21-124_Mech_Pre-Bid_Resub.pdf

PDF 2 MB Posted

Attached to
Y1BG--EHRM Infrastructure Upgrades Construction John Cochran Federal contract opportunity
Solicitation number
36C77623B0034
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation seeks a general contractor to construct twenty-four telecommunication rooms at a VA medical center. Infrastructure improvements include electrical work such as panel upgrades and power systems; HVAC assessments, reconfigurations and expansions; construction of a new exterior telecom tower; communication infrastructure upgrades including data outlets and cabling; physical security enhancements; fiber infrastructure assessments and upgrades; and hazardous material abatement. The work will take place at Building 1 of the St. Louis John Cochran VAMC.

View the file

Other files for this federal contract opportunity

Other files attached to Y1BG--EHRM Infrastructure Upgrades Construction John Cochran, newest first.
File Type Posted
52.204-27 Prohibition on a ByteDance Covered App - June 2023.pdf PDF
36C77623B0034 0004.pdf PDF
36C77623B0034 0003.pdf PDF
21-124_Geotech Report_Signed.pdf PDF
028211.1 Terracon Asbestos Report.pdf PDF
Technical Questions - FINAL - St. Louis 6-23-23.pdf PDF
028211 Trad Asbestos Abate (002)230620.pdf PDF
271510 Data Port.pdf PDF
271510.2 New Data Ports.pdf PDF
MN_ONCAM_C-8_Indoor_DS_EN_08-2022_HR.pdf PDF
21-124 Elec Pre-Bid Resub.pdf PDF
36C77623B0034 0002.pdf PDF
271510.1 Existing Data Port Survey.pdf PDF
000110 21-154 TOC.pdf PDF
MN_Oncam_C-12_Indoor_EN_10-2021.pdf PDF
SubReg May 2023.xlsx XLSX spreadsheet
36C77623B0034 0001.pdf PDF
Site Visit Sign-in Sheet - St. Louis 6-1-23.pdf PDF
Site Visit Sign-in Sheet - St. Louis 5-31-23.pdf PDF
ATTACHMENT 1 - Specifications Volume 1 of 2.pdf PDF
ATTACHMENT 5 - Civil Drawings.pdf PDF
ATTACHMENT 6 - Electrical Drawings.pdf PDF
ATTACHMENT 7 - Mechanical Drawings.pdf PDF
ATTACHMENT 3 - General Drawings.pdf PDF
ATTACHMENT 9 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 10 - Construction Wage Rates - St. Louis 4-14-23.pdf PDF
ATTACHMENT 11 - Contractor Safety - Environmental Form.docx DOCX document
36C77623B0034 - 5-11-23.pdf PDF
ATTACHMENT 2 - Specifications Volume 2 of 2.pdf PDF
ATTACHMENT 4 - Architectural Drawings.pdf PDF
ATTACHMENT 8 - Structural Drawings.pdf PDF
ATTACHMENT 12 - Site Visit Registration.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLUSHING CONNECTION

FEED OR CROSS MAIN.

TYPICAL TEE WITH

CROSS MAIN PITCH

TOWARDS FEED MAIN.

NOTE: INSTALL FLUSHING

CONNECTION AT END OF

CROSS MAINS.

2" NIPPLE 4" LONG

WITH CAP.

MECHANICAL TEE

NEW PIPING

MECHANICAL TEE

SCREWED END

STEEL BEAM

RETAINING STRAP

C-CLAMP

THREADED HANGER ROD

ADJUSTABLE RING HANGER

NOTE:

HANGING DETAILS SHOWN ARE SUBJECT TO REQUIREMENTS OF SEISMIC DESIGN.

EXPANSION ANCHOR HILT QUIK

BOLT TZ OR APPROVED EQUAL.

EXPANSION ANCHOR SHALL BE

QUALIFIED FOR USE IN CRACKED

CONCRETE PER ACI 355.2

EXISTING CONCRETE SLAB

AUTO. SPRINKLER PIPE

SET SCREW

SURGE RESTRAINER

1" X ARMOVER

1" 90 EL

1" X DROP

DROP NIPPLE

1" x 1/2" R.C. REDUCER

NOTE:

1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.

2. ALL EXPOSED PIPING SHALL BE PAINTED RED.

SUSPENDED CEILING

HANGERS SHALL

BE PROVIDED AS

REQUIRED BY

NFPA 13 TYPICAL

1" x 2" NIPPLE

BRANCH LINE

PENDENT SPRINKLER HEAD

DUCTWORK OR OTHER

OBSTRUCTION OVER

48" IN WIDTH.

UPRIGHT HEAD

SPRINKLER BRANCH LINE

ALL EXPOSED

SPRINKLER PIPING

SHALL BE PAINTED RED.

UPRIGHT HEAD.

PROVIDE GUARD.

NOTE:

1. PROVIDE SPRINKLER ABOVE AND BELOW DUCT OR OTHER OBSTRUCTION OVER 48" IN WIDTH.

2. COORDINATE SPRINKLER PIPE ROUTING AND LOCATION WITH COR AND ALL PARTIES INVOLVED WITH

INSTALLATION OF THE OBSTRUCTION.

3. PROVIDE PIPE SUPPORTS THAT COMPLY WITH NFPA 13 REQUIREMENTS. INCLUDE COST OF ADDITIONAL

SUPPORTS AS REQUIRED.

4. ATTACH PIPE SUPPORTS TO BUILDING STRUCTURE OR PROVIDE SUPPLEMENTAL STEEL ANCHOR POINTS. DO NOT ATTACH PIPE SUPPORTS TO DUCTWORK, PIPES, CONDUIT, OR EXISTING HANGER RODS FOR OTHER

EQUIPMENT.

INSTALL INSULATION AFTER

CAULKING SLEEVE, SEAL

ANNULAR SPACE.

FIRE RATED WALL AND OR SLAB.

STEEL PIPE SLEEVE TERMINATE

SLEEVE FLUSH WITH FINISHED

SURFACE.

UL-LISTED FIRESTOPPING

FINISHED ESCUTCHEON PLATE

FLUSH AGAINST WALL AND OF

SIZE TO COMPLETELY COVER

OPENING.

APPROVED TYPE FIRE SAFE &

SMOKE TIGHT CAULKING SEALER

BETWEEN BARE PIPE AND SLEEVE.

NOTE:

MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF CONCRETE OR CMU WALLS

SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC REQUIREMENTS.

NOTES:

1. ALL EXPOSED PIPING SHALL BE PAINTED RED.

2. PROVIDE GUARDS ON UPRIGHT SPRINKLERS UNLESS OTHERWISE NOTED.

THREADED

HANGER ROD

SURGE

RESTRAINER

ADJUSTABLE

RING HANGER

BRANCHLINE

AUTO. SPRINKLER FEED

UPRIGHT AUTOMATIC

SPRINKLER, FM APPROVED,

QUICK RESPONSE

REDUCER

RISER NIPPLE

REDUCING TEE

LISTED WIRE GUARD

(RED COLOR)

1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES PRIOR

TO START OF WORK.

2. COORDINATE WITH COR FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE.

GIVE THE COR THREE (3) DAYS NOTICE PRIOR TO PLANNED SHUTDOWN OR INTERRUPTION.

3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED.

PROTECT OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.

4. FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN

OFFSITE AND DISPOSED OF.

FIRE SUPPRESSION DEMOLITION GENERAL NOTES

1. USE NFPA-13 (2019), CHAPTER 27, “PLANS AND CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW. DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR

THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM.

2. COMPLY WITH THE INTERNATIONAL BUILDING CODE (LATEST ADOPTED EDITION). INSTALLATION SHALL COMPLY WITH VA REQUIREMENTS. SYSTEM SHALL ALSO BE IN COMPLIANCE WITH ALL REQUIRED PLUMBING CODES.

3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS. COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS. LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA

REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.

4. THIS FACILITY IS FULLY SPRINKLERED. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA

AND VA REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.

5. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13

AND VA STANDARDS.

6. PROVIDE ACTUAL NUMBER OF HEADS, REQUIRED SPACING AND PIPE ROUTING AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS AND OTHER TRADES TO PROVIDE A COMPLETE AND OPERABLE SYSTEM IN ACCORDANCE

WITH NFPA AND VA REQUIREMENTS.

7. FIRE PROTECTION CONTRACTOR SHALL OBTAIN FLOW TEST DATA INDICATING THE WATER FLOW, STATIC PRESSURE AVAILABLE WITH NO FLOW, AND RESIDUAL PRESSURE AT FULL FLOW TO THE FACILITY. SUBMIT PLANS RELATED TO

A MINIMUM OF 1 REMOTE AREA FOR REVIEW.

8. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING.

SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER

TRADES TO AVOID CONFLICT.

9. SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION

LOADS AT PRIMARY BUILDING STRUCTURAL MEMBERS.

10. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS IN ACCORDANCE WITH NFPA REQUIREMENTS.

11. CLEAN ENTIRE WORK AREA OF ALL DUST, DIRT, AND OTHER DEBRIS. MAINTAIN WORK AREA IN CLEAN CONDITION.

12. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM

AS SPECIFIED AND INDICATED ON THE DRAWINGS.

13. SUBMIT ONE COMPLETE SET OF AUTOMATIC SPRINKLER SYSTEM DRAWINGS, CURRENT WATER FLOW TEST, AND THE EQUIPMENT DATA BROCHURES PREPARED BY OR UNDER THE SUPERVISION OF, AND SEALED BY A

PROFESSIONAL ENGINEER.

14. REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE WORK AT NO ADDITIONAL COST TO THE VA.

15. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.

16. FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES IN ACCORDANCE WITH NFPA-13.

17. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONNECTION AT TOP OF PIPE.

18. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS OR

CORRIDORS. LOCATE CENTERED IN CEILING TILE WHERE POSSIBLE.

19. CONTRACTOR SHALL ASSESS THE ADEQUACY OF THE EXISTING WATER SUPPLY. PERFORM WATER SUPPLY FLOW

TESTING OF FIRE HYDRANTS AND/OR FIRE PUMP IF NECESSARY.

20. CONTRACTOR IS RESPONSIBLE FOR DRAINING THE SPRINKLER SYSTEM TO DO THE MODIFICATION WORK REFILING THE SYSTEM AND PUTTING THE SYSTEM BACK IN OPERATION. FIRE WATCH SHALL BE PROVIDE FOR THE DURATION

SPRINKLER SYSTEM IS NOT OPERATIONAL.

FIRE SUPPRESSION GENERAL NOTES

NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT

SEMI-RECESSED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

FIRE LINEFL

CONCEALED SPRINKLER HEAD

PENDANT SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

FIRE DEPARTMENT CONNECTION (FDC)

FIRE DRAINDRAIN

POINT OF NEW CONNECTION

LIMIT OF DEMOLITION

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

FIRE PROTECTION CONTRACTORFPC

TAMPER SWITCH

FLOW SWITCH

CHECK VALVE

GATE VALVE

EXTERIOR ALARM GONG (WATER ACTIVATED)

TEST AND DRAIN ASSEMBLY

BACKFLOW PREVENTER

T&D

TS

FS

ORDINARY HAZARD

GROUP 1 OCCUPANCY

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

ORDINARY HAZARD

GROUP 2 OCCUPANCY

LIGHT HAZARD

FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS

1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND

WRITTEN DUST CONTROL PLAN.

2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE

MAINTAINED.

3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS. PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY

MEASURES.

4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC

PATHOGENS.

5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE OWNER'S

ACCEPTANCE.

INFECTION CONTROL MEASURES

1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS OUT OF COMMISSION, CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY IN ACCORDANCE WITH VA REQUIREMENTS. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION. REFER TO INTERNATIONAL FIRE

CODE CHAPTER 9, SECTION 901.7.

2. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE

PERSONS PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.

3. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED

IN ITS USE.

4. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND ROOM OF THE FIRE AREA IS COVERED.

BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF FIRE

PROTECTION SERVICE

THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA

13. IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE

PROTECTION WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS

DRAWING IS “FOR INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE

PROTECTION CONTRACTOR TO BASE THE DESIGN OF THE FIRE PROTECTION

SYSTEM ON. THE CONTRACTOR SHALL VERIFY THE EXACT CONDITIONS THAT THIS

DRAWING REPRESENTS, INCLUDING ANY PERCEIVED CONCEALED SPACES, AND THE

BUILDING TYPE AND CONSTRUCTION AS OUTLINED IN THE INTERNATIONAL BUILDING

CODE, PRIOR TO THE START OF WORK. REFER TO THE INTERNATIONAL BUILDING

CODE, NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION

REQUIREMENTS.

Engineers Architects th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

C R e v it P ro je c ts

\M P

F

-1

S

T L

-J C

-E H

R M

G e n e ra l_ s h a rm o n A

C G

.r v t

/2

/2

:1 :1

P

M

21-124 FIRE SUPPRESSION SYMBOLS,

ABBREVIATIONS AND NOTES

EHRM INFRASTRUCTURE UPGRADES 657-21-700JC

BID DOCUMENTS

SMHNOVEMBER 28, 2022 RBK

3 43

00-M-003

Scale: No Scale

MECHANICAL TEE AND FLUSHING CONNECTION DETAIL

Scale: No Scale

PIPE HANGER SUPPORT DETAIL

Scale: No Scale

SEMI-RECESSED PENDENT SPRINKLER DETAIL

Scale: No Scale

SPRINKLER ABOVE AND BELOW DUCT DETAIL

Scale: No Scale

SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL DETAIL

Scale: No Scale

UPRIGHT AUTOMATIC SPRINKLER WITH GUARD DETAIL

1 ADDENDUM 01 6/23/2023

DocuSign Envelope ID: 109BD02D-C2BD-4451-925E-380E3BC4F3F0

6/22/2023

FCU OR ACU UNITARY

CONTROLLER , TYP.

QUANTITY MAY VARY IN EACH

TR - PROVIDE ONE 120V

20AMP CIRCUIT FOR UP TO

FOUR CONTROLLERS

NOTES:

1. TYPICAL AT EACH BUILDING.

2. USER GROUP (OIT) TO HAVE ACCESS WITH PASSWORD TO MONITOR ONLY THE FOLLOWING:

A. TR ROOM TEMPERATURE SETPOINT.

B. TR ROOM CURRENT TEMPERATURE.

C. TR ROOM CURRENT HUMIDITY LEVEL.

D. TR ROOM HVAC UNIT (FAN COIL OR AIR CONDITIONING UNIT) STATUS.

E. TR ALARMS WITH LOCATIONS.

3. EEC TO HAVE ACCESS WITH PASSWORD TO ALL CONTROL POINTS.

EXISTING

CONTROLLER(S)

NEW

CONTROLLER

TR ROOMS

ROOM WATER

DETECTOR

DRAIN PAN

DETECTOR

T

H

ROOM WATER

DETECTOR

DRAIN PAN

DETECTOR

T

H

ROOM WATER

DETECTOR

DRAIN PAN

DETECTOR

T

H

TEMPERATURE SENSOR, TYP.

HUMIDITY SENSOR, TYP.

TO EXISTING

EQUIPMENT AND

CONTROLS IN BUILDING

BAS TRUNK

BAS TRUNK TO ECC

PROVIDE IN CONTROL PANEL 1

ROOM TEMPERATURE AND HUMIDITY SENSOR, WALL MOUNTED 48" AFF.

RA

FILTER

COOLING COIL

FAN

HS

SST

T T-1

PC

CHR

CHS

VALVE

T

DISCHARGE AIR TEMPERATURE

SENSOR

T

SA

H

HW

WATER

DETECTION

ALARM IN

DRAIN PAN

IT

CURRENT SENSOR FOR FAN STATUS

HAND-OFF-AUTO SWITCH

POINT NAME:

ROOM TEMPERATURE

ROOM TEMPERATURE SETPOINT

DISCHARGE AIR TEMPERATURE

FAN STATUS

FAN ON/OFF

COOLING COIL CONTROL VALVE

HIGH DISCHARGE AIR TEMPERATURE

LOW DISCHARGE AIR TEMPERATURE

HARDWARE POINTS

AI AO

X

X

X

BI BO

SOFTWARE POINTS

AV BV SCHED TREND ALARM

SHOW ON GRAPHIC

X

X

X

X

X

X

X

X

X

X

X

X

TOTAL HARDWARE (7) TOTAL SOFTWARE (12)

3 1

X

X

X

5 6 9

X

X

X

X

X

X

X

2 1

ROOM HUMIDITY

X

WATER DETECTION ALARM IN DRAIN PAN X X

TOTAL POINTS BY TYPE: 1

FAN COIL UNIT:

1. ON CALL FOR COOLING, FAN SHALL START AND VALVE V-1 SHALL MODULATE TO MAINTAIN A ROOM TEMPERATURE OF 72

DEGREES F (ADJ.).

2. ALARM BAS IF ROOM IS MORE THAN 5 DEGREES FROM SETPOINT (ADJ.).

3. HUMIDITY SENSOR SHALL MONITOR SPACE HUMIDITY AND REPORT VALUE TO THE BUILDING AUTOMATION SYSTEM (BAS).

4. THE OIT DEPARTMENT SHALL HAVE THE ABILITY TO SEE AND CHANGE THE ROOM TEMPERATURE SETPOINT THROUGH PASSWORD PROTECTED ACCESS TO THE BAS. THE OIT DEPARTMENT SHALL NOT HAVE ACCESS TO ANY OTHER SYSTEMS IN THE BAS EXCEPT THE TR ROOMS. PROVIDE ANY NECESSARY COMPONENTS FOR THIS ABILITY.

SUPPORT

STRAPS OR

WIRES, TYP.

DRAIN PAN

NOTES:

1. DRAIN PAN TO BE GALVANIZED SHEETMETAL WITH WATER-TIGHT JOINTS.

2. LOCATE 4 TO 8 INCHES (10 TO 20 CM) BELOW PIPE OR EQUIPMENT THAT IS SUBJECT TO LEAK.

3. SUPPORT PAN WITH 1" (2.5 CM) WIDE STRAPS OR WIRES ATTACHED TO STRUCTURE.

4. WIDTH AND LENGTH SHALL BE A MINIMUM OF 2 INCHES (5 CM) LONGER THAN THE PIPE OR EQUIPMENT SIZE.

5. WATER DETECTOR SHALL ALARM TO THE BUILDING AUTOMATION SYSTEM (BAS). BAS SHALL SHOW ROOM LOCATION

WITH ALARM.

VARIES

VARIES

WATER DETECTOR CONTROLLER WATER DETECTOR SENSOR

POINT NAME:

HARDWARE POINTS

AI AO BI BO

SOFTWARE POINTS

AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC

TOTAL HARDWARE (1) TOTAL SOFTWARE (2)

0 0 1 111 0 0 0 0 0

DRAIN PAN WATER DETECTION ALARM X X X

POINT NAME:

HARDWARE POINTS

AI AO BI BO AV BV LOOP SCHED TREND

SHOW ON GRAPHICS

ALARM

SOFTWARE POINTS

CHWS TEMPERATURE X X X

CHWR TEMPERATURE X X X

CHW LOOP DIFFERENTIAL PRESSURE X X X

TOTAL POINTS BY TYPE: 3 2 4 2 2 6 0 7 11 198

TOTAL HARDWARE (11) TOTAL SOFTWARE (34)

HIGH CHWS TEMPERATURE X XX

LOW CHWS TEMPERATURE X XXX

X

PUMP 1 START/STOP X X X

PUMP 1 STATUS X X XX

PUMP 1 VFD SPEED X X X

PUMP 1 VFD FAULT X X XX

PUMP 2 START/STOP X X X

PUMP 2 STATUS X X XX

PUMP 2 VFD SPEED X X X

PUMP 2 VFD FAULT X X XX

LEAD PUMP MINIMUM RUN TIME X X X

LEAD PUMP MINIMUM OFF TIME X X X

PUMP CHANGEOVER TIME X X X

PUMP 1 RUN TIME X X X

PUMP 2 RUN TIME X X X

PUMP MANUAL CHANGEOVER SWITCH X X

X

X

WALL

NOTES:

1. LOCATE SENSOR 4 TO 8 INCHES (10 TO 20 CM) BELOW OR BESIDE EQUIPMENT THAT IS SUBJECT TO LEAK.

2. LOCATE SENSOR OUT OF THE TRAFFIC PATH.

3. WATER DETECTOR SHALL ALARM TO THE BUILDING AUTOMATION SYSTEM (BAS). BAS SHALL SHOW ROOM LOCATION

WITH ALARM.

4. THIS IS FOR ALL TR'S.

WATER DETECTOR CONTROLLER

WATER DETECTOR SENSOR

POINT NAME:

HARDWARE POINTS

AI AO BI BO

SOFTWARE POINTS

AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC

TOTAL HARDWARE (1) TOTAL SOFTWARE (2)

0 0 1 111 0 0 0 0 0

ROOM WATER DETECTION ALARM X X X

CHILLED WATER PUMPS

1. RUN CONDITIONS:

A. PUMPS:

1. CHILLED WATER LEAD PUMP SHALL RUN CONTINUOUSLY.

2. PUMPS SHALL HAVE MINIMUM RUN AND OFF TIMES, BOTH USER ADJUSTABLE, TO PREVENT SHORT CYCLING.

B. SETPOINTS:

1. MINIMUM CHILLED WATER ALARM SETPOINT: 38 (ADJ.).

2. MAXIMUM CHILLED WATER ALARM SETPOINT: 48°F (ADJ.).

2. CHILLED WATER PUMPS CONTROL:

A. PUMPS SHALL OPERATE IN A LEAD/LAG SEQUENCE. ONLY ONE PUMP WILL RUN AT ANY GIVEN TIME.

1. LEAD PUMP SHALL RUN FIRST.

2. LAG PUMP WILL OPERATE UPON FAILURE OF THE LEAD PUMP. LEAD PUMP SHALL BE COMMANDED OFF.

3. LEAD PUMP ROTATION SHALL BE CONTROLLED BY A USER SELECTABLE SOFTWARE SWITCH FOR ONE OF THE FOLLOWING CONDITIONS:

a. MANUAL CHANGEOVER THROUGH A SOFTWARE SWITCH.

b. PUMP RUNTIME (ADJ.).

c. DAILY CHANGEOVER.

d. WEEKLY CHANGEOVER.

e. MONTHLY CHANGEOVER.

4. PUMPS SHALL HAVE MINIMUM RUN AND OFF TIMES, BOTH USER ADJUSTABLE, TO PREVENT SHORT CYCLING.

5. PUMP SPEED TO BE CONTROLLED BY A PRESSURE SWITCH LOCATED ABOUT 2/3 DOWN THE LONGEST CHILLED WATER SUPPLY PIPE.

THE VFD WILL ADJUST THE PUMP SPEED TO MAINTAIN THE PRESSURE SETTING AS DETERMINED BY THE BALANCING CONTRACTOR

(ADJ.).

3. CHILLED WATER TEMPERATURE MONITORING:

A. CHILLED WATER RETURN TEMPERATURE.

B. CHILLED WATER SUPPLY TEMPERATURE.

4. ALARMS:

A. CHILLED WATER PUMPS:

1. PUMP FAILURE, PUMP COMMANDED ON BUT THE STATUS IS OFF.

2. RUNNING IN HAND, COMMANDED OFF, BUT STATUS IS ON.

3. RUNTIME EXCEEDED, STATUS RUNTIME EXCEEDS USER DEFINABLE LIMIT.

B. LOW CHILLED WATER SUPPLY TEMP: IF THE CHILLED WATER SUPPLY TEMP IS BELOW THE MINIMUM CHILLED WATER ALARM SETPOINT.

C. HIGH CHILLED WATER SUPPLY TEMP: IF THE CHILLED WATER SUPPLY TEMP IS ABOVE THE MAXIMUM CHILLED WATER ALARM SETPOINT.

Engineers Architects th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

C R e v it P ro je c ts

\M P

F

-1

S

T L

-J C

-E H

R M

G e n e ra l_ s h a rm o n A

C G

.r v t

/2

/2

:5 :4

P

M

21-124 MECHANICAL CONTROLS EHRM INFRASTRUCTURE UPGRADES 657-21-700JC

BID DOCUMENTS

WLFNOVEMBER 28, 2022 RBK

41 43

00-M-503

Scale: No Scale

BUILDING CONTROLS RISER DIAGRAM

Scale: No Scale

FAN COIL UNIT CONTROLS SCHEMATIC - COOLING ONLY

Scale: No Scale

FAN COIL UNIT POINTS LIST - COOLING ONLY

Scale: No Scale

FAN COIL UNIT SEQUENCE OF OPERATION - COOLING ONLY

Scale: No Scale

DRAIN PAN DETAIL

Scale: No Scale

DRAIN PAN POINTS LIST

Scale: No Scale

CHILLED WATER PUMPS CONTROLS POINTS LIST

Scale: No Scale

ROOM WATER ALARM DETAIL

Scale: No Scale

ROOM WATER ALARM POINTS LIST

Scale: No Scale

CHILLED WATER PUMPS SEQUENCE OF OPERATION

1 ADDENDUM 01 6/23/2023

Engineers Architects th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

C R e v it P ro je c ts

\M P

F

-1

S

T L

-J C

-E H

R M

G e n e ra l_ s h a rm o n A

C G

.r v t

/2

/2

:5 :4

P

M

21-124 MECHANICAL SCHEDULES EHRM INFRASTRUCTURE UPGRADES 657-21-700JC

BID DOCUMENTS

WLFNOVEMBER 28, 2022 WLF

42 43

00-M-601

1. PROVIDE 2 VFD'S, ONE FOR EACH PUMP MOTOR.

NOTES

1-CHP1 A019 TR /OIT ROOOMS CHILLED WATER

CLOSE COUPLED

TWIN INLINE

WATER 165 [ 10 ] 65 [ 190 ] 8 [ 24 ] 45 [ 7 ] 1 60 5 EA [ 4 ] 3 480 7.6 1800 VFD 1

GPM [L/s] FT [kPa] FT [kPa] °F [°C] HP [kW]

FLUID

FLOW HEAD NPSH AVAILABLE TEMPERATURE

SP GR

NOMINAL POWER

PHASE VOLT FLA MAX RPM

SPEED

CONTROL

REMARKS

MARK LOCATION

AREA AND/OR BLDG

SERVED

SYSTEM AND/OR

SERVICE

TYPE

CIRCULATING FLUID

MIN % EFF

ELECTRICAL MOTOR

PUMP SCHEDULE

2. PROVIDE CONDENSATE PUMP.

1. PROVIDE A SINGLE, DOUBLE-DEFLECTION SUPPLY GRILLE AND A LOUVERED RETURN GRILLE. SUPPLY GRILLE LOCATION SHALL DIRECT SUPPLY AIRFLOW TOWARD FACE OF RACKS. SEE PLANS.

NOTE

1-FCU-T901 330

BLDG 1

T901

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-T801 330

BLDG 1

T801

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-T701 330

BLDG 1

T701

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-T601 330

BLDG 1

T601

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-T501 330

BLDG 1

T501

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-T401 330

BLDG 1

T401

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-T301 330

BLDG 1

T301

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-T201 330

BLDG 1

T201

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-T101 330

BLDG 1

T101

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-T001 330

BLDG 1

T001

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-B904D 330

BLDG 1

B904D

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-B850 330

BLDG 1

B850

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-B702 330

BLDG 1

A702

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-B630A 330

BLDG 1

B630A

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-C524 330

BLDG 1

C524

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-B427 330

BLDG 1

B427

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-B422 330

BLDG 1

B422

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-C304 330

BLDG 1

C304

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-D261 330

BLDG 1

D261

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-B201E 330

BLDG 1

B201E

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-D145 330

BLDG 1

D145

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-B121 330

BLDG 1

B121

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-DB15B 330

BLDG 1

DB15B

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-B009 330

BLDG 1

B009

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-A019 330

BLDG 1

A019

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

1-FCU-A016 330

BLDG 1

A016

VERTICAL

STACK FCU

1100 [ 520 ] 0.2 [ 50 ] 30,500 [ 8900 ] 46,500 [ 14000 ] 80 [ 27 ] 67 [ 19 ] 4 6.7 0.4 45 [ 7 ] 25 [ 75 ] 1 [ 25 ] 8 0.6 [ 450 ] 1 115 5.21 1750 N/A 1, 2

CFM [L/s] IN WG [Pa] BTUH [W] BTUH [W] °F [°C] °F [°C] GPM [L/s] °F [°C] FT [kPa] IN [mm] MERV RATING HP [W]

Db Wb

MIN SENS CAPACITY MIN TOTAL CAPACITY

EAT

ROWS

FLOW EWT WPD RUNOUT SIZE POWER

PHASE VOLT AMPS RPM

SPEED

CONTROL

MARK BUILDING AREA LOCATION TYPE

FAN AIR FLOW EXTERNAL APD

COOLING REQUIREMENTS CIRCULATING WATER

FILTER

FAN MOTOR

REMARKS

COOLING ONLY TWO PIPE FAN COIL UNIT SCHEDULE

1. CUSTOM FINISH COLOR TO MATCH COMPOSIT PANELS.

NOTES:

1-LVR-T901 DRAINABLE BLADE 105 50 0.100 25 38 x 6 965 x 150 2 50 ALUMINUM NONE NOTE 1 1

1-LVR-T801 DRAINABLE BLADE 80 38 0.100 25 38 x 6 965 x 150 2 50 ALUMINUM NONE NOTE 1 1

1-LVR-T701 DRAINABLE BLADE 85 40 0.100 25 38 x 6 965 x 150 2 50 ALUMINUM NONE NOTE 1 1

1-LVR-T601 DRAINABLE BLADE 75 35 0.100 25 38 x 6 965 x 150 2 50 ALUMINUM NONE NOTE 1 1

1-LVR-T501 DRAINABLE BLADE 85 40 0.100 25 38 x 6 965 x 150 2 50 ALUMINUM NONE NOTE 1 1

1-LVR-T401 DRAINABLE BLADE 90 42 0.100 25 38 x 6 965 x 150 2 50 ALUMINUM NONE NOTE 1 1

1-LVR-T301 DRAINABLE BLADE 75 35 0.100 25 38 x 6 965 x 150 2 50 ALUMINUM NONE NOTE 1 1

1-LVR-T201 DRAINABLE BLADE 75 35 0.100 25 38 x 6 965 x 150 2 50 ALUMINUM NONE NOTE 1 1

1-LVR-T101 DRAINABLE BLADE 50 24 0.100 25 38 x 6 965 x 150 2 50 ALUMINUM NONE NOTE 1 1

1-LVR-T001 DRAINABLE BLADE 100 47 0.100 25 16 x 8 400 x 200 2 50 ALUMINUM NONE NOTE 1 1

CFM [L/s] IN WG [Pa] IN x IN [mm x mm] IN [mm ]

MARK TYPE

AIR FLOW MAX APD

WIDTH x HEIGHT SIZE BLADE DEPTH

MATERIAL DAMPER FINISH NOTES

LOUVER SCHEDULE

1 ADDENDUM 01 6/23/2023

GROUND FLOOR

1" CHR

1" CHS

1-FCU-DB15B

1" CHR

1" CHS

1-FCU-B009

GROUND FLOOR

FIRST FLOOR

1" CHR

1" CHS

1-FCU-D145

1" CHR

1" CHS

1-FCU-B121

1" CHR

1" CHS

1-FCU-T101

FIRST FLOOR

SECOND FLOOR

1" CHR

1" CHS

1-FCU-D261

1" CHR

1" CHS

1-FCU-B201E

1" CHR

1" CHS

1-FCU-T201

SECOND FLOOR

THIRD FLOOR

1" CHR

1" CHS

1-FCU-B427

1" CHR

1" CHS

1-FCU-C304

1" CHR

1" CHS

1-FCU-T301

THIRD FLOOR

ROOF

1" CHR

1" CHS

1-FCU-B422

1" CHR

1" CHS

1-FCU-T401

FOURTH FLOOR

1" CHR

1" CHS

1-FCU-C524

1" CHR

1" CHS

1-FCU-T501

FIFTH FLOOR

1" CHR

1" CHS

1-FCU-B630

1" CHR

1" CHS

1-FCU-T601

SIXTH FLOOR

1" CHR

1" CHS

1-FCU-B702

1" CHR

1" CHS

1-FCU-T701

SEVENTH FLOOR

1" CHR

1" CHS

1-FCU-B850

1" CHR

1" CHS

1-FCU-T801

EIGHTH FLOOR

1" CHR

1" CHS

1-FCU-B904D

1" CHR

1" CHS

1-FCU-T901

NINTH FLOOR

ROOF

FIFTH FLOOR

SIXTH FLOOR

SEVENTH FLOOR

EIGHTH FLOOR

NINTH FLOOR

ROOF

FOURTH FLOOR

BALL VALVE AND MANUAL

AIR VENT, TYP.

1" CHS 1" CHR

1-1/2" CHS 1-1/2" CHR

2" CHS 2" CHR

1" CHS 1" CHR

BALL VALVE, TYP.

2" CHS

2" CHR

1" CHS

1" CHR

1" CHS 1" CHR

1-1/2" CHS 1-1/2" CHR

2" CHS 2" CHR

2" CHS 2" CHR

2-1/2" CHS 2-1/2" CHR

2-1/2" CHS 2-1/2" CHR

BUTTERFLY VALVE, TYP.

2" CHS

2" CHR

2-WAY CONTROL VALVE

UNLESS NOTED OTHERWISE -

SEE DETAIL 8/00-M-502, TYP.

3-WAY CONTROL VALVE -

SEE DETAIL 9/00-M-502

3-WAY CONTROL VALVE -

SEE DETAIL 9/00-M-502

3-WAY CONTROL VALVE -

SEE DETAIL 9/00-M-502

3" CHS

3" CHR

EX 10" CHS

EX 10" CHR

2-1/2" CHS 2-1/2" CHR

2" CHS 2" CHR

2" CHS 2" CHR

1-1/2" CHS 1-1/2" CHR

1" CHS 1" CHR

1" CHS

1" CHR

2-1/2" CHS 2-1/2" CHR

P

PRESSURE SWITCH FOR PUMP CONTROL

2" ADJUSTABLE PRESSURE RELIEF VALVE AND

BALANCE VALVE WITH ISOLATION VALVES -

SET TO PROVIDE MINIMUM PUMP FLOW WHEN

ALL CONTROL VALVES ARE CLOSED

1" CHR

1" CHS

1-FCU-A019

3" CHS

1" CHR

1" CHS

1-FCU-A016

1" CHR

1" CHS

1-FCU-T001

3" CHS

3" CHR CORRIDOR

H003

CIRCULATION PUMP

3" CHS

3" NC BYPASS

DRILL THROUGH CONCRETE

BEAM FROM CORRIDOR H003

INTO OFFICE/STORAGE A106

BOTTOM OF RISER HOSE END DRAIN

VALVE WITH CAPPED HOSE END, TYP.

3" CHR

EX 6" CHR

3" CHS

EX 6" CHS

CONNECT TO EXISTING FIRE LINE IN CORRIDOR

OUTSIDE OF STAIR 01 SEE 01-MP401 FOR MORE

INFORMATION.

3" FIRE RISER TYP.

UPRIGHT SPRINKLER

HEADS TYP.

2" ADJUSTABLE PRESSURE RELIEF VALVE AND

BALANCE VALVE WITH ISOLATION VALVES -

SET TO PROVIDE MINIMUM PUMP FLOW WHEN

ALL CONTROL VALVES ARE CLOSED

2" ADJUSTABLE PRESSURE RELIEF VALVE AND

BALANCE VALVE WITH ISOLATION VALVES -

SET TO PROVIDE MINIMUM PUMP FLOW WHEN

ALL CONTROL VALVES ARE CLOSED

2" ADJUSTABLE PRESSURE RELIEF VALVE AND

BALANCE VALVE WITH ISOLATION VALVES -

SET TO PROVIDE MINIMUM PUMP FLOW WHEN

ALL CONTROL VALVES ARE CLOSED

Engineers Architects th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

C R e v it P ro je c ts

\M P

F

-1

S

T L

-J C

-E H

R M

G e n e ra l_ s h a rm o n A

C G

.r v t

/2

/2

:5 :2

P

M

21-124 BUILDING 1 CHILLED WATER & FIRE

SUPPRESSION RISER DIAGRAMS

EHRM INFRASTRUCTURE UPGRADES 657-21-700JC

BID DOCUMENTS

WLFNOVEMBER 28, 2022 RBK

43 43

01-M-602

Scale: No Scale

BUILDING 1 CHILLED WATER & FIRE SUPPRESSION RISER DIAGRAMS

1 ADDENDUM 01 6/23/2023

OS

OS

ELEC

A016A

OI&T

A017A

HAC

A017

F.E.

CLOSET

B682

STAIR 01

S001OFFICE

A019

OFFICE /

STORAGE

A016

CHASE

CH-A-1

6810 7

G.9

H

I

TELECOM

T001

OFFICE

A019

CHASE

CH-A-1

STAIR 01

S001

HAC

A017

OI&T

A017A

F.E.

CLOSET

B682

ELEC

A016A

6810 7

G.9

H

I

OFFICE /

STORAGE

A016

F L

F L

6 6

FSTSFS

FSTSTS 15

FSTSFS

FSTSTS

F L

ELEC

A016A

OI&T

A017A

HAC

A017

F.E.

CLOSET

B682

STAIR 01

S001

OFFICE

A019

OFFICE /

STORAGE

A016

CHASE

CH-A-1

TELECOM

T001

6810 7

G.9

H

I

FSTST

FSTSH

1-FCU-T001

FSTS

FSTS

3" CHS

3" CHR

1-CHP1

1-FCU-A019

FSTST

FSTST

1-FCU-A016

FSTS

FSTS

FSTS

FSTS

1-LVR-T001

/4

C

H S

/4

C

H R

CHASE

CH-A-1

OFFICE

A019

STAIR 01

S001

OFFICE /

STORAGE

A016

TOILET,

MALE

A015

6810 7

G.9

H

I

EXISTING FIRE RISER

# KEY NOTES:

# KEY NOTES:

Engineers Architects th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

C R e v it P ro je c ts

\A M

E P

F

-J

C

-0 s h a rm o n

A C

G .r v t

/2

/2

:5 :0

P

M

21-124 BUILDING 1, GROUND FLOOR,

TELECOM T001 PLANS

EHRM INFRASTRUCTURE UPGRADES 657-21-700JC

BID DOCUMENTS

SMHNOVEMBER 28, 2022 RBK

14 43

01-MP401

NORTH

0 2 4 8

Scale: 1/4" = 1'-0"

TELECOM ROOM T001

MECHANICAL DEMOLITION PLAN

NORTH

0 2 4 8

Scale: 1/4" = 1'-0"

TELECOM ROOM T001

FIRE SUPPRESSION PLAN

NORTH

0 2 4 8

Scale: 1/4" = 1'-0"

TELECOM ROOM T001

MECHANICAL PLAN

A. COORDINATE ALL WORK WITH THE GENERAL

CONTRACTOR, OTHER TRADES AND THE

COR TO MINIMIZE DISRUPTION OF AREAS

OUTSIDE OF THE PROJECT LIMITS OF WORK.

B. ALL DEMOLISHED EQUIPMENT SHALL

BECOME THE PROPERTY OF THE

CONTRACTOR AND SHALL BE DISPOSED OF

IN ACCORDANCE WITH VAPHS

REQUIREMENTS AND ENVIRONMENTAL

REGULATIONS.

C. CONTRACTOR TO FIELD VERIFY ALL

CONDITIONS. PRESERVE EXISTING

DUCTWORK, PIPING OR EQUIPMENT THAT IS

NOT INDICATED FOR DEMOLITION OR IS

DISCOVERED IN THE DEMOLITION PROCESS.

D. UNLESS NOTED OTHERWISE, ALL DIFFUSERS

AND GRILLE RUN-OUTS ARE THE SAME SIZE

AS THE NECK/DUCT CONNECTION SIZE

SPECIFIED IN THE AIR DEVICE SCHEDULE.

E. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

F. SEE ARCHITECTURAL CEILING PLAN FOR

CEILING TYPES AS WELL AS DIFFUSER AND

GRILLE PLACEMENT WITHIN THE CEILING.

G. COORDINATE ALL THERMOSTAT LOCATIONS

WITH ALL OTHER WALL MOUNTED OBJECTS

BEFORE INSTALLATION.

H. PROVIDE ISOLATION BALL VALVES FOR EACH

PIPING BRANCH. LOCATE AS CLOSE TO MAIN

AS POSSIBLE.

N

KEY PLAN

SCALE: NO SCALE

1 PROVIDE 3/4” CONDENSATE DRAIN FROM

FCU AND CONNECT TO DRAIN RISER .

2 PROVIDE NEW FAN COIL UNIT. CONNECT 1"

PIPING TO CHILLED WATER SUPPLY AND

RETURN RISERS AS SHOWN WITH

ISOLATION VALVES.

3 SEE DRAIN PAN DETAIL ON 00-M-501 SHEET

FOR MORE INFORMATION.

4 PROVIDE TEMPERATURE AND HUMIDITY

SENSOR ON WALL AND CONNECT TO THE

BAS FOR NEW FAN COIL UNIT.

5 PROVIDE 16"x8" OUTSIDE AIR LOUVER THROUGH EXTERIOR WALL. ROUTE 8"x8"

OUTSIDE AIR DUCT TO PLENUM BOX ON FAN

COIL UNIT.

6 PROVIDE STANDARD RESPONSE UPRIGHT

SPRINKLER HEADS. CONNECT TO EXISTING

FIRE SPRINKLER PIPING SERVING THIS

AREA.

7 PROVIDE INLINE CHS/R PUMP AS

SCHEDULED. CONNECT TO THE BUILDING

AUTOMATION SYSTEM.

8 REMOVE THE EXISTING ELBOW AND

REPLACE WITH TEE EXTEND NEW

SPRINKLER PIPING. ROUTE AS NECESSARY

TO PROVIDE COVERAGE IN TELECOM ROOM.

9 PROVIDE 3/4" CONDENSATE DRAIN FROM

FCU AND ROUTE FLOOR DRAIN IN CHASE

CH-A-1. PROVIDE CONDENSATE AIR TRAP,

DES CHAMP OR EQUAL.

10 PROVIDE TEMPERATURE SENSOR ON WALL

AND CONNECT TO THE BAS FOR NEW FAN

COIL UNIT.

11 CONDENSATE DRAIN AND CHS/R PIPING UP

TO FLOORS. SEE RISER FOR PIPE SIZES.

12 3" FL UP TO THE NEXT FLOOR.

13 PROVIDE SIDEWALL DIFFUSER 16x16.

14 PROVIDE 16x16 RETURN GRILL BELOW

SIDEWALL DIFFUSER 8" AFF.

15 PROVIDE NEW TAMPER AND FLOW

SWITCHES TO NEW 3” FIRE LINE. CONNECT

ELECTRICAL TO EXISTING JUNCTION BOX IN

STAIR 01.

16 EXISTING JUNCTION BOX FOR FLOW SWITCH

AND TAMPER VALVE.

17 PROVIDE NEW TAMPER AND FLOW

SWITCHES. CONNECT ELECTRICAL TO THE

EXISTING JUNCTION BOX IN STAIR 01.

18 DDC CONTROL PANEL 120V 20 AMP FOR

POWER REFER TO DIVISION 26.

19 ROUTE 3/4” CHILLED WATER SUPPLY AND

RETURN PIPING AS SHOWN.

1 REMOVE EXISTING WINDOW MOUNTED AIR

CONDITIONING UNIT. REFER TO

ARCHITECTURAL PLANS FOR PATCHING OF

WINDOW PANEL.

2 REMOVE SPRINKLER HEAD AND MAKE

PIPING READY FOR NEW SPRINKLER HEAD.

Scale: 1/4" = 1'-0"

TELECOM ROOM T001

FIRE SUPPRESSION DEMOLITION PLAN

NORTH

0 2 4 8

1 APPENDUM 01 6/23/2023

S S

S

S S

S

J

L

K

FSTS

FSTS

FSTST

FSTSH

6 2

3" CHR

3" CHS

TR

B009

OFFICE

B008

CORRIDOR

H011

OFFICE

B010

1-FCU-B009

3/4" D

STORAGE

2" CHR

2" CHS

1" CHR

1" CHS

J

L

K

TR

B009

OFFICE

B008

OFFICE

B010

CORRIDOR

H011

J

L

K

CORRIDOR

H011

OFFICE

B008

OFFICE

B010

OFFICE

B009

J

L

K

OFFICE

B008

OFFICE

B010

CORRIDOR

H011

HARD CIELING

COULD NOT SURVEY

ABOVE CEILING

OFFICE

B009

J

L

KK

OFFICE

B008

CORRIDOR

H011

OFFICE

B010

HARD CIELING

COULD NOT SURVEY

ABOVE CIELING

OFFICE

B009

# KEY NOTES:

# KEY NOTES:

Engineers Architects th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

C R e v it P ro je c ts

\A M

E P

F

-J

C

-0 s h a rm o n

A C

G .r v t

/2

/2

:0 :4

P

M

21-124 BUILDING 1, GROUND FLOOR,

TELECOM B009 PLANS

EHRM INFRASTRUCTURE UPGRADES 657-21-700JC

BID DOCUMENTS

SMHNOVEMBER 28, 2022 RBK

15 43

01-MP402

Scale: 1/4" = 1'-0"

TELECOM ROOM B009

MECHANICAL PLAN

Scale: 1/4" = 1'-0"

TELECOM ROOM B009

FIRE SUPPRESSION PLAN

Scale: 1/4" = 1'-0"

TELECOM ROOM B009

FIRE SUPPRESSION

DEMOLITION PLAN

NORTH

0 2 4 8

NORTH

0 2 4 8

NORTH

0 2 4 8

NORTH

0 2 4 8

Scale: 1/4" = 1'-0"

TELECOM ROOM B009

MECHANICAL DEMOLITION

PLAN

A. COORDINATE ALL WORK WITH THE GENERAL

CONTRACTOR, OTHER TRADES AND THE COR

TO MINIMIZE DISRUPTION OF AREAS OUTSIDE

OF THE PROJECT LIMITS OF WORK.

B. ALL DEMOLISHED EQUIPMENT SHALL BECOME

THE PROPERTY OF THE CONTRACTOR AND

SHALL BE DISPOSED OF IN ACCORDANCE

WITH VAPHS REQUIREMENTS AND

ENVIRONMENTAL REGULATIONS.

C. CONTRACTOR TO FIELD VERIFY ALL

CONDITIONS. PRESERVE EXISTING

DUCTWORK, PIPING OR EQUIPMENT THAT IS

NOT INDICATED FOR DEMOLITION OR IS

DISCOVERED IN THE DEMOLITION PROCESS.

D. UNLESS NOTED OTHERWISE, ALL DIFFUSERS

AND GRILLE RUN-OUTS ARE THE SAME SIZE

AS THE NECK/DUCT CONNECTION SIZE

SPECIFIED IN THE AIR DEVICE SCHEDULE.

E. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

F. SEE ARCHITECTURAL CEILING PLAN FOR

CEILING TYPES AS WELL AS DIFFUSER AND

GRILLE PLACEMENT WITHIN THE CEILING.

G. COORDINATE ALL THERMOSTAT LOCATIONS

WITH ALL OTHER WALL MOUNTED OBJECTS

BEFORE INSTALLATION.

H. PROVIDE ISOLATION BALL VALVES FOR EACH

PIPING BRANCH. LOCATE AS CLOSE TO MAIN

AS POSSIBLE.

N

KEY PLAN

SCALE: NO SCALE

2 PROVIDE NEW FAN COIL UNIT. CONNECT 1"

PIPING TO CHILLED WATER SUPPLY AND

RETURN RISERS AS SHOWN WITH ISOLATION

VALVES.

3 SEE DRAIN PAN DETAIL ON 00-M-501 SHEET

FOR MORE INFORMATION.

4 PROVIDE TEMPERATURE AND HUMIDITY

SENSOR ON WALL AND CONNECT TO THE

BAS FOR NEW FAN COIL UNIT.

5 PROVIDE STANDARD RESPONSE UPRIGHT

SPRINKLER HEADS. CONNECT TO EXISTING

FIRE SPRINKLER PIPING SERVING THIS

AREA.

6 DDC CONTROL PANEL CONNECT 120V 20

AMP ALL OTHER TR’S OUTSIDE OF TOWER

TO THIS PANEL. FOR POWER REFER TO

DIVISION 26.

1 REMOVE EXISTING FAN COIL UNIT.

DEMOLISH CHILLED WATER SUPPLY AND

RETURN PIPING BACK TO MAINS.

2 DEMOLISH RADIATOR AND ASSOCIATED

PIPING. CAP PIPE BELOW FLOOR.

3 REMOVE SPRINKLER HEAD AND MODIFY

EXISTING SPRINKLER PIPING AS NECESSARY

FOR FUTURE SPRINKLER LAYOUT.

4 DEMOLISH SHEET METAL COVER 12"x 3" x 55"

Scale: 1/4" = 1'-0"

TELECOM ROOM B009

PLUMBING DEMOLITION

PLAN

NORTH

0 2 4 8

1 APPENDUM 01 6/23/2023

Sheets
00-M-002 - PLUMBING SYMBOLS, ABBREVIATIONS AND NOTES
00-M-503 - MECHANICAL CONTROLS
00-M-601 - MECHANICAL SCHEDULES
01-M-602 - BUILDING 1 CHILLED WATER & FIRE SUPPRESSION RISER DIAGRAMS
2023-06-22T13:19:35-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .