Attachment 5 Program Bid Conditions - Fillable Form.pdf

PDF 2 MB Posted

Attached to
DKX REROOF MUSEUM HANGAR AND REROOF OF MAINTENANCE BUILDING
Solicitation number
IFB-MKAA-0000000003
Issued by
Bradley County, Tennessee

About this file

This document is a Disadvantaged Business Enterprise (DBE) Program attachment for the Metropolitan Knoxville Airport Authority's Terminal Apron Expansion project at McGhee Tyson Airport in Alcoa, Tennessee. The project, issued for bid on September 30, 2022, involves DBE program specifications and bid conditions for a federally-assisted contract, with a specific focus on ensuring maximum participation of disadvantaged businesses in the contract. The project will be funded through the Federal Aviation Administration, and bidders are required to meet specific DBE participation goals and demonstrate good faith efforts to include DBE firms.

The DBE participation goal for this project is set at 8.9%, with 8.9% designated as race-conscious participation and 0.0% as race-neutral. Bidders must comply with detailed requirements, including providing documentation of DBE firm contacts, intentions to perform as subcontractors, and affidavits confirming DBE status. The contract allows for different levels of DBE participation credit: 100% for subcontractors and manufacturers, and 60% for suppliers. Contractors must submit various forms demonstrating their efforts to engage DBE firms, and failure to meet the DBE goals or make acceptable good faith efforts may result in contract termination or other remedies deemed appropriate by the Metropolitan Knoxville Airport Authority.

View the file

Other files

File Type Posted
Attachment 10 Drug Free - Fillable Form.pdf PDF
PROJECT MANUAL SECTIONS I THRU VI DKX REROOF IBF 02_04_2025.pdf PDF
Q&A Document 1.pdf PDF
Addendum No. 1 DKX Reroof - Issued 2-10-2025.pdf PDF
Attachment 8 Identification of Principals - Fillable Form.pdf PDF
Addendum No 3 Issued February 21, 2025 BidNetDirect.pdf PDF
BID PROPOSAL PACKET DKX REROOF IFB 02_04_2025.pdf PDF
Attachment 6 Buy America Certification - Fillable Form.pdf PDF
Attachment 3 EEOStatment - Fillable Form.pdf PDF
Attachment 1 Bidbond - Fillable Form.pdf PDF
Bid Proposal Form and Price Addendum No. 3 Issued Februrary 21 2025.pdf PDF
_Bid Proposal Form DKX Reroof - Fillable Form.pdf PDF
097301 DKX Musmeum Hangar Reroof _ Maintenance Building Reroof Addendum No. 2 February 17, 2025.pdf PDF
Attachment 4 DBE Objectives and Policy Statement - Fillable Form.pdf PDF
Attachment 12 Certification Against All Debarment - Fillable Form.pdf PDF
Attachment 2 Noncollusion - Fillable Form.pdf PDF
Attachment 13 Contractor License Form - Fillable Form.pdf PDF
Attachment 9 Subconstractor Solicitation - Fillable Form.pdf PDF
DRAWINGS SECTION VII DKX REROOF IFB 02_04_2025.pdf PDF
Attachment 7 Certification of Nonsegregated Facilities - Fillable Form.pdf PDF
Attachment 11 Statement of Compliance Certificate Illegal Immigrants - Fillable Form.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCGHEE TYSON AIRPORT TERMINAL APRON EXPANSION

ALCOA, TENNESSEE ISSUED FOR BID – SEPTEMBER 30, 2022

DBE PROGRAM BF-17

MCGHEE TYSON AIRPORT

Metropolitan Knoxville Airport Authority Terminal Apron Expansion

DISADVANTAGED BUSINESS ENTERPRISE PROGRAM

BID CONDITIONS

The following bid conditions apply to this Department of Transportation (DOT) assisted contract.

Submission of a bid/proposal by a prospective Contractor shall constitute full acceptance of these bid conditions.

(1) DEFINITION – Disadvantaged Business Enterprise (DBE) as used in this Contract shall have the same meaning as defined in Paragraph 23.62 of Subpart D to 49 CFR Part 26.

