This document provides details on a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0044 to expand primary care facilities at Lake Nona (West) Project 675-102. An attachment to the solicitation provides construction drawings related to the project. Proposals are due by the date listed on the solicitation for expanding primary care infrastructure to support increased demand at the specified VA medical center location. The opportunity is set aside for small businesses.

View the file

Other files

File Type Posted
Public - Lake Nona Bid Opening Abstract.pdf PDF
36C77623B0044 0006.pdf PDF
36C77623B0044 0005.pdf PDF
Technical Questions and Answers.pdf PDF
2017 Orlando VA Medical Center ACM Report Compressed.pdf PDF
Hazardous Material Survey for Womens Helath Clinic Reception Area- Existing.pdf PDF
00 01 10_REV 230801.pdf PDF
36C77623B0044 0004.pdf PDF
08 71 00_REV 2023-08-01.pdf PDF
36C77623B0044 0003.pdf PDF
Remove Note from 2.3.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
Construction Wage Rates - Orange County - 7-7-23.pdf PDF
36C77623B0044 0002.pdf PDF
675-102 Supplement to General Requirements Spec - 7-5-23.pdf PDF
675102-21109_AQ602.pdf PDF
675102-21109_AQ601.pdf PDF
36C77623B0044 0001.pdf PDF
675102-21109_AQ603.pdf PDF
08 71 00_REV 2023-06-05.pdf PDF
Attachment 2 - Specifications Vol 2.pdf PDF
Attachment 8 - ACM Report Compressed - 2017 - Orlando VA Medical Center.pdf PDF
Attachment 3 - Specifications Vol 3.pdf PDF
IFB - 36C77623B0044.pdf PDF
Attachment 5 - Drawings - 675-102 - 43-86.pdf PDF
Attachment 1 - Specifications Vol 1.pdf PDF
Attachment 13 - Brand Name Justification - Lake Nona Primary Care_Redacted.pdf PDF
Attachment 4 - Drawings - 675-102 - 1-42.pdf PDF
Attachment 6 - Drawings - 675-102 - 87-130.pdf PDF
Attachment 12 - Site Visit Instruction.pdf PDF
Attachment 11 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 9 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 10 - Construction Wage Rates - Orange County - 6-2-23.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STEEL BEAM

HEAVY-DUTY

BEAM CLAMP

HANGER ROD

STRUCTURAL

STEEL BEAM

CONCRETE INSERT

CONCRETE SLAB

INSERT NUT

HANGER ROD

HEAVY-DUTY CONCRETE STEEL

INSERT W/ ELONGATED SLOT

ADJUSTABLE

STEEL U-SUPPORT

LOCKING NUT

HANGER ROD

WOOD JOIST

OR BEAM

LAG SCREWS

SUPPORT NUT

WOOD JOIST OR BEAM

WELDS WEB MEMBERS O.W.S.J.

HANGER NUT

BOTTOM CHORD

OF O.W.S.J.

BENT STRAP 1 1/2" x 3/16"

OVER VERTICAL LEGS OF

ANGLES.

HANGER ROD

STEEL JOIST

PIPE HANGERS AND SUPPORTS

SUPPORT HORIZONTAL STEEL AND COPPER PIPING AS FOLLOWS:

NOMINAL PIPE SIZE DISTANCE BETWEEN SUPPORTS HANGER ROD DIAMETERS

1/2" 6' 3/8"

3/4" TO 1-1/2" 6' 1/2"

2" TO 2-1/2" 10' 1/2"

3" TO 4" 12' 5/8"

6" TO 12" 14' 7/8"

14" TO 18" 20' 1"

PLACE HANGER WITHIN 1 FOOT OF EACH HORIZ. ELBOW. SUPPORT HORIZ. SOIL WASTE AND STORM PIPE NEAR

EACH HUB, WITH 5 FEET MAXIMUM SPACING BETWEEN HANGERS.

VERTICAL PIPING:

1. SUPPORT VERTICAL WATER PIPING AT EVERY FLOOR.

2. SUPPORT VERTICAL SOIL PIPE AT EACH FLOOR AT HUB.

WHERE SEVERAL PIPES CAN BE INSTALLED IN PARALLEL AND AT SAME ELEVATION PROVIDE MULTIPLE OR TRAPEZE HANGERS. WHERE PRACTICAL, SUPPORT RISER PIPING INDEPENDENTLY OF CONNECTED HORIZ. PIPING.

ONE ANGLE EACH SIDE OF WEB MEMBERS. REST ON TOP

OF BOTTOM CHORD OF O.W.S.J. BETWEEN PANEL POINTS.

SIZE FOR LOAD.

SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB. UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER

TYPE 1 - SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER

TYPE 43 - SEE SPECIFICATIONS

PROVIDE INSULATION SHIELD & INSERT

FOR ALL PIPING (8" MIN.)

BAND

1-5/8" 12 GAUGE CHANNEL OR

2"x2"x1/4" ANGLE

1/2" DIA. HANGER RODS WITH 36"

MAX. SPACING ON EACH CHANNEL

WELD

SADDLE

INSULATION SHIELD

AT HANGER

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9 PSF MIN.

DENSITY) UNDER INSULATION SHIELD

INSULATION (VAPOR BARRIER TYPE IS

REQUIRED FOR LOW TEMPERATURE

PIPE)

HANGER ROD

NOTES:

SEE SPECIFER FOR DETAILED

HANGER REQUIREMENTS

THRU 3/4

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOM. SIZE IN.

PIPE FT.

TUBING FT.

5 FT

1 1/4

1 1/2

2 1/2

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

1" M

AX

NOTES:

1. PROVIDE ANCHORS ONLY WHERE SHOWN ON DRAWINGS

2. EXTEND SLEEVE ABOVE FLOOR WHERE SPECIFIED.

INSULATION

BOLT (TYPICAL)

FLOOR SLAB

FIRE-STOPPING MATERIAL COMPLIANT WITH UL 1479 2-HOUR RATING

(SIMILAR TO 3M SYSTEM NO. C-AJ-1551 OR HILTI F-A-1028)

BOLT

PIPE

PIPE SLEEVE

WHERE SPECIFIED

RISER CLAMP

RISER

PIPE SLEEVE

WHERE SPECIFIED

RISER CLAMP. BOTTOM CLAMP

REQUIRED AT ANCHOR POINTS ONLY.

ELEVATION

PLAN

RISER CLAMP

CONTINUOUS FIRESTOP

SEALANT

CONTINUOUS FIRESTOP SEALANT

FIRESTOP SEALANT-MIN 1/2" THICKNESS OF FILL

MATERIAL APPLIED WITHIN THE ANNULUS, FLUSH

WITH THE TOP SURFACE OF FLOOR. AT THE POINT

OF CONTACT LOCATION BETWEEN PIPE AND

CONCRETE, A MIN 1/2" DIAM BEAD OF FILL MATERIAL

SHALL BE APPLIED AT THE CONCRETE/PIPE

INTERFACE ON THE TOP SURFACE OF FLOOR AND

ON BOTH SURFACES OF WALL.

THROUGH PENETRANTS-ONE METALLIC PIPE,

CONDUIT OR TUBING TO BE INSTALLED WITHIN

THE FIRESTOP SYSTEM. PIPE, CONDUIT OR

TUBING TO BE RIGIDLY SUPPORTED ON BOTH

SIDES OF FLOOR OR WALL ASSEMBLY OF WALL.

FLOOR

NOTE:

1. SEE ARCHITECTURAL DRAWINGS FOR LAVATORY MOUNTING HEIGHTS.

2. P-TRAP, TAIL PIECE, AND WASTE ARM NOT SHOWN FOR CLARITY.

3. FOR HANDICAP LAVATORY INSTALLATION ALL WASTE PIPING UNDER SINK SHALL BE

WRAPPED WITH PROTECTIVE PIPE COVERS.

4. FOR HANDICAP LAVATORY INSTALLATION ANGLE STOP VALVES AND SUPPLY RISERS

SHALL BE WRAPPED WITH PROTECTIVE PIPE COVERS. SUPPLY RISERS SHALL BE

WRAPPED FROM STOP VALVES TO MIXING VALVE. ENDS OF PROTECTIVE WRAP SHALL

BE CUT SQUARE AND TIE WRAPPED CLOSED.

CHROME PLATED RIGID

SUPPLY RISER (TYPICAL)

CHROME PLATED ALL BRASS

CONSTRUCTION ANGLE STOP WITH FULL

TURN BRASS STEM AND LOOSE KEY

HANDLE. (TYP.2)

SANITARY ROUGH-IN

WALL HUNG LAVATORY REFER TO

PLANS AND SPECIFICATIONS FOR

TYPE OF FIXTURE AND FAUCET.

FOUR PORT POINT-OF-USE THERMOSTATIC

MIXING VALVE MOUNTED AS HIGH AS

POSSIBLE. MIXING SET TO DISCHARGE 105°F

PACK VOID BETWEEN PIPE OR

INSULATION AND WALL WITH FIBERGLASS

BATT, THEN SEAL WITH A SILICONE

COMPOUND OR OTHER APPROVED

SEALANTS. IF WALL IS FIRE RATED, FILL

VOID BETWEEN PIPE OR INSULATION AND

WALL WITH FIRE BARRIER CAULK

CHROME PLATED OR STAINLESS

STEEL ESCUTCHEON PLATES BOTH

SIDES OF WALL IN EXPOSED AREAS.

PLATE SHALL BE SECURED WITH

WALL CLIPS OR MOUNTING SPRINGS

PROVIDE A MINIMUM OF 1/2"

CLEARANCE BETWEEN WALL

AND PIPE OR INSULATION

PIPE INSULATION

SEE DRAWINGS FOR PIPE

SIZE AND MATERIAL

NOTES:

1. I.D. OF WALL OPENING TO BE A MIN. OF 1/2" LARGER THAN O.D. OF PIPE OR INSULATION PASSING THROUGH WALL.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR WALL OPENINGS WITH OTHER TRADES AND / OR CONTRACTORS.

3. PIPE PENETRATIONS OF SMOKE OR FIRE WALLS SHALL BE IN COMPLIANCE WITH NFPA-90A.

FACE OF WALL

M

IN

IM

IZ

E D

IM

EN

TI

O

N

GAS TIGHT BRASS CLEANOUT PLUG

COMBINATION WYE OR 1/8" BEND

CAST IRON STORM, SANITARY OR WASTE PIPE.

CAULK INSIDE CONNECTION.

18 GAUGE ROUND GALVANIZED STEEL

PIPE SLEEVE

STEEL RISER CLAMP

PROVIDE A SECTION OF HIGH COMPRESSION STRENGTH

INSULATION AT EACH HANGER POINT, INSULATION MAY BE

HALF FULL ROUND OR FULL ROUND & EXTENDED 2"

BEYOND GALVANIZED SHIELD EACH WAY.

SUPPORT HANGER

STEEL ANCHOR

SUPPORT HANGER

STEEL ROD

ADJUSTABLE

MALLEABLE

IRON SPLIT

SWIVEL RING

PIPE SADDLE

1/4" TURN BALL

VALVE

CHECK

VALVE

CIRCUIT SETTER BALANCING

VALVE (BALANCE TO 0.5 GPM)

FROM WATER

SYSTEM

TO HOT WATER

RETURN SYSTEM.

1/4" TURN BALL

VALVE

WATER HAMMER

ARRESTOR. INSTALL PER

MANUFACTURER'S

RECOMMENDATIONS

WATER SUPPLY

WATER SUPPLY TO

PLUMBING FIXTURE

WATER HAMMER

ARRESTOR. INSTALL PER

MANUFACTURER'S

RECOMMENDATIONS

WATER SUPPLY

WATER SUPPLY TO

PLUMBING FIXTURES

WATER HAMMER

ARRESTOR SIZE

MODEL

CONNECTION

DIAMETER

(IN.)

FIXTURE

UNITS

Z1700-100 3/4 1-11

Z1700-200 3/4 12-32

Z1700-300 1 33-60

Z1700-400 1 61-113

Z1700-500 1 114-154

Z1700-600 1 155-330

SIZING BASED ON ZURN SERIES Z1700

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

E4KEY PLANAREA A, ZONE 1

E1E2E3D4HOSPITALD1D2D5D3WD6D7

CLINICP-WC1C2P-E

A1A2A3B1A4B2

N

10/19/2022

PLUMBING - DETAILS EXPAND PRIMARY CARE

AT LAKE NONA (WEST)

ORLANDO VA MEDICAL CENTER

RAH TE

675-102

P501

01 & 02

CONSTRUCTION

DOCUMENTS

21-10936C77621C0079

NOT TO

SCALE

PIPE HANGER

NOT TO

SCALE

PIPE HANGER

NOT TO

SCALE

SUPPORT / ANCHOR FOR PIPE RISERS

NOT TO

SCALE

LAVATORY MIXING VALVE

NOT TO

SCALE

PIPE PENETRATION OF INTERIOR WALL

NOT TO

SCALE

SUSPEND DRAINAGE CLEANOUT

NOT TO

SCALE

HOT WATER CIRCULATION (HWC) VALVE ASSEMBLY

NOT TO

SCALE

WATER HAMMER ARRESTOR DETAIL

Revisions: Date:

50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022

75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022

95% CONSTRUCTION DOCUMENT SUBMITTAL 05/11/2022

100% FINAL SUBMISSION - ISSUE FOR BID 10/19/2022

NICKLE BRONZE ADJUSTABLE STRAINER

(FLUSH WITH FINISHED FLOOR)

CEMENT BED

TILE FLOOR

CONCRETE FILL

STRUCTURAL SLAB

FLASHING

CLAMP WITH

WEEP HOLES

THREADED, CAULKED OR

NO-HUB CONNECTION

LOOSE GRAVEL

AT WEEP HOLES

3mm to 6mm SIZE

WATERPROOF MEMBRANE

SLOPE 2% TO DRAIN

PROVIDE A METAL SUPPORT PLATE

WHEN DRAIN IS INSTALLED IN AN

EXISTING FLOOR - CAULK AROUND

DRAIN PRIOR TO RE-GROUTING

CLAMP WATERPROOF MEMBRANE INSIDE OF

DRAIN BODY TO DRAIN TO WEEP HOLES

FAUCET SEE

SPECIFICATIONS

LAMINAR FLOW

CONTROL DEVICE

OFFSET WASTE

TRAP PARALLEL TO WALLFINISHED

FLOOR

LOOSE KEY STOP

ESCUTCHEON

NOTE: PROVIDE COVER FOR EXPOSED PIPING

FO

R

F

IX

TU

R

E H

EI

G

H

TS

S

EE

AR

C

H

IT

EC

TU

R

AL

D R

AW

IN

G S

6.5

8.5 7.5 6.5 5.5

6.5

5.5

3.5

1 73.5632

(IN.) H(FT.)W(FT.)H(FT.)W(FT.)H(FT.)

6"

TOTAL ANCHOR TO ANCHOR EXPANSION

PIPE EXPANSION LOOP DIMENSION (WxH) SCHEDULE

2"

W(FT.)

4"PIPE SIZE

1.8" PER 100' LENGTH200° F.

200° F.

50° F.

1.3" PER 100' LENGTH50° F.

HOT WATER

HOT WATER

OPERATING

TEMPERATURE

INSTALLED

TEMPERATURE

ANCHOR

GUIDE

ANCHOR

GUIDE

2H

TOTAL ANCHOR-TO-ANCHOR EXPANSION

2H

H

W

PROVIDE ADDITIONAL GUIDES TO

ENSURE A MAXIMUM DISTANCE

BETWEEN GUIDES OF 20 FEET.

X X XX

BLACK STEEL

COPPER

FLUID EXPANSIONPIPE TYPE

TOTAL ANCHOR TO ANCHOR EXPANSION TABLE

PRIMING TUBE

FINISHED FLOOR

FLOOR DRAIN FD-1

1/2" TYPE "K" SOFT SEAMLESS COPPER (WITH

NO JOINTS) BELOW FLOOR SLAB. SLOPE AT

1/8" PER FOOT MIN. TO FLOOR DRAIN

CONNECTION.

P-TRAP

PRIMING MANIFOLD

ELECTRONIC TRAP

PRIMING CABINET

C-TP-3

(EXISTING)

SERVES EXISTING

FLOOR DRAINS

ALL HORIZONTAL STORM PIPING TO BE INSULATED

FROM SUMP RECEIVER TO A POINT 1'-0" DOWN TO

VERTICAL DOWNSPOUT WITH 1/2" FIBERGLASS

INSULATION WITH ALL SERVICE JACKET. INSULATE

ALL HORIZONTAL OFFSETS DOWN TO GRADE.

STEEL ROD AND CLEVIS HANGER

CLEANOUT PLUG

(EXPOSED)

WATERPROOFING

MEMBRANE

DRAIN BODY SECURED

TO DECK PLATE

ROOF DECK

DECK PLATE FASTENED

TO ROOF DECK

RUN PIPE INSULATION UP TO

UNDERSIDE OF SUMP RECEIVER

DECK PLATE

GASKET

ROOF DRAIN WITH CAST IRON DOME

SECURE FLASHING CLAMP TO

ROOFING FLASHING MATERIAL

ROOF INSULATION BY

ROOFING CONTRACTOR

EXTENSION COLLAR

PLUMBING CONTRACTOR TO PROVIDE SUMP

RECEIVER. COORDINATE WITH ROOFING

CONTRACTOR.

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

E4KEY PLANAREA A, ZONE 1

E1E2E3D4HOSPITALD1D2D5D3WD6D7

CLINICP-WC1C2P-E

A1A2A3B1A4B2

N

10/19/2022

PLUMBING - DETAILS EXPAND PRIMARY CARE

AT LAKE NONA (WEST)

ORLANDO VA MEDICAL CENTER

RAH TE

675-102

P502

01 & 02

CONSTRUCTION

DOCUMENTS

21-10936C77621C0079

NOT TO

SCALE

TYPE "C" FLOOR DRAIN

NOT TO

SCALE

TYPICAL WHEELCHAIR LAVATORY

NOT TO

SCALE

PIPE EXPANSION LOOP DETAIL/SCHEDULE

NOT TO

SCALE

TRAP PRIMING CABINET

NOT TO

SCALE

ROOF DRAIN (INSULATED STEEL DECK)

Revisions: Date:

50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022

75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022

EXAM

ROOM

4A312

EXAM

ROOM

4A310

EXAM

ROOM

4A308

CONSULTATION

ROOM

4A309

CONSULTATION

ROOM

4A311

CONSULTATION

ROOM

4A313

STAFF

TOILET

4A337

STAFF

TOILET

4A337

EXAM

ROOM

4A318

EXAM

ROOM

4A316

EXAM

ROOM

4A319

TOILET

ROOM

4A322

TOILET

ROOM

4A322

SOILED

UTILITY

4A324

SOILED

UTILITY

4A324

H.A.C.

4A320

PROCEDURE

ROOM

4A321

TOILET

ROOM

4A104

TOILET

ROOM

4A103

TOILET

ROOM

4A104

TOILET

ROOM

4A103

CORRIDOR

4AC03

LACTATION

ROOM

4A301

TREATMENT

ROOM

4A334

TOILET

ROOM

4A335

TOILET

ROOM

4A335

TOILET

ROOM

4A333

TOILET

ROOM

4A333

EXAM

ROOM

4A330

EXAM

ROOM

4A332

TOILET

ROOM

4A331

TOILET

ROOM

4A331

TOILET

ROOM

4A329

TOILET

ROOM

4A329

MED

ALCOVE

4AC07A

EXAM

ROOM

4A328

TOILET

ROOM

4A315

TOILET

ROOM

4A315

BREAK

ROOM

4A327

BREAK

ROOM

4A327

SOILED

UTILITY

4A324

CLEAN

UTILITY

4A323

VB

FOURTH FLOOR CEILING

FOURTH FLOOR INTERSTITIAL

FOURTH FLOOR FOURTH FLOOR

FOURTH FLOOR CEILING

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

FOURTH FLOOR ROOF

3/ 4"

H W

3/ 4"

C

WBACK TO

BACK

FIXTURES

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

1- 1/

2" C

W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

1- 1/

2" C

W

3/ 4"

H W

3/ 4"

C W

1- 1/

2" C

W

EMERGENCY

THERMOSTATIC

MIXING VALVE

FOURTH FLOOR INTERSTITIAL

FOURTH FLOOR ROOF

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

FOURTH FLOOR CEILING

FOURTH FLOOR INTERSTITIAL

FOURTH FLOOR FOURTH FLOOR

FOURTH FLOOR CEILING

FOURTH FLOOR INTERSTITIAL

FOURTH FLOOR ROOF

3/ 4"

H W

3/ 4"

C W

2" C

WBACK TO

BACK

FIXTURES

BACK TO

BACK

FIXTURES

1/ 2"

C W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

1- 1/

2" C

W

3/ 4"

H W

3/ 4"

C W

1- 1/

2" C

W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

1- 1/

2" C

W

3/ 4"

H W

3/ 4"

C W

1- 1/

2" C

W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

A

3/ 4"

H W

C

3/ 4"

H W

2" C

W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

2" C

W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

2" C

W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

1- 1/

2" C

W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

1- 1/

2" C

W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

1"HW

2"CW

3/4"HWC

3/4"HW

3/4"CW

3/ 4"

H W

3/4"CW

3/4"CW3/4"CW

1-1/2"CW1-1/2"CW3/4"CW

3/4"CW

3/4"HW

3/4"HWC

2"CW

3/4"HW

3/4"HWC

2"CW

1"HW

3/4"HWC

2-1/2"CW

1-1/4"HW

3/4"HWC

2-1/2"CW

1-1/4"HW

3/4"HWC

2"CW

3/4"HW

3/4"HWC

2"CW

3/4"HW

3/4"HWC

2"CW

1"HW

3/4"HWC

2-1/2"CW

1"HW

3/4"HWC

1- 1/

2" C

W

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

1- 1/

2" C

W

2"CW

1"HW

3/4"HWC

TYP.

0.5

0.5

0.5

A

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

2-1/2"CW

1-1/2"HW

3/4"HWC

2-1/2"CW

1-1/2"HW

3/4"HWC

1/ 2"

C W

ICE

MAKER

3/ 4"

H W

3/ 4"

C W

3/ 4"

H W

3/ 4"

C W

FOURTH FLOOR ROOF

SK-1 SK-1 SK-1 SK-1 SK-1 SK-1

WC-1

LAV-1 SK-1 SK-1 SK-1

WC-1

LAV-1 SK-3

EW-1

MB-1

SK-4

WC-1 WC-1

LAV-1 LAV-1 EWC-1 SK-1 SK-1

WC-1 WC-1

LAV-1 LAV-1 SK-1 SK-1

WC-1 WC-1

LAV-1 LAV-1

SK-2 SK-1

WC-1

LAV-1

WHA-1

SK-2

BFP-1

SK-5 SK-5

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

E4KEY PLANAREA A, ZONE 1

E1E2E3D4HOSPITALD1D2D5D3WD6D7

CLINICP-WC1C2P-E

A1A2A3B1A4B2

N

10/19/2022

PLUMBING - DOMESTIC WATER RISER

DIAGRAM

EXPAND PRIMARY CARE

AT LAKE NONA (WEST)

ORLANDO VA MEDICAL CENTER

RAH TE

675-102

P601

01 & 02

CONSTRUCTION

DOCUMENTS

21-10936C77621C0079

NOT TO

SCALE

PLUMBING - DOMESTIC WATER RISER DIAGRAM

Revisions: Date:

75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022

EXAM

ROOM

4A319

TOILET

ROOM

4A322

TOILET

ROOM

4A322

SOILED

UTILITY

4A324

H.A.C.

4A320

SOILED

UTILITY

4A324

STAFF

TOILET

4A337

STAFF

TOILET

4A337

EXAM

ROOM

4A316

EXAM

ROOM

4A318

MED

ALCOVE

4AC07A

TOILET

ROOM

4A329

TOILET

ROOM

4A331

EXAM

ROOM

4A328

TOILET

ROOM

4A329

TOILET

ROOM

4A331

BREAK

ROOM

4A327

TOILET

ROOM

4A315

TOILET

ROOM

4A315

CONSULTATION

ROOM

4A313

CONSULTATION

ROOM

4A311

CONSULTATION

ROOM

4A309

EXAM

ROOM

4A312

EXAM

ROOM

4A308

EXAM

ROOM

4A310

TOILET

ROOM

4A335

EXAM

ROOM

4A330

EXAM

ROOM

4A332

TOILET

ROOM

4A333

LACTATION

ROOM

4A301

TOILET

ROOM

4A333

TREATMENT

ROOM

4A334

TOILET

ROOM

4A335

TOILET

ROOM

4A104

TOILET

ROOM

4A104

TOILET

ROOM

4A103

TOILET

ROOM

4A103

PROCEDURE

ROOM

4A321

SOILED

UTILITY

4A324

CLEAN

UTILITY

4A323

1- 1/

2" V

CO

1- 1/

2" V

2" V

4"SAN

2" V

1- 1/

2" V

2" V

3"

SA

N

CO

2" V

1- 1/

2" V

CO

1- 1/

2" V

1- 1/

2" V

1- 1/

2" V

2" V

1- 1/

2" V

CO

CO

1- 1/

2" V

2" V

1- 1/

2" V

1- 1/

2" V

CO

4"SAN 4"SAN

4"SAN (E)4"SAN

(E )6

"S

AN

2" V

1- 1/

2" V

CO

1- 1/

2" V

4"SAN

FOURTH FLOOR CEILING

FOURTH FLOOR INTERSTITIAL

FOURTH FLOOR FOURTH FLOOR

FOURTH FLOOR CEILING

FOURTH FLOOR ROOF

FOURTH FLOOR INTERSTITIAL

FOURTH FLOOR ROOF

FOURTH FLOOR CEILING

FOURTH FLOOR INTERSTITIAL

FOURTH FLOOR FOURTH FLOOR

FOURTH FLOOR CEILING

THIRD FLOOR INTERSTITIAL

FOURTH FLOOR INTERSTITIAL

THIRD FLOOR INTERSTITIAL

1- 1/

2" V

2"

SA

N

BACK TO

BACK

FIXTURES

CO

1- 1/

2" V

1- 1/

2" V

1- 1/

2" V

CO

2" V

1- 1/

2" V

CO

1- 1/

2" V

1- 1/

2" V

1- 1/

2" V

1- 1/

2" V

2" V

CO

1- 1/

2" V

CO 4"SAN (E)4"SAN

(E )6

"S

AN

1- 1/

2" V

BACK TO

BACK

FIXTURES

CO

2"

SA

N

2" V

4"

SA

N

BACK TO

BACK

FIXTURES

4"SAN

B

B

(E ) 4

"V

FOURTH FLOOR ROOF FOURTH FLOOR ROOF

THIRD FLOOR INTERSTITIAL THIRD FLOOR INTERSTITIAL

(E ) 4

"V

4"SAN

4"SAN

4"SAN 4"SAN

3"SAN

4"SAN

4"SAN

2"SAN 2"SAN

4"SAN

4"SAN

2"V

2"V 2"V

2"V

1- 1/

2" V

1- 1/

2" V

2" V

2" V

2" V

2"V

1- 1/

2" V

1- 1/

2" V

1- 1/

2" V

1- 1/

2" V

2" V

2"V

2" V

2" V

2" V

2"V

2"V

1-1/2"V

2" V

1- 1/

2" V

2" V

(E)4"SAN

2" V

1- 1/

2" V

1- 1/

2" V

SK-1

WC-1

LAV-1

MB-1

EW-1

SK-3

WC-1

LAV-1 SK-1 SK-1 SK-2

WC-1

LAV-1 LAV-1

WC-1

SK-1 SK-2

WC-1

LAV-1 SK-1SK-1 SK-1 SK-1 SK-1 SK-1

WC-1

SK-1 SK-1 LAV-1 SK-1

WC-1

SK-1 LAV-1 LAV-1 LAV-1

WC-1 WC-1

SK-4 SK-5 SK-5

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

E4KEY PLANAREA A, ZONE 1

E1E2E3D4HOSPITALD1D2D5D3WD6D7

CLINICP-WC1C2P-E

A1A2A3B1A4B2

N

10/19/2022

PLUMBING - SANITARY AND VENT RISER

DIAGRAM

EXPAND PRIMARY CARE

AT LAKE NONA (WEST)

ORLANDO VA MEDICAL CENTER

RAH TE

675-102

P602

01 & 02

CONSTRUCTION

DOCUMENTS

21-10936C77621C0079

NOT TO

SCALE

PLUMBING - SANITARY AND VENT RISER DIAGRAM

Revisions: Date:

75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022

RW

306B

RW

306B

RW

306A

RW

306A

FOURTH FLOOR INTERSTITAL

FIFTH FLOOR

THIRD FLOOR

THIRD FLOOR INTERSTITIAL

FOURTH FLOORTHIRD FLOOR ROOF (D)RD (D)ORD (D)RD (D)ORD (D)RD (D)ORD (D)RD (D)ORD (D)RD (D)ORD (D)RD (D)ORD

(E ) 8

" S

TO

(E ) 8

" S T

(E ) 8

" S

TO

(E ) 8

" S T

(E ) 1

0" S

T

(E ) 6

" S

TO

(E ) 6

" S T

(E ) 6

" S T

(D ) 8

" S T

(E) 6" ST

(E) 6" ST

(E) 6" STO

(D ) 8

" S

TO

(E ) 1

0" S

TO

(E

) 6 " S

TO

(E) 6" STO

(D ) 6

" S

TO

(D ) 6

" S T

(D ) 6

" S T

(D) 6" STO

(D) 6" ST

(D) 6" STO

(D) 6" ST

(D) 6" STO

(D) 6" ST

(D) 6" STO

(D) 6" ST

(D) 6" STO

(D) 6" ST

(D ) 6

" S

TO

(D ) 6

" S T

(D ) 6

" S

TO

(D ) 6

" S T

(D ) 6

" S

TO

(D ) 6

" S T

(D ) 6

" S

T (D) 6" STO

(D) 6" STO

(D) 6" ST

(E) 6" STO

(E) 6" ST

(D) 6" STO

RW

306B

RW

306B

RW

306A

RW

306A

FOURTH FLOOR INTERSTITAL

FIFTH FLOOR

THIRD FLOOR

THIRD FLOOR INTERSTITIAL

FOURTH FLOOR

FOURTH FLOOR ROOF

(E ) 6

" S T

(E ) 6

" S T

(E ) 1

0" S

T

" S T

6" S

TO

6" S

T

6" S

TO

6" S

T

6" S

TO

6" S

T

6" S

TO

6" S

T

CO

CO

CO

CO

6" S

T 6" STO

6" STO

6" ST

6" STO

6" ST

6" STO

6" ST

6" STO

6" ST

6" STO

6" ST

(E ) 6

" S

TO

" S

TO

(E

) 1 0"

S

TO

(E ) 6

" S

TO

6" STO

6" S

T

(E) 6" ST

(E) 6" STO

(E) 6" ST

(E) 6" STO

(E) 6" STO

(E) 6" ST

(E ) 8

" S

TO

(E ) 8

" S T

(E ) 8

" S

TO

(E ) 8

" S T

RD-1 ORD-1 RD-1 ORD-1 RD-1 ORD-1 RD-1 ORD-1 RD-1 ORD-1 RD-1 ORD-1

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

E4KEY PLANAREA A, ZONE 1

E1E2E3D4HOSPITALD1D2D5D3WD6D7

CLINICP-WC1C2P-E

A1A2A3B1A4B2

N

10/19/2022

PLUMBING - STORM RISER DIAGRAM EXPAND PRIMARY CARE

AT LAKE NONA (WEST)

ORLANDO VA MEDICAL CENTER

RAH TE

675-102

P603

01 & 02

CONSTRUCTION

DOCUMENTS

21-10936C77621C0079

NOT TO

SCALE

PLUMBING - STORM DEMOLITION RISER DIAGRAM

NOT TO

SCALE

PLUMBING - STORM RISER DIAGRAM

Revisions: Date:

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION MANUFACTURER MODEL

DOMESTIC

COLD WATER

DOMESTIC

HOT WATER

SANITARY VENT REMARKS

CO-1 CLEANOUT ZURN Z1470

- - 4" 2"

NOTES:

1. SIZES LISTED ARE MINIMUM CONNECTIONS REQUIRED TO FIXTURES.

FD-1 FLOOR DRAIN ZURN Z541

ROUND TOP DRAIN, DURA-COATED CAST IRON BODY WITH BOTTOM OUTLET, SEEPAGE PAN AND COMBINATION MEMBRANE FLASHING CLAMP AND FRAME FOR HEAVY-DUTY, DURESIST GRATE, TRAP PRIMER CONNECTION, CAST IRON SEDIMENT BUCKET, LOOSE SLOTTED

GRATE. 12-1/4" DIAMETER TOP DRAIN.

BRONZE CLEANOUT PLUG, COUNTERSUNK, ABS TAPERED THREAD PLUG.

SINK: PROVIDED WITH CASEWORK. REFER TO ARCHITECTURAL DRAWINGS FOR MORE INFORMATION.

FAUCET: DECK MOUNTED, SINGLE HOLE, RIGID/SWING GOOSENECK SPOUT, DUAL BEAM INFRARED SENSOR, 0.5 GPM, CHROME PLATED, VANDAL PROOF, NON-AERATING SPRAY OUTLET, 6-VOLT BATTERY, STAINLESS STEEL HOSES, USER ADJUSTABLE TEMPERATURE

CONTROL MIXER, ADA COMPLIANT.

PROVIDE INSULATION PRE-MANUFACTURED FOR P-TRAP, STOP VALVE, AND SUPPLY LINES. APPROVED ASME AND ANSI. ADA COMPLIANT. ALL BRONZE, BRASS AND STAINLESS STEEL CONSTRUCTION, NIPPLE AND THREADED BRASS FITTINGS. UNION INLETS WITH STRAINERS AND CHECK STOPS, DIAL THERMOMETER ON OUTLET. PROVIDE CARRIER WITH CONCEALED ARMS.

SK-1

SINK

SINK TRIM

(SEE ARCHITECTURAL)

CHICAGO FAUCETS

(SEE ARCHITECTURAL)

116.223.AB.1

1/2" 1/2" 1-1/2" 1-1/2"

SINK: SINGLE BOWL DROP-IN SINK, 18 GAUGE TYPE 304 STAINLESS STEEL WITH LUSTROUS SATIN FINISH, DIMENSIONS: 17" x 20" x 7-5/8", BOWL DIMENSIONS: 14" x 14" x 7-1/2", CENTER DRAIN WITH OPENING SIZE: 3-1/2".

FAUCET: DECK MOUNTED, SINGLE HOLE, RIGID/SWING GOOSENECK SPOUT, DUAL BEAM INFRARED SENSOR, 0.5 GPM, CHROME PLATED, VANDAL PROOF, NON-AERATING SPRAY OUTLET, 6-VOLT BATTERY, STAINLESS STEEL HOSES, USER ADJUSTABLE TEMPERATURE

CONTROL MIXER, ADA COMPLIANT.

PROVIDE INSULATION PREMANUFACTURED FOR P-TRAP, STOP VALVE, ANS SUPPLY LINES. APPROVED ASME AND ANSI. ADA COMPLAINT. ALL BRONZE, BRASS AND STAINLESS STEEL CONSTRUCTION. UNION INLETS WITH STRAINERS AND CHECK STOPS, DIAL

THERMOMETER ON OUTLET.

SK-2

ELKAY

CHICAGO FAUCETS

LR17203

116.223.AB.1

1/2" 1/2" 1-1/2" 1-1/2"

SINK

SINK TRIM

SK-3

CLINICAL SINK

CLINICAL SINK TRIM

ADA COMPLIANT BI-LEVEL WITH BOTTLE FILLING STATION, WALL MOUNTED, STAINLESS STEEL, 8 GPH CHILLING CAPACITY, BOTTLE FILLER SHALL PROVIDE 1.1 GPM FLOW RATE WITH LAMINAR FLOW AND SHALL INCLUDE HANDS FREE, FILTER NSF 42 AND 53 CERTIFIED FOR LEAD AND LED VISUAL FILTER MONITOR, ANTIMICROBIAL, COMPRESSOR HERMETICALLY-SEALED, RECIPROCATING TYPE, REFRIGERANT R-134a, SINGLE PHASE 115V, FLA: 5, 370 WATTS, APPROVED ANSI AND UL. PROVIDE CANE APRON TO MEET ADA

REQUIREMENTS.

EWC-1 ELECTRIC WATER COOLER ELKAY LZSTL8WSVRSK - 1-1/2" 1-1/2"1/2"

EW-1

EYE WASH

EMERGENCY THERMOSTATIC

MIXING VALVE

BRADLEY

BRADLEY

S19-220

S19-2000

3/4" 1-1/2" 1-1/2"3/4"

EYE WASH: WALL MOUNTED EYE/FACE WASH WITH 10" DIAMETER IMPACT RESISTANT BOWL, CHROME-PLATED BRASS WITH TWIN SOFT- FLOW EYEWASH HEADS WITH PROTECTIVE SPRAYHEAD COVERS, 30-90 PSI WITH INTEGRAL FLOW CONTROL IN THE SPRAYHEAD ASSEMBLY, GALVANIZED STEEL PIPING AND FITTINGS, HEAVY-GUAGE SAND CAST ALUMINUM WALL BRACKET.

EMERGENCY THERMOSTATIC MIXING VALVE: SATIFIES ANSI Z358.1 TEPID WATER REQUIREMENTS, CHECKSTOPS ON INLET.

ADJUSTABLE SET POINT WITHIN TEMPERATURE RANGE, ACCURATE TEMPERATURE CONTROL TO WITHIN ±3°F, BUILT-IN COLD WATER BYPASS, POSITIVE SHUTOFF OF HOT SUPPLY WHEN COLD SUPPLY IS LOST, DIAL THERMOMETER, FACTORY ASSEMBLED AND TESTED, SURFACE MOUNTED STAINLESS STEEL CABINET.

LAVATORY: WALL-HUNG, WHITE VITREOUS CHINA, FRONT OVERFLOW, D-SHAPED BOWL, CENTER HOLE ONLY, OVERALL DIMENSIONS 20-1/2" x 18-1/4".

FAUCET: DECK MOUNTED, SINGLE HOLE, DUAL BEAM INFRARED SENSOR, CONTEMPORARY-STYLE INTEGRAL SPOUT, 0.5 GPM, CHROME PLATED, VANDAL PROOF, NON-AERATING SPRAY OUTLET, LAMINAR FLOW INSERT, 6-VOLT BATTERY, STAINLESS STEEL HOSES, USER

ADJUSTABLE TEMPERATURE CONTROL MIXER, ADA COMPLIANT.

PROVIDE INSULATION PREMANUFACTURED FOR P-TRAP, STOP VALVE, ANS SUPPLY LINES. APPROVED ASME AND ANSI. ADA OFFSET OPEN GRID STRAINER. THERMOSTATIC MIXING VALVE, ALL BRONZE, BRASS AND STAINLESS STEEL CONSTRUCTION. UNION INLETS WITH STRAINERS AND CHECK STOPS, DIAL THERMOMETER ON OUTLET. PROVIDE CARRIER WITH CONCEALED ARMS.

LAV-1

LAVATORY

LAVATORY TRIM

THERMOSTATIC MIXING VALVE

AMERICAN

STANDARD

CHICAGO FAUCETS

CHICAGO FAUCETS

0356.421

116.222.AB.1

131-CFMABRCF

1/2" 1/2" 1-1/2" 1-1/2"

3/4" 3/4" 3" 1-1/2"MB-1 MOP BASIN

FIAT

CHICAGO FAUCET

TSBC-1610

911-CP

MOP BASIN: NEO-CORNER STYLE, 24x24x12" TERRAZZO WITH 6" DROP FRONT, PROVIDE WITH STAINLESS STEEL CAP ON THRESHOLD, AND TWO 12" HIGH STAINLESS STEEL BACK SPLASH.

FAUCET: CHROME PLATED FINISH, 8" FIXED CENTERS, 5-3/4" RIGID SPOUT, 1/2" NPT FEMALE THREAD INLETS, 3/4" MALE HOSE THREAD, WALL BRACE, PAIL HOOK, 76" HIGH VACUUM BREAKER.

PROVIDE MOP HANGER, HOSE AND HOSE BRACKET.

- - SEE DRAWING SEE DRAWINGORD-1 OVERFLOW DRAIN ZURN Z100

15" DIAMETER, DURA-COATED CAST IRON BODY WITH COMBINATION MEMBRANE FLASHING CLAMP/GRAVEL GUARD AND LOW SILHOUETTE POLY-DOME, DEEP BOTTOM OUTLET, FLASHING CLAMP, GRAVEL STOP, UNDERDECK CLAMP, BEARING PAN, SEE DRAWING

FOR PIPE SIZE.

KOHLER

ZURN

CAMERTON K-12867

AQUA VANTAGE

Z60842AV-BWN

3/4" 3/4" 3" 1-1/2"

SINK: WALL-MOUNT SERVICE SINK, DEEP SQUARED BASIN, DIMENSIONS: 21-1/2" x 25", WHITE VITROUS CHINA, 1-1/2" TOP SPUD. BLOW-

OUT ACTION FLUSHING RIM.

FLUSH VALVE: CLINIC SINK FLUSH VALVE WITH BEDPAN WASHER ASSEMBLY AND SERVICE SINK FAUCET, DIAPHRAGM TYPE, POLISHED CHROME PLATED BRASS BODY, HIGH BACK PRESSURE VACUUM BREAKER, WALL BRACKET AND SUPPORT ROD, 4" VANDAL RESISTANT

BRASS WRIST BLADE COLOR-CODED HANDLES.

- - SEE DRAWING SEE DRAWINGRD-1 ROOF DRAIN ZURN Z100

15" DIAMETER, DURA-COATED CAST IRON BODY WITH COMBINATION MEMBRANE FLASHING CLAMP/GRAVEL GUARD AND LOW SILHOUETTE POLY-DOME, DEEP BOTTOM OUTLET, FLASHING CLAMP, GRAVEL STOP, UNDERDECK CLAMP, BEARING PAN, SEE DRAWING

FOR PIPE SIZE.

SK-4 SURGICAL SCRUB SINK STERIS STREAMLINE 1/2" 1/2" 1-1/2" 1-1/2"

SINK: SINGLE-BAY SCRUB STATION, THERMOFORMED HIGH-QUALITY KYDEX MATERIAL WITH BUILT-IN ANTIMICROBIAL PROTECTION, SEAMLESS LARGE COVERED BASIN, KNEE-ACTUATED HANDS-FREE WATER CONTROL, LAMINAR FLOW FAUCET HEAD, DIMENSIONS: 32" x 27-9/32" x 51-1/2", BUILT-IN THERMOSTATICALLY CONTROLLED MIXING VALVE.

- - 4" 2"FD-2

FLOOR DRAIN

(W/ FUNNEL)

ZURN

Z415

Z400E

FLOOR DRAIN, DURA-COATED CAST IRON BODY WITH BOTTOM OUTLET, COMBINATION INVERTIBLE MEMBRANE CLAMP AND ADJUSTABLE COLLAR WITH SEEPAGE SLOTS AND 7" DIAMETER TYPE E ROUND ADJUSTABLE STRAINER TOP WITH COMBINATION

FUNNEL/GRATE WITH PERIMETER OPENINGS.

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

E4KEY PLANAREA A, ZONE 1

E1E2E3D4HOSPITALD1D2D5D3WD6D7

CLINICP-WC1C2P-E

A1A2A3B1A4B2

N

10/19/2022

PLUMBING - SCHEDULE EXPAND PRIMARY CARE

AT LAKE NONA (WEST)

ORLANDO VA MEDICAL CENTER

RAH TE

675-102

P701

01 & 02

CONSTRUCTION

DOCUMENTS

21-10936C77621C0079

Revisions: Date:

50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022

75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION MANUFACTURER MODEL

DOMESTIC

COLD WATER

DOMESTIC

HOT WATER

SANITARY VENT REMARKS

NOTES:

1. SIZES LISTED ARE MINIMUM CONNECTIONS REQUIRED TO FIXTURES.

SHOKTROL WATER HAMMER ARRESTOR, ALL STAINLESS STEEL CONTRUCTION, HERMETICALY SEALED BELLOWS TYPE. APPROVED

PDI, ANSI, AND ASSE. SIZE ARRESTOR PER FIXTURE UNITS.

WHA-1 WATER HAMMER ASSESTER ZURN Z1700 SEE DETAIL ON SHEET P502 SEE DETAIL ON SHEET P502 - -

WATER CLOSET: FLOOR MOUNTED, ELONGATED, REAR OUTLET, WHITE VITEROUS CHINA, 16-1/2" RIM HEIGHT, 1-1/2" TOP SPUD, 1.28

GPF, ADA COMPLIANT, DIRECT-FED SIPHON JET ACTION.

FLUSH VALVE: EXPOSED SENSOR FLUSH VALVE, BATTERY POWERED, BRUSHED NICKEL, SINGLE FLUSH, 1.28 GPF, 11-1/2" ROUGH-IN, 1"

I.P.S ANGLE STOP, VACUUM BREAKER.

SEAT: ENLONGATED, COMMERCIAL HEAVY DUTY PLASTIC TOILET SEAT, WHITE IN COLOR, OPEN FRONT LESS COVER, ANTI-MICROBIAL, 304 STAINLESS STEEL CHECK HINGE.

WC-1

WATER

CLOSET

FLUSH

VALVE

SEAT

AMERICAN

STANDARD

SLOAN

BEMIS

3695.001

8111 BT-1.28

1-1/2" - 4" 2"

WH-1 WALL HYDRANT ZURN Z1300 3/4" - - -

ENCASED FLUSH INSTALLATION, NON-FREEZE, ANTI-SIPHON, AUTOMATIC DRAINING. BRONZE CASING, ALL BRONZE INTERIOR PARTS, NON-TURNING OPERATING ROD WITH FREE-FLOATING COMPRESSION CLOSURE VALVE, 3/4' MALE HOSE THREAD, NICKEL BRONZE BOX AND HINGED COVER WITH OPERATING KEY LOCK AND "WATER" CAST ON COVER. ASSE 1019 APPROVED.

LAVATORY: WALL-HUNG, WHITE VITREOUS CHINA, FRONT OVERFLOW, D-SHAPED BOWL, CENTER HOLE ONLY, OVERALL DIMENSIONS 20-1/2" x 18-1/4".

FAUCET: DECK MOUNTED, SINGLE HOLE, DUAL BEAM INFRARED SENSOR, CONTEMPORARY-STYLE INTEGRAL SPOUT, 0.5 GPM, CHROME PLATED, VANDAL PROOF, NON-AERATING SPRAY OUTLET, LAMINAR FLOW INSERT, 6-VOLT BATTERY, STAINLESS STEEL HOSES, USER

ADJUSTABLE TEMPERATURE CONTROL MIXER, ADA COMPLIANT.

PROVIDE INSULATION PREMANUFACTURED FOR P-TRAP, STOP VALVE, ANS SUPPLY LINES. APPROVED ASME AND ANSI. ADA OFFSET OPEN GRID STRAINER. THERMOSTATIC MIXING VALVE, ALL BRONZE, BRASS AND STAINLESS STEEL CONSTRUCTION. UNION INLETS WITH STRAINERS AND CHECK STOPS, DIAL THERMOMETER ON OUTLET. PROVIDE CARRIER WITH CONCEALED ARMS.

SK-5

SINK

SINK TRIM

THERMOSTATIC MIXING VALVE

AMERICAN

STANDARD

CHICAGO FAUCETS

CHICAGO FAUCETS

0356.421

116.222.AB.1

131-CFMABRCF

1/2" 1/2" 1-1/2" 1-1/2"

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

E4KEY PLANAREA A, ZONE 1

E1E2E3D4HOSPITALD1D2D5D3WD6D7

CLINICP-WC1C2P-E

A1A2A3B1A4B2

N

10/19/2022

PLUMBING - SCHEDULE EXPAND PRIMARY CARE

AT LAKE NONA (WEST)

ORLANDO VA MEDICAL CENTER

RAH TE

675-102

P702

01 & 02

CONSTRUCTION

DOCUMENTS

21-10936C77621C0079

Revisions: Date:

SYMBOL VACUUM WAGD OXYGEN

MEDICAL

AIR

NITROUS

OXIDE

NITROGEN

CARBON

DIOXIDE

MEDICAL GAS FIXTURE ROUGH-IN SCHEDULE

MGO-1 3/4" - 1/2" 1/2" - -

NOTES:

1. SIZE OF VACUUM, MEDICAL AIR, AND OXYGEN IS THE FINAL VERTICAL DROP TO SINGLE OUTLET

SYMBOL DESCRIPTION

MEDICAL GAS SYMBOL LIST

VACUUM

SHUT-OFF VALVE

WASTE ANESTHETIC GAS DISPOSAL

CARBON DIOXIDE

NITROGEN

NITROUS OXIDE

OXYGEN

MEDICAL AIR

PRESSURE GAUGE

PRESSURE TRANSDUCER

VALVE BOX

PRESSURE RELIEF DEVICE

CONNECT TO EXISTING

LIMIT OF DEMOLITION

PIPE DOWN

PIPE UP

DEMO PIPING

PRESSURE RELIEF VALVE

BOTTOM CONNECTION

RISE OR DROP IN PIPE

MEDICAL GAS GENERAL NOTES

GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED HEREIN.

EQUIVALENCY SUBSTITUTIONS: THE "BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS" ARE TO BE FOLLOWED FOR ALL MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SPECIFIED AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE SPECIFIC BOD COMPLIANCE REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED.

1. THESE DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO DEFINE EXACT QUANTITIES. DRAWINGS SHALL NOT BE SCALED. THE MEDICAL GAS CONTRACTOR SHALL VERIFY QUANTITIES, SIZES, AND LOCATIONS OF ALL OUTLETS, ALARMS, PIPING, EQUIPMENT, ETC. PRIOR TO ANY CONSTRUCTION. ANY UNFORESEEN CONDITIONS OR EXISTING CONDITIONS NOT AS SHOWN SHALL BE CALLED TO THE IMMEDIATE ATTENTION OF THE VA/COR.

2. THE CONTRACTOR, BY VIRTUE OF COMPLETING THE WORK SHALL BE RESPONSIBLE FOR GUARANTEES THAT ALL INSTALLED SYSTEM WILL FUNCTION PROPERLY AS DESIGNATED BY HIS/HER ORIGINAL CONTRACT. IN THE CASE THAT DISCREPANCY BETWEEN SPECIFICATIONS AND CONTRACT DRAWINGS EXIST, THE MOST STRINGENT SHALL PREVAIL.

3. ALL MEDICAL GAS PIPING AND EQUIPMENT INSTALLATIONS SHALL BE IN STRICT ACCORDANCE WITH NFPA 99 & ASSE 6000.

4. PIPING AND EQUIPMENT LAYOUT ON DRAWINGS IS SCHEMATIC, EXACT LOCATIONS OF PIPING AND EQUIPMENT ARE TO

BE COORDINATED WITH BUILDING STRUCTURE AND WORK OF OTHER CONTRACTORS.

5. REFER TO ARCHITECTURAL ELEVATIONS FOR QUANTITY & MOUNTING LOCATION OF OUTLETS, VALVE BOXES, AND ALARM

PANEL.

6. SEE THE ARCHITECTURAL PLANS FOR A LEGEND OF WALL PARTITION TYPES. PROVIDE A UL RATED FIRESTOPPING ASSEMBLY TO MEET THE RATING OF THE WALLS REQUIRING SUCH. SEE DETAILS AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

7. RUN ALL MEDICAL GAS LINES LEVEL.

8. COORDINATE ALL EQUIPMENT DELIVERY, RIGGING, STORAGE, AND INSTALLATION WITH GENERAL CONTRACTOR &

BUILDING CONSTRUCTION CONDITIONS.

9. THESE PLANS HAVE ATTEMPTED TO SHOW CONNECTIONS FOR MEDICAL EQUIPMENT AND VA FURNISHED CONTRACTOR INSTALLED EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL COORDINATE ALL CONNECTIONS FOR MEDICAL EQUIPMENT AND VA FURNISHED AND CONTRACTOR INSTALLED EQUIPMENT, AND SHALL PROVIDE THESE

REQUIREMENTS IN THEIR SCOPE OF WORK, OR AS REQUIRED BY THE VA/COR.

10. IN THE EVENT OF INCONSISTENCY OR CONFLICT WITHIN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK, AND COMPLY WITH THE STRICTER REQUIREMENTS.

11. PRIOR TO FABRICATION OR INSTALLATION OF PIPING, THE MEDICAL GAS CONTRACTOR SHALL COORDINATE LOCATIONS & ELEVATIONS OF OTHER EQUIPMENT, INCLUDING, BUT NOT LIMITED TO LIGHT FIXTURES, DIFFUSERS, DUCTWORK, CONDUITS, PIPING, & CEILING GRID. OBTAIN SIGNATURES OF OTHER TRADES ON THE COORDINATION DRAWING.

12. ALL PIPING SHALL BE CONCEALED IN AREAS OF FINISHED CONSTRUCTION.

13. PROVIDE ACCESS PANELS AND DOORS FOR VALVES, EQUIPMENT AND OTHER ITEMS REQUIRING ACCESS THAT ARE CONCEALED BEHIND FINISHED SURFACES. COORDINATE THE LOCATIONS OF ACCESS PANELS AND ACCESS TO ALL

EQUIPMENT WITH THE VA/COR, PRIOR TO ROUGH-IN.

14. TESTING AND VERIFICATION SHALL BE DONE IN COMPLIANCE WITH NFPA 99 SECTION 5.1.12.2 AND 5.1.12.3 IN THE PRESENCE OF THE VA / COR. PRESSURE TEST ALL SYSTEMS IN STRICT ACCORDANCE WITH NFPA 99. THIRD PARTY CERTIFICATION OF SYSTEMS IS REQUIRED. VA / COR SHALL BE PROVIDED WITH DOCUMENTATION OF CONTRACTOR'S COMPLIANCE WITH NFPA 99. TEST PRESSURE TO BE 1.5 TIMES THE MAXIMUM WORKING PRESSURE, BUT IN NO CASE

LESS THAN:

A. OXYGEN 150 PSI

B. VACUUM 60 PSI

C. WAGD 60 PSI

D. MEDICAL AIR 150 PSI

E. NITROUS OXIDE 150 PSI

AREA ALARM PANEL

ZONE VALVE BOX

GAS MANIFOLD

NITROGEN CONTROL PANEL

MEDICAL VACUUM

MEDICAL AIR

OXYGEN

MA

O

MV

MV

MA

O

N2O

N

CO2

WAGD

CHECK VALVE (DIRECTION OF FLOW)

AAP

ZVB

GM

NCP

MEDICAL GAS MATERIAL LIST

FURNISH LABOR, MATERIAL, AND SERVICES NECESSARY TO COMPLETE THE MEDICAL GAS DISTRIBUTION SYSTEM TO PERFORM ALL REQUIRED PROGRESS AND FINAL TEST. MATERIAL USED SHALL BE NEW, OF THE BEST GRADE AND QUALITY AND IN STRICT ACCORDANCE WITH SPECIFICATION, EXCEPT WHERE NOTED. SHALL CONFORM TO THE PROVISIONS OF NFPA 99.

CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL APPLICABLE FEDERAL, STATE, LOCAL, AND

GOVERNING AUTHORITIES.

AREA ALARM PANEL

AREA ALARM PANEL- BOX SHALL BE CONSTRUCTED WITH 18 GAUGE STEEL, INDIVIDUAL MICROPROCESSOR FOR EACH DISPLAY AND SENSOR BOARD, EACH SIGNAL CONTAINS A GREEN LED INDICATOR FOR NORMAL AND A RED LED INDICATOR FOR ABNORMAL CONDITIONS. WHEN A FAULT OCCURS, THE GREEN LED TURNS OFF, THE RED LED ILLUMINATED AND THE AUDIBLE ALARM SOUNDS. THE RED LED FLASHES UNTIL THE FRONT PANEL ALARM MUTE BUTTON IS PRESSED. AFTER THE ALARM MUTE BUTTON IS PRESSED, THE RED LED REMAINS ILLUMINATED BUT DOES NOT FLASH. THE RED INDICATOR AUTOMATICALLY TURNS OFF AND THE GREEN LED ILLUMINATES WHEN FAULT IS CORRECTED. A TEST AND ALARM MUTE BUTTON SHALL BE EASILY ACCESSIBLE TO OPERATE AND TEST THE UNIT. ALL POWER WIRING TO THE ALARM PANEL AND SENSOR TO BE WIRED BY ELECTRICAL CONTRACTOR. ALL ALARM WIRING TO THE PANEL IS THE CONTRACTORS RESPONSIBILITY. INSTALLATION SHALL BE

PER MANUFACTURER'S RECOMMENDATIONS AND PROJECT REQUIREMENTS.

THE FOLLOWING MEDICAL GAS SHALL BE MONITORED:

OXYGEN

MEDICAL AIR

VACUUM

MANUFACTURER: BEACONMEDAES : "MEGA 3 MEDICAL GAS NOTIFICATION ALARM - AREA ALARM - M3-A10-OAV OR VA APPROVED

EQUAL.

AAP-1 OR VA APPROVED EQUIVALENT.

REFER TO SPECIFICATION 22 63 00 GAS

SYSTEMS FOR LAB AND HEALTHCARE

ZONE VALVE BOX

VALVE BOX- SHALL BE 18 GAUGE STEEL CONSTRUCTION WITH A BAKED WHITE ENAMEL FINISH. SHALL HOUSE SHUT-OFF BALL VALVES WITH TUBE EXTENSIONS, AN ALUMINUM FRAME AND PULL-OUT REMOVABLE WINDOW. VALVE SHALL BE OPERATED BY A LEVER-TYPE HANDLE REQUIRING ONLY A QUARTER TURN FROM A FULLY OPEN POSITION TO A FULLY CLOSED POSITION.

PROVIDE TWO ADJUSTABLE STEEL BRACKETS FOR THE PURPOSE OF MOUNTING THE BOX TO THE STRUCTURAL SUPPORT.

WINDOW SHALL BE MARKED TO PROHIBIT UNAUTHORIZED PERSONS FROM TAMPERING WITH THE VALVES WITH THE

FOLLOWING SILK-SCREEN CAUTION:

"MEDICAL GAS CONTROL VALVES CLOSE ONLY IN EMERGENCY"

INSTALLATION SHALL BE PER MANUFACTURER'S RECOMMENDATIONS AND PROJECT REQUIREMENTS.

THE FOLLOWING MEDICAL GAS SHALL BE MONITORED:

OXYGEN

MEDICAL AIR

VACUUM

MANUFACTURER: BEACONMEDAES ZONE VALVE BOX ASSEMBLY ZVB3-AAC-ENG OR VA APPROVED EQUAL.

ZVB-1 OR VA APPROVED EQUIVALENT.

REFER TO SPECIFICATION 22 63 00 GAS

SYSTEMS FOR LAB AND HEALTHCARE

MEDICAL GAS OUTLET

MEDICAL GAS OUTLET- DISS OUTLETS, WALL MOUNTED. PLATES CONSIST OF A STAINLESS STEEL INSERT SURROUNDED BY A SILVER METALLIC FINISH ABS HIGH IMPACT DECORATIVE TRIM. VALVE BODY O-RING, INLET TUBE WITH SECONDARY CHECK. GAS IDENTIFICATION POLYCARBONATE PLASTIC INSERT, COLOR CODED BY GAS. TYPE K COPPER INLET WITH 1/2" OD CONNECTION.

INSTALLATION SHALL BE PER MANUFACTURER'S RECOMMENDATIONS AND PROJECT REQUIREMENTS. MODULAR MEDICAL GAS

OUTLET

OXYGEN

MEDICAL AIR

VACUUM

SLIDE

MANUFACTURER: BEACONMEDAES SERIES B , MEDICAL GAS OUTLET, DISS KEY STYLE OR VA APPROVED EQUAL.

MGO-1

OR VA APPROVED EQUIVALENT.

REFER TO SPECIFICATION 22 63 00 GAS

SYSTEMS FOR LAB AND HEALTHCARE

MEDICAL GAS OUTLETMGO

ZVB-2

AAP-2

THROUGH PENETRANTS-ONE METALLIC PIPE, CONDUIT OR TUBING TO BE

INSTALLED WITHIN THE FIRESTOP SYSTEM. PIPE, CONDUIT OR TUBING TO BE

RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.

SEALANT-MIN 1/2" THICKNESS OF FILL MATERIAL APPLIED WITHIN THE

ANNULUS, FLUSH WITH THE TOP SURFACE OF FLOOR. AT THE POINT OF

CONTACT LOCATION BETWEEN PIPE AND CONCRETE, A MIN 1/2" DIAM BEAD OF

FILL MATERIAL SHALL BE APPLIED AT THE CONCRETE/PIPE INTERFACE ON THE

TOP SURFACE OF FLOOR AND ON BOTH SURFACES OF WALL.

OXYGEN

SLIDEBLANK

MOUNTING HEIGHT: 54" AFF, OR AS DIRECTED BY THE ARCHITECTURAL DRAWINGS

MED AIR VACUUM

360° GALVANIZED SHEET

METAL INSULATION

SHIELD AT U-BOLT.

U-BOLT

LOCKING NUT EACH

SIDE OF CHANNEL.

HIGH DENSITY PIPE

INSULATION

STEEL HANGER ROD

SUPPORTED FROM BUILDING

STRUCTURAL ELEMENTS.

STEEL CHANNEL OR

ANGLE IRON

ALL PIPING

THRU 1 1/2" DIA.

PACK VOID BETWEEN PIPE OR

INSULATION AND WALL WITH FIBERGLASS

BATT, THEN SEAL WITH A SILICONE

COMPOUND OR OTHER APPROVED

SEALANTS. IF WALL IS FIRE RATED, FILL

VOID BETWEEN PIPE OR INSULATION AND

WALL WITH FIRE BARRIER CAULK

CHROME PLATED OR STAINLESS

STEEL ESCUTCHEON PLATES BOTH

SIDES OF WALL IN EXPOSED AREAS.

PLATE SHALL BE SECURED WITH

WALL CLIPS OR MOUNTING SPRINGS

PROVIDE A MINIMUM OF 1/2"

CLEARANCE BETWEEN WALL

AND PIPE OR INSULATION

PIPE INSULATION

SEE DRAWINGS FOR PIPE

SIZE AND MATERIAL

NOTES:

1. I.D. OF WALL OPENING TO BE A MIN. OF 1/2" LARGER THAN O.D. OF PIPE OR INSULATION PASSING THROUGH WALL.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR WALL OPENINGS WITH OTHER TRADES AND / OR CONTRACTORS.

3. PIPE PENETRATIONS OF SMOKE OR FIRE WALLS SHALL BE IN COMPLIANCE WITH NFPA-90A.

FACE OF WALL

3/ 4"

M A

3/ 4"

M A

P

P

3/ 4"

O

1" V

AC

3/ 4"

O

1" V

AC

V

P

P

V

NORMAL HIGH LOW

NORMAL HIGH LOW

NORMAL HIGH LOW

TO OUTLETSFROM PIPING SYSTEM

VALVE BOX (ZVB-1)

AREA ALARM PANEL (AAP-1)

PRESSURE/VACUUM GAUGE (TYP.)

ISOLATION VALVE (TYP.)

PRESSURE

TRANSDUCER

ELECTRICAL CONTRACTOR TO PROVIDE CABLING.

CONTROLS CONTRACTOR TO ROUTE 22-GAUGE SHIELDED

TWISTED PAIR OF SIGNAL WIRING IN CONDUIT FROM

PRESSURE SENSOR TO AREA ALARM PANEL. (TYP.)

PRESSURE TRANSDUCER

NOTE: ZVB-2 & AAP-2, SIMILAR

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

E4KEY PLANAREA A, ZONE 1

E1E2E3D4HOSPITALD1D2D5D3WD6D7

CLINICP-WC1C2P-E

A1A2A3B1A4B2

N

10/19/2022

MEDICAL GAS - GENERAL NOTES, SYMBOLS

AND ABBREVIATIONS

EXPAND PRIMARY CARE

AT LAKE NONA (WEST)

ORLANDO VA MEDICAL CENTER

RAH TE

675-102

MG001

01 & 02

CONSTRUCTION

DOCUMENTS

21-10936C77621C0079

NOT TO

SCALE

FIRE STOP - PIPE PLAN

NOT TO

SCALE

MEDICAL GAS OUTLET (MGO-1)

NOT TO

SCALE

PIPE HANGER DETAIL

NOT TO

SCALE

PIPE PENETRATION OF INTERIOR WALL

NOT TO

SCALE

ZONE VALVE BOX (ZVB-1) WITH ALARM PANEL (AAP-1) DIAGRAM

d. Friction loss in fittings as equivalent lengths: 1/2" = 1 ft ; 3/4" = 2 ft.

c. Friction loss designed for full flow (100% simultaneous use) for both rooms through entire pipe run.

b. Per ASPE, medical air is not required for the procedure room; however, it is included in this design since it is installed in the existing procedure room.

MV

Procedure Room

4A431 Fourth Floor Interstitial

Area 2 30 2 60 (c) 3/4" 0.099 343 9 (d) 361 0.357

MA

Procedure Room

4A431 Fourth Floor Interstitial

Area 2 30 2 (b) 60 (c) 1/2" 0.064 343 9 (d) 352 0.225

O Procedure Room

4A431 Fourth Floor Interstitial

Area 2 10 2 20 (c) 1/2" 0.011 343 9 (d) 352 0.039

Start End Flow Rate

(lpm per room) No. of

Outlets Total Flow Rate (lpm)

Pipe Size Loss per 100' Run (ft)

No. of 90° El Total Length (ft) Loss

a. Source: Beacon Medaes Detail 11.6.2, Pressure Gas Outlet Flows

4A321 Procedure Room Multi-service, Observation, Patient Room 1 - 1 10 (a) 100 30 10 30 10

4A334 Treatment Room Treatment Room 1 1 1 10 (a) 100 30 10 30 10

Room No. Room Name Occupancy O MA MV O (lpm) Simul. Use (%) MA (lpm) Simul. Use (%) MV (lpm) Simul. Use (%)

Inlet / Outlet Station Data Anticipated Peak Demands

ASPE Plumbing Engineering Design Handbook - Volume 3, Special Plumbing Systems

MEDICAL GAS SUMMARY

Revisions: Date:

50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022

75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022

FEC

F E

C

F E

C

FEC

CK

C10

C12

C11

C9

C8 C7

C5

C4

C3

C2

C1

C13

C13.9 C14

C15 C16 C17

CB

CA

CB.6

CC

CD

CE

CF

CC.3

CG

CH

CJ

AAP-1

MGO-1

MGO-12

ZVB-13

LACTATION

ROOM

4A301

STORAGE

4A305

ELECTRICAL

CLOSET

4A307

TOILET

ROOM

4A315

SUPERVISOR

OFFICE

4A326

BREAK

ROOM

4A327

CORRIDOR

4AC07

CORRIDOR

4AC04

FILE

ALCOVE

4A300A

STAFF

TOILET

4A337

MED

ALCOVE

4AC07A

TOILET

ROOM

4A329

TOILET

ROOM

4A331

TOILET

ROOM

4A333

TOILET

ROOM

4A335

WEIGHING

ALCOVE

4AC04A

WEIGHING

ALCOVE

4AC04B

TOILET

ROOM

4A104

TOILET

ROOM

4A103

RECEPTION

4A102

CORRIDOR

4AC03

WAITING

AREA

4A101

CORRIDOR

4AC06

CORRIDOR

4AC03A

AAP-24

ZVB-2 3

CORRIDOR

4AC03

CONSULTATION

ROOM

4A309

CONSULTATION

ROOM

4A311

CONSULTATION

ROOM

4A313

EXAM

ROOM

4A317

EXAM

ROOM

4A319

TOILET

ROOM

4A322

PROCEDURE

ROOM

4A321

HAC

4A320

CLEAN

UTILITY

4A323

SOILED

UTILITY

4A324

SUPERVISOR

OFFICE

4A325 SUPERVISOR

OFFICE

4A326

MSA

SUPERVISOR

4A302

MATERNITY

/ WOMENS

HEALTH

OFFICE

4A303

WOMEN

VETERAN

PROGRAM

MANAGER

4A304

CONFERENCE

ROOM

4A306

EXAM

ROOM

4A328

EXAM

ROOM

4A330

EXAM

ROOM

4A332

TREATMENT

ROOM

4A334

CORRIDOR

4AC06

CORRIDOR

4AC06

EXAM

ROOM

4A316

EXAM

ROOM

4A318

CORRIDOR

4AC05

CORRIDOR

4AC05

STAFF /

TEAM

AREA

4A300

STAFF /

TEAM

AREA

4A300

EXAM

ROOM

4A308

EXAM

ROOM

4A310

EXAM

ROOM

4A312

STORAGE

ALCOVE

4AC05A

COMMUNICATIONS

ROOM

4A314

CORRIDOR

4AC03

1. FURNISH AND INSTALL NEW MEDICAL GAS OUTLETS AND MEDICAL VACUUM INLETS (MGO-1) WITH BACK BOXES, FACE PLATES AND ASSOCIATED PIPING. INSTALL PER MANUFACTURER'S INSTALLATION INSTRUCTION.

WHERE REQUIRED PROVIDE A BLANK FACE PLATE AND SLIDE PLATE FOR MEDICAL VACUUM BOTTLE. SEE

ARCHITECTURAL DRAWING ELEVATIONS FOR MOUNTING HEIGHTS.

2. ROUTE 1/2"O, 1/2"MA AND 3/4"MV DN TO MEDICAL GAS INLET/OUTLETS (MGO-1).

3. FURNISH AND INSTALL MEDICAL GAS ZONE VALVE BOX (ZVB-1 / ZVB-2) PER MANUFACTURER'S INSTALLATION

INSTRUCTIONS. INSTALL LABELS TO DENOTE THE ROOM OR AREA SERVED BY THE VALVE BOX.

4. FURNISH AND INSTALL MEDICAL GAS AREA ALARM PANEL (AAP-1 / AAP-2) PER MANUFACTUER'S INSTALLATION INSTRUCTIONS. INSTALL LABELS TO DENOTE THE ROOM OR AREA SERVED BY THE ALARM PANEL.

MEDICAL GAS KEYNOTESX

MEDICAL GAS GENERAL NOTES

A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL MEDICAL GAS SERVICE OUTAGES.

B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE

PROCEEDING.

C. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO

PERMIT THE INSTALLATION OF NEW WORK.

