Attachment 5 - Drawings - 675-102 - 43-86.pdf
PDF 20 MB Posted
- Solicitation number
- 36C77623B0044
About this file
This attachment provides construction drawings related to a federal contract opportunity issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks proposals to expand primary care facilities at Lake Nona (West) Project 675-102, as identified in solicitation number 36C77623B0044. Interested offerors should review the 20MB set of drawings for detailed specifications regarding minor construction requirements. Proposals are due by the dates outlined in the solicitation document in order to expand medical services for veterans at the specified VA location.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
J
J
J
J
J
J
J
J
J
J
C10
C12
C11
C9
C8 C7
C6
C5
C4
C3
C2
C1
C13
C13.9 C14
C15
CB
CA
CB.6
CC
CD
CE
CF
CC.3
CG
CH
CJ
CK
/1 AC104.1
/1 AC104.2
A C
4.
A C
4.
ELEC
4C102
COMM
4B102
WAITING
4B202
RECEPTION
4B204
CASE MNGR
4B205
MAS OFFICE
4B206
DIETICIAN
4C202
CASE MNGR
4B207
TRANS PAT
ADVO
4B209
AW2 LIAISON
4B211
STAFF LOUNGE
4B906
INFORMATIC
WORKROOM
4B905A
INFORMATIC
4B905
INFORMATICS
4B905C
TLT
4B208
INFORMATICS
OFFICE
4B905B
CORR
4BC02A
STORAGE
4A903A
COMPL
OFFICER
4A209
MGMT ANALYST
4A207
ELEC
4A202
TOILET
4A206
FOUNDATION
OFFICE
4A208
STUDY
COORDINATOR
4A210
P
INVESTIGATOR
4A212
P
INVESTIGATOR
4A214
ELEC
4A901
RESEARCH
OPEN OFFICE
4A903
CORR
4CC09
CORR
4BC02
ELEV LOBBY
4B101
CORR
4BC01
P
INVESTIGATOR
4A216
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
N KEY PLAN
LOCATION OF WORK
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - REFFLECTED CEILING
PLAN - 4TH FLOOR
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ LH
675-102
AC104
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
N
1/8" = 1'-0"
REFLECTED CEILING PLAN - 4TH FLOOR
0 4' 8' 16'
Revisions: Date:
50% DESIGN DEVELOPMENT SUBMITTAL 01/10/2022
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
95% CONSTRUCTION DOCUMENT SUBMITTAL 05/11/2022
100% FINAL SUBMISSION - ISSUE FOR BID 10/19/2022
J
J
J
AL
IG
N
C9C8C7C6C5C4C3C2C1
CF
CG
CH
CJ
CK
A301
/1 AC104.2
A401
A402
8' - 0"
A541
TYP.
A541
8' - 10"
A541
A541
1'
- 2
1'
- 2
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
N KEY PLAN
A
B
C
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - REFLECTED CEILING
PLAN - 4TH FLOOR - AREA A
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ LH
675-102
AC104.1
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
CEILING PLAN KEYNOTES
N
1/4" = 1'-0"
REFLECTED CEILING PLAN - 4TH FLOOR - AREA A
1 NEW CEILING EXPANSION JOINT. BASIS OF DESIGN: INPRO 811-A07-075.
2 PATCH EXISTING TILE CEILING TO MEET NEW CONSTRUCTION. MATCH GRID TO EXISTING
FINISH. INSTALL SALVAGED CEILING TILES TO MATCH EXISTING TILES.
3 NEW GYPSUM BOARD SOFFIT ALONG PERIMETER WALL. BOTTOM OF GYPSUM BOARD
SHALL BE 10'-4 1/2" AFF. COORDINATE WITH FIRE PROTECTION AND ELECTRICAL
DRAWINGS.
4 24" X 24" ACCESS PANEL IN GYPSUM BOARD CEILING.
5 SUN SHADE IN RECESSED CEILING POCKET.
6 NO CEILING. OPEN TO DECK ABOVE.
0 2' 4' 8'
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
J
J
J
C9C8C7C6C5C4C3C2C1
CB
CB.6
CC
CD
CE
CF
CC.3
A301
A301
/1 AC104.1
A C
4.
A311
A402
A404
A403
A403
3 3 3
A541
9' - 0"
10' - 0"
A541 8' - 11"
A541
A541
A312
1'
- 4
66 6
66 66 6
1/
2"
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
N KEY PLAN
A
B
C
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - REFLECTED CEILING
PLAN - 4TH FLOOR - AREA B
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ LH
675-102
AC104.2
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
CEILING PLAN KEYNOTES
N
1/4" = 1'-0"
REFLECTED CEILING PLAN - 4TH FLOOR - AREA B
1 NEW CEILING EXPANSION JOINT. BASIS OF DESIGN: INPRO 811-A07-075.
2 PATCH EXISTING TILE CEILING TO MEET NEW CONSTRUCTION. MATCH GRID TO EXISTING
FINISH. INSTALL SALVAGED CEILING TILES TO MATCH EXISTING TILES.
3 NEW GYPSUM BOARD SOFFIT ALONG PERIMETER WALL. BOTTOM OF GYPSUM BOARD
SHALL BE 10'-4 1/2" AFF. COORDINATE WITH FIRE PROTECTION AND ELECTRICAL
DRAWINGS.
4 NEW GYPSUM BOARD SOFFIT ALONG PERIMETER WALL. ALIGN BOTTOM OF SOFFIT WITH
TOP OF EXISTING ADJACENT WINDOW.
5 24" X 24" ACCESS PANEL IN GYPSUM BOARD CEILING.
6 SUN SHADE IN RECESSED CEILING POCKET.
7 NO CEILING. OPEN TO DECK ABOVE.
0 2' 4' 8'
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
J
C10 C12C11C9 C13
CB
CA
CB.6
CC
CD
CC.3
A C
4.
A541 9' - 0"
10' - 0"
A541
8' - 11"
10' - 0"
7' - 0"
V.I.F.
7' - 0"
V.I.F.2
A541
A541
A312
A312
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
N KEY PLAN
A
B
C
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - REFLECTED CEILING
PLAN - 4TH FLOOR - AREA C
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ LH
675-102
AC104.3
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
N
1/4" = 1'-0"
REFLECTED CEILING PLAN - 4TH FLOOR - AREA C
CEILING PLAN KEYNOTES
1 PATCH EXISTING TILE CEILING TO MEET NEW CONSTRUCTION. MATCH GRID TO EXISTING
FINISH. INSTALL SALVAGED CEILING TILES TO MATCH EXISTING TILES.
2 NEW GYPSUM BOARD SOFFIT ALONG PERIMETER WALL. ALIGN BOTTOM OF SOFFIT WITH
TOP OF EXISTING ADJACENT WINDOW.
3 ALIGN FRONT EDGE OF SOFFIT WITH INSIDE CORNER OF WALL.
4 24" X 24" ACCESS PANEL IN GYPSUM BOARD CEILING.
5 SUN SHADE IN RECESSED CEILING POCKET.
0 2' 4' 8'
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
C10
C12
C11
C9
C8 C7
C6
C5
C4
C3
C2
C1
CB
CA
CB.6
CC
CD
CE
CF
CC.3
CG
CH
CJ
CK
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - REFLECTED CEILING
PLAN - 4TH FLOOR INTERSTITAL
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
AC104IS
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
N
1/8" = 1'-0"
REFLECTED CEILING PLAN - 4TH FLOOR INTERSTITIAL
0 4' 8' 16'
Revisions: Date:
LEVEL 1
0"
LEVEL 2
20' - 8"
INTERSTITIAL 1
12' - 2"
INTERSTITIAL 2
32' - 10"
INTERSTITIAL 3
53' - 6"
INTERSTITIAL 4
74' - 2"
LEVEL 3
41' - 4"
LEVEL 4
62' - 0"
LEVEL 5
82' - 8"
C9 C8 C7 C6 C5 C4 C3 C2 C1
LEVEL 6
100' - 10"
A301
CW1CW1 CW1CW1 CW1CW1 CW2CW2 CW2CW2 CW1CW1
NEW CONSTRUCTION
EXISTING TO REMAIN
LEVEL 1
0"
LEVEL 2
20' - 8"
INTERSTITIAL 1
12' - 2"
INTERSTITIAL 2
32' - 10"
INTERSTITIAL 3
53' - 6"
INTERSTITIAL 4
74' - 2"
LEVEL 3
41' - 4"
LEVEL 4
62' - 0"
LEVEL 5
82' - 8"
C9C8C7C6C5C4C3C2C1
LEVEL 6
100' - 10"
A301
CW1CW1 CW1CW1 CW1CW1 CW1CW1 CW1CW1 CW1CW1
NEW CONSTRUCTION
EXISTING TO REMAIN
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - EXTERIOR ELEVATIONS EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A201
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
1/8" = 1'-0"
EXTERIOR ELEVATION - NORTH
1/8" = 1'-0"
EXTERIOR ELEVATION - SOUTH
0 4' 8' 16'0 4' 8' 16'
EXTERIOR ELEVATION KEYNOTES
1 EXISTING PRECAST CONCRETE PANELS TO REMAIN.
2 NEW PRECAST CONCRETE PANELS.
3 NEW PRECAST CONCRETE PARAPET WITH METAL COPING CAP.
4 EXISTING VERTICAL EXPANSION JOINT TO REMAIN.
5 NEW 4" VERTICAL EXPANSION JOINT. NEW JOINT TO ALIGN WITH EXISTING ADJACENT
JOINT BELOW. JOINT TYPE AND FINISH TO MATCH EXISTING.
6 REINSTALL SALVAGED INSULATED METAL PANELS ON EXISTING STEEL TUBE WALL
STRUCTURE.
7 EXISTING METAL COPING TO REMAIN.
8 EXISTING INSULATED METAL PANELS TO REMAIN.
1. REFER TO SHEET A512 FOR PRECAST PANEL REVEAL, JOINT, AND PROFILE INFORMATION.
SPECIFIC SHEET NOTES
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
LEVEL 1
0"
LEVEL 2
20' - 8"
INTERSTITIAL 1
12' - 2"
INTERSTITIAL 2
32' - 10"
INTERSTITIAL 3
53' - 6"
INTERSTITIAL 4
74' - 2"
LEVEL 3
41' - 4"
LEVEL 4
62' - 0"
LEVEL 5
82' - 8"
CB CACB.6CCCDCECF CC.3CGCHCJCK
LEVEL 6
100' - 10"
A301
CW1CW1 CW4 CW5 CW3 CW3 CW6 CW1CW1
A202
A202
SIM.
O.H.
NEW CONSTRUCTION
EXISTING TO REMAIN
LEVEL 5
82' - 8"
CBCB.6CCCDCECF CC.3CGCHCJCK
LEVEL 6
100' - 10"
A301
A312
A531
6 A531
O.H.
44 5
77 7
811 11
INTERSTITIAL 4
74' - 2"
LEVEL 4
62' - 0"
LEVEL 5
82' - 8"
CK
A531
V.
I.F
- 2
1" 1"
V.
I.F
- 2
1" 1"
A511
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - EXTERIOR ELEVATIONS EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A202
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
1/8" = 1'-0"
EXTERIOR ELEVATION - WEST
0 4' 8' 16'
1/8" = 1'-0"
EXTERIOR ELEVATION - WEST AT ROOF
1/4" = 1'-0"
PART. ELEV - CORNER PANEL
EXTERIOR ELEVATION KEYNOTES
1 EXISTING PRECAST CONCRETE PANELS TO REMAIN.
2 NEW PRECAST CONCRETE PANELS.
3 NEW PRECAST CONCRETE PARAPET WITH METAL COPING CAP.
4 REINSTALL SALVAGED INSULATED METAL PANELS ON EXISTING STEEL TUBE WALL
STRUCTURE.
5 NEW ROOF ACCESS DOOR. CUT INSULATED METAL PANELS AS REQUIRED TO CREATE
OPENING AROUND DOOR.
6 NEW METAL STAIR AND RAILING.
7 NEW ROOF EXPANSION JOINT - BASIS OF DESIGN: INPRO 651-A02-075.
8 METAL COPING EXPANSION TERMINATION AT EXISTING PRECASE CONCRETE PANEL.
9 NEW PRECAST CONCRETE CORNER PANEL INFILL AT BUILDING CORNER. PROVIDE
REVEALS MATCHING WITH ADJACENT EXISTING CORNER PANEL.
10 DASHED LINE INDICATES ADJACENT PRECAST CONCRETE PANEL ABUTTING EXPANSION
JOINT.
11 WALL HYDRANT, SEE PLUMBING DRAWINGS.
0 4' 8' 16'
0 4' 8' 16'
1. REFER TO SHEET A512 FOR PRECAST PANEL REVEAL, JOINT, AND PROFILE INFORMATION.
SPECIFIC SHEET NOTES
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
INTERSTITIAL 3
53' - 6"
INTERSTITIAL 4
74' - 2"
LEVEL 3
41' - 4"
LEVEL 4
62' - 0"
LEVEL 5
82' - 8"
C10C9C8C7C6C5C4C3C2C1
LEVEL 6
100' - 10"
A301
NEW CONSTRUCTION
EXISTING TO REMAIN
A311
A311
RF-1
INTERSTITIAL 3
53' - 6"
INTERSTITIAL 4
74' - 2"
LEVEL 3
41' - 4"
LEVEL 4
62' - 0"
LEVEL 5
82' - 8"
CBCB.6CCCDCECF CC.3CGCHCJ
A301
NEW CONSTRUCTION
EXISTING TO REMAIN
RF-1
EW-1
5 5
1'
- 0
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - BUILDING SECTIONS EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A301
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
1/8" = 1'-0"
BUILDING LONGITUDINAL SECTION
1/8" = 1'-0"
BUILDING CROSS SECTION
0 4' 8' 16'
0 4' 8' 16'
KEYNOTES
1 NEW 8" CONCRETE MECHANICAL PAD. PAINT ENTIRE PAD WITH (1) PRIME COAT AND (2)
FINISH COATS. FINISH COATS SHALL BE YELLOW IN COLOR. COORDINATE FINAL SIZE AND
LOCATION WITH MECHANICAL DRAWINGS.
2 NEW MECHANICAL UNIT. SEE MECHANICAL DRAWINGS.
3 REINSTALL SALVAGED INSULATED METAL PANELS ON EXISTING STEEL TUBE WALL
STRUCTURE.
4 10-1/2" DEEP ALUMINUM CURTAIN WALL SYSTEM - BASIS OF DESIGN: KAWNEER 1600UT
SYSTEM 1. SEE EXTERIOR ELEVATIONS AND A600 SERIES DRAWINGS FOR ADDITIONAL
INFORMATION.
5 PRECAST CONCRETE PARAPET.
6 NEW PRECAST CONCRETE PANEL.
7 EXISTING PRECAST CONCRETE PANEL TO REMAIN. CLEAN AND REMOVE ANY
PROTRUDING OBJECTS FROM THE EDGE OF THE PANEL TO PROVIDE A SMOOTH
SURFACE.
RF-1 ROOF ASSEMBLY: 5-1/2" CONCRETE SLAB ON METAL DECK, 5" POLYISOCYANURATE
INSULATION (R-25 MIN), TAPERED POLYISOCYANURATE INSULATION AS REQUIRED FOR
MIN 1/4" PER FOOT SLOPE, 1/4" COVERBOARD, TPO ROOFING MEMBRANE
BUILDING ASSEMBLIES
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
INTERSTITIAL 4
74' - 2"
LEVEL 4
62' - 0"
LEVEL 5
82' - 8"
C1
A511
A541
A511
EW-1
RF-1
INTERSTITIAL 4
74' - 2"
LEVEL 4
62' - 0"
LEVEL 5
82' - 8"
C8C7
LEVEL 6
100' - 10"
A531
A521
A521
A531
3 4 5
18RF-1
INTERSTITIAL 4
74' - 2"
LEVEL 4
62' - 0"
LEVEL 5
82' - 8"
C8C7
A531
A521
A521
- 5
7"
RF-1
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - WALL SECTIONS EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A311
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
3/4" = 1'-0"
WALL SECTION - TYPICAL AT WINDOW
3/4" = 1'-0"
WALL SECTION
3/4" = 1'-0"
WALL SECTION
0 2' 3'1'
WALL SECTION KEYNOTES
1 PROVIDE 2" CONCRETE TOPPING SLAB OVER EXISTING CONCRETE SLAB AND
STRUCTURE. TOP OF SLAB SHALL ALIGN WITH TOP OF EXISTING ADJACENT 4TH FLOOR
SLAB.
2 EXISTING CONCRETE SLAB AND STRUCTURE TO REMAIN.
3 5-1/2" CONCRETE FLOOR OVER METAL DECK. TOP OF CONCRETE SHALL MATCH EXISTING
ADJACENT INTERSTITIAL FLOOR SLAB. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL
INFORMATION.
4 3" FLOOR EXPANSION JOINT ATTACHED ON EXISTING BUILDING SIDE OF FLOOR - BASIS OF
DESIGN: INPRO 801-A01-075. PROVIDE 2-HOUR FIRE BARRIER FOR ENTIRE LENGTH OF
JOINT - BASIS OF DESIGN: INPRO FIRELINE 140.
5 EXISTING INTERSTITIAL CONCRETE FLOOR SLAB TO REMAIN.
6 2-HOUR FIRE BARRIER AT EXPANSION JOINT. BARRIER SHALL EXTEND FOR THE ENTIRE
LENGTH OF THE EXPANSION JOINT.
7 4" ROOF EXPANSION JOINT.
8 METAL STAIRS AND RAILINGS.
9 EXISTING STEEL TUBE WALL STRUCTURE TO REMAIN.
10 REINSTALL SALVAGED INSULATED METAL PANELS ON EXISTING STEEL TUBE WALL
STRUCTURE.
11 NEW PREFINISHED METAL COPING AT TOP OF METAL PANEL WALL. MATCH TYPE AND
FINISH WITH EXISTING ADJACENT COPING.
12 EXISTING ROOFING TO REMAIN. PATCH ROOFING TURNED UP WALL AS REQUIRED AT NEW
COPING.
13 EXISTING PRECAST CONCRETE PANEL TO REMAIN. CLEAN AND REMOVE ANY
PROTRUDING OBJECTS FROM THE EDGE OF THE PANEL TO PROVIDE A SMOOTH
SURFACE.
14 NEW PRECAST CONCRETE PANEL.
15 10-1/2" DEEP ALUMINUM CURTAIN WALL SYSTEM - BASIS OF DESIGN: KAWNEER 1600UT
SYSTEM 1. SEE EXTERIOR ELEVATIONS AND A600 SERIES DRAWINGS FOR ADDITIONAL
INFORMATION.
16 PRECAST CONCRETE PARAPET.
17 PREFINISHED METAL COPING.
18 TPO ROOF ON TAPERED INSULATION.
19 3" FLOOR EXPANSION JOINT - BASIS OF DESIGN: INPRO 733-A01-075. PROVIDE 2-HOUR
FIRE BARRIER ACROSS ENTIRE LENGTH OF JOINT - BASIS OF DESIGN: INPRO FIRELINE
140.
20 3" WALL EXPANSION JOINT BEYOND - BASIS OF DESIGN: INPRO 811-A07-075.
21 3" CEILING EXPANSION JOINT - BASIS OF DESIGN: INPRO 811-A07-075.
22 STRUCTURAL STEEL FRAMING. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL
INFORMATION. ALL NEW STRUCTURAL STEEL SHALL RECEIVE 2-HOUR MIN. SPRAY FIRE
PROOFING.
23 PAINT BOTTOM PORTION OF PRECAST PANEL WHERE YELLOW FLOOR EGRESS PATH
PASSES BELOW TO BRING AWARENESS TO LOW HEAD HEIGHT CLEARANCE. PAINT COLOR
SHALL MATCH YELLOW FLOOR PATH COLOR. WIDTH OF PAINTED PORTION SHALL MATCH
WIDTH OF FLOOR PAINT BELOW. PROVIDE PAINT 3" UP THE FRONT FACE OF BOTH SIDES
OF THE PANEL.
24 PROVIDE MINIMUM 1" SPRAY FIRE PROOFING APPLIED TO THE BOTTOM OF INTERSTITIAL
FLOOR PURLINS, TYPICAL ALL PURLINS.
RF-1 ROOF ASSEMBLY: 5-1/2" CONCRETE SLAB ON METAL DECK, 5" POLYISOCYANURATE
INSULATION (R-25 MIN), TAPERED POLYISOCYANURATE INSULATION AS REQUIRED FOR
MIN 1/4" PER FOOT SLOPE, 1/4" COVERBOARD, TPO ROOFING MEMBRANE
0 2' 3'1'0 2' 3'1'
BUILDING ASSEMBLIES
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
LEVEL 5
82' - 8"
C7
A531
RF-1
A601
A421
A421
A421
A421
INTERSTITIAL 4
74' - 2"
LEVEL 5
82' - 8"
C7
- 5
7"
B /O
E
XI
ST
IN
G P
RE
CA
ST
P
AN
EL
BEYOND
5'
- 4
" E
XP
AN
SI
O N
JO
IN
T
CO
VE
R
BEYOND
BEYOND
LEVEL 4
62' - 0"
A541
LEVEL 4
62' - 0"
A541
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - WALL SECTIONS EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A312
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
3/4" = 1'-0"
WALL SECTION - ROOF ACCESS DOOR
3/4" = 1'-0"
WALL SECTION
WALL SECTION KEYNOTES
1 METAL STAIRS AND RAILINGS.
2 NEW 6"X8"X1/2" STEEL ANGLE WELDED BETWEEN EXISTING STEEL TUBE WALL
STRUCTURE. PRIME AND PAINT AFTER INSTALLATION.
3 REINSTALL SALVAGED INSULATED METAL PANELS ON EXISTING STEEL TUBE WALL
STRUCTURE.
4 EXISTING STEEL TUBE WALL STRUCTURE TO REMAIN.
5 STRUCTURAL STEEL FRAMING. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL
INFORMATION. ALL NEW STRUCTURAL STEEL SHALL RECEIVE 2-HOUR MIN. SPRAY FIRE
PROOFING.
6 4" ROOF EXPANSION JOINT.
7 3" WALL EXPANSION JOINT ATTACHED ON EXISTING BUILDING SIDE OF WALL - BASIS OF
DESIGN: INPRO 801-A07-075. PROVIDE 2-HOUR FIRE BARRIER FOR ENTIRE LENGTH OF
JOINT - BASIS OF DESIGN: INPRO FIRELINE 140.
8 3" FLOOR EXPANSION JOINT ATTACHED ON EXISTING BUILDING SIDE OF FLOOR - BASIS OF
DESIGN: INPRO 801-A01-075. PROVIDE 2-HOUR FIRE BARRIER FOR ENTIRE LENGTH OF
JOINT - BASIS OF DESIGN: INPRO FIRELINE 140.
9 2-HOUR FIRE BARRIER AT EXPANSION JOINT. BARRIER SHALL EXTEND FOR THE ENTIRE
LENGTH OF THE EXPANSION JOINT.
10 EXISTING WINDOW SILL TO REMAIN.
11 EXISTING CURTAIN WALL SYSTEM
12 MANUALLY OPERATED WINDOW ROLLER SHADE. TYPE, COLOR, AND STYLE TO MATCH
EXISTING VA STANDARD.
13 SCHEDULED WALL BASE, SEE FINISH PLANS AND SCHEDULES
14 SCHEDULED FLOORING, SEE FINISH PLANS
15 COPING END TERMINATION. SEE SHEET A531 FOR DETAILS.
16 PROVIDE 2-HOUR FIRE BARRIER AT WALL EXPANSION JOINT. FIRE BARRIER AND
EXPANSION JOINT SHALL RUN VERTICALLY UP WALL, AROUND EXISTING CONSTRUCTION,
AND UP TO ROOF EXPANSION JOINT ABOVE. BASIS OF DESIGN: INPRO FIRELINE 140.
17 PROVIDE MINIMUM 1" SPRAY FIRE PROOFING APPLIED TO THE BOTTOM OF INTERSTITIAL
FLOOR PURLINS, TYPICAL ALL PURLINS.
18 EXISTING CONCRETE FLOOR AND STRUCTURE
RF-1 ROOF ASSEMBLY: 5-1/2" CONCRETE SLAB ON METAL DECK, 5" POLYISOCYANURATE
INSULATION (R-25 MIN), TAPERED POLYISOCYANURATE INSULATION AS REQUIRED FOR
MIN 1/4" PER FOOT SLOPE, 1/4" COVERBOARD, TPO ROOFING MEMBRANE
0 2' 3'1'0 2' 3'1'
BUILDING ASSEMBLIES
3/4" = 1'-0"
WALL SECTION
3/4" = 1'-0"
WALL SECTION
0 2' 3'1'0 2' 3'1'
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
ACOUSTICAL SEALANT, CONTINUOUS BOTH SIDES TOP AND BOTTOM
GYPSUM BOARD AS SCHEDULED BELOW
METAL STUD FRAMING
METAL RUNNER, CONTINUOUS
WALL BASE, BOTH SIDES - SEE FINISHED SCHEDULE.
LINE OF
CEILING
HEAD TRACK SYSTEM TO ACCOMMODATE DEFLECTION CRITERIA SHOWN ON
STRUCTURAL DRAWINGS
SOUND ATTENUATION BATT. INSULATION, U.N.O.
LINE OF FLOOR
SLAB
UNDERSIDE OF
FLOOR STRUCTURE
A
NON-RATED PARTITIONS
WALL TAG GYPSUM BOARD
STUD
WIDTH
PART.
WIDTH
FIRE
RATING
UL
LISTING REMARKS
A
-(1) LAYER 5/8" (TYPE-X), EACH SIDE NOT RATED -
STC
RATING
44 MIN.
FIRE RESISTIVE TRACK SEALANT, CONTINUOUS BOTH SIDES TOP AND BOTTOM
METAL STUD FRAMING
METAL RUNNER, CONTINUOUS
WALL BASE - SEE FINISHED SCHEDULE.
LINE OF
CEILING
FIRE RESISTIVE HEAD TRACK SYSTEM TO ACCOMMODATE DEFLECTION
CRITERIA SHOWN ON STRUCTURAL DRAWINGS
SOUND ATTENUATION BATT. INSULATION, U.N.O.
LINE OF FLOOR
SLAB
UNDERSIDE OF
FLOOR STRUCTURE
B
RATED PARTITIONS
WALL TAG GYPSUM BOARD
STUD
WIDTH
PART.
WIDTH
FIRE
RATING
UL
LISTING REMARKS
(1) LAYER 5/8" (TYPE-X), EACH SIDE 4-7/8"3-5/8"
B
-1 HR U419
STC
RATING
44 MIN.
GYPSUM BOARD AS SCHEDULED BELOW
PARTITION
WIDTH
PARTITION
WIDTH
ACOUSTICAL SEALANT, CONTINUOUS TOP AND BOTTOM
GYPSUM BOARD AS SCHEDULED BELOW
METAL STUD FRAMING
METAL RUNNER, CONTINUOUS
WALL BASE - SEE FINISHED SCHEDULE.
LINE OF
CEILING
HEAD TRACK SYSTEM TO ACCOMMODATE DEFLECTION CRITERIA SHOWN ON
STRUCTURAL DRAWINGS
SOUND ATTENUATION BATT. INSULATION, U.N.O.
LINE OF FLOOR
SLAB
UNDERSIDE OF
FLOOR STRUCTURE
NON-RATED FURRING PARTITIONS
WALL TAG GYPSUM BOARD
STUD
WIDTH
PART.
WIDTH
FIRE
RATING
UL
LISTING REMARKS
C
C (1) LAYER 5/8" (TYPE-X)
STC
RATING
--NOT RATED -
ACOUSTICAL SEALANT, CONTINUOUS BOTH SIDES TOP AND
BOTTOM
GYPSUM BOARD AS SCHEDULED BELOW
(2) ROWS OF METAL STUD FRAMING
METAL RUNNER, CONTINUOUS
WALL BASE, BOTH SIDES - SEE FINISHED SCHEDULE.
LINE OF
CEILING
HEAD TRACK SYSTEM TO ACCOMMODATE DEFLECTION CRITERIA
SHOWN ON STRUCTURAL DRAWINGS
SOUND ATTENUATION BATT. INSULATION, U.N.O.
LINE OF FLOOR
SLAB
UNDERSIDE OF
FLOOR STRUCTURE
D
NON-RATED CHASE PARTITION
WALL TAG GYPSUM BOARD
STUD
WIDTH
PART.
WIDTH
FIRE
RATING
UL
LISTING REMARKS
(1) LAYER 5/8" (TYPE-X), EACH SIDE 15-1/2"3-5/8"
D
-NOT RATED -
STC
RATING
METAL STUD BRACING @ 48" O.C. MAX VERTICALLY
FIRE RESISTIVE TRACK SEALANT, CONTINUOUS TOP
METAL C-H STUD FRAMING
METAL J-RUNNER, CONTINUOUS
WALL BASE - SEE FINISHED SCHEDULE.
LINE OF
CEILING
FIRE RESISTIVE HEAD TRACK SYSTEM TO ACCOMMODATE DEFLECTION
CRITERIA SHOWN ON STRUCTURAL DRAWINGS
SOUND ATTENUATION BATT. INSULATION, U.N.O.
LINE OF FLOOR
SLAB
UNDERSIDE OF
FLOOR STRUCTURE
E
RATED SHAFT PARTITIONS
WALL TAG GYPSUM BOARD
STUD
WIDTH
PART.
WIDTH
FIRE
RATING
UL
LISTING REMARKS
(1) LAYER 5/8" (TYPE-X)
5-1/4"4"
E
4-5/8"4"
E1 (2) LAYERS 5/8" (TYPE-X) 2 HR
U415 SYST.
B
STC
RATING
1 HR
U415 SYST.
A -
GYPSUM BOARD AS SCHEDULED BELOW
PARTITION
WIDTH
HOLD
WIDTH
7"
SE
CT
IO
N
VI
EW
PL
AN
V
IE
W
SE
CT
IO
N
VI
EW
(1) LAYER 1" THICK TYPE X GYPSUM BOARD SHAFT LINER FRICTION FIT INTO SHAFT
WALL SIDE OF C-H STUDS, EXTEND TO UNDERSIDE OF STRUCTURE ABOVE
SE
CT
IO
N
VI
EW
PL
AN
V
IE
W
SE
CT
IO
N
VI
EW
SE
CT
IO
N
VI
EW
PL
AN
V
IE
W
SE
CT
IO
N
VI
EW
HOLD WIDTH
PARTITION WIDTH
PARTITION
WIDTH
SE
CT
IO
N
VI
EW
PL
AN
V
IE
W
SE
CT
IO
N
VI
EW
SE
CT
IO
N
VI
EW
PL
AN
V
IE
W
SE
CT
IO
N
VI
EW
4-7/8"3-5/8"
C1 (1) LAYER 5/8" (TYPE-X) --4-1/4"3-5/8" NOT RATED -
3-1/8"2-1/2"
PARTITION TYPES NOTES
GENERAL NOTES
1. REFER TO HEAD CONDITION DETAILS THIS SHEET FOR ADDITIONAL NOTES ON TOP OF WALL CONDITIONS.
GYPSUM BOARD
1. PROVIDE CEMENTITIOUS BACKER BOARD INSTEAD OF GYPSUM BOARD AT ALL WALLS TO RECEIVE TILE.
2. PROVIDE CEMENTITIOUS BACKER BOARD INSTEAD OF GYPSUM BOARD IN ALL WET LOCATIONS, INCLUDING BUT NOT LIMITED TO TOILET
ROOMS AND HAC ROOMS.
3. GYPSUM BOARD SHALL EXTEND TO UNDERSIDE OF STRUCTURE ABOVE, U.N.O.
4. ALL PARTITION FACES THAT FACE THE CORRIDOR ARE TO HAVE "MOLD TOUGH GYP" OR EQUAL TO 4' A.F.F.
METAL STUDS
1. METAL STUD FRAMING SHALL BE 18-20 GAUGE, U.N.O.
2. METAL STUD FRAMING SHALL BE SPACED AT 16" O.C., U.N.O.
3. METAL STUD FRAMING SHALL EXTEND TO UNDERSIDE OF STRUCTURE ABOVE, U.N.O.
METAL RUNNERS AND HEAD TRACKS
1. SECURE METAL RUNNERS AND HEAD TRACKS TO SLAB BELOW/ABOVE AT 24" O.C., U.N.O.
-D1 (1) LAYER 5/8" (TYPE-X), EACH SIDE 17-1/2"3-5/8" -NOT RATED - -9"
C2 (1) LAYER 5/8" (TYPE-X) --1-1/2"
7/8" HAT
CHANNEL NOT RATED -
A1 -(1) LAYER 5/8" (TYPE-X), EACH SIDE NOT RATED - 44 MIN.7-1/4"6"
FIRE RESISTIVE SEALANT, CONTINUOUS ALONG BOTTOM
FIRE RESISTIVE SEALANT, CONTINUOUS ALONG BOTTOM
CONTINUOUS RUNNER AT BOTH TOP
AND BOTTOM.
METAL DECK
STEEL STRAPS FASTEN AT 24" OC.
SLOTTED CEILING RUNNER FASTENED TO
STRAPS. DO NOT SCREW GYP. BD. TO SLOTTED
CEILING RUNNER.
COMPRESSIBLE FILLER
TYPES AND LOCATIONS
SEE PLAN FOR PART.
ACOUSTICAL OR FIRESTOP TOP TRACK SEAL,
REFER TO PARTITION TYPE.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
10/19/2022
ARCHITECTURAL - PARTITION TYPES EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ/PK LH / RB
675-102
A321
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
3" = 1'-0"
PARTITION HEAD DETAIL
Revisions: Date:
25% SCHEMATIC DESIGN SUBMITTAL 11/04/2021
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
F
S
WAP
D
C2C1
CH
CJ
PROCEDURE
ROOM
4A321
TOILET ROOM
4A322
A401
A401
M8810
F0205
P6990
M3070
M9025
F0340
E0948
M7401
M4116
M4200
M0765
M0755
M4100
A1132
M0750
F2010
A5106
A1012M1803
M1801M1801
F2000
A5077
A5075
A1067
A5082
A5109.B
A5090
A5202 A5109.C
A5109.A
U3070
U020
E0915
A5180
CLEAR OPENING
3' - 4 3/4"
WP-6
M8810 M7401 M4116 M1803
WP-6 WP-6 WP-6 WP-6
A1012
M4200
M0765
M0755
M0750
M4100
A1132
VB-1
WP-2WP-6VB-1U3070
A5106
E0948 F2010
F3200E0915
4'
- 0
" T
YP
WP-2VB-1WP-6
F3200 A5180 1 4'
- 0 " T
YP
F3025 A5082
P6990
M3070
F0205
M8810
A5075
A5077
VB-1 WP-6
M0512
C2C1
CH
CJ
M7470
A5180
F3200
10"
M0512
R 5' - 0"
U1200
1'
- 2
2' - 1"
A1067
A5075
A5077
A5109.B
A5109.A
A1067
A5082
A5109.C
A5109.A
A5202 A5090 F2000 F2000
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - ENLARGED ROOMS AND
INTERIOR ELEVATIONS
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A401
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
N
1/2" = 1'-0"
ENL. PLAN - PROCEDURE/TLT ROOM 4A321/4A322
1/2" = 1'-0"
PROCEDURE ROOM 4A321 - NORTH
1/2" = 1'-0"
PROCEDURE ROOM 4A321 - EAST
1/2" = 1'-0"
PROCEDURE ROOM 4A321 - SOUTH
1/2" = 1'-0"
PROCEDURE ROOM 4A321 - WEST
N
1/2" = 1'-0"
ENL. RCP - PROCEDURE/TLT ROOM 4A321/4A322
1/2" = 1'-0"
TOILET ROOM 4A322 - NORTH
1/2" = 1'-0"
TOILET ROOM 4A322 - EAST
1/2" = 1'-0"
TOILET ROOM 4A322 - SOUTH
1/2" = 1'-0"
TOILET ROOM 4A322 - WEST
1. REFER TO AQ600 SERIES SHEETS FOR EQUIPMENT SCHEDULES AND INFORMATION.
ENLARGED PLAN SHEET NOTES
SHEET KEYNOTES
1 PATIENT LIFT TRACK SYSTEM, SEE RCP. PROVIDE DOOR FRAME TO ACCOMMODATE
TRACK ROUTE, SEE DOOR AND FRAME SCHEDULE FOR ADDITIONAL INFORMATION.
2 WALL-MOUNTED SINK, SEE PLUMBING DRAWINGS.
3 FLOOR-MOUNTED TOILET, SEE PLUMBING DRAWINGS.
4 18"X18" WALL ACCESS PANEL. ALIGN AS MANY EDGES AS POSSIBLE TO TILE LINES.
COORDINATE EXACT LOCATION WITH PLUMBING.
5 24"X24" CEILING ACCESS PANEL. COORDINATE EXACT LOCATION WITH UTILITIES ACCESS
ABOVE CEILING.
INTERIOR ELEVATION SHEET NOTES
1. REFER TO SHEET A561 FOR WALL PROTECTION (WP) DETAIL INFORMATION.
2. REFER TO AF600 SERIES SHEETS FOR FINISH LEGENDS AND SCHEDULES.
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4' 0 1' 2' 4' 0 1' 2' 4' 0 1' 2' 4'
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
OS
D
C2C1
CE
A301
A402
CONSULTATION
ROOM
4A311
M1840
F0420
U3612
F0740 F0205
F0205
F0280
E0042
M1801
A1015
U030
U041
U020
U0810
VB-1WP-2
4'
- 0
" T
YP
F0205 F0740 F0205
VB-1 WP-2
F0420
M1840
4'
- 0
" T
YP
U3612 U3612F0420
M1840
2'
- 1
0"
2"3' - 0"3' - 10"
VB-1 F0205
A5077
A5082
A5075 U030
U0810
A551
2'
- 9
VB-1
4'
- 0
" T
YP
F0205 WP-2 F0740
C2C1
CG
A402
EXAM ROOM
4A319
F0205
F0340
M9025
M4116
A1012
F2310 A5415A5415M1803
M1801M1801
U3070
A5106
F2010 M4200
A1132
M4100
A5180
U0810
U030
U0810
C2C1
CG
6"
CE
NT
ER
O
F
CU
RT
AI
N
TR
AC
K
5'
- 6
A5180
C2C1
CE
6"
A5075
A5082
A5077
U030
U0810
F0340 U3070 F2010
A5106 M4100 M4200 A1132
M9025 M7401VB-1
2'
- 9
VB-1
F3200 A5180
WP-2
4'
- 0
" T
YP
A1012
M7401
M4116M9025
VB-1
F3025 M1801M1801
F2310
F0205
WP-2
4'
- 0
" T
YP
A5415A5415
F0205 F0340VB-1
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - ENLARGED ROOMS AND
INTERIOR ELEVATIONS
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A402
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
N
1/2" = 1'-0"
ENLARGED PLAN - CONSULTATION ROOM
1/2" = 1'-0"
CONSULTATION ROOM 4A311 - NORTH
1/2" = 1'-0"
CONSULTATION ROOM 4A311 - EAST
1/2" = 1'-0"
CONSULTATION ROOM 4A311 - SOUTH
1/2" = 1'-0"
CONSULTATION ROOM 4A311 - WEST
N
1/2" = 1'-0"
ENLARGED PLAN - EXAM ROOM (TYPE 1)
N
1/2" = 1'-0"
ENLARGED RCP - EXAM ROOM (TYPE 1)
N
1/2" = 1'-0"
ENLARGED RCP - CONSULTATION ROOM
1/2" = 1'-0"
EXAM ROOM 4A319 - NORTH
1/2" = 1'-0"
EXAM ROOM 4A319 - EAST
1/2" = 1'-0"
EXAM ROOM 4A319 - SOUTH
1/2" = 1'-0"
EXAM ROOM 4A319 - WEST
EXAM ROOM (TYPE 1) SHALL BE REFERENCED FOR THE FOLLOWING ROOMS:
4A317 (O.H.), 4A319
CONSULTATION ROOM SHALL BE REFERENCED FOR THE FOLLOWING ROOMS:
4A309 (O.H.), 4A311, 4A313
1. REFER TO AQ600 SERIES SHEETS FOR EQUIPMENT SCHEDULES AND INFORMATION.
ENLARGED PLAN SHEET NOTES
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
C6
CD
CC.3
A403
TREATMENT
ROOM
4A334
E0948
F0340
M4655
F0205
F2310M1803
M1801M1801
A5415A5415
U3070
U020
A5106
F2010
M4116
A1012
M0750M0755
M0765
A1132
M7401
M4200M4100
A5180
A5180
U0810
C3
CD
A403
EXAM ROOM
4A310
F0205A5415A5415 M1803
M1801M1801
F2310
F0340
M9025
A1012
M4116
M7401
M4200
A1132
M4100
A5106
F2010
U020
U3070
U0810
C3
CD
CE
NT
ER
O
F
CU
RT
AI
N
TR
AC
K
5'
- 6
C6
CD
CC.3
A5180
A5180
U1200
F3025 M1801M1801
A5415A5415
F0205 M1803 F2310
WP-2
VB-1
4'
- 0
" T
YP
F0340 U3070
VB-1
WP-2
4'
- 0
" T
YP
A5180
U3070
A5077
A5082
U030 A5075 A5106
U0810F0340 F2010 M9025
M4116
M7401
A1132 M4100 M4200
F3200
VB-1
2'
- 9
M7401
M9025
M4116 A1012
F3200
VB-1
A5180
F3025 M1801M1801
M1803
F2310
F0205
WP-2 VB-1
4'
- 0
" T
YP
F2310
A5415A5415
F0205
M7401
F3200
A1012 M4116VB-1
M7401
M4116
F3200
U1200 A5106 A5075
A5077
A5082
U030
U3070U0810F0340F2010
M4655
M4100
M4200
A1132
M0765
M0755
M0750
VB-1
2'
- 9
E0948U3070
VB-1
WP-24'
- 0
" T
YP
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - ENLARGED ROOMS AND
INTERIOR ELEVATIONS
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A403
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
N
1/2" = 1'-0"
ENLARGED PLAN - TREATMENT ROOM 4A334
N
1/2" = 1'-0"
ENLARGED PLAN - EXAM ROOM (TYPE 2)
N
1/2" = 1'-0"
ENLARGED RCP - EXAM ROOM (TYPE 2)
N
1/2" = 1'-0"
ENLARGED RCP - TREATMENT ROOM 4A334
1/2" = 1'-0"
EXAM ROOM 4A310 - NORTH
1/2" = 1'-0"
EXAM ROOM 4A310 - EAST
1/2" = 1'-0"
EXAM ROOM 4A310 - SOUTH
1/2" = 1'-0"
EXAM ROOM 4A310 - WEST
1/2" = 1'-0"
TREATMENT ROOM 4A334 - NORTH
1/2" = 1'-0"
TREATMENT ROOM 4A334 - EAST
1/2" = 1'-0"
TREATMENT ROOM 4A334 - SOUTH
1/2" = 1'-0"
TREATMENT ROOM 4A334 - WEST
EXAM ROOM (TYPE 2) SHALL BE REFERENCED FOR THE FOLLOWING ROOMS:
4A308 (SIM), 4A310. 4A312, 4A316, 4A318
1. REFER TO AQ600 SERIES SHEETS FOR EQUIPMENT SCHEDULES AND INFORMATION.
ENLARGED PLAN SHEET NOTES
SHEET KEYNOTES
1 PATIENT LIFT TRACK SYSTEM, SEE RCP.
INTERIOR ELEVATION SHEET NOTES
1. REFER TO SHEET A561 FOR WALL PROTECTION (WP) DETAIL INFORMATION.
2. REFER TO AF600 SERIES SHEETS FOR FINISH LEGENDS AND SCHEDULES.
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
1 PATIENT LIFT TRACK SYSTEM, SEE RCP.
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
S
S
OS
C6
CD
CE
A301
A4043
EXAM ROOM
4A332
TOILET ROOM
4A333
TOILET ROOM
4A335
A4047
A5415A5415
F0205 F2310 M1803
M1801M1801
M4116
A1012
M9025
F0340
M4100
M7401
A1132
M4200 A5106
F2010 U3070
U020
A5109.C
A5202
A5109.A
A5090
A5109.B
A5082
F2000
A1067
A5075
A5077
A5109.B
A5090
A5109.A
A5202
A5109.C
A404 7
A5082
F2000
A1067
A5075
A5077
A5180
U0810
A5106 U030
A5077
A5082
A5075
U3070
U020
F0340F2010M9025
M4116
M7401
F3200
M4200 M4100 A1132
VB-1 U0810
2'
- 9
WP-2
VB-1
F3025 M1801M1801
M1803 F0205
F2310
4'
- 0
" T
YP
VB-1A5180F0340
VB-1
F3200A5180
M7401
M9025
M4116
F0205
F2310
A5415A5415
A1012
C6
CD
CE
A5180
CE
NT
ER
O
F
CU
RT
AI
N
TR
AC
K
5'
- 6
A1067
A5075
A5077
A5202A5090
A5109.C
A5109.A
A5109.B
A5109.A
A5082
A1067
F2000
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - ENLARGED ROOMS AND
INTERIOR ELEVATIONS
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A404
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
N
1/2" = 1'-0"
ENLARGED PLAN - EXAM / TLT ROOM (TYPE 3)
1/2" = 1'-0"
EXAM ROOM 4A332 - NORTH
1/2" = 1'-0"
EXAM ROOM 4A332 - SOUTH
1/2" = 1'-0"
EXAM ROOM 4A332 - EAST
1/2" = 1'-0"
EXAM ROOM 4A332 - WEST
N
1/2" = 1'-0"
ENLARGED RCP - EXAM / TLT ROOM (TYPE 3)
1/2" = 1'-0"
TOILET ROOM 4A333 - NORTH
1/2" = 1'-0"
TOILET ROOM 4A333 - EAST
1/2" = 1'-0"
TOILET ROOM 4A333 - SOUTH
1/2" = 1'-0"
TOILET ROOM 4A333 - WEST
EXAM ROOM (TYPE 1) SHALL BE REFERENCED FOR THE FOLLOWING ROOMS:
4A328, 4A330, 4A332
1. REFER TO AQ600 SERIES SHEETS FOR EQUIPMENT SCHEDULES AND INFORMATION.
ENLARGED PLAN SHEET NOTES
SHEET KEYNOTES
1 24"X24" CEILING ACCESS PANEL. COORDINATE EXACT LOCATION WITH UTILITIES ACCESS
ABOVE CEILING.
2 FLOOR-MOUNTED TOILET, SEE PLUMBING DRAWINGS.
3 WALL-MOUNTED SINK, SEE PLUMBING DRAWINGS.
4 18"X18" WALL ACCESS PANEL. ALIGN AS MANY EDGES AS POSSIBLE TO TILE LINES.
COORDINATE EXACT LOCATION WITH PLUMBING.
INTERIOR ELEVATION SHEET NOTES
1. REFER TO SHEET A561 FOR WALL PROTECTION (WP) DETAIL INFORMATION.
2. REFER TO AF600 SERIES SHEETS FOR FINISH LEGENDS AND SCHEDULES.
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4' 0 1' 2' 4'
0 1' 2' 4' 0 1' 2' 4'
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
C3
CF
A405
STAFF TOILET
4A337
F2000 A5415
A5109.B
A5082
A5109.C
A5202
A5109.A
A5090
A1067
A5075
A5077
C2C1
CF
TOILET ROOM
4A315
A405
1' - 1" 1' - 8"
A5415 A4995
A5109.C
A5202
A5109.A
A5090
A5082
F2000
A5109.B
A1067
A5075
A5077
C10
CC
CD
CC.3
TOILET ROOM
4A104
TOILET ROOM
4A103
A405
A405
O.H.
SIM
O.H.O.H.
SIM, O.H.
A5415 A4995
A5109.C
A5202
A5109.A
A5090
A5109.B
A5082
F2000
A1067
A5075
A5077
A5415 A4995
A5109.C
A5202
A5109.A
A5090
A5082
F2000 A5109.B
A1067
A5075
A5077
7'
- 8
9'
- 1
/2
F2000
A5082
A1067
A5109.A
A5109.B
A5202 A5090
A5109.C
A5109.A
A4995
A5415
A5077
A5075
A1067
A5082
A1067
F2000
A5109.B
A5109.A
A1067
A5075
A5077
A4995
A5415
A5109.C
A5109.A
A5090 A5202
F2000
A5415
A5077
A5075
A1067
A5082
A1067
A5109.B
A5109.A
A5109.C
A5109.A
A5090A5202 F2000
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - ENLARGED ROOMS AND
INTERIOR ELEVATIONS
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A405
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
N
1/2" = 1'-0"
ENL. PLAN - TLT 4A337
N
1/2" = 1'-0"
ENL. PLAN - TLT 4A315
N
1/2" = 1'-0"
ENL. PLAN - TLTS 4A103 AND 4A104
1/2" = 1'-0"
TOILET ROOM 4A103 - NORTH
1/2" = 1'-0"
TOILET ROOM 4A103 - EAST
1/2" = 1'-0"
TOILET ROOM 4A103 - SOUTH
1/2" = 1'-0"
TOILET ROOM 4A103 - WEST
1/2" = 1'-0"
TOILET ROOM 4A315 - NORTH
1/2" = 1'-0"
TOILET ROOM 4A315 - EAST
1/2" = 1'-0"
TOILET ROOM 4A315 - SOUTH
1/2" = 1'-0"
TOILET ROOM 4A315 - WEST
1/2" = 1'-0"
STAFF TOILET 4A337 - NORTH
1/2" = 1'-0"
STAFF TOILET 4A337 - EAST
1/2" = 1'-0"
STAFF TOILET 4A337 - SOUTH
1/2" = 1'-0"
STAFF TOILET 4A337 - WEST
1. REFER TO AQ600 SERIES SHEETS FOR EQUIPMENT SCHEDULES AND INFORMATION.
ENLARGED PLAN SHEET NOTES
SHEET KEYNOTES
1 FLOOR-MOUNTED TOILET, SEE PLUMBING DRAWINGS.
2 WALL-MOUNTED SINK, SEE PLUMBING DRAWINGS.
3 18"X18" WALL ACCESS PANEL. ALIGN AS MANY EDGES AS POSSIBLE TO TILE LINES.
COORDINATE EXACT LOCATION WITH PLUMBING.
INTERIOR ELEVATION SHEET NOTES
1. REFER TO SHEET A561 FOR WALL PROTECTION (WP) DETAIL INFORMATION.
2. REFER TO AF600 SERIES SHEETS FOR FINISH LEGENDS AND SCHEDULES.
0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
OPEN TO
BEYOND
OPEN TO
BEYOND
WP-4 WP-6WP-5WP-7WP-7WP-6WP-4WP-5 WP-3 WP-3WP-6 VB-1VB-1
M4020M4020M4020M4020
WP-6
2'
- 1
0" T
YP
4'
- 0
" T
YP
OPEN TO
BEYOND
WP-5WP-4WP-3VB-1WP-6 WP-4 WP-5 WP-3 WP-4 3 WP-4 WP-5 WP-3 VB-1 3
2'
- 1
0" T
YP
VB-1 WP-5WP-4
1 1 111
4'
- 0
" T
YP
VB-1VB-1
1 1 1 1 1 1 1
EQ EQ
2VB-1
OPEN TO
BEYOND
OPEN TO
BEYOND
VB-1 WP-7 WP-6 WP-7 WP-6 VB-1 WP-61
A551
E0948 E0948 M3150
R6200
A5106
F2010
A5082
A5077
A5075
WP-6
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - INTERIOR ELEVATIONS -
CORRIDORS
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A411
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
1/2" = 1'-0"
INTERIOR ELEVATION - 4AC04 NORTH
1/2" = 1'-0"
INTERIOR ELEVATION - 4AC04 SOUTH
1/2" = 1'-0"
CORRIDOR 4AC07 - NORTH
1/2" = 1'-0"
CORRIDOR 4AC07 - SOUTH
SHEET KEYNOTES
1 ROOM SIGNAGE, REFER TO AW SERIES SHEETS FOR WAYFINDING INFORMATION.
2 SEMI-RECESSED FIRE EXTINGUISHER CABINET. SEE SHEET A571 FOR DETAILS.
3 POWER AND/OR DATA OUTLETS, REFER TO ELECTRICAL DRAWINGS.
INTERIOR ELEVATION SHEET NOTES
1. REFER TO SHEET A561 FOR WALL PROTECTION (WP) DETAIL INFORMATION.
2. REFER TO AF600 SERIES SHEETS FOR FINISH LEGENDS AND SCHEDULES.
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
WP-5WP-4WP-3VB-1
WP-6
3 WP-4WP-5 WP-3
4'
- 0
" T
YP
WP-6WP-5WP-4WP-3VB-1 WP-6
2'
- 1
0" T
YP
WP-5WP-4WP-3VB-1WP-6VB-1
4'
- 0
" T
YP
OPEN TO
BEYOND
WP-6WP-5WP-4VB-1WP-6WP-6
1 1 1
2'
- 1
0" T
YP
VB-1 WP-3WP-3 WP-4 WP-5 WP-4WP-5WP-3VB-1
4'
- 0
" T
YP
2'
- 1
0" T
YP
WP-4 WP-5 VB-1 WP-6
1 1 11
EQ EQ
WP-32 3WP-5WP-4WP-3VB-1 WP-4 WP-4 WP-5 WP-3
4'
- 0
" T
YP
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - INTERIOR ELEVATIONS -
CORRIDORS
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A412
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
1/2" = 1'-0"
CORRIDOR 4AC05 - NORTHWEST
1/2" = 1'-0"
CORRIDOR 4AC05 - NORTHEAST
1/2" = 1'-0"
CORRIDOR 4AC05 - SOUTHEAST
1/2" = 1'-0"
CORRIDOR 4AC05 - SOUTHWEST
SHEET KEYNOTES
1 ROOM SIGNAGE, REFER TO AW SERIES SHEETS FOR WAYFINDING INFORMATION.
2 SEMI-RECESSED FIRE EXTINGUISHER CABINET. SEE SHEET A571 FOR DETAILS.
3 POWER AND/OR DATA OUTLETS, REFER TO ELECTRICAL DRAWINGS.
4 MEDICAL GAS VALVE BOX, SEE PLUMBING DRAWINGS.
INTERIOR ELEVATION SHEET NOTES
1. REFER TO SHEET A561 FOR WALL PROTECTION (WP) DETAIL INFORMATION.
2. REFER TO AF600 SERIES SHEETS FOR FINISH LEGENDS AND SCHEDULES.
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
2'
- 1
0" T
YP
WP-5WP-4WP-3VB-1WP-6WP-6
WP-6
VB-1 WP-3 WP-4 WP-5WP-6WP-6
4'
- 0
" T
YP
WP-5WP-4WP-3VB-1
2 2 2
1 VB-1 WP-4 WP-6WP-5 WP-3 VB-1 WP-4 1 WP-5
2'
- 1
0" T
YP
4'
- 0
" T
YP
WP-6 WP-6WP-5WP-4WP-3VB-1WP-6WP-6VB-1 WP-3 WP-4 WP-5
2'
- 1
0" T
YP
4'
- 0
" T
YP
OPEN TO
BEYOND
WP-5WP-3VB-1WP-6WP-6VB-1 WP-4 1 WP-5
WP-3 WP-41
VB-1 WP-3 WP-4 WP-5
2'
- 1
0" T
YP
. 4'
- 0
" T
YP
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - INTERIOR ELEVATIONS -
CORRIDORS
EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A413
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
1/2" = 1'-0"
CORRIDOR 4AC06 - NORTHEAST
1/2" = 1'-0"
CORRIDOR 4AC06 - NORTHWEST
1/2" = 1'-0"
CORRIDOR 4AC06 - SOUTHEAST
1/2" = 1'-0"
CORRIDOR 4AC06 - SOUTHWEST
SHEET KEYNOTES
1 POWER AND/OR DATA OUTLETS, REFER TO ELECTRICAL DRAWINGS.
2 ROOM SIGNAGE, REFER TO AW SERIES SHEETS FOR WAYFINDING INFORMATION.
3 SEMI-RECESSED FIRE EXTINGUISHER CABINET. SEE SHEET A571 FOR DETAILS.
INTERIOR ELEVATION SHEET NOTES
1. REFER TO SHEET A561 FOR WALL PROTECTION (WP) DETAIL INFORMATION.
2. REFER TO AF600 SERIES SHEETS FOR FINISH LEGENDS AND SCHEDULES.
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
0 1' 2' 4'
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
VB-1
VB-122
33 OPEN TO
BEYOND
OPEN TO
BEYOND
2'
- 1
0"
EQ 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" EQ
A551
2'
- 6
/2
1'
- 9
/2
2'
- 6
F3025
A551
VB-1
3' - 10" 1' - 3"U3612VB-1
2'
- 6
/2
1'
- 9
/2
2'
- 6
EQ 3' - 0" 3' - 0" 3' - 0" EQ
A551
A551
CENTERED ON
COUNTERTOP9
A551
2'
- 6
/2
1'
- 9
/2
2'
- 6
F3025
VB-1 1
1' - 3" 3' - 10"
VB-1
2'
- 1
0"
R6200 A5082
2' - 4"2' - 9"1"WP-7VB-1
M3150
WP-6VB-1U800
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL SHEET NOTES, AND GRAPHIC LEGENDS.
REFER TO AND COORDINATE WITH MEP DRAWINGS FOR ADDITIONAL INFORMATION
10/19/2022
ARCHITECTURAL - INTERIOR ELEVATIONS EXPAND PRIMARY CARE
AT LAKE NONA (WEST)
ORLANDO VA MEDICAL CENTER
CZ RB
675-102
A414
01 & 02
CONSTRUCTION
DOCUMENTS
21-10936C77621C0079
1/2" = 1'-0"
STAFF / TEAM AREA 4A300 - SOUTHWEST
1/2" = 1'-0"
STAFF / TEAM AREA 4A300 - SOUTHEAST
1/2" = 1'-0"
STAFF / TEAM AREA 4A300 - SOUTH
1/2" = 1'-0"
FILE ALCOVE 4A300A - EAST
1/2" = 1'-0"
FILE ALCOVE 4A300A - NORTH
1/2" = 1'-0"
FILE ALCOVE 4A300A - WEST
1/2" = 1'-0"
FILE ALCOVE 4A300A - SOUTH
1/2" = 1'-0"
MED ALCOVE 4AC07A - EAST
1/2" = 1'-0"
MED ALCOVE 4AC07A - WEST
1/2" = 1'-0"
PNEUMATIC TUBE ELEVATION
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'0 1' 2' 4'
0 1' 2' 4'0 1' 2' 4'
SHEET KEYNOTES
1 POWER AND/OR DATA OUTLETS, REFER TO ELECTRICAL DRAWINGS.
2 MEDICAL GAS VALVE BOX, SEE PLUMBING DRAWINGS.
3 ROOM SIGNAGE, REFER TO AW SERIES SHEETS FOR WAYFINDING INFORMATION.
INTERIOR ELEVATION SHEET NOTES
1. REFER TO SHEET A561 FOR WALL PROTECTION (WP) DETAIL INFORMATION.
2. REFER TO AF600 SERIES SHEETS FOR FINISH LEGENDS AND SCHEDULES.
Revisions: Date:
75% CONSTRUCTION DOCUMENT SUBMITTAL 03/11/2022
WP-6VB-11
VB-1WP-7
3 3
OPEN TO
BEYOND
OPEN TO
BEYOND
2'
- 1
0"
A551
EQ 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" 1' - 3" EQ VB-1
VB-1
3'
- 6
R7250
VB-1
R7250
K4665
K1552
R4700
A551
A551
2' - 4"2' - 0"2' - 0"1"
2' - 0" 2' - 0" 2' - 4"
2'
- 1
0" 1'
- 6
2'
- 6
3'
- 6
VB-1
K4665
K1552 R4700
OPEN TO
BEYOND
A551
A551
1"2' - 0"2' - 9"2' - 4"
A541
1' - 10 1/2" 3' - 9" 1' - 10 1/2"
2'
- 1
0" 1'
- 6
2'
- 6
M0512
U3612 U3612VB-1
A551
A551
3'
- 6
A551
1" 3' - 6"
F2010
A5106 U042
U0810
U041
R6200
U021
U030
A5077
A5075
F0270VB-1
A1067
A4995
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
REVIEW ONLY - NOT FOR CONSTRUCTION
Bancroft Project No. VA CONTRACT NO.
E4
KEY PLANAREA A, ZON E 1
E1E2E3
D 4HOSPITALD 1D 2D 5D 3WD 6D 7
CLIN ICP-WC 1C 2P-E
A 1A 2A 3B 1A 4B 2
N
GENERAL NOTE
REFER TO A001, A002 AND A003 SHEETS FOR ALL ABBREVIATIONS, SYMBOLS, MOUNTING
HEIGHTS, GENERAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .