This is Addendum #2 to a Request for Bids (RFB DMAVS 2027-03) issued by the New Hampshire Department of Military Affairs and Veterans Services for alterations to Building 1 at the State Military Reservation. The addendum, posted July 30, 2026, addresses seven vendor inquiries regarding project specifications and technical requirements, with responses provided prior to the bid closing date of September 2, 2026 at 12:00 PM EST. Key clarifications include confirmation that curb adapters are acceptable alternatives to curb removal and replacement; that Open Automation, LLC and other qualified contractors are eligible to submit proposals; that all sensors, actuators, and relays for air handling unit (AHU) controller replacements should be assumed functional unless found defective during Retro-commissioning, with defective devices to be identified for agency disposition; that certain building areas require 48 hours' advance notice for access coordination; that existing thermostat wiring may be reused if performance verification confirms functionality; and that replacement thermostats must provide equivalent functionality to existing systems, including dual-function capabilities for temperature, carbon dioxide, and occupancy sensing. The addendum also clarifies that no direct Ethernet connection exists between the existing JCI controller in Building 2 and the JACE location in Building 1, requiring contractors to plan accordingly for network connectivity.
The responses provided in this addendum establish technical parameters and procurement flexibility to encourage broad contractor participation while maintaining design intent and system performance standards. These clarifications address critical design and installation questions regarding controls integration, equipment compatibility, and site access logistics that directly impact bid preparation and project execution. The addendum reinforces that contractors must meet specified technical requirements regardless of equipment manufacturer selection and that work coordination must accommodate an occupied facility with established scheduling protocols.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF NEW HAMPSHIRE
DEPARTMENT OF MILITARY AFFAIRS AND VETERANS SERVICES
RFB DMAVS 2027-03
NHARNG - State Military Reservation - Building 1 Alterations
ADDENDUM #2
AGENCY RESPONSES TO VENDOR INQUIRIES
DATE OF POSTING: 07/30/2026 DATE OF CLOSING: 09/02/2026
TIME OF POSTING: By 3:00 PM EST TIME OF CLOSING: 12:00 PM EST
INQUIRY 1: Are curb adapters allowed to be used instead of removal and replacement of the existing curbs?
RESPONSE 1: Yes. See Drawing Keynotes on drawing M2.4 at ADD ALT 1, 2, & 3.
INQUIRY 2: Is Open Automation, LLC an approved bidder for this project, provided they meet the specification?
RESPONSE 2: We welcome and encourage participation from all qualified contractors. Open Automation, LLC is fully eligible to submit a proposal for this project, provided they meet the technical specifications, performance requirements, and scope of work outlined in the procurement documents.
INQUIRY 3: For AHU controller replacements, should all sensors, actuators and relays be assumed to be in working order?
RESPONSE 3: Scope includes replacing all identified sensors and devices found defective during Retro- CX and calls for any device found not functioning during the work to be identified for NHARNG disposition.
INQUIRY 4: Are there any areas within the building that will be inaccessible during normal business hours?
RESPONSE 4: No. But access to certain spaces will need to be coordinated 48 hours, or two business days, in advance.
INQUIRY 5: M1.0 General note 10 indicates reuse of If a non-JCI product is selected to replace the existing JCI VAV controllers, can the existing thermostat wire be reused, provided the existing functionality remains (or the specified functionality is provided)?
RESPONSE 5: Design intent is to re-use the existing T-Stat wiring following Contractor verification of performance.
INQUIRY 6: Keynote X indicates "T-STAT, JCI NS8000 SERIES NSB8BTN241-0 FOR
TEMPERATURE-ONLY APPLICATIONS. MODIFY FOR DUAL-FUNCTION APPLICATIONS,
INCLUDING TEMP + CO2, AND/OR TEMP + OCC. SENSOR." Is the intent that existing functionality remains (contractor to replace existing thermostats with these features with new that provide the same features)?
RESPONSE 6: Yes.
INQUIRY 7: Is there an existing Ethernet connection from the existing JCI controller in building 2 to the existing JACE location in building 1?
RESPONSE 7: There is no direct Ethernet connection from the JCI controller in building 2 to the existing JACE in building 1.
File details come from the government source that posted it. Updated .