This document provides details on a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0044 to expand primary care facilities at Lake Nona (West) Project 675-102. An attachment to the solicitation provides construction drawings related to the project. Proposals are due by the date listed on the solicitation for expanding primary care infrastructure to support increased demand at the specified VA medical center location. The opportunity is set aside for small businesses.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STEEL BEAM
HEAVY-DUTY
BEAM CLAMP
HANGER ROD
STRUCTURAL
STEEL BEAM
CONCRETE INSERT
CONCRETE SLAB
INSERT NUT
HANGER ROD
HEAVY-DUTY CONCRETE STEEL
INSERT W/ ELONGATED SLOT
ADJUSTABLE
STEEL U-SUPPORT
LOCKING NUT
HANGER ROD
WOOD JOIST
OR BEAM
LAG SCREWS
SUPPORT NUT
WOOD JOIST OR BEAM
WELDS WEB MEMBERS O.W.S.J.
HANGER NUT
BOTTOM CHORD
OF O.W.S.J.
BENT STRAP 1 1/2" x 3/16"
OVER VERTICAL LEGS OF
ANGLES.
HANGER ROD
STEEL JOIST
PIPE HANGERS AND SUPPORTS
SUPPORT HORIZONTAL STEEL AND COPPER PIPING AS FOLLOWS:
NOMINAL PIPE SIZE DISTANCE BETWEEN SUPPORTS HANGER ROD DIAMETERS
1/2" 6' 3/8"
3/4" TO 1-1/2" 6' 1/2"
2" TO 2-1/2" 10' 1/2"
3" TO 4" 12' 5/8"
6" TO 12" 14' 7/8"
14" TO 18" 20' 1"
PLACE HANGER WITHIN 1 FOOT OF EACH HORIZ. ELBOW. SUPPORT HORIZ. SOIL WASTE AND STORM PIPE NEAR
EACH HUB, WITH 5 FEET MAXIMUM SPACING BETWEEN HANGERS.
VERTICAL PIPING:
1. SUPPORT VERTICAL WATER PIPING AT EVERY FLOOR.
2. SUPPORT VERTICAL SOIL PIPE AT EACH FLOOR AT HUB.
WHERE SEVERAL PIPES CAN BE INSTALLED IN PARALLEL AND AT SAME ELEVATION PROVIDE MULTIPLE OR TRAPEZE HANGERS. WHERE PRACTICAL, SUPPORT RISER PIPING INDEPENDENTLY OF CONNECTED HORIZ. PIPING.
ONE ANGLE EACH SIDE OF WEB MEMBERS. REST ON TOP
OF BOTTOM CHORD OF O.W.S.J. BETWEEN PANEL POINTS.
SIZE FOR LOAD.
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB. UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD & INSERT
FOR ALL PIPING (8" MIN.)
BAND
1-5/8" 12 GAUGE CHANNEL OR
2"x2"x1/4" ANGLE
1/2" DIA. HANGER RODS WITH 36"
MAX. SPACING ON EACH CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF MIN.
DENSITY) UNDER INSULATION SHIELD
INSULATION (VAPOR BARRIER TYPE IS
REQUIRED FOR LOW TEMPERATURE
PIPE)
HANGER ROD
NOTES:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS
THRU 3/4
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOM. SIZE IN.
PIPE FT.
TUBING FT.
5 FT
1 1/4
1 1/2
2 1/2
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
1" M
AX
NOTES:
1. PROVIDE ANCHORS ONLY WHERE SHOWN ON DRAWINGS
2. EXTEND SLEEVE ABOVE FLOOR WHERE SPECIFIED.
INSULATION
BOLT (TYPICAL)
FLOOR SLAB
FIRE-STOPPING MATERIAL COMPLIANT WITH UL 1479 2-HOUR RATING
(SIMILAR TO 3M SYSTEM NO. C-AJ-1551 OR HILTI F-A-1028)
BOLT
PIPE
PIPE SLEEVE
WHERE SPECIFIED
RISER CLAMP
RISER
PIPE SLEEVE
WHERE SPECIFIED
RISER CLAMP. BOTTOM CLAMP
REQUIRED AT ANCHOR POINTS ONLY.
ELEVATION
PLAN
RISER CLAMP
CONTINUOUS FIRESTOP
SEALANT
CONTINUOUS FIRESTOP SEALANT
FIRESTOP SEALANT-MIN 1/2" THICKNESS OF FILL
MATERIAL APPLIED WITHIN THE ANNULUS, FLUSH
WITH THE TOP SURFACE OF FLOOR. AT THE POINT
OF CONTACT LOCATION BETWEEN PIPE AND
CONCRETE, A MIN 1/2" DIAM BEAD OF FILL MATERIAL
SHALL BE APPLIED AT THE CONCRETE/PIPE
INTERFACE ON THE TOP SURFACE OF FLOOR AND
ON BOTH SURFACES OF WALL.
THROUGH PENETRANTS-ONE METALLIC PIPE,
CONDUIT OR TUBING TO BE INSTALLED WITHIN
THE FIRESTOP SYSTEM. PIPE, CONDUIT OR
TUBING TO BE RIGIDLY SUPPORTED ON BOTH
SIDES OF FLOOR OR WALL ASSEMBLY OF WALL.
FLOOR
NOTE:
1. SEE ARCHITECTURAL DRAWINGS FOR LAVATORY MOUNTING HEIGHTS.
2. P-TRAP, TAIL PIECE, AND WASTE ARM NOT SHOWN FOR CLARITY.
3. FOR HANDICAP LAVATORY INSTALLATION ALL WASTE PIPING UNDER SINK SHALL BE
WRAPPED WITH PROTECTIVE PIPE COVERS.
4. FOR HANDICAP LAVATORY INSTALLATION ANGLE STOP VALVES AND SUPPLY RISERS
SHALL BE WRAPPED WITH PROTECTIVE PIPE COVERS. SUPPLY RISERS SHALL BE
WRAPPED FROM STOP VALVES TO MIXING VALVE. ENDS OF PROTECTIVE WRAP SHALL
BE CUT SQUARE AND TIE WRAPPED CLOSED.
CHROME PLATED RIGID
SUPPLY RISER (TYPICAL)
CHROME PLATED ALL BRASS
CONSTRUCTION ANGLE STOP WITH FULL
TURN BRASS STEM AND LOOSE KEY
HANDLE. (TYP.2)
SANITARY ROUGH-IN
WALL HUNG LAVATORY REFER TO
PLANS AND SPECIFICATIONS FOR
TYPE OF FIXTURE AND FAUCET.
FOUR PORT POINT-OF-USE THERMOSTATIC
MIXING VALVE MOUNTED AS HIGH AS
POSSIBLE. MIXING SET TO DISCHARGE 105°F
PACK VOID BETWEEN PIPE OR
INSULATION AND WALL WITH FIBERGLASS
BATT, THEN SEAL WITH A SILICONE
COMPOUND OR OTHER APPROVED
SEALANTS. IF WALL IS FIRE RATED, FILL
VOID BETWEEN PIPE OR INSULATION AND
WALL WITH FIRE BARRIER CAULK
CHROME PLATED OR STAINLESS
STEEL ESCUTCHEON PLATES BOTH
SIDES OF WALL IN EXPOSED AREAS.
PLATE SHALL BE SECURED WITH
WALL CLIPS OR MOUNTING SPRINGS
PROVIDE A MINIMUM OF 1/2"
CLEARANCE BETWEEN WALL
AND PIPE OR INSULATION
PIPE INSULATION
SEE DRAWINGS FOR PIPE
SIZE AND MATERIAL
NOTES:
1. I.D. OF WALL OPENING TO BE A MIN. OF 1/2" LARGER THAN O.D. OF PIPE OR INSULATION PASSING THROUGH WALL.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR WALL OPENINGS WITH OTHER TRADES AND / OR CONTRACTORS.
3. PIPE PENETRATIONS OF SMOKE OR FIRE WALLS SHALL BE IN COMPLIANCE WITH NFPA-90A.
FACE OF WALL
M
IN
IM
IZ
E D
IM
EN
TI
O
N
GAS TIGHT BRASS CLEANOUT PLUG
COMBINATION WYE OR 1/8" BEND
CAST IRON STORM, SANITARY OR WASTE PIPE.
CAULK INSIDE CONNECTION.
18 GAUGE ROUND GALVANIZED STEEL
PIPE SLEEVE
STEEL RISER CLAMP
PROVIDE A SECTION OF HIGH COMPRESSION STRENGTH
INSULATION AT EACH HANGER POINT, INSULATION MAY BE
HALF FULL ROUND OR FULL ROUND & EXTENDED 2"
BEYOND GALVANIZED SHIELD EACH WAY.
SUPPORT HANGER
STEEL ANCHOR
SUPPORT HANGER
STEEL ROD
ADJUSTABLE
MALLEABLE
IRON SPLIT
SWIVEL RING
PIPE SADDLE
1/4" TURN BALL
VALVE
CHECK
VALVE
CIRCUIT SETTER BALANCING
VALVE (BALANCE TO 0.5 GPM)
FROM WATER
SYSTEM
TO HOT WATER
RETURN SYSTEM.
1/4" TURN BALL
VALVE
WATER HAMMER
ARRESTOR. INSTALL PER
MANUFACTURER'S
RECOMMENDATIONS
WATER SUPPLY
WATER SUPPLY TO
PLUMBING FIXTURE
WATER HAMMER
ARRESTOR. INSTALL PER
MANUFACTURER'S
RECOMMENDATIONS
WATER SUPPLY
WATER SUPPLY TO
PLUMBING FIXTURES
WATER HAMMER
ARRESTOR SIZE
MODEL
CONNECTION
DIAMETER
(IN.)
