NHARNG - State Military Reservation - Building 1 Alterations
Solicitation number
RFB-DMAVS-2027-03
Issued by
Merrimack County, New Hampshire

About this file

This is a comprehensive set of clarifying sketches and mechanical/electrical control drawings for the New Hampshire Army National Guard State Military Reservation Building 1 Alterations project located at 1 Minuteman Way, Concord, New Hampshire. The project involves the demolition and replacement of the existing Energy Management System (EMS) controls infrastructure with modern control devices while maintaining existing functionality. The scope of work includes replacing building controllers, air handling unit (AHU) controllers, terminal equipment controllers, communication bus systems, graphics interfaces, and data trending capabilities. The project encompasses work on both Building 1 and Building 2, with mechanical work concentrated on retrofitting VAV (variable air volume) controllers, thermostats, CO2 detectors, and associated wiring throughout the first and second floors. Four alternate bid items are specified: three alternates for replacing Energy Recovery Ventilators (ERV-1, ERV-2, and ERV-3) with new units and controls in their existing locations, and one alternate for replacing controls on existing terminal devices and equipment located in Building 1 Room 167. The project requires coordination with building occupants throughout construction with a minimum of two weeks' notice, as the buildings will remain occupied during the work.

The drawings provide detailed mechanical plans, roof layouts, control schematics, and points lists for four AHU systems. Three allowances are included: $3,500 for replacing damaged suspended acoustic ceiling tiles and gypsum wall board ceilings during construction, $4,500 for replacing additional 8-conductor wires beyond the initial ten included in the base bid, and $10,000 for up to fifty new control points and programming to graphics. The project specifies JCI/Tridium-based hardware as the basis of design for building controllers, with provisions for compatible alternate systems subject to owner and engineer approval. All work must be performed in accordance with NFPA, ASHRAE, and Underwriters Laboratories standards, along with applicable municipal and state codes. A one-year warranty on all workmanship, materials, and equipment is required from the date of final acceptance. Testing, adjusting, and balancing work must be performed by an AABC or NEBB certified independent agency, with tolerance specifications of plus/minus 10 percent for hydronic systems and plus/minus 5 percent for air handling unit supply systems.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FF finish floor FE fire extinguisher FLG flashing FD floor drain FRT fire retardant FTG footing FND foundation GA gage, gauge GALV galvanized GC general contract(or) GWB gypsum wall board GFE Government furnished equipment GFCI Government furnished-contractor installed HPDL high pressure decorative laminate HWD hardwood HVAC heating, ventilating & air conditioning HT height HOR horizontal ID inside diameter INSUL insulation JAN janitor JT joint LAV lavatory MAX maximum MECH mechanical MFR manufacturer MH manhole MO masonry opening MTL metal MIN minimum NIC not in contract NTS not to scale OC on center OD outside diameter OPNG opening

PNT paint(ed) PR pair PL plate PT pressure treated PWD plywood REF refrigerator R riser RM room RO rough opening SAC suspended acoustic ceiling SHTH sheathing SIM similar SPEC specification(s) SQ square SS stainless steel STD standard SD storm drain STRUC structural SYS system TBP tile backing panel TDO thermoset decorative overlay TEL telephone TG tempered glass THK thick(ness) TH threshold T&G tongue & groove TOC top of concrete TOM top of masonry TOS top of steel TOW top of wall T tread TYP typical UNO unless noted otherwise VERT vertical VCT vinyl composition tile VR vapor retarder VT vinyl tile WG wire glass W/O with out WD wood

ABI additive bid item ACT acoustic ceiling tile ADJ adjustable AFF above finish floor ALUM aluminum ANC anchor, anchorage ARCH architect(ural) BSMT basement BIT bituminous BLKG blocking BD board BOT bottom BRK brick BLDG building BTWN between CB catch basin CJ control joint CLG ceiling CT ceramic tile CO clean out CL closet CLR clear(ance) COL column CONC concrete CMU concrete masonry unit CONT continuous or continue DP dampproofing DEM demolish, demolition DET detail DIA diameter DWG drawing DF drinking fountain ELEC electric(al) EL elevation ELEV elevator EQ equal EXG existing EXT exterior FG fiberglass FIN finish

D R AW I N G S Y M B O L S

C O N S T R U C TI O N M AT E R I A L S

A B B R E V IATI O N S

INTERIOR ELEVATION

BUILDING SECTION

WALL SECTION

DETAIL

ENLARGED DETAIL

WINDOW TYPE

DOOR NUMBER

VERTICAL ELEVATION

A

Elevation reference number

EL. 100'-0"

A-7

A-2

See this detail...

...on thisdrawing

A-6

B A-4

B A-4

See this section...

...on thisdrawing

COMPACTED

GRANULAR

FILL

GYPSUM

BOARD

TILE BACKING

PANEL

STEEL OR

HEAVY GAUGE

METAL

STONE

(PLAN/ELEV.)

STONE

(SECTION)

CONCRETE

CONCRETE

BLOCK

BRICK

SPRAY APPLIED

URETHANE

INSULATION

RIGID

INSULATION

FOAM IN PLACE

INSULATION

SOUND

ATTENUATION

BATTS

FINISH

WOOD

ROUGH

WOOD

PLYWOOD

PARTICLE

BOARD OR MDF

LIST OF DRAWINGS

COVER SHEET

ARCHITECTURAL DRAWINGS

A-1.0 FIRST FLOOR PLAN

A-1.1 SECOND FLOOR PLAN

A-1.2 ROOF PLAN

NEW HAMPSHIRE

ARMY NATIONAL GUARD

SMR

BUILDING 1 ALTERATIONS

J U LY 1 6, 2 0 26

MECHANICAL DRAWINGS

M0.1 MECHANICAL GENERAL NOTES, LEGENDS, AND SCOPE

M0.2 AHU SERVICE MAP

M1.0 SMR B1 & B2 NETWORK ARCHITECTURE

M2.0 SMR B1 1ST FLOOR NORTH

M2.1 SMR B1 1ST FLOOR SOUTH

M2.2 SMR B1 2ND FLOOR NORTH

M2.3 SMR B1 2ND FLOOR SOUTH

M2.4 SMR B1 ROOF PLAN

M2.5 SMR B2 1ST FLOOR PARTIAL PLAN AND SCOPE NOTES

M3.0 SMR B1 AHU-1 / ERV-1 CONTROLS DIAGRAM

M3.1 SMR B1 AHU-2&3 / ERV-2 CONTROLS DIAGRAM

M3.2 SMR B1 AHU-4 / ERV-3 CONTROLS DIAGRAM

M3.3 SMR B1 VAV - EF & MUA CONTROLS DIAGRAM

1 M I N U T E M A N WAY,

C O N C O R D, N H

C O N S U L T A N T S

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

1 MINUTEMAN WAY

CONCORD, NH

NEW HAMPSHIRE

ARMY NATIONAL GUARD

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

ALTERNATES:

M E C H A N I C A L / E L E C T R I C A L

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

ALTERNATES 1, 2, & 3

BASE BID: EXISTING ERV-1, ERV-2, & ERV-3 AND THEIR CONTROLS WILL REMAIN IN PLACE.

ALTERNATE 1: ADD COST TO REPLACE ERV-1 AND ITS CONTROLS IN THE SAME LOCATION.

ALTERNATE 2: ADD COST TO REPLACE ERV-2 AND ITS CONTROLS IN THE SAME LOCATION.

ALTERNATE 3: ADD COST TO REPLACE ERV-3 AND ITS CONTROLS IN THE SAME LOCATION.

ALTERNATE 4

BASE BID: THE EXISTING CONTROLS FOR EXISTING TERMINAL DEVICES (CUH's, UH's, FTR's, HP-1 THROUGH HP-4, , HEAT

EXCHANGERS, AND PUMPS LOCATED IN BUILDING 1 ROOM 167) NOT INCLUDED IN THE PRIMARY SCOPE, WILL

REMAIN IN PLACE. THE NEW NETWORK WILL BE WIRED TO MAINTAIN EXISTING CONTROLS.

ALTERNATE 4: ADD COST TO REPLACE THE CONTROLS FOR THE THE EXISTING TERMINAL DEVICES (CUH's, UH's, FTR's, HP-1 THROUGH HP-4, HEAT EXCHANGERS AND PUMPS LOCATED IN BUILDING 1 ROOM 167) NOT INCLUDED IN THE PRIMARY SCOPE

AND WIRE TO THE NEW NETWORK.

V I C I N I T Y P L A N

PROJECT

LOCATIONPembroke Rd

Lo udon R d

Airport Rd

Minuteman Way

Minuteman Way

L O C A T I O N P L A N

PROJECT SITEALLOWANCES

ALLOWANCE #1 - $3,500:

REPLACE SUSPENDED ACOUSTIC CEILING TILE, GRID SYSTEM, AND GWB CEILING SYSTEMS IF DAMAGED DURING CONSTRUCTION. CEILING ACCESS MAY BE REQUIRED TO COMPLETE WORK. MATCH EXISTING CEILING TILE AND GRID.

PATCH, FINISH, AND PAINT GWB TO MATCH ADJACENT COLOR AND SHEEN.

ALLOWANCE #2 - $4,500:

REPLACE 8 CONDUCTOR WIRE IN KIND IF MORE THAN (10) EXISTING WIRES NEED TO BE REPLACED. REPLACEMENT OF (10)

WIRES ARE PART OF THE BASE BID.

ALLOWANCE #3 - $10,000:

PROVIDE UP TO 50 NEW POINTS AND PROGRAMMING TO GRAPHICS, COORDINATE ALL NEW POINTS WITH OWNER.

FIRST FLOOR PLAN

3/32" = 1'-0"

PROJECT

NORTH

180179

VAULT

5A

MEN'S LOCKER

WOMEN'S LOCKER

FITNESS

MEN'S BATHROOM W'S BATHROOM

MEN'S SHOWERS W'S SHOWER

DINING

KITCHEN

144143

140A

VESTIBULE

STAIR 3

STAIR 2

STAIR 1

UP

VESTIBULE

UP

UP

138139

132 133

125 124 123

121A

123 121 116 115 114

109108

112111

MEN'S

WOMEN'S

MECHANICAL

DRILL HALL

LOBBY

ELEV

MECH

BUILDING 1BUILDING 2

CORR

100B

EXISTING SUSPENDED ACOUSTIC GRID CEILING

DRAWING KEY

EXISTING PAINTED GYPSUM WALL BOARD CEILING

NOTES:

1. MECHANICAL WORK IN THIS PROJECT REQUIRES ACCESS ABOVE EXISTING

CEILINGS IN SOME LOCATIONS. REMOVE AND SALVAGE ACOUSTIC CEILING

TILES FOR REINSTALLATION IN SAME LOCATIONS. REPLACE DAMAGED

CEILING TILES BEFORE REINSTALLATION AND MATCH EXISTING. GYPSUM

WALL BOARD CEILINGS WILL BE PATCHED, PRIMED AND PAINTED TO MATCH

EXISTING AJACENT SURFACES. SEE ALLOWANCE #1.

2. THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. THE

CONTRACTOR WILL COORDINATE WORK AREAS WITH THE OWNER WITH TWO

WEEKS NOTICE. THIS WILL BE AN ONGOING EFFORT THROUGHOUT

CONSTRUCTION.

A-1.0

R E V I S I O N S

P R O J E C T

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: MO

CHECKED: CD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

M EC H A N IC A L/

E L E C TR IC A L

FIRST FLOOR PLAN

SECOND FLOOR PLAN

A-1.1

SECOND FLOOR PLAN

3/32" = 1'-0"

PROJECT

NORTH

215 214 213 212 209 207

210202

217 218

WOMEN'S

MEN'S255

251 258 270

261 264

271 273272 274

277 276

268ELEV 293 292 291

286 287

290296

STAIR 3

STAIR 2

STAIR 1

DN

DN

DN

237 238

246 245

233 234

WOMEN'S

MEN'S

(OPEN TO BELOW)

(OPEN TO BELOW)

EXG. NH STATE

SEAL INLAY

O F

E

ATTSHET

A L

OF

S E

7 7

EXG. WOOD

PANEL WALL

BUILDING 1BUILDING 2

EXISTING SUSPENDED ACOUSTIC GRID CEILING

DRAWING KEY

EXISTING PAINTED GYPSUM WALL BOARD CEILING

NOTES:

1. MECHANICAL WORK IN THIS PROJECT REQUIRES ACCESS ABOVE EXISTING

CEILINGS IN SOME LOCATIONS. REMOVE AND SALVAGE ACOUSTIC CEILING

TILES FOR REINSTALLATION IN SAME LOCATIONS. REPLACE DAMAGED

CEILING TILES BEFORE REINSTALLATION AND MATCH EXISTING. GYPSUM

WALL BOARD CEILINGS WILL BE PATCHED, PRIMED AND PAINTED TO MATCH

EXISTING AJACENT SURFACES. SEE ALLOWANCE #1.

2. THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. THE

CONTRACTOR WILL COORDINATE WORK AREAS WITH THE OWNER WITH TWO

WEEKS NOTICE. THIS WILL BE AN ONGOING EFFORT THROUGHOUT

CONSTRUCTION.

R E V I S I O N S

P R O J E C T

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: MO

CHECKED: CD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

M EC H A N IC A L/

E L E C TR IC A L

R E V I S I O N S

P R O J E C T

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: MO

CHECKED: CD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

M EC H A N IC A L/

E L E C TR IC A L

ROOF PLAN

A-1.2

ROOF PLAN

3/32" = 1'-0"

PROJECT

NORTH

BASE BID: EXG ERV - 2

ALT NO. 2: REPLACE ERV-2 &

CONTROLS.

EXG SKYLIGHT, TYP.

BASE BID: EXG ERV - 1

ALT NO. 1: REPLACE

ERV-1 & CONTROLS.

BUILDING 1BUILDING 2

BASE BID: EXG ERV - 3

ALT NO. 3: REPLACE

ERV-3 AND CONTROLS.

EXG AHU - 4

EXG AHU - 1

EXG MUA - 17

EXISTING MEMBRANE ROOFING SYSTEM

R E V I S I O N S

P R O J E C T

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: MO

CHECKED: CD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

M EC H A N IC A L/

E L E C TR IC A L

A. THIS BUILDING WILL BE OCCUPIED THOUGHOUT CONSTRUCTION. MAINTAIN SAFE ACCESS AND

EGRESS TO THE BUILDING AT ALL TIMES.

B. ORGANIZE AND PERFORM THE WORK TO MINIMIZE THE DANGER OF DAMAGE TO THE BUILDING.

PROTECT THE BUILDING INTERIORS FROM DAMAGE AT ALL TIMES. PERFORM ROOFING WORK ONLY IN

CLEAR WEATHER.

C. INSTALL ERV'S, FLASHINGS, AND ROOF PENETRATION FLASHINGS TO FORM A COMPLETE WEATHER

TIGHT INSTALLATION.

D. ROOFING CONTRACTOR IS RESPONSIBLE FOR DISCONNECTING / RECONNECTING ANY DUCTWORK, VENTS, ELECTRICAL CONNECTIONS, ETC IN CONJUNCTION WITH ERV AND ROOFING SYSTEM TIE-IN.

E. REPLACE EXISTING ROOF PENETRATION CURBS PER ROOFING MANUFACTURER'S SPECIFICATIONS TO

ACCOMMODATE NEW ERV UNITS SCHEDULED TO BE INSTALLED. AT ALL MEMBRANE ROOFS, WOOD

BLOCKING AND NAILERS ARE UNTREATED. PROVIDE PRESSURE TREATED WOOD BLOCKING AND

NAILERS ONLY IF REQUIRED TO MAINTAIN WARRANTY OF EXISTING MEMBRANE MANUFACTURER.

WWW.GENFLEX.COM FOR MANUF. DETAILS. SEE EXISTING WARRANTY IN SPECIFICATION.

EXISTING FULLY ADHERED TPO ROOFING SYSTEM:

MANUF: GENFLEX ROOFING SYSTEM, LLC. WWW.GENFLEX.COM FOR MANUF. DETAILS.

ROOFING CONTRACTOR: SKYLINE ROOFING COMPANY

861 PAGE ST.

MANCHESTER, NH 03109

GENERAL ROOFING NOTES AT ALTERNATES 1, 2, & 3:

ALTERNATES 1, 2, & 3:

BASE BID: EXISTING ERV-1, ERV-2, & ERV-3 AND THEIR CONTROLS WILL REMAIN IN PLACE.

ALTERNATE 1: ADD COST TO REPLACE ERV-1 AND ITS CONTROLS IN THE SAME LOCATION.

ALTERNATE 2: ADD COST TO REPLACE ERV-2 AND ITS CONTROLS IN THE SAME LOCATION.

ALTERNATE 3: ADD COST TO REPLACE ERV-3 AND ITS CONTROLS IN THE SAME LOCATION.

R E V I S I O N S

P R O J E C T

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: SER

CHECKED: SVD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

MECHANICAL/

ELECTRICAL

M0.1

MECHANICAL

GENERAL

NOTES,

LEGENDS, AND

SCOPE

NOTE: HARDWARE REFERENCES BASIS OF DESIGN IS JCI/TRIDIUM. ALTERNATE SYSTEMS ARE ACCEPTABLE PROVIDED THE SOFTWARE IS OPEN PROTOCOL, ALL LICENSES AND SOFTWARE SHALL BE PROVIDED TO OWNER. ALL SECURITY ACCESS AND CONTROL REQUIREMENTS SHALL BE COMMUNICATED AND APPROVED BY THE OWNER. A COMPATIBLE CONTROLS PLATFORM WITH THE SAME FEATURES WILL BE

CONSIDERED WITH OWNER & ENGINEERS APPROVAL.

BUILDING CONTROLLERS: REPLACE EXISTING TWO (2) BUILDING 1 JACE'S AND SINGLE (1) BUILDING 2 JCI SNE (VERIFY CONTROLLERS IN FIELD) WITH (2) NEW JCI FX-90 TRIDIUM BASED DEVICES, ONE IN EACH BUILDING. COORDINATE WITH EXISTING CONTROL LOOPS (N2 AND LON IN B1, FC BUS IN B2) TO PROVIDE NEW WIRING TO CAPTURE ALL EXISTING AND NEW FIELD EQUIPMENT CONTROLLERS. PROVIDE ROUTERS, CONVERTERS AND ALL OTHER REQUIRED ANCILLARY DEVICES TO MAINTAIN CONTROL OF ALL NEW AND EXISTING EQUIPMENT.

AHU CONTROLLERS: REPLACE EXISTING JCI DX-9100 CONTROLLER WITH JCI F4-CGM FOR MS/TP.

CONTROLLERS: ALL TERMINAL EQUIPMENT CONTROLLERS SHALL BE INVENTORIED FROM THE EXISTING CONTROLS TREE.

COMM BUS: B1 IS A JCI METASYS N2 PROTOCOL BUS. AS WIRE GAUGE AND COMMUNICATION SPEED IS NOT COMPATIBLE WITH AN MS/TP BUS, A NEW COMM BUS SHALL BE INSTALLED TO ALL NEW CONTROLLERS IN B1. THE EXISTING N2 BUS SHALL BE RECONFIGURED TO SERVE ALL

REMAINING CONTROLLERS AND BROUGHT BACK TO THE B1 JACE.

GRAPHICS: ALL GRAPHICS ON THE B1 SYSTEM SHALL BE REPLICATED IN HTML AND INCLUDE ALL DISPLAY, USER INTERFACE, ALARM AND OTHER FEATURES EQUIVALENT TO THE EXISTING. GRAPHICS ON THE B2 CONTROLLER & SERVER SHALL BE REPLICATED ONTO THE NEW SYSTEM IN THE SAME MANNER TO BE CONSISTENT WITH B1 GRAPHICS. NOTIFY ENGINEER IF EXISTING GRAPHICS ON THE B2 SERVER ARE HTML 5 BASED AND SUITABLE FOR RE-USE. GRAPHICS TO BE UPDATED TO INCLUDE MISSING FEATURES AND VERIFY USER ACCESSIBLE: PUMP SWAP SCHEDULES, LEAD/LAG ASSIGNMENTS. PROVIDE ALLOWANCE FOR UP TO 50 NEW POINTS AND PROGRAMMING TO GRAPHICS, COORDINATE ALL NEW POINTS WITH OWNER, SEE ALLOWANCE #3.

DATA TRENDING: ALL I/O POINTS SHALL BE TRENDED, INCLUDING ALL ANALOG SIGNAL AND DIGITAL CHANGES OF STATE. TREND DATA SHALL BE COLLECTED AT 15 SECOND SAMPLE INTERVAL AND STORED FOR A PERIOD OF NOT LESS THAN 365 DAYS.

WORKSTATION: PROVIDE A NEW FRONT-END WORKSTATION TO BE LOCATED IN THE B1 MECH ROOM. SERVER SHALL BE HIGH PERFORMANCE WITH LATEST SOFTWARE AND DRIVERS. HARD DRIVE SHALL HAVE THE CAPACITY TO STORE ALL TREND DATA IN ADDITION TO ALL SYSTEM

REQUIREMENTS. NO SYSTEM PROGRAMMING SHALL RESIDE ON THE WORKSTATION.

NOTE: CONTRACTOR TO ADDRESS ALL DEVICES REMAINING ON B1 N2 NETWORK. FOR JCI EQUIPMENT, MAINTAIN SEPARATE N2 NETWORK FUNCTIONAL. FOR PROPOSED ALTERNATE EQUIPMENT, PROVIDE ALL INTERFACE DEVICES TO MAINTAIN EXISTING CONTROLS FUNCTIONALITY.

FACILITY OPERATION: THE BUILDINGS ARE BOTH OCCUPIED AND SHALL REMAIN OCCUPIED DURING THE WORK. ALL WORK AND EQUIPMENT OUTAGES SHALL BE CAREFULLY COORDINATED AND SCHEDULED WITH THE OWNER TO MINIMIZE THE IMPACT TO OCCUPANTS. SCHEDULE

WORK WITH A MINIMUM OF TWO WEEKS' NOTICE TO OWNER.

GENERAL SCOPE OF WORK:

A/TER1ATES � � �

%ASE %I'� E;ISTI1* ER9��� ER9��� ER9�� A1' THEIR C21TR2/S :I// RE0AI1 I1 3/ACE�

A''�A/TER1ATE �� RE3/ACE ER9�� A1' ITS C21TR2/S I1 THE SA0E /2CATI21� I1C/8'I1* 1E: C8R% A'A3TER� A''�A/TER1ATE �� RE3/ACE ER9�� A1' ITS C21TR2/S I1 THE SA0E /2CATI21� I1C/8'I1* 1E: C8R% A'A3TER� A''�A/TER1ATE �� RE3/ACE ER9�� A1' ITS C21TR2/S I1 THE SA0E /2CATI21� I1C/8'I1* 1E: C8R% A'A3TER�

A/TER1ATE �

%ASE %I'� THE E;ISTI1* C21TR2/S )2R E;ISTI1* TER0I1A/ 'E9ICES �C8H

V� 8H

V� )TR

V� H3�� THR28*H H3��� � HEAT E;CHA1*ERS� A1'

3803S /2CATE' I1 %8I/'I1* � R220 ���� 12T I1C/8'E' I1 THE %ASE SC23E� :I// RE0AI1 I1 3/ACE� THE 1E: 1ET:2R. :I// %E :IRE'

T2 0AI1TAI1 E;ISTI1* C21TR2/S�

A''�A/TER1ATE �� RE3/ACE THE C21TR2/S )2R THE E;ISTI1* TER0I1A/ 'E9ICES �C8H

V� 8H

V� )TR

V� H3�� THR28*H H3��� HEAT

E;CHA1*ERS A1' 3803S /2CATE' I1 %8I/'I1* � R220 ���� 12T I1C/8'E' I1 THE %ASE SC23E� A1' :IRE T2 THE 1E: 1ET:2R.�

A/TER1ATES SC23E 2) :2R.�

MECHANICAL GENERAL NOTESMECHANICAL LEGEND

AFF ABOVE FINISH FLOOR

AHU AIR HANDLING UNIT

APD AIR PRESSURE DROP

AS AIR SEPARATOR

ABV AUTOMATIC BALANCE VALVE

B BOILER

BF BOILER FEEDWATER

CD CONDENSATE DRAIN

CKT CIRCUIT

CM CONSTRUCTION MANAGER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

DCW DOMESTIC COLD WATER

DR DRAIN

DX DIRECT EXPANSION

<E> EXISTING

E/A EXHAUST AIR

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

ERV ENERGY-RECOVERY VENTILATOR

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

FCU FAN COIL UNIT

FOP FUEL OIL PUMP

FTR FINNED-TUBE RADIATION

GC GENERAL CONTRACTOR

HP HEAT PUMP

HP HORSEPOWER

HR HEATING RADIATOR

HRU HEAT RECOVERY UNIT

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HX HEAT EXCHANGER

HZ HERTZ

IWH INDIRECT WATER HEATER

KH KITCHEN HOOD

KSH KICKSPACE HEATER

LV LOUVER

LPG LIQUID PROPANE GAS

LWR LOOP WATER RETURN

LWS LOOP WATER SUPPLY

MAX MAXIMUM

MBH 1,000 BRITISH THERMAL UNITS

MC MECHANICAL CONTRACTOR

<N> NEW

NG NATURAL GAS

O/A OUTDOOR AIR

P PUMP

PC PLUMBING CONTRACTOR

<R> RELOCATE/RELOCATED

R/A RETURN AIR

S/A SUPPLY AIR

UH UNIT HEATER

VAV VARIABLE AIR VOLUME BOX

VB VACUUM BREAKER

VFD VARIABLE FREQUENCY DRIVE

WH WATER HEATER

WPD WATER PRESSURE DROP

A. QUALITY OF WORK

1. IT IS THE INTENT OF THE DRAWINGS AND SPECIFICATIONS TO OBTAIN A COMPLETE AND SATISFACTORY

INSTALLATION. AN ATTEMPT HAS BEEN MADE TO SEPARATE AND DEFINE THE WORK OF THE

CONTRACTOR. DRAWINGS ARE DIAGRAMMATIC, BUT SHALL BE FOLLOWED AS CLOSELY AS ACTUAL CONSTRUCTION OF THE FACILITY AND WORK OF OTHER TRADES WILL PERMIT. THE DRAWINGS UTILIZE

SYMBOLS AND SCHEMATIC DIAGRAMS TO INDICATE VARIOUS ITEMS OF WORK. THEREFORE, NO

INTERPRETATION WILL BE MADE FROM THE LIMITATION OF SYMBOLS AND DIAGRAMS THAT ANY

ELEMENTS NECESSARY FOR THE COMPLETE INSTALLATION ARE EXCLUDED. THE ENGINEER SHOULD BE NOTIFIED OF ANY DISCREPANCIES, OMISSIONS, CONFLICTS, OR INTERFERENCE WHICH OCCUR BETWEEN VARIOUS DRAWINGS AND SPECIFICATIONS. IF SUCH NOTIFICATION IS NOT RECEIVED, THE INSTALLING

CONTRACTOR(S) SHALL BE RESPONSIBLE FOR THEIR INTERPRETATIONS.

2. "PROVIDE" SHALL MEAN "FURNISH AND INSTALL" AND MUST INCLUDE ALL EQUIPMENT (THAT INCLUDE

THE ACCESSORIES, SUPPORTS, FITTINGS AND OTHER INCIDENTAL MATERIAL NEEDED FOR THE

EQUIPMENT), DEVICES, HARDWARE, MOUNTS, LABOR, RIGGING, SUBCONTRACTS, ETC., THAT RESULT IN A COMPLETE AND FUNCTIONAL PROJECT INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE. MINOR ITEMS TO FINISH THE WORK SUCH AS PATCHING, BLOCKING, TRIM, TOUCH-UP PAINT, ETC., SHALL BE PROVIDED WHETHER OR NOT INDICATED IN THE CONTRACT DOCUMENTS.

3. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS IN

STRAIGHT SECTIONS OF PIPE OR DUCT AS RECOMMENDED BY THE MANUFACTURER.

4. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE

MANUFACTURER SHALL BE USED.

5. ALL WORKMANSHIP, MATERIALS, AND EQUIPMENT SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR

AFTER ACCEPTANCE BY THE OWNER.

6. PROVIDE IDENTIFICATION LABELS FOR NEW EQUIPMENT. AFFIX PERMANENT IDENTIFYING TAGS OR LABELS TO FANS, TERMINAL UNITS, AIR-HANDLERS ETC. IDENTIFY SYSTEM ON PIPING AND DUCTWORK MAINS AND INDICATE DIRECTION OF FLOW ON PIPING. INDICATE THE CONTROLLED EQUIPMENT ON WALL

MOUNTED CONTROLS.

B. CODES/PERMITS

1. WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH NFPA, ASHRAE, UNDERWRITERS

LABORATORIES AND ALL MUNICIPAL, STATE AND OTHER AUTHORITIES, PUBLIC AND PRIVATE, HAVING JURISDICTION. REPORT ALL DISCREPANCIES WITH SUCH REGULATIONS TO ENGINEER AND DO NOT

PROCEED WITH ANY WORK UNTIL WRITTEN AUTHORIZATION IS RECEIVED FROM THE ENGINEER.

2. ALL NECESSARY FEES, PERMITS, AND APPROVALS AS REQUIRED BY THE WORK OF THESE DRAWINGS

AND SPECIFICATIONS SHALL BE OBTAINED AND PAID FOR BY THIS CONTRACTOR.

3. NOTHING CONTAINED IN THE SPECIFICATIONS OR INDICATED ON THESE DRAWINGS SHALL BE CONSTRUED TO CONFLICT WITH APPLICABLE PORTIONS OF ANY LAWS, ORDINANCES, REGULATIONS, OR

CODES.

C. COORDINATION OF WORK

1. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, AND ELECTRICAL WORK - NEW OR EXISTING.

2. WHEN MECHANICAL WORK (HVAC, PLUMBING, FIRE PROTECTION, ETC.) IS SUBCONTRACTED, IT SHALL BE

THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO COORDINATE SUBCONTRACTORS AND THE

ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTOR PROVIDES

A PARTICULAR ITEM OF THE MECHANICAL CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL

CONNECTIONS FOR A PARTICULAR ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE

ATTENTION OF THE MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.

3. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS ARE APPROXIMATE AND NOT DEFINITELY FIXED BY DIMENSIONS. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE THE

DRAWINGS.

4. PROVIDE LOCATIONS OF REQUIRED ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS TO SERVICE VALVES, DAMPERS, AND OTHER CONCEALED MECHANICAL EQUIPMENT. GENERAL CONTRACTOR

SHALL FURNISH & INSTALL ACCESS PANELS.

5. COORDINATE LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS WITH ALL OTHER TRADES INVOLVED. ALL OPENINGS IN FIRE WALLS FOR PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED.

6. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR ALTERNATION AND REPAIRS.

7. PROVIDE FLEXIBLE CONNECTION IN ALL PIPING SYSTEMS CONNECTED TO PUMPS, CHILLERS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION EXCEPT WATER COILS. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS INDICATED ON DRAWINGS.

D. TESTING, ADJUSTING, AND BALANCING

1. WORK SHALL BE PERFORMED BY AN INDEPENDENT TESTING AND BALANCING AGENCY SPECIALIZING IN

TESTING, ADJUSTING, AND BALANCING OF HEATING, VENTILATION, AND COOLING SYSTEMS. TESTING

AND BALANCING CONTRACTOR SHALL BE AABC OR NEBB CERTIFIED.

2. TOLERANCE OF HYDRONIC SYSTEMS: ADJUST FLUID FLOW RATES AT BALANCE VALVES AND ALL

EQUIPMENT TO PLUS/MINUS 10% OF DESIGN FLOW RATES.

3. TOLERANCE OF AIR SYSTEMS: ADJUST AIR FLOW RATES AT AIR HANDLING UNITS TO PLUS/MINUS 5% OF DESIGN FOR SUPPLY SYSTEMS AND PLUS/MINUS 10% OF DESIGN FOR RETURN AND EXHAUST SYSTEMS.

ADJUST AIR FLOW RATES AT AIR INLETS AND OUTLETS TO PLUS/MINUS 10% OF DESIGN TO THE SPACE.

MAINTAIN RELATIVE PRESSURIZATION OF EXISTING SPACES AND ESTABLISH REQUIRED PRESSURIZATION

IN MODIFIED SPACES.

4. SCHEDULED EQUIPMENT SHALL BE BALANCED AND A PRELIMINARY REPORT SUBMITTED TO THE ENGINEER FOR REVIEW. PROVIDE ALLOWANCE FOR (2) RETURN TRIPS FOR ADDITIONAL REBALANCE WORK AFTER ENGINEER REVIEW OF INITIAL REPORTS. PROVIDE THE FINAL REPORT TO ENGINEER.

E. WARRANTY

1. GUARANTEE ALL WORK PERFORMED AND MATERIALS AND EQUIPMENT INSTALLED TO THE FULL EXTENT REQUIRED BY THE DRAWINGS AND SPECIFICATIONS TO BE FREE FORM INHERENT DEFECTS OF MATERIAL

AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE.

2. REPLACE ANY MATERIAL AND EQUIPMENT PRIOR TO THE FINAL ACCEPTANCE WHICH IS CORRODED OR OTHERWISE DAMAGED THROUGH THE MECHANICAL CONTRACTOR'S FAILURE TO PROPERLY OPERATE

AND MAINTAIN THE INSTALLATION DURING CONSTRUCTION OR RETESTING.

3. KEEP THE WORK IN REPAIR AND REPLACE ANY DEFECTIVE MATERIALS, EQUIPMENT, OR WORKMANSHIP UPON NOTICE FROM THE ENGINEER OR OWNER'S REPRESENTATIVE FOR A PERIOD OF ONE YEAR FROM

DATE OF ACCEPTANCE.

4. CONSIDER DEFECTIVE ALL MATERIAL OR EQUIPMENT REQUIRING EXCESSIVE SERVICE DURING THE FIRST

YEAR OF OPERATION.

5. THE DATE OF ACCEPTANCE OF THE PROJECT APPEARS ON THE ENGINEER'S CERTIFICATE OF

SUBSTANTIAL COMPLETION.

F. INSURANCE

1. THE CONTRACTOR SHALL, DURING THE LIFE OF THE CONTRACT, MAINTAIN IN FORCE, SUCH INSURANCE

AS IS REQUIRED OF THE PRIME CONTRACTOR IN THE GENERAL CONDITIONS OF THE CONTRACT; AND SHALL FURNISH THE PRIME CONTRACTOR AND THE OWNER WITH CERTIFICATION OF SUCH INSURANCE

BEFORE BEGINNING WORK ON THIS SECTION OF CONTRACT.

DEMO AND REPLACE THE EXISTING EMS CONTROLS SYSTEM COMPONENTS WITH MODERN

CONTROL DEVICES. MAINTAIN EXISTING FUNCTIONALITY WHILE MODIFYING THE COMMUNICATION

PROTOCOLS TO SOME DEVICES, AND ADJUSTING HOW SOME CONTROLS WIRING IS ROUTED.

PROJECT IS TO OCCUR DURING EXISTING BUILDING OCCUPATION AND REQUIRES COORDINATION

OF WORK WITH OCCUPANTS. PROJECT HAS ADD-ALTS FOR ERV REPLACEMENT, AND FOR THE

REPLACEMENT OF TERMINAL DEVICE CONTROLLERS.

PROJECT DESCRIPTION:

IECC-2018 (AMENDED)

IEBC-2021 (AMENDED)

IMC-2021 (AMENDED)

APPLICABLE CODES:

AutoCAD SHX Text

COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC

AutoCAD SHX Text

BDD

AutoCAD SHX Text

AUTOMATIC AIR VENT

AutoCAD SHX Text

BACKDRAFT DAMPER

AutoCAD SHX Text

BACKFLOW PREVENTOR

AutoCAD SHX Text

BALANCING VALVE

AutoCAD SHX Text

BALL VALVE

AutoCAD SHX Text

BUTTERFLY VALVE

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

CONCENTRIC REDUCER

AutoCAD SHX Text

CONNECT TO EXISTING

AutoCAD SHX Text

FIRE DAMPER

AutoCAD SHX Text

FLEXIBLE DUCT

AutoCAD SHX Text

FLOW DIRECTION

AutoCAD SHX Text

FLOW SWITCH

AutoCAD SHX Text

GAS COCK

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

GLOBE VALVE

AutoCAD SHX Text

MANUAL AIR VENT

AutoCAD SHX Text

MOTORIZED DAMPER

AutoCAD SHX Text

PIPE CAPPED

AutoCAD SHX Text

PIPE TURNED DOWN

AutoCAD SHX Text

PIPE TURNED UP

AutoCAD SHX Text

PRESSURE GAUGE

AutoCAD SHX Text

PRESSURE REGULATING VALVE

AutoCAD SHX Text

CIRCULATOR PUMP

AutoCAD SHX Text

RETURN REGISTER

AutoCAD SHX Text

SAFETY RELIEF VALVE

AutoCAD SHX Text

STEAM TRAP

AutoCAD SHX Text

STRAINER

AutoCAD SHX Text

STRAINER WITH BLOW DOWN VALVE

AutoCAD SHX Text

SUPPLY DIFFUSER

AutoCAD SHX Text

THERMOSTAT

AutoCAD SHX Text

THERMOSTAT LINE VOLTAGE

AutoCAD SHX Text

UNION

AutoCAD SHX Text

FS

AutoCAD SHX Text

EXHAUST REGISTER

AutoCAD SHX Text

VD

AutoCAD SHX Text

VOLUME DAMPER

AutoCAD SHX Text

FUEL OIL PIPING

AutoCAD SHX Text

FOP

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

CO2

AutoCAD SHX Text

CO2 SENSOR

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: SER

CHECKED: SVD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

MECHANICAL/

ELECTRICAL

M0.2

AHU SERVICE

MAP

MECHANICAL LAYOUT PROVIDED FROM

OAK POINT ASSOCIATES READINESS CENTER ADD/ALT

DRAWINGS DATED 7/1/2004 WITH FORMATTING EDITS.

LAYOUT WAS MODIFIED WITH UPDATED BACKGROUNDS

AND INPUT FROM NHARNG ON 7/13/2026.

LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD

CONDITIONS

AutoCAD SHX Text

PLAN

AutoCAD SHX Text N

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

PLAN

AutoCAD SHX Text N

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

HVAC INPUTS & OUTPUTS

AutoCAD SHX Text

AHU-1

AutoCAD SHX Text

LEVEL 1

AutoCAD SHX Text

LEVEL 2

AutoCAD SHX Text

AHU-2

AutoCAD SHX Text

AHU-3

AutoCAD SHX Text

AHU-4

AutoCAD SHX Text

AHU-5

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

MECH ROOM

AutoCAD SHX Text

MECH ROOM

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

CST/GARAGES

AutoCAD SHX Text

LOCATION

COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC

EXIST.

DOMESTIC

BOILER B-2

NEW WORKSTATION

(SEE NOTE 9)

FRONT END WITH VIEW OF

GRAPHICS, ACCESS CONTROL

& DATA COLLECTION

NETWORK

SWITCH

CONTROL

PANEL

KEY NOTES

T-STAT, JCI NS8000 SERIES NSB8BTN241-0 FOR TEMPERATURE-ONLY APPLICATIONS. MODIFY FOR DUAL-FUNCTION

APPLICATIONS, INCLUDING TEMP + CO2, AND/OR TEMP + OCC. SENSOR.

VAV CONTROLLER JCI CVM SERIES MODEL M4-CVM3050 MS/TP & N2 COMPATIBLE WITH RJ12 6-PIN SENSOR (SA BUS) PORT FOR MSTP BACNET MSTP (M4-CVE SERIES FOR IP) W/ RJ-12 SUBNETWORK FOR T-STAT CONNECTION, WITH INTEGRATED DAMPER ACTUATOR AND ON-BOARD AIRFLOW SENSOR.

NOTE SENSOR BUS IS RJ-12, ALL DEVICES TO BE BACNET BTL LISTED B-AAC OPEN & INTEROPERABLE CONTROLLERS

GENERAL NOTES

1. BMS BUILDING CONTROLLER SHALL BE TRIDIUM N4 BASED GRAPHICS. ALL SOFTWARE TO BE FULLY OPEN ARCHITECTURE WITH ALL ACCESS ATTRIBUTES PROVIDED TO OWNER INCLUDING SOFTWARE KEY'S AND PROTOCOLS. CONTRACTOR TO PROVIDE ROUTER/SWITCH TO

ESTABLISH COMMUNICATIONS.

2. CONTROL ZONE THERMOSTATS AND EQUIPMENT SHALL COMMUNICATE TO THE BUILDING AUTOMATION SYSTEM (BAS) VIA BACNET MSTP

INTERFACE PROTOCOL.

2. BUILDING IS EQUIPPED WITH EXISTING BMS. SURVEY AND INVENTORY ALL EXISTING SYSTEM FEATURES INCLUDING I/O, ALARMS, GRAPHICS

DISPLAY AND FRONT END FEATURES AND REPLICATE ON TO NEW SYSTEM.

3. SCHEDULING OF THE OCCUPIED AND UNOCCUPIED PERIOD FOR EACH ZONE SHALL BE DONE AT THE BAS.

4. PROGRAMMING OF EACH ZONE'S HEATING AND COOLING SETPOINT TEMPERATURES FOR BOTH OCCUPIED AND UNOCCUPIED PERIODS SHALL BE DONE AT THE BAS. LOCAL THERMOSTAT CONTROLS SHALL MODIFY LOCAL SETPOINTS ± 3°F (ADJ.). SETPOINT ALARMS SHALL BE ADJUSTED

TO ALARM ON ± 6°F DEFICIENCY FROM SETPOINT (ADJ.).

5. HVAC CONTROLS CONTRACTOR SHALL FIELD-VERIFY & FUNCTIONALLY TEST ALL COMPONENT PARTS, DEVICE CABLING, ETC. PRIOR TO

INSTALLATION OF NEW SYSTEMS.

6. CONTROL CONTRACTOR SHALL INTEGRATE VENDOR NETWORK SYSTEM TO THE NEW BMS & SHALL PROVIDE MONITORING, TRENDING, GRAPHICS, ALARMS ECT. CONTROLS CONTRACTOR SHALL PROVIDE NETWORK ADDRESSING FOR ALL VENDOR SIGNALS TO PROVIDE COMPLETE

MONITORING & COMMUNICATION WITH ALL VENDOR EQUIPMENT.

7. CONTROL CONTRACTOR TO FIELD VERIFY EXISTING CONTROLLER CAPACITIES & LOCATIONS FOR NEW WORK. PROVIDE NEW CONTROLLERS OR

EXPANSION MODULES AS REQUIRED FOR NEW WORK CONTROL POINTS.

8. SEE CONTROLS SCHEMATICS FOR ADDIONAL REQUIREMENTS.

9. CONTROLS CONTRACTOR TO UTILIZE DESKTOP PC FOR SCOPE DEVELOPMENT AND PROGRAMMING. GUARD DESIRES DESKTOP PC, FULLY CONFIGURED, TO BE LEFT ON-SITE TO SERVE AS THE EMS WORKSTATION. PROVIDE KEYBOARD, MOUSE, 2TB SSD, 30" MONITOR, AND ALL OTHER REQUIRED PERIPHERALS TO CREATE A FULL WORKSTATION. LOCATE IN B1, 279. BMS SHALL HAVE CAPACITY TO RECORD TREND DATA OF ALL POINTS AT (15) SECOND INTERVALS FOR (1) YEAR. COORDINATE MIGRATION OF ALL EXISTING HDD DATA TO NEW HDD AS NECESSARY TO ACCOMMODATE NEW HDD

INSTALLATION.

ETHERNET

ROOF

SECOND

FLOOR

1ST FLOOR

BA

CN

ET

/M

ST

P

BA

CN

ET

/M

ST

P

EXTERIOR

ZC ZONE CONTROLLER

ZV ZONE VALVE AT FINNED TUBE OR CUH

RZV REHEAT ZONE VALVE

ABBREVIATIONS

LOCATE IN ROOM 279

BUILDING 2

EXIST.

PUMPS

EXIST.

PUMPS

EXIST.

BOILER

B-1 (B2)

DT DUCT TEMPERATURE TRANSMITTER

BUILDING 1

BUILDING 2 BUILDING 1

2ND FLOOR

SOUTHVAV-1-1

ZC

RZVDT THROUGH

ROOF

SECOND

FLOOR

1ST FLOOR

X

A

NETWORK ARCHITECTURE JFHQ SMR-B1

NOT TO SCALE

VAV TAGGING METHOD:

FOR 'VAV-X-Y':

X - INDICATES THE ASSOCIATED AHU SUPPLYING THE VAV,

Y - IS GENERAL UNIT NUMERATION, PER ASSOCIATED AHU

QTY. 7

NOTE: THE FOLLOWING VAVs HAVE AUXILLARY HEAT (VAV LOCATION):

SERVING CUHS: VAV 2-27 (2N), 2-38 (2S), 1-15 (2S)

SERVING FTR VALVES: VAV 2-11 (2S), 2-28 (1S), 1-5 (2S)

NEW

NETWORK

CONTROLLER

(JACE)

A

X

P-1

P-2

CHWP-5

CHWP-6

HWP-7

HWP-8

AHU-3AHU-2

VAV-1-7

ZC

RZVDT

A

X

VAV-1-15

ZC

RZVDT

A

X

ZV

VAV-2-11

ZC

RZVDT

A

X

ZV

THROUGH VAV-2-17

ZC

RZVDT

A

X

VAV-2-38

ZC

RZVDT

A

X

ZV

VAV-3-19

ZC

RZVDT

A

X

THROUGH VAV-3-22

ZC

RZVDT

A

X

VAV-2-1

ZC

RZVDT THROUGH

A

X

VAV-2-10

ZC

RZVDT

A

X

VAV-2-27

ZC

RZVDT

A

X

ZV

VAV-3-2

ZC

RZVDT

A

X

THROUGH VAV-3-18

ZC

RZVDT

A

X

VAV-3-43

ZC

RZVDT

A

X

ERV-2

ERV-1AHU-1 ERV-3AHU-4

VAV-1-8

ZC

RZVDT THROUGH

A

X

VAV-1-14

ZC

RZVDT

A

X

VAV-2-28

ZC

RZVDT THROUGH

A

X

ZV

VAV-2-37

ZC

RZVDT

A

X

VAV-3-35

ZC

RZVDT THROUGH

A

X

VAV-3-42

ZC

RZVDT

A

X

VAV-2-18

ZC

RZVDT THROUGH

QTY. 9

A

X

VAV-2-26

ZC

RZVDT

A

X

VAV-3-25

ZC

RZVDT THROUGH

QTY. 10

A

X

VAV-3-34

ZC

RZVDT

A

X

2ND FLOOR

NORTH

1ST FLOOR

NORTH

CUH-1 THROUGH

QTY. 4

CUH-4 FR-1 THROUGH

QTY. 6

FR-6 DF-1 DF-2 EF-3 THROUGH

QTY. 6

EF-8

1ST FLOOR

SOUTH

RF-9 CAF-10 1ST FLOOR

(VARIOUS LOCATIONS)UH-2UH-1

NOTE: COMMUNICATION BUS TYPE

TO BE CONSIDERED AS FOLLOWS:

MSTP (BASE BID)

BACNET IP (ADD-ALT.)

NOTE: CUH & FR CONTROLLERS

TO BE STAND-ALONE OR ASSOCIATED

WITH VAV CONTROLLERS

BA

CN

ET

/M

ST

P

BA

CN

ET

/M

ST

P

BA

CN

ET

/M

ST

P

HX-1 HX-2

1ST FLOOR

MECH RM 167

EXIST. MECH. SHED

EXIST. JCI

NETWORK

CONTROLLER

WORKSTATION

EXIST.

NOTE: RETAIN DISCONNECTED B2

WORKSTATION, PROVIDE TO OWNER

BUILDING 2 BUILDING 1

ETHERNET

EXIST.

PUMPS

EXIST.

PUMPS

EXIST.

DOMESTIC

BOILER B-1

BOILERS & PUMPS SERVE B2

ERV-4 AHU-5MAU-1

VAVS

W/ REHEAT

ERV-1

(B2)

REPEATER

REPEATER

REPEATER

REPEATER

ZC

RZVDT

A

X

ZV

QTY. 5

VAVS

W/ REHEAT

ZC

RZVDT

A

X

ZV

QTY.

UNKNOWN

EXIST.

CHWP-22A

EXIST.

CHWP-22B

TF-15 EF-4EF-11MAU-1

CHILLER

CH-3 (B2)

EXISTING ROUTING TO REMAIN

REPEATER REPEATER

QTY. 7 QTY. 7

QTY. 17QTY. 10

QTY. 7 QTY. 10 QTY. 8

ETHERNET

NOTE: REROUTE NETWORK SIGNAL

FROM EXISTING B1 SERVER TO

NEW COMBINED NETWORK

NEW

NETWORK

CONTROLLER

(JACE)

EXIST.

NETWORK

CONTROLLERS

(2)

VAV-1-5

ZC

RZVDT

A

X

ZV

THROUGH

10. REUSE EXISTING 8 CONDUCTOR CABLE FROM T-STAT TO VAV. REMOVE EXISTING RJ-45 CONNECTOR FROM EACH END AND INSTALL RJ-12 CONNECTORS AND 6 WIRES FROM CABLE FOR VAV & T-STAT PLUG-IN. TEST ALL CONDUCTORS FOR FULL FUNCTIONALITY. PROVIDE UP TO 10 NEW CABLES.

CONTRACTOR TO WARRANTY ALL WIRING FOR STANDARD WARRANTY PERIOD. SEE ALLOWANCE #2 FOR CABLE REPLACEMENT.

JCI FX 9200, LOCATE IN 2ND

FLOOR MECHANICAL ROOM

N2

IP

N2 ROUTER /

CONVERTER

HP-1 HP-2 HP-3 HP-4

LOCATIONS

UNKNOWN

CUH-X UH-X FTR-X UH-X

VARIOUS

LOCATIONS

ADD-ALT SCOPE INCLUDES REPLACEMENT

OF ERV AND NEW CONTROLS

REWIRE ALL CONTROLLERS TO NEW B1 JACE. INSTALL NEW

COMMUNICATION CABLE AND FOLLOW EXISTING CABLE

PATH TO B1. NOTIFY OWNER AND ENGINEER IF CABLE RUN

EXCEEDS MAX. LENGTH.

CHILLER

CH-2 (B1)

CHILLER

CH-1 (B1)

REPEATER

BOILER

B-1 (B1)

BOILER

B-2 (B1)

EXIST.

CHWP-3

(INTEGRAL)

PUMP

EVAP-A

EXIST.

BOILER

B-2 (B2)

NOTE: JOC AREA SPLIT-SYSTEM HEAT PUMP UNITS ARE CONTROLLED

BY EXISTING VAV THERMOSTATS. PROVIDE HEAT PUMPS WITH NEW

WIRING AND CONNECTION TO NEW CONTROLS SYSTEM, MAINTAIN

EXISTING THERMOSTAT CONTROL FOR VAV'S AND GWP'S.

NOTE: JCI FX 9000 IS PROVIDED WITH N2 DRIVER, ANY NON-JCI ALT JACE MUST

BE PROVIDED WITH THIRD-PARTY N2 CONVERTER TO MAINTAIN N2 CONNECTIVITY

GWP-6 HPVZC

X

GWP-7 HPV GWP-8 HPV

HPV THREE-WAY HEAT PUMP VALVE

ZC

X

ZC

X

11. ALL CONTROLS (PROGRAMMING, PAGES, DOCUMENTATION) SHALL BE TURNED OVER TO OWNER AT PROJECT COMPLETION.

PROVIDE IN THE FORM OF A FLASH DRIVE OF APPROPRIATE SIZE FOR FUTURE CONTROLS UPDATES / REVISIONS.

JCI FX 9100

12. ETHERNET CONNECTIONS BETWEEN JACES, NETWORK SWITCH, AND WORKSTATION ARE CABLE-TYPE, PROVIDE CAT-6A CABLE.

NETWORK

SWITCH

NETWORKED

DEVICES

NETWORKED

DEVICES

13. ELECTRICAL CONTRACTOR TO PROVIDE 120V POWER TO DEVICES REQUIRING POWER.

WALL-MOUNTED EPO SWITCH, WITH COVER, FOR ISOLATION OF

HVAC AND OUTSIDE AIR. COORDINATE SWITCH REQUIREMENTS

AND LOCATION WITH OWNER. PROVIDE WITH PLACARD AT

SWITCH IDENTIFYING AS "HVAC SHUTDOWN".

SMR B1 & B2

NETWORK

ARCHITECTURE

R E V I S I O N S

P R O J E C T

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: SER

CHECKED: SVD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

MECHANICAL/

ELECTRICAL

A''�A/T �

SC23E

A''�A/T �� �� �

SC23E

M1.0

191192193

194170

VAULT

5A

MEN'S LOCKER

WOMEN'S LOCKER

FITNESS

MEN'S BATHROOM W'S BATHROOM

MEN'S SHOWERS W'S SHOWER

140A

VESTIBULE

STAIR 1

VESTIBULE

124 123

121A

123 121 116 115 114

112111

MEN'S

WOMEN'S

MECHANICAL

LOBBY

ELEV

MECH

ELEV

SCALE: 3/32" = 1'-0"

HORIZONTAL SCALE IN FEET

01248 8 16 24 32

FIRST FLOOR MECHANICAL PLAN - NORTH

DRAWING KEYNOTES:

MECHANICAL LAYOUT PROVIDED FROM

OAK POINT ASSOCIATES READINESS CENTER ADD/ALT

DRAWINGS DATED 7/1/2004

LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD

CONDITIONS

R E V I S I O N S

P R O J E C T

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: SER

CHECKED: SVD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

MECHANICAL/

ELECTRICAL

M2.0

SMR B1

1ST FLOOR

NORTH

REPLACE VAV CONTROLLER. SEE CONTROLS SCHEMATIC FOR DEVICE INFORMATION.

REPLACE T-STAT. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.

REPLACE CO2 DETECTOR. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.

MODIFY EXISTING LAN CABLE BETWEEN T-STAT & CONTROLLER. REMOVE 8-PIN CONNECTOR

ON EACH END AND INSTALL 6-PIN CONNECTOR UTILIZING 6 CONDUCTORS CONSISTENTLY.

TEST CONNECTORS FOR CONTINUITY PRIOR TO CONNECTION TO DEVICES.

AutoCAD SHX Text %%uKEYPLAN

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FEC

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-26

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-25

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-24

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-23

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-22

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-21

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-20

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-19

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-18

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-34

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-33

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-32

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-26

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-25

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-31

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-30

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-29

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-27

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-28

AutoCAD SHX Text

CO2

AutoCAD SHX Text

CO2

AutoCAD SHX Text

CO2

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

TO VAV 2-28

AutoCAD SHX Text

IN 100A ON M2.1

AutoCAD SHX Text T

AutoCAD SHX Text

ABOVE ON M6

AutoCAD SHX Text

TO VAV 2-27

AutoCAD SHX Text

CUH

AutoCAD SHX Text

AutoCAD SHX Text

CONTROL VALVE

AutoCAD SHX Text

TO FR-2 & 4

AutoCAD SHX Text T

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text N

1 1

4 4

4 4

191192

180179

VAULT

FITNESS

MEN'S BATHROOM W'S BATHROOM

MEN'S SHOWERS W'S SHOWER

DINING

KITCHEN

144143

140A

STAIR 3

STAIR 2

138139

MECHANICAL

DRILL HALL

LOBBY

ELEV

MECH

SCALE: 3/32" = 1'-0"

HORIZONTAL SCALE IN FEET

01248 8 16 24 32

FIRST FLOOR MECHANICAL PLAN - SOUTH

MECHANICAL LAYOUT PROVIDED FROM

OAK POINT ASSOCIATES READINESS CENTER ADD/ALT

DRAWINGS DATED 7/1/2004

LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD

CONDITIONS

DRAWING KEYNOTES:

REPLACE VAV CONTROLLER. SEE CONTROLS SCHEMATIC FOR DEVICE INFORMATION.

REPLACE T-STAT. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.

REPLACE CO2 DETECTOR. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.

MODIFY EXISTING LAN CABLE BETWEEN T-STAT & CONTROLLER. REMOVE 8-PIN CONNECTOR

ON EACH END AND INSTALL 6-PIN CONNECTOR UTILIZING 6 CONDUCTORS CONSISTENTLY.

TEST CONNECTORS FOR CONTINUITY PRIOR TO CONNECTION TO DEVICES.

UNIT HEATER LOCATED IN KITCHEN STORAGE ROOM. BASE BID SCOPE IS FOR CONTROLS

REWIRE TO UNIT, ADD DEVICE TO EMS, INCLUDING ALL ALARMS AND I/O TRENDING.

R E V I S I O N S

P R O J E C T

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: SER

CHECKED: SVD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

MECHANICAL/

ELECTRICAL

M2.1

SMR B1

1ST FLOOR

SOUTH

AutoCAD SHX Text %%uKEYPLAN

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FEC

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-37

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-35

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-34

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-36

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-33

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-32

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-31

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-29

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-30

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-28

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-10

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-9

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-8

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-13

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-14

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-11

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-35

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-36

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-37

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-38

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-39

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-40

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-42

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-41

AutoCAD SHX Text

CO2

AutoCAD SHX Text

CO2

AutoCAD SHX Text

CO2

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-12

AutoCAD SHX Text

CO2

AutoCAD SHX Text

CO2

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text

TO EF-4

AutoCAD SHX Text

ON ROOF

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

PS

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

TO VAV 2-38

AutoCAD SHX Text

ABOVE ON M2.3

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

FROM T-STAT

AutoCAD SHX Text

IN 101 ON M2.0

AutoCAD SHX Text

TO VAV 1-15

AutoCAD SHX Text

ABOVE ON M2.3

AutoCAD SHX Text

CUH

AutoCAD SHX Text

AutoCAD SHX Text

CUH

AutoCAD SHX Text

AutoCAD SHX Text

UH

AutoCAD SHX Text

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UH

AutoCAD SHX Text

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text N

ELEV

1 1

1 1

1 1

2 2 2

4 4

4 4

O F

E

ATTSHET

A L

OF

S E

7 7

215 214 213 212 209 207

210202

220 222

217 218

WOMEN'S

MEN'S255

258 270

261 264

271 273 274

277 276

STAIR 3

3 3

SCALE: 3/32" = 1'-0"

HORIZONTAL SCALE IN FEET

01248 8 16 24 32

SECOND FLOOR MECHANICAL PLAN - NORTH

MECHANICAL LAYOUT PROVIDED FROM

OAK POINT ASSOCIATES READINESS CENTER ADD/ALT

DRAWINGS DATED 7/1/2004

LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD

CONDITIONS

DRAWING KEYNOTES:

REPLACE VAV CONTROLLER. SEE CONTROLS SCHEMATIC FOR DEVICE INFORMATION.

REPLACE T-STAT. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION

REPLACE CO2 DETECTOR. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.

MODIFY EXISTING LAN CABLE BETWEEN T-STAT & CONTROLLER. REMOVE 8-PIN CONNECTOR

ON EACH END AND INSTALL 6-PIN CONNECTOR UTILIZING 6 CONDUCTORS CONSISTENTLY.

TEST CONNECTORS FOR CONTINUITY PRIOR TO CONNECTION TO DEVICES.

IN ADDITION TO THE VAV'S SHOWN ON THE PLANS, THE JOC AREA IS SERVED BY THREE (3)

HEAT PUMPS. APPROXIMATE LOCATIONS FOR GWP-6, 7, AND 8 ARE AS SHOWN. BASE BID

SCOPE INCLUDES TO PROVIDE HEAT PUMPS WITH NEW WIRING AND CONNECTION TO NEW

CONTROLS SYSTEM. HEAT PUMPS CONTROLLED BY EXISTING VAV T-STATS, VERIFY BMS

CONTROL OF BOTH VAV AND HEAT PUMP DEVICES IS MAINTAINED IN REPLACEMENT.

SUPPLY DIFFUSERS SERVED BY GWP-7. OTHER HEAT PUMP DIFFUSERS AND DUCTWORK NOT

SHOWN.

THERMOSTATS IN 225 AND 234 RELOCATED WITH ARCHITECTURAL CHANGES, CONTRACTOR

TO VERIFY WIRED TO CORRECT VAV SERVING AREA CONTIGUOUS WITH THERMOSTAT

R E V I S I O N S

P R O J E C T

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: SER

CHECKED: SVD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

MECHANICAL/

ELECTRICAL

M2.2

SMR B1

2ND FLOOR

NORTH

AutoCAD SHX Text

DN

AutoCAD SHX Text

DISPLAY

AutoCAD SHX Text

DISPLAY

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-27

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-10

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-8

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-9

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-7

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-6

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-4

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-3

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-2

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-1

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-9

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-8

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-7

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-6

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-5

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-4

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-2

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-3

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-1

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-15

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-16

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-17

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-18

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-14

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-13

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-10

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-11

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-5

AutoCAD SHX Text

CO2

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-43

AutoCAD SHX Text

PS

AutoCAD SHX Text

PS

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

IN 200A ON M2.3

AutoCAD SHX Text

TO VAV 2-11

AutoCAD SHX Text

CONTROL VALVE

AutoCAD SHX Text

TO FR-2, 3, 4

AutoCAD SHX Text

IN 002 ON M4

AutoCAD SHX Text

FROM T-STAT

AutoCAD SHX Text

AC

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text

EXG. NH STATE SEAL INLAY

AutoCAD SHX Text

GHP

AutoCAD SHX Text

AutoCAD SHX Text

GHP

AutoCAD SHX Text

AutoCAD SHX Text

GHP

AutoCAD SHX Text

AutoCAD SHX Text

GHP-8 LOCATED ABOVE CEILING

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-12

AutoCAD SHX Text T

AutoCAD SHX Text

CO2

AutoCAD SHX Text %%uKEYPLAN

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FEC

AutoCAD SHX Text N

4 4

4 4

251 258 270

271 273272 274 275

268ELEV

295281

290296

STAIR 3

STAIR 2

237 238

WOMEN'S

MEN'S

MECHANICAL LAYOUT PROVIDED FROM

OAK POINT ASSOCIATES READINESS CENTER ADD/ALT

DRAWINGS DATED 7/1/2004

LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD

CONDITIONS

SCALE: 3/32" = 1'-0"

HORIZONTAL SCALE IN FEET

01248 8 16 24 32

SECOND FLOOR MECHANICAL PLAN - SOUTH

DRAWING KEYNOTES:

REPLACE VAV CONTROLLER. SEE CONTROLS SCHEMATIC FOR DEVICE INFORMATION.

REPLACE T-STAT. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION

REPLACE CO2 DETECTOR. SEE CONTROLS SUBMITTAL FOR DEVICE INFORMATION.

MODIFY EXISTING LAN CABLE BETWEEN T-STAT & CONTROLLER. REMOVE 8-PIN CONNECTOR

ON EACH END AND INSTALL 6-PIN CONNECTOR UTILIZING 6 CONDUCTORS CONSISTENTLY.

TEST CONNECTORS FOR CONTINUITY PRIOR TO CONNECTION TO DEVICES.

R E V I S I O N S

P R O J E C T

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: SER

CHECKED: SVD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

MECHANICAL/

ELECTRICAL

M2.3

SMR B1

2ND FLOOR

SOUTH

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-17

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-38

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-16

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-15

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-14

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-12

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-13

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-2

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-3

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-4

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-5

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-1

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-6

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-15

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-21

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-22

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-23

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-24

AutoCAD SHX Text

VAV

AutoCAD SHX Text 2-11

AutoCAD SHX Text

CO2

AutoCAD SHX Text

CO2

AutoCAD SHX Text

CO2

AutoCAD SHX Text

CO2

AutoCAD SHX Text

CO2

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

(ABOVE)

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

(ABOVE)

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

(ABOVE)

AutoCAD SHX Text

ERV

AutoCAD SHX Text

AutoCAD SHX Text

(ABOVE)

AutoCAD SHX Text

MUA

AutoCAD SHX Text

AutoCAD SHX Text

(ABOVE)

AutoCAD SHX Text

VAV

AutoCAD SHX Text 1-7

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

CO2

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

FROM T-STAT

AutoCAD SHX Text

BELOW ON M2.1

AutoCAD SHX Text

FROM T-STAT

AutoCAD SHX Text

IN 200 ON M2.2

AutoCAD SHX Text

FROM T-STAT

AutoCAD SHX Text

BELOW ON M2.2

AutoCAD SHX Text

BELOW

AutoCAD SHX Text

TO FR-1 VALVE

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

ERV

AutoCAD SHX Text

AutoCAD SHX Text

(ABOVE)

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

ERV

AutoCAD SHX Text

AutoCAD SHX Text

(ABOVE)

AutoCAD SHX Text S

AutoCAD SHX Text

PANELS

AutoCAD SHX Text

DDC CONTROL

AutoCAD SHX Text T

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

(OPEN TO BELOW)

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

(OPEN TO BELOW)

AutoCAD SHX Text

(OPEN TO BELOW)

AutoCAD SHX Text

EXG APPLIED WALL GRAPHICS

AutoCAD SHX Text

VAV

AutoCAD SHX Text 3-20

AutoCAD SHX Text %%uKEYPLAN

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FEC

AutoCAD SHX Text N

BASE BID: EXG. ERV-2

ALT NO. 2: REPLACE ERV-2 &

CONTROLS.

BASE BID: EXG. ERV-3

ALT NO. 3: REPLACE ERV-3 &

CONTROLS.

BASE BID: EXG. ERV-1

ALT NO. 1: REPLACE ERV-1 &

CONTROLS.

EXG.

EXG.

EXG.

MECHANICAL LAYOUT PROVIDED FROM

OAK POINT ASSOCIATES READINESS CENTER ADD/ALT

DRAWINGS DATED 7/1/2004

LAYOUT SHOWN MAY NOT REFLECT CURRENT FIELD

CONDITIONS

R E V I S I O N S

P R O J E C T

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: SER

CHECKED: SVD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

MECHANICAL/

ELECTRICAL

M2.4

SMR B1

ROOF PLAN

SCALE: 3/16" = 1'-0"

HORIZONTAL SCALE IN FEET

0124 4 8 12 16

ROOF MECHANICAL PLAN

DRAWING KEYNOTES:

BASE BID SCOPE IS EXISTING ERVS TO REMAIN. ADD-ALT 1, 2, & 3 SCOPE IS TO REPLACE

ERVS 1, 2, & 3 RESPECTIVELY, INCLUDING CONTROLS.

FOR ADD-ALT1, 2, & 3: REMOVE EXISTING ERV AND ALL WIRING TO UNIT INCLUDING POWER

AND CONTROLS. EXISTING ROOF CURB AND DUCTWORK TO REMAIN FOR CONNECTION TO

NEW ERVS. PROVIDE ROOF CURB ADAPTER FOR NEW UNIT CONNECTIONS TO EXISTING

CURB. PROVIDE UNIT POWER FROM EXISTING PANEL LOCATION. WIRE CONTROL POINTS TO

EMS VIA NEW AHU CONTROLLERS, SEE POINTS LIST FOR REQUIRED CONTROL POINTS.

AutoCAD SHX Text

MUA

AutoCAD SHX Text

AutoCAD SHX Text

ERV

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

ERV

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

ERV

AutoCAD SHX Text

AutoCAD SHX Text

COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC

N

DATE: JULY 16, 2026

SCALE: AS NOTED

DRAWN BY: SER

CHECKED: SVD

C O N S U L T A N T S

117 SAINT PAUL ST

BURLINGTON, VERMONT 05401

P: 802.863.2227 www.sasarchitects.com

SMITH ALVAREZ SIENKIEWYCZ

AS S

A R C H I T E C T S

SAS PROJECT NUMBER: 1327

SMR

BUILDING 1

ALTERATIONS

CONCORD, NH

03301

DUBOIS & KING

10 CORPORATE DRIVE, SUITE 210

BEDFORD, NH 03110

P: 603-444-6578

MECHANICAL/

ELECTRICAL

M2.5

SMR B2

1ST FLOOR

PARTIAL PLAN

AND SCOPE

NOTES

BUILDING BACKGROUNDS PROVIDED FROM

YEATON ASSOCIATES SMR BLDG…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .