This is a comprehensive set of clarifying sketches and mechanical/electrical control drawings for the New Hampshire Army National Guard State Military Reservation Building 1 Alterations project located at 1 Minuteman Way, Concord, New Hampshire. The project involves the demolition and replacement of the existing Energy Management System (EMS) controls infrastructure with modern control devices while maintaining existing functionality. The scope of work includes replacing building controllers, air handling unit (AHU) controllers, terminal equipment controllers, communication bus systems, graphics interfaces, and data trending capabilities. The project encompasses work on both Building 1 and Building 2, with mechanical work concentrated on retrofitting VAV (variable air volume) controllers, thermostats, CO2 detectors, and associated wiring throughout the first and second floors. Four alternate bid items are specified: three alternates for replacing Energy Recovery Ventilators (ERV-1, ERV-2, and ERV-3) with new units and controls in their existing locations, and one alternate for replacing controls on existing terminal devices and equipment located in Building 1 Room 167. The project requires coordination with building occupants throughout construction with a minimum of two weeks' notice, as the buildings will remain occupied during the work.
The drawings provide detailed mechanical plans, roof layouts, control schematics, and points lists for four AHU systems. Three allowances are included: $3,500 for replacing damaged suspended acoustic ceiling tiles and gypsum wall board ceilings during construction, $4,500 for replacing additional 8-conductor wires beyond the initial ten included in the base bid, and $10,000 for up to fifty new control points and programming to graphics. The project specifies JCI/Tridium-based hardware as the basis of design for building controllers, with provisions for compatible alternate systems subject to owner and engineer approval. All work must be performed in accordance with NFPA, ASHRAE, and Underwriters Laboratories standards, along with applicable municipal and state codes. A one-year warranty on all workmanship, materials, and equipment is required from the date of final acceptance. Testing, adjusting, and balancing work must be performed by an AABC or NEBB certified independent agency, with tolerance specifications of plus/minus 10 percent for hydronic systems and plus/minus 5 percent for air handling unit supply systems.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FF finish floor FE fire extinguisher FLG flashing FD floor drain FRT fire retardant FTG footing FND foundation GA gage, gauge GALV galvanized GC general contract(or) GWB gypsum wall board GFE Government furnished equipment GFCI Government furnished-contractor installed HPDL high pressure decorative laminate HWD hardwood HVAC heating, ventilating & air conditioning HT height HOR horizontal ID inside diameter INSUL insulation JAN janitor JT joint LAV lavatory MAX maximum MECH mechanical MFR manufacturer MH manhole MO masonry opening MTL metal MIN minimum NIC not in contract NTS not to scale OC on center OD outside diameter OPNG opening
PNT paint(ed) PR pair PL plate PT pressure treated PWD plywood REF refrigerator R riser RM room RO rough opening SAC suspended acoustic ceiling SHTH sheathing SIM similar SPEC specification(s) SQ square SS stainless steel STD standard SD storm drain STRUC structural SYS system TBP tile backing panel TDO thermoset decorative overlay TEL telephone TG tempered glass THK thick(ness) TH threshold T&G tongue & groove TOC top of concrete TOM top of masonry TOS top of steel TOW top of wall T tread TYP typical UNO unless noted otherwise VERT vertical VCT vinyl composition tile VR vapor retarder VT vinyl tile WG wire glass W/O with out WD wood
ABI additive bid item ACT acoustic ceiling tile ADJ adjustable AFF above finish floor ALUM aluminum ANC anchor, anchorage ARCH architect(ural) BSMT basement BIT bituminous BLKG blocking BD board BOT bottom BRK brick BLDG building BTWN between CB catch basin CJ control joint CLG ceiling CT ceramic tile CO clean out CL closet CLR clear(ance) COL column CONC concrete CMU concrete masonry unit CONT continuous or continue DP dampproofing DEM demolish, demolition DET detail DIA diameter DWG drawing DF drinking fountain ELEC electric(al) EL elevation ELEV elevator EQ equal EXG existing EXT exterior FG fiberglass FIN finish
D R AW I N G S Y M B O L S
C O N S T R U C TI O N M AT E R I A L S
A B B R E V IATI O N S
INTERIOR ELEVATION
BUILDING SECTION
WALL SECTION
DETAIL
ENLARGED DETAIL
WINDOW TYPE
DOOR NUMBER
VERTICAL ELEVATION
A
Elevation reference number
EL. 100'-0"
A-7
A-2
See this detail...
...on thisdrawing
A-6
B A-4
B A-4
See this section...
...on thisdrawing
COMPACTED
GRANULAR
FILL
GYPSUM
BOARD
TILE BACKING
PANEL
STEEL OR
HEAVY GAUGE
METAL
STONE
(PLAN/ELEV.)
STONE
(SECTION)
CONCRETE
CONCRETE
BLOCK
BRICK
SPRAY APPLIED
URETHANE
INSULATION
RIGID
INSULATION
FOAM IN PLACE
INSULATION
SOUND
ATTENUATION
BATTS
FINISH
WOOD
ROUGH
WOOD
PLYWOOD
PARTICLE
BOARD OR MDF
LIST OF DRAWINGS
COVER SHEET
ARCHITECTURAL DRAWINGS
A-1.0 FIRST FLOOR PLAN
A-1.1 SECOND FLOOR PLAN
A-1.2 ROOF PLAN
NEW HAMPSHIRE
ARMY NATIONAL GUARD
SMR
BUILDING 1 ALTERATIONS
J U LY 1 6, 2 0 26
MECHANICAL DRAWINGS
M0.1 MECHANICAL GENERAL NOTES, LEGENDS, AND SCOPE
M0.2 AHU SERVICE MAP
M1.0 SMR B1 & B2 NETWORK ARCHITECTURE
M2.0 SMR B1 1ST FLOOR NORTH
M2.1 SMR B1 1ST FLOOR SOUTH
M2.2 SMR B1 2ND FLOOR NORTH
M2.3 SMR B1 2ND FLOOR SOUTH
M2.4 SMR B1 ROOF PLAN
M2.5 SMR B2 1ST FLOOR PARTIAL PLAN AND SCOPE NOTES
M3.0 SMR B1 AHU-1 / ERV-1 CONTROLS DIAGRAM
M3.1 SMR B1 AHU-2&3 / ERV-2 CONTROLS DIAGRAM
M3.2 SMR B1 AHU-4 / ERV-3 CONTROLS DIAGRAM
M3.3 SMR B1 VAV - EF & MUA CONTROLS DIAGRAM
1 M I N U T E M A N WAY,
C O N C O R D, N H
C O N S U L T A N T S
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
1 MINUTEMAN WAY
CONCORD, NH
NEW HAMPSHIRE
ARMY NATIONAL GUARD
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
ALTERNATES:
M E C H A N I C A L / E L E C T R I C A L
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
ALTERNATES 1, 2, & 3
BASE BID: EXISTING ERV-1, ERV-2, & ERV-3 AND THEIR CONTROLS WILL REMAIN IN PLACE.
ALTERNATE 1: ADD COST TO REPLACE ERV-1 AND ITS CONTROLS IN THE SAME LOCATION.
ALTERNATE 2: ADD COST TO REPLACE ERV-2 AND ITS CONTROLS IN THE SAME LOCATION.
ALTERNATE 3: ADD COST TO REPLACE ERV-3 AND ITS CONTROLS IN THE SAME LOCATION.
ALTERNATE 4
BASE BID: THE EXISTING CONTROLS FOR EXISTING TERMINAL DEVICES (CUH's, UH's, FTR's, HP-1 THROUGH HP-4, , HEAT
EXCHANGERS, AND PUMPS LOCATED IN BUILDING 1 ROOM 167) NOT INCLUDED IN THE PRIMARY SCOPE, WILL
REMAIN IN PLACE. THE NEW NETWORK WILL BE WIRED TO MAINTAIN EXISTING CONTROLS.
ALTERNATE 4: ADD COST TO REPLACE THE CONTROLS FOR THE THE EXISTING TERMINAL DEVICES (CUH's, UH's, FTR's, HP-1 THROUGH HP-4, HEAT EXCHANGERS AND PUMPS LOCATED IN BUILDING 1 ROOM 167) NOT INCLUDED IN THE PRIMARY SCOPE
AND WIRE TO THE NEW NETWORK.