FIXTURE
UNITS
Z1700-100 3/4 1-11
Z1700-200 3/4 12-32
Z1700-300 1 33-60
Z1700-400 1 61-113
Z1700-500 1 114-154
Z1700-600 1 155-330
SIZING BASED ON ZURN SERIES Z1700
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4KEY PLANAREA A, ZONE 1
E1E2E3D4HOSPITALD1D2D5D3WD6D7
CLINICP-WC1C2P-E
A1A2A3B1A4B2
N
10/19/2022
PLUMBING - DETAILS EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
RAH TE
675-102
P501
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
NOT TO
SCALE
PIPE HANGER
NOT TO
SCALE
PIPE HANGER
NOT TO
SCALE
SUPPORT / ANCHOR FOR PIPE RISERS
NOT TO
SCALE
LAVATORY MIXING VALVE
NOT TO
SCALE
PIPE PENETRATION OF INTERIOR WALL
NOT TO
SCALE
SUSPEND DRAINAGE CLEANOUT
NOT TO
SCALE
HOT WATER CIRCULATION (HWC) VALVE ASSEMBLY
NOT TO
SCALE
WATER HAMMER ARRESTOR DETAIL
Revisions: Date:
50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
95% CONSTRUCTION DOCUMENT SUBMITTAL 05/11/2022
100% FINAL SUBMISSION - ISSUE FOR BID 10/19/2022
NICKLE BRONZE ADJUSTABLE STRAINER
(FLUSH WITH FINISHED FLOOR)
CEMENT BED
TILE FLOOR
CONCRETE FILL
STRUCTURAL SLAB
FLASHING
CLAMP WITH
WEEP HOLES
THREADED, CAULKED OR
NO-HUB CONNECTION
LOOSE GRAVEL
AT WEEP HOLES
3mm to 6mm SIZE
WATERPROOF MEMBRANE
SLOPE 2% TO DRAIN
PROVIDE A METAL SUPPORT PLATE
WHEN DRAIN IS INSTALLED IN AN
EXISTING FLOOR - CAULK AROUND
DRAIN PRIOR TO RE-GROUTING
CLAMP WATERPROOF MEMBRANE INSIDE OF
DRAIN BODY TO DRAIN TO WEEP HOLES
FAUCET SEE
SPECIFICATIONS
LAMINAR FLOW
CONTROL DEVICE
OFFSET WASTE
TRAP PARALLEL TO WALLFINISHED
FLOOR
LOOSE KEY STOP
ESCUTCHEON
NOTE: PROVIDE COVER FOR EXPOSED PIPING
FO
R
F
IX
TU
R
E H
EI
G
H
TS
S
EE
AR
C
H
IT
EC
TU
R
AL
D R
AW
IN
G S
6.5
8.5 7.5 6.5 5.5
6.5
5.5
3.5
1 73.5632
(IN.) H(FT.)W(FT.)H(FT.)W(FT.)H(FT.)
6"
TOTAL ANCHOR TO ANCHOR EXPANSION
PIPE EXPANSION LOOP DIMENSION (WxH) SCHEDULE
2"
W(FT.)
4"PIPE SIZE
1.8" PER 100' LENGTH200° F.
200° F.
50° F.
1.3" PER 100' LENGTH50° F.
HOT WATER
HOT WATER
OPERATING
TEMPERATURE
INSTALLED
TEMPERATURE
ANCHOR
GUIDE
ANCHOR
GUIDE
2H
TOTAL ANCHOR-TO-ANCHOR EXPANSION
2H
H
W
PROVIDE ADDITIONAL GUIDES TO
ENSURE A MAXIMUM DISTANCE
BETWEEN GUIDES OF 20 FEET.
X X XX
BLACK STEEL
COPPER
FLUID EXPANSIONPIPE TYPE
TOTAL ANCHOR TO ANCHOR EXPANSION TABLE
PRIMING TUBE
FINISHED FLOOR
FLOOR DRAIN FD-1
1/2" TYPE "K" SOFT SEAMLESS COPPER (WITH
NO JOINTS) BELOW FLOOR SLAB. SLOPE AT
1/8" PER FOOT MIN. TO FLOOR DRAIN
CONNECTION.
P-TRAP
PRIMING MANIFOLD
ELECTRONIC TRAP
PRIMING CABINET
C-TP-3
(EXISTING)
SERVES EXISTING
FLOOR DRAINS
ALL HORIZONTAL STORM PIPING TO BE INSULATED
FROM SUMP RECEIVER TO A POINT 1'-0" DOWN TO
VERTICAL DOWNSPOUT WITH 1/2" FIBERGLASS
INSULATION WITH ALL SERVICE JACKET. INSULATE
ALL HORIZONTAL OFFSETS DOWN TO GRADE.
STEEL ROD AND CLEVIS HANGER
CLEANOUT PLUG
(EXPOSED)
WATERPROOFING
MEMBRANE
DRAIN BODY SECURED
TO DECK PLATE
ROOF DECK
DECK PLATE FASTENED
TO ROOF DECK
RUN PIPE INSULATION UP TO
UNDERSIDE OF SUMP RECEIVER
DECK PLATE
GASKET
ROOF DRAIN WITH CAST IRON DOME
SECURE FLASHING CLAMP TO
ROOFING FLASHING MATERIAL
ROOF INSULATION BY
ROOFING CONTRACTOR
EXTENSION COLLAR
PLUMBING CONTRACTOR TO PROVIDE SUMP
RECEIVER. COORDINATE WITH ROOFING
CONTRACTOR.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4KEY PLANAREA A, ZONE 1
E1E2E3D4HOSPITALD1D2D5D3WD6D7
CLINICP-WC1C2P-E
A1A2A3B1A4B2
N
10/19/2022
PLUMBING - DETAILS EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
RAH TE
675-102
P502
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
NOT TO
SCALE
TYPE "C" FLOOR DRAIN
NOT TO
SCALE
TYPICAL WHEELCHAIR LAVATORY
NOT TO
SCALE
PIPE EXPANSION LOOP DETAIL/SCHEDULE
NOT TO
SCALE
TRAP PRIMING CABINET
NOT TO
SCALE
ROOF DRAIN (INSULATED STEEL DECK)
Revisions: Date:
50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
EXAM
ROOM
4A312
EXAM
ROOM
4A310
EXAM
ROOM
4A308
CONSULTATION
ROOM
4A309
CONSULTATION
ROOM
4A311
CONSULTATION
ROOM
4A313
STAFF
TOILET
4A337
STAFF
TOILET
4A337
EXAM
ROOM
4A318
EXAM
ROOM
4A316
EXAM
ROOM
4A319
TOILET
ROOM
4A322
TOILET
ROOM
4A322
SOILED
UTILITY
4A324
SOILED
UTILITY
4A324
H.A.C.
4A320
PROCEDURE
ROOM
4A321
TOILET
ROOM
4A104
TOILET
ROOM
4A103
TOILET
ROOM
4A104
TOILET
ROOM
4A103
CORRIDOR
4AC03
LACTATION
ROOM
4A301
TREATMENT
ROOM
4A334
TOILET
ROOM
4A335
TOILET
ROOM
4A335
TOILET
ROOM
4A333
TOILET
ROOM
4A333
EXAM
ROOM
4A330
EXAM
ROOM
4A332
TOILET
ROOM
4A331
TOILET
ROOM
4A331
TOILET
ROOM
4A329
TOILET
ROOM
4A329
MED
ALCOVE
4AC07A
EXAM
ROOM
4A328
TOILET
ROOM
4A315
TOILET
ROOM
4A315
BREAK
ROOM
4A327
BREAK
ROOM
4A327
SOILED
UTILITY
4A324
CLEAN
UTILITY
4A323
VB
FOURTH FLOOR CEILING
FOURTH FLOOR INTERSTITIAL
FOURTH FLOOR FOURTH FLOOR
FOURTH FLOOR CEILING
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
FOURTH FLOOR ROOF
3/ 4"
H W
3/ 4"
C
WBACK TO
BACK
FIXTURES
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
1- 1/
2" C
W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
1- 1/
2" C
W
3/ 4"
H W
3/ 4"
C W
1- 1/
2" C
W
EMERGENCY
THERMOSTATIC
MIXING VALVE
FOURTH FLOOR INTERSTITIAL
FOURTH FLOOR ROOF
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
FOURTH FLOOR CEILING
FOURTH FLOOR INTERSTITIAL
FOURTH FLOOR FOURTH FLOOR
FOURTH FLOOR CEILING
FOURTH FLOOR INTERSTITIAL
FOURTH FLOOR ROOF
3/ 4"
H W
3/ 4"
C W
2" C
WBACK TO
BACK
FIXTURES
BACK TO
BACK
FIXTURES
1/ 2"
C W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
1- 1/
2" C
W
3/ 4"
H W
3/ 4"
C W
1- 1/
2" C
W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
1- 1/
2" C
W
3/ 4"
H W
3/ 4"
C W
1- 1/
2" C
W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
A
3/ 4"
H W
C
3/ 4"
H W
2" C
W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
2" C
W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
2" C
W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
1- 1/
2" C
W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
1- 1/
2" C
W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
1"HW
2"CW
3/4"HWC
3/4"HW
3/4"CW
3/ 4"
H W
3/4"CW
3/4"CW3/4"CW
1-1/2"CW1-1/2"CW3/4"CW
3/4"CW
3/4"HW
3/4"HWC
2"CW
3/4"HW
3/4"HWC
2"CW
1"HW
3/4"HWC
2-1/2"CW
1-1/4"HW
3/4"HWC
2-1/2"CW
1-1/4"HW
3/4"HWC
2"CW
3/4"HW
3/4"HWC
2"CW
3/4"HW
3/4"HWC
2"CW
1"HW
3/4"HWC
2-1/2"CW
1"HW
3/4"HWC
1- 1/
2" C
W
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
1- 1/
2" C
W
2"CW
1"HW
3/4"HWC
TYP.