D. REFER TO MEDICAL GAS ROUGH-IN SCHEDULE FOR BRANCH CONNECTION TO FIXTURE.

E. INSTALL LOCKABLE ISOLATION VALVES AS SHOWN ON THE DRAWINGS AND REQUIRED BY CODE.

F. ACCESS SHALL BE PROVIDED SUCH THAT MEDICAL GAS COMPONENTS SHALL BE READILY SERVICEABLE, FOR ALL COMPONENTS THAT REQUIRE OPERATING, CLEANING, SERVICING, MAINTENANCE, AND

CALIBRRATION. SUCH COMPONENTS INCLUDES, BUT ARE NOT LIMITED TO MANUAL VALVES,

PRESSURE/VACUUM SWITCHES, AND ALARM PANELS.

G. ALL MEDICAL AIR AND OXYGEN PIPING TO BE 1/2” MINIMUM UNLESS OTHERWISE NOTED.

H. ALL VACUUM PIPING TO BE 3/4" MINIMUM UNLESS OTHERWISE NOTED.

I. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.

J. COORDINATE THE LOCATION OF ZONE VALVE BOX, ALARM PANELS AND MEDICAL GAS INLET/OUTLET

PANELS WITH THE ARCHITECTURAL DRAWINGS.

PLAN LEGEND

AREA NOT IN CONTRACT

2 HOUR FIRE & SMOKE SEPARATION

1 HOUR FIRE & SMOKE SEPARATION

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

E4KEY PLANAREA A, ZONE 1

E1E2E3D4HOSPITALD1D2D5D3WD6D7

CLINICP-WC1C2P-E

A1A2A3B1A4B2

N

N KEY PLAN

10/19/2022

MEDICAL GAS - FLOOR PLAN, FOURTH

FLOOR

EXPAND PRIMARY CARE

AT LAKE NONA (WEST)

ORLANDO VA MEDICAL CENTER

RAH TE

675-102

MG104

01 & 02

CONSTRUCTION

DOCUMENTS

21-10936C77621C0079

N

1/8" = 1'-0"

MEDICAL GAS - FLOOR PLAN, FOURTH FLOOR

0 4' 8' 16'

AREA OF WORK

Revisions: Date:

50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022

75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022

F E

C

CK

C10

C12

C11

C9

C8 C7

C5

C4

C3

C2

C1

C13

C13.9 C14

C15 C16 C17

CB

CA

CB.6

CC

CD

CE

CF

CC.3

CG

CH

CJ

M G

IS

.2

M G

IS

.2

1/2" O

1/2" MA

3/4" MV

1" MV

1/2" MA

1/2" O

1/2" O

1/2" MA

1" MV

MEDICAL GAS GENERAL NOTES

A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL MEDICAL GAS SERVICE OUTAGES.

B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE

PROCEEDING.

C. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO

PERMIT THE INSTALLATION OF NEW WORK.

D. INSTALL LOCKABLE ISOLATION VALVES AS SHOWN ON THE DRAWINGS AND REQUIRED BY CODE.

E. ACCESS SHALL BE PROVIDED SUCH THAT MEDICAL GAS COMPONENTS SHALL BE READILY SERVICEABLE, FOR ALL COMPONENTS THAT REQUIRE OPERATING, CLEANING, SERVICING, MAINTENANCE, AND

CALIBRRATION. SUCH COMPONENTS INCLUDES, BUT ARE NOT LIMITED TO MANUAL VALVES,

PRESSURE/VACUUM SWITCHES, AND ALARM PANELS.

F. ALL MEDICAL AIR AND OXYGEN PIPING TO BE 1/2” MINIMUM UNLESS OTHERWISE NOTED.

G. ALL VACUUM PIPING TO BE 3/4" MINIMUM UNLESS OTHERWISE NOTED.

H. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.

I. COORDINATE CONCRETE FLOOR SLAB AND REPLACEMENT WORK WITH ARCHITECTURAL AND

STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME REQUIRED THE NEW

FLOOR FINISHES.

J. COORDINATE THE LOCATION OF ZONE VALVE BOX, ALARM PANEL AND MEDICAL GAS INLET/OUTLET

PANELS WITH THE ARCHITECTURAL DRAWINGS.

1. ROUTE 1/2"O, 1/2"MA AND 3/4"MV DN TO ZONE VALVE BOX (ZVB-1 / ZVB-2).

2. ROUTE PIPING AS HIGH AS POSSIBLE TO AVOID INTERFERING WITH WAYFINDING EGRESS PATHWAY.

3. CONTINUATION OF MEDICAL GAS PIPING TO FOURTH FLOOR INTERSTITIAL, ZONE 2. REFER TO SHEET

MG104-I.2.

4. WAYFINDING EGRESS PATH, AVOID ROUTING PIPING THROUGH THIS AREA.

MEDICAL GAS KEYNOTESX

PLAN LEGEND

AREA NOT IN CONTRACT

2 HOUR FIRE & SMOKE SEPARATION

1 HOUR FIRE & SMOKE SEPARATION

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

E4KEY PLANAREA A, ZONE 1

E1E2E3D4HOSPITALD1D2D5D3WD6D7

CLINICP-WC1C2P-E

A1A2A3B1A4B2

N

N KEY PLAN

10/19/2022

MEDICAL GAS - FLOOR PLAN, FOURTH

FLOOR INTERSTITIAL - ZONE 1

EXPAND PRIMARY CARE

AT LAKE NONA (WEST)

ORLANDO VA MEDICAL CENTER

RAH TE

675-102

MG104IS.1

01 & 02

CONSTRUCTION

DOCUMENTS

21-10936C77621C0079

N

1/8" = 1'-0"

MEDICAL GAS - FLOOR PLAN, FOURTH FLOOR INTERSTITIAL - ZONE 1

0 4' 8' 16'

AREA OF WORK

Revisions: Date:

50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022

75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022

CK

C15

C16

C17

C18

C19

C20

C21

C22

C23 C24 C25 C26 C27 C28

CB

CA

CB.6

CC

CD

CE

CF

CC.3

CG

CH

CJ

(E) 3" MV DN

(E) 1" MA DN

(E) 1" O DN

1/2" O

1/2" MA

1" MV

(E) 1/2" O

(E) 1/2" MA

(E) 1" MV

(E) 1 1/2" MV

(E) 1/2" MA

(E) 1/2" O

M G

IS

.1

M G

IS

.1

MEDICAL GAS GENERAL NOTES

A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL MEDICAL GAS SERVICE OUTAGES.

B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE

PROCEEDING.

C. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO

PERMIT THE INSTALLATION OF NEW WORK.

D. INSTALL LOCKABLE ISOLATION VALVES AS SHOWN ON THE DRAWINGS AND REQUIRED BY CODE.

E. ACCESS SHALL BE PROVIDED SUCH THAT MEDICAL GAS COMPONENTS SHALL BE READILY SERVICEABLE, FOR ALL COMPONENTS THAT REQUIRE OPERATING, CLEANING, SERVICING, MAINTENANCE, AND

CALIBRRATION. SUCH COMPONENTS INCLUDES, BUT ARE NOT LIMITED TO MANUAL VALVES,

PRESSURE/VACUUM SWITCHES, AND ALARM PANELS.

F. ALL MEDICAL AIR AND OXYGEN PIPING TO BE 1/2” MINIMUM UNLESS OTHERWISE NOTED.

G. ALL VACUUM PIPING TO BE 3/4" MINIMUM UNLESS OTHERWISE NOTED.

H. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.

I. COORDINATE CONCRETE FLOOR SLAB AND REPLACEMENT WORK WITH ARCHITECTURAL AND

STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME REQUIRED THE NEW

FLOOR FINISHES.

J. COORDINATE THE LOCATION OF ZONE VALVE BOX, ALARM PANEL AND MEDICAL GAS INLET/OUTLET

PANELS WITH THE ARCHITECTURAL DRAWINGS.

1. CONNECT NEW MEDICAL GAS PIPING TO EXISTING 1/2"O, 1/2"MA AND 1-1/2"MV.

2. EXISITING MEDICAL GAS PIPING DN TO SERVE THE FLOOR BELOW, PROTECT DURING CONSTRUCTION.

3. CONTINUATION OF MEDICAL GAS PIPING TO FOURTH FLOOR INTERSTITIAL, ZONE 1. REFER TO SHEET

MG104-I.1.

4. MEDICAL GAS RISERS, PROTECT DURING CONSTRUCTION.

MEDICAL GAS KEYNOTESX

PLAN LEGEND

AREA NOT IN CONTRACT

2 HOUR FIRE & SMOKE SEPARATION

1 HOUR FIRE & SMOKE SEPARATION

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

REVIEW ONLY - NOT FOR CONSTRUCTION

Bancroft Project No. VA CONTRACT NO.

E4KEY PLANAREA A, ZONE 1

E1E2E3D4HOSPITALD1D2D5D3WD6D7

CLINICP-WC1C2P-E

A1A2A3B1A4B2

N

N KEY PLAN

10/19/2022

MEDICAL GAS - FLOOR PLAN, FOURTH

FLOOR INTERSTITIAL - ZONE 2

EXPAND PRIMARY CARE

AT LAKE NONA (WEST)

ORLANDO VA MEDICAL CENTER

RAH TE

675-102

MG104IS.2

01 & 02

CONSTRUCTION

DOCUMENTS

21-10936C77621C0079

N

1/8" = 1'-0"

MEDICAL GAS - FLOOR PLAN, FOURTH FLOOR INTERSTITIAL - ZONE 2

0 4' 8' 16'

AREA OF WORK

Revisions: Date:

50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022

75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022

ELECTRICAL GENERAL NOTES

NOTES:

1. ALL DIMENSIONS ARE CONSIDERED FROM FINISHED FLOOR AND, UNLESS NOTED OTHERWISE, SHALL NOT VARY. RAISED FLOORS SHALL BE

CONSIDERED FINISHED FLOOR.

2. ALL DIMENSIONS SHALL BE COORDINATED WITH ARCHITECTURAL DETAILS AND MAY BE ADJUSTED TO CONFORM WITH ARCHITECTURAL

REQUIREMENTS AS LONG AS NO CODE RESTRICTION IS VIOLATED.

3. OUTLETS INSTALLED LOWER THAN 15" AFF (FORWARD REACH) AND 9" AFF (SIDE REACH) ARE IN VIOLATION OF ADA.

AS NOTED ON DRAWINGS.

EXCEPTION: 44" MAXIMUM TO TOP ABOVE COUNTERS

16" TO…