Attachment 6 Buy America Certification - Fillable Form.pdf

PDF 1 MB Posted

Attached to
DKX REROOF MUSEUM HANGAR AND REROOF OF MAINTENANCE BUILDING
Solicitation number
IFB-MKAA-0000000003
Issued by
Bradley County, Tennessee

About this file

This document is a Buy America Certification form for the Metropolitan Knoxville Airport Authority Terminal Apron Expansion project at McGhee Tyson Airport in Alcoa, Tennessee. The certification, issued on September 30, 2022, with AIP/BIL Numbers 3-47-0037-82-2022 and 3-47-0037-01-2022, requires bidders to certify compliance with Title 49 U.S.C. Section 50101, which mandates the use of steel and manufactured goods produced in the United States for federally funded airport projects.

The certification requires bidders to either affirm they will use 100% U.S.-manufactured steel and manufactured products or request a waiver if full compliance is not possible. Waivers may be granted under specific conditions, such as inconsistency with public interest, insufficient domestic production, high component costs, or if domestic materials would increase overall project costs by more than 25%. Approval of waivers is rare and can only be granted by the FAA Office of Airports in Washington DC or regional/district offices, with specific documentation and component calculations required from the bidder.

View the file

Other files

File Type Posted
Attachment 5 Program Bid Conditions - Fillable Form.pdf PDF
Attachment 10 Drug Free - Fillable Form.pdf PDF
PROJECT MANUAL SECTIONS I THRU VI DKX REROOF IBF 02_04_2025.pdf PDF
Q&A Document 1.pdf PDF
Addendum No. 1 DKX Reroof - Issued 2-10-2025.pdf PDF
Attachment 8 Identification of Principals - Fillable Form.pdf PDF
Addendum No 3 Issued February 21, 2025 BidNetDirect.pdf PDF
BID PROPOSAL PACKET DKX REROOF IFB 02_04_2025.pdf PDF
Attachment 3 EEOStatment - Fillable Form.pdf PDF
Attachment 1 Bidbond - Fillable Form.pdf PDF
Bid Proposal Form and Price Addendum No. 3 Issued Februrary 21 2025.pdf PDF
_Bid Proposal Form DKX Reroof - Fillable Form.pdf PDF
097301 DKX Musmeum Hangar Reroof _ Maintenance Building Reroof Addendum No. 2 February 17, 2025.pdf PDF
Attachment 4 DBE Objectives and Policy Statement - Fillable Form.pdf PDF
Attachment 12 Certification Against All Debarment - Fillable Form.pdf PDF
Attachment 2 Noncollusion - Fillable Form.pdf PDF
Attachment 13 Contractor License Form - Fillable Form.pdf PDF
Attachment 9 Subconstractor Solicitation - Fillable Form.pdf PDF
DRAWINGS SECTION VII DKX REROOF IFB 02_04_2025.pdf PDF
Attachment 7 Certification of Nonsegregated Facilities - Fillable Form.pdf PDF
Attachment 11 Statement of Compliance Certificate Illegal Immigrants - Fillable Form.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCGHEE TYSON AIRPORT TERMINAL APRON EXPANSION

ALCOA, TENNESSEE ISSUED FOR BID – SEPTEMBER 30, 2022

BUY AMERICA CERTIFICATION BF-35

Buy America Certification (Title 49 U.S.C. Section 50101)

PROJECT NAME: Metropolitan Knoxville Airport Authority Terminal Apron Expansion

AIRPORT NAME: McGhee Tyson Airport

AIP/BIL NUMBER: 3-47-0037-82-2022 / 3-47-0037-01-2022

This solicitation and any resulting contract are subject to the Buy America requirements of 49 U.S.C. Section 50101. The bidder certifies it and all associated subcontractors will comply with the Buy American preferences established under Title 49 U.S.C. Section 50101 as follows:

U.S.C. Section 50101 - Buying goods produced in the United States

(a) Preference. - The Secretary of Transportation may obligate an amount that may be appropriated to carry out section 106(k), 44502(a)(2), or 44509, subchapter I of chapter 471 (except section 47127), or chapter 481 (except sections 48102(e), 48106, 48107, and 48110) of this title for a project only if steel and manufactured goods used in the project are produced in the United States.

(b) Waiver. - The Secretary may waive subsection (a) of this section if the Secretary finds that -

(1) Applying subsection (a) would be inconsistent with the public interest;

(2) The steel and goods produced in the United States are not produced in a sufficient and reasonably available amount or are not of a satisfactory quality;

(3) When procuring a facility or equipment under section 44502(a)(2) or 44509, subchapter I of chapter 471 (except section 47127), or chapter 481 (except sections 48102(e), 48106, 48107, and 48110) of this title -

A. The cost of components and subcomponents produced in the United States is more than 60 percent of the cost of all components of the facility or equipment; and

B. Final assembly of the facility or equipment has occurred in the United States; or

(4) Including domestic material will increase the cost of the overall project by more than 25 percent.

(c) Labor Costs. - In this section, labor costs involved in final assembly are not included in calculating the cost of components.

Please note that approval of waivers listed under (b) (1) & (2) above, can only be approved by the FAA Office of Airports in Washington DC and approval is rare. Waivers listed under (b) (3) & (4) may be approved by FAA Regional or District Offices. A listing of Equipment and Products that have been approved and on the national waiver list may be located at:

http://www.faa.gov/airports/aip/procurement/federal_contract_provisions/media/buy_american_waiver.xls

As a matter of bid responsiveness, the bidder or offeror must complete and submit this certification with their bid proposal.

The bidder must sign and date the certification. The bidder/offeror must indicate how they propose to comply with the Buy America provision by selecting one of the following certification statements.

The bidder hereby certifies that it will comply with Title 49 U.S.C Section 50101(a) by only installing steel and manufactured products produced in the United States of America. The bidder further agrees that if chosen as the apparent low bid, it will submit documentation to the owner that demonstrate all steel and manufactured products are 100% manufactured in the United States.

The bidder hereby certifies that it cannot fully comply with the Buy America preferences of Title 49 U.S.C Section 50101(a); the bidder therefore requests a waiver per Title 49 U.S.C Section 50101(b).

The bidder further agrees that upon notification from the Owner, the bidder identified with the apparent low bid agrees to prepare and submit a waiver request and component calculation information to the owner within calendar days of the date of the notice of apparent low bid.

Bidder’s Firm Name Date

Signature

Kalousek, John Rectangle

Rectangle

Image

Text Box Attachment No. 6

MCGHEE TYSON AIRPORT TERMINAL APRON EXPANSION

ALCOA, TENNESSEE ISSUED FOR BID – SEPTEMBER 30, 2022

INTENTIONALLY LEFT BLANK

Rectangle

Bidders Firm Name:
Date:
Check_1: Off
Check_2: Off
days:

File details come from the government source that posted it. Updated .