0.5
0.5
0.5
A
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
2-1/2"CW
1-1/2"HW
3/4"HWC
2-1/2"CW
1-1/2"HW
3/4"HWC
1/ 2"
C W
ICE
MAKER
3/ 4"
H W
3/ 4"
C W
3/ 4"
H W
3/ 4"
C W
FOURTH FLOOR ROOF
SK-1 SK-1 SK-1 SK-1 SK-1 SK-1
WC-1
LAV-1 SK-1 SK-1 SK-1
WC-1
LAV-1 SK-3
EW-1
MB-1
SK-4
WC-1 WC-1
LAV-1 LAV-1 EWC-1 SK-1 SK-1
WC-1 WC-1
LAV-1 LAV-1 SK-1 SK-1
WC-1 WC-1
LAV-1 LAV-1
SK-2 SK-1
WC-1
LAV-1
WHA-1
SK-2
BFP-1
SK-5 SK-5
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4KEY PLANAREA A, ZONE 1
E1E2E3D4HOSPITALD1D2D5D3WD6D7
CLINICP-WC1C2P-E
A1A2A3B1A4B2
N
10/19/2022
PLUMBING - DOMESTIC WATER RISER
DIAGRAM
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
RAH TE
675-102
P601
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
NOT TO
SCALE
PLUMBING - DOMESTIC WATER RISER DIAGRAM
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
EXAM
ROOM
4A319
TOILET
ROOM
4A322
TOILET
ROOM
4A322
SOILED
UTILITY
4A324
H.A.C.
4A320
SOILED
UTILITY
4A324
STAFF
TOILET
4A337
STAFF
TOILET
4A337
EXAM
ROOM
4A316
EXAM
ROOM
4A318
MED
ALCOVE
4AC07A
TOILET
ROOM
4A329
TOILET
ROOM
4A331
EXAM
ROOM
4A328
TOILET
ROOM
4A329
TOILET
ROOM
4A331
BREAK
ROOM
4A327
TOILET
ROOM
4A315
TOILET
ROOM
4A315
CONSULTATION
ROOM
4A313
CONSULTATION
ROOM
4A311
CONSULTATION
ROOM
4A309
EXAM
ROOM
4A312
EXAM
ROOM
4A308
EXAM
ROOM
4A310
TOILET
ROOM
4A335
EXAM
ROOM
4A330
EXAM
ROOM
4A332
TOILET
ROOM
4A333
LACTATION
ROOM
4A301
TOILET
ROOM
4A333
TREATMENT
ROOM
4A334
TOILET
ROOM
4A335
TOILET
ROOM
4A104
TOILET
ROOM
4A104
TOILET
ROOM
4A103
TOILET
ROOM
4A103
PROCEDURE
ROOM
4A321
SOILED
UTILITY
4A324
CLEAN
UTILITY
4A323
1- 1/
2" V
CO
1- 1/
2" V
2" V
4"SAN
2" V
1- 1/
2" V
2" V
3"
SA
N
CO
2" V
1- 1/
2" V
CO
1- 1/
2" V
1- 1/
2" V
1- 1/
2" V
2" V
1- 1/
2" V
CO
CO
1- 1/
2" V
2" V
1- 1/
2" V
1- 1/
2" V
CO
4"SAN 4"SAN
4"SAN (E)4"SAN
(E )6
"S
AN
2" V
1- 1/
2" V
CO
1- 1/
2" V
4"SAN
FOURTH FLOOR CEILING
FOURTH FLOOR INTERSTITIAL
FOURTH FLOOR FOURTH FLOOR
FOURTH FLOOR CEILING
FOURTH FLOOR ROOF
FOURTH FLOOR INTERSTITIAL
FOURTH FLOOR ROOF
FOURTH FLOOR CEILING
FOURTH FLOOR INTERSTITIAL
FOURTH FLOOR FOURTH FLOOR
FOURTH FLOOR CEILING
THIRD FLOOR INTERSTITIAL
FOURTH FLOOR INTERSTITIAL
THIRD FLOOR INTERSTITIAL
1- 1/
2" V
2"
SA
N
BACK TO
BACK
FIXTURES
CO
1- 1/
2" V
1- 1/
2" V
1- 1/
2" V
CO
2" V
1- 1/
2" V
CO
1- 1/
2" V
1- 1/
2" V
1- 1/
2" V
1- 1/
2" V
2" V
CO
1- 1/
2" V
CO 4"SAN (E)4"SAN
(E )6
"S
AN
1- 1/
2" V
BACK TO
BACK
FIXTURES
CO
2"
SA
N
2" V
4"
SA
N
BACK TO
BACK
FIXTURES
4"SAN
B
B
(E ) 4
"V
FOURTH FLOOR ROOF FOURTH FLOOR ROOF
THIRD FLOOR INTERSTITIAL THIRD FLOOR INTERSTITIAL
(E ) 4
"V
4"SAN
4"SAN
4"SAN 4"SAN
3"SAN
4"SAN
4"SAN
2"SAN 2"SAN
4"SAN
4"SAN
2"V
2"V 2"V
2"V
1- 1/
2" V
1- 1/
2" V
2" V
2" V
2" V
2"V
1- 1/
2" V
1- 1/
2" V
1- 1/
2" V
1- 1/
2" V
2" V
2"V
2" V
2" V
2" V
2"V
2"V
1-1/2"V
2" V
1- 1/
2" V
2" V
(E)4"SAN
2" V
1- 1/
2" V
1- 1/
2" V
SK-1
WC-1
LAV-1
MB-1
EW-1
SK-3
WC-1
LAV-1 SK-1 SK-1 SK-2
WC-1
LAV-1 LAV-1
WC-1
SK-1 SK-2
WC-1
LAV-1 SK-1SK-1 SK-1 SK-1 SK-1 SK-1
WC-1
SK-1 SK-1 LAV-1 SK-1
WC-1
SK-1 LAV-1 LAV-1 LAV-1
WC-1 WC-1
SK-4 SK-5 SK-5
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4KEY PLANAREA A, ZONE 1
E1E2E3D4HOSPITALD1D2D5D3WD6D7
CLINICP-WC1C2P-E
A1A2A3B1A4B2
N
10/19/2022
PLUMBING - SANITARY AND VENT RISER
DIAGRAM
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
RAH TE
675-102
P602
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
NOT TO
SCALE
PLUMBING - SANITARY AND VENT RISER DIAGRAM
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
RW
306B
RW
306B
RW
306A
RW
306A
FOURTH FLOOR INTERSTITAL
FIFTH FLOOR
THIRD FLOOR
THIRD FLOOR INTERSTITIAL
FOURTH FLOORTHIRD FLOOR ROOF (D)RD (D)ORD (D)RD (D)ORD (D)RD (D)ORD (D)RD (D)ORD (D)RD (D)ORD (D)RD (D)ORD
(E ) 8
" S
TO
(E ) 8
" S T
(E ) 8
" S
TO
(E ) 8
" S T
(E ) 1
0" S
T
(E ) 6
" S
TO
(E ) 6
" S T
(E ) 6
" S T
(D ) 8
" S T
(E) 6" ST
(E) 6" ST
(E) 6" STO
(D ) 8
" S
TO
(E ) 1
0" S
TO
(E
) 6 " S
TO
(E) 6" STO
(D ) 6
" S
TO
(D ) 6
" S T
(D ) 6
" S T
(D) 6" STO
(D) 6" ST
(D) 6" STO
(D) 6" ST
(D) 6" STO
(D) 6" ST
(D) 6" STO
(D) 6" ST
(D) 6" STO
(D) 6" ST
(D ) 6
" S
TO
(D ) 6
" S T
(D ) 6
" S
TO
(D ) 6
" S T
(D ) 6
" S
TO
(D ) 6
" S T
(D ) 6
" S
T (D) 6" STO
(D) 6" STO
(D) 6" ST
(E) 6" STO
(E) 6" ST
(D) 6" STO
RW
306B
RW
306B
RW
306A
RW
306A
FOURTH FLOOR INTERSTITAL
FIFTH FLOOR
THIRD FLOOR
THIRD FLOOR INTERSTITIAL
FOURTH FLOOR
FOURTH FLOOR ROOF
(E ) 6
" S T
(E ) 6
" S T
(E ) 1
0" S
T
" S T
6" S
TO
6" S
T
6" S
TO
6" S
T
6" S
TO
6" S
T
6" S
TO
6" S
T
CO
CO
CO
CO
6" S
T 6" STO
6" STO
6" ST
6" STO
6" ST
6" STO
6" ST
6" STO
6" ST
6" STO
6" ST
(E ) 6
" S
TO
" S
TO
(E
) 1 0"
S
TO
(E ) 6
" S
TO
6" STO
6" S
T
(E) 6" ST
(E) 6" STO
(E) 6" ST
(E) 6" STO
(E) 6" STO
(E) 6" ST
(E ) 8
" S
TO
(E ) 8
" S T
(E ) 8
" S
TO
(E ) 8
" S T
RD-1 ORD-1 RD-1 ORD-1 RD-1 ORD-1 RD-1 ORD-1 RD-1 ORD-1 RD-1 ORD-1
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4KEY PLANAREA A, ZONE 1
E1E2E3D4HOSPITALD1D2D5D3WD6D7
CLINICP-WC1C2P-E
A1A2A3B1A4B2
N
10/19/2022
PLUMBING - STORM RISER DIAGRAM EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
RAH TE
675-102
P603
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
NOT TO
SCALE
PLUMBING - STORM DEMOLITION RISER DIAGRAM
NOT TO
SCALE
PLUMBING - STORM RISER DIAGRAM
Revisions: Date:
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION MANUFACTURER MODEL
DOMESTIC
COLD WATER
DOMESTIC
HOT WATER
SANITARY VENT REMARKS
CO-1 CLEANOUT ZURN Z1470
- - 4" 2"
NOTES:
1. SIZES LISTED ARE MINIMUM CONNECTIONS REQUIRED TO FIXTURES.
FD-1 FLOOR DRAIN ZURN Z541
ROUND TOP DRAIN, DURA-COATED CAST IRON BODY WITH BOTTOM OUTLET, SEEPAGE PAN AND COMBINATION MEMBRANE FLASHING CLAMP AND FRAME FOR HEAVY-DUTY, DURESIST GRATE, TRAP PRIMER CONNECTION, CAST IRON SEDIMENT BUCKET, LOOSE SLOTTED
GRATE. 12-1/4" DIAMETER TOP DRAIN.