V I C I N I T Y P L A N
PROJECT
LOCATIONPembroke Rd
Lo udon R d
Airport Rd
Minuteman Way
Minuteman Way
L O C A T I O N P L A N
PROJECT SITEALLOWANCES
ALLOWANCE #1 - $3,500:
REPLACE SUSPENDED ACOUSTIC CEILING TILE, GRID SYSTEM, AND GWB CEILING SYSTEMS IF DAMAGED DURING CONSTRUCTION. CEILING ACCESS MAY BE REQUIRED TO COMPLETE WORK. MATCH EXISTING CEILING TILE AND GRID.
PATCH, FINISH, AND PAINT GWB TO MATCH ADJACENT COLOR AND SHEEN.
ALLOWANCE #2 - $4,500:
REPLACE 8 CONDUCTOR WIRE IN KIND IF MORE THAN (10) EXISTING WIRES NEED TO BE REPLACED. REPLACEMENT OF (10)
WIRES ARE PART OF THE BASE BID.
ALLOWANCE #3 - $10,000:
PROVIDE UP TO 50 NEW POINTS AND PROGRAMMING TO GRAPHICS, COORDINATE ALL NEW POINTS WITH OWNER.
FIRST FLOOR PLAN
3/32" = 1'-0"
PROJECT
NORTH
180179
VAULT
5A
MEN'S LOCKER
WOMEN'S LOCKER
FITNESS
MEN'S BATHROOM W'S BATHROOM
MEN'S SHOWERS W'S SHOWER
DINING
KITCHEN
144143
140A
VESTIBULE
STAIR 3
STAIR 2
STAIR 1
UP
VESTIBULE
UP
UP
138139
132 133
125 124 123
121A
123 121 116 115 114
109108
112111
MEN'S
WOMEN'S
MECHANICAL
DRILL HALL
LOBBY
ELEV
MECH
BUILDING 1BUILDING 2
CORR
100B
EXISTING SUSPENDED ACOUSTIC GRID CEILING
DRAWING KEY
EXISTING PAINTED GYPSUM WALL BOARD CEILING
NOTES:
1. MECHANICAL WORK IN THIS PROJECT REQUIRES ACCESS ABOVE EXISTING
CEILINGS IN SOME LOCATIONS. REMOVE AND SALVAGE ACOUSTIC CEILING
TILES FOR REINSTALLATION IN SAME LOCATIONS. REPLACE DAMAGED
CEILING TILES BEFORE REINSTALLATION AND MATCH EXISTING. GYPSUM
WALL BOARD CEILINGS WILL BE PATCHED, PRIMED AND PAINTED TO MATCH
EXISTING AJACENT SURFACES. SEE ALLOWANCE #1.
2. THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. THE
CONTRACTOR WILL COORDINATE WORK AREAS WITH THE OWNER WITH TWO
WEEKS NOTICE. THIS WILL BE AN ONGOING EFFORT THROUGHOUT
CONSTRUCTION.
A-1.0
R E V I S I O N S
P R O J E C T
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: MO
CHECKED: CD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
M EC H A N IC A L/
E L E C TR IC A L
FIRST FLOOR PLAN
SECOND FLOOR PLAN
A-1.1
SECOND FLOOR PLAN
3/32" = 1'-0"
PROJECT
NORTH
215 214 213 212 209 207
210202
217 218
WOMEN'S
MEN'S255
251 258 270
261 264
271 273272 274
277 276
268ELEV 293 292 291
286 287
290296
STAIR 3
STAIR 2
STAIR 1
DN
DN
DN
237 238
246 245
233 234
WOMEN'S
MEN'S
(OPEN TO BELOW)
(OPEN TO BELOW)
EXG. NH STATE
SEAL INLAY
O F
E
ATTSHET
A L
OF
S E
7 7
EXG. WOOD
PANEL WALL
BUILDING 1BUILDING 2
EXISTING SUSPENDED ACOUSTIC GRID CEILING
DRAWING KEY
EXISTING PAINTED GYPSUM WALL BOARD CEILING
NOTES:
1. MECHANICAL WORK IN THIS PROJECT REQUIRES ACCESS ABOVE EXISTING
CEILINGS IN SOME LOCATIONS. REMOVE AND SALVAGE ACOUSTIC CEILING
TILES FOR REINSTALLATION IN SAME LOCATIONS. REPLACE DAMAGED
CEILING TILES BEFORE REINSTALLATION AND MATCH EXISTING. GYPSUM
WALL BOARD CEILINGS WILL BE PATCHED, PRIMED AND PAINTED TO MATCH
EXISTING AJACENT SURFACES. SEE ALLOWANCE #1.
2. THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. THE
CONTRACTOR WILL COORDINATE WORK AREAS WITH THE OWNER WITH TWO
WEEKS NOTICE. THIS WILL BE AN ONGOING EFFORT THROUGHOUT
CONSTRUCTION.
R E V I S I O N S
P R O J E C T
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: MO
CHECKED: CD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
M EC H A N IC A L/
E L E C TR IC A L
R E V I S I O N S
P R O J E C T
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: MO
CHECKED: CD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
M EC H A N IC A L/
E L E C TR IC A L
ROOF PLAN
A-1.2
ROOF PLAN
3/32" = 1'-0"
PROJECT
NORTH
BASE BID: EXG ERV - 2
ALT NO. 2: REPLACE ERV-2 &
CONTROLS.
EXG SKYLIGHT, TYP.
BASE BID: EXG ERV - 1
ALT NO. 1: REPLACE
ERV-1 & CONTROLS.
BUILDING 1BUILDING 2
BASE BID: EXG ERV - 3
ALT NO. 3: REPLACE
ERV-3 AND CONTROLS.
EXG AHU - 4
EXG AHU - 1
EXG MUA - 17
EXISTING MEMBRANE ROOFING SYSTEM
R E V I S I O N S
P R O J E C T
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: MO
CHECKED: CD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
M EC H A N IC A L/
E L E C TR IC A L
A. THIS BUILDING WILL BE OCCUPIED THOUGHOUT CONSTRUCTION. MAINTAIN SAFE ACCESS AND
EGRESS TO THE BUILDING AT ALL TIMES.
B. ORGANIZE AND PERFORM THE WORK TO MINIMIZE THE DANGER OF DAMAGE TO THE BUILDING.
PROTECT THE BUILDING INTERIORS FROM DAMAGE AT ALL TIMES. PERFORM ROOFING WORK ONLY IN
CLEAR WEATHER.
C. INSTALL ERV'S, FLASHINGS, AND ROOF PENETRATION FLASHINGS TO FORM A COMPLETE WEATHER
TIGHT INSTALLATION.
D. ROOFING CONTRACTOR IS RESPONSIBLE FOR DISCONNECTING / RECONNECTING ANY DUCTWORK, VENTS, ELECTRICAL CONNECTIONS, ETC IN CONJUNCTION WITH ERV AND ROOFING SYSTEM TIE-IN.
E. REPLACE EXISTING ROOF PENETRATION CURBS PER ROOFING MANUFACTURER'S SPECIFICATIONS TO
ACCOMMODATE NEW ERV UNITS SCHEDULED TO BE INSTALLED. AT ALL MEMBRANE ROOFS, WOOD
BLOCKING AND NAILERS ARE UNTREATED. PROVIDE PRESSURE TREATED WOOD BLOCKING AND
NAILERS ONLY IF REQUIRED TO MAINTAIN WARRANTY OF EXISTING MEMBRANE MANUFACTURER.
WWW.GENFLEX.COM FOR MANUF. DETAILS. SEE EXISTING WARRANTY IN SPECIFICATION.
EXISTING FULLY ADHERED TPO ROOFING SYSTEM:
MANUF: GENFLEX ROOFING SYSTEM, LLC. WWW.GENFLEX.COM FOR MANUF. DETAILS.
ROOFING CONTRACTOR: SKYLINE ROOFING COMPANY
861 PAGE ST.
MANCHESTER, NH 03109
GENERAL ROOFING NOTES AT ALTERNATES 1, 2, & 3:
ALTERNATES 1, 2, & 3:
BASE BID: EXISTING ERV-1, ERV-2, & ERV-3 AND THEIR CONTROLS WILL REMAIN IN PLACE.
ALTERNATE 1: ADD COST TO REPLACE ERV-1 AND ITS CONTROLS IN THE SAME LOCATION.
ALTERNATE 2: ADD COST TO REPLACE ERV-2 AND ITS CONTROLS IN THE SAME LOCATION.
ALTERNATE 3: ADD COST TO REPLACE ERV-3 AND ITS CONTROLS IN THE SAME LOCATION.
R E V I S I O N S
P R O J E C T
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: SER
CHECKED: SVD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
MECHANICAL/
ELECTRICAL
M0.1
MECHANICAL
GENERAL
NOTES,
LEGENDS, AND
SCOPE
NOTE: HARDWARE REFERENCES BASIS OF DESIGN IS JCI/TRIDIUM. ALTERNATE SYSTEMS ARE ACCEPTABLE PROVIDED THE SOFTWARE IS OPEN PROTOCOL, ALL LICENSES AND SOFTWARE SHALL BE PROVIDED TO OWNER. ALL SECURITY ACCESS AND CONTROL REQUIREMENTS SHALL BE COMMUNICATED AND APPROVED BY THE OWNER. A COMPATIBLE CONTROLS PLATFORM WITH THE SAME FEATURES WILL BE
CONSIDERED WITH OWNER & ENGINEERS APPROVAL.
BUILDING CONTROLLERS: REPLACE EXISTING TWO (2) BUILDING 1 JACE'S AND SINGLE (1) BUILDING 2 JCI SNE (VERIFY CONTROLLERS IN FIELD) WITH (2) NEW JCI FX-90 TRIDIUM BASED DEVICES, ONE IN EACH BUILDING. COORDINATE WITH EXISTING CONTROL LOOPS (N2 AND LON IN B1, FC BUS IN B2) TO PROVIDE NEW WIRING TO CAPTURE ALL EXISTING AND NEW FIELD EQUIPMENT CONTROLLERS. PROVIDE ROUTERS, CONVERTERS AND ALL OTHER REQUIRED ANCILLARY DEVICES TO MAINTAIN CONTROL OF ALL NEW AND EXISTING EQUIPMENT.
AHU CONTROLLERS: REPLACE EXISTING JCI DX-9100 CONTROLLER WITH JCI F4-CGM FOR MS/TP.
CONTROLLERS: ALL TERMINAL EQUIPMENT CONTROLLERS SHALL BE INVENTORIED FROM THE EXISTING CONTROLS TREE.
COMM BUS: B1 IS A JCI METASYS N2 PROTOCOL BUS. AS WIRE GAUGE AND COMMUNICATION SPEED IS NOT COMPATIBLE WITH AN MS/TP BUS, A NEW COMM BUS SHALL BE INSTALLED TO ALL NEW CONTROLLERS IN B1. THE EXISTING N2 BUS SHALL BE RECONFIGURED TO SERVE ALL
REMAINING CONTROLLERS AND BROUGHT BACK TO THE B1 JACE.
GRAPHICS: ALL GRAPHICS ON THE B1 SYSTEM SHALL BE REPLICATED IN HTML AND INCLUDE ALL DISPLAY, USER INTERFACE, ALARM AND OTHER FEATURES EQUIVALENT TO THE EXISTING. GRAPHICS ON THE B2 CONTROLLER & SERVER SHALL BE REPLICATED ONTO THE NEW SYSTEM IN THE SAME MANNER TO BE CONSISTENT WITH B1 GRAPHICS. NOTIFY ENGINEER IF EXISTING GRAPHICS ON THE B2 SERVER ARE HTML 5 BASED AND SUITABLE FOR RE-USE. GRAPHICS TO BE UPDATED TO INCLUDE MISSING FEATURES AND VERIFY USER ACCESSIBLE: PUMP SWAP SCHEDULES, LEAD/LAG ASSIGNMENTS. PROVIDE ALLOWANCE FOR UP TO 50 NEW POINTS AND PROGRAMMING TO GRAPHICS, COORDINATE ALL NEW POINTS WITH OWNER, SEE ALLOWANCE #3.
DATA TRENDING: ALL I/O POINTS SHALL BE TRENDED, INCLUDING ALL ANALOG SIGNAL AND DIGITAL CHANGES OF STATE. TREND DATA SHALL BE COLLECTED AT 15 SECOND SAMPLE INTERVAL AND STORED FOR A PERIOD OF NOT LESS THAN 365 DAYS.
WORKSTATION: PROVIDE A NEW FRONT-END WORKSTATION TO BE LOCATED IN THE B1 MECH ROOM. SERVER SHALL BE HIGH PERFORMANCE WITH LATEST SOFTWARE AND DRIVERS. HARD DRIVE SHALL HAVE THE CAPACITY TO STORE ALL TREND DATA IN ADDITION TO ALL SYSTEM
REQUIREMENTS. NO SYSTEM PROGRAMMING SHALL RESIDE ON THE WORKSTATION.
NOTE: CONTRACTOR TO ADDRESS ALL DEVICES REMAINING ON B1 N2 NETWORK. FOR JCI EQUIPMENT, MAINTAIN SEPARATE N2 NETWORK FUNCTIONAL. FOR PROPOSED ALTERNATE EQUIPMENT, PROVIDE ALL INTERFACE DEVICES TO MAINTAIN EXISTING CONTROLS FUNCTIONALITY.
FACILITY OPERATION: THE BUILDINGS ARE BOTH OCCUPIED AND SHALL REMAIN OCCUPIED DURING THE WORK. ALL WORK AND EQUIPMENT OUTAGES SHALL BE CAREFULLY COORDINATED AND SCHEDULED WITH THE OWNER TO MINIMIZE THE IMPACT TO OCCUPANTS. SCHEDULE
WORK WITH A MINIMUM OF TWO WEEKS' NOTICE TO OWNER.
GENERAL SCOPE OF WORK:
A/TER1ATES � � �
%ASE %I'� E;ISTI1* ER9��� ER9��� ER9�� A1' THEIR C21TR2/S :I// RE0AI1 I1 3/ACE�
A''�A/TER1ATE �� RE3/ACE ER9�� A1' ITS C21TR2/S I1 THE SA0E /2CATI21� I1C/8'I1* 1E: C8R% A'A3TER� A''�A/TER1ATE �� RE3/ACE ER9�� A1' ITS C21TR2/S I1 THE SA0E /2CATI21� I1C/8'I1* 1E: C8R% A'A3TER� A''�A/TER1ATE �� RE3/ACE ER9�� A1' ITS C21TR2/S I1 THE SA0E /2CATI21� I1C/8'I1* 1E: C8R% A'A3TER�
A/TER1ATE �
%ASE %I'� THE E;ISTI1* C21TR2/S )2R E;ISTI1* TER0I1A/ 'E9ICES �C8H
V� 8H
V� )TR
V� H3�� THR28*H H3��� � HEAT E;CHA1*ERS� A1'
3803S /2CATE' I1 %8I/'I1* � R220 ���� 12T I1C/8'E' I1 THE %ASE SC23E� :I// RE0AI1 I1 3/ACE� THE 1E: 1ET:2R. :I// %E :IRE'
T2 0AI1TAI1 E;ISTI1* C21TR2/S�
A''�A/TER1ATE �� RE3/ACE THE C21TR2/S )2R THE E;ISTI1* TER0I1A/ 'E9ICES �C8H
V� 8H
V� )TR
V� H3�� THR28*H H3��� HEAT
E;CHA1*ERS A1' 3803S /2CATE' I1 %8I/'I1* � R220 ���� 12T I1C/8'E' I1 THE %ASE SC23E� A1' :IRE T2 THE 1E: 1ET:2R.�
A/TER1ATES SC23E 2) :2R.�
MECHANICAL GENERAL NOTESMECHANICAL LEGEND
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
APD AIR PRESSURE DROP
AS AIR SEPARATOR
ABV AUTOMATIC BALANCE VALVE
B BOILER
BF BOILER FEEDWATER
CD CONDENSATE DRAIN
CKT CIRCUIT
CM CONSTRUCTION MANAGER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
DCW DOMESTIC COLD WATER
DR DRAIN
DX DIRECT EXPANSION
<E> EXISTING
E/A EXHAUST AIR
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
ERV ENERGY-RECOVERY VENTILATOR
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
FCU FAN COIL UNIT
FOP FUEL OIL PUMP
FTR FINNED-TUBE RADIATION
GC GENERAL CONTRACTOR
HP HEAT PUMP
HP HORSEPOWER
HR HEATING RADIATOR
HRU HEAT RECOVERY UNIT
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ
IWH INDIRECT WATER HEATER
KH KITCHEN HOOD
KSH KICKSPACE HEATER
LV LOUVER
LPG LIQUID PROPANE GAS
LWR LOOP WATER RETURN
LWS LOOP WATER SUPPLY
MAX MAXIMUM
MBH 1,000 BRITISH THERMAL UNITS
MC MECHANICAL CONTRACTOR
<N> NEW
NG NATURAL GAS
O/A OUTDOOR AIR
P PUMP
PC PLUMBING CONTRACTOR
<R> RELOCATE/RELOCATED
R/A RETURN AIR
S/A SUPPLY AIR
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VB VACUUM BREAKER
VFD VARIABLE FREQUENCY DRIVE
WH WATER HEATER
WPD WATER PRESSURE DROP
A. QUALITY OF WORK
1. IT IS THE INTENT OF THE DRAWINGS AND SPECIFICATIONS TO OBTAIN A COMPLETE AND SATISFACTORY
INSTALLATION. AN ATTEMPT HAS BEEN MADE TO SEPARATE AND DEFINE THE WORK OF THE
CONTRACTOR. DRAWINGS ARE DIAGRAMMATIC, BUT SHALL BE FOLLOWED AS CLOSELY AS ACTUAL CONSTRUCTION OF THE FACILITY AND WORK OF OTHER TRADES WILL PERMIT. THE DRAWINGS UTILIZE
SYMBOLS AND SCHEMATIC DIAGRAMS TO INDICATE VARIOUS ITEMS OF WORK. THEREFORE, NO
INTERPRETATION WILL BE MADE FROM THE LIMITATION OF SYMBOLS AND DIAGRAMS THAT ANY
ELEMENTS NECESSARY FOR THE COMPLETE INSTALLATION ARE EXCLUDED. THE ENGINEER SHOULD BE NOTIFIED OF ANY DISCREPANCIES, OMISSIONS, CONFLICTS, OR INTERFERENCE WHICH OCCUR BETWEEN VARIOUS DRAWINGS AND SPECIFICATIONS. IF SUCH NOTIFICATION IS NOT RECEIVED, THE INSTALLING
CONTRACTOR(S) SHALL BE RESPONSIBLE FOR THEIR INTERPRETATIONS.
2. "PROVIDE" SHALL MEAN "FURNISH AND INSTALL" AND MUST INCLUDE ALL EQUIPMENT (THAT INCLUDE
THE ACCESSORIES, SUPPORTS, FITTINGS AND OTHER INCIDENTAL MATERIAL NEEDED FOR THE
EQUIPMENT), DEVICES, HARDWARE, MOUNTS, LABOR, RIGGING, SUBCONTRACTS, ETC., THAT RESULT IN A COMPLETE AND FUNCTIONAL PROJECT INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE. MINOR ITEMS TO FINISH THE WORK SUCH AS PATCHING, BLOCKING, TRIM, TOUCH-UP PAINT, ETC., SHALL BE PROVIDED WHETHER OR NOT INDICATED IN THE CONTRACT DOCUMENTS.
3. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS IN
STRAIGHT SECTIONS OF PIPE OR DUCT AS RECOMMENDED BY THE MANUFACTURER.
4. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE
MANUFACTURER SHALL BE USED.
5. ALL WORKMANSHIP, MATERIALS, AND EQUIPMENT SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR
AFTER ACCEPTANCE BY THE OWNER.
6. PROVIDE IDENTIFICATION LABELS FOR NEW EQUIPMENT. AFFIX PERMANENT IDENTIFYING TAGS OR LABELS TO FANS, TERMINAL UNITS, AIR-HANDLERS ETC. IDENTIFY SYSTEM ON PIPING AND DUCTWORK MAINS AND INDICATE DIRECTION OF FLOW ON PIPING. INDICATE THE CONTROLLED EQUIPMENT ON WALL
MOUNTED CONTROLS.
B. CODES/PERMITS
1. WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH NFPA, ASHRAE, UNDERWRITERS
LABORATORIES AND ALL MUNICIPAL, STATE AND OTHER AUTHORITIES, PUBLIC AND PRIVATE, HAVING JURISDICTION. REPORT ALL DISCREPANCIES WITH SUCH REGULATIONS TO ENGINEER AND DO NOT
PROCEED WITH ANY WORK UNTIL WRITTEN AUTHORIZATION IS RECEIVED FROM THE ENGINEER.
2. ALL NECESSARY FEES, PERMITS, AND APPROVALS AS REQUIRED BY THE WORK OF THESE DRAWINGS
AND SPECIFICATIONS SHALL BE OBTAINED AND PAID FOR BY THIS CONTRACTOR.
3. NOTHING CONTAINED IN THE SPECIFICATIONS OR INDICATED ON THESE DRAWINGS SHALL BE CONSTRUED TO CONFLICT WITH APPLICABLE PORTIONS OF ANY LAWS, ORDINANCES, REGULATIONS, OR
CODES.
C. COORDINATION OF WORK
1. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, AND ELECTRICAL WORK - NEW OR EXISTING.
2. WHEN MECHANICAL WORK (HVAC, PLUMBING, FIRE PROTECTION, ETC.) IS SUBCONTRACTED, IT SHALL BE
THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO COORDINATE SUBCONTRACTORS AND THE
ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTOR PROVIDES
A PARTICULAR ITEM OF THE MECHANICAL CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL
CONNECTIONS FOR A PARTICULAR ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE
ATTENTION OF THE MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.
3. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS ARE APPROXIMATE AND NOT DEFINITELY FIXED BY DIMENSIONS. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE THE
DRAWINGS.
4. PROVIDE LOCATIONS OF REQUIRED ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS TO SERVICE VALVES, DAMPERS, AND OTHER CONCEALED MECHANICAL EQUIPMENT. GENERAL CONTRACTOR
SHALL FURNISH & INSTALL ACCESS PANELS.
5. COORDINATE LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS WITH ALL OTHER TRADES INVOLVED. ALL OPENINGS IN FIRE WALLS FOR PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED.
6. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR ALTERNATION AND REPAIRS.
7. PROVIDE FLEXIBLE CONNECTION IN ALL PIPING SYSTEMS CONNECTED TO PUMPS, CHILLERS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION EXCEPT WATER COILS. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS INDICATED ON DRAWINGS.
D. TESTING, ADJUSTING, AND BALANCING
1. WORK SHALL BE PERFORMED BY AN INDEPENDENT TESTING AND BALANCING AGENCY SPECIALIZING IN
TESTING, ADJUSTING, AND BALANCING OF HEATING, VENTILATION, AND COOLING SYSTEMS. TESTING
AND BALANCING CONTRACTOR SHALL BE AABC OR NEBB CERTIFIED.
2. TOLERANCE OF HYDRONIC SYSTEMS: ADJUST FLUID FLOW RATES AT BALANCE VALVES AND ALL
EQUIPMENT TO PLUS/MINUS 10% OF DESIGN FLOW RATES.
3. TOLERANCE OF AIR SYSTEMS: ADJUST AIR FLOW RATES AT AIR HANDLING UNITS TO PLUS/MINUS 5% OF DESIGN FOR SUPPLY SYSTEMS AND PLUS/MINUS 10% OF DESIGN FOR RETURN AND EXHAUST SYSTEMS.
ADJUST AIR FLOW RATES AT AIR INLETS AND OUTLETS TO PLUS/MINUS 10% OF DESIGN TO THE SPACE.
MAINTAIN RELATIVE PRESSURIZATION OF EXISTING SPACES AND ESTABLISH REQUIRED PRESSURIZATION
IN MODIFIED SPACES.
4. SCHEDULED EQUIPMENT SHALL BE BALANCED AND A PRELIMINARY REPORT SUBMITTED TO THE ENGINEER FOR REVIEW. PROVIDE ALLOWANCE FOR (2) RETURN TRIPS FOR ADDITIONAL REBALANCE WORK AFTER ENGINEER REVIEW OF INITIAL REPORTS. PROVIDE THE FINAL REPORT TO ENGINEER.
E. WARRANTY
1. GUARANTEE ALL WORK PERFORMED AND MATERIALS AND EQUIPMENT INSTALLED TO THE FULL EXTENT REQUIRED BY THE DRAWINGS AND SPECIFICATIONS TO BE FREE FORM INHERENT DEFECTS OF MATERIAL
AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE.
2. REPLACE ANY MATERIAL AND EQUIPMENT PRIOR TO THE FINAL ACCEPTANCE WHICH IS CORRODED OR OTHERWISE DAMAGED THROUGH THE MECHANICAL CONTRACTOR'S FAILURE TO PROPERLY OPERATE
AND MAINTAIN THE INSTALLATION DURING CONSTRUCTION OR RETESTING.
3. KEEP THE WORK IN REPAIR AND REPLACE ANY DEFECTIVE MATERIALS, EQUIPMENT, OR WORKMANSHIP UPON NOTICE FROM THE ENGINEER OR OWNER'S REPRESENTATIVE FOR A PERIOD OF ONE YEAR FROM
DATE OF ACCEPTANCE.
4. CONSIDER DEFECTIVE ALL MATERIAL OR EQUIPMENT REQUIRING EXCESSIVE SERVICE DURING THE FIRST
YEAR OF OPERATION.
5. THE DATE OF ACCEPTANCE OF THE PROJECT APPEARS ON THE ENGINEER'S CERTIFICATE OF
SUBSTANTIAL COMPLETION.
F. INSURANCE
1. THE CONTRACTOR SHALL, DURING THE LIFE OF THE CONTRACT, MAINTAIN IN FORCE, SUCH INSURANCE
AS IS REQUIRED OF THE PRIME CONTRACTOR IN THE GENERAL CONDITIONS OF THE CONTRACT; AND SHALL FURNISH THE PRIME CONTRACTOR AND THE OWNER WITH CERTIFICATION OF SUCH INSURANCE
BEFORE BEGINNING WORK ON THIS SECTION OF CONTRACT.
DEMO AND REPLACE THE EXISTING EMS CONTROLS SYSTEM COMPONENTS WITH MODERN
CONTROL DEVICES. MAINTAIN EXISTING FUNCTIONALITY WHILE MODIFYING THE COMMUNICATION
PROTOCOLS TO SOME DEVICES, AND ADJUSTING HOW SOME CONTROLS WIRING IS ROUTED.
PROJECT IS TO OCCUR DURING EXISTING BUILDING OCCUPATION AND REQUIRES COORDINATION
OF WORK WITH OCCUPANTS. PROJECT HAS ADD-ALTS FOR ERV REPLACEMENT, AND FOR THE
REPLACEMENT OF TERMINAL DEVICE CONTROLLERS.
PROJECT DESCRIPTION:
IECC-2018 (AMENDED)
IEBC-2021 (AMENDED)
IMC-2021 (AMENDED)
APPLICABLE CODES:
AutoCAD SHX Text
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
AutoCAD SHX Text
BDD
AutoCAD SHX Text
AUTOMATIC AIR VENT
AutoCAD SHX Text
BACKDRAFT DAMPER
AutoCAD SHX Text
BACKFLOW PREVENTOR
AutoCAD SHX Text
BALANCING VALVE
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
CONCENTRIC REDUCER
AutoCAD SHX Text
CONNECT TO EXISTING
AutoCAD SHX Text
FIRE DAMPER
AutoCAD SHX Text
FLEXIBLE DUCT
AutoCAD SHX Text
FLOW DIRECTION
AutoCAD SHX Text
FLOW SWITCH
AutoCAD SHX Text
GAS COCK
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
GLOBE VALVE
AutoCAD SHX Text
MANUAL AIR VENT
AutoCAD SHX Text
MOTORIZED DAMPER
AutoCAD SHX Text
PIPE CAPPED
AutoCAD SHX Text
PIPE TURNED DOWN
AutoCAD SHX Text
PIPE TURNED UP
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
PRESSURE REGULATING VALVE
AutoCAD SHX Text
CIRCULATOR PUMP
AutoCAD SHX Text
RETURN REGISTER
AutoCAD SHX Text
SAFETY RELIEF VALVE
AutoCAD SHX Text
STEAM TRAP
AutoCAD SHX Text
STRAINER
AutoCAD SHX Text
STRAINER WITH BLOW DOWN VALVE
AutoCAD SHX Text
SUPPLY DIFFUSER
AutoCAD SHX Text
THERMOSTAT
AutoCAD SHX Text
THERMOSTAT LINE VOLTAGE
AutoCAD SHX Text
UNION
AutoCAD SHX Text
FS
AutoCAD SHX Text
EXHAUST REGISTER
AutoCAD SHX Text
VD
AutoCAD SHX Text
VOLUME DAMPER
AutoCAD SHX Text
FUEL OIL PIPING
AutoCAD SHX Text
FOP
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
CO2
AutoCAD SHX Text
CO2 SENSOR
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: SER
CHECKED: SVD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
MECHANICAL/
ELECTRICAL
M0.2
AHU SERVICE
MAP
MECHANICAL LAYOUT PROVIDED FROM
OAK POINT ASSOCIATES READINESS CENTER ADD/ALT
DRAWINGS DATED 7/1/2004 WITH FORMATTING EDITS.
LAYOUT WAS MODIFIED WITH UPDATED BACKGROUNDS
AND INPUT FROM NHARNG ON 7/13/2026.
LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD
CONDITIONS
AutoCAD SHX Text
PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
HVAC INPUTS & OUTPUTS
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text
LEVEL 1
AutoCAD SHX Text
LEVEL 2
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
AHU-3
AutoCAD SHX Text
AHU-4
AutoCAD SHX Text
AHU-5
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
MECH ROOM
AutoCAD SHX Text
MECH ROOM
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
CST/GARAGES
AutoCAD SHX Text
LOCATION
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
EXIST.
DOMESTIC
BOILER B-2
NEW WORKSTATION
(SEE NOTE 9)
FRONT END WITH VIEW OF
GRAPHICS, ACCESS CONTROL
& DATA COLLECTION
NETWORK
SWITCH
CONTROL
PANEL
KEY NOTES
T-STAT, JCI NS8000 SERIES NSB8BTN241-0 FOR TEMPERATURE-ONLY APPLICATIONS. MODIFY FOR DUAL-FUNCTION
APPLICATIONS, INCLUDING TEMP + CO2, AND/OR TEMP + OCC. SENSOR.
VAV CONTROLLER JCI CVM SERIES MODEL M4-CVM3050 MS/TP & N2 COMPATIBLE WITH RJ12 6-PIN SENSOR (SA BUS) PORT FOR MSTP BACNET MSTP (M4-CVE SERIES FOR IP) W/ RJ-12 SUBNETWORK FOR T-STAT CONNECTION, WITH INTEGRATED DAMPER ACTUATOR AND ON-BOARD AIRFLOW SENSOR.
NOTE SENSOR BUS IS RJ-12, ALL DEVICES TO BE BACNET BTL LISTED B-AAC OPEN & INTEROPERABLE CONTROLLERS
GENERAL NOTES
1. BMS BUILDING CONTROLLER SHALL BE TRIDIUM N4 BASED GRAPHICS. ALL SOFTWARE TO BE FULLY OPEN ARCHITECTURE WITH ALL ACCESS ATTRIBUTES PROVIDED TO OWNER INCLUDING SOFTWARE KEY'S AND PROTOCOLS. CONTRACTOR TO PROVIDE ROUTER/SWITCH TO
ESTABLISH COMMUNICATIONS.
2. CONTROL ZONE THERMOSTATS AND EQUIPMENT SHALL COMMUNICATE TO THE BUILDING AUTOMATION SYSTEM (BAS) VIA BACNET MSTP
INTERFACE PROTOCOL.
2. BUILDING IS EQUIPPED WITH EXISTING BMS. SURVEY AND INVENTORY ALL EXISTING SYSTEM FEATURES INCLUDING I/O, ALARMS, GRAPHICS
DISPLAY AND FRONT END FEATURES AND REPLICATE ON TO NEW SYSTEM.
3. SCHEDULING OF THE OCCUPIED AND UNOCCUPIED PERIOD FOR EACH ZONE SHALL BE DONE AT THE BAS.
4. PROGRAMMING OF EACH ZONE'S HEATING AND COOLING SETPOINT TEMPERATURES FOR BOTH OCCUPIED AND UNOCCUPIED PERIODS SHALL BE DONE AT THE BAS. LOCAL THERMOSTAT CONTROLS SHALL MODIFY LOCAL SETPOINTS ± 3°F (ADJ.). SETPOINT ALARMS SHALL BE ADJUSTED
TO ALARM ON ± 6°F DEFICIENCY FROM SETPOINT (ADJ.).
5. HVAC CONTROLS CONTRACTOR SHALL FIELD-VERIFY & FUNCTIONALLY TEST ALL COMPONENT PARTS, DEVICE CABLING, ETC. PRIOR TO
INSTALLATION OF NEW SYSTEMS.
6. CONTROL CONTRACTOR SHALL INTEGRATE VENDOR NETWORK SYSTEM TO THE NEW BMS & SHALL PROVIDE MONITORING, TRENDING, GRAPHICS, ALARMS ECT. CONTROLS CONTRACTOR SHALL PROVIDE NETWORK ADDRESSING FOR ALL VENDOR SIGNALS TO PROVIDE COMPLETE
MONITORING & COMMUNICATION WITH ALL VENDOR EQUIPMENT.
7. CONTROL CONTRACTOR TO FIELD VERIFY EXISTING CONTROLLER CAPACITIES & LOCATIONS FOR NEW WORK. PROVIDE NEW CONTROLLERS OR
EXPANSION MODULES AS REQUIRED FOR NEW WORK CONTROL POINTS.
8. SEE CONTROLS SCHEMATICS FOR ADDIONAL REQUIREMENTS.
9. CONTROLS CONTRACTOR TO UTILIZE DESKTOP PC FOR SCOPE DEVELOPMENT AND PROGRAMMING. GUARD DESIRES DESKTOP PC, FULLY CONFIGURED, TO BE LEFT ON-SITE TO SERVE AS THE EMS WORKSTATION. PROVIDE KEYBOARD, MOUSE, 2TB SSD, 30" MONITOR, AND ALL OTHER REQUIRED PERIPHERALS TO CREATE A FULL WORKSTATION. LOCATE IN B1, 279. BMS SHALL HAVE CAPACITY TO RECORD TREND DATA OF ALL POINTS AT (15) SECOND INTERVALS FOR (1) YEAR. COORDINATE MIGRATION OF ALL EXISTING HDD DATA TO NEW HDD AS NECESSARY TO ACCOMMODATE NEW HDD
INSTALLATION.
ETHERNET
ROOF
SECOND
FLOOR
1ST FLOOR
BA
CN
ET
/M
ST
P
BA
CN
ET
/M
ST
P
EXTERIOR
ZC ZONE CONTROLLER
ZV ZONE VALVE AT FINNED TUBE OR CUH
RZV REHEAT ZONE VALVE
ABBREVIATIONS
LOCATE IN ROOM 279
BUILDING 2
EXIST.
PUMPS
EXIST.
PUMPS
EXIST.
BOILER
B-1 (B2)
DT DUCT TEMPERATURE TRANSMITTER
BUILDING 1
BUILDING 2 BUILDING 1
2ND FLOOR
SOUTHVAV-1-1
ZC
RZVDT THROUGH
ROOF
SECOND
FLOOR
1ST FLOOR
X
A
NETWORK ARCHITECTURE JFHQ SMR-B1
NOT TO SCALE
VAV TAGGING METHOD:
FOR 'VAV-X-Y':
X - INDICATES THE ASSOCIATED AHU SUPPLYING THE VAV,
Y - IS GENERAL UNIT NUMERATION, PER ASSOCIATED AHU
QTY. 7
NOTE: THE FOLLOWING VAVs HAVE AUXILLARY HEAT (VAV LOCATION):
SERVING CUHS: VAV 2-27 (2N), 2-38 (2S), 1-15 (2S)
SERVING FTR VALVES: VAV 2-11 (2S), 2-28 (1S), 1-5 (2S)
NEW
NETWORK
CONTROLLER
(JACE)
A
X
P-1
P-2
CHWP-5
CHWP-6
HWP-7
HWP-8
AHU-3AHU-2
VAV-1-7
ZC
RZVDT
A
X
VAV-1-15
ZC
RZVDT
A
X
ZV
VAV-2-11
ZC
RZVDT
A
X
ZV
THROUGH VAV-2-17
ZC
RZVDT
A
X
VAV-2-38
ZC
RZVDT
A
X
ZV
VAV-3-19
ZC
RZVDT
A
X
THROUGH VAV-3-22
ZC
RZVDT
A
X
VAV-2-1
ZC
RZVDT THROUGH
A
X
VAV-2-10
ZC
RZVDT
A
X
VAV-2-27
ZC
RZVDT
A
X
ZV
VAV-3-2
ZC
RZVDT
A
X
THROUGH VAV-3-18
ZC
RZVDT
A
X
VAV-3-43
ZC
RZVDT
A
X
ERV-2
ERV-1AHU-1 ERV-3AHU-4
VAV-1-8
ZC
RZVDT THROUGH
A
X
VAV-1-14
ZC
RZVDT
A
X
VAV-2-28
ZC
RZVDT THROUGH
A
X
ZV
VAV-2-37
ZC
RZVDT
A
X
VAV-3-35
ZC
RZVDT THROUGH
A
X
VAV-3-42
ZC
RZVDT
A
X
VAV-2-18
ZC
RZVDT THROUGH
QTY. 9
A
X
VAV-2-26
ZC
RZVDT
A
X
VAV-3-25
ZC
RZVDT THROUGH
QTY. 10
A
X
VAV-3-34
ZC
RZVDT
A
X
2ND FLOOR
NORTH
1ST FLOOR
NORTH
CUH-1 THROUGH
QTY. 4
CUH-4 FR-1 THROUGH
QTY. 6
FR-6 DF-1 DF-2 EF-3 THROUGH
QTY. 6
EF-8
1ST FLOOR
SOUTH
RF-9 CAF-10 1ST FLOOR
(VARIOUS LOCATIONS)UH-2UH-1
NOTE: COMMUNICATION BUS TYPE
TO BE CONSIDERED AS FOLLOWS:
MSTP (BASE BID)
BACNET IP (ADD-ALT.)
NOTE: CUH & FR CONTROLLERS
TO BE STAND-ALONE OR ASSOCIATED
WITH VAV CONTROLLERS
BA
CN
ET
/M
ST
P
BA
CN
ET
/M
ST
P
BA
CN
ET
/M
ST
P
HX-1 HX-2
1ST FLOOR
MECH RM 167
EXIST. MECH. SHED
EXIST. JCI
NETWORK
CONTROLLER
WORKSTATION
EXIST.
NOTE: RETAIN DISCONNECTED B2
WORKSTATION, PROVIDE TO OWNER
BUILDING 2 BUILDING 1
ETHERNET
EXIST.
PUMPS
EXIST.
PUMPS
EXIST.
DOMESTIC
BOILER B-1
BOILERS & PUMPS SERVE B2
ERV-4 AHU-5MAU-1
VAVS
W/ REHEAT
ERV-1
(B2)
REPEATER
REPEATER
REPEATER
REPEATER
ZC
RZVDT
A
X
ZV
QTY. 5
VAVS
W/ REHEAT
ZC
RZVDT
A
X
ZV
QTY.
UNKNOWN
EXIST.
CHWP-22A
EXIST.
CHWP-22B
TF-15 EF-4EF-11MAU-1
CHILLER
CH-3 (B2)
EXISTING ROUTING TO REMAIN
REPEATER REPEATER
QTY. 7 QTY. 7
QTY. 17QTY. 10
QTY. 7 QTY. 10 QTY. 8
ETHERNET
NOTE: REROUTE NETWORK SIGNAL
FROM EXISTING B1 SERVER TO
NEW COMBINED NETWORK
NEW
NETWORK
CONTROLLER
(JACE)
EXIST.
NETWORK
CONTROLLERS
(2)
VAV-1-5
ZC
RZVDT
A
X
ZV
THROUGH
10. REUSE EXISTING 8 CONDUCTOR CABLE FROM T-STAT TO VAV. REMOVE EXISTING RJ-45 CONNECTOR FROM EACH END AND INSTALL RJ-12 CONNECTORS AND 6 WIRES FROM CABLE FOR VAV & T-STAT PLUG-IN. TEST ALL CONDUCTORS FOR FULL FUNCTIONALITY. PROVIDE UP TO 10 NEW CABLES.
CONTRACTOR TO WARRANTY ALL WIRING FOR STANDARD WARRANTY PERIOD. SEE ALLOWANCE #2 FOR CABLE REPLACEMENT.
JCI FX 9200, LOCATE IN 2ND
FLOOR MECHANICAL ROOM
N2
IP
N2 ROUTER /
CONVERTER
HP-1 HP-2 HP-3 HP-4
LOCATIONS
UNKNOWN
CUH-X UH-X FTR-X UH-X
VARIOUS
LOCATIONS
ADD-ALT SCOPE INCLUDES REPLACEMENT
OF ERV AND NEW CONTROLS
REWIRE ALL CONTROLLERS TO NEW B1 JACE. INSTALL NEW
COMMUNICATION CABLE AND FOLLOW EXISTING CABLE
PATH TO B1. NOTIFY OWNER AND ENGINEER IF CABLE RUN
EXCEEDS MAX. LENGTH.
CHILLER
CH-2 (B1)
CHILLER
CH-1 (B1)
REPEATER
BOILER
B-1 (B1)
BOILER
B-2 (B1)
EXIST.
CHWP-3
(INTEGRAL)
PUMP
EVAP-A
EXIST.
BOILER
B-2 (B2)
NOTE: JOC AREA SPLIT-SYSTEM HEAT PUMP UNITS ARE CONTROLLED
BY EXISTING VAV THERMOSTATS. PROVIDE HEAT PUMPS WITH NEW
WIRING AND CONNECTION TO NEW CONTROLS SYSTEM, MAINTAIN
EXISTING THERMOSTAT CONTROL FOR VAV'S AND GWP'S.
NOTE: JCI FX 9000 IS PROVIDED WITH N2 DRIVER, ANY NON-JCI ALT JACE MUST
BE PROVIDED WITH THIRD-PARTY N2 CONVERTER TO MAINTAIN N2 CONNECTIVITY
GWP-6 HPVZC
X
GWP-7 HPV GWP-8 HPV
HPV THREE-WAY HEAT PUMP VALVE
ZC
X
ZC
X
11. ALL CONTROLS (PROGRAMMING, PAGES, DOCUMENTATION) SHALL BE TURNED OVER TO OWNER AT PROJECT COMPLETION.
PROVIDE IN THE FORM OF A FLASH DRIVE OF APPROPRIATE SIZE FOR FUTURE CONTROLS UPDATES / REVISIONS.
JCI FX 9100
12. ETHERNET CONNECTIONS BETWEEN JACES, NETWORK SWITCH, AND WORKSTATION ARE CABLE-TYPE, PROVIDE CAT-6A CABLE.
NETWORK
SWITCH
NETWORKED
DEVICES
NETWORKED
DEVICES
13. ELECTRICAL CONTRACTOR TO PROVIDE 120V POWER TO DEVICES REQUIRING POWER.
WALL-MOUNTED EPO SWITCH, WITH COVER, FOR ISOLATION OF
HVAC AND OUTSIDE AIR. COORDINATE SWITCH REQUIREMENTS
AND LOCATION WITH OWNER. PROVIDE WITH PLACARD AT
SWITCH IDENTIFYING AS "HVAC SHUTDOWN".
SMR B1 & B2
NETWORK
ARCHITECTURE
R E V I S I O N S
P R O J E C T
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: SER
CHECKED: SVD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
MECHANICAL/
ELECTRICAL
A''�A/T �
SC23E
A''�A/T �� �� �
SC23E
M1.0
191192193
194170
VAULT
5A
MEN'S LOCKER
WOMEN'S LOCKER
FITNESS
MEN'S BATHROOM W'S BATHROOM
MEN'S SHOWERS W'S SHOWER
140A
VESTIBULE
STAIR 1
VESTIBULE
124 123
121A
123 121 116 115 114
112111
MEN'S
WOMEN'S
MECHANICAL
LOBBY
ELEV
MECH
ELEV
SCALE: 3/32" = 1'-0"
HORIZONTAL SCALE IN FEET
01248 8 16 24 32
FIRST FLOOR MECHANICAL PLAN - NORTH
DRAWING KEYNOTES:
MECHANICAL LAYOUT PROVIDED FROM
OAK POINT ASSOCIATES READINESS CENTER ADD/ALT
DRAWINGS DATED 7/1/2004
LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD
CONDITIONS
R E V I S I O N S
P R O J E C T
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: SER
CHECKED: SVD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
MECHANICAL/
ELECTRICAL
M2.0
SMR B1
1ST FLOOR
NORTH
REPLACE VAV CONTROLLER. SEE CONTROLS SCHEMATIC FOR DEVICE INFORMATION.
REPLACE T-STAT. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.
REPLACE CO2 DETECTOR. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.
MODIFY EXISTING LAN CABLE BETWEEN T-STAT & CONTROLLER. REMOVE 8-PIN CONNECTOR
ON EACH END AND INSTALL 6-PIN CONNECTOR UTILIZING 6 CONDUCTORS CONSISTENTLY.
TEST CONNECTORS FOR CONTINUITY PRIOR TO CONNECTION TO DEVICES.
AutoCAD SHX Text %%uKEYPLAN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FEC
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-26
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-25
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-24
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-23
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-22
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-21
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-20
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-19
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-18
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-34
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-33
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-32
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-26
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-25
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-31
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-30
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-29
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-27
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-28
AutoCAD SHX Text
CO2
AutoCAD SHX Text
CO2
AutoCAD SHX Text
CO2
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
TO VAV 2-28
AutoCAD SHX Text
IN 100A ON M2.1
AutoCAD SHX Text T
AutoCAD SHX Text
ABOVE ON M6
AutoCAD SHX Text
TO VAV 2-27
AutoCAD SHX Text
CUH
AutoCAD SHX Text
AutoCAD SHX Text
CONTROL VALVE
AutoCAD SHX Text
TO FR-2 & 4
AutoCAD SHX Text T
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text N
1 1
4 4
4 4
191192
180179
VAULT
FITNESS
MEN'S BATHROOM W'S BATHROOM
MEN'S SHOWERS W'S SHOWER
DINING
KITCHEN
144143
140A
STAIR 3
STAIR 2
138139
MECHANICAL
DRILL HALL
LOBBY
ELEV
MECH
SCALE: 3/32" = 1'-0"
HORIZONTAL SCALE IN FEET
01248 8 16 24 32
FIRST FLOOR MECHANICAL PLAN - SOUTH
MECHANICAL LAYOUT PROVIDED FROM
OAK POINT ASSOCIATES READINESS CENTER ADD/ALT
DRAWINGS DATED 7/1/2004
LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD
CONDITIONS
DRAWING KEYNOTES:
REPLACE VAV CONTROLLER. SEE CONTROLS SCHEMATIC FOR DEVICE INFORMATION.
REPLACE T-STAT. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.
REPLACE CO2 DETECTOR. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.
MODIFY EXISTING LAN CABLE BETWEEN T-STAT & CONTROLLER. REMOVE 8-PIN CONNECTOR
ON EACH END AND INSTALL 6-PIN CONNECTOR UTILIZING 6 CONDUCTORS CONSISTENTLY.
TEST CONNECTORS FOR CONTINUITY PRIOR TO CONNECTION TO DEVICES.
UNIT HEATER LOCATED IN KITCHEN STORAGE ROOM. BASE BID SCOPE IS FOR CONTROLS
REWIRE TO UNIT, ADD DEVICE TO EMS, INCLUDING ALL ALARMS AND I/O TRENDING.
R E V I S I O N S
P R O J E C T
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: SER
CHECKED: SVD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
MECHANICAL/
ELECTRICAL
M2.1
SMR B1
1ST FLOOR
SOUTH
AutoCAD SHX Text %%uKEYPLAN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FEC
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-37
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-35
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-34
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-36
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-33
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-32
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-31
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-29
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-30
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-28
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-10
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-9
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-8
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-13
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-14
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-11
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-35
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-36
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-37
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-38
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-39
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-40
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-42
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-41
AutoCAD SHX Text
CO2
AutoCAD SHX Text
CO2
AutoCAD SHX Text
CO2
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-12
AutoCAD SHX Text
CO2
AutoCAD SHX Text
CO2
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text
TO EF-4
AutoCAD SHX Text
ON ROOF
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
PS
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
TO VAV 2-38
AutoCAD SHX Text
ABOVE ON M2.3
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
FROM T-STAT
AutoCAD SHX Text
IN 101 ON M2.0
AutoCAD SHX Text
TO VAV 1-15
AutoCAD SHX Text
ABOVE ON M2.3
AutoCAD SHX Text
CUH
AutoCAD SHX Text
AutoCAD SHX Text
CUH
AutoCAD SHX Text
AutoCAD SHX Text
UH
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UH
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text N
ELEV
1 1
1 1
1 1
2 2 2
4 4
4 4
O F
E
ATTSHET
A L
OF
S E
7 7
215 214 213 212 209 207
210202
220 222
217 218
WOMEN'S
MEN'S255
258 270
261 264
271 273 274
277 276
STAIR 3
3 3
SCALE: 3/32" = 1'-0"
HORIZONTAL SCALE IN FEET
01248 8 16 24 32
SECOND FLOOR MECHANICAL PLAN - NORTH
MECHANICAL LAYOUT PROVIDED FROM
OAK POINT ASSOCIATES READINESS CENTER ADD/ALT
DRAWINGS DATED 7/1/2004
LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD
CONDITIONS
DRAWING KEYNOTES:
REPLACE VAV CONTROLLER. SEE CONTROLS SCHEMATIC FOR DEVICE INFORMATION.
REPLACE T-STAT. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION
REPLACE CO2 DETECTOR. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.
MODIFY EXISTING LAN CABLE BETWEEN T-STAT & CONTROLLER. REMOVE 8-PIN CONNECTOR
ON EACH END AND INSTALL 6-PIN CONNECTOR UTILIZING 6 CONDUCTORS CONSISTENTLY.
TEST CONNECTORS FOR CONTINUITY PRIOR TO CONNECTION TO DEVICES.
IN ADDITION TO THE VAV'S SHOWN ON THE PLANS, THE JOC AREA IS SERVED BY THREE (3)
HEAT PUMPS. APPROXIMATE LOCATIONS FOR GWP-6, 7, AND 8 ARE AS SHOWN. BASE BID
SCOPE INCLUDES TO PROVIDE HEAT PUMPS WITH NEW WIRING AND CONNECTION TO NEW
CONTROLS SYSTEM. HEAT PUMPS CONTROLLED BY EXISTING VAV T-STATS, VERIFY BMS
CONTROL OF BOTH VAV AND HEAT PUMP DEVICES IS MAINTAINED IN REPLACEMENT.
SUPPLY DIFFUSERS SERVED BY GWP-7. OTHER HEAT PUMP DIFFUSERS AND DUCTWORK NOT
SHOWN.
THERMOSTATS IN 225 AND 234 RELOCATED WITH ARCHITECTURAL CHANGES, CONTRACTOR
TO VERIFY WIRED TO CORRECT VAV SERVING AREA CONTIGUOUS WITH THERMOSTAT
R E V I S I O N S
P R O J E C T
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: SER
CHECKED: SVD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
MECHANICAL/
ELECTRICAL
M2.2
SMR B1
2ND FLOOR
NORTH
AutoCAD SHX Text
DN
AutoCAD SHX Text
DISPLAY
AutoCAD SHX Text
DISPLAY
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-27
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-10
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-8
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-9
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-7
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-6
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-4
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-3
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-2
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-1
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-9
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-8
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-7
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-6
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-5
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-4
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-2
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-3
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-1
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-15
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-16
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-17
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-18
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-14
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-13
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-10
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-11
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-5
AutoCAD SHX Text
CO2
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-43
AutoCAD SHX Text
PS
AutoCAD SHX Text
PS
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
IN 200A ON M2.3
AutoCAD SHX Text
TO VAV 2-11
AutoCAD SHX Text
CONTROL VALVE
AutoCAD SHX Text
TO FR-2, 3, 4
AutoCAD SHX Text
IN 002 ON M4
AutoCAD SHX Text
FROM T-STAT
AutoCAD SHX Text
AC
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text
EXG. NH STATE SEAL INLAY
AutoCAD SHX Text
GHP
AutoCAD SHX Text
AutoCAD SHX Text
GHP
AutoCAD SHX Text
AutoCAD SHX Text
GHP
AutoCAD SHX Text
AutoCAD SHX Text
GHP-8 LOCATED ABOVE CEILING
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-12
AutoCAD SHX Text T
AutoCAD SHX Text
CO2
AutoCAD SHX Text %%uKEYPLAN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FEC
AutoCAD SHX Text N
4 4
4 4
251 258 270
271 273272 274 275
268ELEV
295281
290296
STAIR 3
STAIR 2
237 238
WOMEN'S
MEN'S
MECHANICAL LAYOUT PROVIDED FROM
OAK POINT ASSOCIATES READINESS CENTER ADD/ALT
DRAWINGS DATED 7/1/2004
LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD
CONDITIONS
SCALE: 3/32" = 1'-0"
HORIZONTAL SCALE IN FEET
01248 8 16 24 32
SECOND FLOOR MECHANICAL PLAN - SOUTH
DRAWING KEYNOTES:
REPLACE VAV CONTROLLER. SEE CONTROLS SCHEMATIC FOR DEVICE INFORMATION.
REPLACE T-STAT. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION
REPLACE CO2 DETECTOR. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.
MODIFY EXISTING LAN CABLE BETWEEN T-STAT & CONTROLLER. REMOVE 8-PIN CONNECTOR
ON EACH END AND INSTALL 6-PIN CONNECTOR UTILIZING 6 CONDUCTORS CONSISTENTLY.
TEST CONNECTORS FOR CONTINUITY PRIOR TO CONNECTION TO DEVICES.
R E V I S I O N S
P R O J E C T
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: SER
CHECKED: SVD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
MECHANICAL/
ELECTRICAL
M2.3
SMR B1
2ND FLOOR
SOUTH
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-17
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-38
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-16
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-15
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-14
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-12
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-13
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-2
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-3
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-4
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-5
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-1
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-6
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-15
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-21
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-22
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-23
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-24
AutoCAD SHX Text
VAV
AutoCAD SHX Text 2-11
AutoCAD SHX Text
CO2
AutoCAD SHX Text
CO2
AutoCAD SHX Text
CO2
AutoCAD SHX Text
CO2
AutoCAD SHX Text
CO2
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
MUA
AutoCAD SHX Text
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
VAV
AutoCAD SHX Text 1-7
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
CO2
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
FROM T-STAT
AutoCAD SHX Text
BELOW ON M2.1
AutoCAD SHX Text
FROM T-STAT
AutoCAD SHX Text
IN 200 ON M2.2
AutoCAD SHX Text
FROM T-STAT
AutoCAD SHX Text
BELOW ON M2.2
AutoCAD SHX Text
BELOW
AutoCAD SHX Text
TO FR-1 VALVE
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
(ABOVE)
AutoCAD SHX Text S
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
DDC CONTROL
AutoCAD SHX Text T
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
(OPEN TO BELOW)
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
(OPEN TO BELOW)
AutoCAD SHX Text
(OPEN TO BELOW)
AutoCAD SHX Text
EXG APPLIED WALL GRAPHICS
AutoCAD SHX Text
VAV
AutoCAD SHX Text 3-20
AutoCAD SHX Text %%uKEYPLAN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FEC
AutoCAD SHX Text N
BASE BID: EXG. ERV-2
ALT NO. 2: REPLACE ERV-2 &
CONTROLS.
BASE BID: EXG. ERV-3
ALT NO. 3: REPLACE ERV-3 &
CONTROLS.
BASE BID: EXG. ERV-1
ALT NO. 1: REPLACE ERV-1 &
CONTROLS.
EXG.
EXG.
EXG.
MECHANICAL LAYOUT PROVIDED FROM
OAK POINT ASSOCIATES READINESS CENTER ADD/ALT
DRAWINGS DATED 7/1/2004
LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD
CONDITIONS
R E V I S I O N S
P R O J E C T
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: SER
CHECKED: SVD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
MECHANICAL/
ELECTRICAL
M2.4
SMR B1
ROOF PLAN
SCALE: 3/16" = 1'-0"
HORIZONTAL SCALE IN FEET
0124 4 8 12 16
ROOF MECHANICAL PLAN
DRAWING KEYNOTES:
BASE BID SCOPE IS EXISTING ERVS TO REMAIN. ADD-ALT 1, 2, & 3 SCOPE IS TO REPLACE
ERVS 1, 2, & 3 RESPECTIVELY, INCLUDING CONTROLS.
FOR ADD-ALT1, 2, & 3: REMOVE EXISTING ERV AND ALL WIRING TO UNIT INCLUDING POWER
AND CONTROLS. EXISTING ROOF CURB AND DUCTWORK TO REMAIN FOR CONNECTION TO
NEW ERVS. PROVIDE ROOF CURB ADAPTER FOR NEW UNIT CONNECTIONS TO EXISTING
CURB. PROVIDE UNIT POWER FROM EXISTING PANEL LOCATION. WIRE CONTROL POINTS TO
EMS VIA NEW AHU CONTROLLERS, SEE POINTS LIST FOR REQUIRED CONTROL POINTS.
AutoCAD SHX Text
MUA
AutoCAD SHX Text
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
N
DATE: JULY 16, 2026
SCALE: AS NOTED
DRAWN BY: SER
CHECKED: SVD
C O N S U L T A N T S
117 SAINT PAUL ST
BURLINGTON, VERMONT 05401
P: 802.863.2227 www.sasarchitects.com
SMITH ALVAREZ SIENKIEWYCZ
AS S
A R C H I T E C T S
SAS PROJECT NUMBER: 1327
SMR
BUILDING 1
ALTERATIONS
CONCORD, NH
03301
DUBOIS & KING
10 CORPORATE DRIVE, SUITE 210
BEDFORD, NH 03110
P: 603-444-6578
MECHANICAL/
ELECTRICAL
M2.5
SMR B2
1ST FLOOR
PARTIAL PLAN
AND SCOPE
NOTES
BUILDING BACKGROUNDS PROVIDED FROM
YEATON ASSOCIATES SMR BLDG…