This document is a comprehensive mechanical and electrical design specification for a VA Medical Center replacement project located in Walla Walla, Washington. The project, identified as VA Project Number 687-21-106, involves replacing mechanical and plumbing systems across multiple buildings at the facility, with a focus on upgrading HVAC, electrical, and plumbing infrastructure. The design documents are at 100% construction document phase, prepared by GDM, Inc., and dated March 17, 2025, with compliance to numerous building codes including the 2021 International Building Code, NFPA standards, and VA design manuals.

The specification covers mechanical and electrical work for approximately 10-12 different buildings, including Buildings 143, 140, 82, 81, 74, 66, 65, 63, T-7, T-1, and T-2. Key technical requirements include installing new HVAC systems with variable air volume (VAV) components, upgrading electrical panels and distribution systems, implementing energy-efficient components, and ensuring compliance with accessibility and fire safety standards. The project includes comprehensive demolition of existing systems and installation of new mechanical, electrical, plumbing, and control systems, with specific attention to system commissioning, permit acquisition, and adherence to VA design guidelines.

View the file

Other files

File Type Posted
36C26025R0065 0006.docx DOCX document
36C26025R0065 0004.docx DOCX document
Attachment 15 - Building 82 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 14 - Building 81 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 18 - Building T7 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 20 - Building T7 Walla Walla System Replacement M.pdf PDF
Attachment 21 - Schedules Walla Walla System Replacement_Me.pdf PDF
Attachment 11 - Building 65 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 12 - Building 66 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 13 - Building 74A Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 23 - WWMC- Topology - All Utilities 02.pdf PDF
Attachment 19 - Building T7 Walla Walla VAMC Electrical Plan.pdf PDF
Attachment 10 - Building 63 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 17 - Building T2 Walla Walla VAMC - Final Rev 1.pdf PDF
Attachment 23 - WWMC- Topology - All Utilities.pdf PDF
Attachment 22 - Photos Walla Walla VAMC.pdf PDF
36C26025R0065 0003.docx DOCX document
Attachment 16 - Building T1 Walla Walla VAMC - Final Rev 1.pdf PDF
36C26025R0065 0002.docx DOCX document
36C26025R0065 0001.docx DOCX document
Attachment 6 - Contractor Rules of Behavior.pdf PDF
Attachment 9 - PPQ NCO 20 687-21-106 CON Replace Mechanical and Plumbing.docx DOCX document
Attachment 8 - Limitations on Subcontracting 687-21-106 Mech and Plumbing.docx DOCX document
Attachment 7 - Divisional Price Breakout.xlsx XLSX spreadsheet
Attachment 4 - Calculations 687-21-106 WWW Replace Mechanical and Plumbing 03-17-2025.pdf PDF
Attachment 1 - SOW CON Replace Mechanical and Plumbing Systems 687-21-106_R0V2 02.pdf PDF
Attachment 2 - SPECS 687-21-106 Replace Mechanical and Plumbing 06-25-2025.pdf PDF
36C26025R0065_1.docx DOCX document
Attachment 5 - Wage Determination 6-06-2025.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

100% CONSTRUCTION

DOCUMENTS

CONSULTANT

GDM, Inc.

1308 NE 134th St, Suite A Vancouver, WA 98685 541-436-4723

WWW.GDM-AE.COM

VA PROJECT NUMBER:

CONTRACT NUMBER:

PROJECT DESIGN TEAM

APPLICABLE CODES, REGULATIONS, VA DESIGN MANUALS SHEET INDEX

A u to d e sk D o cs

/2

-0

W a lla

W a lla

R e p la ce M e ch a n ic a l S ys te m s/

-0

W a lla W a lla

S ys te m

R e p la ce m e n t_

M e ch a n ic a l_

.r vt

/2

/2

:2

:0

A

M

G001

COVER SHEET REPLACE MECHANICAL AND

PLUMBING SYSTEMS

WALLA WALLA, WASHINGTON

687-21-106

AFJB

A/E

FULLY SPRINKLERED

77 WAINWRIGHT DR.

US DEPARTMENT OF VETERAN AFFAIRS

REPLACE MECHANICAL AND PLUMBING SYSTEMS

100% CONSTRUCTION DOCUMENTS

WALLA WALLA, WA 99362

DATE 2025/03/17

687-21-106

WALLA WALLA, WA VAMC

36C26022N0538

2025/03/17

2025/03/17

ACCESSIBILITY CODE

FEDERAL ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABASS), REV 2015

PG-18-13 VA FIRE BARRIER (A SUPPLEMENT TO FEDERAL BARRIERS ACT ACCESSIBILITY

STANDARDS) FIRE DESIGN GUIDE, DEC 2011

BUILDING CODES

INTERNATIONAL CODE COUNCIL (ICC)

IBC—INTERNATIONAL BUILDING CODE, 2021

IFC—INTERNATIONAL FIRE CODE, 2021

IFGC—INTERNATIONAL FUEL GAS CODE, 2021

IMC—INTERNATIONAL MECHANICAL CODE, 2021

IPC—INTERNATIONAL PLUMBING CODE, 2021

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA LIFE SAFETY CODE-101, 2021

NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHER, 2018 EDITION

NFPA 13 STANDARDS FOR INSTALLATION ON SPRINKLER SYSTEMS 2022

NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2022

NFPA 70 NATIONAL ELECTRICAL CODE (NEC) ESSENTIALS 2020

NFPA 70E ELECTRICAL SAFETY IN THE WORKPLACE, 2021

NFPA 75 STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT, 2020.

NFPA 101 LIFE SAFTY CODE ESSENTIALS 2021

NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION ALTERATION AND DEMOLITION

OPERATIONS, 2022

NFPA 2001 STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS, 2021

NFPA 855 STANDARD FOR THE INSTALLATION OF STATIONARY ENERGY STORAGE SYSTEMS, 2020

NFPA 99 HEALTHCARE FACILITIES CODE

NFPA NEC HEALTHCARE FACILITIES CODE

NFPA STANDARD FOR THE INSTALLATION OF LIGHTING PROTECTION

NFPA 2001 STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS

VA DESIGN MANUALS

VA OFFICE OF CONSTRUCTION AND FACILITY MANAGEMENT DESIGN MANUAL AUGUST 1, 2014

PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS, HTTP://WWW.CFM.VA.GOV/TIL/SPEC.ASP2)

PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES, APRIL 2019,

HTTP://WWW.CFM.VA.GOV/TIL/CPRO.ASP

PG-18-14 ROOM FINISHES, DOOR AND HARDWARE SCHEDULE – DECEMBER 2018

PG-18-15 VOL C A/E SUBMISSIONS INSTRUCTION OF MINOR AND NRM CONSTRUCTION PROGRAM NOV

VA INTERIOR DESIGN

INTERIOR DESIGN MANUAL FOR NEW CONSTRUCTION AND RENOVATIONS OF HOSPITALS AND

CLINICS — NOVEMBER 1, 2020 HTTP://WWW/CFM.VA.GOV/TIL/DMANUAL/DMLDHONH.PDF

VA ELECTRICAL DESIGN

VA ELECTRICAL DESIGN MANUAL – DECEMBER 1, 2019

VA LIGHTING DESIGN

LIGHTING DESIGN MANUAL — DECEMBER 2015

HTTP://WWW.CFM.VA.GOV/TIL/DMANUAL/DMLIGHTING.PDF

VA STRUCTURAL ENGINEERING

VA SEISMIC CODES AND STANDARDS, H-18-8 HTTP://WWW.CFM.VA.GOV/TIL/SEISMIC.ASP

VA SUSTAINABILITY

SUSTAINABLE DESIGN MANUAL MANUAL – REV 1 AUGUST 18, 2017,

HTTPS://WWW.CFM.VA.GOV/TIL/SUSTAIN/DMSUSTAIN.PDF

VA ASBESTOS ABATEMENT

ASBESTOS ABATEMENT DESIGN MANUAL FOR NEW HOSPITALS, REPLACEMENT HOSPITALS,

AMBULATORY CARE, CLINICAL ADDITIONS, ENERGY CENTERS, OUTPATIENT CLINICS, ANIMAL

RESEARCH FACILITIES, LABORATORY BUILDINGS – JULY 2011

VA-JOINT COMMISSION CLARIFICATION DOCUMENTS

SUMMARY OF DISCUSSION ISSUES RELATED TO VHA IMPLEMENTATION OF THE JOINT COMMISSION ENVIRONMENT OF CARE (EC) AND LIFE SAFETY (LS) STANDARDS, MAY 2021 REVISION. EFFECTIVE

DATE: MAY 1, 2021

MECHANICAL

DESIGN STANDARDS

AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR-CONDITIONING ENGINEERS (ASHRAE)

STANDARD 62.1 – VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY, 2017

STANDARD 90.1 - ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS, STANDARD 170 - VENTILATION OF HEALTH CARE FACILITIES, 2021

SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION

HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE

HVAC SYSTEMS COMMISSIONING MANUAL, 2ND EDITION, 2013

SEISMIC RESTRAINT MANUAL GUIDELINES FOR MECHANICAL SYSTEMS, 3RD EDITION, 2008

US DEPARTMENT OF VETERAN’S AFFAIRS (VA)

HVAC DESIGN MANUAL (REVISION 1), PG18-10, 1 MAY 2021

SUSTAINABLE DESIGN MANUAL (REVISION 1), 18 AUGUST 2017

A. REQUIREMENTS FOR VA MINOR NEW CONSTRUCTION AND RENOVATION PROJECTS (I.E. UNDER

$20,000,000) WHOLE BUILDING COMMISSIONING MANUAL (REVISION 1), NOVEMBER 2013

12" = 1'-0"1

SITE MAP

425-828-0500

POC: DENNIS TESCHLOG

KIRKLAND, WA 98033

520 KIRKLAND WAY, SUITE 301

PRODIMS

COST ESTIMATOR

509-780-1312 541-436-4723 541-436-4723

POC: MARK AYLWARD POC: COLLIN BUNDY POC: CELYN DEZMAIN

RIO RANCHO, NM 87124 VANCOUVER, WA 98685 VANCOUVER, WA 98685

2600 THE AMERICAN ROAD SE, SUITE 100 1308 NE 134TH ST SUITE A 1308 NE 134TH ST SUITE A

GDM-NEW MEXICO GDM-WASHINGTON GDM-WASHINGTON

ARCHITECT STRUCTURAL ENGINEER CIVIL ENGINEER

509-987-8633 360-318-7095 541-436-4723

POC: ROBERT TAYLOR POC: JESSE BARKSDALE POC: MICHAEL REBSTOCK

WALLA WALLA, WA 99362 LACEY, WA 98503 VANCOUVER, WA 98685

77 WAINWRIGHT DRIVE 4317 6TH AVENUE SE, SUITE 300 1308 NE 134TH ST SUITE A

WALLA WALLA VA GDM-WASHINGTON GDM-WASHINGTON

OWNER MECHANICAL ENGINEER ELECTRICAL ENGINEER

Revisions: Date:

106 000-CS-002 CIVIL DETAILS

105 000-CS-001 OVERALL CIVIL SITE PLAN

CIVIL

104 000-EJ-005 ELECTRICAL PANEL SCHEDULES

103 000-EJ-004 ELECTRICAL PANEL SCHEDULES

102 000-EJ-003 ELECTRICAL ONE-LINE DIAGRAMS

101 000-EJ-002 ELECTRICAL DEMOLITION ONE-LINE DIAGRAMS

100 000-EJ-001 CAMPUS PRIMARY ONE-LINE DIAGRAM #1

99 143-EP-101 BLDG 143 FIRST FLOOR ELECTRICAL PLAN

98 143-ED-101 BLDG 143 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

97 140-EP-102 BLDG 140 ROOF ELECTRICAL PLAN

96 140-EP-101 BLDG 140 FIRST FLOOR ELECTRICAL PLAN

95 140-ED-102 BLDG 140 ROOF ELECTRICAL DEMOLITION PLAN

94 140-ED-101 BLDG 140 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

93 082-EP-102 BLDG 82 SECOND FLOOR ELECTRICAL PLAN

92 082-EP-101 BLDG 82 FIRST FLOOR ELECTRICAL PLAN

91 082-ED-102 BLDG 82 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

90 082-ED-101 BLDG 82 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

89 081-EP-102 BLDG 81 ROOF ELECTRICAL PLAN

88 081-EP-101 BLDG 81 FIRST FLOOR ELECTRICAL PLAN

87 081-ED-102 BLDG 81 ROOF ELECTRICAL DEMOLITION PLAN

86 081-ED-101 BLDG 81 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

85 074-EP-102 BLDG 74 SECOND FLOOR ELECTRICAL PLAN

84 074-ED-102 BLDG 74 SECOND FLOOR ELECTRICAL DEMOLITION PLAN

83 065-EP-102 BLDG 65 ATTIC ELECTRICAL PLAN

82 065-EP-101 BLDG 65 FIRST FLOOR ELECTRICAL PLAN

81 065-ED-101 BLDG 65 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

80 063-EP-101 BLDG 63 BASEMENT AND FIRST FLOOR ELECTRICAL PLANS

79 063-ED-101 BLDG 63 BASEMENT AND FIRST FLOOR ELECTRICAL DEMOLITION PLANS

78 0T7-EP-102 BLDG T-7 ATTIC ELECTRICAL PLAN

77 0T7-EP-101 BLDG T-7 CRAWL SPACE AND FIRST FLOOR ELECTRICAL PLANS

76 0T7-ED-102 BLDG T-7 ATTIC ELECTRICAL DEMOLITION PLAN

75 0T7-ED-101 BLDG T-7 CRAWL SPACE AND FIRST FLOOR ELECTRICAL DEMOLITION

74 0T1-EP-101 BLDG T-1 AND T-2 ELECTRICAL PLANS

73 0T1-ED-101 BLDG T-1 AND T-2 ELECTRICAL DEMOLITION PLANS

72 000-ES-003 ENLARGED SITE PLAN

71 000-ES-002 ENLARGED SITE PLAN

70 000-ES-001 OVERALL ELECTRICAL SITE PLAN

69 000-ES-000 SITE KEY PLAN

68 000-EG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES

ELECTRICAL

67 143-MH-202 BLDG 143 ENLARGED MECHANICAL PLANS

66 143-MH-201 BLDG 143 ENLARGED MECHANICAL PLANS

65 143-MH-101 BLDG 143 FIRST AND SECOND FLOOR MECHANICAL PLANS

64 140-MH-202 BLDG 140 ENLARGED MECHANICAL PLANS

63 140-MH-201 BLDG 140 ENLARGED MECHANICAL PLANS

62 140-MH-102 BLDG 140 ROOF AND ATTIC MECHANICAL PLAN

61 140-MH-101 BLDG 140 FIRST FLOOR MECHANICAL PLAN

60 082-MH-103 BLDG 82 ATTIC MECHANICAL PLAN

59 082-MH-102 BLDG 82 SECOND FLOOR MECHANICAL PLAN

58 082-MH-101 BLDG 82 FIRST FLOOR MECHANICAL PLAN

57 082-MD-103 BLDG 82 ATTIC MECHANICAL DEMOLITION PLAN

56 082-MD-102 BLDG 82 SECOND FLOOR MECHANICAL DEMOLITION PLAN

55 082-MD-101 BLDG 82 FIRST FLOOR MECHANICAL DEMOLITION PLAN

54 081-MH-103 BLDG 81 ROOF MECHANICAL PLAN

53 081-MH-102 BLDG 81 FIRST FLOOR MECHANICAL PLAN

52 081-MH-101 BLDG 81 CRAWL SPACE MECHANICAL PLAN

51 081-MD-103 BLDG 81 ROOF HVAC DEMOLITION PLAN

50 081-MD-102 BLDG 81 FIRST FLOOR MECHANICAL DEMOLITION PLAN

49 081-MD-101 BLDG 81 CRAWL SPACE MECHANICAL DEMOLITION PLAN

48 074-MH-102 BLDG 74 SECOND FLOOR MECHANICAL PLAN

47 074-MH-101 BLDG 74 FIRST FLOOR MECHANICAL PLAN

46 074-MD-102 BLDG 74 SECOND FLOOR MECHANICAL DEMOLITION PLAN

45 074-MD-101 BLDG 74 FIRST FLOOR MECHANICAL DEMOLITION PLAN

44 066-MH-103 BLDG 66 ROOF MECHANICAL PLAN

43 066-MH-102 BLDG 66 FIRST FLOOR MECHANICAL PLAN

42 066-MH-101 BLDG 66 BASEMENT MECHANICAL PLAN

41 066-MD-103 BLDG 66 ROOF MECHANICAL DEMOLITION PLAN

40 066-MD-102 BLDG 66 FIRST FLOOR MECHANICAL DEMOLITION PLAN

39 066-MD-101 BLDG 66 BASEMENT MECHANICAL DEMOLITION PLAN

38 065-MH-103 BLDG 65 ATTIC MECHANICAL PLAN

37 065-MH-102 BLDG 65 FIRST FLOOR MECHANICAL PLAN

36 065-MH-101 BLDG 65 FOUNDATION PLAN

35 065-MD-102 BLDG 65 FIRST FLOOR MECHANICAL DEMOLITION PLAN

34 065-MD-101 BLDG 65 FOUNDATION DEMOLITION PLAN

33 063-MH-101 BLDG 63 MECHANICAL PLANS

32 063-MD-101 BLDG 63 MECHANICAL DEMOLITION PLANS

31 0T7-MH-102 BLDG T-7 MECHANICAL PLANS

30 0T7-MH-101 BLDG T-7 MECHANICAL PLANS

29 0T7-MD-102 BLDG T-7 ATTIC MECHANICAL DEMOLITION PLAN

28 0T7-MD-101 BLDG T-7 MECHANICAL DEMOLITION PLANS

27 0T2-MH-101 BLDG T-2 MECHANICAL PLANS

26 0T2-MD-101 BLDG T-2 MECHANICAL DEMOLITION PLANS

25 0T1-MH-101 BLDG T-1 MECHANICAL PLANS

24 0T1-MD-101 BLDG T-1 MECHANICAL DEMOLITION PLANS

23 MH022 CONTROL SEQUENCE OF OPERATIONS

22 MH021 CONTROL POINTS LISTS

21 MH020 STEAM DIAGRAMS

20 MH019 STEAM DIAGRAMS

19 MH018 DOMESTIC WATER DIAGRAMS

18 MH017 DOMESTIC WATER DIAGRAMS

17 MH016 DOMESTIC WATER DIAGRAMS

16 MH015 DETAILS - 082

15 MH014 DETAILS - 081

14 MH013 DETAILS - 065

13 MH012 DETAILS - 063

12 MH011 DETAILS - 0T7

11 MH010 DETAILS - 0T1 & 0T2

10 MH009 DETAILS

9 MH008 DETAILS

8 MH007 DETAILS

7 MH006 DETAILS

6 MH005 SCHEDULES

5 MH004 SCHEDULES

4 MH003 SCHEDULES

3 MH002 SITE PLAN

2 MH001 LEGEND, ABBREVIATIONS LIST, AND GENERAL NOTES

1 G001 COVER SHEET

MECHANICAL

PAGE SHEET NUMBER SHEET NAME

VETERANS HEALTH

ADMINISTRATION

VISN 20

FLEXIBLE DUCT

DUCT DOWN (ROUND)

DUCT UP (ROUND)

PL105

A

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

DRAWING NUMBER WHERE DRAWN

PL105

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

DIRECTION OF PIPE PITCH (DOWN)

UNION

CAPPED OUTLET

POINT OF CONNECTION BETWEEN NEW AND

STRAINER

BALL VALVE

CHECK VALVE

AUTOMATIC OR MANUAL AIR VENT

PIPE OR DUCT BREAK (GRAPHIC ONLY -

COLD WATER PIPING

CONTINUOUS PIPE/DUCT)

(WALL TYPE)

DN

DN

UP

UP EXHAUST DUCT (UP & DOWN)

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

DNUP RETURN DUCT (UP & DOWN)

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

SQUARE 1-WAY CEILING DIFFUSERS

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SECTION.)