(2) POLICY - It is the policy of DOT that DBE’s as defined in 49 CFR Part 26 shall have the maximum opportunity to participate in the performance of contracts and subcontracts financed in whole or in part with federal funds. The Runway 5L-23R Reconstruction – NAVAIDs Installation will be funded through the Federal Aviation Administration.

Therefore, the DBE requirements of 49 CFR Part 26 applies to this contract.

(3) DBE OBLIGATION – The Contractor agrees to ensure that disadvantaged business enterprises as defined in 49 CFR Part 26 have the maximum opportunity to participate in the performance of contracts and subcontracts financed in whole or in part with federal funds, and through other funding sources specified by the Metropolitan Knoxville Airport Authority.

In this regard, all Contractors shall take all necessary and reasonable steps in accordance with 49 CFR Part 26 to ensure that DBE’s have the maximum opportunity to compete for and perform contracts. Contractors shall not discriminate on the basis of race, color, national origin, disability or sex in the award and performance of DOT assisted contracts, or other contracts defined by the Owner.

(4) COMPLIANCE - All bidders, potential Contractors, or subcontractors for this DOT assisted contract are hereby notified that failure to carry out the DOT policy, the Airport Authority policy, and the DBE obligation, as set forth above, shall constitute a breach of contract which may result in termination of the contract or such other remedy as deemed appropriate by the Owner.

(5) SUBCONTRACT CLAUSE – All bidders and potential Contractors hereby assure that they will include the above clauses in all subcontracts which offer further subcontracting opportunities.

Kalousek, John Rectangle

Image

Text Box Attachment No. 5

Text Box Attachment No. 5

DBE PROGRAM BF-18

(6) RACE-CONSCIOUS – Measure or program is one that is focused specifically on assisting only DBE’s, including women-owned DBE’s (as defined in 49 CFR Part 26.5).

(7) RACE-NEUTRAL – Measure or program is one that is, or can be, used to assist all small businesses. For the purposes of this part, race-neutral includes gender-neutrality (as defined in 49 CFR Part 26.5).

(8) CONTRACT AWARD - Bidders are hereby advised that meeting DBE subcontract goals or making an acceptable good faith effort to meet such goals are conditions of being awarded a DOT assisted contract or other contract defined by the Owner.

The Owner proposes to award the contract to the lowest responsive and responsible bidder submitting a reasonable bid provided the bidder has met the goals for DBE participation or, if failing to meet the goals, the bidder has made an acceptable good faith effort to meet the established goals for the DBE participation. Bidder is advised that the Owner reserves the right to reject any or all bids submitted, and to award or refrain from awarding a contract for the work, whichever is deemed to be in the Owner’s best interest.

(9) DBE PARTICIPATION GOAL - The attainment of goals established for this contract are to be measured as a percentage of the total dollar value of specific portions of the contract. The application of the DBE goal is required for all of the work associated with this project.

The DBE goal for this project as awarded, regardless of the bid elements included is:

The achievement of the DBE goals shall address two categories as outlined in 49 CFR Part 26:

1. Race Conscious – Minimum participation requirement: 8.9%

2. Race Neutral – Balance of participation goal: 0.0%

Total Participation: 8.9%

RACE CONSCIOUS – Measure or program is one that is focused specifically on assisting only DBE’s, including women-owned DBE’s (as defined in 49 CFR Part 26.5).

RACE NEUTRAL – Measure or program is one that is, or can be, used to assist all small businesses. For the purposes of this part, race-neutral includes gender-neutrality (as defined in 49 CFR Part 26.5).

The determination of the proposed DBE participation for the project shall be made as follows:

Highlight 6.8%

Highlight nt: 8.9%

Highlight nt: 8.9%

Highlight ent: 8.9%

Highlight 8.9%

Highlight

Highlight

Image

Text Box Attachment No. 5

Highlight ent: 8.9%

Highlight

Highlight

Highlight CFR Pa

Highlight ent: 8.9%

Highlight 8.9%

Highlight ent: 8.9%

Highlight in 49 CFR

Highlight : 8.9%

Highlight ement: 8.9%

Highlight Race Conscious – Minimum participation requirement: 8.9%

Highlight Total Participation: 8.9%

DBE PROGRAM BF-19

Total DBE Amount Bid Total Bid Amount

(10) AVAILABLE DBE’S – The Metropolitan Knoxville Airport Authority is a member of the Tennessee Uniform Certification Program (TNUCP). The Metropolitan Knoxville Airport Authority continues to certify DBE construction contractors, suppliers, and manufacturers, and relies solely on the certified list of DBE companies as prepared by the Tennessee Department of Transportation. The internet link to this document is: http:

www.tdot.state.tn.us/dbedirectinternet/Vendor.aspx

(Note: pop-up blocker must be disabled to view report)

Bidders are encouraged to contact the Metropolitan Knoxville Airport Authority in their pursuit of locating DBE’s for the work. At the Bidder’s request, the Metropolitan Knoxville Airport Authority will provide a list of DBE contractors who are currently certified with the

TNUCP.

Credit toward the DBE goal will not be counted unless the companies to be used to satisfy the goal is (are) certified as a DBE by the TNUCP prior to the bid date.

(11) CATEGORIES FOR OBTAINING DBE PARTICIPATION – DBE participation can be achieved from any combination of the following categories. Note the percentage amount paid to the DBE company that will be allowed for credit toward DBE participation:

● Subcontractor 100%

● Manufacturer 100%

● Supplier 60%

(12) CONTRACTOR’S REQUIRED SUBMISSION – The Owner requires the submission of the following information with the bid. Certain other DBE information may also be required.

http://www.tdot.state.tn.us/dbedirectinternet/Vendor.aspx Image

Intentionally Left Blank

Rectangle

DBE PROGRAM BF-21

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

PROGRAM SPECIFICATIONS

Exhibit 1

BASE BID SCHEDULE

DBE PARTICIPATION SCHEDULE

FORM A (2 pages)

(1) DBE Name of Firm: DOT/TYPE:

□ *Minority □ Women □ Other Address: Telephone:

Owner/Contact Name(s): Email Address:

□ Contractor □ Subcontractor

□ Manufacturer □ Consultant

□ Dealer/Supplier

□ Hauler – Number of DBE Owned Trucks ______

(Must provide VIN Numbers for DBE owned trucks to be used at Post Bid Meeting).

Area of Work to be performed:

DBE Bid Amount:

DBE Goal Percentage:

(2) DBE Name of Firm: DOT/TYPE:

□ *Minority □ Women □ Other

Address: Telephone:

Owner/Contact Name(s): Email Address:

□ Contractor □ Subcontractor

□ Manufacturer □ Consultant

□ Dealer/Supplier

□ Hauler – Number of DBE Owned Trucks ______

(Must provide VIN Numbers for DBE owned trucks to be used at Post Bid Meeting).

Area of Work to be performed:

DBE Bid Amount:

DBE Goal Percentage:

(3) DBE Name of Firm: DOT/TYPE:

□ *Minority □ Women □ Other

Address: Telephone:

Owner/Contact Name(s): Email Address:

□ Contractor □ Subcontractor

□ Manufacturer □ Consultant

□ Dealer/Supplier

□ Hauler – Number of DBE Owned Trucks ______

(Must provide VIN Numbers for DBE owned trucks to be used at Post Bid Meeting).

Area of Work to be performed:

DBE Bid Amount:

DBE Goal Percentage:

Image

DBE PROGRAM BF-22

(4) DBE Name of Firm:

DOT/TYPE:

Address:

Telephone:

Owner/Contact Name(s):

Email Address:

□ Contractor □ Subcontractor

□ Manufacturer □ Consultant

□ Dealer/Supplier

□ Hauler – Number of DBE Owned Trucks ______

(Must provide VIN Numbers for DBE owned trucks to be used at Post Bid Meeting).

Area of Work to be performed:

DBE Bid Amount:

DBE Goal Percentage:

(5) DBE Name of Firm:

□ Manufacturer □ Consultant

□ Dealer/Supplier

□ Hauler – Number of DBE Owned Trucks ______

(Must provide VIN Numbers for DBE owned trucks

DBE Goal Percentage:

(6) DBE Name of Firm:

□ Manufacturer □ Consultant

□ Dealer/Supplier

□ Hauler – Number of DBE Owned Trucks ______

(Must provide VIN Numbers for DBE owned trucks

DBE Goal Percentage:

*(Black, Hispanic, Asian American, American Indian and other Economically Disadvantaged)

The undersigned will enter formal agreements with subcontractors or suppliers names in this document, if awarded a contract by Owner. Failure to do so may constitute a breach of contract, with the Owner.

Bidders Signature:______________________________________________________ Date:__________________

Print Name:____________________________________________________________ Title:__________________

Image

DBE PROGRAM BF-23

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

PROGRAM SPECIFICATIONS

Exhibit 2

BASE BID SCHEDULE

UTILIZATION STATEMENT

Form B

The undersigned bidder has satisfied the requirements of the bid specification in the following manner. (Please mark the appropriate box).

□ The bidder is committed to a minimum of __________% DBE utilization on this contract.

□ The bidder, while unable to meet the DBE goal of __________, hereby commits to a minimum of __________% DBE utilization on this contract and also submits documentation, as an attachment demonstrating good faith efforts (GFE).

The undersigned hereby further assures that the information included herein is true and correct, and that the DBE firm(s) listed herein have agreed to perform a commercially useful function in the work items noted for each firm. The undersigned further understands that no changes to this statement may be made without prior approval from the Civil Right Staff of the Federal Aviation Administration.

Name of Prime Contractor:_______________________________________________________________________

Project Name:__________________________________________________________________________________

Signature:_____________________________________________________________ Date:___________________

DBE UTILIZATION SUMMARY

□ Base Bid

□ Bid Additive No. __________

□ Bid Alternate No. __________

Contract Amount DBE Amount

DBE Prime Contractor $_______________ x1.00 = $______________

DBE Subcontractor $_______________ x1.00 = $______________

DBE Dealer/Supplier $_______________ x0.60 = $______________

DBE Manufacturer $_______________ x1.00 = $______________

Total Amount DBE $ $______________

Prime Contractor Bid $______________

DBE Anticipated Goal (Total DBE $/Prime Contractor Bid x 100 = TOTAL DBE %) _______________%

Image

INTENTIONALLY LEFT BLANK

DBE PROGRAM BF-25

If the Contractor fails to meet the DBE subcontract goals established in paragraph 9 above, the following information must be submitted prior to contract award to assist the Owner in determining whether or not the contactor made acceptable good faith efforts to meet the contract goal. This information (when applicable), as well as the DBE information, should be submitted as specified in Paragraph 12 above.

Suggested guidance for use in determining if good faith efforts were made by a contractor are included in Appendix A 49 CFR Part 26, subpart 23.45(h).

A list of efforts that a contractor may make and the Owner may use in making a determination as to the acceptability of a contractor’s efforts to meet the goal as included in Appendix A 49 CFR Part 26, Subpart 23.45(h) are as follows:

a. Whether the contractor attended any pre-solicitation or pre-bid meetings that were scheduled by the recipient to inform DBE’s of contracting and subcontracting opportunities;

b. Whether the contractor advertised in general circulation, trade association, and minority-focus media concerning the subcontracting opportunities;

c. Whether the contractor provided written notice to a reasonable number of specific DBE’s that their interest in the contract was being solicited in sufficient time to allow the DBE’s to participate effectively;

d. Whether the contractor followed up initial solicitations of interest by contracting DBE’s to determine with certainty whether DBE’s were interested;

e. Whether the contractor selected portions of work to be performed by DBE’s in order to increase the likelihood of meeting the DBE goal (including, where appropriate, breaking down contracts into economically feasible unites to facilitate DBE participation);

f. Whether the contractor provided interested DBE’s with adequate information about the plans specifications, and requirements of the contract;

g. Whether the contractor negotiated in good faith with interested DBE’s, not rejecting DBE’s as unqualified without sound reasons based on a thorough investigation of their capabilities;

h. Whether the contractor made efforts to assist interested DBE’s in obtaining bonding, lines of credit, or insurance required by the recipient or contractor; and

i. Whether the contractor effectively used the services of available minority community organizations; minority contractors’ groups; local and state Federal Minority Business Assistance Offices; and other organizations that provide assistance in the recruitment and placement of DBE’s.

DBE PROGRAM BF-26

NOTE: The efforts set forth above, a – I, are merely suggested criteria and the Owner may specify that you submit information on certain other actions a contractor took to secure DBE participation in an effort to meet the goals. A contractor may also submit to the Owner other information on efforts to meet the goals.

(13) CONTRACTOR ASSURANCES –

a. The bidder hereby assures that he/she will comply with the following statement and include in all subcontracts:

The contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to:

(1) Withholding monthly progress payments;

(2) Assessing sanctions;

(3) Liquidated damages; and/or

(4) Disqualifying the contractor from future bidding as non-responsible.

b. The contractor shall utilize the specific DBEs listed to perform the work and supply the materials for which each is listed unless the contractor obtains the Owner’s written consent as provided for in 49 CFR 26.53 (f).

c. Without the Owner’s written consent as provided for under 49 CFR 26.53 (f), the contractor shall not be entitled to any payment for work or material unless it is performed or supplied by the listed DBE.

The Bidder also assures to comply with the following goals:

a. The DBE participation goal as established in Paragraph 9 above.

b. The calculated DBE participation percentage as shown in Paragraph 12, which was submitted as a condition of contract award.

Agreements between bidder/proposer and a DBE in which the DBE promises not to provide subcontracting quotations to other bidders/proposers are prohibited. The bidder shall make a good

Image

DBE PROGRAM BF-27

faith effort to replace a DBE subcontract that is unable to perform successfully with another DBE subcontractor. Substitution must be coordinated and approved by the Owner.

The Bidder shall establish and maintain records and submit regular reports, as required, which will identify and assess progress in achieving DBE subcontract goals and other DBE affirmative action efforts.

Name of BIDDER:_____________________________________________________________

IRS Number:______________________ By:_______________________________________

Date:_____________________________ Title:_____________________________________

END DBE PROGRAM

Image

DBE PROGRAM BF-29

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

PROGRAM SPECIFICATIONS

Exhibit 3

BASE BID SCHEDULE

DBE CONTACT SHEET

Form C

(Multiple Copies Can Be Made)

*Prime Contractor to complete and submit along with bid/proposal or within TWO (2) business days of Bid Submission with “Good Faith Effort Documentation.”

* Submit information regarding all DBE subcontractors contacted

Bid Opening Date_____/_____/_____, Time: _______________

Name of Prime Contractor:____________________________________________ Bid Number:________________ Date Contacted Name of Firm Person Contacted Telephone Number Subcontractor Response

Work Item to be Performed Price Quoted MBE (Minority) WBE (Woman)

Date Contacted Name of Firm Person Contacted Telephone Number Subcontractor Response

Work Item to be Performed Price Quoted MBE (Minority) WBE (Woman)

Date Coacted Name of Firm Person Contacted Telephone Number Subcontractor Response

Work Item to be Performed Price Quoted MBE (Minority) WBE (Woman)

Date Contacted Name of Firm Person Contacted Telephone Number Subcontractor Response

Work Item to be Performed Price Quoted MBE (Minority) WBE (Woman)

I hereby certify that the subcontractors listed above were contacted by my firm and requested to submit quotes on the above-referenced project. All interested subcontractors were negotiated with in good faith efforts.

Signed:________________________________________________ Title:_______________________________

Print Name:____________________________________________ Telephone:__________________________

DBE PROGRAM (Initial_____)

Image

DBE PROGRAM BF-31

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

PROGRAM SPECIFICATIONS

Exhibit 4

BASE BID SCHEDULE

AFFIDAVIT OF DBE

Form D (Provide a separate sheet(s) for each DBE Contractor)

Name of DBE Contractor:_________________________________________________________________________

Project Name:__________________________________________________________________________________

Check All that Apply:

Base Bid

I hereby declare and affirm that I am an officer or person duly authorized to represent the below named firm.

I declare and affirm that I am a Disadvantaged Business Enterprise as defined in USDOT/TNDOT (49CFR, part 26) and am listed in the DBE Directory in good standing. I also declare that I am certified for the work area that we are being hired to perform. I have provided a copy of our TN Uniform Certification Program Certificate. I am a citizen of the United States.

I do solemnly declare and affirm under the penalties of perjury that the contents of the foregoing document are true and correct and that I am authorized, on behalf of the named firm to sign this affidavit.

__________________________________________________(DBE SIGNATURE)

_________________________(DATE)

_______________________________________________________________________________(PRINTED NAME)

STATE OF _____________________________________ COUNTY OF ____________________________________

ON THIS ______________ (DAY) OF _______________________ (MONTH), ______________(YEAR)

The person described in the foregoing affidavit acknowledges that he/she executed the same in the capacity therein stated and for the purposes therein contained.

In witness thereof, I here unto set my official seal:

Notary Public Signature

My Commission Expires

DBE PROGRAM (Initial_____)

Image

DBE PROGRAM BF-33

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

PROGRAM SPECIFICATIONS

Exhibit 5

BASE BID SCHEDULE

INTENT TO PERFORM AS A SUBCONTRACTOR

Form E

(Provide a separate sheet(s) for each DBE Contractor)

TO:_______________________________________________________ Bid Number:________________________ (Name of Prime Contractor)

Project Name:__________________________________________________________________________________

(Check One):

An Individual A Corporation A Partnership A Joint Venture

(Check One):

Contractor Subcontractor Manufacturer Consultant Dealer/Supplier

The DBE status of the undersigned is confirmed on the Affidavit of Disadvantaged Business Enterprise.

The undersigned is prepared to perform the following described work in connection with the above- referenced project:

DBE CONTRACTED PRICE: $____________________________

The Prime Contractor has projected the following commencement date for such work, and the undersigned projects completion of such work as follows:

Project Commencement Date______________________ Project Completion Date______________________

With respect to the proposed subcontract described above, _____% of the dollar value of such subcontract will be sublet and/or awarded to NON-DBE Contractors and/or Non-DBE Suppliers.

The undersigned will enter into a formal agreement for the above work with the Contractor Subcontractor. As a DBE Contractor, I will cooperate with the certificate and monitoring process set forth by ____________________ for the referenced project.

Signature of DBE Date Name of DBE Firm

Printed Name Address

Type Title Telephone Number

DBE Program (Initial_____)

Image

Intentionally Left Blank

Address:
Email Address:
Subcontractor: Off
Contractor: Off
Manufacturer: Off
DealerSupplier: Off
Hauler Number of DBE Owned Trucks: Off
Consultant: Off
Area of Work to be performed:
DBE Bid Amount:
Address_2:
Telephone_2:
Email Address_2:
Subcontractor_2: Off
Contractor_2: Off
Manufacturer_2: Off
DealerSupplier_2: Off
Hauler Number of DBE Owned Trucks_2: Off
Consultant_2: Off
Area of Work to be performed_2:
DBE Bid Amount_2:
Address_3:
Telephone_3:
OwnerContact Names_3:
Email Address_3:
Subcontractor_3: Off
Contractor_3: Off
Manufacturer_3: Off
DealerSupplier_3: Off
Hauler Number of DBE Owned Trucks_3: Off
Consultant_3: Off
Area of Work to be performed_3:
DBE Bid Amount_3:
Address_4:
Telephone_4:
OwnerContact Names_4:
Email Address_4:
Subcontractor_4: Off
Contractor_4: Off
Manufacturer_4: Off
DealerSupplier_4: Off
Hauler Number of DBE Owned Trucks_4: Off
Consultant_4: Off
Area of Work to be performed_4:
DBE Bid Amount_4:
Address_5:
Telephone_5:
OwnerContact Names_5:
Email Address_5:
Subcontractor_5: Off
Contractor_5: Off
Manufacturer_5: Off
DealerSupplier_5: Off
Hauler Number of DBE Owned Trucks_5: Off
Consultant_5: Off
Area of Work to be performed_5:
DBE Bid Amount_5:
Address_6:
Telephone_6:
OwnerContact Names_6:
Email Address_6:
Subcontractor_6: Off
Contractor_6: Off
Manufacturer_6: Off
DealerSupplier_6: Off
Hauler Number of DBE Owned Trucks_6: Off
Consultant_6: Off
Area of Work to be performed_6:
DBE Bid Amount_6:
undefined_2:
undefined_3:
undefined_4:
undefined_5:
Base Bid: Off
Bid Additive No: Off
Bid Alternate No: Off
undefined_6:
undefined_7:
undefined_8:
undefined_9:
undefined_10:
undefined_11:
undefined_12:
undefined_13:
undefined_14:
IRS Number:
Time:
Bid Number:
Base Bid_2: Off
Check One: Off
A Corporation: Off
A Partnership: Off
A Joint Venture: Off
Contractor_7: Off
Subcontractor_7: Off
Manufacturer_7: Off
Consultant_7: Off
DealerSupplier_7: Off
Owner/Contact Names:
Owner/Contact Names_2:
Minority: Off
Women: Off
Other: Off
Type Other:
DBE Goal Percentage:
Telephone:
Name of Firm:
Name of Firm_2:
DBE Goal Percentage_2:
Name of Firm_3:
#Trucks_1:
#Trucks_2:
Minority_2: Off
Women_2: Off
Other_2: Off
Type Other_2:
Minority_3: Off
Women_3: Off
Other_3: Off
Type Other_3:
#Trucks_3:
DBE Goal Percentage_3:
Name of Firm_4:
Minority_4: Off
Women_4: Off
Other_4: Off
Type Other_4:
DBE Goal Percentage_4:
#Trucks_4:
Name of Firm_5:
Minority_5: Off
Women_5: Off
Other_5: Off
Type Other_5:
#Trucks_5:
DBE Goal Percentage_5:
Name of Firm_6:
#Trucks_6:
DBE Goal Percentage_6:
Type Other_6:
Minority_6: Off
Women_6: Off
Other_6: Off
Check_B1: Off
Check_B2: Off
%_B1:
%_B2:
%_B3:
Date_B1:
Date_A1:
Print Name_A1:
Title_A1:
Prime Contractor_B1:
Project Name_B1:
Month_C1:
Date_C1:
Year_C1:
Prime Contractor_C1:
Date Contacted_C1:
Name of Firm_C1:
Person Contacted_C1:
Telephone Number_C1:
Subcontractor Response_C1:
Work Item to be Performed_C1:
Price Quoted_C1:
MBE_C1: Off
Date Contacted_C2:
Name of Firm_C2:
Person Contacted_C2:
Telephone Number_C2:
Subcontractor Response_C2:
Work Item to be Performed_C2:
Price Quoted_C2:
MBE_C2: Off
Date Contacted_C3:
Name of Firm_C3:
Person Contacted_C3:
Telephone Number_C3:
Subcontractor Response_C3:
Work Item to be Performed_C3:
Price Quoted_C3:
MBE_C3: Off
WBE_C3: Off
WBE_C1: Off
WBE_C2: Off
Date Contacted_C4:
Name of Firm_C4:
Person Contacted_C4:
Telephone Number_C4:
Subcontractor Response_C4:
Work Item to be Performed_C4:
Price Quoted_C4:
MBE_C4: Off
WBE_C4: Off
Title_C1:
Print Name_C1:
Telephone_C1:
Initial_C1:
Name of BIDDER_B2:
By_B2:
Date_B2:
Title_B2:
DBE Contractor_D1:
Project Name_D1:
PRINTED NAME_D1:
STATE_D1:
COUNTY_D1:
DATE_D1:
MONTH_D1:
YEAR_D1:
My Commission Expires_D1:
Initial_D1:
Name of Prime Contractor_E1:
Bid Number_E1:
Project Name_E1:
%_E1:
by_E1:
Project Completion Date_E1:
Project Commencement Date_E1:
DBE CONTRACTED PRICE_E1:
Description of Work_E1:
The undersigned is prepared to perform the following described work in connection with the abovereferenced project 2:
Date_E1:
Name of DBE Firm_E1:
Printed Name_E1:
Address_E1:
Type Title_E1:
Telephone Number_E1:
Initial_E1:
Subcontractor_E1: Off
Contractor_E1: Off

File details come from the government source that posted it. Updated .