BRONZE CLEANOUT PLUG, COUNTERSUNK, ABS TAPERED THREAD PLUG.
SINK: PROVIDED WITH CASEWORK. REFER TO ARCHITECTURAL DRAWINGS FOR MORE INFORMATION.
FAUCET: DECK MOUNTED, SINGLE HOLE, RIGID/SWING GOOSENECK SPOUT, DUAL BEAM INFRARED SENSOR, 0.5 GPM, CHROME PLATED, VANDAL PROOF, NON-AERATING SPRAY OUTLET, 6-VOLT BATTERY, STAINLESS STEEL HOSES, USER ADJUSTABLE TEMPERATURE
CONTROL MIXER, ADA COMPLIANT.
PROVIDE INSULATION PRE-MANUFACTURED FOR P-TRAP, STOP VALVE, AND SUPPLY LINES. APPROVED ASME AND ANSI. ADA COMPLIANT. ALL BRONZE, BRASS AND STAINLESS STEEL CONSTRUCTION, NIPPLE AND THREADED BRASS FITTINGS. UNION INLETS WITH STRAINERS AND CHECK STOPS, DIAL THERMOMETER ON OUTLET. PROVIDE CARRIER WITH CONCEALED ARMS.
SK-1
SINK
SINK TRIM
(SEE ARCHITECTURAL)
CHICAGO FAUCETS
(SEE ARCHITECTURAL)
116.223.AB.1
1/2" 1/2" 1-1/2" 1-1/2"
SINK: SINGLE BOWL DROP-IN SINK, 18 GAUGE TYPE 304 STAINLESS STEEL WITH LUSTROUS SATIN FINISH, DIMENSIONS: 17" x 20" x 7-5/8", BOWL DIMENSIONS: 14" x 14" x 7-1/2", CENTER DRAIN WITH OPENING SIZE: 3-1/2".
FAUCET: DECK MOUNTED, SINGLE HOLE, RIGID/SWING GOOSENECK SPOUT, DUAL BEAM INFRARED SENSOR, 0.5 GPM, CHROME PLATED, VANDAL PROOF, NON-AERATING SPRAY OUTLET, 6-VOLT BATTERY, STAINLESS STEEL HOSES, USER ADJUSTABLE TEMPERATURE
CONTROL MIXER, ADA COMPLIANT.
PROVIDE INSULATION PREMANUFACTURED FOR P-TRAP, STOP VALVE, ANS SUPPLY LINES. APPROVED ASME AND ANSI. ADA COMPLAINT. ALL BRONZE, BRASS AND STAINLESS STEEL CONSTRUCTION. UNION INLETS WITH STRAINERS AND CHECK STOPS, DIAL
THERMOMETER ON OUTLET.
SK-2
ELKAY
CHICAGO FAUCETS
LR17203
116.223.AB.1
1/2" 1/2" 1-1/2" 1-1/2"
SINK
SINK TRIM
SK-3
CLINICAL SINK
CLINICAL SINK TRIM
ADA COMPLIANT BI-LEVEL WITH BOTTLE FILLING STATION, WALL MOUNTED, STAINLESS STEEL, 8 GPH CHILLING CAPACITY, BOTTLE FILLER SHALL PROVIDE 1.1 GPM FLOW RATE WITH LAMINAR FLOW AND SHALL INCLUDE HANDS FREE, FILTER NSF 42 AND 53 CERTIFIED FOR LEAD AND LED VISUAL FILTER MONITOR, ANTIMICROBIAL, COMPRESSOR HERMETICALLY-SEALED, RECIPROCATING TYPE, REFRIGERANT R-134a, SINGLE PHASE 115V, FLA: 5, 370 WATTS, APPROVED ANSI AND UL. PROVIDE CANE APRON TO MEET ADA
REQUIREMENTS.
EWC-1 ELECTRIC WATER COOLER ELKAY LZSTL8WSVRSK - 1-1/2" 1-1/2"1/2"
EW-1
EYE WASH
EMERGENCY THERMOSTATIC
MIXING VALVE
BRADLEY
BRADLEY
S19-220
S19-2000
3/4" 1-1/2" 1-1/2"3/4"
EYE WASH: WALL MOUNTED EYE/FACE WASH WITH 10" DIAMETER IMPACT RESISTANT BOWL, CHROME-PLATED BRASS WITH TWIN SOFT- FLOW EYEWASH HEADS WITH PROTECTIVE SPRAYHEAD COVERS, 30-90 PSI WITH INTEGRAL FLOW CONTROL IN THE SPRAYHEAD ASSEMBLY, GALVANIZED STEEL PIPING AND FITTINGS, HEAVY-GUAGE SAND CAST ALUMINUM WALL BRACKET.
EMERGENCY THERMOSTATIC MIXING VALVE: SATIFIES ANSI Z358.1 TEPID WATER REQUIREMENTS, CHECKSTOPS ON INLET.
ADJUSTABLE SET POINT WITHIN TEMPERATURE RANGE, ACCURATE TEMPERATURE CONTROL TO WITHIN ±3°F, BUILT-IN COLD WATER BYPASS, POSITIVE SHUTOFF OF HOT SUPPLY WHEN COLD SUPPLY IS LOST, DIAL THERMOMETER, FACTORY ASSEMBLED AND TESTED, SURFACE MOUNTED STAINLESS STEEL CABINET.
LAVATORY: WALL-HUNG, WHITE VITREOUS CHINA, FRONT OVERFLOW, D-SHAPED BOWL, CENTER HOLE ONLY, OVERALL DIMENSIONS 20-1/2" x 18-1/4".
FAUCET: DECK MOUNTED, SINGLE HOLE, DUAL BEAM INFRARED SENSOR, CONTEMPORARY-STYLE INTEGRAL SPOUT, 0.5 GPM, CHROME PLATED, VANDAL PROOF, NON-AERATING SPRAY OUTLET, LAMINAR FLOW INSERT, 6-VOLT BATTERY, STAINLESS STEEL HOSES, USER
ADJUSTABLE TEMPERATURE CONTROL MIXER, ADA COMPLIANT.
PROVIDE INSULATION PREMANUFACTURED FOR P-TRAP, STOP VALVE, ANS SUPPLY LINES. APPROVED ASME AND ANSI. ADA OFFSET OPEN GRID STRAINER. THERMOSTATIC MIXING VALVE, ALL BRONZE, BRASS AND STAINLESS STEEL CONSTRUCTION. UNION INLETS WITH STRAINERS AND CHECK STOPS, DIAL THERMOMETER ON OUTLET. PROVIDE CARRIER WITH CONCEALED ARMS.
LAV-1
LAVATORY
LAVATORY TRIM
THERMOSTATIC MIXING VALVE
AMERICAN
STANDARD
CHICAGO FAUCETS
CHICAGO FAUCETS
0356.421
116.222.AB.1
131-CFMABRCF
1/2" 1/2" 1-1/2" 1-1/2"
3/4" 3/4" 3" 1-1/2"MB-1 MOP BASIN
FIAT
CHICAGO FAUCET
TSBC-1610
911-CP
MOP BASIN: NEO-CORNER STYLE, 24x24x12" TERRAZZO WITH 6" DROP FRONT, PROVIDE WITH STAINLESS STEEL CAP ON THRESHOLD, AND TWO 12" HIGH STAINLESS STEEL BACK SPLASH.
FAUCET: CHROME PLATED FINISH, 8" FIXED CENTERS, 5-3/4" RIGID SPOUT, 1/2" NPT FEMALE THREAD INLETS, 3/4" MALE HOSE THREAD, WALL BRACE, PAIL HOOK, 76" HIGH VACUUM BREAKER.
PROVIDE MOP HANGER, HOSE AND HOSE BRACKET.
- - SEE DRAWING SEE DRAWINGORD-1 OVERFLOW DRAIN ZURN Z100
15" DIAMETER, DURA-COATED CAST IRON BODY WITH COMBINATION MEMBRANE FLASHING CLAMP/GRAVEL GUARD AND LOW SILHOUETTE POLY-DOME, DEEP BOTTOM OUTLET, FLASHING CLAMP, GRAVEL STOP, UNDERDECK CLAMP, BEARING PAN, SEE DRAWING
FOR PIPE SIZE.
KOHLER
ZURN
CAMERTON K-12867
AQUA VANTAGE
Z60842AV-BWN
3/4" 3/4" 3" 1-1/2"
SINK: WALL-MOUNT SERVICE SINK, DEEP SQUARED BASIN, DIMENSIONS: 21-1/2" x 25", WHITE VITROUS CHINA, 1-1/2" TOP SPUD. BLOW-
OUT ACTION FLUSHING RIM.
FLUSH VALVE: CLINIC SINK FLUSH VALVE WITH BEDPAN WASHER ASSEMBLY AND SERVICE SINK FAUCET, DIAPHRAGM TYPE, POLISHED CHROME PLATED BRASS BODY, HIGH BACK PRESSURE VACUUM BREAKER, WALL BRACKET AND SUPPORT ROD, 4" VANDAL RESISTANT
BRASS WRIST BLADE COLOR-CODED HANDLES.
- - SEE DRAWING SEE DRAWINGRD-1 ROOF DRAIN ZURN Z100
15" DIAMETER, DURA-COATED CAST IRON BODY WITH COMBINATION MEMBRANE FLASHING CLAMP/GRAVEL GUARD AND LOW SILHOUETTE POLY-DOME, DEEP BOTTOM OUTLET, FLASHING CLAMP, GRAVEL STOP, UNDERDECK CLAMP, BEARING PAN, SEE DRAWING
FOR PIPE SIZE.
SK-4 SURGICAL SCRUB SINK STERIS STREAMLINE 1/2" 1/2" 1-1/2" 1-1/2"
SINK: SINGLE-BAY SCRUB STATION, THERMOFORMED HIGH-QUALITY KYDEX MATERIAL WITH BUILT-IN ANTIMICROBIAL PROTECTION, SEAMLESS LARGE COVERED BASIN, KNEE-ACTUATED HANDS-FREE WATER CONTROL, LAMINAR FLOW FAUCET HEAD, DIMENSIONS: 32" x 27-9/32" x 51-1/2", BUILT-IN THERMOSTATICALLY CONTROLLED MIXING VALVE.
- - 4" 2"FD-2
FLOOR DRAIN
(W/ FUNNEL)
ZURN
Z415
Z400E
FLOOR DRAIN, DURA-COATED CAST IRON BODY WITH BOTTOM OUTLET, COMBINATION INVERTIBLE MEMBRANE CLAMP AND ADJUSTABLE COLLAR WITH SEEPAGE SLOTS AND 7" DIAMETER TYPE E ROUND ADJUSTABLE STRAINER TOP WITH COMBINATION
FUNNEL/GRATE WITH PERIMETER OPENINGS.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4KEY PLANAREA A, ZONE 1
E1E2E3D4HOSPITALD1D2D5D3WD6D7
CLINICP-WC1C2P-E
A1A2A3B1A4B2
N
10/19/2022
PLUMBING - SCHEDULE EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
RAH TE
675-102
P701
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
Revisions: Date:
50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION MANUFACTURER MODEL
DOMESTIC
COLD WATER
DOMESTIC
HOT WATER
SANITARY VENT REMARKS
NOTES:
1. SIZES LISTED ARE MINIMUM CONNECTIONS REQUIRED TO FIXTURES.
SHOKTROL WATER HAMMER ARRESTOR, ALL STAINLESS STEEL CONTRUCTION, HERMETICALY SEALED BELLOWS TYPE. APPROVED
PDI, ANSI, AND ASSE. SIZE ARRESTOR PER FIXTURE UNITS.
WHA-1 WATER HAMMER ASSESTER ZURN Z1700 SEE DETAIL ON SHEET P502 SEE DETAIL ON SHEET P502 - -
WATER CLOSET: FLOOR MOUNTED, ELONGATED, REAR OUTLET, WHITE VITEROUS CHINA, 16-1/2" RIM HEIGHT, 1-1/2" TOP SPUD, 1.28
GPF, ADA COMPLIANT, DIRECT-FED SIPHON JET ACTION.
FLUSH VALVE: EXPOSED SENSOR FLUSH VALVE, BATTERY POWERED, BRUSHED NICKEL, SINGLE FLUSH, 1.28 GPF, 11-1/2" ROUGH-IN, 1"
I.P.S ANGLE STOP, VACUUM BREAKER.
SEAT: ENLONGATED, COMMERCIAL HEAVY DUTY PLASTIC TOILET SEAT, WHITE IN COLOR, OPEN FRONT LESS COVER, ANTI-MICROBIAL, 304 STAINLESS STEEL CHECK HINGE.
WC-1
WATER
CLOSET
FLUSH
VALVE
SEAT
AMERICAN
STANDARD
SLOAN
BEMIS
3695.001
8111 BT-1.28
1-1/2" - 4" 2"
WH-1 WALL HYDRANT ZURN Z1300 3/4" - - -
ENCASED FLUSH INSTALLATION, NON-FREEZE, ANTI-SIPHON, AUTOMATIC DRAINING. BRONZE CASING, ALL BRONZE INTERIOR PARTS, NON-TURNING OPERATING ROD WITH FREE-FLOATING COMPRESSION CLOSURE VALVE, 3/4' MALE HOSE THREAD, NICKEL BRONZE BOX AND HINGED COVER WITH OPERATING KEY LOCK AND "WATER" CAST ON COVER. ASSE 1019 APPROVED.
LAVATORY: WALL-HUNG, WHITE VITREOUS CHINA, FRONT OVERFLOW, D-SHAPED BOWL, CENTER HOLE ONLY, OVERALL DIMENSIONS 20-1/2" x 18-1/4".
FAUCET: DECK MOUNTED, SINGLE HOLE, DUAL BEAM INFRARED SENSOR, CONTEMPORARY-STYLE INTEGRAL SPOUT, 0.5 GPM, CHROME PLATED, VANDAL PROOF, NON-AERATING SPRAY OUTLET, LAMINAR FLOW INSERT, 6-VOLT BATTERY, STAINLESS STEEL HOSES, USER
ADJUSTABLE TEMPERATURE CONTROL MIXER, ADA COMPLIANT.
PROVIDE INSULATION PREMANUFACTURED FOR P-TRAP, STOP VALVE, ANS SUPPLY LINES. APPROVED ASME AND ANSI. ADA OFFSET OPEN GRID STRAINER. THERMOSTATIC MIXING VALVE, ALL BRONZE, BRASS AND STAINLESS STEEL CONSTRUCTION. UNION INLETS WITH STRAINERS AND CHECK STOPS, DIAL THERMOMETER ON OUTLET. PROVIDE CARRIER WITH CONCEALED ARMS.
SK-5
SINK
SINK TRIM
THERMOSTATIC MIXING VALVE
AMERICAN
STANDARD
CHICAGO FAUCETS
CHICAGO FAUCETS
0356.421
116.222.AB.1
131-CFMABRCF
1/2" 1/2" 1-1/2" 1-1/2"
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4KEY PLANAREA A, ZONE 1
E1E2E3D4HOSPITALD1D2D5D3WD6D7
CLINICP-WC1C2P-E
A1A2A3B1A4B2
N
10/19/2022
PLUMBING - SCHEDULE EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
RAH TE
675-102
P702
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
Revisions: Date:
SYMBOL VACUUM WAGD OXYGEN
MEDICAL
AIR
NITROUS
OXIDE
NITROGEN
CARBON
DIOXIDE
MEDICAL GAS FIXTURE ROUGH-IN SCHEDULE
MGO-1 3/4" - 1/2" 1/2" - -
NOTES:
1. SIZE OF VACUUM, MEDICAL AIR, AND OXYGEN IS THE FINAL VERTICAL DROP TO SINGLE OUTLET
SYMBOL DESCRIPTION
MEDICAL GAS SYMBOL LIST
VACUUM
SHUT-OFF VALVE
WASTE ANESTHETIC GAS DISPOSAL
CARBON DIOXIDE
NITROGEN
NITROUS OXIDE
OXYGEN
MEDICAL AIR
PRESSURE GAUGE
PRESSURE TRANSDUCER
VALVE BOX
PRESSURE RELIEF DEVICE
CONNECT TO EXISTING
LIMIT OF DEMOLITION
PIPE DOWN
PIPE UP
DEMO PIPING
PRESSURE RELIEF VALVE
BOTTOM CONNECTION
RISE OR DROP IN PIPE
MEDICAL GAS GENERAL NOTES
GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED HEREIN.
EQUIVALENCY SUBSTITUTIONS: THE "BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS" ARE TO BE FOLLOWED FOR ALL MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SPECIFIED AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE SPECIFIC BOD COMPLIANCE REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED.
1. THESE DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO DEFINE EXACT QUANTITIES. DRAWINGS SHALL NOT BE SCALED. THE MEDICAL GAS CONTRACTOR SHALL VERIFY QUANTITIES, SIZES, AND LOCATIONS OF ALL OUTLETS, ALARMS, PIPING, EQUIPMENT, ETC. PRIOR TO ANY CONSTRUCTION. ANY UNFORESEEN CONDITIONS OR EXISTING CONDITIONS NOT AS SHOWN SHALL BE CALLED TO THE IMMEDIATE ATTENTION OF THE VA/COR.
2. THE CONTRACTOR, BY VIRTUE OF COMPLETING THE WORK SHALL BE RESPONSIBLE FOR GUARANTEES THAT ALL INSTALLED SYSTEM WILL FUNCTION PROPERLY AS DESIGNATED BY HIS/HER ORIGINAL CONTRACT. IN THE CASE THAT DISCREPANCY BETWEEN SPECIFICATIONS AND CONTRACT DRAWINGS EXIST, THE MOST STRINGENT SHALL PREVAIL.
3. ALL MEDICAL GAS PIPING AND EQUIPMENT INSTALLATIONS SHALL BE IN STRICT ACCORDANCE WITH NFPA 99 & ASSE 6000.
4. PIPING AND EQUIPMENT LAYOUT ON DRAWINGS IS SCHEMATIC, EXACT LOCATIONS OF PIPING AND EQUIPMENT ARE TO
BE COORDINATED WITH BUILDING STRUCTURE AND WORK OF OTHER CONTRACTORS.
5. REFER TO ARCHITECTURAL ELEVATIONS FOR QUANTITY & MOUNTING LOCATION OF OUTLETS, VALVE BOXES, AND ALARM
PANEL.
6. SEE THE ARCHITECTURAL PLANS FOR A LEGEND OF WALL PARTITION TYPES. PROVIDE A UL RATED FIRESTOPPING ASSEMBLY TO MEET THE RATING OF THE WALLS REQUIRING SUCH. SEE DETAILS AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
7. RUN ALL MEDICAL GAS LINES LEVEL.
8. COORDINATE ALL EQUIPMENT DELIVERY, RIGGING, STORAGE, AND INSTALLATION WITH GENERAL CONTRACTOR &
BUILDING CONSTRUCTION CONDITIONS.
9. THESE PLANS HAVE ATTEMPTED TO SHOW CONNECTIONS FOR MEDICAL EQUIPMENT AND VA FURNISHED CONTRACTOR INSTALLED EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL COORDINATE ALL CONNECTIONS FOR MEDICAL EQUIPMENT AND VA FURNISHED AND CONTRACTOR INSTALLED EQUIPMENT, AND SHALL PROVIDE THESE
REQUIREMENTS IN THEIR SCOPE OF WORK, OR AS REQUIRED BY THE VA/COR.
10. IN THE EVENT OF INCONSISTENCY OR CONFLICT WITHIN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK, AND COMPLY WITH THE STRICTER REQUIREMENTS.
11. PRIOR TO FABRICATION OR INSTALLATION OF PIPING, THE MEDICAL GAS CONTRACTOR SHALL COORDINATE LOCATIONS & ELEVATIONS OF OTHER EQUIPMENT, INCLUDING, BUT NOT LIMITED TO LIGHT FIXTURES, DIFFUSERS, DUCTWORK, CONDUITS, PIPING, & CEILING GRID. OBTAIN SIGNATURES OF OTHER TRADES ON THE COORDINATION DRAWING.
12. ALL PIPING SHALL BE CONCEALED IN AREAS OF FINISHED CONSTRUCTION.
13. PROVIDE ACCESS PANELS AND DOORS FOR VALVES, EQUIPMENT AND OTHER ITEMS REQUIRING ACCESS THAT ARE CONCEALED BEHIND FINISHED SURFACES. COORDINATE THE LOCATIONS OF ACCESS PANELS AND ACCESS TO ALL
EQUIPMENT WITH THE VA/COR, PRIOR TO ROUGH-IN.
14. TESTING AND VERIFICATION SHALL BE DONE IN COMPLIANCE WITH NFPA 99 SECTION 5.1.12.2 AND 5.1.12.3 IN THE PRESENCE OF THE VA / COR. PRESSURE TEST ALL SYSTEMS IN STRICT ACCORDANCE WITH NFPA 99. THIRD PARTY CERTIFICATION OF SYSTEMS IS REQUIRED. VA / COR SHALL BE PROVIDED WITH DOCUMENTATION OF CONTRACTOR'S COMPLIANCE WITH NFPA 99. TEST PRESSURE TO BE 1.5 TIMES THE MAXIMUM WORKING PRESSURE, BUT IN NO CASE
LESS THAN:
A. OXYGEN 150 PSI
B. VACUUM 60 PSI
C. WAGD 60 PSI
D. MEDICAL AIR 150 PSI
E. NITROUS OXIDE 150 PSI
AREA ALARM PANEL
ZONE VALVE BOX
GAS MANIFOLD
NITROGEN CONTROL PANEL
MEDICAL VACUUM
MEDICAL AIR
OXYGEN
MA
O
MV
MV
MA
O
N2O
N
CO2
WAGD
CHECK VALVE (DIRECTION OF FLOW)
AAP
ZVB
GM
NCP
MEDICAL GAS MATERIAL LIST
FURNISH LABOR, MATERIAL, AND SERVICES NECESSARY TO COMPLETE THE MEDICAL GAS DISTRIBUTION SYSTEM TO PERFORM ALL REQUIRED PROGRESS AND FINAL TEST. MATERIAL USED SHALL BE NEW, OF THE BEST GRADE AND QUALITY AND IN STRICT ACCORDANCE WITH SPECIFICATION, EXCEPT WHERE NOTED. SHALL CONFORM TO THE PROVISIONS OF NFPA 99.
CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL APPLICABLE FEDERAL, STATE, LOCAL, AND
GOVERNING AUTHORITIES.
AREA ALARM PANEL
AREA ALARM PANEL- BOX SHALL BE CONSTRUCTED WITH 18 GAUGE STEEL, INDIVIDUAL MICROPROCESSOR FOR EACH DISPLAY AND SENSOR BOARD, EACH SIGNAL CONTAINS A GREEN LED INDICATOR FOR NORMAL AND A RED LED INDICATOR FOR ABNORMAL CONDITIONS. WHEN A FAULT OCCURS, THE GREEN LED TURNS OFF, THE RED LED ILLUMINATED AND THE AUDIBLE ALARM SOUNDS. THE RED LED FLASHES UNTIL THE FRONT PANEL ALARM MUTE BUTTON IS PRESSED. AFTER THE ALARM MUTE BUTTON IS PRESSED, THE RED LED REMAINS ILLUMINATED BUT DOES NOT FLASH. THE RED INDICATOR AUTOMATICALLY TURNS OFF AND THE GREEN LED ILLUMINATES WHEN FAULT IS CORRECTED. A TEST AND ALARM MUTE BUTTON SHALL BE EASILY ACCESSIBLE TO OPERATE AND TEST THE UNIT. ALL POWER WIRING TO THE ALARM PANEL AND SENSOR TO BE WIRED BY ELECTRICAL CONTRACTOR. ALL ALARM WIRING TO THE PANEL IS THE CONTRACTORS RESPONSIBILITY. INSTALLATION SHALL BE
PER MANUFACTURER'S RECOMMENDATIONS AND PROJECT REQUIREMENTS.
THE FOLLOWING MEDICAL GAS SHALL BE MONITORED:
OXYGEN
MEDICAL AIR
VACUUM
MANUFACTURER: BEACONMEDAES : "MEGA 3 MEDICAL GAS NOTIFICATION ALARM - AREA ALARM - M3-A10-OAV OR VA APPROVED
EQUAL.
AAP-1 OR VA APPROVED EQUIVALENT.
REFER TO SPECIFICATION 22 63 00 GAS
SYSTEMS FOR LAB AND HEALTHCARE
ZONE VALVE BOX
VALVE BOX- SHALL BE 18 GAUGE STEEL CONSTRUCTION WITH A BAKED WHITE ENAMEL FINISH. SHALL HOUSE SHUT-OFF BALL VALVES WITH TUBE EXTENSIONS, AN ALUMINUM FRAME AND PULL-OUT REMOVABLE WINDOW. VALVE SHALL BE OPERATED BY A LEVER-TYPE HANDLE REQUIRING ONLY A QUARTER TURN FROM A FULLY OPEN POSITION TO A FULLY CLOSED POSITION.
PROVIDE TWO ADJUSTABLE STEEL BRACKETS FOR THE PURPOSE OF MOUNTING THE BOX TO THE STRUCTURAL SUPPORT.
WINDOW SHALL BE MARKED TO PROHIBIT UNAUTHORIZED PERSONS FROM TAMPERING WITH THE VALVES WITH THE
FOLLOWING SILK-SCREEN CAUTION:
"MEDICAL GAS CONTROL VALVES CLOSE ONLY IN EMERGENCY"
INSTALLATION SHALL BE PER MANUFACTURER'S RECOMMENDATIONS AND PROJECT REQUIREMENTS.
THE FOLLOWING MEDICAL GAS SHALL BE MONITORED:
OXYGEN
MEDICAL AIR
VACUUM
MANUFACTURER: BEACONMEDAES ZONE VALVE BOX ASSEMBLY ZVB3-AAC-ENG OR VA APPROVED EQUAL.
ZVB-1 OR VA APPROVED EQUIVALENT.
REFER TO SPECIFICATION 22 63 00 GAS
SYSTEMS FOR LAB AND HEALTHCARE
MEDICAL GAS OUTLET
MEDICAL GAS OUTLET- DISS OUTLETS, WALL MOUNTED. PLATES CONSIST OF A STAINLESS STEEL INSERT SURROUNDED BY A SILVER METALLIC FINISH ABS HIGH IMPACT DECORATIVE TRIM. VALVE BODY O-RING, INLET TUBE WITH SECONDARY CHECK. GAS IDENTIFICATION POLYCARBONATE PLASTIC INSERT, COLOR CODED BY GAS. TYPE K COPPER INLET WITH 1/2" OD CONNECTION.
INSTALLATION SHALL BE PER MANUFACTURER'S RECOMMENDATIONS AND PROJECT REQUIREMENTS. MODULAR MEDICAL GAS
OUTLET
OXYGEN
MEDICAL AIR
VACUUM
SLIDE
MANUFACTURER: BEACONMEDAES SERIES B , MEDICAL GAS OUTLET, DISS KEY STYLE OR VA APPROVED EQUAL.
MGO-1
OR VA APPROVED EQUIVALENT.
REFER TO SPECIFICATION 22 63 00 GAS
SYSTEMS FOR LAB AND HEALTHCARE
MEDICAL GAS OUTLETMGO
ZVB-2
AAP-2
THROUGH PENETRANTS-ONE METALLIC PIPE, CONDUIT OR TUBING TO BE
INSTALLED WITHIN THE FIRESTOP SYSTEM. PIPE, CONDUIT OR TUBING TO BE
RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.
SEALANT-MIN 1/2" THICKNESS OF FILL MATERIAL APPLIED WITHIN THE
ANNULUS, FLUSH WITH THE TOP SURFACE OF FLOOR. AT THE POINT OF
CONTACT LOCATION BETWEEN PIPE AND CONCRETE, A MIN 1/2" DIAM BEAD OF
FILL MATERIAL SHALL BE APPLIED AT THE CONCRETE/PIPE INTERFACE ON THE
TOP SURFACE OF FLOOR AND ON BOTH SURFACES OF WALL.
OXYGEN
SLIDEBLANK
MOUNTING HEIGHT: 54" AFF, OR AS DIRECTED BY THE ARCHITECTURAL DRAWINGS
MED AIR VACUUM
360° GALVANIZED SHEET
METAL INSULATION
SHIELD AT U-BOLT.
U-BOLT
LOCKING NUT EACH
SIDE OF CHANNEL.
HIGH DENSITY PIPE
INSULATION
STEEL HANGER ROD
SUPPORTED FROM BUILDING
STRUCTURAL ELEMENTS.
STEEL CHANNEL OR
ANGLE IRON
ALL PIPING
THRU 1 1/2" DIA.
PACK VOID BETWEEN PIPE OR
INSULATION AND WALL WITH FIBERGLASS
BATT, THEN SEAL WITH A SILICONE
COMPOUND OR OTHER APPROVED
SEALANTS. IF WALL IS FIRE RATED, FILL
VOID BETWEEN PIPE OR INSULATION AND
WALL WITH FIRE BARRIER CAULK
CHROME PLATED OR STAINLESS
STEEL ESCUTCHEON PLATES BOTH
SIDES OF WALL IN EXPOSED AREAS.
PLATE SHALL BE SECURED WITH
WALL CLIPS OR MOUNTING SPRINGS
PROVIDE A MINIMUM OF 1/2"
CLEARANCE BETWEEN WALL
AND PIPE OR INSULATION
PIPE INSULATION
SEE DRAWINGS FOR PIPE
SIZE AND MATERIAL
NOTES:
1. I.D. OF WALL OPENING TO BE A MIN. OF 1/2" LARGER THAN O.D. OF PIPE OR INSULATION PASSING THROUGH WALL.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR WALL OPENINGS WITH OTHER TRADES AND / OR CONTRACTORS.
3. PIPE PENETRATIONS OF SMOKE OR FIRE WALLS SHALL BE IN COMPLIANCE WITH NFPA-90A.
FACE OF WALL
3/ 4"
M A
3/ 4"
M A
P
P
3/ 4"
O
1" V
AC
3/ 4"
O
1" V
AC
V
P
P
V
NORMAL HIGH LOW
NORMAL HIGH LOW
NORMAL HIGH LOW
TO OUTLETSFROM PIPING SYSTEM
VALVE BOX (ZVB-1)
AREA ALARM PANEL (AAP-1)
PRESSURE/VACUUM GAUGE (TYP.)
ISOLATION VALVE (TYP.)
PRESSURE
TRANSDUCER
ELECTRICAL CONTRACTOR TO PROVIDE CABLING.
CONTROLS CONTRACTOR TO ROUTE 22-GAUGE SHIELDED
TWISTED PAIR OF SIGNAL WIRING IN CONDUIT FROM
PRESSURE SENSOR TO AREA ALARM PANEL. (TYP.)
PRESSURE TRANSDUCER
NOTE: ZVB-2 & AAP-2, SIMILAR
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4KEY PLANAREA A, ZONE 1
E1E2E3D4HOSPITALD1D2D5D3WD6D7
CLINICP-WC1C2P-E
A1A2A3B1A4B2
N
10/19/2022
MEDICAL GAS - GENERAL NOTES, SYMBOLS
AND ABBREVIATIONS
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
RAH TE
675-102
MG001
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
NOT TO
SCALE
FIRE STOP - PIPE PLAN
NOT TO
SCALE
MEDICAL GAS OUTLET (MGO-1)
NOT TO
SCALE
PIPE HANGER DETAIL
NOT TO
SCALE
PIPE PENETRATION OF INTERIOR WALL
NOT TO
SCALE
ZONE VALVE BOX (ZVB-1) WITH ALARM PANEL (AAP-1) DIAGRAM
d. Friction loss in fittings as equivalent lengths: 1/2" = 1 ft ; 3/4" = 2 ft.
c. Friction loss designed for full flow (100% simultaneous use) for both rooms through entire pipe run.
b. Per ASPE, medical air is not required for the procedure room; however, it is included in this design since it is installed in the existing procedure room.
MV
Procedure Room
4A431 Fourth Floor Interstitial
Area 2 30 2 60 (c) 3/4" 0.099 343 9 (d) 361 0.357
MA
Procedure Room
4A431 Fourth Floor Interstitial
Area 2 30 2 (b) 60 (c) 1/2" 0.064 343 9 (d) 352 0.225
O Procedure Room
4A431 Fourth Floor Interstitial
Area 2 10 2 20 (c) 1/2" 0.011 343 9 (d) 352 0.039
Start End Flow Rate
(lpm per room) No. of
Outlets Total Flow Rate (lpm)
Pipe Size Loss per 100' Run (ft)
No. of 90° El Total Length (ft) Loss
a. Source: Beacon Medaes Detail 11.6.2, Pressure Gas Outlet Flows
4A321 Procedure Room Multi-service, Observation, Patient Room 1 - 1 10 (a) 100 30 10 30 10
4A334 Treatment Room Treatment Room 1 1 1 10 (a) 100 30 10 30 10
Room No. Room Name Occupancy O MA MV O (lpm) Simul. Use (%) MA (lpm) Simul. Use (%) MV (lpm) Simul. Use (%)
Inlet / Outlet Station Data Anticipated Peak Demands
ASPE Plumbing Engineering Design Handbook - Volume 3, Special Plumbing Systems
MEDICAL GAS SUMMARY
Revisions: Date:
50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
FEC
F E
C
F E
C
FEC
CK
C10
C12
C11
C9
C8 C7
C5
C4
C3
C2
C1
C13
C13.9 C14
C15 C16 C17
CB
CA
CB.6
CC
CD
CE
CF
CC.3
CG
CH
CJ
AAP-1
MGO-1
MGO-12
ZVB-13
LACTATION
ROOM
4A301
STORAGE
4A305
ELECTRICAL
CLOSET
4A307
TOILET
ROOM
4A315
SUPERVISOR
OFFICE
4A326
BREAK
ROOM
4A327
CORRIDOR
4AC07
CORRIDOR
4AC04
FILE
ALCOVE
4A300A
STAFF
TOILET
4A337
MED
ALCOVE
4AC07A
TOILET
ROOM
4A329
TOILET
ROOM
4A331
TOILET
ROOM
4A333
TOILET
ROOM
4A335
WEIGHING
ALCOVE
4AC04A
WEIGHING
ALCOVE
4AC04B
TOILET
ROOM
4A104
TOILET
ROOM
4A103
RECEPTION
4A102
CORRIDOR
4AC03
WAITING
AREA
4A101
CORRIDOR
4AC06
CORRIDOR
4AC03A
AAP-24
ZVB-2 3
CORRIDOR
4AC03
CONSULTATION
ROOM
4A309
CONSULTATION
ROOM
4A311
CONSULTATION
ROOM
4A313
EXAM
ROOM
4A317
EXAM
ROOM
4A319
TOILET
ROOM
4A322
PROCEDURE
ROOM
4A321
HAC
4A320
CLEAN
UTILITY
4A323
SOILED
UTILITY
4A324
SUPERVISOR
OFFICE
4A325 SUPERVISOR
OFFICE
4A326
MSA
SUPERVISOR
4A302
MATERNITY
/ WOMENS
HEALTH
OFFICE
4A303
WOMEN
VETERAN
PROGRAM
MANAGER
4A304
CONFERENCE
ROOM
4A306
EXAM
ROOM
4A328
EXAM
ROOM
4A330
EXAM
ROOM
4A332
TREATMENT
ROOM
4A334
CORRIDOR
4AC06
CORRIDOR
4AC06
EXAM
ROOM
4A316
EXAM
ROOM
4A318
CORRIDOR
4AC05
CORRIDOR
4AC05
STAFF /
TEAM
AREA
4A300
STAFF /
TEAM
AREA
4A300
EXAM
ROOM
4A308
EXAM
ROOM
4A310
EXAM
ROOM
4A312
STORAGE
ALCOVE
4AC05A
COMMUNICATIONS
ROOM
4A314
CORRIDOR
4AC03
1. FURNISH AND INSTALL NEW MEDICAL GAS OUTLETS AND MEDICAL VACUUM INLETS (MGO-1) WITH BACK BOXES, FACE PLATES AND ASSOCIATED PIPING. INSTALL PER MANUFACTURER'S INSTALLATION INSTRUCTION.
WHERE REQUIRED PROVIDE A BLANK FACE PLATE AND SLIDE PLATE FOR MEDICAL VACUUM BOTTLE. SEE
ARCHITECTURAL DRAWING ELEVATIONS FOR MOUNTING HEIGHTS.
2. ROUTE 1/2"O, 1/2"MA AND 3/4"MV DN TO MEDICAL GAS INLET/OUTLETS (MGO-1).
3. FURNISH AND INSTALL MEDICAL GAS ZONE VALVE BOX (ZVB-1 / ZVB-2) PER MANUFACTURER'S INSTALLATION
INSTRUCTIONS. INSTALL LABELS TO DENOTE THE ROOM OR AREA SERVED BY THE VALVE BOX.
4. FURNISH AND INSTALL MEDICAL GAS AREA ALARM PANEL (AAP-1 / AAP-2) PER MANUFACTUER'S INSTALLATION INSTRUCTIONS. INSTALL LABELS TO DENOTE THE ROOM OR AREA SERVED BY THE ALARM PANEL.
MEDICAL GAS KEYNOTESX
MEDICAL GAS GENERAL NOTES
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL MEDICAL GAS SERVICE OUTAGES.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE
PROCEEDING.
C. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
D. REFER TO MEDICAL GAS ROUGH-IN SCHEDULE FOR BRANCH CONNECTION TO FIXTURE.
E. INSTALL LOCKABLE ISOLATION VALVES AS SHOWN ON THE DRAWINGS AND REQUIRED BY CODE.
F. ACCESS SHALL BE PROVIDED SUCH THAT MEDICAL GAS COMPONENTS SHALL BE READILY SERVICEABLE, FOR ALL COMPONENTS THAT REQUIRE OPERATING, CLEANING, SERVICING, MAINTENANCE, AND
CALIBRRATION. SUCH COMPONENTS INCLUDES, BUT ARE NOT LIMITED TO MANUAL VALVES,
PRESSURE/VACUUM SWITCHES, AND ALARM PANELS.
G. ALL MEDICAL AIR AND OXYGEN PIPING TO BE 1/2” MINIMUM UNLESS OTHERWISE NOTED.
H. ALL VACUUM PIPING TO BE 3/4" MINIMUM UNLESS OTHERWISE NOTED.
I. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
J. COORDINATE THE LOCATION OF ZONE VALVE BOX, ALARM PANELS AND MEDICAL GAS INLET/OUTLET
PANELS WITH THE ARCHITECTURAL DRAWINGS.
PLAN LEGEND
AREA NOT IN CONTRACT
2 HOUR FIRE & SMOKE SEPARATION
1 HOUR FIRE & SMOKE SEPARATION
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4KEY PLANAREA A, ZONE 1
E1E2E3D4HOSPITALD1D2D5D3WD6D7
CLINICP-WC1C2P-E
A1A2A3B1A4B2
N
N KEY PLAN
10/19/2022
MEDICAL GAS - FLOOR PLAN, FOURTH
FLOOR
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
RAH TE
675-102
MG104
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
N
1/8" = 1'-0"
MEDICAL GAS - FLOOR PLAN, FOURTH FLOOR
0 4' 8' 16'
AREA OF WORK
Revisions: Date:
50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
F E
C
CK
C10
C12
C11
C9
C8 C7
C5
C4
C3
C2
C1
C13
C13.9 C14
C15 C16 C17
CB
CA
CB.6
CC
CD
CE
CF
CC.3
CG
CH
CJ
M G
IS
.2
M G
IS
.2
1/2" O
1/2" MA
3/4" MV
1" MV
1/2" MA
1/2" O
1/2" O
1/2" MA
1" MV
MEDICAL GAS GENERAL NOTES
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL MEDICAL GAS SERVICE OUTAGES.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE
PROCEEDING.
C. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
D. INSTALL LOCKABLE ISOLATION VALVES AS SHOWN ON THE DRAWINGS AND REQUIRED BY CODE.
E. ACCESS SHALL BE PROVIDED SUCH THAT MEDICAL GAS COMPONENTS SHALL BE READILY SERVICEABLE, FOR ALL COMPONENTS THAT REQUIRE OPERATING, CLEANING, SERVICING, MAINTENANCE, AND
CALIBRRATION. SUCH COMPONENTS INCLUDES, BUT ARE NOT LIMITED TO MANUAL VALVES,
PRESSURE/VACUUM SWITCHES, AND ALARM PANELS.
F. ALL MEDICAL AIR AND OXYGEN PIPING TO BE 1/2” MINIMUM UNLESS OTHERWISE NOTED.
G. ALL VACUUM PIPING TO BE 3/4" MINIMUM UNLESS OTHERWISE NOTED.
H. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
I. COORDINATE CONCRETE FLOOR SLAB AND REPLACEMENT WORK WITH ARCHITECTURAL AND
STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME REQUIRED THE NEW
FLOOR FINISHES.
J. COORDINATE THE LOCATION OF ZONE VALVE BOX, ALARM PANEL AND MEDICAL GAS INLET/OUTLET
PANELS WITH THE ARCHITECTURAL DRAWINGS.
1. ROUTE 1/2"O, 1/2"MA AND 3/4"MV DN TO ZONE VALVE BOX (ZVB-1 / ZVB-2).
2. ROUTE PIPING AS HIGH AS POSSIBLE TO AVOID INTERFERING WITH WAYFINDING EGRESS PATHWAY.
3. CONTINUATION OF MEDICAL GAS PIPING TO FOURTH FLOOR INTERSTITIAL, ZONE 2. REFER TO SHEET
MG104-I.2.
4. WAYFINDING EGRESS PATH, AVOID ROUTING PIPING THROUGH THIS AREA.
MEDICAL GAS KEYNOTESX
PLAN LEGEND
AREA NOT IN CONTRACT
2 HOUR FIRE & SMOKE SEPARATION
1 HOUR FIRE & SMOKE SEPARATION
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4KEY PLANAREA A, ZONE 1
E1E2E3D4HOSPITALD1D2D5D3WD6D7
CLINICP-WC1C2P-E
A1A2A3B1A4B2
N
N KEY PLAN
10/19/2022
MEDICAL GAS - FLOOR PLAN, FOURTH
FLOOR INTERSTITIAL - ZONE 1
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
RAH TE
675-102
MG104IS.1
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
N
1/8" = 1'-0"
MEDICAL GAS - FLOOR PLAN, FOURTH FLOOR INTERSTITIAL - ZONE 1
0 4' 8' 16'
AREA OF WORK
Revisions: Date:
50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
CK
C15
C16
C17
C18
C19
C20
C21
C22
C23 C24 C25 C26 C27 C28
CB
CA
CB.6
CC
CD
CE
CF
CC.3
CG
CH
CJ
(E) 3" MV DN
(E) 1" MA DN
(E) 1" O DN
1/2" O
1/2" MA
1" MV
(E) 1/2" O
(E) 1/2" MA
(E) 1" MV
(E) 1 1/2" MV
(E) 1/2" MA
(E) 1/2" O
M G
IS
.1
M G
IS
.1
MEDICAL GAS GENERAL NOTES
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL MEDICAL GAS SERVICE OUTAGES.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE
PROCEEDING.
C. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
D. INSTALL LOCKABLE ISOLATION VALVES AS SHOWN ON THE DRAWINGS AND REQUIRED BY CODE.
E. ACCESS SHALL BE PROVIDED SUCH THAT MEDICAL GAS COMPONENTS SHALL BE READILY SERVICEABLE, FOR ALL COMPONENTS THAT REQUIRE OPERATING, CLEANING, SERVICING, MAINTENANCE, AND
CALIBRRATION. SUCH COMPONENTS INCLUDES, BUT ARE NOT LIMITED TO MANUAL VALVES,
PRESSURE/VACUUM SWITCHES, AND ALARM PANELS.
F. ALL MEDICAL AIR AND OXYGEN PIPING TO BE 1/2” MINIMUM UNLESS OTHERWISE NOTED.
G. ALL VACUUM PIPING TO BE 3/4" MINIMUM UNLESS OTHERWISE NOTED.
H. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
I. COORDINATE CONCRETE FLOOR SLAB AND REPLACEMENT WORK WITH ARCHITECTURAL AND
STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME REQUIRED THE NEW
FLOOR FINISHES.
J. COORDINATE THE LOCATION OF ZONE VALVE BOX, ALARM PANEL AND MEDICAL GAS INLET/OUTLET
PANELS WITH THE ARCHITECTURAL DRAWINGS.
1. CONNECT NEW MEDICAL GAS PIPING TO EXISTING 1/2"O, 1/2"MA AND 1-1/2"MV.
2. EXISITING MEDICAL GAS PIPING DN TO SERVE THE FLOOR BELOW, PROTECT DURING CONSTRUCTION.
3. CONTINUATION OF MEDICAL GAS PIPING TO FOURTH FLOOR INTERSTITIAL, ZONE 1. REFER TO SHEET
MG104-I.1.
4. MEDICAL GAS RISERS, PROTECT DURING CONSTRUCTION.
MEDICAL GAS KEYNOTESX
PLAN LEGEND
AREA NOT IN CONTRACT
2 HOUR FIRE & SMOKE SEPARATION
1 HOUR FIRE & SMOKE SEPARATION
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4KEY PLANAREA A, ZONE 1
E1E2E3D4HOSPITALD1D2D5D3WD6D7
CLINICP-WC1C2P-E
A1A2A3B1A4B2
N
N KEY PLAN
10/19/2022
MEDICAL GAS - FLOOR PLAN, FOURTH
FLOOR INTERSTITIAL - ZONE 2
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
RAH TE
675-102
MG104IS.2
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
N
1/8" = 1'-0"
MEDICAL GAS - FLOOR PLAN, FOURTH FLOOR INTERSTITIAL - ZONE 2
0 4' 8' 16'
AREA OF WORK
Revisions: Date:
50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
ELECTRICAL GENERAL NOTES
NOTES:
1. ALL DIMENSIONS ARE CONSIDERED FROM FINISHED FLOOR AND, UNLESS NOTED OTHERWISE, SHALL NOT VARY. RAISED FLOORS SHALL BE
CONSIDERED FINISHED FLOOR.
2. ALL DIMENSIONS SHALL BE COORDINATED WITH ARCHITECTURAL DETAILS AND MAY BE ADJUSTED TO CONFORM WITH ARCHITECTURAL
REQUIREMENTS AS LONG AS NO CODE RESTRICTION IS VIOLATED.
3. OUTLETS INSTALLED LOWER THAN 15" AFF (FORWARD REACH) AND 9" AFF (SIDE REACH) ARE IN VIOLATION OF ADA.
AS NOTED ON DRAWINGS.
EXCEPTION: 44" MAXIMUM TO TOP ABOVE COUNTERS
16" TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .