This document is a Price Schedule Breakdown attachment for a VA construction project at the Walla Walla VAMC in Washington State. The solicitation (RFQ 687-21-106) involves replacing mechanical and plumbing systems across multiple buildings, with a comprehensive price breakdown organized by 18 standard construction industry divisions ranging from General Requirements (Division 1) to Utilities (Division 33). The pricing template requires contractors to detail costs across these divisions, with specific instructions that all pricing is fixed-price and that field office overhead and general conditions will be applied only once to the contract and any subsequent changes.

The document provides a structured framework for contractors to submit their pricing, including areas for overhead rates, subcontract markup rates, profit rates, mobilization/demobilization costs, insurance/bond expenses, and other ancillary project costs. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration, specifically within Veterans Integrated Service Network 20, and seeks a comprehensive mechanical and plumbing system replacement project. Contractors are instructed to ensure formula accuracy when calculating subtotals and total contract costs, with the price breakdown serving as an informational tool rather than establishing separate billable deliverables.

View the file

Other files

File Type Posted
36C26025R0065 0006.docx DOCX document
36C26025R0065 0004.docx DOCX document
Attachment 22 - Photos Walla Walla VAMC.pdf PDF
Attachment 17 - Building T2 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 23 - WWMC- Topology - All Utilities 02.pdf PDF
Attachment 19 - Building T7 Walla Walla VAMC Electrical Plan.pdf PDF
Attachment 15 - Building 82 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 14 - Building 81 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 12 - Building 66 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 10 - Building 63 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 11 - Building 65 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 16 - Building T1 Walla Walla VAMC - Final Rev 1.pdf PDF
36C26025R0065 0003.docx DOCX document
Attachment 21 - Schedules Walla Walla System Replacement_Me.pdf PDF
Attachment 20 - Building T7 Walla Walla System Replacement M.pdf PDF
Attachment 18 - Building T7 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 13 - Building 74A Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 23 - WWMC- Topology - All Utilities.pdf PDF
36C26025R0065 0002.docx DOCX document
36C26025R0065 0001.docx DOCX document
Attachment 1 - SOW CON Replace Mechanical and Plumbing Systems 687-21-106_R0V2 02.pdf PDF
Attachment 9 - PPQ NCO 20 687-21-106 CON Replace Mechanical and Plumbing.docx DOCX document
Attachment 6 - Contractor Rules of Behavior.pdf PDF
Attachment 5 - Wage Determination 6-06-2025.pdf PDF
36C26025R0065_1.docx DOCX document
Attachment 3 - DWGS 687-21-106 Replace Mechanical and Plumbing 06-20-2025.pdf PDF
Attachment 8 - Limitations on Subcontracting 687-21-106 Mech and Plumbing.docx DOCX document
Attachment 4 - Calculations 687-21-106 WWW Replace Mechanical and Plumbing 03-17-2025.pdf PDF
Attachment 2 - SPECS 687-21-106 Replace Mechanical and Plumbing 06-25-2025.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
RFQ: 687-21-106 Replace Mechanical and Plumbing

Project Location: Walla Walla VAMC, Walla Walla, WA

RatesBase Item
Price
Division 1 General Requirements
Division 2 Existing Conditions
Division 3 Concrete
Division 4 Masonry
Division 5 Metals
Division 6 Woods, Plastic and Composites
Division 7 Thermal and Moisture Protection
Division 8 Openings
Division 9 Finishes
Division 10 Specialties
Division 11 Equipment
Division 12 Furnishings
Division 13 Special Construction
Division 14 Conveying Equipment
Division 21 Fire Suppression
Division 22 Plumbing
Division 23 HVAC
Division 25 Integrated Automation
Divison 26 Electrical
Division 27 Communications
Divison 28 Electronic Safety and Security
Division 31 Earthwork
Division 32 Exterior Improvements
Division Item 33 Utilities

SubTotals N/A $0.00

Period of Performance (FAR 52.211-10) ________ days

Mobilization / Demobilization
Insurance / Bonds
Taxes / Other Fees (provide itemized list)
O&M Manuals and Red Line Drawings
OverheadRate _______%
Overhead (daily rate)Per Day $0.00
SubContract Mark-UpRate _______%
ProfitRate _______%
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS $0.00