Attachment 7 - KRS_Substation_Combined_Dwgs_CD-3B_20250424.pdf
PDF 29 MB Posted
- Attached to
- Request for Proposal - UIP-KRS-369604-JK
- Solicitation number
- UIP-KRS-369604-JK
About this file
This document is a comprehensive architectural and engineering drawing set for the Kautz Road Substation Replacement project at Fermilab, prepared by Arup US, Inc. The drawings, dated April 24, 2025, cover multiple disciplines including architectural, electrical, structural, civil, and fire system plans for a new prefabricated control house building. The project involves replacing an existing substation with a new switchgear building, featuring detailed plans for a 345/13.8kV electrical system, including single-line diagrams, switchyard layouts, cable routing, and comprehensive demolition and construction specifications.
Key technical details include a prefabricated building with specific design requirements such as a Twilight Blue color, Class A-25/450 flame spread/smoke development rating, R-19 wall insulation, R-30 roof insulation, and provisions for electrical equipment integration. The project encompasses a basement and first-floor layout, with precise architectural elevations, electrical schematics for various panels and systems, and structural considerations for foundation, floor, and roof elements. The drawings indicate a structured approach to replacing the existing infrastructure with modern, code-compliant electrical and building systems at the Fermilab campus.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
WILSON ST...............6 AM TO 6 PM
PINE ST.....................6 AM TO 8 PM
KAUTZ RD..................6 AM TO 6 PM
BATAVIA RD..............6 AM TO 8 PM
ON SITE CONST. ROUTES
SITE BOUNDARY LINES
LEGEND
ENTRANCE
BATAVIA RD.
(LOAD LIMIT-6 TONS)
NOTE: APPROPRIATE I.D. IS REQUIRED
TO ENTER ANY OPEN GATE
ENTRANCE
(NO ACCESS)
EOLA RD.
(MAJOR DELIVERIES
ONLY - NO GENERAL
CONSTRUCTION
TRAFFIC)
ENTRANCE
KAUTZ RD.
CONSTRUCTION
TO RT. 59
TO HWY 59
HOURS
CDF
SW
ENSONF
AR
M
R D
FE
LD
O
TT
R D
EO
LA
R D.
PROJECT
AREA
PROJECT NO. 3-5-207
1" = 400'
LOCATION PLAN
NTS
VICINITY PLAN
HWY. 56 BUTTERFIELD RD.
RING RD.
PROJECT
NORTH
E S
W
PR
O
JEC
T
N O
R
TH
E
S
W
HOLTER RD
PINE ST. (OUT)
ROAD
A
-1
ROAD
A
-2
FA
R
N
SW
O R
TH
PINE ST. (IN)(NO TRUCKS)
LEON M. LEDERMAN
SCIENCE & EDUCATION
TO
IN
TE
R
ST
AT
E I-8
MAIN
KA
U
TZ
R
D
CENTER
LABORATORY
CENTRAL
AREA
PINE ST.
ENTRANCE
MAIN
INJECTOR
KAUTZ RD.
SUBSTATION
WILSON ST.
ENTRANCE
KI
R
K R
D
. ROAD B
BATAVIA RD.
RECEIVING
BURLINGTON NORTHERN R.R.
WILSON ST.
SITE
CONSTRUCTION ENTRANCE
C O
M M
O N
W
EA
LT
H
E D
IS
O
N P
O W
ER
L
IN
ES
BATAVIA RD. AREA ROAD D
ROAD
A
HWY 38 ROOSEVELT RD.
VILLAGE
FERMILAB
EL
G
IN
J
O
LI
ET
E
AS
TE
R
N R
.R
WILSON ST.
ROAD
C
INDUSTRIAL
AREA
FIXED
TARGET
LOCKED
GATE
RAILYARD
STORAGE
MAIN RING
WILSON HALL
CENTRAL
LABORATORY AREA
FEYNMAN
COMPUTING
CENTER
FEEDERS
KRS SUBSTATION
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
SCALE:
REVISIONS PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT FERMILAB DATE
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
DESCRIPTIONS
DATE
DATEREV.
Ap r 2
4,
- 8 :5
5A M
A ut oD es k D oc s:
\A R
U P\
-0
Fe rm iL ab C am pu s In fra st ru ct ur e\
Pr oj ec t F ile s\
_W
IP
M od el s\ G
G en er al \0
Sh ee ts
\G 1-
3- 5-
7.
dw g
CD-3B PACKAGE04/24/255
60% FINAL DESIGN02/20/254
100% PRELIMINARY DESIGN10/18/243
90% PRELIMINARY DESIGN08/09/242
60% PRELIMINARY DESIGN05/09/241 04/24/25
04/24/25
04/24/25
04/24/25
D. GURALCHUK
H. LOBO
R. SIERRA
R. TANDEL
NTS
3-5-207
GENERAL
AP
R
IL
4, G-1COVER SHEET
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
GENERAL DRAWING INDEX
DWG
NO. TITLE SCALE
100%
PRELIM.
DESIGN
60%
FINAL
CD-3B
PACKAGE
G-1 GENERAL - COVER SHEET NTS ● ● ●
G-2 GENERAL - SHEET INDEX NTS ● ●
CIVIL DRAWING INDEX
DWG
NO. TITLE SCALE
100%
PRELIM.
DESIGN
60%
FINAL
CD-3B
PACKAGE
C-1 CIVIL - GENERAL NOTES AND ABBREVIATIONS NTS ● ●
C-2 CIVIL - EXISTING CONDITIONS AND DEMOLITION PLAN 1" = 20' ● ●
C-3 CIVIL - EROSION AND SEDIMENT CONTROL PLAN 1" = 20' ● ●
C-4 CIVIL - EXTERNAL IMPROVEMENTS PLAN 1" = 20' ● ●
C-5 CIVIL - EXTERNAL IMPROVEMENTS DETAILS NTS ● ●
C-6 CIVIL - COMPOSITE UTILITIES PLAN 1" = 20' ● ●
C-7 CIVIL - COMPOSITE UTILITIES DETAILS NTS ● ●
ARCHITECTURAL DRAWING INDEX
DWG
NO. TITLE SCALE
100%
PRELIM.
DESIGN
60%
FINAL
CD-3B
PACKAGE
AG-001 ARCHITECTURAL - ABBREVIATIONS & SYMBOLS NTS ● ● ●
AG-002 ARCHITECTURAL - CODE MATRIX NTS ● ● ●
AD-001 ARCHITECTURAL - FIRST FLOOR DEMOLITION PLAN 1/4" = 1'-0" ● ● ●
A-101 ARCHITECTURAL - BASEMENT & FIRST FLOOR PLAN 1/4" = 1'-0" ● ● ●
A-102 ARCHITECTURAL - ROOF PLAN 1/4" = 1'-0" ● ● ●
A-201 ARCHITECTURAL - EXTERIOR ELEVATIONS 1/4" = 1'-0" ● ● ●
A-301 ARCHITECTURAL - BUILDING SECTIONS 1/4" = 1'-0" ● ● ●
ELECTRICAL DRAWING INDEX
DWG
NO. TITLE SCALE
100%
PRELIM.
DESIGN
60%
FINAL
CD-3B
PACKAGE
E-1 ELECTRICAL - LEGEND DRAWING NTS ● ●
E-1-D ELECTRICAL - LEGEND DRAWING DEMOLITION NTS ● ●
E-2 ELECTRICAL - 345/13.8kV SINGLE LINE NTS ● ● ●
E-2-D ELECTRICAL - 345/13.8kV SINGLE LINE DEMOLITION NTS ● ● E-3 ELECTRICAL - 345/13.8kV SINGLE LINE NTS ● ● ●
E-3-D ELECTRICAL - 345/13.8kV SINGLE LINE DEMOLITION NTS ● ● E-4 ELECTRICAL - 13.8kV & 480V SINGLE LINE NTS ● ● ●
E-4-D ELECTRICAL - 13.8kV & 480V SINGLE LINE DEMOLITION NTS ● ●
E-5-D ELECTRICAL - METERING & RELAYING DIAGRAM DEMOLITION NTS ●
E-6 ELECTRICAL - METERING & RELAYING DIAGRAM T-85 NTS ● ● ●
E-6-D ELECTRICAL - METERING & RELAYING DIAGRAM T-85 DEMOLITION NTS ● ●
E-7 ELECTRICAL - METERING & RELAYING DIAGRAM T-86 NTS ● ● ●
E-7-D ELECTRICAL - METERING & RELAYING DIAGRAM T-86 DEMOLITION NTS ● ●
E-8 ELECTRICAL - METERING & RELAYING DIAGRAM T-87 NTS ● ● ●
E-8-D ELECTRICAL - METERING & RELAYING DIAGRAM T-87 DEMOLITION NTS ● ●
E-9 ELECTRICAL - METERING & RELAYING DIAGRAM T-88 NTS ● ● ●
E-9-D ELECTRICAL - METERING & RELAYING DIAGRAM T-88 DEMOLITION NTS ● ●
E-10 ELECTRICAL - THREE LINE DIAGRAM 345kV LINE NTS ● ●
E-10-D ELECTRICAL - THREE LINE AC SCHEMATIC DEMOLITION NTS ●
E-11 ELECTRICAL - THREE LINE DIAGRAM T85 & T86 NTS ● ●
E-11-D ELECTRICAL - THREE LINE AC SCHEMATIC DEMOLITION NTS ●
E-12 ELECTRICAL - THREE LINE DIAGRAM T87 NTS ● ●
E-12-D ELECTRICAL - THREE LINE AC SCHEMATIC DEMOLITION NTS ●
E-13 ELECTRICAL - THREE LINE DIAGRAM T88 NTS ● ●
E-13-D ELECTRICAL - THREE LINE AC SCHEMATIC DEMOLITION NTS ●
E-15 ELECTRICAL - 345kV BREAKER CB119 SCHEMATIC CLOSE NTS ●
E-15-D ELECTRICAL - DC S/D CB119 & CC & TC #2 DEMOLITION NTS ●
E-16 ELECTRICAL - 345kV BREAKER CB119 SCHEMATIC TRIP NTS ●
E-16-D ELECTRICAL - DC S/D CB119 TC #1 DEMOLITION NTS ●
E-17 ELECTRICAL - 345kV BREAKER CB119 AUX POWER NTS ●
E-17-D ELECTRICAL - DC S/D CB119 AUX DEMOLITION NTS ●
E-18 ELECTRICAL - 345kV BREAKER CB119 STATUS & ALARM NTS ●
E-18-D ELECTRICAL - AC S/D CB119 AUX DEMOLITION NTS ●
E-20 ELECTRICAL - DC S/D MOD 119-1 NTS ●
E-20-D ELECTRICAL - DC S/D MOD 119-1 DEMOLITION NTS ●
E-21 ELECTRICAL - DC S/D MOD 119-2 NTS ●
E-21-D ELECTRICAL - DC S/D MOD 119-2 DEMOLITION NTS ●
E-22 ELECTRICAL - DC S/D MOD 119-3 NTS ●
E-22-D ELECTRICAL - DC S/D MOD 119-3 DEMOLITION NTS ●
E-23 ELECTRICAL - MOD 85 SCHEMATIC AND WIRING NTS ●
E-23-D ELECTRICAL - DC S/D MOD 85 DEMOLITION NTS ●
E-24 ELECTRICAL - MOD 86 SCHEMATIC AND WIRING NTS ●
E-24-D ELECTRICAL - DC S/D MOD 86 DEMOLITION NTS ●
E-25 ELECTRICAL - MOD 87 SCHEMATIC AND WIRING NTS ●
E-25-D ELECTRICAL - DC S/D MOD 87 DEMOLITION NTS ●
E-26 ELECTRICAL - MOD 88 SCHEMATIC AND WIRING NTS ●
E-26-D ELECTRICAL - DC S/D MOD 88 DEMOLITION NTS ●
E-27-D ELECTRICAL - DC S/D TRANSFORMER PROT. T-85 DEMOLITION NTS ●
E-28 ELECTRICAL - DC S/D TRANSFORMER PROT. T-86 NTS ●
E-28-D ELECTRICAL - DC S/D TRANSFORMER PROT. T-86 DEMOLITION NTS ●
E-29 ELECTRICAL - DC S/D TRANSFORMER PROT. T-87 NTS ●
E-29-D ELECTRICAL - DC S/D TRANSFORMER PROT. T-87 DEMOLITION NTS ●
E-30 ELECTRICAL - DC S/D TRANSFORMER PROT. T-88 NTS ●
E-30-D ELECTRICAL - DC S/D TRANSFORMER PROT. T-88 DEMOLITION NTS ●
E-74 ELECTRICAL - KIRK KEY INTERLOCK SYSTEM NTS ●
E-75 ELECTRICAL - AC PANELBOARD SCHEDULE NTS ● ● ●
E-75-D ELECTRICAL - AC PANELBOARD SCHEDULE DEMOLITION NTS ● ●
E-76 ELECTRICAL - DC PANELBOARD SCHEDULE NTS ● ● ●
E-76-D ELECTRICAL - DC PANELBOARD SCHEDULE DEMOLITION NTS ● ●
E-100 ELECTRICAL - DC S/D DIRECT TRANSFER TRIP SYSTEM NTS ●
E-100-D ELECTRICAL - DC S/D DIRECT TRANSFER TRIP SYSTEM DEMOLITION NTS ●
E-122 ELECTRICAL - CONTROL BUILDING SYSTEM ARCHITECTURE NTS ● ●
E-198 ELECTRICAL - GENERAL NOTES AND SYMBOLS NTS ● ●
E-199 ELECTRICAL - EQUIPMENT AND MATERIAL LIST NTS ● ●
E-199-D ELECTRICAL - EQUIPMENT AND MATERIAL LIST DEMOLITION NTS ● ●
E-200 ELECTRICAL - SWITCHYARD PLAN 1" = 20' ● ● ●
E-200-D ELECTRICAL - SWITCHYARD PLAN DEMOLITION 1" = 20' ● ●
E-201 ELECTRICAL - SWITCHYARD SECTIONS 1" = 10' ● ●
E-201-D ELECTRICAL - SWITCHYARD SECTIONS DEMOLITION 1" = 10' ● ●
E-202 ELECTRICAL - SWITCHYARD SECTIONS 1" = 10' ● ●
ELECTRICAL DRAWING INDEX
DWG
NO. TITLE SCALE
100%
PRELIM.
DESIGN
60%
FINAL
CD-3B
PACKAGE
E-202-D ELECTRICAL - SWITCHYARD SECTIONS DEMOLITION 1" = 10' ● ●
E-205 ELECTRICAL - SWITCHYARD LIGHTNING PROTECTION 1" = 20' ● ●
E-206 ELECTRICAL - SWITCHYARD GROUNDING PLAN 1" = 20' ● ●
E-206-D ELECTRICAL - SWITCHYARD GROUNDING PLAN DEMOLITION 1" = 20' ● ●
E-216 ELECTRICAL - SWITCHYARD LIGHTING PLAN 1" = 20' ● ●
E-218 ELECTRICAL - 15kV BUS DUCT LAYOUT 1" = 10' ● ●
E-218-D ELECTRICAL - 15kV BUS DUCT LAYOUT DEMOLITION 1" = 10' ● ● E-219 ELECTRICAL - 15kV BUS DUCT SECTIONS 1" = 10' ● ●
E-219-D ELECTRICAL - 15kV BUS DUCT SECTIONS DEMOLITION 1" = 10' ● ●
E-220 ELECTRICAL - SWITCHYARD CABLE ROUTING SCHEDULE 1" = 20' ● ●
E-220-D ELECTRICAL - SWITCHYARD CABLE ROUTING SCHEDULE DEMOLITION 1" = 20' ● ●
E-256 ELECTRICAL - CABLE TRAY LAYOUT AS SHOWN ● ● ●
E-257 ELECTRICAL - VAULT CABLE RACK LAYOUT 1/4" = 1'-0" ●
E-258 ELECTRICAL - CABLE RACK DETAILS NTS ●
E-303 ELECTRICAL - RELAY PANEL 3 WIRING DIAGRAM NTS
E-304 ELECTRICAL - RELAY PANEL 4 WIRING DIAGRAM NTS
E-305 ELECTRICAL - RELAY PANEL 5 WIRING DIAGRAM NTS
E-306 ELECTRICAL - RELAY PANEL 6 WIRING DIAGRAM NTS
E-307 ELECTRICAL - RELAY PANEL 7 WIRING DIAGRAM NTS
E-308 ELECTRICAL - RELAY PANEL 8 WIRING DIAGRAM NTS
E-337 ELECTRICAL - MARSHALLING CABINET NO. 1 MC WIRING NTS
E-338 ELECTRICAL - MARSHALLING CABINET NO. 2 MC WIRING NTS
E-500 ELECTRICAL - PPDB FLOOR PLAN 1/4" = 1'-0" ● ● ●
E-500-D ELECTRICAL - PPDB FLOOR PLAN DEMOLITION NTS ● ●
E-501 ELECTRICAL - PPDB END WALL ELEVATION/SECTION 1/4" = 1'-0" ● ● ●
E-501-D ELECTRICAL - PPDB END WALL ELEVATION SECTION DEMOLITION NTS ●
E-502 ELECTRICAL - PPDB EXTERIOR WALL ELEVATIONS 1/4" = 1'-0" ● ● ●
E-502-D ELECTRICAL - PPDB EXTERIOR WALL ELEVATIONS DEMOLITION NTS ●
E-503 ELECTRICAL - PPDB INTERIOR WALL ELEVATIONS 1/4" = 1'-0" ● ● ●
E-503-D ELECTRICAL - PPDB INTERIOR WALL ELEVATIONS DEMOLITION NTS ●
E-504 ELECTRICAL - PPDB ISOMETRIC VIEW NTS ● ● ●
E-506 ELECTRICAL - PPDB LIGHTING PLAN 1/4" = 1'-0" ● ● ●
E-506-D ELECTRICAL - PPDB LIGHTING PLAN DEMOLITION NTS ●
E-507 ELECTRICAL - VAULT LIGHTING PLAN 1/4" = 1'-0" ● ● ●
E-508 ELECTRICAL - VAULT FLOOR PLAN 1/4" = 1'-0" ● ● ●
E-508-D ELECTRICAL - VAULT FLOOR PLAN DEMOLITION NTS ●
E-570 ELECTRICAL - RELAY PANEL LAYOUT NTS ● ● ●
E-570-D ELECTRICAL - RELAY PANEL LAYOUT DEMOLITION NTS ●
E-571 ELECTRICAL - RELAY PANEL BOM NTS ● ● ●
E-571-D ELECTRICAL - RELAY PANEL LAYOUT DEMOLITION NTS ●
E-590 ELECTRICAL - MIMIC PANEL LAYOUT 3/32" = 1'-0" ● ● ●
E-590-D ELECTRICAL - MIMIC PANEL LAYOUT DEMOLITION NTS ●
MP1 SH1 ELECTRICAL - AC & DC SCHEMATIC MIMIC PANEL 01 NTS ● ●
MP1 SH2 ELECTRICAL - AC & DC SCHEMATIC MIMIC PANEL 01 NTS ● ●
MP2 SH1 ELECTRICAL - AC & DC SCHEMATIC MIMIC PANEL 02 NTS ● ●
MP2 SH2 ELECTRICAL - AC & DC SCHEMATIC MIMIC PANEL 02 NTS ● ●
MP2 SH3 ELECTRICAL - AC & DC SCHEMATIC MIMIC PANEL 02 NTS ● ●
MP3 SH1 ELECTRICAL - AC & DC SCHEMATIC MIMIC PANEL 03 NTS ● ●
MP3 SH2 ELECTRICAL - AC & DC SCHEMATIC MIMIC PANEL 03 NTS ● ●
MP4 SH1 ELECTRICAL - AC & DC SCHEMATIC MIMIC PANEL 04 NTS ● ●
MP4 SH2 ELECTRICAL - AC & DC SCHEMATIC MIMIC PANEL 04 NTS ● ●
RP1 SH1 ELECTRICAL - DC SCHEMATIC RELAY PANEL 01 (SCADA) NTS ● ●
RP1 SH2 ELECTRICAL - DC SCHEMATIC RELAY PANEL 01 (SCADA) NTS ● ●
RP1 SH3 ELECTRICAL - DC SCHEMATIC RELAY PANEL 01 (SCADA) NTS ● ●
RP1 SH4 ELECTRICAL - DC SCHEMATIC RELAY PANEL 01 (SCADA) NTS ● ●
RP1 SH5 ELECTRICAL - DC SCHEMATIC RELAY PANEL 01 (SCADA) NTS ●
RP1 SH6 ELECTRICAL - DC SCHEMATIC RELAY PANEL 01 (SCADA) NTS ●
RP2 SH1 ELECTRICAL - DC SCHEMATIC RELAY PANEL 02 (COMMUNICATION) NTS ● ●
RP3 SH1 ELECTRICAL - AC SCHEMATIC RELAY PANEL 03 (751CB119) NTS ● ●
RP3 SH2 ELECTRICAL - DC SCHEMATIC RELAY PANEL 03 (751CB119) NTS ● ●
RP4 SH1 ELECTRICAL - AC SCHEMATIC RELAY PANEL 04 (487CB119) NTS ● ●
RP4 SH2 ELECTRICAL - DC SCHEMATIC RELAY PANEL 04 (487CB119) NTS ● ●
RP5 SH1 ELECTRICAL - AC SCHEMATIC RELAY PANEL 05 787PT85/787BT85 (TR. DIFF.) NTS ● ● RP5 SH2 ELECTRICAL - DC SCHEMATIC RELAY PANEL 05 787PT85/787BT85 (TR. DIFF.) NTS ● ● RP6 SH1 ELECTRICAL - AC SCHEMATIC RELAY PANEL 06 787PT86/787BT86 (TR. DIFF.) NTS ● ● RP6 SH2 ELECTRICAL - DC SCHEMATIC RELAY PANEL 06 787PT86/787BT86 (TR. DIFF.) NTS ● ● RP7 SH1 ELECTRICAL - AC SCHEMATIC RELAY PANEL 07 787PT87/787BT87 (TR. DIFF.) NTS ● ● RP7 SH2 ELECTRICAL - DC SCHEMATIC RELAY PANEL 07 787PT87/787BT87 (TR. DIFF.) NTS ● ● RP8 SH1 ELECTRICAL - AC SCHEMATIC RELAY PANEL 08 787PT88/787BT88 (TR. DIFF.) NTS ● ● RP8 SH2 ELECTRICAL - DC SCHEMATIC RELAY PANEL 08 787PT88/787BT88 (TR. DIFF.) NTS ● ●
STRUCTURAL DRAWING INDEX
DWG
NO. TITLE SCALE
100%
PRELIM.
DESIGN
60%
FINAL
CD-3B
PACKAGE
S-001 STRUCTURAL - DRAWING LIST, SYMBOLS, AND ABBREVIATIONS NTS ● ● ●
S-002 STRUCTURAL - GENERAL NOTES NTS ● ● ●
S-100 STRUCTURAL - SITE PLAN 1" = 50' ● ●
S-200 STRUCTURAL - DEMOLITION OVERALL PLAN 3/64" = 1'-0" ● ●
S-200A STRUCTURAL - DEMOLITION PLAN WEST 3/32" = 1'-0" ● ● ●
S-200B STRUCTURAL - DEMOLITION PLAN EAST 3/32" = 1'-0" ● ●
S-210 STRUCTURAL - GROUND LEVEL PLAN 1" = 10' ● ● ●
S-220 STRUCTURAL - SUPERSTRUCTURE PLAN 1" = 10' ● ● ●
S-400 STRUCTURAL - ELEVATIONS 1/4" = 1'-0" ● ● ●
S-500 STRUCTURAL - TYPICAL REINFORCEMENT DETAILS NTS ● ●
S-501 STRUCTURAL - TYPICAL CONCRETE DETAILS NTS ● ● ●
S-502 STRUCTURAL - TYPICAL CONCRETE DETAILS AS SHOWN ● ●
S-510 STRUCTURAL - TYPICAL STEEL DETAILS AS SHOWN ● ●
S-550 STRUCTURAL - REFERENCED SECTIONS AND DETAILS AS SHOWN ● ● ●
S-551 STRUCTURAL - REFERENCED SECTIONS AND DETAILS AS SHOWN ●
FIRE SYSTEM DRAWING INDEX
DWG
NO. TITLE SCALE
100%
PRELIM.
DESIGN
60%
FINAL
CD-3B
PACKAGE
FP-355 FIRE SYSTEM - LEGEND NTS ● ● ●
FP-355-D FIRE SYSTEM - LEGEND - DEMOLITION NTS ●
FP-356 FIRE SYSTEM - FLOOR PLAN 1/4" = 1'-0" ● ● ●
FP-356-D FIRE SYSTEM - FLOOR PLAN - DEMOLITION NTS ●
FP-357 FIRE SYSTEM - TYPICAL DETAILS NTS ● ● ●
FP-357-D FIRE SYSTEM - TYPICAL DETAILS - DEMOLITION NTS ●
PROJECT NO. 3-5-207
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
SCALE:
REVISIONS PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT FERMILAB DATE
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
DESCRIPTIONS
DATE
DATEREV.
Ap r 2
4,
- 8 :5
5A M
A ut oD es k D oc s:
\A R
U P\
-0
Fe rm iL ab C am pu s In fra st ru ct ur e\
Pr oj ec t F ile s\
_W
IP
M od el s\ G
G en er al \0
Sh ee ts
\G 2-
3- 5-
7.
dw g
CD-3B PACKAGE04/24/252
60% FINAL DESIGN02/20/251 04/24/25
04/24/25
04/24/25
04/24/25
D. GURALCHUK
H. LOBO
R. SIERRA
R. TANDEL
NTS
3-5-207
GENERAL
AP
R
IL
4, G-2SHEET INDEX
ABBREVIATIONS
A.B. anchor bolt ABV above ACT acoustical ceiling tile A.D. area drain ADD addendum AED automated external defibrillator ADH adhesive ADJ adjustable A/C air conditioning A.F.F. above finished floor AGG aggregate AL aluminum ALT alternate ANOD anodized ANCH anchor A.P. access panel APPROX approximate ARCH architect(ural) AUTO automatic
B/ bottom B/F bottom of finish BB baseboard BD board BET between BOT bottom BITUM bituminous BLDG building BLK block BLKG blocking BLW below BM beam B.M. bench mark BR brick BRG bearing B.S. both sides BSMT basement B.T.B. back to back B.U.R. built-up roofing BLV bevel(ed)
CAB cabinet CACS Customer Assistant Call CAK Customer Assistant Kiosk CEM cement C.F. compressible filler C.L. center line C.L.L. contract limit line C.I. cast iron C.H. ceiling height CLR clear(ance) C.B. catch basin, chalk board CIRC circumference CLG ceiling CLO closet CM construction manager C.M.U. concrete masonry unit CO clean out COL column CON/CONC concrete CONF conference CONST construction CONT continuous CONTR contractor COORD coordinate CORR corridor CPT carpet C.J. control joint C.T. ceramic tile CTR center CS countersunk CSMT casement C.C.T.V. closed circuit television C.W. cold water, curtain wall
DBL double DEG degree DEMO demolish(ition) DEPT department DIA diameter DIAG diagonal DIFF diffuser DIM dimension DISP dispenser DIV division DN down D.O. door opening D.P. damp proofing DR door D.S. down spout DTL detail D.W. distilled water DWG drawing DW dumbwaiter D.H. double hung D.F. drinking founatin
E East EA each E.B. expansion bolt E.J. expansion jolt EL elevation ELAS elastometric ELEC electric(al) ELEV elevator EMER emergency ENCL enclosure E.O. electric outlet E.O.S. edge of slab EP epoxy EQ equal EQUIP equipment E.W.C. electric water cooler ESC escalator EXC excavation EXH exhaust EXIST existing EXP expansion EXPO exposed EXT exterior
F/ face of F.A. fire alarm F.B. face brick F.C. foot control F.C.O. floor clean out F.D. floor drain FDN foundation F.E. fire extinguisher F.E.C. fire extinguisher cabinet F.F. factory finish, finish floor F.H.C. fire hose cabinet F.H.M.S. flat head machine screw F.H.R. fire hose rack FIN finish(ed) FL floor(ing) FLUOR flourescent FP fireproof FR frame(d)(ing) FT foot, feet F.T.F. face to face FTG footing F.T.R. fine tube radiation FURN furnish FUR furring(ed) FUT future
GA gauge GALV galvanized G.B. grab bar G.C. general contractor G.C.M.U. glazed concrete masonry unit GEN general GL glass GLB glass block GND ground G.P.L. gypsum plaster GR grade G.T. grease trap G.I. galvanized iron G.W.B./GYPgypsum wall board
H head H.B. hose bibb H.C. hollow core HDWD hardwood HDW hardware H.M. hollow metal H.O. hold open HORIZ horizontal H.P. high point HR hour HT height HTG heating HC handicapped H.V.A.C. heating, ventilating, air conditioning H.W. hot water H.W.H. hot water heater HYD hydrant
I.D. inside diameter IGU insulated glass unit IN inch(es) INCAND incandescent INCL include(d) INSUL insulate(d)(ion) INT inteior INV invert
J jamb J.C. Janitor's Closet JT joint
K.D. knock down K.O. knock out KIT kitchen K.S. knee space
L length LAM laminate(d) LAV lavatory L.B.(s) pound(s) LBL label L.F. linear foot L.H. left hand LKR locker L.P. low point LT light L.W. light weight
M meter MB marker board MAINT maintenance MAS masonry MATL material(s) MAX maximum M.C.B. metal corner bead MECH mechanical MEMB membrane MEZZ mezzanine MFR manufacture(er) M.H. manhole MIN minimum MISC miscellaneous MM millimeter M.O. masonry opening MOV movable M.S. metal stud MTD mounted MTG mounting MTL metal MUL mullion
N North N/A not applicable N.C. non-combustible N.I.C. not in contract NO number NOM nominal N.R.C. noise reduction coefficient N.T.S. not to scale
OA overall O.C. on center O.D. outside diameter OFCI owner furnished contractor installed OFF office O.F.O.I. owner funished owner installed OH overhead OPNG opening OPP opposite OPP.H. opposite hand ORIG original
P.A. public address PAR parallel P.C. pre-cast concrete P.C.W. precast concrete wall P.I.P.C. poured in place concrete PL plate P.LAM plastic laminate PLAS plaster PLBG plumbing PLW/PLYW plywood PNL panel POL polished PR pair PROP property P.S.F. pounds per square foot P.S.I. pounds per square inch PNT paint P.T. porcelain tile PTD painted PTN partition PVC polyvinyl chloride
Q.T. quarry tile r radius R riser R.A. return air R.O.W. right-of-way R.B. rubber base R.C.P. reflected ceiling plan R.D. roof drain R.H. right hand R.J. revel joint REC recessed REF reference REFR refrigerator REINF reinforced REM remove REQD required RES resilient RET return REV revision(s)(ed) RF roof RFG roofing RFH roof hatch RM room R.O. rough opening RT rectangular
S South, sill SPRK sprinkler S.A. supply air SAN sanitary S.C. solid core SCHED schedule(d) S.D. soap dispenser SEAL sealant SECT section S.F. square foot (feet) SGFT structural glazed facing tile S.I. square inch SHR shower SHT sheet SIM similar S.A.F.B. sound attenuation fire blanket SP standpipe SPEC specification(s) SQ square S.S. solid surface S.SK service sink S.S.G. structural silicone glazed S.STL stainless steel STA station S.T.C. sound transmission class STD standard STER sterilizer STL steel STOR storage STRUC structure(al) SUSP suspended(ion) SWBD switchboard SYM symmetry(ical) SYS system
T tread T/ top of T/F top of finish T.B. track board T&B top & bottom T&G tongue & groove TEL telephone T.C. terra cotta TEMP tempered TER terrazzo TGL tempered glass THK thick(ness) TLT toilet TOPO topography TSE transit system escalort TV television TYP typical
UC undercut UNEXC unexcavated UNF unfinished U.N.O. unless note otherwise UR urinal UTIL utility U.L. Underwriters Laboratories
V vinyl VAC vacuum VAR vary(ies) V.C.T. vinyl composition VERT vertical VEST vestibule V.I.F. verify in field VOL volume V.T. vinyl tile V.W.C. vinyl wall covering V.B. vapor barrier, vinyl base
W West, width, wide W/ with W/IN with in W/O with out W.B. wood base W.C. water closet W.R. water resistant WD wood W.F. wide flange W.H. water heater W.I. wrought iron WIN window W.M. wire mesh WP waterproofing WSCT wainscot(ting) WT weight W.W. window wall W.W.F. welded wire fabric W.P. work point
YD yard
EARTH
GRAVEL
BRICK
CERAMIC OR STRUCTURAL GLAZED
TILE
WOOD, ROUGH CARPENTRY
PLYWOOD, LARGE SCALE
GLASS, LARGE SCALE
METAL
ALUMINUM
BATT INSULATION
GYPSUM BOARD
WOOD BLOCKING
CONCRETE
STONE
CONCRETE MASONRY UNIT
WOOD, FINISH CARPENTRY
PLYWOOD, SMALL SCALE
GLASS, SMALL SCALE
RIGID INSULATION
PARTICLE BOARD
NEW CONSTRUCTION
DEMOLITION
ACOUSTICAL TILE EXISTING CONSTRUCTION
MATERIAL DESIGNATIONS
WALL SECTION
A101
SIM
A101
SIM BUILDING SECTION
DRAWING NUMBER
SHEET NUMBER
REFERENCE LABEL
COLUMN GRID LINES
A101
SIM DETAIL
REVISION TITLE BLOCK LISTING
REVISION DATE
REVISION NUMBER
REVISION BUBBLE
REVISION AREA
WORK POINT
EQUATION OF BUILDING DATUM
TO TOPOGRAPHICAL DATUM
BEGINNING OF ALL HORIZONTAL
AND VERTICAL DIMENSIONING
/1 A101
EXTERIOR ELEVATION
A101
SIM
INTERIOR ELEVATION
A101
SIM
CRB10/21/201
NOTED REFERENCE TO DETAILSEE
WORK POINT
T/CONC
EL: 0'-0"=656CCD
GRAPHIC SYMBOLS
DRAWING NUMBER
SHEET NUMBER
REFERENCE LABEL
A101
SIM
DRAWING NUMBER
SHEET NUMBER
REFERENCE LABEL
DRAWING NUMBER
SHEET NUMBER
REFERENCE LABEL
DRAWING NUMBER
SHEET NUMBER
REFERENCE LABEL
PARTITION TYPE TARGET
DOOR TARGET
GLAZING TARGET
ROOM TARGET
ROOM NUMBER
ROOM NAME
A
LOBBY
GENERAL NOTES - ARCHITECTURAL
1. ROSS BARNEY ARCHITECTS EXPRESSLY DISCLAIMS ANY RESPONSIBILITY
ARISING FROM ANY UNAUTHORIZED USE OF THESE DRAWINGS, PLANS, AND
NOTES. ANY AUTHORIZATION MUST BE IN WRITING. THESE DRAWINGS MAY HAVE
BEEN REPRODUCED AT A SIZE DIFFERENT THAN ORIGINALLY DRAWN. USING
AGENCY AND ARCHITECT ASSUME NO RESPONSIBILITY FOR USE OF INCORRECT
SCALE.
2. DIMENSIONS AND ELEVATIONS LOCATING EXISTING SITE ITEMS ARE PROVIDED
FOR INFORMATION ONLY. THE CONTRACTOR IS REQUIRED TO FIELD VERIFY ALL
DIMENSIONS AND ELEVATIONS AND NOTIFY ARCHITECT OF ANY DISCREPANCIES.
3. THE CONTRACTORS SHALL BE RESPONSIBLE TO VISIT THE SITE TO VERIFY
EXISTING CONDITIONS, AND BE KNOWLEDGEABLE OF CONDITIONS THEREIN.
THEY SHALL INVESTIGATE, VERIFY AND BE RESPONSIBLE FOR ALL CONDITIONS
OF THE PROJECT AND SHALL NOTIFY THE USING AGENCY OF ANY
DISCREPANCIES BETWEEN THE PLAN AND ACTUAL CONDITIONS AND OF ALL
CONDITIONS REQUIRING MODIFICATION BEFORE PROCEEDING WITH THE WORK.
4. THE CONTRACTORS SHALL BE RESPONSIBLE FOR PROVIDING ALL REQUIRED
BLOCKING, SUPPORTS, AND BRACING REQUIRED TO ACHIEVE SPECIFIED
REQUIREMENTS AND STANDARDS WHETHER SPECIFICALLY INDICATED OR NOT.
FIRE RETARDANT, PRESSURE TREATED BLOCKING SHALL BE PROVIDED.
5. ALL NEW GUARDRAILS AND HANDRAILS SHALL MEET OSHA, NIOSH, AND ADA
STANDARDS AND 200 PSF LIVE LOAD SAFETY CODE REQUIREMENTS.
6. THE CONTRACTORS SHALL PROVIDE ALL REQUIRED PERMITS. CONTRACTOR
SHALL COORDINATE WORK WITH WORK OF OTHER CONTRACTORS.
7. CONTRACTORS SHALL PROTECT EXISTING CONSTRUCTION, ITEMS AND FINISHES
TO REMAIN AGAINST DAMAGE.
8. CONTRACTORS SHALL PROVIDE FLOOR OPENING PROTECTION THROUGHOUT
DURATION OF WORK AND PROTECTION SHALL REMAIN IN PLACE AFTER
COMPLETION OF WORK. COVER FLOOR OPENINGS MORE THAN 6 INCHES BY 6
INCHES BUT LESS THAN 3 FEET BY 6 FEET WITH 3/4 INCH PLYWOOD SECURED TO
EXISTING CONCRETE FLOOR. OPENINGS GREATER THAN 3 FEET BY 6 FEET
SHALL HAVE AN OSHA-COMPLIANT PROTECTIVE GUARDRAIL.
9. APPROVED VEHICLE ACCESS FOR FIREFIGHTING AND EMERGENCY RESPONSE
SHALL BE PROVIDED TO ALL CONSTRUCTION OR DEMOLITION SPTES PER (2018)
IFC 3310.
10. ANY CONSTRUCTION DUMPSTERS OF DEBIRS SHALL BE PLACED AS TO NOT
BLOCK ACCESS FOR FIREFIGHTING OR EMERGENCY SERVICES IN ACCORDANCE
WITH (2021) IFC SECTION 3310.
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
SCALE:
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T F
O R
C O
N S
T R
U C
T
IO
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
3-5-207 A p ri l
:5 :5
P M
ARCHITECTURAL
ABBREVIATIONS & SYMBOLS
AG-001
GN
MR
MR
GN 04/24/2025
04/24/2025
04/24/2025
04/24/2025
ARCHITECTURE DRAWINGS INDEX
DWG NO. TITLE
AG-001 ARCHITECTURAL ABBREVIATIONS & SYMBOLS
AG-002 ARCHITECTURAL CODE MATRIX AND EGRESS PLANS
AD-001 ARCHITECTURAL FIRST FLOOR DEMOLITION PLAN
A-101 ARCHITECTURAL BASEMENT & FIRST FLOOR PLAN
A-102 ARCHITECTURAL ROOF PLAN
A-201 ARCHITECTURAL EXTERIOR ELEVATIONS
A-301 ARCHITECTURAL BUILDING SECTIONS
1 05/09/2024 60% PRELIMINARY DESIGN
2 08/09/2024 90% PRELIMINARY DESIGN
3 10/18/2024 100% PRELIMINARY DESIGN
4 02/20/2025 60% FINAL DESIGN
5 04/24/2025 CD-3B PACKAGE
F F
F
IR
U S
A S
F
PF
A C
P H
V A
C
F
FASFPASFP
DN DN
9 8 7 6 5 4 3 2 1
B
C
A
D
BASEMENT
EXIT STAIR
CLEAR WIDTH = 36" (FACTOR 0.30) UNSPRINKLERED
EGRESS CAPACITY =120 OCCUPANTS
ACTUAL LOAD = 11 / 2 = 6 OCCUPANTS
EXIT STAIR
CLEAR WIDTH = 36" (FACTOR 0.30) UNSPRINKLERED
EGRESS CAPACITY =120 OCCUPANTS
ACTUAL LOAD = 11 / 2 = 5 OCCUPANTS
B-1 TRAVEL DISTANCE 59'-0"
B-1
B-2 TRAVEL DISTANCE 54'-6"
B-2
9 8 7 6 5 4 3 2 1
B
C
A
D
101112
3' - 9 1/2"
3' - 0"
SWITCHGEAR
BUILDING
3' - 0"
EXIT DOOR
CLEAR WIDTH = 80" (FACTOR 0.20)
UNSPRINKLERED
EGRESS CAPACITY = 400 OCCUPANTS
ACTUAL LOAD = 27 /3 = 9 OCCUPANTS
EXIT DOOR
CLEAR WIDTH = 36" (FACTOR 0.20)
UNSPRINKLERED
EGRESS CAPACITY = 180 OCCUPANTS
ACTUAL LOAD = 27/ 3 = 9 OCCUPANTS
EXIT DOOR
CLEAR WIDTH = 80" (FACTOR 0.20)
UNSPRINKLERED
EGRESS CAPACITY = 400 OCCUPANTS
ACTUAL LOAD = 27/3 = 9 OCCUPANTS
" L-1 L-1 TRAVEL DISTANCE 73'-0"
L-2 TRAVEL DISTANCE 75'-0" L-2
F E F
E
PANIC HARDWARE TO BE PROVIDED
ON ALL EXIT DOORS, SEE
SPECIFICATIONS FOR DOOR
HARDWARE
PANIC HARDWARE TO BE
PROVIDED ON ALL EXIT
DOORS, SEE SPECIFICATIONS
FOR DOOR HARDWARE
NEW CONCRETE PAD AT FINISH
FLOOR LEVEL, TYP. AT ALL EXIT
DOORS
NEW CONCRETE PAD AT
FINISH FLOOR LEVEL, TYP. AT
ALL EXIT DOORS
3' - 0"
PANIC HARDWARE TO BE PROVIDED
ON ALL EXIT DOORS, SEE
SPECIFICATIONS FOR DOOR
HARDWARE
4' - 6"
EXIT CAPACITY TABLE
LEVEL CALCULATIONS
BASEMENT TOTAL OCCUPANCY 11
TOTAL EGRESS WIDTH REQUIRED STAIRS (0.30)= 11 X 0.30 = 3.3"
TOTAL EGRESS WIDTH PROVIDED (2) STAIRS (36" CLEAR) = 72"
LEVEL 1 TOTAL OCCUPANCY 16
TOTAL EGRESS WIDTH REQUIRED DOORS (0.20) = 16 X 0.20 = 3.2"
TOTAL EGRESS WIDTH PROVIDED (1) 36" DOOR & (2) 80" DOORS = 196"
PATH OF TRAVEL
FIRE EXTINGUISHER W/ WALL BRACKETFE
LEGEND
TRAVEL DISTANCE
OCCUPANCY F-1 UNSPRINKLERED
REMOTE POINT EGRESS PATH (FEET)
B-1
B-2
L-1
L-2
SEGMENT B-1
DISTANCE 59'-0"
SEGMENT B-2
DISTANCE 54'-6"
SEGMENT L-1
DISTANCE 73'-0"
SEGMENT L-2
DISTANCE 75-0"
CODE ANALYSIS
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
4'0 8' 16'
SCALE: 1/8" = 1'-0"
E
S
WSCALE:
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T F
O R
C O
N S
T R
U C
T
IO
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
3-5-207
TRUE
NORTH
A p ri l
N
:5 :5
P M
ARCHITECTURAL CODE MATRIX
AND EGRESS PLANS
AG-002
GN
MR
MR
GN 04/24/2025
04/24/2025
04/24/2025
04/24/2025
1/8" = 1'-0"
BASEMENT - LIFE SAFETY PLAN
1/8" = 1'-0"
LEVEL 1 - LIFE SAFETY PLAN
OCCUPANCY LOAD
LEVEL NAME AREA
OCCUPANCY
TYPE
LOAD
FACTOR
OCCUPANT
LOAD
BASEMENT BASEMENT 3325 SF F-1 300 SF 11
LEVEL 1 SWITCHGEAR BUILDING 4878 SF F-1 300 SF 16
PER IBC 2021
3 10/18/2024 100% PRELIMINARY DESIGN
9 8 7 6 5 4 3 2 1
B
C
A
D
EXTERIOR PREMANUFACTURED
WALLS AND DOORS TO BE
DEMOLISHED
EXISTING HATCH AND
LADDER TO BE
DEMOLISHED
EXISTING HATCH AND
LADDER TO BE
DEMOLISHED
EXTERIOR
PREMANUFACTURED WALLS
AND DOORS TO BE
DEMOLISHED
EXISTING FLOOR TO BE DEMOLISHED STRUCTURE
BELOW TO REMAIN, SEE STRUCTURAL DRAWINGS
FOR MORE INFORMATION.
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
E
S
WSCALE:
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T F
O R
C O
N S
T R
U C
T
IO
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
2'0 4' 8'
SCALE: 1/4" = 1'-0"
3-5-207
TRUE
NORTH
A p ri l
N
:5 :5
P M
ARCHITECTURAL FIRST FLOOR
DEMOLITION PLAN
AD-001
GN
MR
MR
GN 04/24/2025
04/24/2025
04/24/2025
04/24/2025
1/4" = 1'-0"
Level 1-Demolition
1 05/09/2024 60% PRELIMINARY DESIGN
2 08/09/2024 90% PRELIMINARY DESIGN
3 10/18/2024 100% PRELIMINARY DESIGN
DN DN
UP
UP
A-201
A-201
A-201
A-2019 8 7 6
6' - 0 1/2" 11' - 5" 11' - 5" 11' - 5" 12' - 6" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0"
5 4 3 2 1
B
C
A
D
101112
A-301 5" 124' - 3" 1 1/2"
/8
28' - 5 1/2" 95' - 9 1/2"
E X
IS
TI
N G
N E
W
A-301
EXISTING
NEW
SWITCHGEAR
BUILDING
A-301
NEW STEEL GRATING
TREAD STAIR
NEW STEEL GRATING
TREAD STAIR
REFER TO ELECTRICAL
SHEETS FOR NEW
ELECTRICAL EQUIPMENT
12' - 10"3' - 4"
/2
/2
/2
"NEW
FLOOR
HATCH
4' - 0" 3' - 8"
NEW PAINTED
ALUMINUM
DOWNSPOUTS,
TYP.
NEW PAINTED
ALUMINUM
DOWNSPOUTS
36' - 5 1/2" 1' - 11" 3' - 1" 83' - 4"
5' - 0"
NEW CONCRETE PAD AT
FINISH FLOOR LEVEL, TYP.
AT ALL EXIT DOORS
NEW PAINTED
ALUMINUM
DOWNSPOUTS NEW PAINTED
ALUMINUM
DOWNSPOUTS
NEW CONCRETE PAD AT
FINISH FLOOR LEVEL, TYP.
AT ALL EXIT DOORS
NEW CONCRETE PAD AT
FINISH FLOOR LEVEL, TYP.
AT ALL EXIT DOORS. SLOPE
AWAY FROM BUILDING, SEE
CIVIL DRAWINGS
4' - 9 1/2" 6' - 0 1/2"
E Q
E Q
37' - 11 1/2"
18 GAUGE STEEL DOORS,
SEE SPECS FOR DOOR
INFORMATION AND
HARDWARE
18 GAUGE STEEL DOORS,
SEE SPECS FOR DOOR
INFORMATION AND
HARDWARE
18 GAUGE STEEL DOORS,
SEE SPECS FOR DOOR
INFORMATION AND
HARDWARE
E Q
E Q
6"
3' - 4"
4 1/2"
3' - 2 1/2"
9 8 7 6 5 4 3 2 1
B
C
A
D
A-301
A-301
A-301
8' - 3 1/2"
BASEMENT
FLOOR HATCH ABOVE
SHOWN DASHED4
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
E
S
WSCALE:
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T F
O R
C O
N S
T R
U C
T
IO
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
2'0 4' 8'
SCALE: 1/4" = 1'-0"
3-5-207
TRUE
NORTH
A p ri l
N
:5 :4
P M
ARCHITECTURAL BASEMENT &
FIRST FLOOR PLAN
A-101
GN
MR
MR
GN 04/24/2025
04/24/2025
04/24/2025
04/24/2025
1/4" = 1'-0"
LEVEL 1
1/4" = 1'-0"
BASEMENT
1 05/09/2024 60% PRELIMINARY DESIGN
2 08/09/2024 90% PRELIMINARY DESIGN
3 10/18/2024 100% PRELIMINARY DESIGN
A-201
A-201
A-201
A-2019 8 7 6 5 4 3 2 1
B
C
A
D
6' - 0 1/2" 11' - 5" 11' - 5" 11' - 5" 12' - 6" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0"
101112
A-301
A-301
A-301
/8
/2
/2
/2
S L O
P E
S L O
P E
NEW PREFABRICATED BUILDING, ROOF AND
WALLS PROVIDED BY PREFAB MANUFACTURER.
ENCLOSURE MATERIALS TO BE CLASS A-25/450
FLAME SPREAD/SMOKE DEVELOPMENT RATING
NEW PAINTED
ALUMINUM GUTTER
AND DOWNSPOUTS
DS
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
E
S
WSCALE:
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T F
O R
C O
N S
T R
U C
T
IO
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
2'0 4' 8'
SCALE: 1/4" = 1'-0"
3-5-207
TRUE
NORTH
A p ri l
N
:5 :4
P M
ARCHITECTURAL ROOF PLAN
A-102
GN
MR
MR
GN 04/24/2025
04/24/2025
04/24/2025
04/24/2025
1/4" = 1'-0"
ROOF PLAN
1 05/09/2024 60% PRELIMINARY DESIGN
2 08/09/2024 90% PRELIMINARY DESIGN
3 10/18/2024 100% PRELIMINARY DESIGN
LEVEL 1
0' - 0"
ROOF H.P.
13' - 11 1/2"
BC AD
A-301
1/2" / 1'-0" 1/2" / 1'-0"
NEW PREFABRICATED BUILDING:
ROOF, WALLS AND FLOORS TO BE
PROVIDED BY PREFAB
MANUFACTURER. COLOR TO BE
TWILIGHT BLUE. ALL ENCLOSURE
MATERIALS TO BE CLASS A-25/450
FLAME SPREAD/SMOKE
DEVELOPEMENT RATING
REMOVABLE 7'-0" WIDE
BY 1'-6" HIGH TRANSOM
W T
R A
N S
O M
R E
M O
V E
D
LEVEL 1
0' - 0"
ROOF H.P.
13' - 11 1/2"
B CA D
A-301
1/2" / 1'-0" 1/2" / 1'-0"
NEW PREFABRICATED BUILDING:
ROOF, WALLS AND FLOORS TO BE
PROVIDED BY PREFAB
MANUFACTURER. COLOR TO BE
TWILIGHT BLUE. ALL ENCLOSURE
MATERIALS TO BE CLASS A-25/450
FLAME SPREAD/SMOKE
DEVELOPEMENT RATING
REMOVABLE 7'-0" WIDE
BY 1'-6" HIGH TRANSOM
W T
R A
N S
O M
R E
M O
V E
D
BUILDING SIGNAGE TO
MATCH EXISTING
LEVEL 1
0' - 0"
ROOF H.P.
13' - 11 1/2"
987654321 10 11 12
A-301
A-301
NEW PAINTED
ALUMINUM GUTTER
NEW PAINTED
ALUMINUM
DOWNSPOUT, TYP.
ELECTRICAL
EQUIPMENT, SEE
ELECTRICAL SHEETS
BUILDING COLOR TO BE
TWILIGHT BLUE. COORDINATE
WITH MANUFACTURER
DRAWINGS
DUCT OPENING,
COORDINATE WITH
ELECTRICAL DRAWINGS
LEVEL 1
0' - 0"
ROOF H.P.
13' - 11 1/2"
9 8 7 6 5 4 3 2 1101112
A-301
A-301
NEW PREFABRICATED BUILDING:
ROOF, WALLS AND FLOORS TO BE
PROVIDED BY PREFAB
MANUFACTURER. ALL ENCLOSURE
MATERIALS TO BE CLASS A-25/450
FLAME SPREAD/SMOKE
DEVELOPEMENT RATING
GUTTER TO SLOPE TO
SOUTH DOWNSPOUT,
SEE ROOF PLAN
ELECTRICAL EQUIPMENT, SEE
ELECTRICAL SHEETS
BUILDING COLOR TO
BE TWILIGHT BLUE,
COORDINATE WITH
MANUFACTURER
DRAWINGS
NEW PAINTED
ALUMINUM
DOWNSPOUT, TYP.
ELECTRICAL EQUIPMENT, SEE
ELECTRICAL SHEETS
3' - 4 1/2"1' - 10" 3' - 5" 1' - 10"
4" 1' - 10" 1' - 3" 1' - 10"
CABLE TRAY OPENING,
COORDINATE WITH
ELECTRICAL DRAWINGS
2' - 8" 3' - 5"2' - 8" 6' - 4 1/2"
DUCT OPENING,
COORDINATE WITH
ELECTRICAL DRAWINGS
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
E
S
WSCALE:
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T F
O R
C O
N S
T R
U C
T
IO
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
2'0 4' 8'
SCALE: 1/4" = 1'-0"
3-5-207
TRUE
NORTH
A p ri l
N
:5 :4
P M
ARCHITECTURAL EXTERIOR
ELEVATIONS
A-201
GN
MR
MR
GN 04/24/2025
04/24/2025
04/24/2025
04/24/2025
1/4" = 1'-0"
NORTH
1/4" = 1'-0"
SOUTH
1/4" = 1'-0"
WEST
1/4" = 1'-0"
EAST
1 05/09/2024 60% PRELIMINARY DESIGN
2 08/09/2024 90% PRELIMINARY DESIGN
3 10/18/2024 100% PRELIMINARY DESIGN
LEVEL 1
0' - 0"
ROOF H.P.
13' - 11 1/2"
B CA D
BASEMENT
-10' - 5 1/2"
A-301
3' - 9"
NEW GALVANIZED STEEL GRATING TREAD
WITH STEEL RAILINGS AND GUARDS
ATTACHED TO METAL STAIRS
EXISTING BASEMENT
WALLS TO REMAIN
C L E
A R
M
IN
H
E A
D C
L E
A R
A N
C E
SWITCHGEAR
BUILDING
BASEMENT
NEW PAINTED ALUMINUM
GUTTER
NEW 3/16" STEEL PLATE WITH FLOOR
BEAMS BY PREFAB BUILDING
MANUFACTURER.
V.I.F.
11' - 6" 12' - 0"
V.I.F.
11' - 6"
R E
Q 'D
C L
E A
R A
N C
E
NEW 3/16" STEEL PLATE WITH FLOOR BEAMS
BY PREFAB BUILDING MANUFACTURER
EXISTING LAYER OF
CRUSHED STONE TO REMAIN
NEW PREFABRICATED BUILDING, ROOF
AND WALLS PROVIDED BY PREFAB
MANUFACTURER. ENCLOSURE
MATERIALS TO BE CLASS A-25/450
FLAME SPREAD/SMOKE DEVELOPMENT
RATING.
COORDINATE WITH EQUIPMENT
SIZING
STAINLESS STEEL FLASHING
AT PERIMETER OF NEW
FOUNDATION WALL
PROVIDE DAMP PROOFING TO
FINISH GRADE.
CONCRETE CURB INFILL UP TO
FLOOR LEVEL AT DOOR LOCATIONS
1/2" COMPRESSIBLE FILLER
6" CONCRETE PAD AT DOORS,
MIN. 2% SLOPE, SEE CIVIL
DRAWINGS
SLOPEA-301
WALL INSULATION TO MEET R-19, SEE
SPECIFICATIONS FOR MORE
INFORMATION
ROOF INSULATION TO MEET R-30, SEE
SPECIFICATIONS FOR MORE INFORMATION
R-19 SPRAYED-ON FOAM INSULATION AT
RIM JOIST
PROVIDE RIGID INSULATION R-30
UNDER FLOOR STRUCTURE
1/2" / 1'-0" 1/2" / 1'-0"
PROVIDE RIGID INSULATION R-7.5
WITH DRAINAGE BOARD
MANUFACTURER TO COORDINATE AND
PROVIDE CONTINUITY OF
WATERPROOFING BETWEEN EXISTING
AND NEW WATERPROOFING AS
NECESSARY TO SEAL BUILDING FROM
MOISTURE, TYP.
LEVEL 1
0' - 0"
ROOF H.P.
13' - 11 1/2"
B CA D
BASEMENT
-10' - 5 1/2"
A-301
NEW 3/16" STEEL PLATE WITH FLOOR
BEAMS BY PREFAB BUILDING
MANUFACTURER
3' - 9"
EXISTING BASEMENT
WALLS TO REMAIN
BASEMENT
SWITCHGEAR
BUILDING
NEW GALVANIZED STEEL GRATING
TREAD WITH STEEL RAILINGS AND
GUARDS ATTACHED TO METAL STAIRS
NEW PAINTED ALUMINUM
GUTTER
11' - 6" 12' - 0" 11' - 6"
NEW PREFABRICATED BUILDING,
ROOF AND WALLS PROVIDED BY
PREFAB MANUFACTURER.
ENCLOSURE MATERIALS TO BE CLASS
A-25/450 FLAME SPREAD/SMOKE
DEVELOPMENT RATING
STAINLESS STEEL FLASHING AT
PERIMETER OF NEW FOUNDATION
WALL
MANUFACTURER TO COORDINATE AND
PROVIDE CONTINUITY OF
WATERPROOFING BETWEEN EXISTING
AND NEW WATERPROOFING AS
NECESSARY TO SEAL BUILDING FROM
MOISTURE, TYP.
PROVIDE DAMP PROOFING TO FINISH
GRADE
ROOF INSULATION TO MEET R-30, SEE
SPECIFICATIONS FOR MORE
INFORMATION
WALL INSULATION TO MEET R-19, SEE
SPECIFICATIONS FOR MORE
INFORMATION
R-19 SPRAYED-ON FOAM
INSULATION AT RIM JOIST
WALL INSULATION TO MEET R-19,
SEE SPECIFICATIONS FOR MORE
INFORMATION
PROVIDE FIBERGLASS INSULATION
R-13 UNDER FLOOR PLATE. PROVIDE
16 GAUGE GALV. STEEL SHEET
UNDER FLOOR FRAMING
1/2" / 1'-0" 1/2" / 1'-0"
PROVIDE R-30 RIGID INSULATION
UNDER FLOOR STRUCTURE FOR
NEW BUILDING EXTENSION
EXISTING LAYER OF
CRUSHED STONE TO REMAIN
PROVIDE RIGID INSULATION R-7.5
WITH DRAINAGE BOARD
LEVEL 1
0' - 0"
ROOF H.P.
13' - 11 1/2"
9 8 7 6 5 4 3 2 1
BASEMENT
-10' - 5 1/2"
101112
A-301
A-301
EXISTING BASEMENT
WALLS TO REMAINBASEMENT
SWITCHGEAR
BUILDING
NEW PAINTED ALUMINUM
GUTTER
/2
NEW 3/16" STEEL PLATE WITH
FLOOR BEAMS BY PREFAB BUILDING
MANUFACTURER
NEW 3/16" STEEL PLATE WITH
FLOOR BEAMS BY PREFAB
BUILDING MANUFACTURER
LIGHT FIXTURES, SEE
ELECTRICAL
LIGHT FIXTURES, SEE
ELECTRICAL
LIGHT FIXTURES, SEE
ELECTRICAL
PROVIDE DAMP PROOFING TO
FINISH GRADE.
PROVIDE RIGID INSULATION R-7.5
WITH DRAINAGE BOARD
MANUFACTURER TO COORDINATE AND
PROVIDE CONTINUITY OF
WATERPROOFING BETWEEN EXISTING
AND NEW WATERPROOFING AS
NECESSARY TO SEAL BUILDING FROM
MOISTURE, TYP.
PROVIDE RIGID INSULATION
R-30 UNDER FLOOR
STRUCTURE
LEVEL 1
0' - 0"
D
3/16" STEEL PLATE FLOOR
FINISH BY PREFAB
MANUFACTURER
1/2" COMPRESSIBLE
FILLER
DOOR CONCRETE PAD, SEE CIVIL
CONCRETE INFILL AT
CURB UP TO FLOOR LEVEL
DOOR TO BE PROVIDED
BY BUILDING
MANUFACTURER
R-19 SPRAYED-ON
FOAM INSULATION
AT RIM JOIST
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
E
S
WSCALE:
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T F
O R
C O
N S
T R
U C
T
IO
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
2'0 4' 8'
SCALE: 1/4" = 1'-0"
3-5-207
TRUE
NORTH
A p ri l
N
:5 :5
P M
ARCHITECTURAL BUILDING
SECTIONS
A-301
GN
MR
MR
GN 04/24/2025
04/24/2025
04/24/2025
04/24/2025
1/4" = 1'-0"
BUILDING SECTION -STAIR
1/4" = 1'-0"
BUILDING SECTION NORTH
1/4" = 1'-0"
BUILDING SECTION WEST
1 1/2" = 1'-0"
DOOR THRESHOLD
1 05/09/2024 60% PRELIMINARY DESIGN
2 08/09/2024 90% PRELIMINARY DESIGN
3 10/18/2024 100% PRELIMINARY DESIGN
LEVEL
SYMBOL
CAMBER
NUMBER OF STUDS
TOP ELEVATION OF STRUCTURAL ELEMENT
STEEL BEAM
STEEL JOIST
BRACE, BRACE FRAME STARTS AT THIS LEVEL
MOMENT CONNECTION
DRAG CONNECTION
BRACE, BRACE FRAME BELOW THIS LEVEL
PLATE CONNECTION
STIFFENER PLATE CONNECTION
COLUMN STARTS ON THIS LEVEL
COLUMN FINISHES BELOW THIS LEVEL
COLUMN HANGER
COLUMN POST
SLOPED COLUMN STARTS ON THIS LEVEL
SLOPED COLUMN FINISHES BELOW THIS LEVEL
SLOPED COLUMN CONTINUES THROUGH THIS LEVEL
SLAB DROP
SLAB SLOPE
CHANGE IN SLAB THICKNESS
GROUND
ONE WAY SPANNING SLAB
TWO WAY SPANNING SLAB
TOP OF SLAB ELEVATION
WELD TYPE
CONCRETE WALL (PLAN VIEW)
CONCRETE BEAM (PLAN VIEW )
SETTING OUT POINT/WORK POINT
LEVEL
DESCRIPTION
SYMBOLS
SPLICE
FFL FINISH FLOOR LEVEL
EMBEDMENTEMB
XS
XXS
EXTRA STRONG (PIPE)
DOUBLE EXTRA STRONG (PIPE)
IF INSIDE FACE
INTERIOR
JOINT
INT
JT
INSIDE DIAMETERID
INCHIN
TS STRUCTURAL STEEL TUBE
STRUCT STRUCTURAL
SSL SHORT SLOTTED (BOLT HOLE)
SOG SLAB ON GRADE
REBAR REINFORCING BAR
PARTIAL PENETRATION (WELD)PP
PERP PERPENDICULAR
OVS OVERSIZE (BOLT HOLE)
ON CENTEROC
NORMAL WEIGHTNW
NOMINALNOM
NEAR FACENF
MOMENT FORCEM
LW LIGHT WEIGHT
LIGHTLT
LONG SLOTTED (BOLT HOLE)LSL
POUNDLB
L LENGTH
HSS HOLLOW STRUCTURAL SECTION
HEIGHTHT
HEXAGON, HEXAGONALHEX
GRADEGR
YIELD STRESSFY
FAR FACEFF
EXISTINGE
DIAGONALDIAG
DEPTH, DEEP, DECKD
COMPLETE JOINT PENETRATION (WELD)CJP
CONSTRUCTIONCONST
COVERPLATE
CONTINUOUS
CPL
CONT
CONNECTION
CONCRETE
COLUMN
CONN
CONC
COL
CLEAR
CENTERLINE
CLR
CL
CTRL JT CONTROL JOINT
CHANNELC
BOTH FACESBF
STEELST
TOP & BOTTOM
VERIFY IN FIELD
WITH
TYP TYPICAL
WORK POINT
WELDED WIRE FABRICWWF
WP
WITHOUT
UNLESS OTHERWISE NOTED
VERTICAL (FORCE)
W/O
VIF
W/
UON
VERT, V
T/COL TOP OF COLUMN
TOP OF SLAB
TOP OF STEEL
TOP OF WALL
TOPPING
T/ST
T/WALL
T/SL
TOPG
THICKTHK
T&B
STIFFENER
SQUARE FOOT
SQUARE INCH
STANDARD
STAINLESS STEEL
STIFF
STD
SQ FT
SQ IN
SS
SIMILAR
SLAB
SIM
SL
REVISION
REINFORCE(ING)
POINT
RADIUS
REINF
REV
R
PT
POUNDS PER CUBIC FOOT
PLATE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PL
PSF
PSI
PCF
OUTSIDE FACE
OPENING
DESCRIPTION
ABBREVIATIONS
ABV.
OD OUTSIDE DIAMETER
OPPOSITE HAND
OPPOSITE
OPNG
OPP
OF
OH
GAUGEGA
ALT ALTERNATE
ABV.
ABBREVIATIONS
DESCRIPTION
BM
BLDG
BET
BEAM
BUILDING
BETWEEN
BOT
BPL
B/FTG
BS
BASE PLATE
BOTTOM
BOTH SIDES
BOTTOM OF FOOTING
CANT
CJ CONSTRUCTION JOINT
CANTILEVER
DEMO DEMOLITION
DIA
DIM
DO
DL
DIAMETER
DITTO
DEAD LOAD
DIMENSION
DETAILDET
EF
EA
EL
EJ
EQ
EACH FACE
EACH
EQUAL
EXIST
EW
FT
EXT
EXP
FEET
EXTERIOR
EXPANSION
EXISTING
EACH WAY
DRAWINGDWG
ELEVATION
EXPANSION JOINT
FIN
FDN
FL FLOOR
FINISHED
FOUNDATION
FS
FTG FOOTING
FAR SIDE
GALV GALVANISED
HORIZ
HSB
HP
HIGH-STRENGTH BOLT
HIGH POINT
HORIZONTAL
KSF
K
KIPS PER SQUARE FOOT
KIP = 1000 LBS
LIN
LL
LP
LLV
LLH
LOW POINT
LONG LEG VERTICAL
LONG LEG HORIZONTAL
LIVE LOAD
LINEAR OR LINEAL
LONGLG
NIC
NO
NOT IN CONTRACT
NUMBER
NS
NTS
NEAR SIDE
NOT TO SCALE
MOMENT FRAMEMF
T/D TOP OF METAL DECK
SLABS
METAL DECKMD
AXIAL FORCE, SEE PH
SHEAR FORCEV
AXIAL FORCEP
BRACE FRAME
T/SL = X'-XX"
ISOLATION JOINTIJ
MOVEMENT JOINTMJ
DJ DOWEL JOINT
H
P
S
S
SS
B/ST BOTTOM OF STEEL
T/CONC TOP OF CONCRETE
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
AP
RI
L
, 2
:0 :0
P M
STRUCTURAL
DRAWING LIST, SYMBOLS &
ABBREVIATIONS
S-001
JULIAN SAFAR
BRIAN RAINE
ARIF OZKAN
SYLVIA RICHARDSON 02/24/25
02/24/25
02/24/25
02/24/25
3-5-207
Sheet List
Sheet Number Sheet Name
S-001 STRUCTURAL DRAWING LIST, SYMBOLS & ABBREVIATIONS
S-002 STRUCTURAL GENERAL NOTES
S-100 STRUCTURAL SITE PLAN
S-200 STRUCTURAL DEMOLITION OVERALL PLAN
S-200A STRUCTURAL DEMOLITION PLAN WEST
S-200B STRUCTURAL DEMOLITION PLAN EAST
S-210 STRUCTURAL GROUND LEVEL PLAN
S-220 STRUCTURAL SUPERSTRUCTURE PLAN
S-400 STRUCTURAL ELEVATIONS
S-500 STRUCTURAL TYPICAL REINFORCEMENT DETAILS
S-501 STRUCTURAL TYPICAL CONCRETE DETAILS
S-502 STRUCTURAL TYPICAL CONCRETE DETAILS
S-510 STRUCTURAL TYPICAL STEEL DETAILS
S-550 STRUCTURAL REFERENCED SECTIONS & DETAILS
S-551 STRUCTURAL REFERENCED SECTIONS & DETAILS
1 05/09/24 60% PRELIMINARY DESIGN
2 08/09/24 90% PRELIMINARY DESIGN
3 10/18/24 100% PRELIMINARY DESIGN
4 02/20/25 60% FINAL DESIGN
5 04/24/25 CD-3B PACKAGE
http://www.arup.com
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
AP
RI
L
, 2
:0 :0
P M
STRUCTURAL
GENERAL NOTES S-002
JULIAN SAFAR
BRIAN RAINE
ARIF OZKAN
SYLVIA RICHARDSON 02/24/25
02/24/25
02/24/25
02/24/25
3-5-207
DESIGN BASIS
1. SUPERIMPOSED DEAD LOADS: CONTROL BUILDING GROUND LEVEL = 25 PSF
2. LIVE LOADS: CONTROL BUILDING GROUND LEVEL = 125 PSF
3. WIND LOADS:
PARAMETER VALUE
BASIC WIND SPEED, V 107 MPH
WIND IMPORTANCE FACTOR, I 1.00
WIND EXPOSURE CATEGORY C
RISK CATEGORY II
GUST FACTOR, G = 0.85 0.85
DIRECTIONALITY FACTOR, Kd = 0.85 0.85
4. SEISMIC LOADS:
PARAMETER VALUE
SEISMIC IMPORTANCE FACTOR, I 1.0
SITE CLASS D
SHORT PERIOD SITE COEFFICIENT, Fa 1 SEC PERIOD SITE COEFFICIENT, Fv SHORT PERIOD SPECTRAL RESPONSE ACCELERATION, Ss 0.136
1 SEC PERIOD SPECTRAL RESPONSE ACCELERATION, S1 0.066
Sms Sm1 Sds Sd1
RISK CATEGORY II
SEISMIC DESIGN CATEGORY B
SEISMIC FORCE-RESISTING SYSTEM STEEL SYSTEM NOT
SPECIFICALLY DETAILED
RESPONSE MODIFICATION COEFFICIENT, R
SEISMIC RESPONSE COEFFICIENT, Cs
DESIGN BASE SHEAR, V
SYSTEM OVERSTRENGTH FACTOR, Ω0
DEFLECTION AMPLIFICATION FACTOR, Cd
ANALYSIS PROCEDURE
1. REFER TO ASCE 7-16 FIGURE 30.3-2B FOR EXTENT OF ROOF ZONES.
NOTES:
3r > 500 21.2 -41.9
3r 200 22.4 -53.4
3r 50 25.0 -80.0
3r <= 2 25.0 -80.0
3e > 500 19.8 -25.0 3e 200 21.2 -37.0 3e 50 25.0 -67.3
3e <= 2 25 -67.3
2r > 500 19.8 -25.0
2r 200 21.2 -37.0
2r 50 25.0 -67.3
2r <= 2 25.0 -67.3
2n > 500 19.8 -25.0
2n 200 21.2 -37.0
2n 50 25.0 -67.3
2n <= 2 25.0 -67.3
2e > 500 21.2 -14.4
2e 200 22.4 -28.1
2e 50 23.9 -46.2
2e <= 2 25.0 -46.2
1 > 500 21.2 -14.4
1 200 22.4 -28.1
1 50 23.9 -46.2
1 <= 2 25.0 -46.2
ZONE TRIBUTARY WIND
AREA (FT^2)
ULTIMATE WIND
PRESSURE
(PSF)
ULTIMATE WIND
SUCTION
(PSF)
GABLED ROOFS
3. THE DIMENSION 'a' IS 10 PERCENT OF THE LEAST HORIZONTAL DIMENSION, BUT NOT LESS THAN 3 FT
2. ZONE 4 IS THE PORTION OF WALL BOUNDED BY ZONES 5. REFER TO ASCE 7-16 FIGURE 28.3-1.
REFER TO ASCE 7-16 FIGURE 28.3-1.
1. ZONE 5 IS THE WALL EDGE ZONE, WHICH EXTENDS A DISTANCE 'a' FROM THE BLDG EDGE.
NOTES:
5 > 500 18.6 -20.8
5 200 20.1 -23.7
5 50 22.4 -28.2
5 <= 10 25.0 -33.5
4 > 500 18.6 -20.8
4 200 20.1 -22.2
4 50 22.4 -24.5
4 <= 10 25.0 -27.1
ZONE TRIBUTARY WIND
AREA (FT^2)
ULTIMATE WIND
PRESSURE
(PSF)
ULTIMATE WIND
SUCTION
(PSF)
WALLS
REINFORCING STEEL AND FIBERGLASS FOR CONCRETE AND MASONRY
1. REINFORCEMENT BARS SHALL BE AS FOLLOWS:
A. DEFORMED BARS CONFORMING TO ASTM A615 GRADE 60 UNO.
B. DEFORMED BARS CONFORMING TO ASTM A706 GRADE 60 FOR BARS TO BE WELDED AND WHERE NOTED ON DRAWINGS.
C. DEFORMED BARS CONFORMING TO ASTM A970 FOR HEADED BARS.
D. ASTM A185 FOR WELDED WIRE REINFORCEMENT (WELDED WIRE FABRIC). USE FLAT SHEETS ONLY.
E. FIBERGLASS BARS CONFORMING TO ASTM D7957/D7957M-17
2. MECHANICAL SPLICES SHALL BE TYPE 2 COUPLERS (UON) WITH A CURRENT ICC APPROVAL.
3. MINIMUM LAP OF WELDED WIRE REINFORCEMENT SHALL BE 6" OR ONE FULL MESH PLUS 2", WHICHEVER IS GREATER.
4. REINFORCING BARS SHALL BE LAP SPLICED PER THE LAP SPLICE LENGTH SCHEDULE. LAP SPLICES SHALL BE SECURELY TIED
AT ALL SIDE AND END LAPS.
5. REINFORCING BARS MARKED AS “CONTINUOUS” SHALL BE LAP SPLICED PER LAP SPLICE LENGTH SCHEDULE.
6. REINFORCING BAR SPLICES SHALL BE MADE ONLY WHERE INDICATED ON THE DRAWINGS. WHERE SPLICE LOCATIONS ARE NOT SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL SHOW THEIR PROPOSED SPLICE LOCATIONS ON THE SHOP
DRAWINGS.
7. ALL BARS AT NON-CONTINUOUS ENDS SHALL HAVE A STANDARD HOOK.
8. WELDING OF REINFORCING STEEL BARS SHALL BE IN ACCORDANCE WITH AWS D1.4. WELD REINFORCING BARS ONLY WHERE INDICATED ON THE DRAWINGS. TACK WELDING OR WELDING OF BARS TO PLATES, TEMPLATES, ETC. IS PROHIBITED, UNLESS
SPECIFICALLY SHOWN ON THE STRUCTURAL DRAWINGS.
9. DOWELS CONNECTING WALLS OR COLUMNS TO FOUNDATIONS SHALL BE THE SAME GRADE, SIZE AND SPACING AS THE
VERTICAL REINFORCING BARS IN THE WALLS OR COLUMNS, UNLESS NOTED OTHERWISE.
10. ALL DOWELS SHALL BE FULLY DEVELOPED IN TENSION UNLESS NOTED OTHERWISE.
11. ADDITIONAL REINFORCEMENT SHALL BE PROVIDED AROUND ALL SLAB AND WALL OPENINGS AS SHOWN ON THE TYPICAL
DETAILS UNLESS NOTED OTHERWISE.
12. WHERE VERTICAL DOWELS FROM FOUNDATION INTERFERE WITH STEEL COLUMN BASE PLATE, THE CONTRACTOR SHALL
RELOCATE THESE DOWELS THREE (3) INCHES FROM EDGE OF BASE PLATE.
13. ALL WALLS SHALL BE INTERCONNECTED AT CORNERS AND INTERSECTIONS WITH DOWELS MATCHING HORIZONTAL
REINFORCEMENT PER TYPICAL DETAILS UNLESS NOTED OTHERWISE.
14. ALL FOUNDATION AND GRADE BEAM REINFORCEMENT SHALL BE CONTINUOUS THROUGH INTERSECTING FOUNDATIONS AND
GRADE BEAMS UNLESS NOTED OTHERWISE.
15. BARS SHALL NOT BE BENT OR TWISTED IN THE FIELD, UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS.
16. ALL REINFORCING BARS, INSERTS, EMBEDS ETC. SHALL BE SECURELY HELD IN PLACE TO MAINTAIN THEIR POSITIONS WHILE CONCRETE IS POURED. PROVIDE SUITABLE CHAIRS, TIES, SPACERS, ADDITIONAL BARS AND STIRRUPS AS REQUIRED.
STRUCTURAL STEEL WELDING
1. ALL WELDING SHALL BE DONE BY AWS CERTIFIED WELDERS.
2. SHOP DRAWINGS SHALL SHOW ALL WELDING WITH AWS A2.4 SYMBOLS.
3. WELDS SHALL BE MADE USING LOW-HYDROGEN ELECTRODES WITH MINIMUM TENSILE STRENGTH OF 70 KSI (E70XX
ELECTRODES) UNLESS NOTED OTHERWISE.
4. WELD LENGTHS CALLED FOR ON DRAWINGS ARE THE NET EFFECTIVE LENGTH REQUIRED. WHERE LENGTH OF WELD IS NOT
SHOWN IT SHALL BE THE FULL LENGTH OF JOINT.
5. WELDS THAT HAVE BEEN DEFINED ON THE DRAWINGS AS “DEMAND CRITICAL WELD” (DCW) REQUIRE HIGHER STANDARDS
FOR WELDING, TESTING AND INSPECTION PER AISC 341.
6. ALL GROOVE AND BUTT WELDS SHALL BE COMPLETE JOINT PENETRATION (CJP) WELDS UNLESS NOTED OTHERWISE.
7. ALL PARTIAL PENETRATION GROOVE WELD SIZES SHOWN ON THE DRAWINGS REFER TO THE EFFECTIVE THROAT
THICKNESS.
8. FILLET WELD SIZES SHOWN ON DRAWINGS ARE MINIMUM SIZES. INCREASE WELD SIZE TO AWS MINIMUM SIZES BASED ON
PLATE THICKNESSES. THE MINIMUM FILLET WELD SIZE SHALL BE 3/16”.
9. PROJECT SPECIFIC WELDING PROCEDURE SPECIFICATION (WPS) FOR ALL SHOP AND FIELD WELDS ON THE PROJECT SHALL BE SUBMITTED FOR REVIEW AND ACCEPTANCE PRIOR TO STARTING FABRICATION OR ERECTION. THE WPS SHALL BE SUBMITTED TO OWNER’S TESTING LAB FOR REVIEW AND ACCEPTANCE PRIOR TO BEING SUBMITTED TO THE ARCHITECT.
10. THE CONTRACTOR SHALL DETERMINE THE SEQUENCE AND PROCEDURES OF WELDING TO MINIMIZE THE EFFECT WELD
SHRINKAGE, RESIDUAL STRESSES AND TO MAINTAIN ERECTION TOLERANCES.
11. ALL STEEL EXPOSED TO WEATHER SHALL HAVE ADDITIONAL SEAL WELDING TO PROTECT THE MEMBERS (PIPES, TUBES, BUILT-UPS) AND THE CONNECTIONS FROM MOISTURE INFILTRATION. THESE ADDITIONAL SEAL WELDS SHALL BE SHOWN ON
SHOP DRAWINGS.
STRUCTURAL STEEL
1. STRUCTURAL STEEL MEMBERS SHALL CONFORM TO THE FOLLOWING UNLESS NOTED OTHERWISE:
SHAPE GRADE YIELD STRENGTH Fy (KSI)
WIDE FLANGE SHAPES ASTM A992 50
TEES ASTM A992 50
CHANNELS ASTM A36 36
ANGLES ASTM A36 36
PLATES ASTM A572 GRADE 50 50
BARS ASTM A500 GRADE 50 50
SQUARE & RECTANGULAR HSS ASTM A500 GRADE C 50
ROUND HSS ASTM A500 GRADE C 46
STEEL PIPE ASTM A53 GRADE B 36
2. HIGH-STRENGTH BOLTS SHALL CONFORM TO THE FOLLOWING UNLESS NOTED OTHERWISE:
BOLT TYPE REMARKS
ASTM A325 WHERE NOTED ON DRAWINGS
ASTM A490 WHERE NOTED ON DRAWINGS
ASTM A307 GRADE A MACHINE BOLTS WHERE NOTED ON DRAWINGS
3. WHERE NON-SLIP CRITICAL BOLTS ARE SPECIFIED, THEY SHALL BE TIGHTENED TO A SNUG TIGHT CONDITION. SEE DETAILS
AND SCHEDULES FOR BOLT DIAMETERS AND SCHEDULES.
4. ALL BOLT HOLES SHALL BE STANDARD SIZE HOLES (1/16” LARGER IN DIAMETER THAN THE DIAMETER OF THE BOLT)
UNLESS NOTED OTHERWISE.
5. ALL BOLTS SPECIFIED AS SLIP CRITICAL BOLTS (A325-SC OR A490-SC) SHALL HAVE CLASS A FAYING SURFACES UNLESS
NOTED OTHERWISE.
6. AT ALL SLIP CRITICAL CONNECTIONS SLIP IS CHECKED AT THE FACTORED LOAD LEVEL UNLESS NOTED OTHERWISE.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
A. ALL ERECTION AIDS.
B. STEELWORK ERECTION SEQUENCE. IN DETERMINING THE ERECTION SEQUENCE THE CONTRACTOR SHALL TAKE
NECESSARY MEASURES TO MINIMIZE THE EFFECTS OF TEMPERATURE CHANGES AND DIFFERENTIAL TEMPERATURE EFFECTS (SUCH AS EXPOSURE TO STRONG SUN ON ONE SIDE OF THE BUILDING) WHILE MEETING AISC ACCEPTABLE
ERECTION TOLERANCES.
8. THE CONTRACTOR SHALL SUBMIT DETAILED, COORDINATED AND CHECKED SHOP DRAWINGS FOR ALL STRUCTURAL STEEL MEMBERS AND CONNECTIONS TO THE ARCHITECT FOR REVIEW PRIOR TO THE START OF FABRICATION AND ERECTION.
9. STRUCTURAL AND ARCHITECTURAL STEEL PERMANENTLY EXPOSED TO WEATHER SHALL BE CORROSION PROTECTED BY BEING HOT-DIPPED GALVANIZED AND/OR SUITABLY PRIMED AND PAINTED AS SHOWN ON ARCHITECTURAL DRAWINGS AND PER PROJECT SPECIFICATIONS. STEEL ELEMENTS EMBEDDED IN CONCRETE OR MASONRY SHALL BE LEFT UNPAINTED.
10. THE CONTRACTOR SHALL PROVIDE MINIMUM 4” CONCRETE COVER AROUND ALL STEEL MEMBERS OR COMPONENTS ADJACENT TO AND EXPOSED TO SOIL.
This is the start of the file's text. The full file is on GovTribe.