10x8

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

MANUAL VOLUME DAMPER

SUPPLY

RETURN45°

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

45°

AUTOMATIC CONTROL DAMPER MODULATING

EXISTING WORK

PUMP

T THERMOSTAT

TE TEMPERATURE SENSOR

PETE'S PLUG

STRAINER WITH BLOWDOWN VALVE & 3/4'' HOSE

CONNECTION

DRAIN/BLOWDOWN VALVE WITH 3/4'' HOSE

CONNECTION

SYMBOL

SYMBOL LEGEND

DESCRIPTION SYMBOL DESCRIPTION

CEILING / WALL ACCESS PANEL

CD-1 12"X12"

100 CFM

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

RISE OR DROP IN PIPE

THERMOMETER

TEMPERATURE GAUGE

PIPE UP

PIPE DOWN

GATE VALVE

WALL CLEANOUT

FLUSH CLEANOUT OR SURFACE CLEANOUT

VENT PIPING

WASTE PIPING

3"WCO

3"WCO

HOT WATER CIRCULATION PIPING

HOT WATER PIPING

CONNECT NEW DUCT TO EXISTING DUCT

VANED ELBOW (SHORT RADIUS)

VD

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED

PTAC

WINDOW TYPE AIR CONDITIONING UNIT

CONVECTOR OR RADIATOR (RECESSED)

CONVECTOR OR RADIATOR (WALL HUNG)

EXISTING PIPE OR OBJECT TO BE REMOVED

SUPPLY ARROW

EXHAUST ARROW

BACKFLOW PREVENTOR

FLOOR DRAIN

DIFFUSER CALLOUT ( TYPE, SIZE, CFM )

26-P-3

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

PUMP NO.3 IN BUILDING NO.26

EQUIPMENT ABBREVIATION (PUMP)

26-TU-I-I ITEM NUMBER (TERMINAL UNIT NO.1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO.1

BUILDING NO. WHERE EQUIPMENT IS LOCATED

(WALL TYPE)

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

BFP

M METER

TEMPERING VALVE

SOFTEN COLD WATERSCW

CIRCUIT SETTER

BALANCING VALVE

INVERTED BUCKET TRAP SET INCLUDING PIPING

ACCESSORIES

GLOBE VALVE

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES

GATE VALVE WITH 3/4 " HOSE ADAPTER

ECCENTRIC REDUCER

EQUIPMENT CLEARANCE

M MOTORIZED DAMPER SIZED TO FIT IN DUCTWORK

PRESSURE REGULATING VALVE

PRESSURE RELIEF VALVE

TWO POSITION CONTROL VALVE

PRESSURE REDUCING VALVE

FLEXIBLE DUCT

BUTTERFLY VALVE

PE PRESSURE SENSOR C2 C02 SENSOR

HE HUMIDITY SENSOR TH TEMPERATURE AND HUMIDITY SENSOR

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

2025/03/17

100% CONSTRUCTION

DOCUMENTS

CONSULTANT

2025/03/17

GDM, Inc.

1308 NE 134th St, Suite A Vancouver, WA 98685 P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

A u to d e sk D o cs

/2

-0

W a lla

W a lla

R e p la ce M e ch a n ic a l S ys te m s/

-0

W a lla W a lla

S ys te m

R e p la ce m e n t_

M e ch a n ic a l_

.r vt

/1

/2

:3

:2

P

M

MH001

LEGEND, ABBREVIATIONS LIST, AND

GENERAL NOTES

REPLACE MECHANICAL AND

PLUMBING SYSTEMS

WALLA WALLA, WASHINGTON

687-21-106

KTJB

A/E

FULLY SPRINKLERED

ABBREVIATIONS LIST

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VRF VARIABLE REFRIGERANT FLOW

VTR VENT THROUGH ROOF

W/ WITH

W WASTE

W WATT

WB WET BULB

WC WATER CLOSET

WC WATER COLUMN

WCO WALL CLEANOUT

WI WIDTH

°F DEGREES FAHRENHEIT

(E) EXISTING

A AMPERES

A/E ARCHITECT/ENGINEER

AABC ASSOCIATED AIR BALANCE COUNCIL

ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD

ABV ABOVE

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

AG AIRGAP

AHU AIR HANDLING UNIT

AMP AMPERES

APD AIR PRESSURE DROP

ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS

ASJ ALL SERVICE JACKET

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

ASTM AMERICAN SOCIETY FOR TESTING MATERIALS

AUX AUXILIARY

AVG AVERAGE

AWG AVERAGE WIRE GUAGE

BC BRANCH CIRCUIT CONTROLLER

BDD BACKDRAFT DAMPER

BFP BACKFLOW PREVENTER

BHP BREAK HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

C CONDUIT

CAP CAPACITY

CD CEILING DIFFUSER

CFH CUBIC FEE PER HOUR

CFM CUBIC FEET PER MINUTE

CFSD COMBINATION FIRE/SMOKE DAMPER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CIRC CIRCULATION

CO CLEANOUT

CO2 CARBON DIOXIDE

COMP COMPRESSED

COND CONDENSATE

CONN CONNECTION

COP COEFFICIENT OF PERFORMANCE

CPVC CHLORINATED POLYVINYL CHLORIDE

CSR CURRENT SENSING RELAY

CU CUBIC

CV COEFFICIENT OF FLOW

CW COLD WATER

DB DRY BULB

DC DIRECT CURRENT

DC DOUBLE CHECK

DDC DIRECT DIGITAL CONTROL

DEG DEGREE (FAHRENHEIT)

DF DRINKING FOUNTAIN

DIA DIAMETER

DISCH DISCHARGE

DN DOWN

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE (DEGREES FAHRENHEIT)

EC ELECTRICAL CONTRACTOR

EDB ENTERING DRY BULB TEMPERATURE (DEGREES FAHRENHEIT)

EER ENERGY EFFICIENCY RATIO

EFF EFFICIENCY

EG EXHAUST GRILLE

ELEC ELECTRICAL

EMCS ENERGY MANAGEMENT/CONTROL SYSTEM

ERV ENERGY RECOVERY VENTILATOR

ESP EXTERNAL STATIC PRESSURE

EWB ENTERING WET BULB TEMPERATURE (DEGREES FAHRENHEIT)

EWT ENTERING WATER TEMPERATURE (DEGREES FAHRENHEIT)

EXH EXHAUST

F FAHRENHEIT

F FIRE

F&FD FLOOR & FUNNEL DRAIN

FCO FLUSH CLEANOUT

FD FLOOR DRAIN

FIN FINISHED

FLA FULL LOAD AMPERES

FLR FLOOR

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

FU FIXTURE UNITS

FWH FREEZEPROOF WALL HYDRANT

G GAS

GA GAUGE

GAL GALLON

GC GENERAL CONTRACTOR

GPD GALLONS PER DAY

GPF GALLONS PER FLUSH

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GYP GYPSUM

H HEIGHT

HB HOSE BIBB

HOR HORIZONTAL

HP HORSEPOWER

HPC HIGH PRESSURE CONDENSATE

HPS HIGH PRESSURE STEAM

HSPF HEATING SEASON PERFORMANCE FACTOR

HR HOUR

HRS HOURS

HW HOT WATER

HWC HOT WATER CIRCULATION

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

IBC INTERNATIONAL BUILDING CODE

ID INSIDE DIAMETER

IEER INTEGRATED ENERGY EFFICIENCY RATIO

IMC INTERNATIONAL MECHANICAL CODE

IN INCH

INDW INDIRECT WASTE

IPLV INTEGRATED PART LOAD VALUE

IU INDOOR UNIT

IWT INSTANT WATER HEATER

KW KILOWATT

L LENGTH

LAT LEAVING AIR TEMPERATURE (DEGREES FAHRENHEIT)

LAV LAVATORY

LB POUND

LBS POUNDS

LPC LOW PRESSURE CONDENSATE

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LPS LOW PRESSURE STEAM

LWT LEAVING WATER TEMPERATURE (DEGREES FAHRENHEIT)

MAX MAXIMUM

MBH THOUSAND BRITISH THERMAL UNITS PER HOUR

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPACITY

MERV MINIMUM ENERGY REPORTING VALUE

MFG MANUFACTURER

MFR MANUFACTURER

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

MPC MEDIUM PRESSURE CONDENSATE

MPS MEDIUM PRESSURE STEAM

MRT MEAN RADIANT TEMPERATURE

N/A NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NEBB NATIONAL ENVIRONMENTAL BALANCING BUREAU

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NO NORMALLY OPEN

NPLV NON-STANDARD PART LOAD VALUE

NPSHA NOMINAL PUMP SUCTION HEAD AVAILABLE

NPSHR NOMINAL PUMP SUCTION HEAD REQUIRED

NRC NOISE REDUCTION CRITERIA

OA OUTSIDE AIR

OD OUTSIDE DIAMETER

ORL OVERFLOW RAIN LEADER

OSA OUTSIDE AIR

OSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION

OU OUTDOOR UNIT

PB PRESSURE BALANCE

PD PRESSURE DROP

PH PHASE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSID POUNDS PER SQUARE INCH DIFFERENTIAL

PSIG POUNDS PER SQUARE INCH GAUGE

PTAC PACKAGED TERMINAL AIR CONDITIONER

PVC POLYVINYL CHLORIDE

QTY QUANTITY

RA RETURN AIR

RECT RECTANGULAR

RG RETURN GRILLE

RGB RED-GREEN-BLUE

RL RAIN LEADER

RM ROOM

RP REDUCED PRESSURE

RPBP REDUCED PRESSURE BACKFLOW PREVENTER

RPM REVOLUTIONS PER MINUTE

RR REFRIGERANT RETURN

RS REFRIGERANT SUPPLY

RTU ROOFTOP UNIT

SA SUPPLY AIR

SCFM STANDARD CUBIC FEET PER MINUTE

SC SENSIBLE COOLING

SCH SCHEDULE

SCO SURFACE CLEANOUT

SCW SOFT COLD WATER

SD SUPPLY DIFFUSER

SEER SEASONAL ENERGY EFFICIENCY RATIO

SENS SENSIBLE

SF SQUARE FEET

SGR STEAM GRAVITY CONDENSATE RETURN

SH SHOWER

SM SHEET METAL

SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL

ASSOCIATION

SP SET POINT

SP STATIC PRESSURE

SPR STEAM PUMPED CONDENSATE RETURN

SPWG STATIC PRESSURE (INCHES WATER GAUGE)

SQ FT SQUARE FEET

SQ IN SQUARE INCHES

SS STAINLESS STEEL

ST STORM DRAIN

STM STEAM

SVR STEAM VACUUMED CONDENSATE RETURN

T&PV TEMPERATURE & PRESSURE RELIEF VALVE

T TEMPERATURE

TC TOTAL COOLING

TD TEMPERATURE DROP

TEMP TEMPERATURE

TS THERMOSTATIC

TW TEMPERED WATER

TYP TYPICAL

UL UNDERWRITERS LABORATORIES

UPC UNIFORM PLUMBING CODE

UR URINAL

UV ULTRAVIOLET

V VENT

V VOLT

VA UNITED STATES DEPARTMENT OF VETERAN'S AFFAIRS

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

GENERAL NOTES

1. PROVIDE SYSTEM STARTUP, TESTING, & ADJUSTMENTS OF INSTALLED

SYSTEMS TO MEET PERFORMANCE REQUIREMENTS INDICATED IN THE

CONTRACT DOCUMENTS.

2. CONTRACTOR SHALL SUPPORT SYSTEM COMMISSIONING AND SHALL

COORDINATE WITH PROJECT COMMISSIONING AGENT.

3. CONTRACTOR SHALL PROVIDE ALL DOCUMENTATION REQUIRED TO

SUPPORT SYSTEM COMMISSIONING.

4. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND

CONSTRUCTION FEES. FURNISH COPIES OF ALL CONSTRUCTION

PERMITS, FINAL APPROVED PERMITS, AND SIMILAR DOCUMENTS TO

OWNER DOCUMENTING COMPLIANCE WITH CODE REQUIREMENTS.

5. BASIS OF DESIGN: THE PRODUCTS OR SERVICES IN THE BASIS OF

DESIGN AND EQUIPMENT/PRODUCT SCHEDULES ON THESE DRAWINGS

WERE PURPOSELY SELECTED BY THE A/E TO MEET THE OWNER’S

PROGRAMMING REQUIREMENTS AND ARE NOT BEING "SOLE-SOURCED"

BY THE VA UNLESS NOTED OTHERWISE. PRODUCTS FROM OTHER

MANUFACTURERS WITH EQUAL SALIENT CHARACTERISTICS, EQUAL

QUALITY, EQUAL LEAD TIMES, AND EQUAL MAINTENANCE COSTS MAY BE

USED TO BID AND CONSTRUCT THE PROJECT. BIDDERS SHALL CONTACT

THE A/E VIA THE VA PROJECT CONTRACTING OFFICER DURING THE BID

PHASE FOR APPROVAL OF THE SUBSTITUTION REQUEST ON EACH ITEM.

IN THE EVENT A CONTRACTOR IS AWARDED THE PROJECT WITHOUT

OBTAINING VA APPROVAL OF THE SUBSTITUTION REQUEST DURING THE

BID PHASE AND THE SHOP DRAWINGS AND SUBMITTALS OF ALTERNATE

MANUFACTURERS ARE NOT APPROVED BY THE A/E OR THE VA THEN THE

CONTRACTOR MUST INSTALL THE BASIS OF DESIGN PRODUCTS OR

SERVICES AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL

BE RESPONSIBLE FOR ANY AND ALL CHANGES RESULTING FROM

PRODUCT SUBSTITUTIONS. NON-APPROVED PRODUCTS OR SERVICES

ARE AT THE CONTRACTOR'S RISK AND NO EQUITABLE ADJUSTMENT TO

TIME OR MONEY WILL BE MADE FOR COST DIFFERENCES BETWEEN

APPROVED VERSUS NON-APPROVED AFTER BIDDING HAS BEEN CLOSED.

ALLOW SEVEN CALENDAR DAYS BEFORE BIDS ARE DUE TO OBTAIN

APPROVAL.

6. ALL VALVES, TRAPS, TEST PORTS, DAMPERS, CONTROLS, CLEANOUTS,

ETC. SHALL BE LOCATED SO AS TO BE ACCESSIBLE FOR MAINTENANCE,

ADJUSTMENT, & TESTING. PROVIDE ACCESS PANELS FOR ALL

CONCEALED DEVICES. ACCESS PANEL LOCATIONS AND FINISHES SHALL

BE COORDINATED WITH ARCHITECT.

7. ALL PIPING & DUCTWORK IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING

SYSTEM. REFER TO ARCHITECTURAL DOCUMENTS FOR FURRING &

CHASE LOCATIONS & SIZES.

8. ALL PIPING & DUCTWORK EXPOSED IN UTILITY SPACES OR SIMILAR

AREAS SHALL BE PAINTED. COORDINATE PAINTING REQUIREMENTS &

FINISHES WITH ARCHITECT.

9. ALL EXPOSED PIPING & DUCTWORK SHALL BE PAINTED. COORDINATE

PAINTING REQUIREMENTS & FINISHES WITH ARCHITECT.

10. ALL PIPING ROUTED EXPOSED IN AREAS ADJACENT TO VEHICLE TRAFFIC

SHALL BE PROVIDED WITH STEEL PIPE PROTECTION (BOLLARDS, GUARD

RAILS, PLATING, OR SIMILAR).

11. THE FIRST FIGURE OF DUCT SIZE CALLOUTS INDICATES DIMENSION OF

FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.

PROVIDE ANY APPLICABLE DUCT LINING AND INSULATION PER THESE

PLANS AND SPECIFICATIONS. NOMINAL OUTER DUCT DIMENSIONS ARE

NET INSIDE DIMENSIONS PLUS 2X INSULATION THICKNESS.

12. DUCTWORK SHALL BE 2.0" PRESSURE CLASS UNLESS OTHERWISE NOTED

ON THESE DRAWINGS.

13. CONSTRUCT DUCTWORK ACCORDING TO INTERNATIONAL ENERGY

CONSERVATION CODE SECTION C403.12.2.

14. PROVIDE TURNING VANES IN ALL MITERED RECTANGULAR DUCT ELBOWS

& TEES.

15. PROVIDE MANUAL BALANCING DAMPERS ON ALL NEW AND MODIFIED

DUCT BRANCHES TO AIR INLETS & OUTLETS. LOCATE DAMPERS AS

CLOSE TO MAIN TRUNK DUCT CONNECTION AS POSSIBLE. WHERE

BRANCH DUCTWORK IS INACCESSIBLE (SUCH AS ABOVE HARD LID

CEILING SYSTEM), PROVIDE BALANCING DAMPER AT REGISTER, GRILLE,

OR DIFFUSER.

16. PROVIDE MOTORIZED DAMPERS ON OUTDOOR AIR SUPPLY, EXHAUST

OPENINGS, AND RELIEF OUTLETS. DAMPERS SHALL HAVE A MAXIMUM

LEAKAGE RATE OF 4 CFM PER SQUARE FOOT AT 1” W.C. DAMPERS SHALL

BE INTERLOCKED WITH ASSOCIATED FANS, EQUIPMENT, AND OTHER

DAMPERS SERVING THE SAME ZONE OR AREA.

17. RELIEF GRAVITY DAMPERS SHALL HAVE A MAXIMUM LEAKAGE RATE OF

20 CFM PER SQUARE FOOT AT 1” W.C. DAMPERS SMALLER THAN 24” IN

EITHER DIRECTION SHALL HAVE A MAXIMUM LEAKAGE RATE OF 40 CFM

PER SQUARE FOOT AT 1” W.C.

18. PROVIDE COMPLETE CONDENSATE DRAINAGE SYSTEM FOR MINI-SPLIT,

SPLIT SYSTEM, AND OTHER HVAC SYSTEMS WITH COOLING,

CONDENSING, OR HEAT PUMP COILS. FIELD ROUTE DRAINAGE PIPING

FROM EQUIPMENT TO NEAREST DRAIN LOCATION (SUCH AS SERVICE

SINK, FUNNEL DRAIN, ETC.). SLOPE NON-PRESSURIZED DRAIN PIPING TO

DRAIN LOCATION. PIPING & FITTINGS SHALL BE TYPE L COPPER. MINIMUM

PIPE SIZE SHALL BE 3/4". INCREASE PIPE SIZE WHERE APPLICABLE PER

IMC 307.2.2.

19. PIPING & DUCTWORK SHALL BE ROUTED SO AS NOT TO OBSTRUCT

ACCESS OR CAUSE TRIPPING OR OTHER HAZARDS.

20. PIPING & DUCTWORK SHALL BE ROUTED SO AS TO MAINTAIN CODE-

REQUIRED CLEARANCES FOR ELECTRICAL EQUIPMENT, ADA

ACCESSIBILITY, AS WELL AS MAINTAINING CLEAR ACCESS AT ALL DOORS,

WINDOWS, & OTHER ARCHITECTURAL FEATURES IN THE BUILDING.

21. SIZE REFRIGERANT PIPING ON SPLIT SYSTEM UNITS & VRF SYSTEMS PER

MANUFACTURER'S RECOMMENDATION.

22. PROVIDE 5W/FT HEAT TRACE FOR ALL DOMESTIC WATER SYSTEM PIPING

& P-TRAPS IN UNHEATED SPACES.

23. PIPING INSULATION SHALL MEET OR EXCEED INTERNATIONAL ENERGY

EFFICIENCY CODE SECTION C403.12.3 REQUIREMENTS.

24. UN-RECIRCULATED HOT AND TEMPERED WATER SYSTEM BRANCHES

SHALL NOT EXCEED 25 FEET IN DEVELOPED LENGTH.

25. TOTAL STATIC PRESSURE NOTED IN SCHEDULES SHALL BE ASSUMED TO

INCLUDE DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.

26. ALL SUPPLY AIR FILTERS SHALL BE MINIMUM MERV-8 RATED. ALL

RETURN/EXHAUST/OUTSIDE AIR FILTERS SHALL BE MINIMUM MERV-8

RATED.

27. AIR INLET & OUTLET SIZES SHOWN ON PLANS ARE NECK SIZES. PROVIDE

ADDITIONAL PANS, HARDWARE, ETC., REQUIRED TO INSTALL AIR INLETS &

OUTLETS IN CEILING SYSTEM.

28. WALL REGISTER-TYPE AIR INLETS & OUTLETS SHALL BE INSTALLED AT 7"

AFF MINIMUM ELEVATION.

29. AIR INLETS & OUTLETS IN UNFINISHED SPACES OR OPEN CEILING AREAS

SHALL BE INSTALLED AT 72" AFF UNLESS OTHERWISE NOTED ON THESE

DRAWINGS. ALL INLETS & OUTLETS WITHIN THE SAME SPACE SHALL BE

INSTALLED AT THE SAME ELEVATION.

30. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL

BE MANUFACTURED & CONNECTED IN COUNTER-FLOW CONFIGURATION

BETWEEN WATER & AIR.

31. HYDRONIC HEATING & CHILLED WATER SYSTEMS SHALL BE PROVIDED

WITH 20% PROPYLENE GLYCOL BY SYSTEM VOLUME. CONTRACTOR

SHALL CONFIRM PERCENTAGE WITH VA BEFORE SYSTEM FILL.

32. ALL PRESSURES LISTED ARE GAGE PRESSURES UNLESS OTHERWISE

NOTED.

33. STEAM DISTRIBUTION PRESSURES ARE GENERALLY HIGH PRESSURE

(60-90 PSIG) FOR SITE DISTRIBUTION, AND LOW PRESSURE (<15 PSI)

WITHIN BUILDINGS.

34. PROVIDE MANUAL/AUTOMATIC AIR VENTS AT ALL LOCAL HIGH POINTS

FOR HYDRONIC SYSTEMS.

35. PROVIDE COMPLETE DRAINAGE PIPING SYSTEM FOR DISCHARGE FROM

ALL AIR VENTS INSTALLED ON HYDRONIC PIPING. FIELD ROUTE

DRAINAGE PIPING FROM EQUIPMENT TO NEAREST DRAIN LOCATION

(SUCH AS SERVICE SINK, FUNNEL DRAIN, ETC.). DRAIN LOCATIONS SHALL

BE IN UTILITY ROOMS OR OTHER NON-PUBLIC AREAS. SLOPE NON-

PRESSURIZED DRAIN PIPING TO DRAIN LOCATION. PIPING & FITTINGS

SHALL BE TYPE-L COPPER WITH BRAZED OR SWEAT FITTINGS. MINIMUM

PIPE SIZE SHALL BE 3/4".

36. PROVIDE SEISMIC SUPPORT, BRACING, AND ATTACHMENTS FOR

DUCTWORK, PIPING, AND EQUIPMENT.

37. SEISMIC PROVISIONS SHALL BE PROVIDED TO MEET REQUIREMENTS FOR

ASCE-7 BUILDING SEISMIC DESIGN CATEGORY C, SITE CLASS C, & RISK

CATEGORY IV.

38. COORDINATE ALL MECHANICAL AND PLUMBING WORK WITH OTHER

TRADES TO INSURE PROPER AND ADEQUATE INTERFACE OF THEIR WORK

WITH THE WORK SHOWN ON THESE DOCUMENTS. CONTRACTOR SHALL

PROVIDE COORDINATED SHOP DRAWINGS FOR APPROVAL PRIOR TO

FABRICATION AND INSTALLATION.

39. ALL ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH

NFPA 70 STANDARDS AND LOCAL REQUIREMENTS.

40. ALL FIELD WIRING SHALL REQUIRE AN ELECTRICAL PERMIT AND SHALL BE

PERFORMED BY A LICENSED ELECTRICIAN.

41. A SHORT DASH IN A SCHEDULE TABLE CELL INDICATES THAT THE

COLUMN HEADING IS NOT USED OR NOT APPLICABLE TO THAT

SCHEDULED ITEM.

42. MAINTAIN AND RESTORE (IF INTERRUPTED) ALL CONDUITS &

CONDUCTORS, PIPING, & DUCTWORK PASSING THROUGH RENOVATED

AREAS AND SERVICING UNDISTURBED AREAS.

43. REMOVE ALL ABANDONED DUCTWORK, PIPING, CONTROLS, WIRING, ETC.,

WHERE ACCESSIBLE IN RENOVATED AREAS.

44. WHERE CONTROLS ARE DEMOLISHED, REMOVE WIRING BACK TO

NEAREST CONTROL PANEL OR JUNCTION BOX. REMOVE ACCESSIBLE

CONDUIT, JUNCTION BOXES, ETC.

45. ALL FIRE ALARM CONNECTIONS AND WORK SHALL BE PERFORMED IN

ACCORDANCE WITH DIVISION 28 SPECIFICATIONS.

46. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL FOR ALL EQUIPMENT AND

COMPONENTS REMOVED DURING DEMOLITION.

47. CONTRACTOR SHALL SCAN WALLS, FLOORS, CEILINGS, AND OTHER

SURFACES THAT COULD CONCEAL COMPONENTS SUCH AS EXISTING

PIPING, ELECTRICAL ITEMS, OR OTHERS PRIOR TO ANY CUTTING,

DRILLING, OR SIMILAR OPERATION TO VERIFY THAT THE AREA OF WORK

IS CLEAR OF COMPONENTS THAT COULD BE DAMAGED.

48. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL CUTTING &

RESTORATION WORK NECESSARY IN EXISTING AREAS OF THE BUILDING

TO PROVIDE WORK SHOWN ON THESE DOCUMENTS. RESTORATION

SHALL INCLUDE PATCHING TO MATCH EXISTING SURROUNDING

CONSTRUCTION AND FINISHES. PATCHED AREAS SHALL BE RE-PAINTED

FULL HEIGHT OF WALL FROM WALL CORNER TO WALL CORNER.

49. CONTRACTOR SHALL PATCH AND REPAIR ANY UNUSED PENETRATIONS,

MOUNTING POINTS, ETC. TO MATCH EXISTING ADJACENT SURFACE AND

FINISH TO MATCH EXISTING.

50. WHERE NEW EQUIPMENT OR COMPONENTS ARE INSTALLED IN THE SAME

LOCATION AS DEMOLISHED ITEMS, CONTRACTOR SHALL PATCH AND

REPAIR FINISHES AND SURFACES LEFT EXPOSED BY NEW EQUIPMENT TO

MATCH EXISTING SURROUNDING SURFACES AND FINISHES.

51. WHERE EQUIPMENT OR COMPONENTS ARE DEMOLISHED AND NO

REPLACEMENT IS INSTALLED, CONTRACTOR SHALL INFILL, PATCH, AND

FINISH SURFACES TO MATCH ADJACENT SURFACES AND FINISHES.

Revisions: Date:

VETERANS HEALTH

B O

OK

S H

EL

F

B

OOKSH

ELF

B

OOKSH

ELF

P

ED

B

OX

B O X

FI

LE

P

ED

B

OX

B O X

FI

LE

P

ED

B

OX

B O X

FI

LE

P

ED

B

OX

B O X

FI

LE

P

ED

B

OX

B O X

FI

LE

PED

B

OX B

OX FILE

ROOF ACCESS LADDER

W/ LOCKABLE SECURITY

GATE

VESTI BULE

PO RT E CO CHE'ER10 0

HSKP

14 5

T-1

T-2

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

STATE NURSING HOME

F U

T U

R E

S T A

T E

N U

R S

IN

G

H O

M E

105 115

CM

WATER TOWER

F U

T U

R E

B

LD

G

PR

V

Va ul t

Me te r

Va ul t

PR

V

Va ul t

8"

BUILDING 82

BUILDING 81

BUILDING 63

BUILDING 65

BUILDING 140

BUILDING T-2

BUILDING T-1

BUILDING T-7

BUILDING 66

BUILDING 143

BUILDING 74

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

2025/03/17

100% CONSTRUCTION

DOCUMENTS

CONSULTANT

2025/03/17

GDM, Inc.

1308 NE 134th St, Suite A Vancouver, WA 98685 P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

A u to d e sk D o cs

/2

-0

W a lla

W a lla

R e p la ce M e ch a n ic a l S ys te m s/

-0

W a lla W a lla

S ys te m

R e p la ce m e n t_

M e ch a n ic a l_

.r vt

/1

/2

:3

:2

P

M

MH002

SITE PLAN REPLACE MECHANICAL AND

PLUMBING SYSTEMS

WALLA WALLA, WASHINGTON

687-21-106

ARJB

A/E

FULLY SPRINKLERED

NORTH

N.T.S.1

SITE PLAN

Revisions: Date:

PLAN NOTES

CONTRACTOR SHALL PROVIDE AND INSTALL (30) RENTED CUBICLE UNITS IN

BUILDING 66 1ST FLOOR LEVEL (10 IN SMALL ROOM, 20 IN LARGER ROOM).

CUBICLES SHALL BE PER VA SPECIFICATIONS. VA SHALL PROVIDE POWER &

DATA CONNECTIONS FOR ALL CUBICLES. REFER TO BUILDING 66 PLANS

FOR REFERENCE.

VETERANS HEALTH

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

2025/03/17

100% CONSTRUCTION

DOCUMENTS

CONSULTANT

2025/03/17

GDM, Inc.

1308 NE 134th St, Suite A Vancouver, WA 98685 P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

A u to d e s k D o c s /2

-0

W a lla

W a lla

R e p la c e

M e c h a n ic a l S y s te m s /2

-0

W a lla W a lla

S y s te m R e p la c e m e n t_

M e c h a n ic a l_

.r v t

/1

/2

:4

:1

P

M

MH003

SCHEDULES REPLACE MECHANICAL AND

PLUMBING SYSTEMS

WALLA WALLA, WASHINGTON

687-21-106

KTJB

A/E

FULLY SPRINKLERED

NOTES:

82-WC-1 BROAN 843BL 6 EXHAUST BLACK POWDER COAT

81-WC-2 BROAN 843BL 6 EXHAUST BLACK POWDER COAT

81-WC-1 BROAN 610F 6 OSA BLACK POWDER COAT

T7-WC-2 BROAN 843BL 6 EXHAUST BLACK POWDER COAT

T7-WC-1 BROAN 610F 6 OSA BLACK POWDER COAT

SYMBOL MANUFACTURER MODEL SIZE SYSTEM FINISH NOTES

WALL CAP SCHEDULE

Revisions: Date:

1. EQUIPMENT FURNISHED BY VA FOR CONTRACTOR INSTALLATION.

NOTES:

OPC-SH-2 DRISTEEM VLC-100-4 44.72" X 32" X 47.11" 285 BLDG 143 480 3 120.3 12 4 500 1

(LENGTH X WIDTH X HEIGHT) CAPACITY (LBS/HR) VOLT PH FLA QTY. STAGES (LBS)

SYMBOL MANUFACTURER MODEL DIMENSIONS MAX. STEAM SERVICE ELECTRICAL HEATERS WEIGHT NOTES

STEAM HUMIDIFIER

NOTES:

B140-134 CLEAN STORAGE 106.00 8.00 848.00 4.00 100 90 0 0 7.08 POSITIVE

B81-101F 967.00 8.00 7736.00 4.00 1200 1100 0 0 9.31 POSITIVE

B74-126 CLEAN STORAGE 92.00 8.00 736.00 4.00 125 115 0 0 10.19 POSITIVE

FLOOR AREA HEIGHT VOLUME REQ'D ACH SUPPLY EXHAUST RETURN TRANSFER ACH

SPACE ROOM DIMENSIONS (FT) MINIMUM AIRFLOW (CFM) DESIGN PRESSURIZATION NOTES

AIR CHANGE CALCULATIONS

NOTES:

OPC-WS-1 WATER SOFTENER 1 BLDG 143 CULLIGAN 20X54 DEMOLISH

OPC-SH-3 STEAM HUMIDIFIER 1 BLDG 143 SERVES AHU-2. DRISTREEM VLC-100-4, 480V/3PH, 120.3A, 100 KW, 285 LBS/HR CAPACITY -

OPC-SH-2 STEAM HUMIDIFIER 1 BLDG 143 SERVES AHU-1. DRISTREEM VLC-50-2, 480V/3PH, 60.1A, 50 KW, 142.5 LBS-HR CAPACITY DEMOLISH

OPC-SH-1 STEAM HUMIDIFIER 1 BLDG 143 SERVES AHU-1. DRISTREEM VLC-100-4, 480V/3PH, 120.3A, 100 KW, 285 LBS/HR CAPACITY -

OPC-AHU-1 AIR HANDLER 1 BLDG 143 SERVES 1ST FLOOR. 39000 MAX CFM SA, 27000 CFM MIN SA, 9000 CFM MIN OSA, 242309 BTU TC, 108500 BTU HC, -

140-ERV-03 ENERGY RECOVERY VENTILATOR 1 140-RTU-03 VENMAR CES ERV1500eWF1BG22SXHE, 480V/3PH, 5.2 MCA, 7 MOCP, SA: 0.75 HP, 1.33 AMP. EA: 1.5 HP, 2.2AMP. 1200 CFM DEMOLISH

140-ERV-02 ENERGY RECOVERY VENTILATOR 1 140-RTU-02 VENMAR CES ERV1500eWF1BG22SXHE, 480V/3PH, 6 MCA, 8 MOCP, SA: 1.5 HP, 2.2 AMP. EA: 1.5 HP, 2.2AMP. 1350 CFM DEMOLISH

140-ERV-01 ENERGY RECOVERY VENTILATOR 1 140-RTU-01 VENMAR CES ERV1500eWF1BG22SXHE, 480V/3PH, 5.2 MCA, 7 MOCP, SA: 0.75 HP, 1.33 AMP. EA: 1.5 HP, 2.2AMP. 1200 CFM DEMOLISH

140-RTU-04 ROOFTOP UNIT 1 BLDG 140

9500 CFM SA, 2500 CFM OSA, 3" WC ESP, 1517 RPM, 9.39 BHP, 308.67 MBH SC, 365.65 MBH TC, 0.28"WC APD, 540 MBH HEATING INPUT, 432 MBH HEATING

OUTPUT, 0.03" WC APD, 480V/3PH, 80 FLA, 85 MCA

DEMOLISH

140-RTU-03 ROOFTOP UNIT 1 BLDG 140 AAON RN-007-3-0-EBD9-329, 7 TON, 480V/3PH, 19 MCA, 25 MOCP, R410A REFRIGERANT DEMOLISH

140-RTU-02 ROOFTOP UNIT 1 BLDG 140 AAON RN-008-3-0-EAD9-329, 480V/3PH, 25 MCA, 35 MOCP, R410A REFRIGERANT DEMOLISH

140-RTU-01 ROOFTOP UNIT 1 BLDG 140 AAON RN-007-3-0-EBD9-329, 480V/3PH, 19 MCA, 25 MOCP, R410A REFRIGERANT DEMOLISH

140-MAU-1 MAKE-UP AIR UNIT 1 BLDG 140 ABSOLUT-AIRE, MODEL: V1-HOM, 1490 CFM, 0.5" W.C. ESP, 1 HP, NATURAL GAS DIRECT FIRED BURNER, MAX. 112 MBH, MIN. 15 MBH, 480V/3PH, 3.1 FLA DEMOLISH

140-HWP-2 HEATING WATER PUMP 1 BLDG 140 ARMSTRONG 15x1x18, 45 GPM, 55 FT HEAD, 2 HP, 1800 RPM, 460V/3PH, 2.9 AMPS DEMOLISH

140-HWP-1 HEATING WATER PUMP 1 BLDG 140 ARMSTRONG 15x1x18, 45 GPM, 55 FT HEAD, 2 HP, 1800 RPM, 460V/3PH, 2.9 AMPS DEMOLISH

140-TMV-1 THERMOSTATIC MIXING VALVE 1 BLDG 140 SYMMONS 5-900, 55 GPM @ 10 PSI DROP DEMOLISH

140-HWRP-2 140 DEG RECIRC PUMP 1 BLDG 140 TACO, 0011-SF4, 1/8HP, 1.76 AMP, 115V/1PH, 3250 RPM6 GPM, 15' HEAD DEMOLISH

140-HWRP-1 DOM HW RECIRC PUMP 1 BLDG 140 TACO, 0011-SF4, 1/8HP, 1.76 AMP, 115V/1PH, 3250 RPM, 6 GPM, 15' HEAD DEMOLISH

FC-1.13 FAN COIL 1 BLDG 82 - -

82-HRV-1 HEAT RECOVERY VENTILATOR 1 BLDG 82 AMERICAN ALDES VENTILATION CORP., MODEL: 700SFD, 120V/1PH, 5.6 FLA -

(E) RADIATOR RADIATOR 2 BLDG 82 - -

(E) SWAMP COOLER SWAMP COOLER 1 BLDG 82 - -

(E) PTAC UNIT PTAC 1 BLDG 82 - -

(E) STEAM HEATER STEAM HEATER 3 BLDG 82 - -

81-RTU-1 ROOFTOP UNIT 1 BLDG 81 AAON RK-06-2-E0-000, 3450 RPM, 18.6 FLA, 1.63 ESP, 35 MCA, 50 MOCP, 208V, 3PH, R-22 REFRIGERANT DEMOLISH

81-OU-1 OUTDOOR UNIT 1 BLDG 81 MITSUBISHI PUY-A12NKA7, 12 MBH, 208V/1PH, 11 MCA, 28 MOCP -

81-IU-1 INDOOR UNIT 1 BLDG 81 MITSUBISHI PEAD-A12, 350 CFM, 0.14 ESP, 208V/1 PH, 1.45 MCA, 15 MOCP -

(E) RADIATOR RADIATOR 4 BLDG 81 - -

74-RTU-02 ROOFTOP UNIT 1 BLDG 74 MAMMOTH TL20-1023-E, 480V/3PH, 38.4 MCA,50 MOCP, R-438A, 4500 CFM, 3" TSP, 3.8 BHP, 5 HP, 140 MBH TC, 230 MBH STEAM COIL CAPACITY DEMOLISH

74-RTU-01 ROOFTOP UNIT 1 BLDG 74 MAMMOTH TL20-1823-E, 480V/3PH, 69.6 MCA, 90 MOCP, R-438A, 8000 CFM, 4" TSP, 8.1 BHP, 10 HP, 240 MBH TC, 300 MBH STEAM COIL CAPACITY DEMOLISH

65-OU-1 OUTDOOR UNIT 1 BLDG 65 DUCTLESS AIRE DA1821-H2-O, 15 MCA, 15 MOCP -

65-IU-1 INDOOR UNIT 1 BLDG 65 DUCTLESS AIRE DA1821-H2-I, 3 MCA, 15 MOCP -

(E) STEAM HEATER STEAM HEATER 5 BLDG 65 - -

(E) MECHANICAL UNIT SWAMP COOLER 1 BLDG 65 CHAMPION COOLER, MODEL RWC50/RN50W, 1/2 HP, 120V/1PH, 9.3 AMPS -

(E) PTAC UNIT PTAC 4 BLDG 65 FRIGIDAIRE FFRE1533Q1, 115V/1PH, 15 BTU, 11.2 EER, 12 AMP -

(E) RADIATOR RADIATOR 3 BLDG 65 -

63-UH-1 UNIT HEATER 1 BLDG 63 AIR CURTAIN, MODEL B-62, 1/3 HP, 1725 RPM, 120V/1PH, 6.6 AMPS -

63-OU-1 OUTDOOR UNIT 1 BLDG 63 MITSUBISHI PUY-A12NKA7, 12 MBH, 208V/1PH, 11 MCA, 28 MOCP -

63-IU-1 INDOOR UNIT 1 BLDG 63 MITSUBISHI PEAD-A12, 350 CFM, 0.14 ESP, 208V/1 PH, 1.45 MCA, 15 MOCP -

(E) SWAMP COOLER SWAMP COOLER 1 BLDG 63 - DEMOLISH

(E) STEAM HEATER STEAM HEATER 2 BLDG 63 - DEMOLISH

(E) PTAC UNIT PTAC 1 BLDG 63 - DEMOLISH

(E) RADIATOR RADIATOR 4 BLDG 63 - DEMOLISH

0T7-OU-1 OUTDOOR UNIT 1 T-7 MITSUBISHI PUY-A12NKA7, 12 MBH, 208V/1PH, 11 MCA, 28 MOCP -

0T7-IU-1 INDOOR UNIT 1 T-7 MITSUBISHI PEAD-A12, 350 CFM, 0.14 ESP, 208V/1 PH, 1.45 MCA, 15 MOCP -

(E) PTAC UNIT PTAC 3 T-7 - -

(E) RADIATOR RADIATOR 13 T-7 - DEMOLISH

0T2-OU-1 OUTDOOR UNIT 1 T-2 MITSUBISHI PUY-A12NKA7, 12 MBH, 208V/1PH, 11 MCA, 28 MOCP -

0T2-IU-1 INDOOR UNIT 1 T-2 MITSUBISHI PEAD-A12, 350 CFM, 0.14 ESP, 208V/1 PH, 1.45 MCA, 15 MOCP -

(E) PTAC UNIT PTAC 6 T-2 - -

(E) RADIATOR RADIATOR 12 T-2 - DEMOLISH

0T1-OU-1 OUTDOOR UNIT 1 T-1 MITSUBISHI PUY-A12NKA7, 12 MBH, 208V/1PH, 11 MCA, 28 MOCP -

0T1-IU-1 INDOOR UNIT 1 T-1 MITSUBISHI PEAD-A12, 350 CFM, 0.14 ESP, 208V/1 PH, 1.45 MCA, 15 MOCP -

(E) PTAC UNIT PTAC 4 T-1 - -

(E) RADIATOR RADIATOR 6 T-1 - DEMOLISH

SYMBOL TYPE QTY SERVICE DESCRIPTION/DATA WORK SCOPE NOTES

EXISTING HVAC EQUIPMENT SCHEDULE

11. PROVIDE WITH NEW ROOF CURB WITH MERV 14 FINAL FILTER SECTION.

10. PROVIDE WITH NEW ROOF CURB. NEW ROOF CURB TO MATCH EXISTING CURB HEIGHT TO ALLOW FOR CONNECTION OF EXISTING DUCT TO NEW UNITS.

9. PROVIDE WITH RETURN AIR CO2 SENSOR.

8. UNIT SHALL INCLUDE DX DEHUMIDIFICATION COIL AND SEQUENCES.

7. UNIT CONFIGURED FOR VAV CONTROL.

6. PROVIDE WITH FULL INTEGRATED ECONOMIZER.

5. R454B REFRIGERANT.

4. PROVIDE WITH LONWORKS DDC INTERFACE.

3. PROVIDE WITH INTEGRAL DUCT SMOKE DETECTOR IN RETURN SIDE OF UNIT.

2. PROVIDE WITH 120V CONVENIENCE/SERVICE RECEPTACLE MOUNTED TO UNIT EXTERIOR. POWER TO RECEPTACLE SHALL BE PROVIDED SEPARATELY FROM UNIT BY DIVISION 26 CONTRACTOR.

1. PROVIDE WITH NEW ROOF CURB.

NOTES:

140-RTU-4 AAON RNA-030-C-A--3-GJBBB DX 332.4 271.4 77.9 63.4 54.9 52.4 - - - - - GAS 540.0 437.4 60.8 102.9 DX HOT-GAS 201.9 9500 20.00 14.34 1646 5.02 2.20 X 7000 5.00 1400 0.47 0.20 X 2500 MERV 8 MERV 14 10.58 13.20 - 480 3 80 87 110 3630 2,3,4,5,6,7,8,9,10

140-RTU-3 AAON RNA-007-A-A-3 DX 80.3 64.0 78.9 63.8 52.8 51.1 HEAT PUMP 49.9 - - - GAS 90.0 72.9 52.5 71.6 - - 2100 2.00 1.85 2063 3.11 2.10 X 2100 1.00 689 0.19 0.10 X 750 MERV 8 MERV 14 11.86 14.10 3.59 480 3 20 22 30 1338 2,3,4,5,6,7,9,10

140-RTU-2 AAON RNA-008-A-A-3 DX 94.0 73.5 78.8 63.8 51.3 50.0 HEAT PUMP 79.7 - - - GAS 90.0 72.9 53.0 80.8 - - 2300 3.00 2.15 2174 3.28 2.10 X 2300 1.00 747 0.21 0.10 X 800 MERV 8 MERV 14 11.37 14.10 3.40 480 3 23 26 35 1436 2,3,4,5,6,7,9,10

140-RTU-1 AAON RNA-007-A-A-3 DX 80.3 64.0 78.9 63.8 52.8 51.1 HEAT PUMP 49.9 - - - GAS 90.0 72.9 52.5 71.6 - - 2100 2.00 1.85 2063 3.11 2.10 X 2100 1.00 689 0.19 0.10 X 750 MERV 8 MERV 14 11.86 14.10 3.59 480 3 20 22 30 1338 2,3,4,5,6,7,9,10

81-RTU-1 AAON RNA-006 DX 66.9 56.8 80.5 64.6 54.9 53.5 HEAT PUMP 36.9 - - - - - - 40.0 53.5 DX HOT-GAS 64.7 2200 2.00 1.24 1679 2.10 1.05 X - - - - - - 1200 MERV 8 MERV 14 12.74 14.50 2.50 208 3 34 40 60 1200 1,2,3,4,6,7,8,11

74-RTU-2 NEWTRON CAH4DXHACS12T DX 144.2 121.7 80.0 64.0 55.0 53.1 STEAM 217.6 5.0 225.0 226.0 - - - 55.0 99.6 - - 4500 7.50 4.82 - 4.00 1.00 X 4359 1.50 1.00 - X 3010 MERV 7 MERV 13 10.30 14.90 - 480 3 - 38.4 50 4800 1,2,3,4,5,6,7

74-RTU-1 NEWTRON CAH8DXHACS20T DX 247.6 214.0 80.0 64.0 55.3 53.5 STEAM 314.0 5.0 225.0 327.0 - - - 55.0 91.2 - - 8000 10.00 8.88 - 4.50 1.54 X 7344 3.00 - 1.00 - X 4000 MERV 11 MERV 14 10.30 14.90 - 480 3 - 69.6 90 5200 1,2,3,4,5,6,7,8

( °F) ( °F) ( °F) ( °F) TYPE TOTAL MBH INLET PRESSURE (PSIG) TEMP LBS/HR TYPE INPUT MBH OUTPUT MBH ( °F) ( °F) TYPE MBH

TYPE TOTAL MBH SENS MBH EDB EWB LDB LWB HEATING AUXILIARY HEAT EDB LDB RE-HEAT CFM HP BHP RPM TSP ESP VFD CFM HP RPM TSP ESP VFD OSA PRE FINAL EER IEER COP VOLT PHASE FLA MCA MOCP (LBS)

SYMBOL MANUFACTURER MODEL COOLING HEATING DEHUMIDIFICATION SUPPLY FAN EXHAUST FAN MIN FILTER EFFICIENCY ENERGY EFFICIENCY ELECTRICAL WEIGHT NOTES

AIR HANDLING UNIT SCHEDULE

4. ENCLOSURE TO BE FULL HEIGHT.

3. UNIT TO BE 18 GAUGE C.R.S. WITH BAKED WHITE POWDER COAT FINISH. ELEMENT TO BE COPPER TUBE ALUMINUM FIN.

2. PROVIDE WITH TAMPER RESISTANT DAMPER OPTION.

1. PROVIDE WITH END CAP ACCESSORY WITH 6"x9" ACCESS HATCH ON LEFT AND RIGHT SIDE FOR VALVE ACCESS. MATCH HEIGHT OF UNIT.

NOTES:

82-SR-1 BLDG 82 104 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4

63-SR-4 BLDG 63 101A STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 30.00 3020 0.75 3 40 70 7,928 5 225 10.00 1.510 8.26 1, 2, 3, 4

63-SR-3 BLDG 63 101B STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2650 0.75 2 40 70 5,565 5 225 10.00 1.060 5.80 1, 2, 3, 4

63-SR-2 BLDG 63 101 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 36.00 6.00 36.00 3160 0.75 3 50 70 9,954 5 225 10.00 1.896 10.37 1, 2, 3, 4

63-SR-1 BLDG 63 101C STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 50 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4

0T7-SR-13 T-7 104 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 30.00 3020 0.75 3 40 70 7,928 5 225 10.00 1.510 8.26 1, 2, 3, 4

0T7-SR-12 T-7 108 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 30.00 3020 0.75 3 40 70 7,928 5 225 10.00 1.510 8.26 1, 2, 3, 4

0T7-SR-11 T-7 102 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4

0T7-SR-10 T-7 109 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4

0T7-SR-9 T-7 101 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4

0T7-SR-8 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4

0T7-SR-7 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4

0T7-SR-6 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4

0T7-SR-5 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4

0T7-SR-4 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4

0T7-SR-3 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4

0T7-SR-2 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4

0T7-SR-1 T-7 103 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 42.00 6.00 42.00 3160 0.75 3 50 70 11,613 5 225 10.00 2.212 12.10 1, 2, 3, 4

0T2-SR-12 T-2 111 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4

0T2-SR-11 T-2 101A STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4

0T2-SR-10 T-2 101 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 36.00 6.00 36.00 3020 0.75 3 40 70 9,513 5 225 10.00 1.812 9.91 1, 2, 3, 4

0T2-SR-9 T-2 102 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4

0T2-SR-8 T-2 104 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2650 0.75 2 40 70 5,565 5 225 10.00 1.060 5.80 1, 2, 3, 4

0T2-SR-7 T-2 106 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2650 0.75 2 40 70 5,565 5 225 10.00 1.060 5.80 1, 2, 3, 4

0T2-SR-6 T-2 107 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4

0T2-SR-5 T-2 108 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4

0T2-SR-4 T-2 108 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4

0T2-SR-3 T-2 109 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4

0T2-SR-2 T-2 110 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4

0T2-SR-1 T-2 110 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4

0T1-SR-7 T-1 101 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4

0T1-SR-6 T-1 106 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2120 0.75 1 40 70 4,452 5 225 10.00 0.848 4.64 1, 2, 3, 4

0T1-SR-5 T-1 105 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2650 0.75 2 40 70 5,565 5 225 10.00 1.060 5.80 1, 2, 3, 4

0T1-SR-4 T-1 104 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 2650 0.75 2 40 70 5,565 5 225 10.00 1.060 5.80 1, 2, 3, 4

0T1-SR-3 T-1 102 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4

0T1-SR-2 T-1 102 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 36.00 6.00 36.00 3020 0.75 3 40 70 9,513 5 225 10.00 1.812 9.91 1, 2, 3, 4

0T1-SR-1 T-1 102 STERLING JVB-FT28-LI WALL/FLOOR 28.00 28.00 24.00 6.00 24.00 3020 0.75 3 40 70 6,342 5 225 10.00 1.208 6.61 1, 2, 3, 4

TYPE HEIGHT (IN) HEIGHT LENGTH DEPTH LENGTH (IN) LINEAR FOOT ID (IN) FT (BTUH) INLET PRESSURE(PSI) ENTERING TEMP TD GPM LBS/HR

SYMBOL SERVICE ROOM MANUFACTURER MODEL MOUNTING ENCLOSURE SIZE (IN) RADIANT BTUH PER ELEMENT TIERS FINS PER EAT OUTPUT STEAM NOTES

STEAM RADIATOR SCHEDULE

2. PROVIDE WITH MANUFACTURER'S OUTDOOR ENCLOSURE OPTION WITH HEATER PACKAGE. PROVIDE A SEPARATE 120V/1PH CONNECTION FOR ENCLOSURE.

1. PROVIDE WITH CONDENSATE PUMP.

NOTES:

140-DSH-1 BLDG 140 RM 134 CAREL UR006HM1U4 6x6 125 13.2 3 70 2 70 45 4.80 - 480 3 ATTIC 77

81-DSH-1 BLDG 81 RM 134 DRISTREEM RX-24-1 20x12 1200 24 18.72 99 10 72 45 8.00 10.80 480 3 ROOF 431.7 1, 2

74-DSH-1 BLDG 74 RM 126 DRISTREEM RX-12 9X9 125 12 6 90 14 72 45 4.00 7.20 480 3 ROOF 430.5 2

SIZE (IN) CAPACITY DESIGN DEG F % RH DEG F % RH KW FLA VOLT PHASE (LBS)

SYMBOL SERVES MANUFACTURER MODEL DUCT CFM HUMIDIFICATION (LBS/HR) ENTERING AIR CONDITIONS ROOM CONDITIONS ELECTRICAL MOUNTING WEIGHT NOTES

DUCT HUMIDIFIER SCHEDULE

3. EXHAUST FAN SHALL BE ORIENTED IN AN UP BLAST POSITION.

2. PROVIDE MOTOR RATED WALL SWITCH FOR CONTROL.

1. PROVIDE WITH ROOF CURB.

NOTES:

140-EF-1 BLDG 140 GREENHECK CUE-060-VG RM 134 90 0.25 1,384 2.90 - 0.07 - 1.30 2.00 15.00 120 1 29 1,2,3

82-EF-3 BLDG 82 GREENHECK SP-A110 RESTROOM 100 0.20 950 0.90 - - 18 0.19 - - 120 1 17

82-EF-2 BLDG 82 GREENHECK SP-A200 RESTROOM 170 0.30 900 2.50 - - 53 0.46 - - 120 1 24

82-EF-1 BLDG 82 GREENHECK SP-A110 RESTROOM 100 0.20 950 0.90 - - 18 0.19 - - 120 1 17

81-EF-1 BLDG 81 GREENHECK G-140-VG RM 101F 1,100 0.15 712 5.80 ROOF 0.25 - 2.10 2.60 15.00 120 1 62 1,2

74-EF-1 BLDG 74 GREENHECK G-060-VG RM 126 115 0.20 1427 3.10 - 0.07 - 1.30 2.00 15.00 208 1 22 1,2

SERVED (IN) HP W FLA MCA MOCP VOLT PHASE (LBS)

SYMBOL SERVES MANUFACTURER MODEL AREA CFM ESP RPM SONES MOUNTING ELECTRICAL WEIGHT NOTES

FAN SCHEDULE

VETERANS HEALTH

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

2025/03/17

100% CONSTRUCTION

DOCUMENTS

CONSULTANT

2025/03/17

GDM, Inc.

1308 NE 134th St, Suite A Vancouver, WA 98685 P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

A u to d e sk D o cs

/2

-0

W a lla

W a lla

R e p la ce M e ch a n ic a l S ys te m s/

-0

W a lla W a lla

S ys te m

R e p la ce m e n t_

M e ch a n ic a l_

.r vt

/1

/2

:3

:4

P

M

MH004

SCHEDULES REPLACE MECHANICAL AND

PLUMBING SYSTEMS

WALLA WALLA, WASHINGTON

687-21-106

KTJB

A/E

FULLY SPRINKLERED

6. PROVIDE CEILING PAN FOR T-BAR.

5. COORDINATE DIFFUSER TYPE WITH THE ARCHITECTURAL REFLECTED CEILING PLAN.

4. ALL SUPPLY AIR DIFFUSERS ARE 4-WAY DISTRIBUTION PATTERN UNLESS SHOWN OTHERWISE.

3. PROVIDE MANUAL AIR DAMPERS AT EACH BRANCH DUCT TO A SINGLE DIFFUSER, REGISTER, OR GRILLE.

2. FURNISH ALL PRODUCTS OF A SINGLE MANUFACTURER.

1. REFER TO PLANS FOR SIZE AND QUANTITY.

NOTES:

RG-2 PRICE 80 RETURN DUCT / GYP BOARD EGG CRATE ALUMINUM WHITE 1, 2, 3, 5

RG-1 PRICE 80 RETURN T-BAR EGG CRATE ALUMINUM WHITE 1, 2, 3, 5, 6

EG-2 PRICE 80 EXHAUST DUCT / GYP BOARD EGG CRATE ALUMINUM WHITE 1, 2, 3, 5

EG-1 PRICE 80 EXHAUST T-BAR EGG CRATE ALUMINUM WHITE 1, 2, 3, 5, 6

SD-2 PRICE 30 SUPPLY GYP BOARD GRILLE ALUMINUM WHITE 1, 2, 3, 5

SD-1 PRICE AMCD SUPPLY T-BAR MODULAR CORE ALUMINUM WHITE 1, 2, 3, 4, 5, 6

SYMBOL MANUFACTURER MODEL SERVICE MOUNTING TYPE STYLE MATERIAL FINISH NOTES

AIR INLETS AND OUTLETS SCHEDULE

3. PROVIDE WITH FACTORY PAINTED FINISH, COLOR SELECTED FROM MANUFACTURER'S STANDARD COLOR PALETTE. CONFIRM COLOR SELECTION WITH ARCHITECT.

2. PROVIDE LOUVER WITH SHEET METAL PLENUM BEHIND FULL LOUVER AREA, MINIMUM 6" DEPTH.

1. PROVIDE LOUVER WITH BIRD SCREEN ON INSIDE OF LOUVER.

NOTES:

65-L-4 GREENHECK ESD-435 EXHAUST AIR 210 12.00 12.00 6.00 50.00 0.50 0.08 980 SEE NOTES 1,2,3

65-L-3 GREENHECK ESD-435 OUTSIDE AIR 210 12.00 12.00 6.00 50.00 0.50 0.08 980 SEE NOTES 1,2,3

65-L-2 GREENHECK ESD-435 EXHAUST AIR 370 18.00 12.00 6.00 50.00 0.75 0.08 980 SEE NOTES 1,2,3

65-L-1 GREENHECK ESD-435 OUTSIDE AIR 370 18.00 12.00 6.00 50.00 0.75 0.08 980 SEE NOTES 1,2,3

63-L-2 GREENHECK ESD-435 EXHAUST AIR 310 12.00 18.00 6.00 50.00 0.75 0.08 980 SEE NOTES 1,2,3

63-L-1 GREENHECK ESD-435 OUTSIDE AIR 310 12.00 18.00 6.00 50.00 0.75 0.08 980 SEE NOTES 1,2,3

0T7-L-2 GREENHECK ESD-435 EXHAUST AIR 3,500 36.00 36.00 6.00 50.00 4.50 0.08 980 SEE NOTES 1,2,3

0T7-L-1 GREENHECK ESD-435 OUTSIDE AIR 3,500 42.00 36.00 6.00 50.00 5.25 0.08 980 SEE NOTES 1,2,3

LENGTH HEIGHT DEPTH % SQ FT (IN) (FPM)

SYMBOL MANUFACTURER MODEL SERVICE CFM SIZE (IN) FREE AREA MAX PD MAX VELOCITY FINISH NOTES

WEATHERPROOF LOUVER SCHEDULE

7. PROVIDE ELECTRICAL DISCONNECT, TO BE FIELD INSTALLED BY ELECTRICAL CONTRACTOR.

6. PROVIDE WITH CONDENSATE PUMP, TO BE POWERED BY INDOOR UNIT.

5. INDOOR UNITS ARE EQUIPED WITH AN INTERNAL WATER LEVEL DETECTION DEVICE CONFORMING TO UL 508 PER IPC 314.2.3.

4. THE CORRECTED CAPACITIES INCLUDE THE DE-RATE ASSOCIATED WITH INDOOR UNITS VS.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .