S

SS SSSSSS

S S

S

SS S

S S

S S

S S

S S

SS

S S

S

S S

S S

S S

SS

S S

S S

S

SS SSS

S S

S S

S S

S S

S S

S S

S S

S S

SS SSSSSS

S

SSS S

S

SSS SS

S S

S S

SS SSS

SSSS

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

S SS

69 SF

SPECIMEN

A034A

568 SF

AUTOPSY

A034

118 SF

MECH

DOCK

A032

103 SF

TOILET -

LOCKER

A033

5 SF

CLOSET

A034B

67 SF

Room A036A

5 SF

CLOSET

A034C

16 SF

CLOSET

A035A

172 SF

WALK-IN

REF

A035

150 SF

VIEWING

RM.

A036

134 SF

BATTERY

CHARGING

A037

62 SF

MECH

A038

233 SF

CORRIDOR

H006

428 SF

CORRIDOR

H005

5 SF

ELEC

A001K

99 SF

A039

70 SF

WASH RM.

STORAGE

A029A

419 SF

REF

STORAGE

A028

27 SF

CLOSET

A028B

316 SF

WASH RM.

A029

321 SF

MECH

A028A

172 SF

STAIR 05

S005

141 SF

EQUIP.

STORAGE

A031

224 SF

GAS

STORAGE

A031B

129 SF

CHEMICAL

STORAGE

A031A

92 SF

VAULT

A001F

55 SF

VAULT

A001E

652 SF

SUPPLIES

A001I

577 SF

CORRIDOR

H004

461 SF

FOOD/ BEV

STORAGE

B022

126 SF

VESTIBULE

H010A

368 SF

EMS

STORAGE

A023

291 SF

VOL

SERVICE

STORAGE

A027

414 SF

EMS

STORAGE

A023A

363 SF

SERVICE

ELEVATOR

LOBBY

H007

129 SF

VESTIBULE

B022C

373 SF

FOOD/ BEV

WALK-IN

REF.

B022A

79 SF

STORAGE

A021

211 SF

STORAGE

A021A

127 SF

SILVER

RECOV.

A022

73 SF

EMS

A024

138 SF

OFFICE

A025

68 SF

OFFICE

489 SF

CORRIDOR

H009

156 SF

CORRIDOR

H010

354 SF

MECH. RM.

A002A

2474 SF

MECH. RM.

A002D

158 SF

TOILET,

MALE

A015

291 SF

MAIL RM.

A014

105 SF

STAIR 02

S002

4 SF

F.E.

CLOSET

H008A

15 SF

ELEC

A016A

553 SF

CORRIDOR

H003

269 SF

WAITING

RM.

A007

98 SF

OFFICE

A007A

97 SF

EXAM

A007B 111 SF

EXAM

A007C

96 SF

OFFICE

A007D

76 SF

CONTROL

A007E

360 SF

SIMULATOR

RM.

A007F

81 SF

OI&T

141 SF

RECEPTION

A007L

58 SF

TOILET

B007K

237 SF

OFFICE

A007G

430 SF

CORRIDOR

H002

117 SF

LOCKER

A007H

31 SF

LOCKER

A007I

45 SF

TOILET

A007J

170 SF

WORK

AREA

A008C

114 SF

MAZE

A008A

365 SF

THERAPY

ROOM 1

A008B

236 SF

CONTROL

AREA

A008

246 SF

CONTROL

A009D

633 SF

LINEAR

ACCELERATOR

A009B

146 SF

MAZE

A009A

127 SF

CORRIDOR

H001

150 SF

VESTIBULE

A009

190 SF

MOLD SHOP

A009E

1452 SF

MECH. RM.

A009C

5 SF

ELEC

A003A

91 SF

TOILET

A011J 307 SF

OUT-PATIENT

WAITING

A011

92 SF

OFFICE

A011A

148 SF

OFFICE

A010A

94 SF

PATIENT

DRESSING/

TOILET

A011I

168 SF

CORRIDOR

A011B

70 SF

PATIENT

INJECTION

A011H

114 SF

CORRIDOR

H034

150 SF

STORAGE

A012

91 SF

LABORATORY

A011G

132 SF

CONTROL

RM.

A011C

433 SF

PET/ CT

EXAM

A011D76 SF

EXAM

A011F

159 SF

MECH

A011E

211 SF

WORK RM.

A010

1860 SF

ELEC. RM.

A020

636 SF

CONFERENCE

RM.

B002K

8 SF

ELEC

B002L

196 SF

STAIR 12

S012

18 SF

ELEC RM.

B002F

27 SF

OI&T

B002G

516 SF

ELEC. RM.

A020A

640 SF

MECH. RM.

B002E

35 SF

UTILITY

SERVICE

B002H

332 SF

CORRIDOR

H034B

180 SF

OFFICE

B002C

525 SF

MECH

B002I

43 SF

STAIR 11

S011

19 SF

STORAGE

B004

3516 SF

CLEAN

MEDICAL

SUPPLY

B002

362 SF

OFFICE

B005

153 SF

OFFICE

99 SF

OFFICE

DB09

115 SF

OFFICE

DB08

118 SF

OFFICE

DB07

84 SF

OFFICE

DB06

86 SF

OFFICE

DB05

98 SF

OFFICE

DB04

155 SF

OFFICE

DB03

118 SF

RECEPTION

DB02 65 SF

VESTIBULE

DB01

74 SF

ELEC

CB27

69 SF

ELEC

CB28

157 SF

STAIR 10

S010

52 SF

STORAGE

DB16

52 SF

WORK RM.

DB10

137 SF

OFFICE

DB15A

137 SF

TR

DB15B

64 SF

MECH

DB14

183 SF

STORAGE

DB13

15 SF

OI&T

DB14A

31 SF

TOILET

DB12

31 SF

TOILET

DB11

102 SF

CORRIDOR

H029

95 SF

CORRIDOR

H027

273 SF

CORRIDOR

H028

179 SF

WAITING

RM.

H026

867 SF

CORRIDOR

H024

41 SF

MECH. RM.

CB29A

144 SF

TOILET,

MALE

DB17

76 SF

SOUND

BOOTH

DB22B

122 SF

EXAM

DB23

67 SF

SOUND

BOOTH

DB22A 120 SF

LOCKER

DB17A

115 SF

FEMALE

DB18

393 SF

SOUND

BOOTH

DB22

231 SF

CORRDOR

H032

161 SF

CORRIDOR

H030

37 SF

STORAGE

DB18A

207 SF

MANUAL

WASH

CB30

110 SF

CART WASH

CB16B

136 SF

DETERGENT

& WATER

TREATMENT

CB10

106 SF

ANTE RM.

CB11

86 SF

ANTE RM.

CB12

99 SF

LOCKER

FEMALE

CB1390 SF

LOCKER

MALE

CB14

40 SF

HAC

CB15B

96 SF

Room

CB17

241 SF

SCOPE

PROCESSING

CB17A

135 SF

SCOPE

STORAGE

CB18

93 SF

SHOWER,

FEMALE

CB15A

277 SF

ANTE RM.

CB19

142 SF

ANTE RM.

CB20

158 SF

STAIR 07

S007

97 SF

SHOWER,

FEMALE

CB21A

89 SF

SHOWER

MALE

CB22A

71 SF

HAC

CB25

183 SF

OFFICE

CB23 92 SF

LOCKER

MALE

CB22

94 SF

LOCKER

FEMALE

CB21

58 SF

ETO

CB26A

80 SF

ETO

CB26B

1102 SF

CASE CART

STORAGE

CB29

3445 SF

SURGICAL

STERILIZER

STORAGE

CB24

1919 SF

PREP/

STERILIZATION

CB26

20 SF

PUMP RM.

CB16A

10 SF

OI&T

1312 SF

DECONTAMINATION

CB16

110 SF

OFFICE

DB24

125 SF

OFFICE

DB25

125 SF

OFFICE

DB26

120 SF

OFFICE

DB27

121 SF

CORRIDOR

H031

119 SF

CORRIDOR

H033

192 SF

CORRIDOR

37 SF

HAC

DB28

299 SF

WAITING

RM.

DB32

121 SF

OFFICE

DB29

138 SF

EXAM

DB30

134 SF

EXAM

DB20

92 SF

EXAM

DB19

116 SF

OFFICE

DB31

1140 SF

MECH. RM.

DB33

123 SF

OFFICE

CB09

169 SF

STAFF

CB07

31 SF

ELEC

CB06

58 SF

OI&T

CB05

139 SF

OFFICE

CB08

192 SF

BREAK RM.

CB04

147 SF

CORRIDOR

H021

210 SF

CORRIDOR

H022

85 SF

STORAGE

CB01A

337 SF

CORRIDOR

H020

112 SF

CORRIDOR

H022A

150 SF

STAIR 06

S006

100 SF

Room

CB03B

190 SF

MECH. RM.

CB02A

1164 SF

MECH. RM.

CB02

495 SF

GENERATOR

CB03A

2341 SF

MECH. RM.

CB03

278 SF

CORRIDOR

H023

134 SF

BREAK

ROOM

B006

155 SF

BIOMED

SHOP

CB31

90 SF

OFFICE

CB32

75 SF

OFFICE

CB33

93 SF

TECH

CB34

371 SF

BIOMED

SHOP

CB36

1104 SF

EQUIPMENT

STORAGE

CB35

928 SF

ELEVATOR

LOBBY

H015

220 SF

CONFERENCE

RM.

B007

156 SF

CORRIDOR

H016

346 SF

ELEVATOR

LOBBY

H014

203 SF

STAIR 03

S003

288 SF

OFFICE

B011

234 SF

OFFICE

B010

15 SF

OI&T

B003A

69 SF

LAUNDRY

B003

18 SF

ELEC

B012A

5 SF

F.E.

CLOSET

H011A

134 SF

OFFICE

B008

137 SF

LOCKER

B001

105 SF

TOILET,

FEMALE

B001A

18 SF

OI&T

A017A

29 SF

HAC

A0177 SF

F.E.

CLOSET

B682

188 SF

STAIR 01

S001

146 SF

OFFICE

A019

12 SF

CLOSET

H008B

839 SF

MAIN

ELEVATOR

LOBBY

H008

108 SF

FOOD/ BEV.

WALK-IN

FREEZE

B022B

190 SF

WAREHOUSE

B021D

602 SF

WAREHOUSE

B021A

1084 SF

MECH.

SPACE

B021C

1430 SF

CORRIDOR

H011

110 SF

LIGHT RM.

B020B

118 SF

TOILET

B013A

61 SF

LOCKER

B013

344 SF

MACHINE

SHOP

B014

78 SF

PAINT

STORAGE

B015A

145 SF

PLASTER

SHOP

B016C

399 SF

PAINT SHOP

B015

76 SF

OFFICE

B016B

86 SF

CARPENTER

SHOP

STORAGE

B016A

120 SF

OFFICE

B020A

498 SF

ELEC SHOP

B020

86 SF

OFFICE

B019A

227 SF

PLUMB.

SHOP

B019

188 SF

STAIR 04

S004

294 SF

PLUMB.

SHOP

B019B

81 SF

HVAC SHOP

B17C

829 SF

CORRIDOR

H012

65 SF

OFFICE

B017A

204 SF

CORRIDOR

H013

611 SF

CARPENTER

SHOP

B016

279 SF

HVAC SHOP

B017B

97 SF

STERILIZER

RECESS

CB26C

509 SF

DECONTAMINATION

CB15

44 SF

MECH

B004A

76 SF

ELEV 3

E3

80 SF

ELEV 8

E8

2 SF

CLOSET

H005A

849 SF

TELEPHONE

SWITCHGEAR

A001

721 SF

SERVER

RM.

A001A

60 SF

PHONE

A001L

279 SF

PATIENT

CLOTHING

A002

261 SF

OFFICE /

STORAGE

A016

65 SF

ELEV 10

E10

Redundant Room

TELEPHONE

SWITCHGEAR

A001C

Redundant Room

OFFICE

A001B

101 SF

WAREHOUSE

B021E

11 SF

CHASE

CH-DB-1

30 SF

CHASE

CH-CB-2

29 SF

CHASE

CH-CB-4

33 SF

CHASE

CH-CB-5

8 SF

CHASE

CH-CB-6

43 SF

CHASE

CH-CB-7

12 SF

CHASE

CH-CB-8

93 SF

CHASE

CH-CB-9

7 SF

CHASE

CH-CB-10

20 SF

CHASE

CH-CB-11

11 SF

CHASE

CH-B-12

30 SF

CHASE

CH-B-13

21 SF

CHASE

CH-A-2

10 SF

CHASE

CH-A-3

36 SF

CHASE

CH-A-4

33 SF

CHASE

CH-A-5

13 SF

CHASE

CH-A-6

15 SF

CHASE

CH-A-7

16 SF

CHASE

CH-A-8

19 SF

CHASE

CH-A-9

13 SF

CHASE

CH-A-10

10 SF

CHASE

CH-A-11

27 SF

CHASE

CH-CB-12

102 SF

CHASE

CH-A-1

160 SF

STAIR 7

226 SF

STAIR 08

S308

211 SF

STAIR 09

S309

79 SF

ELEV 1

E1

79 SF

ELEV 2

E2

76 SF

ELEV 4

E4

98 SF

ELEV 5

E5

98 SF

ELEV 6

E6

80 SF

ELEV 7

E7

80 SF

ELEV 9

E9

285 SF

STORAGE

A001G

261 SF

SUPERVISOR

A001H

66 SF

VAULT

A001D

863 SF

CART

HOLDING

A001J

171 SF

EMS

A001M

190 SF

BREAK

AREA/

LOCKERS

B002B

355 SF

OFFICE

102 SF

CORRIDOR

H034A

168 SF

RECEIVING

B021B

185 SF

TELECOM

T001

01-MP402

01-MP401

01-MP403

2" CHR

2" CHS

3" CHS3" CHR

10" CHS

10" CHR

123 SF

TR

B009

3/4" D

# KEY NOTES:

Engineers Architects th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

C R e v it p ro je c ts

\A M

E P

F

-J

C

-0 tb u d a i.

rv t

/2

/2

:0 :3

P

M

21-124 BUILDING 1, GROUND FLOOR,

OVERALL MECHANICAL PLAN

EHRM INFRASTRUCTURE UPGRADES 657-21-700JC

BID DOCUMENTS

SMHNOVEMBER 28, 2022 RBK

4 43

01-MP100

NORTH

0 8 16 32

Scale: 1/16" = 1'-0"

BUILDING 1, GROUND FLOOR, OVERALL MECHANICAL PLAN

N

KEY PLAN

SCALE: NO SCALE

1 1" CHS/R DOWN TO NEW FAN COIL UNIT.

2 2-1/2” CHS/R UP. SEE 01-MP101 FOR

CONTINUATION.

3 PUMP 3/4” CONDENSATE DRAIN TO SINK IN

HAC D106 ABOVE.

4 CONDENSATE DRAIN AND CHS/R PIPING UP

TO FLOORS. SEE RISER FOR PIPE SIZES.

5 1-1/2” CHS/R UP. SEE 01-MP101 FOR

CONTINUATION.

6 1” CHS/R DOWN.

7 CONNECT INTO EXISTING 6" CHS/R.

8 CONNECT INTO EXISTING 10" CHS/R.

9 FIELD COORDINATE PIPE LOCATION WITH

EXISTING PIPE & DUCTWORK CONDITIONS.

10 PUMP 3/4” CONDENSATE DRAIN TO SINK IN

TOILET B013A.

A. SEE THE SHEET REFERENCED AT DETAILED

AREA CALLOUT FOR MECHANICAL,

PLUMBING, AND FIRE SUPPRESSION PLANS,

BOTH DEMOLITION AND NEW, IN THAT AREA.

B. COORDINATE ALL WORK WITH THE GENERAL

CONTRACTOR, OTHER TRADES AND THE COR

TO MINIMIZE DISRUPTION OF AREAS OUTSIDE

OF THE PROJECT LIMITS OF WORK.

C. ALL DEMOLISHED EQUIPMENT SHALL

BECOME THE PROPERTY OF THE

CONTRACTOR AND SHALL BE DISPOSED OF

IN ACCORDANCE WITH VAPHS

REQUIREMENTS AND ENVIRONMENTAL

REGULATIONS.

D. CONTRACTOR TO FIELD VERIFY ALL

CONDITIONS. PRESERVE EXISTING

DUCTWORK, PIPING OR EQUIPMENT THAT IS

NOT INDICATED FOR DEMOLITION OR IS

DISCOVERED IN THE DEMOLITION PROCESS.

E. UNLESS NOTED OTHERWISE, ALL DIFFUSERS

AND GRILLE RUN-OUTS ARE THE SAME SIZE

AS THE NECK/DUCT CONNECTION SIZE

SPECIFIED IN THE AIR DEVICE SCHEDULE.

F. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

G. SEE ARCHITECTURAL CEILING PLAN FOR

CEILING TYPES AS WELL AS DIFFUSER AND

GRILLE PLACEMENT WITHIN THE CEILING.

H. COORDINATE ALL THERMOSTAT LOCATIONS

WITH ALL OTHER WALL MOUNTED OBJECTS

BEFORE INSTALLATION.

I. PROVIDE ISOLATION BALL VALVES FOR EACH

PIPING BRANCH. LOCATE AS CLOSE TO MAIN

AS POSSIBLE.

DN

S

SSS S

S S

S S

S SS S

SSSS S SS S

SSSS

S S

S S

S S

S S

S S

S S

S S

S SS S S S S S

S S

S

S S

S S

S S

S S

S S

SS

S S

S

S SS

S S

S S

S SS S S S S S

S

SS SS S S

S

SSS

S S

S

S SS S

SS SSSS

S

SSS S

S

SSS SS

S

SSS S

SS S

S

SSS SS

S S

S S

SS

S S

S

SS

S S

S S

S S

S S

S SS

S S

S S

S S

S S

S S

S S

S S

S S

SS SSSSSSSS

S SS S S S S S S S

S

SS SS

S S

S

S SS S

SS SS S

S

SSS S

S S

S S

S SS S

SSSS S SS S

SSSS

S S

S S

S S

S S

S S

S S

S S

S SS S S S S S

S S

S

S S

S S

S S

S S

S S

SS

S S

S

S SS

S S

S S

S SS S S S S S

S

SS SS S S

S

SSS

S S

S

S SS S

SS SSSS

S

SSS S

S

SSS SS

S

SSS S

SS S

S

SSS SS

S S

S S

SS

S S

S

SS

S S

S S

S S

S S

S SS

S S

S S

S S

S S

S S

S S

S S

S S

SS SSSSSSSS

S SS S S S S S S S

S

SS SS

S S

S

S SS S

SS SS S

121 SF

EXAM

A120

164 SF

HEMO DIAL

TREAT BAY

A162E

625 SF

CORRIDOR

H109B

117 SF

HEMO DIAL

TREAT BAY

A162F

117 SF

HEMO DIAL

TREAT BAY

A162G

119 SF

HEMO DIAL

TREAT BAY

A162H

125 SF

HEMO DIAL

TREAT BAY

A162J

115 SF

HEMO DIAL

TREAT BAY

A162A

116 SF

HEMO DIAL

TREAT BAY

A162B

113 SF

HEMO DIAL

TREAT BAY

A162C

113 SF

HEMO DIAL

TREAT BAY

A162D

115 SF

EXAM

A163A

140 SF

EXAM

A163B

46 SF

TOILET

A160

19 SF

ELEC

A161

193 SF

NURSE

STATION

A156

61 SF

NOUR.

A159

107 SF

OFFICE

A158

73 SF

MED. PREP.

A157

133 SF

PATIENT

ISO.

A164

46 SF

TOILET

A164A

45 SF

TOILET

A165A

170 SF

STAIR 05

S105

132 SF

PATIENT

ISO.

A165

260 SF

MECH. RM.

A155

56 SF

SOILED

A154

92 SF

CORRIDOR

H108

77 SF

SCALE

H108B

38 SF

HAC

A166

93 SF

EQUIPMENT

REPAIR

A167

102 SF

PERITONEAL

DIALYSIS

A168

108 SF

EXAM

A169A

105 SF

EXAM

A169B

123 SF

OFFICE

A170A

54 SF

DIETITIAN

A170C

39 SF

IV

TREATMENT

A170B

39 SF

IV

TREATMENT

A170D

37 SF

CLEAN

A154A

53 SF

TOILET

A174A

44 SF

TOILET

A173A

194 SF

CONFERENCE

RM.

A153

119 SF

OFFICE

A170F

18 SF

SUPPLY

A170E

96 SF

CORRIDOR

H109C

260 SF

CORRIDOR

H108D

89 SF

CORRIDOR

H109A

18 SF

COATS

A173B 18 SF

STORAGE

A168A

62 SF

LOCKER

RM.

A172A

69 SF

RECEPTION

A173

76 SF

DECONTAMINATION

A171

90 SF

OFFICE

A170G

227 SF

LOUNGE

A172

164 SF

WAITING

A174

265 SF

CORRIDOR

H109

1771 SF

WAITING

RM.

A100

148 SF

RECEPTION

A100A

158 SF

COFFEE

SHOP

A100B

41 SF

STORAGE

A100C

130 SF

TOILET

A101A

41 SF

VESTIBULE

A101

190 SF

TOILET

A101B

91 SF

RELEASE

OF

INFORMATION

A101C

280 SF

OPTICAL

SHOP

A101D

387 SF

CORRIDOR

H105

240 SF

NEPHROLOGY

A177

98 SF

OFFICE

A177A

103 SF

OFFICE

A177B

111 SF

OFFICE

A177C

31 SF

STORAGE

A177D

114 SF

OFFICE

A177E

10 SF

CLOSET

A177F

93 SF

OFFICE

A177G

59 SF

ALARM

PANEL

A102

87 SF

OFFICE

A103

276 SF

RECEPTION

A135

552 SF

WAITING

RM.

A134

93 SF

SCREEN

A104

93 SF

SCREEN

A105

111 SF

LEAD

NURSE

A106 101 SF

EXAM

A107

119 SF

OFFICE

A108

111 SF

OFFICE

A109

213 SF

BREAK

A110

138 SF

EXAM

A111

121 SF

EXAM

A112138 SF

EXAM

A113

119 SF

EXAM

A114

124 SF

EXAM

A115

113 SF

EXAM

A116

128 SF

TOILET

A117

25 SF

HAC

A118

9 SF

ELEC

A119

22 SF

TOILET

A110A

285 SF

CORRIDOR

H101

231 SF

CORRIDOR

H102

134 SF

EXAM

A121

142 SF

EXAM

A122

141 SF

EXAM

A123

114 SF

OPHTH.

CHIEF

RESIDENT

A124

113 SF

OPHTH.

CHIEF

RESIDENT

A125

106 SF

EXAM

A126

126 SF

LASER

TREATMENT

A127

141 SF

PROCEDURE

A128

120 SF

EXAM

A129

118 SF

EXAM

A130

119 SF

CLINICAL

MANAGER

A131

160 SF

EXAM

A132

158 SF

IMAGING

SUPPLY

A133

172 SF

OFFICE,

CHIEF

A132A

10 SF

ELEC

A131A

173 SF

STAIR 02

S102

1015 SF

CORRIDOR

H103

14 SF

ELEC

A137A

20 SF

OI&T

A136

19 SF

FIRE

ALARM

SYSTEM

A136A

229 SF

STAIR 01

S101139 SF

NEUROLOGY

CLINIC

A139191 SF

WAITING

RM.

A139F

481 SF

CORRIDOR

H123

92 SF

NURSE

STATION

A139E

161 SF

EXAM

A139D

154 SF

EXAM

A139C

161 SF

EXAM

A139G

164 SF

EXAM

A139H

172 SF

EXAM

A139J

172 SF

EXAM

A139K

140 SF

EXAM

A139B

141…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .