This document is a comprehensive mechanical and electrical design specification for a VA Medical Center replacement project located in Walla Walla, Washington. The project, identified as VA Project Number 687-21-106, involves replacing mechanical and plumbing systems across multiple buildings at the facility, with a focus on upgrading HVAC, electrical, and plumbing infrastructure. The design documents are at 100% construction document phase, prepared by GDM, Inc., and dated March 17, 2025, with compliance to numerous building codes including the 2021 International Building Code, NFPA standards, and VA design manuals.
The specification covers mechanical and electrical work for approximately 10-12 different buildings, including Buildings 143, 140, 82, 81, 74, 66, 65, 63, T-7, T-1, and T-2. Key technical requirements include installing new HVAC systems with variable air volume (VAV) components, upgrading electrical panels and distribution systems, implementing energy-efficient components, and ensuring compliance with accessibility and fire safety standards. The project includes comprehensive demolition of existing systems and installation of new mechanical, electrical, plumbing, and control systems, with specific attention to system commissioning, permit acquisition, and adherence to VA design guidelines.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
100% CONSTRUCTION
DOCUMENTS
CONSULTANT
GDM, Inc.
1308 NE 134th St, Suite A Vancouver, WA 98685 541-436-4723
WWW.GDM-AE.COM
VA PROJECT NUMBER:
CONTRACT NUMBER:
PROJECT DESIGN TEAM
APPLICABLE CODES, REGULATIONS, VA DESIGN MANUALS SHEET INDEX
A u to d e sk D o cs
/2
-0
W a lla
W a lla
R e p la ce M e ch a n ic a l S ys te m s/
-0
W a lla W a lla
S ys te m
R e p la ce m e n t_
M e ch a n ic a l_
.r vt
/2
/2
:2
:0
A
M
G001
COVER SHEET REPLACE MECHANICAL AND
PLUMBING SYSTEMS
WALLA WALLA, WASHINGTON
687-21-106
AFJB
A/E
FULLY SPRINKLERED
77 WAINWRIGHT DR.
US DEPARTMENT OF VETERAN AFFAIRS
REPLACE MECHANICAL AND PLUMBING SYSTEMS
100% CONSTRUCTION DOCUMENTS
WALLA WALLA, WA 99362
DATE 2025/03/17
687-21-106
WALLA WALLA, WA VAMC
36C26022N0538
2025/03/17
2025/03/17
ACCESSIBILITY CODE
FEDERAL ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABASS), REV 2015
PG-18-13 VA FIRE BARRIER (A SUPPLEMENT TO FEDERAL BARRIERS ACT ACCESSIBILITY
STANDARDS) FIRE DESIGN GUIDE, DEC 2011
BUILDING CODES
INTERNATIONAL CODE COUNCIL (ICC)
IBC—INTERNATIONAL BUILDING CODE, 2021
IFC—INTERNATIONAL FIRE CODE, 2021
IFGC—INTERNATIONAL FUEL GAS CODE, 2021
IMC—INTERNATIONAL MECHANICAL CODE, 2021
IPC—INTERNATIONAL PLUMBING CODE, 2021
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA LIFE SAFETY CODE-101, 2021
NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHER, 2018 EDITION
NFPA 13 STANDARDS FOR INSTALLATION ON SPRINKLER SYSTEMS 2022
NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2022
NFPA 70 NATIONAL ELECTRICAL CODE (NEC) ESSENTIALS 2020
NFPA 70E ELECTRICAL SAFETY IN THE WORKPLACE, 2021
NFPA 75 STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT, 2020.
NFPA 101 LIFE SAFTY CODE ESSENTIALS 2021
NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION ALTERATION AND DEMOLITION
OPERATIONS, 2022
NFPA 2001 STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS, 2021
NFPA 855 STANDARD FOR THE INSTALLATION OF STATIONARY ENERGY STORAGE SYSTEMS, 2020
NFPA 99 HEALTHCARE FACILITIES CODE
NFPA NEC HEALTHCARE FACILITIES CODE
NFPA STANDARD FOR THE INSTALLATION OF LIGHTING PROTECTION
NFPA 2001 STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
VA DESIGN MANUALS
VA OFFICE OF CONSTRUCTION AND FACILITY MANAGEMENT DESIGN MANUAL AUGUST 1, 2014
PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS, HTTP://WWW.CFM.VA.GOV/TIL/SPEC.ASP2)
PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES, APRIL 2019,
HTTP://WWW.CFM.VA.GOV/TIL/CPRO.ASP
PG-18-14 ROOM FINISHES, DOOR AND HARDWARE SCHEDULE – DECEMBER 2018
PG-18-15 VOL C A/E SUBMISSIONS INSTRUCTION OF MINOR AND NRM CONSTRUCTION PROGRAM NOV
VA INTERIOR DESIGN
INTERIOR DESIGN MANUAL FOR NEW CONSTRUCTION AND RENOVATIONS OF HOSPITALS AND
CLINICS — NOVEMBER 1, 2020 HTTP://WWW/CFM.VA.GOV/TIL/DMANUAL/DMLDHONH.PDF
VA ELECTRICAL DESIGN
VA ELECTRICAL DESIGN MANUAL – DECEMBER 1, 2019
VA LIGHTING DESIGN
LIGHTING DESIGN MANUAL — DECEMBER 2015
HTTP://WWW.CFM.VA.GOV/TIL/DMANUAL/DMLIGHTING.PDF
VA STRUCTURAL ENGINEERING
VA SEISMIC CODES AND STANDARDS, H-18-8 HTTP://WWW.CFM.VA.GOV/TIL/SEISMIC.ASP
VA SUSTAINABILITY
SUSTAINABLE DESIGN MANUAL MANUAL – REV 1 AUGUST 18, 2017,
HTTPS://WWW.CFM.VA.GOV/TIL/SUSTAIN/DMSUSTAIN.PDF
VA ASBESTOS ABATEMENT
ASBESTOS ABATEMENT DESIGN MANUAL FOR NEW HOSPITALS, REPLACEMENT HOSPITALS,
AMBULATORY CARE, CLINICAL ADDITIONS, ENERGY CENTERS, OUTPATIENT CLINICS, ANIMAL
RESEARCH FACILITIES, LABORATORY BUILDINGS – JULY 2011
VA-JOINT COMMISSION CLARIFICATION DOCUMENTS
SUMMARY OF DISCUSSION ISSUES RELATED TO VHA IMPLEMENTATION OF THE JOINT COMMISSION ENVIRONMENT OF CARE (EC) AND LIFE SAFETY (LS) STANDARDS, MAY 2021 REVISION. EFFECTIVE
DATE: MAY 1, 2021
MECHANICAL
DESIGN STANDARDS
AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR-CONDITIONING ENGINEERS (ASHRAE)
STANDARD 62.1 – VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY, 2017
STANDARD 90.1 - ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS, STANDARD 170 - VENTILATION OF HEALTH CARE FACILITIES, 2021
SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION
HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE
HVAC SYSTEMS COMMISSIONING MANUAL, 2ND EDITION, 2013
SEISMIC RESTRAINT MANUAL GUIDELINES FOR MECHANICAL SYSTEMS, 3RD EDITION, 2008
US DEPARTMENT OF VETERAN’S AFFAIRS (VA)
HVAC DESIGN MANUAL (REVISION 1), PG18-10, 1 MAY 2021
SUSTAINABLE DESIGN MANUAL (REVISION 1), 18 AUGUST 2017
A. REQUIREMENTS FOR VA MINOR NEW CONSTRUCTION AND RENOVATION PROJECTS (I.E. UNDER
$20,000,000) WHOLE BUILDING COMMISSIONING MANUAL (REVISION 1), NOVEMBER 2013
12" = 1'-0"1
SITE MAP
425-828-0500
POC: DENNIS TESCHLOG
KIRKLAND, WA 98033
520 KIRKLAND WAY, SUITE 301
PRODIMS
COST ESTIMATOR
509-780-1312 541-436-4723 541-436-4723
POC: MARK AYLWARD POC: COLLIN BUNDY POC: CELYN DEZMAIN
RIO RANCHO, NM 87124 VANCOUVER, WA 98685 VANCOUVER, WA 98685
2600 THE AMERICAN ROAD SE, SUITE 100 1308 NE 134TH ST SUITE A 1308 NE 134TH ST SUITE A
GDM-NEW MEXICO GDM-WASHINGTON GDM-WASHINGTON
ARCHITECT STRUCTURAL ENGINEER CIVIL ENGINEER
509-987-8633 360-318-7095 541-436-4723
POC: ROBERT TAYLOR POC: JESSE BARKSDALE POC: MICHAEL REBSTOCK
WALLA WALLA, WA 99362 LACEY, WA 98503 VANCOUVER, WA 98685
77 WAINWRIGHT DRIVE 4317 6TH AVENUE SE, SUITE 300 1308 NE 134TH ST SUITE A
WALLA WALLA VA GDM-WASHINGTON GDM-WASHINGTON
OWNER MECHANICAL ENGINEER ELECTRICAL ENGINEER
Revisions: Date:
106 000-CS-002 CIVIL DETAILS
105 000-CS-001 OVERALL CIVIL SITE PLAN
CIVIL
104 000-EJ-005 ELECTRICAL PANEL SCHEDULES
103 000-EJ-004 ELECTRICAL PANEL SCHEDULES
102 000-EJ-003 ELECTRICAL ONE-LINE DIAGRAMS
101 000-EJ-002 ELECTRICAL DEMOLITION ONE-LINE DIAGRAMS
100 000-EJ-001 CAMPUS PRIMARY ONE-LINE DIAGRAM #1
99 143-EP-101 BLDG 143 FIRST FLOOR ELECTRICAL PLAN
98 143-ED-101 BLDG 143 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
97 140-EP-102 BLDG 140 ROOF ELECTRICAL PLAN
96 140-EP-101 BLDG 140 FIRST FLOOR ELECTRICAL PLAN
95 140-ED-102 BLDG 140 ROOF ELECTRICAL DEMOLITION PLAN
94 140-ED-101 BLDG 140 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
93 082-EP-102 BLDG 82 SECOND FLOOR ELECTRICAL PLAN
92 082-EP-101 BLDG 82 FIRST FLOOR ELECTRICAL PLAN
91 082-ED-102 BLDG 82 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
90 082-ED-101 BLDG 82 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
89 081-EP-102 BLDG 81 ROOF ELECTRICAL PLAN
88 081-EP-101 BLDG 81 FIRST FLOOR ELECTRICAL PLAN
87 081-ED-102 BLDG 81 ROOF ELECTRICAL DEMOLITION PLAN
86 081-ED-101 BLDG 81 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
85 074-EP-102 BLDG 74 SECOND FLOOR ELECTRICAL PLAN
84 074-ED-102 BLDG 74 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
83 065-EP-102 BLDG 65 ATTIC ELECTRICAL PLAN
82 065-EP-101 BLDG 65 FIRST FLOOR ELECTRICAL PLAN
81 065-ED-101 BLDG 65 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
80 063-EP-101 BLDG 63 BASEMENT AND FIRST FLOOR ELECTRICAL PLANS
79 063-ED-101 BLDG 63 BASEMENT AND FIRST FLOOR ELECTRICAL DEMOLITION PLANS
78 0T7-EP-102 BLDG T-7 ATTIC ELECTRICAL PLAN
77 0T7-EP-101 BLDG T-7 CRAWL SPACE AND FIRST FLOOR ELECTRICAL PLANS
76 0T7-ED-102 BLDG T-7 ATTIC ELECTRICAL DEMOLITION PLAN
75 0T7-ED-101 BLDG T-7 CRAWL SPACE AND FIRST FLOOR ELECTRICAL DEMOLITION
74 0T1-EP-101 BLDG T-1 AND T-2 ELECTRICAL PLANS
73 0T1-ED-101 BLDG T-1 AND T-2 ELECTRICAL DEMOLITION PLANS
72 000-ES-003 ENLARGED SITE PLAN
71 000-ES-002 ENLARGED SITE PLAN
70 000-ES-001 OVERALL ELECTRICAL SITE PLAN
69 000-ES-000 SITE KEY PLAN
68 000-EG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES
ELECTRICAL
67 143-MH-202 BLDG 143 ENLARGED MECHANICAL PLANS
66 143-MH-201 BLDG 143 ENLARGED MECHANICAL PLANS
65 143-MH-101 BLDG 143 FIRST AND SECOND FLOOR MECHANICAL PLANS
64 140-MH-202 BLDG 140 ENLARGED MECHANICAL PLANS
63 140-MH-201 BLDG 140 ENLARGED MECHANICAL PLANS
62 140-MH-102 BLDG 140 ROOF AND ATTIC MECHANICAL PLAN
61 140-MH-101 BLDG 140 FIRST FLOOR MECHANICAL PLAN
60 082-MH-103 BLDG 82 ATTIC MECHANICAL PLAN
59 082-MH-102 BLDG 82 SECOND FLOOR MECHANICAL PLAN
58 082-MH-101 BLDG 82 FIRST FLOOR MECHANICAL PLAN
57 082-MD-103 BLDG 82 ATTIC MECHANICAL DEMOLITION PLAN
56 082-MD-102 BLDG 82 SECOND FLOOR MECHANICAL DEMOLITION PLAN
55 082-MD-101 BLDG 82 FIRST FLOOR MECHANICAL DEMOLITION PLAN
54 081-MH-103 BLDG 81 ROOF MECHANICAL PLAN
53 081-MH-102 BLDG 81 FIRST FLOOR MECHANICAL PLAN
52 081-MH-101 BLDG 81 CRAWL SPACE MECHANICAL PLAN
51 081-MD-103 BLDG 81 ROOF HVAC DEMOLITION PLAN
50 081-MD-102 BLDG 81 FIRST FLOOR MECHANICAL DEMOLITION PLAN
49 081-MD-101 BLDG 81 CRAWL SPACE MECHANICAL DEMOLITION PLAN
48 074-MH-102 BLDG 74 SECOND FLOOR MECHANICAL PLAN
47 074-MH-101 BLDG 74 FIRST FLOOR MECHANICAL PLAN
46 074-MD-102 BLDG 74 SECOND FLOOR MECHANICAL DEMOLITION PLAN
45 074-MD-101 BLDG 74 FIRST FLOOR MECHANICAL DEMOLITION PLAN
44 066-MH-103 BLDG 66 ROOF MECHANICAL PLAN
43 066-MH-102 BLDG 66 FIRST FLOOR MECHANICAL PLAN
42 066-MH-101 BLDG 66 BASEMENT MECHANICAL PLAN
41 066-MD-103 BLDG 66 ROOF MECHANICAL DEMOLITION PLAN
40 066-MD-102 BLDG 66 FIRST FLOOR MECHANICAL DEMOLITION PLAN
39 066-MD-101 BLDG 66 BASEMENT MECHANICAL DEMOLITION PLAN
38 065-MH-103 BLDG 65 ATTIC MECHANICAL PLAN
37 065-MH-102 BLDG 65 FIRST FLOOR MECHANICAL PLAN
36 065-MH-101 BLDG 65 FOUNDATION PLAN
35 065-MD-102 BLDG 65 FIRST FLOOR MECHANICAL DEMOLITION PLAN
34 065-MD-101 BLDG 65 FOUNDATION DEMOLITION PLAN
33 063-MH-101 BLDG 63 MECHANICAL PLANS
32 063-MD-101 BLDG 63 MECHANICAL DEMOLITION PLANS
31 0T7-MH-102 BLDG T-7 MECHANICAL PLANS
30 0T7-MH-101 BLDG T-7 MECHANICAL PLANS
29 0T7-MD-102 BLDG T-7 ATTIC MECHANICAL DEMOLITION PLAN
28 0T7-MD-101 BLDG T-7 MECHANICAL DEMOLITION PLANS
27 0T2-MH-101 BLDG T-2 MECHANICAL PLANS
26 0T2-MD-101 BLDG T-2 MECHANICAL DEMOLITION PLANS
25 0T1-MH-101 BLDG T-1 MECHANICAL PLANS
24 0T1-MD-101 BLDG T-1 MECHANICAL DEMOLITION PLANS
23 MH022 CONTROL SEQUENCE OF OPERATIONS
22 MH021 CONTROL POINTS LISTS
21 MH020 STEAM DIAGRAMS
20 MH019 STEAM DIAGRAMS
19 MH018 DOMESTIC WATER DIAGRAMS
18 MH017 DOMESTIC WATER DIAGRAMS
17 MH016 DOMESTIC WATER DIAGRAMS
16 MH015 DETAILS - 082
15 MH014 DETAILS - 081
14 MH013 DETAILS - 065
13 MH012 DETAILS - 063
12 MH011 DETAILS - 0T7
11 MH010 DETAILS - 0T1 & 0T2
10 MH009 DETAILS
9 MH008 DETAILS
8 MH007 DETAILS
7 MH006 DETAILS
6 MH005 SCHEDULES
5 MH004 SCHEDULES
4 MH003 SCHEDULES
3 MH002 SITE PLAN
2 MH001 LEGEND, ABBREVIATIONS LIST, AND GENERAL NOTES
1 G001 COVER SHEET
MECHANICAL
PAGE SHEET NUMBER SHEET NAME
VETERANS HEALTH
ADMINISTRATION
VISN 20
FLEXIBLE DUCT
DUCT DOWN (ROUND)
DUCT UP (ROUND)
PL105
A
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
DRAWING NUMBER WHERE DRAWN
PL105
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
DIRECTION OF PIPE PITCH (DOWN)
UNION
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND
STRAINER
BALL VALVE
CHECK VALVE
AUTOMATIC OR MANUAL AIR VENT
PIPE OR DUCT BREAK (GRAPHIC ONLY -
COLD WATER PIPING
CONTINUOUS PIPE/DUCT)
(WALL TYPE)
DN
DN
UP
UP EXHAUST DUCT (UP & DOWN)
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN REGISTER OR TOP GRILLE
DNUP RETURN DUCT (UP & DOWN)
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
SQUARE 1-WAY CEILING DIFFUSERS
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SECTION.)
10x8
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL
MANUAL VOLUME DAMPER
SUPPLY
RETURN45°
RETURN, NO SPLITTER (45° TAP)
STANDARD BRANCH SUPPLY OR
45°
AUTOMATIC CONTROL DAMPER MODULATING
EXISTING WORK
PUMP
T THERMOSTAT
TE TEMPERATURE SENSOR
PETE'S PLUG
STRAINER WITH BLOWDOWN VALVE & 3/4'' HOSE
CONNECTION
DRAIN/BLOWDOWN VALVE WITH 3/4'' HOSE
CONNECTION
SYMBOL
SYMBOL LEGEND
DESCRIPTION SYMBOL DESCRIPTION
CEILING / WALL ACCESS PANEL
CD-1 12"X12"
100 CFM
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
RISE OR DROP IN PIPE
THERMOMETER
TEMPERATURE GAUGE
PIPE UP
PIPE DOWN
GATE VALVE
WALL CLEANOUT
FLUSH CLEANOUT OR SURFACE CLEANOUT
VENT PIPING
WASTE PIPING
3"WCO
3"WCO
HOT WATER CIRCULATION PIPING
HOT WATER PIPING
CONNECT NEW DUCT TO EXISTING DUCT
VANED ELBOW (SHORT RADIUS)
VD
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
PTAC
WINDOW TYPE AIR CONDITIONING UNIT
CONVECTOR OR RADIATOR (RECESSED)
CONVECTOR OR RADIATOR (WALL HUNG)
EXISTING PIPE OR OBJECT TO BE REMOVED
SUPPLY ARROW
EXHAUST ARROW
BACKFLOW PREVENTOR
FLOOR DRAIN
DIFFUSER CALLOUT ( TYPE, SIZE, CFM )
26-P-3
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
26-TU-I-I ITEM NUMBER (TERMINAL UNIT NO.1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO.1
BUILDING NO. WHERE EQUIPMENT IS LOCATED
(WALL TYPE)
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
BFP
M METER
TEMPERING VALVE
SOFTEN COLD WATERSCW
CIRCUIT SETTER
BALANCING VALVE
INVERTED BUCKET TRAP SET INCLUDING PIPING
ACCESSORIES
GLOBE VALVE
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
GATE VALVE WITH 3/4 " HOSE ADAPTER
ECCENTRIC REDUCER
EQUIPMENT CLEARANCE
M MOTORIZED DAMPER SIZED TO FIT IN DUCTWORK
PRESSURE REGULATING VALVE
PRESSURE RELIEF VALVE
TWO POSITION CONTROL VALVE
PRESSURE REDUCING VALVE
FLEXIBLE DUCT
BUTTERFLY VALVE
PE PRESSURE SENSOR C2 C02 SENSOR
HE HUMIDITY SENSOR TH TEMPERATURE AND HUMIDITY SENSOR
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
2025/03/17
100% CONSTRUCTION
DOCUMENTS
CONSULTANT
2025/03/17
GDM, Inc.
1308 NE 134th St, Suite A Vancouver, WA 98685 P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
A u to d e sk D o cs
/2
-0
W a lla
W a lla
R e p la ce M e ch a n ic a l S ys te m s/
-0
W a lla W a lla
S ys te m
R e p la ce m e n t_
M e ch a n ic a l_
.r vt
/1
/2
:3
:2
P
M
MH001
LEGEND, ABBREVIATIONS LIST, AND
GENERAL NOTES
REPLACE MECHANICAL AND
PLUMBING SYSTEMS
WALLA WALLA, WASHINGTON
687-21-106
KTJB
A/E
FULLY SPRINKLERED
ABBREVIATIONS LIST
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
VTR VENT THROUGH ROOF
W/ WITH
W WASTE
W WATT
WB WET BULB
WC WATER CLOSET
WC WATER COLUMN
WCO WALL CLEANOUT
WI WIDTH
°F DEGREES FAHRENHEIT
(E) EXISTING
A AMPERES
A/E ARCHITECT/ENGINEER
AABC ASSOCIATED AIR BALANCE COUNCIL
ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD
ABV ABOVE
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AG AIRGAP
AHU AIR HANDLING UNIT
AMP AMPERES
APD AIR PRESSURE DROP
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASJ ALL SERVICE JACKET
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING MATERIALS
AUX AUXILIARY
AVG AVERAGE
AWG AVERAGE WIRE GUAGE
BC BRANCH CIRCUIT CONTROLLER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BREAK HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
C CONDUIT
CAP CAPACITY
CD CEILING DIFFUSER
CFH CUBIC FEE PER HOUR
CFM CUBIC FEET PER MINUTE
CFSD COMBINATION FIRE/SMOKE DAMPER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CIRC CIRCULATION
CO CLEANOUT
CO2 CARBON DIOXIDE
COMP COMPRESSED
COND CONDENSATE
CONN CONNECTION
COP COEFFICIENT OF PERFORMANCE
CPVC CHLORINATED POLYVINYL CHLORIDE
CSR CURRENT SENSING RELAY
CU CUBIC
CV COEFFICIENT OF FLOW
CW COLD WATER
DB DRY BULB
DC DIRECT CURRENT
DC DOUBLE CHECK
DDC DIRECT DIGITAL CONTROL
DEG DEGREE (FAHRENHEIT)
DF DRINKING FOUNTAIN
DIA DIAMETER
DISCH DISCHARGE
DN DOWN
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE (DEGREES FAHRENHEIT)
EC ELECTRICAL CONTRACTOR
EDB ENTERING DRY BULB TEMPERATURE (DEGREES FAHRENHEIT)
EER ENERGY EFFICIENCY RATIO
EFF EFFICIENCY
EG EXHAUST GRILLE
ELEC ELECTRICAL
EMCS ENERGY MANAGEMENT/CONTROL SYSTEM
ERV ENERGY RECOVERY VENTILATOR
ESP EXTERNAL STATIC PRESSURE
EWB ENTERING WET BULB TEMPERATURE (DEGREES FAHRENHEIT)
EWT ENTERING WATER TEMPERATURE (DEGREES FAHRENHEIT)
EXH EXHAUST
F FAHRENHEIT
F FIRE
F&FD FLOOR & FUNNEL DRAIN
FCO FLUSH CLEANOUT
FD FLOOR DRAIN
FIN FINISHED
FLA FULL LOAD AMPERES
FLR FLOOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
FU FIXTURE UNITS
FWH FREEZEPROOF WALL HYDRANT
G GAS
GA GAUGE
GAL GALLON
GC GENERAL CONTRACTOR
GPD GALLONS PER DAY
GPF GALLONS PER FLUSH
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GYP GYPSUM
H HEIGHT
HB HOSE BIBB
HOR HORIZONTAL
HP HORSEPOWER
HPC HIGH PRESSURE CONDENSATE
HPS HIGH PRESSURE STEAM
HSPF HEATING SEASON PERFORMANCE FACTOR
HR HOUR
HRS HOURS
HW HOT WATER
HWC HOT WATER CIRCULATION
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IEER INTEGRATED ENERGY EFFICIENCY RATIO
IMC INTERNATIONAL MECHANICAL CODE
IN INCH
INDW INDIRECT WASTE
IPLV INTEGRATED PART LOAD VALUE
IU INDOOR UNIT
IWT INSTANT WATER HEATER
KW KILOWATT
L LENGTH
LAT LEAVING AIR TEMPERATURE (DEGREES FAHRENHEIT)
LAV LAVATORY
LB POUND
LBS POUNDS
LPC LOW PRESSURE CONDENSATE
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LPS LOW PRESSURE STEAM
LWT LEAVING WATER TEMPERATURE (DEGREES FAHRENHEIT)
MAX MAXIMUM
MBH THOUSAND BRITISH THERMAL UNITS PER HOUR
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MERV MINIMUM ENERGY REPORTING VALUE
MFG MANUFACTURER
MFR MANUFACTURER
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MPC MEDIUM PRESSURE CONDENSATE
MPS MEDIUM PRESSURE STEAM
MRT MEAN RADIANT TEMPERATURE
N/A NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NEBB NATIONAL ENVIRONMENTAL BALANCING BUREAU
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NPLV NON-STANDARD PART LOAD VALUE
NPSHA NOMINAL PUMP SUCTION HEAD AVAILABLE
NPSHR NOMINAL PUMP SUCTION HEAD REQUIRED
NRC NOISE REDUCTION CRITERIA
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
ORL OVERFLOW RAIN LEADER
OSA OUTSIDE AIR
OSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION
OU OUTDOOR UNIT
PB PRESSURE BALANCE
PD PRESSURE DROP
PH PHASE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSID POUNDS PER SQUARE INCH DIFFERENTIAL
PSIG POUNDS PER SQUARE INCH GAUGE
PTAC PACKAGED TERMINAL AIR CONDITIONER
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RA RETURN AIR
RECT RECTANGULAR
RG RETURN GRILLE
RGB RED-GREEN-BLUE
RL RAIN LEADER
RM ROOM
RP REDUCED PRESSURE
RPBP REDUCED PRESSURE BACKFLOW PREVENTER
RPM REVOLUTIONS PER MINUTE
RR REFRIGERANT RETURN
RS REFRIGERANT SUPPLY
RTU ROOFTOP UNIT
SA SUPPLY AIR
SCFM STANDARD CUBIC FEET PER MINUTE
SC SENSIBLE COOLING
SCH SCHEDULE
SCO SURFACE CLEANOUT
SCW SOFT COLD WATER
SD SUPPLY DIFFUSER
SEER SEASONAL ENERGY EFFICIENCY RATIO
SENS SENSIBLE
SF SQUARE FEET
SGR STEAM GRAVITY CONDENSATE RETURN
SH SHOWER
SM SHEET METAL
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL
ASSOCIATION
SP SET POINT
SP STATIC PRESSURE
SPR STEAM PUMPED CONDENSATE RETURN
SPWG STATIC PRESSURE (INCHES WATER GAUGE)
SQ FT SQUARE FEET
SQ IN SQUARE INCHES
SS STAINLESS STEEL
ST STORM DRAIN
STM STEAM
SVR STEAM VACUUMED CONDENSATE RETURN
T&PV TEMPERATURE & PRESSURE RELIEF VALVE
T TEMPERATURE
TC TOTAL COOLING
TD TEMPERATURE DROP
TEMP TEMPERATURE
TS THERMOSTATIC
TW TEMPERED WATER
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UPC UNIFORM PLUMBING CODE
UR URINAL
UV ULTRAVIOLET
V VENT
V VOLT
VA UNITED STATES DEPARTMENT OF VETERAN'S AFFAIRS
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
GENERAL NOTES
1. PROVIDE SYSTEM STARTUP, TESTING, & ADJUSTMENTS OF INSTALLED
SYSTEMS TO MEET PERFORMANCE REQUIREMENTS INDICATED IN THE
CONTRACT DOCUMENTS.
2. CONTRACTOR SHALL SUPPORT SYSTEM COMMISSIONING AND SHALL
COORDINATE WITH PROJECT COMMISSIONING AGENT.
3. CONTRACTOR SHALL PROVIDE ALL DOCUMENTATION REQUIRED TO
SUPPORT SYSTEM COMMISSIONING.
4. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND
CONSTRUCTION FEES. FURNISH COPIES OF ALL CONSTRUCTION
PERMITS, FINAL APPROVED PERMITS, AND SIMILAR DOCUMENTS TO
OWNER DOCUMENTING COMPLIANCE WITH CODE REQUIREMENTS.
5. BASIS OF DESIGN: THE PRODUCTS OR SERVICES IN THE BASIS OF
DESIGN AND EQUIPMENT/PRODUCT SCHEDULES ON THESE DRAWINGS
WERE PURPOSELY SELECTED BY THE A/E TO MEET THE OWNER’S
PROGRAMMING REQUIREMENTS AND ARE NOT BEING "SOLE-SOURCED"
BY THE VA UNLESS NOTED OTHERWISE. PRODUCTS FROM OTHER
MANUFACTURERS WITH EQUAL SALIENT CHARACTERISTICS, EQUAL
QUALITY, EQUAL LEAD TIMES, AND EQUAL MAINTENANCE COSTS MAY BE
USED TO BID AND CONSTRUCT THE PROJECT. BIDDERS SHALL CONTACT
THE A/E VIA THE VA PROJECT CONTRACTING OFFICER DURING THE BID
PHASE FOR APPROVAL OF THE SUBSTITUTION REQUEST ON EACH ITEM.
IN THE EVENT A CONTRACTOR IS AWARDED THE PROJECT WITHOUT
OBTAINING VA APPROVAL OF THE SUBSTITUTION REQUEST DURING THE
BID PHASE AND THE SHOP DRAWINGS AND SUBMITTALS OF ALTERNATE
MANUFACTURERS ARE NOT APPROVED BY THE A/E OR THE VA THEN THE
CONTRACTOR MUST INSTALL THE BASIS OF DESIGN PRODUCTS OR
SERVICES AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR ANY AND ALL CHANGES RESULTING FROM
PRODUCT SUBSTITUTIONS. NON-APPROVED PRODUCTS OR SERVICES
ARE AT THE CONTRACTOR'S RISK AND NO EQUITABLE ADJUSTMENT TO
TIME OR MONEY WILL BE MADE FOR COST DIFFERENCES BETWEEN
APPROVED VERSUS NON-APPROVED AFTER BIDDING HAS BEEN CLOSED.
ALLOW SEVEN CALENDAR DAYS BEFORE BIDS ARE DUE TO OBTAIN
APPROVAL.
6. ALL VALVES, TRAPS, TEST PORTS, DAMPERS, CONTROLS, CLEANOUTS,
ETC. SHALL BE LOCATED SO AS TO BE ACCESSIBLE FOR MAINTENANCE,
ADJUSTMENT, & TESTING. PROVIDE ACCESS PANELS FOR ALL
CONCEALED DEVICES. ACCESS PANEL LOCATIONS AND FINISHES SHALL
BE COORDINATED WITH ARCHITECT.
7. ALL PIPING & DUCTWORK IN FINISHED ROOMS OR SPACES SHALL BE
CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING
SYSTEM. REFER TO ARCHITECTURAL DOCUMENTS FOR FURRING &
CHASE LOCATIONS & SIZES.
8. ALL PIPING & DUCTWORK EXPOSED IN UTILITY SPACES OR SIMILAR
AREAS SHALL BE PAINTED. COORDINATE PAINTING REQUIREMENTS &
FINISHES WITH ARCHITECT.
9. ALL EXPOSED PIPING & DUCTWORK SHALL BE PAINTED. COORDINATE
PAINTING REQUIREMENTS & FINISHES WITH ARCHITECT.
10. ALL PIPING ROUTED EXPOSED IN AREAS ADJACENT TO VEHICLE TRAFFIC
SHALL BE PROVIDED WITH STEEL PIPE PROTECTION (BOLLARDS, GUARD
RAILS, PLATING, OR SIMILAR).
11. THE FIRST FIGURE OF DUCT SIZE CALLOUTS INDICATES DIMENSION OF
FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
PROVIDE ANY APPLICABLE DUCT LINING AND INSULATION PER THESE
PLANS AND SPECIFICATIONS. NOMINAL OUTER DUCT DIMENSIONS ARE
NET INSIDE DIMENSIONS PLUS 2X INSULATION THICKNESS.
12. DUCTWORK SHALL BE 2.0" PRESSURE CLASS UNLESS OTHERWISE NOTED
ON THESE DRAWINGS.
13. CONSTRUCT DUCTWORK ACCORDING TO INTERNATIONAL ENERGY
CONSERVATION CODE SECTION C403.12.2.
14. PROVIDE TURNING VANES IN ALL MITERED RECTANGULAR DUCT ELBOWS
& TEES.
15. PROVIDE MANUAL BALANCING DAMPERS ON ALL NEW AND MODIFIED
DUCT BRANCHES TO AIR INLETS & OUTLETS. LOCATE DAMPERS AS
CLOSE TO MAIN TRUNK DUCT CONNECTION AS POSSIBLE. WHERE
BRANCH DUCTWORK IS INACCESSIBLE (SUCH AS ABOVE HARD LID
CEILING SYSTEM), PROVIDE BALANCING DAMPER AT REGISTER, GRILLE,
OR DIFFUSER.
16. PROVIDE MOTORIZED DAMPERS ON OUTDOOR AIR SUPPLY, EXHAUST
OPENINGS, AND RELIEF OUTLETS. DAMPERS SHALL HAVE A MAXIMUM
LEAKAGE RATE OF 4 CFM PER SQUARE FOOT AT 1” W.C. DAMPERS SHALL
BE INTERLOCKED WITH ASSOCIATED FANS, EQUIPMENT, AND OTHER
DAMPERS SERVING THE SAME ZONE OR AREA.
17. RELIEF GRAVITY DAMPERS SHALL HAVE A MAXIMUM LEAKAGE RATE OF
20 CFM PER SQUARE FOOT AT 1” W.C. DAMPERS SMALLER THAN 24” IN
EITHER DIRECTION SHALL HAVE A MAXIMUM LEAKAGE RATE OF 40 CFM
PER SQUARE FOOT AT 1” W.C.
18. PROVIDE COMPLETE CONDENSATE DRAINAGE SYSTEM FOR MINI-SPLIT,
SPLIT SYSTEM, AND OTHER HVAC SYSTEMS WITH COOLING,
CONDENSING, OR HEAT PUMP COILS. FIELD ROUTE DRAINAGE PIPING
FROM EQUIPMENT TO NEAREST DRAIN LOCATION (SUCH AS SERVICE
SINK, FUNNEL DRAIN, ETC.). SLOPE NON-PRESSURIZED DRAIN PIPING TO
DRAIN LOCATION. PIPING & FITTINGS SHALL BE TYPE L COPPER. MINIMUM
PIPE SIZE SHALL BE 3/4". INCREASE PIPE SIZE WHERE APPLICABLE PER
IMC 307.2.2.
19. PIPING & DUCTWORK SHALL BE ROUTED SO AS NOT TO OBSTRUCT
ACCESS OR CAUSE TRIPPING OR OTHER HAZARDS.
20. PIPING & DUCTWORK SHALL BE ROUTED SO AS TO MAINTAIN CODE-
REQUIRED CLEARANCES FOR ELECTRICAL EQUIPMENT, ADA
ACCESSIBILITY, AS WELL AS MAINTAINING CLEAR ACCESS AT ALL DOORS,
WINDOWS, & OTHER ARCHITECTURAL FEATURES IN THE BUILDING.
21. SIZE REFRIGERANT PIPING ON SPLIT SYSTEM UNITS & VRF SYSTEMS PER
MANUFACTURER'S RECOMMENDATION.
22. PROVIDE 5W/FT HEAT TRACE FOR ALL DOMESTIC WATER SYSTEM PIPING
& P-TRAPS IN UNHEATED SPACES.
23. PIPING INSULATION SHALL MEET OR EXCEED INTERNATIONAL ENERGY
EFFICIENCY CODE SECTION C403.12.3 REQUIREMENTS.
24. UN-RECIRCULATED HOT AND TEMPERED WATER SYSTEM BRANCHES
SHALL NOT EXCEED 25 FEET IN DEVELOPED LENGTH.
25. TOTAL STATIC PRESSURE NOTED IN SCHEDULES SHALL BE ASSUMED TO
INCLUDE DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.
26. ALL SUPPLY AIR FILTERS SHALL BE MINIMUM MERV-8 RATED. ALL
RETURN/EXHAUST/OUTSIDE AIR FILTERS SHALL BE MINIMUM MERV-8
RATED.
27. AIR INLET & OUTLET SIZES SHOWN ON PLANS ARE NECK SIZES. PROVIDE
ADDITIONAL PANS, HARDWARE, ETC., REQUIRED TO INSTALL AIR INLETS &
OUTLETS IN CEILING SYSTEM.
28. WALL REGISTER-TYPE AIR INLETS & OUTLETS SHALL BE INSTALLED AT 7"
AFF MINIMUM ELEVATION.
29. AIR INLETS & OUTLETS IN UNFINISHED SPACES OR OPEN CEILING AREAS
SHALL BE INSTALLED AT 72" AFF UNLESS OTHERWISE NOTED ON THESE
DRAWINGS. ALL INLETS & OUTLETS WITHIN THE SAME SPACE SHALL BE
INSTALLED AT THE SAME ELEVATION.
30. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL
BE MANUFACTURED & CONNECTED IN COUNTER-FLOW CONFIGURATION
BETWEEN WATER & AIR.
31. HYDRONIC HEATING & CHILLED WATER SYSTEMS SHALL BE PROVIDED
WITH 20% PROPYLENE GLYCOL BY SYSTEM VOLUME. CONTRACTOR
SHALL CONFIRM PERCENTAGE WITH VA BEFORE SYSTEM FILL.
32. ALL PRESSURES LISTED ARE GAGE PRESSURES UNLESS OTHERWISE
NOTED.
33. STEAM DISTRIBUTION PRESSURES ARE GENERALLY HIGH PRESSURE
(60-90 PSIG) FOR SITE DISTRIBUTION, AND LOW PRESSURE (<15 PSI)
WITHIN BUILDINGS.
34. PROVIDE MANUAL/AUTOMATIC AIR VENTS AT ALL LOCAL HIGH POINTS
FOR HYDRONIC SYSTEMS.
35. PROVIDE COMPLETE DRAINAGE PIPING SYSTEM FOR DISCHARGE FROM
ALL AIR VENTS INSTALLED ON HYDRONIC PIPING. FIELD ROUTE
DRAINAGE PIPING FROM EQUIPMENT TO NEAREST DRAIN LOCATION
(SUCH AS SERVICE SINK, FUNNEL DRAIN, ETC.). DRAIN LOCATIONS SHALL
BE IN UTILITY ROOMS OR OTHER NON-PUBLIC AREAS. SLOPE NON-
PRESSURIZED DRAIN PIPING TO DRAIN LOCATION. PIPING & FITTINGS
SHALL BE TYPE-L COPPER WITH BRAZED OR SWEAT FITTINGS. MINIMUM
PIPE SIZE SHALL BE 3/4".
36. PROVIDE SEISMIC SUPPORT, BRACING, AND ATTACHMENTS FOR
DUCTWORK, PIPING, AND EQUIPMENT.
37. SEISMIC PROVISIONS SHALL BE PROVIDED TO MEET REQUIREMENTS FOR
ASCE-7 BUILDING SEISMIC DESIGN CATEGORY C, SITE CLASS C, & RISK
CATEGORY IV.
38. COORDINATE ALL MECHANICAL AND PLUMBING WORK WITH OTHER
TRADES TO INSURE PROPER AND ADEQUATE INTERFACE OF THEIR WORK
WITH THE WORK SHOWN ON THESE DOCUMENTS. CONTRACTOR SHALL
PROVIDE COORDINATED SHOP DRAWINGS FOR APPROVAL PRIOR TO
FABRICATION AND INSTALLATION.
39. ALL ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH
NFPA 70 STANDARDS AND LOCAL REQUIREMENTS.
40. ALL FIELD WIRING SHALL REQUIRE AN ELECTRICAL PERMIT AND SHALL BE
PERFORMED BY A LICENSED ELECTRICIAN.
41. A SHORT DASH IN A SCHEDULE TABLE CELL INDICATES THAT THE
COLUMN HEADING IS NOT USED OR NOT APPLICABLE TO THAT
SCHEDULED ITEM.
42. MAINTAIN AND RESTORE (IF INTERRUPTED) ALL CONDUITS &
CONDUCTORS, PIPING, & DUCTWORK PASSING THROUGH RENOVATED
AREAS AND SERVICING UNDISTURBED AREAS.
43. REMOVE ALL ABANDONED DUCTWORK, PIPING, CONTROLS, WIRING, ETC.,
WHERE ACCESSIBLE IN RENOVATED AREAS.
44. WHERE CONTROLS ARE DEMOLISHED, REMOVE WIRING BACK TO
NEAREST CONTROL PANEL OR JUNCTION BOX. REMOVE ACCESSIBLE
CONDUIT, JUNCTION BOXES, ETC.
45. ALL FIRE ALARM CONNECTIONS AND WORK SHALL BE PERFORMED IN
ACCORDANCE WITH DIVISION 28 SPECIFICATIONS.
46. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL FOR ALL EQUIPMENT AND
COMPONENTS REMOVED DURING DEMOLITION.
47. CONTRACTOR SHALL SCAN WALLS, FLOORS, CEILINGS, AND OTHER
SURFACES THAT COULD CONCEAL COMPONENTS SUCH AS EXISTING
PIPING, ELECTRICAL ITEMS, OR OTHERS PRIOR TO ANY CUTTING,
DRILLING, OR SIMILAR OPERATION TO VERIFY THAT THE AREA OF WORK
IS CLEAR OF COMPONENTS THAT COULD BE DAMAGED.
48. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL CUTTING &
RESTORATION WORK NECESSARY IN EXISTING AREAS OF THE BUILDING
TO PROVIDE WORK SHOWN ON THESE DOCUMENTS. RESTORATION
SHALL INCLUDE PATCHING TO MATCH EXISTING SURROUNDING
CONSTRUCTION AND FINISHES. PATCHED AREAS SHALL BE RE-PAINTED
FULL HEIGHT OF WALL FROM WALL CORNER TO WALL CORNER.
49. CONTRACTOR SHALL PATCH AND REPAIR ANY UNUSED PENETRATIONS,
MOUNTING POINTS, ETC. TO MATCH EXISTING ADJACENT SURFACE AND
FINISH TO MATCH EXISTING.
50. WHERE NEW EQUIPMENT OR COMPONENTS ARE INSTALLED IN THE SAME
LOCATION AS DEMOLISHED ITEMS, CONTRACTOR SHALL PATCH AND
REPAIR FINISHES AND SURFACES LEFT EXPOSED BY NEW EQUIPMENT TO
MATCH EXISTING SURROUNDING SURFACES AND FINISHES.
51. WHERE EQUIPMENT OR COMPONENTS ARE DEMOLISHED AND NO
REPLACEMENT IS INSTALLED, CONTRACTOR SHALL INFILL, PATCH, AND
FINISH SURFACES TO MATCH ADJACENT SURFACES AND FINISHES.
Revisions: Date:
VETERANS HEALTH
B O
OK
S H
EL
F
B
OOKSH
ELF
B
OOKSH
ELF
P
ED
B
OX
B O X
FI
LE
P
ED
B
OX
B O X
FI
LE
P
ED
B
OX
B O X
FI
LE
P
ED
B
OX
B O X
FI
LE
P
ED
B
OX
B O X
FI
LE
PED
B
OX B
OX FILE
ROOF ACCESS LADDER
W/ LOCKABLE SECURITY
GATE
VESTI BULE
PO RT E CO CHE'ER10 0
HSKP
14 5
T-1
T-2
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
STATE NURSING HOME
F U
T U
R E
S T A
T E
N U
R S
IN
G
H O
M E
105 115
CM
WATER TOWER
F U
T U
R E
B
LD
G
PR
V
Va ul t
Me te r
Va ul t
PR
V
Va ul t
8"
BUILDING 82
BUILDING 81
BUILDING 63
BUILDING 65
BUILDING 140
BUILDING T-2
BUILDING T-1
BUILDING T-7
BUILDING 66
BUILDING 143
BUILDING 74
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
2025/03/17
100% CONSTRUCTION
DOCUMENTS
CONSULTANT
2025/03/17
GDM, Inc.
1308 NE 134th St, Suite A Vancouver, WA 98685 P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
A u to d e sk D o cs
/2
-0
W a lla
W a lla
R e p la ce M e ch a n ic a l S ys te m s/
-0
W a lla W a lla
S ys te m
R e p la ce m e n t_
M e ch a n ic a l_
.r vt
/1
/2
:3
:2
P
M
MH002
SITE PLAN REPLACE MECHANICAL AND
PLUMBING SYSTEMS
WALLA WALLA, WASHINGTON
687-21-106
ARJB
A/E
FULLY SPRINKLERED
NORTH
N.T.S.1
SITE PLAN
Revisions: Date:
PLAN NOTES
CONTRACTOR SHALL PROVIDE AND INSTALL (30) RENTED CUBICLE UNITS IN
BUILDING 66 1ST FLOOR LEVEL (10 IN SMALL ROOM, 20 IN LARGER ROOM).
CUBICLES SHALL BE PER VA SPECIFICATIONS. VA SHALL PROVIDE POWER &
DATA CONNECTIONS FOR ALL CUBICLES. REFER TO BUILDING 66 PLANS
FOR REFERENCE.
VETERANS HEALTH
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
2025/03/17
100% CONSTRUCTION
DOCUMENTS
CONSULTANT
2025/03/17
GDM, Inc.
1308 NE 134th St, Suite A Vancouver, WA 98685 P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
A u to d e s k D o c s /2
-0
W a lla
W a lla
R e p la c e
M e c h a n ic a l S y s te m s /2
-0
W a lla W a lla
S y s te m R e p la c e m e n t_
M e c h a n ic a l_
.r v t
/1
/2
:4
:1
P
M
MH003
SCHEDULES REPLACE MECHANICAL AND
PLUMBING SYSTEMS
WALLA WALLA, WASHINGTON
687-21-106
KTJB
A/E
FULLY SPRINKLERED
NOTES:
82-WC-1 BROAN 843BL 6 EXHAUST BLACK POWDER COAT
81-WC-2 BROAN 843BL 6 EXHAUST BLACK POWDER COAT
81-WC-1 BROAN 610F 6 OSA BLACK POWDER COAT
T7-WC-2 BROAN 843BL 6 EXHAUST BLACK POWDER COAT
T7-WC-1 BROAN 610F 6 OSA BLACK POWDER COAT
SYMBOL MANUFACTURER MODEL SIZE SYSTEM FINISH NOTES
WALL CAP SCHEDULE
Revisions: Date:
1. EQUIPMENT FURNISHED BY VA FOR CONTRACTOR INSTALLATION.
NOTES:
OPC-SH-2 DRISTEEM VLC-100-4 44.72" X 32" X 47.11" 285 BLDG 143 480 3 120.3 12 4 500 1
(LENGTH X WIDTH X HEIGHT) CAPACITY (LBS/HR) VOLT PH FLA QTY. STAGES (LBS)
SYMBOL MANUFACTURER MODEL DIMENSIONS MAX. STEAM SERVICE ELECTRICAL HEATERS WEIGHT NOTES
STEAM HUMIDIFIER
NOTES:
B140-134 CLEAN STORAGE 106.00 8.00 848.00 4.00 100 90 0 0 7.08 POSITIVE
B81-101F 967.00 8.00 7736.00 4.00 1200 1100 0 0 9.31 POSITIVE
B74-126 CLEAN STORAGE 92.00 8.00 736.00 4.00 125 115 0 0 10.19 POSITIVE
FLOOR AREA HEIGHT VOLUME REQ'D ACH SUPPLY EXHAUST RETURN TRANSFER ACH
SPACE ROOM DIMENSIONS (FT) MINIMUM AIRFLOW (CFM) DESIGN PRESSURIZATION NOTES
AIR CHANGE CALCULATIONS
NOTES:
OPC-WS-1 WATER SOFTENER 1 BLDG 143 CULLIGAN 20X54 DEMOLISH
OPC-SH-3 STEAM HUMIDIFIER 1 BLDG 143 SERVES AHU-2. DRISTREEM VLC-100-4, 480V/3PH, 120.3A, 100 KW, 285 LBS/HR CAPACITY -
OPC-SH-2 STEAM HUMIDIFIER 1 BLDG 143 SERVES AHU-1. DRISTREEM VLC-50-2, 480V/3PH, 60.1A, 50 KW, 142.5 LBS-HR CAPACITY DEMOLISH
OPC-SH-1 STEAM HUMIDIFIER 1 BLDG 143 SERVES AHU-1. DRISTREEM VLC-100-4, 480V/3PH, 120.3A, 100 KW, 285 LBS/HR CAPACITY -
OPC-AHU-1 AIR HANDLER 1 BLDG 143 SERVES 1ST FLOOR. 39000 MAX CFM SA, 27000 CFM MIN SA, 9000 CFM MIN OSA, 242309 BTU TC, 108500 BTU HC, -
140-ERV-03 ENERGY RECOVERY VENTILATOR 1 140-RTU-03 VENMAR CES ERV1500eWF1BG22SXHE, 480V/3PH, 5.2 MCA, 7 MOCP, SA: 0.75 HP, 1.33 AMP. EA: 1.5 HP, 2.2AMP. 1200 CFM DEMOLISH
140-ERV-02 ENERGY RECOVERY VENTILATOR 1 140-RTU-02 VENMAR CES ERV1500eWF1BG22SXHE, 480V/3PH, 6 MCA, 8 MOCP, SA: 1.5 HP, 2.2 AMP. EA: 1.5 HP, 2.2AMP. 1350 CFM DEMOLISH
140-ERV-01 ENERGY RECOVERY VENTILATOR 1 140-RTU-01 VENMAR CES ERV1500eWF1BG22SXHE, 480V/3PH, 5.2 MCA, 7 MOCP, SA: 0.75 HP, 1.33 AMP. EA: 1.5 HP, 2.2AMP. 1200 CFM DEMOLISH
140-RTU-04 ROOFTOP UNIT 1 BLDG 140
9500 CFM SA, 2500 CFM OSA, 3" WC ESP, 1517 RPM, 9.39 BHP, 308.67 MBH SC, 365.65 MBH TC, 0.28"WC APD, 540 MBH HEATING INPUT, 432 MBH HEATING
OUTPUT, 0.03" WC APD, 480V/3PH, 80 FLA, 85 MCA
DEMOLISH
140-RTU-03 ROOFTOP UNIT 1 BLDG 140 AAON RN-007-3-0-EBD9-329, 7 TON, 480V/3PH, 19 MCA, 25 MOCP, R410A REFRIGERANT DEMOLISH
140-RTU-02 ROOFTOP UNIT 1 BLDG 140 AAON RN-008-3-0-EAD9-329, 480V/3PH, 25 MCA, 35 MOCP, R410A REFRIGERANT DEMOLISH
140-RTU-01 ROOFTOP UNIT 1 BLDG 140 AAON RN-007-3-0-EBD9-329, 480V/3PH, 19 MCA, 25 MOCP, R410A REFRIGERANT DEMOLISH
140-MAU-1 MAKE-UP AIR UNIT 1 BLDG 140 ABSOLUT-AIRE, MODEL: V1-HOM, 1490 CFM, 0.5" W.C. ESP, 1 HP, NATURAL GAS DIRECT FIRED BURNER, MAX. 112 MBH, MIN. 15 MBH, 480V/3PH, 3.1 FLA DEMOLISH
140-HWP-2 HEATING WATER PUMP 1 BLDG 140 ARMSTRONG 15x1x18, 45 GPM, 55 FT HEAD, 2 HP, 1800 RPM, 460V/3PH, 2.9 AMPS DEMOLISH
140-HWP-1 HEATING WATER PUMP 1 BLDG 140 ARMSTRONG 15x1x18, 45 GPM, 55 FT HEAD, 2 HP, 1800 RPM, 460V/3PH, 2.9 AMPS DEMOLISH
140-TMV-1 THERMOSTATIC MIXING VALVE 1 BLDG 140 SYMMONS 5-900, 55 GPM @ 10 PSI DROP DEMOLISH
140-HWRP-2 140 DEG RECIRC PUMP 1 BLDG 140 TACO, 0011-SF4, 1/8HP, 1.76 AMP, 115V/1PH, 3250 RPM6 GPM, 15' HEAD DEMOLISH
140-HWRP-1 DOM HW RECIRC PUMP 1 BLDG 140 TACO, 0011-SF4, 1/8HP, 1.76 AMP, 115V/1PH, 3250 RPM, 6 GPM, 15' HEAD DEMOLISH
FC-1.13 FAN COIL 1 BLDG 82 - -
82-HRV-1 HEAT RECOVERY VENTILATOR 1 BLDG 82 AMERICAN ALDES VENTILATION CORP., MODEL: 700SFD, 120V/1PH, 5.6 FLA -
(E) RADIATOR RADIATOR 2 BLDG 82 - -
(E) SWAMP COOLER SWAMP COOLER 1 BLDG 82 - -
(E) PTAC UNIT PTAC 1 BLDG 82 - -
(E) STEAM HEATER STEAM HEATER 3 BLDG 82 - -
81-RTU-1 ROOFTOP UNIT 1 BLDG 81 AAON RK-06-2-E0-000, 3450 RPM, 18.6 FLA, 1.63 ESP, 35 MCA, 50 MOCP, 208V, 3PH, R-22 REFRIGERANT DEMOLISH
81-OU-1 OUTDOOR UNIT 1 BLDG 81 MITSUBISHI PUY-A12NKA7, 12 MBH, 208V/1PH, 11 MCA, 28 MOCP -
81-IU-1 INDOOR UNIT 1 BLDG 81 MITSUBISHI PEAD-A12, 350 CFM, 0.14 ESP, 208V/1 PH, 1.45 MCA, 15 MOCP -
(E) RADIATOR RADIATOR 4 BLDG 81 - -
74-RTU-02 ROOFTOP UNIT 1 BLDG 74 MAMMOTH TL20-1023-E, 480V/3PH, 38.4 MCA,50 MOCP, R-438A, 4500 CFM, 3" TSP, 3.8 BHP, 5 HP, 140 MBH TC, 230 MBH STEAM COIL CAPACITY DEMOLISH
74-RTU-01 ROOFTOP UNIT 1 BLDG 74 MAMMOTH TL20-1823-E, 480V/3PH, 69.6 MCA, 90 MOCP, R-438A, 8000 CFM, 4" TSP, 8.1 BHP, 10 HP, 240 MBH TC, 300 MBH STEAM COIL CAPACITY DEMOLISH
65-OU-1 OUTDOOR UNIT 1 BLDG 65 DUCTLESS AIRE DA1821-H2-O, 15 MCA, 15 MOCP -
65-IU-1 INDOOR UNIT 1 BLDG 65 DUCTLESS AIRE DA1821-H2-I, 3 MCA, 15 MOCP -
(E) STEAM HEATER STEAM HEATER 5 BLDG 65 - -
(E) MECHANICAL UNIT SWAMP COOLER 1 BLDG 65 CHAMPION COOLER, MODEL RWC50/RN50W, 1/2 HP, 120V/1PH, 9.3 AMPS -
(E) PTAC UNIT PTAC 4 BLDG 65 FRIGIDAIRE FFRE1533Q1, 115V/1PH, 15 BTU, 11.2 EER, 12 AMP -
(E) RADIATOR RADIATOR 3 BLDG 65 -
63-UH-1 UNIT HEATER 1 BLDG 63 AIR CURTAIN, MODEL B-62, 1/3 HP, 1725 RPM, 120V/1PH, 6.6 AMPS -
63-OU-1 OUTDOOR UNIT 1 BLDG 63 MITSUBISHI PUY-A12NKA7, 12 MBH, 208V/1PH, 11 MCA, 28 MOCP -
63-IU-1 INDOOR UNIT 1 BLDG 63 MITSUBISHI PEAD-A12, 350 CFM, 0.14 ESP, 208V/1 PH, 1.45 MCA, 15 MOCP -
(E) SWAMP COOLER SWAMP COOLER 1 BLDG 63 - DEMOLISH
(E) STEAM HEATER STEAM HEATER 2 BLDG 63 - DEMOLISH
(E) PTAC UNIT PTAC 1 BLDG 63 - DEMOLISH
(E) RADIATOR RADIATOR 4 BLDG 63 - DEMOLISH
0T7-OU-1 OUTDOOR UNIT 1 T-7 MITSUBISHI PUY-A12NKA7, 12 MBH, 208V/1PH, 11 MCA, 28 MOCP -
0T7-IU-1 INDOOR UNIT 1 T-7 MITSUBISHI PEAD-A12, 350 CFM, 0.14 ESP, 208V/1 PH, 1.45 MCA, 15 MOCP -
(E) PTAC UNIT PTAC 3 T-7 - -
(E) RADIATOR RADIATOR 13 T-7 - DEMOLISH
0T2-OU-1 OUTDOOR UNIT 1 T-2 MITSUBISHI PUY-A12NKA7, 12 MBH, 208V/1PH, 11 MCA, 28 MOCP -
0T2-IU-1 INDOOR UNIT 1 T-2 MITSUBISHI PEAD-A12, 350 CFM, 0.14 ESP, 208V/1 PH, 1.45 MCA, 15 MOCP -
(E) PTAC UNIT PTAC 6 T-2 - -
(E) RADIATOR RADIATOR 12 T-2 - DEMOLISH
0T1-OU-1 OUTDOOR UNIT 1 T-1 MITSUBISHI PUY-A12NKA7, 12 MBH, 208V/1PH, 11 MCA, 28 MOCP -
0T1-IU-1 INDOOR UNIT 1 T-1 MITSUBISHI PEAD-A12, 350 CFM, 0.14 ESP, 208V/1 PH, 1.45 MCA, 15 MOCP -
(E) PTAC UNIT PTAC 4 T-1 - -
(E) RADIATOR RADIATOR 6 T-1 - DEMOLISH
SYMBOL TYPE QTY SERVICE DESCRIPTION/DATA WORK SCOPE NOTES
EXISTING HVAC EQUIPMENT SCHEDULE
11. PROVIDE WITH NEW ROOF CURB WITH MERV 14 FINAL FILTER SECTION.
10. PROVIDE WITH NEW ROOF CURB. NEW ROOF CURB TO MATCH EXISTING CURB HEIGHT TO ALLOW FOR CONNECTION OF EXISTING DUCT TO NEW UNITS.
9. PROVIDE WITH RETURN AIR CO2 SENSOR.
8. UNIT SHALL INCLUDE DX DEHUMIDIFICATION COIL AND SEQUENCES.
7. UNIT CONFIGURED FOR VAV CONTROL.
6. PROVIDE WITH FULL INTEGRATED ECONOMIZER.
5. R454B REFRIGERANT.
4. PROVIDE WITH LONWORKS DDC INTERFACE.
3. PROVIDE WITH INTEGRAL DUCT SMOKE DETECTOR IN RETURN SIDE OF UNIT.
2. PROVIDE WITH 120V CONVENIENCE/SERVICE RECEPTACLE MOUNTED TO UNIT EXTERIOR. POWER TO RECEPTACLE SHALL BE PROVIDED SEPARATELY FROM UNIT BY DIVISION 26 CONTRACTOR.
1. PROVIDE WITH NEW ROOF CURB.
NOTES:
140-RTU-4 AAON RNA-030-C-A--3-GJBBB DX 332.4 271.4 77.9 63.4 54.9 52.4 - - - - - GAS 540.0 437.4 60.8 102.9 DX HOT-GAS 201.9 9500 20.00 14.34 1646 5.02 2.20 X 7000 5.00 1400 0.47 0.20 X 2500 MERV 8 MERV 14 10.58 13.20 - 480 3 80 87 110 3630 2,3,4,5,6,7,8,9,10
140-RTU-3 AAON RNA-007-A-A-3 DX 80.3 64.0 78.9 63.8 52.8 51.1 HEAT PUMP 49.9 - - - GAS 90.0 72.9 52.5 71.6 - - 2100 2.00 1.85 2063 3.11 2.10 X 2100 1.00 689 0.19 0.10 X 750 MERV 8 MERV 14 11.86 14.10 3.59 480 3 20 22 30 1338 2,3,4,5,6,7,9,10
140-RTU-2 AAON RNA-008-A-A-3 DX 94.0 73.5 78.8 63.8 51.3 50.0 HEAT PUMP 79.7 - - - GAS 90.0 72.9 53.0 80.8 - - 2300 3.00 2.15 2174 3.28 2.10 X 2300 1.00 747 0.21 0.10 X 800 MERV 8 MERV 14 11.37 14.10 3.40 480 3 23 26 35 1436 2,3,4,5,6,7,9,10
140-RTU-1 AAON RNA-007-A-A-3 DX 80.3 64.0 78.9 63.8 52.8 51.1 HEAT PUMP 49.9 - - - GAS 90.0 72.9 52.5 71.6 - - 2100 2.00 1.85 2063 3.11 2.10 X 2100 1.00 689 0.19 0.10 X 750 MERV 8 MERV 14 11.86 14.10 3.59 480 3 20 22 30 1338 2,3,4,5,6,7,9,10
81-RTU-1 AAON RNA-006 DX 66.9 56.8 80.5 64.6 54.9 53.5 HEAT PUMP 36.9 - - - - - - 40.0 53.5 DX HOT-GAS 64.7 2200 2.00 1.24 1679 2.10 1.05 X - - - - - - 1200 MERV 8 MERV 14 12.74 14.50 2.50 208 3 34 40 60 1200 1,2,3,4,6,7,8,11
74-RTU-2 NEWTRON CAH4DXHACS12T DX 144.2 121.7 80.0 64.0 55.0 53.1 STEAM 217.6 5.0 225.0 226.0 - - - 55.0 99.6 - - 4500 7.50 4.82 - 4.00 1.00 X 4359 1.50 1.00 - X 3010 MERV 7 MERV 13 10.30 14.90 - 480 3 - 38.4 50 4800 1,2,3,4,5,6,7
74-RTU-1 NEWTRON CAH8DXHACS20T DX 247.6 214.0 80.0 64.0 55.3 53.5 STEAM 314.0 5.0 225.0 327.0 - - - 55.0 91.2 - - 8000 10.00 8.88 - 4.50 1.54 X 7344 3.00 - 1.00 - X 4000 MERV 11 MERV 14 10.30 14.90 - 480 3 - 69.6 90 5200 1,2,3,4,5,6,7,8
( °F) ( °F) ( °F) ( °F) TYPE TOTAL MBH INLET PRESSURE (PSIG) TEMP LBS/HR TYPE INPUT MBH OUTPUT MBH ( °F) ( °F) TYPE MBH
TYPE TOTAL MBH SENS MBH EDB EWB LDB LWB HEATING AUXILIARY HEAT EDB LDB RE-HEAT CFM HP BHP RPM TSP ESP VFD CFM HP RPM TSP ESP VFD OSA PRE FINAL EER IEER COP VOLT PHASE FLA MCA MOCP (LBS)
SYMBOL MANUFACTURER MODEL COOLING HEATING DEHUMIDIFICATION SUPPLY FAN EXHAUST FAN MIN FILTER EFFICIENCY ENERGY EFFICIENCY ELECTRICAL WEIGHT NOTES
AIR HANDLING UNIT SCHEDULE
4. ENCLOSURE TO BE FULL HEIGHT.
3. UNIT TO BE 18 GAUGE C.R.S. WITH BAKED WHITE POWDER COAT FINISH. ELEMENT TO BE COPPER TUBE ALUMINUM FIN.
2. PROVIDE WITH TAMPER RESISTANT DAMPER OPTION.
1. PROVIDE WITH END CAP ACCESSORY WITH 6"x9" ACCESS HATCH ON LEFT AND RIGHT SIDE FOR VALVE ACCESS. MATCH HEIGHT OF UNIT.
NOTES:
82-SR-1 BLDG 82 104 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4
63-SR-4 BLDG 63 101A STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 30.00 3020 0.75 3 40 70 7,928 5 225 10.00 1.510 8.26 1, 2, 3, 4
63-SR-3 BLDG 63 101B STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2650 0.75 2 40 70 5,565 5 225 10.00 1.060 5.80 1, 2, 3, 4
63-SR-2 BLDG 63 101 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 36.00 6.00 36.00 3160 0.75 3 50 70 9,954 5 225 10.00 1.896 10.37 1, 2, 3, 4
63-SR-1 BLDG 63 101C STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 50 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4
0T7-SR-13 T-7 104 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 30.00 3020 0.75 3 40 70 7,928 5 225 10.00 1.510 8.26 1, 2, 3, 4
0T7-SR-12 T-7 108 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 30.00 3020 0.75 3 40 70 7,928 5 225 10.00 1.510 8.26 1, 2, 3, 4
0T7-SR-11 T-7 102 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4
0T7-SR-10 T-7 109 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4
0T7-SR-9 T-7 101 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4
0T7-SR-8 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4
0T7-SR-7 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4
0T7-SR-6 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4
0T7-SR-5 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4
0T7-SR-4 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4
0T7-SR-3 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4
0T7-SR-2 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4
0T7-SR-1 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4
0T2-SR-12 T-2 111 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4
0T2-SR-11 T-2 101A STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4
0T2-SR-10 T-2 101 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 36.00 6.00 36.00 3020 0.75 3 40 70 9,513 5 225 10.00 1.812 9.91 1, 2, 3, 4
0T2-SR-9 T-2 102 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4
0T2-SR-8 T-2 104 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2650 0.75 2 40 70 5,565 5 225 10.00 1.060 5.80 1, 2, 3, 4
0T2-SR-7 T-2 106 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2650 0.75 2 40 70 5,565 5 225 10.00 1.060 5.80 1, 2, 3, 4
0T2-SR-6 T-2 107 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4
0T2-SR-5 T-2 108 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4
0T2-SR-4 T-2 108 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4
0T2-SR-3 T-2 109 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4
0T2-SR-2 T-2 110 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4
0T2-SR-1 T-2 110 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4
0T1-SR-7 T-1 101 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4
0T1-SR-6 T-1 106 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4
0T1-SR-5 T-1 105 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2650 0.75 2 40 70 5,565 5 225 10.00 1.060 5.80 1, 2, 3, 4
0T1-SR-4 T-1 104 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2650 0.75 2 40 70 5,565 5 225 10.00 1.060 5.80 1, 2, 3, 4
0T1-SR-3 T-1 102 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4
0T1-SR-2 T-1 102 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 36.00 6.00 36.00 3020 0.75 3 40 70 9,513 5 225 10.00 1.812 9.91 1, 2, 3, 4
0T1-SR-1 T-1 102 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4
TYPE HEIGHT (IN) HEIGHT LENGTH DEPTH LENGTH (IN) LINEAR FOOT ID (IN) FT (BTUH) INLET PRESSURE(PSI) ENTERING TEMP TD GPM LBS/HR
SYMBOL SERVICE ROOM MANUFACTURER MODEL MOUNTING ENCLOSURE SIZE (IN) RADIANT BTUH PER ELEMENT TIERS FINS PER EAT OUTPUT STEAM NOTES
STEAM RADIATOR SCHEDULE
2. PROVIDE WITH MANUFACTURER'S OUTDOOR ENCLOSURE OPTION WITH HEATER PACKAGE. PROVIDE A SEPARATE 120V/1PH CONNECTION FOR ENCLOSURE.
1. PROVIDE WITH CONDENSATE PUMP.
NOTES:
140-DSH-1 BLDG 140 RM 134 CAREL UR006HM1U4 6x6 125 13.2 3 70 2 70 45 4.80 - 480 3 ATTIC 77
81-DSH-1 BLDG 81 RM 134 DRISTREEM RX-24-1 20x12 1200 24 18.72 99 10 72 45 8.00 10.80 480 3 ROOF 431.7 1, 2
74-DSH-1 BLDG 74 RM 126 DRISTREEM RX-12 9X9 125 12 6 90 14 72 45 4.00 7.20 480 3 ROOF 430.5 2
SIZE (IN) CAPACITY DESIGN DEG F % RH DEG F % RH KW FLA VOLT PHASE (LBS)
SYMBOL SERVES MANUFACTURER MODEL DUCT CFM HUMIDIFICATION (LBS/HR) ENTERING AIR CONDITIONS ROOM CONDITIONS ELECTRICAL MOUNTING WEIGHT NOTES
DUCT HUMIDIFIER SCHEDULE
3. EXHAUST FAN SHALL BE ORIENTED IN AN UP BLAST POSITION.
2. PROVIDE MOTOR RATED WALL SWITCH FOR CONTROL.
1. PROVIDE WITH ROOF CURB.
NOTES:
140-EF-1 BLDG 140 GREENHECK CUE-060-VG RM 134 90 0.25 1,384 2.90 - 0.07 - 1.30 2.00 15.00 120 1 29 1,2,3
82-EF-3 BLDG 82 GREENHECK SP-A110 RESTROOM 100 0.20 950 0.90 - - 18 0.19 - - 120 1 17
82-EF-2 BLDG 82 GREENHECK SP-A200 RESTROOM 170 0.30 900 2.50 - - 53 0.46 - - 120 1 24
82-EF-1 BLDG 82 GREENHECK SP-A110 RESTROOM 100 0.20 950 0.90 - - 18 0.19 - - 120 1 17
81-EF-1 BLDG 81 GREENHECK G-140-VG RM 101F 1,100 0.15 712 5.80 ROOF 0.25 - 2.10 2.60 15.00 120 1 62 1,2
74-EF-1 BLDG 74 GREENHECK G-060-VG RM 126 115 0.20 1427 3.10 - 0.07 - 1.30 2.00 15.00 208 1 22 1,2
SERVED (IN) HP W FLA MCA MOCP VOLT PHASE (LBS)
SYMBOL SERVES MANUFACTURER MODEL AREA CFM ESP RPM SONES MOUNTING ELECTRICAL WEIGHT NOTES
FAN SCHEDULE
VETERANS HEALTH
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
2025/03/17
100% CONSTRUCTION
DOCUMENTS
CONSULTANT
2025/03/17
GDM, Inc.
1308 NE 134th St, Suite A Vancouver, WA 98685 P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
A u to d e sk D o cs
/2
-0
W a lla
W a lla
R e p la ce M e ch a n ic a l S ys te m s/
-0
W a lla W a lla
S ys te m
R e p la ce m e n t_
M e ch a n ic a l_
.r vt
/1
/2
:3
:4
P
M
MH004
SCHEDULES REPLACE MECHANICAL AND
PLUMBING SYSTEMS
WALLA WALLA, WASHINGTON
687-21-106
KTJB
A/E
FULLY SPRINKLERED
6. PROVIDE CEILING PAN FOR T-BAR.
5. COORDINATE DIFFUSER TYPE WITH THE ARCHITECTURAL REFLECTED CEILING PLAN.
4. ALL SUPPLY AIR DIFFUSERS ARE 4-WAY DISTRIBUTION PATTERN UNLESS SHOWN OTHERWISE.
3. PROVIDE MANUAL AIR DAMPERS AT EACH BRANCH DUCT TO A SINGLE DIFFUSER, REGISTER, OR GRILLE.
2. FURNISH ALL PRODUCTS OF A SINGLE MANUFACTURER.
1. REFER TO PLANS FOR SIZE AND QUANTITY.
NOTES:
RG-2 PRICE 80 RETURN DUCT / GYP BOARD EGG CRATE ALUMINUM WHITE 1, 2, 3, 5
RG-1 PRICE 80 RETURN T-BAR EGG CRATE ALUMINUM WHITE 1, 2, 3, 5, 6
EG-2 PRICE 80 EXHAUST DUCT / GYP BOARD EGG CRATE ALUMINUM WHITE 1, 2, 3, 5
EG-1 PRICE 80 EXHAUST T-BAR EGG CRATE ALUMINUM WHITE 1, 2, 3, 5, 6
SD-2 PRICE 30 SUPPLY GYP BOARD GRILLE ALUMINUM WHITE 1, 2, 3, 5
SD-1 PRICE AMCD SUPPLY T-BAR MODULAR CORE ALUMINUM WHITE 1, 2, 3, 4, 5, 6
SYMBOL MANUFACTURER MODEL SERVICE MOUNTING TYPE STYLE MATERIAL FINISH NOTES
AIR INLETS AND OUTLETS SCHEDULE
3. PROVIDE WITH FACTORY PAINTED FINISH, COLOR SELECTED FROM MANUFACTURER'S STANDARD COLOR PALETTE. CONFIRM COLOR SELECTION WITH ARCHITECT.
2. PROVIDE LOUVER WITH SHEET METAL PLENUM BEHIND FULL LOUVER AREA, MINIMUM 6" DEPTH.
1. PROVIDE LOUVER WITH BIRD SCREEN ON INSIDE OF LOUVER.
NOTES:
65-L-4 GREENHECK ESD-435 EXHAUST AIR 210 12.00 12.00 6.00 50.00 0.50 0.08 980 SEE NOTES 1,2,3
65-L-3 GREENHECK ESD-435 OUTSIDE AIR 210 12.00 12.00 6.00 50.00 0.50 0.08 980 SEE NOTES 1,2,3
65-L-2 GREENHECK ESD-435 EXHAUST AIR 370 18.00 12.00 6.00 50.00 0.75 0.08 980 SEE NOTES 1,2,3
65-L-1 GREENHECK ESD-435 OUTSIDE AIR 370 18.00 12.00 6.00 50.00 0.75 0.08 980 SEE NOTES 1,2,3
63-L-2 GREENHECK ESD-435 EXHAUST AIR 310 12.00 18.00 6.00 50.00 0.75 0.08 980 SEE NOTES 1,2,3
63-L-1 GREENHECK ESD-435 OUTSIDE AIR 310 12.00 18.00 6.00 50.00 0.75 0.08 980 SEE NOTES 1,2,3
0T7-L-2 GREENHECK ESD-435 EXHAUST AIR 3,500 36.00 36.00 6.00 50.00 4.50 0.08 980 SEE NOTES 1,2,3
0T7-L-1 GREENHECK ESD-435 OUTSIDE AIR 3,500 42.00 36.00 6.00 50.00 5.25 0.08 980 SEE NOTES 1,2,3
LENGTH HEIGHT DEPTH % SQ FT (IN) (FPM)
SYMBOL MANUFACTURER MODEL SERVICE CFM SIZE (IN) FREE AREA MAX PD MAX VELOCITY FINISH NOTES
WEATHERPROOF LOUVER SCHEDULE
7. PROVIDE ELECTRICAL DISCONNECT, TO BE FIELD INSTALLED BY ELECTRICAL CONTRACTOR.
6. PROVIDE WITH CONDENSATE PUMP, TO BE POWERED BY INDOOR UNIT.
5. INDOOR UNITS ARE EQUIPED WITH AN INTERNAL WATER LEVEL DETECTION DEVICE CONFORMING TO UL 508 PER IPC 314.2.3.
4. THE CORRECTED CAPACITIES INCLUDE THE DE-RATE ASSOCIATED WITH INDOOR UNITS VS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .