Attachment 6_Cost_Proposal_Spreadsheet.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Naval Sea Logistics Center Readiness Based Sparing Services Federal contract opportunity
- Solicitation number
- N6572626R3000
About this file
This is a Cost Proposal Spreadsheet template for Solicitation No. N6572626R3000, a Naval Sea Logistics Center Readiness Based Sparing Services task order. The spreadsheet is designed for cost-plus-fixed-fee (CPFF) proposals covering a base period and four option years. Offerors must structure their pricing to include prime contractor direct labor costs organized by employee and labor category, indirect costs (overhead, fringe benefits, and G&A), subcontractor labor costs and fees, pass-through costs, other direct costs (ODCs), and fixed fee components. The template requires separate line items for prime contractor labor, subcontractor proposed costs and fees, prime contractor pass-through amounts, and any G&A adders to ODCs. Fee calculations are subject to SeaPort-e IDIQ contract limitations, with a maximum pass-through percentage of 8.0% and maximum fixed fee constraints based on prime contractor labor cost percentages. The spreadsheet includes a pass-through analysis section that differentiates between subcontractor proposed costs without fee and total pass-through amounts including prime offeror fee, with specific notation that prime offeror fees on subcontractor pricing are treated as fee elements rather than cost elements in Section B of the proposal. The template is formatted for electronic completion and requires offerors to input hours, rates, and amounts across all cost categories for the entire contract period and each individual option year.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N6572626R30000001 SF 30.pdf | ||
| Solicitation Amendment - N6572626R30000001.pdf | ||
| Exhibit D_DD 1423_CDRL A004.pdf | ||
| NAVSUPINST 4441.37A - NAVSEAINST 4441.12A - MARRC-RB (04 SEP 2020).pdf | ||
| Exhibit F_DD 1423_CDRL A006.pdf | ||
| Exhibit C_DD 1423_CDRL A003.pdf | ||
| Attachment 5_Past Performance Reference.docx | DOCX document | |
| Solicitation - N6572626R3000.pdf | ||
| Exhibit E_DD 1423_CDRL A005.pdf | ||
| Exhibit B_DD 1423_CDRL A002.pdf | ||
| Exhibit A_DD 1423_CDRL A001.pdf | ||
| Attachment 2_Quality Assurance Surveillance Plan.pdf | ||
| Attachment 1_DD Form 254.pdf | ||
| Attachment 4_Personnel Qualifications.pdf | ||
| Attachment 3_Staffing_Plan.xlsx | XLSX spreadsheet | |
| Appendix C_Table of Deliverables.pdf | ||
| Appendix B_Non-Disclosure Summary.pdf | ||
| Appendix A_Performance Requirements Summary.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Proposal Spreadsheet
| SOLICITATION NO. N6572626R3000 - ATTACHMENT 6 |
| COST PROPOSAL SPREADSHEEET |
| Prime Offeror Name: | |||||||||||||||||||
| Subcontractor Name (if applicable): | |||||||||||||||||||
| DCAA Point of Contact Information: | |||||||||||||||||||
| Total for All Years | Base Period | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||
| Cost Elements | Company Labor Category | eCRAFT Labor Category | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | |||||||||||||||||||
| Prime Contractor Direct Labor | |||||||||||||||||||
| Employee Name 1 | |||||||||||||||||||
| Employee Name 2 | |||||||||||||||||||
| Etc. | |||||||||||||||||||
| Total Direct Labor Cost | |||||||||||||||||||
| Prime Contractor Indirect Labor Cost | |||||||||||||||||||
| Overhead | |||||||||||||||||||
| Fringe Benefits | |||||||||||||||||||
| G&A | |||||||||||||||||||
| Total Indirect Labor Cost | |||||||||||||||||||
| Total Direct and Indirect Labor cost | |||||||||||||||||||
| COM | |||||||||||||||||||
| Total Prime Contractor Labor Cost |
| Subcontractor Labor Cost |
| Subcontractor proposed cost and fee |
| Subcontractor 1 |
| Subcontractor 2 |
| Etc. |
| Total proposed subcontractor labor cost and fee |
| Prime contractor pass through (not including fee) |
| Handling |
| G&A |
| Other (if any) |
| Total pass through (not including fee) |
| Total Subcontractor Cost including pass through |
Total Labor Cost (Prime and Subcontractor Labor)
| Fixed Fee |
| Prime Contractor Fee for Prime Contractor Labor |
| Prime Contractor Fee for Subcontractor Labor * |
| Total Fee (for Prime and Subcontractor Labor) |
Total Labor Cost Plus Fixed Fee (CPFF)
| Other Direct Costs |
| Other Direct Costs (ODCs) |
| Any adders to ODCs such as G&A (cost only - no fee) |
| Total ODCs |
Total CPFF all CLINs (Labor and ODCs)
| Pass Through Analysis - Total for All Years | Amount | Percent |
| Subcontractor proposed cost and fee | ||
| Pass Through Amount (not including fee) | ||
| Prime Contractor Fee for Subcontractor Labor * | ||
| Total Pass Through Amount (including fee) | ERROR:#DIV/0! | |
| Maximum Pass Through Allowed by SeaPort-e IDIQ Contract | 8.00% |
| Fee Analysis - Total for All Years | Amount | Percent |
| Prime Contractor Labor Cost | ||
| Fixed Fee for Labor Performed by Prime Contractor | ERROR:#DIV/0! | |
| Maximum Fixed Fee Allowed by SeaPort-e IDIQ Contract | ||
| * When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B. |
File details come from the government source that posted it. Updated .