This document set comprises electrical design and construction plans for a building renovation project at a U.S. Department of Veterans Affairs facility in Vancouver, Washington. The drawings include detailed electrical schematics for multiple buildings (BLDG 001 through BLDG 011), showing medium and low voltage one-line diagrams, demolition plans, site electrical plans, panel configurations, and grounding details. The project involves replacement of existing electrical infrastructure including transformers, switch boards, panel boards, and associated distribution equipment across multiple buildings. Key work activities include demolition of existing pad-mounted equipment and panel boards, installation of replacement transformers and panel boards, raceway extensions and modifications, conductor terminations, electrical testing and inspections, and load transfers back to normally sourced power.

The documents specify work shall be performed only on weekends with coordination required for exact outage and work plans. Contractor obligations include providing temporary mobile generators and power distribution equipment to maintain power to one emergency-backed equipment, refueling as necessary, and responsibility for all refueling costs. Active harmonic filter installations, capacitor banks, and motor control centers are included in the scope. General notes and key notes throughout indicate existing equipment containment and development, contractor field coordination requirements, existing circuit tracing and documentation, and specification compliance for all electrical work including protection systems, bonding, and grounding per applicable standards.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING METER ENCLOSURE SHALL BE REMOVED AND

REINSTALLED TO REPLACEMENT PANELBOARD "DP9A/1".

REFERENCE DETAIL 2 ON THIS SHEET FOR ADDITIONAL

INFORMATION.

PROVIDE ACTIVE HARMONIC FILTER AS INDICATED.

REFERENCE ONE-LINE DIAGRAM ON SHEET EP602 FOR

ADDITIONAL INFORMATION.

. WORK SHALL BE PERFORMED ONLY ON WEEKENDS; COORDINATE WITH VA FOR EXACT OUTAGE AND WORK PLANS. THE FOLLOWING PHASING STEPS MAY BE USED TO PERFORM THE WORK AS FOLLOWS:

J

PROVIDE (1) 2" RACEWAY AND (1) 24"Wx24"Hx10D JUNCTION

BOX FOR FUTURE POWER MONITORING DATA CABLING

FROM "09-AHF-9" AND NEARBY POWER METERS TO

BUILDING 3, CONTROL ROOM 102. RACEWAY SHALL BE

PROVIDED WITH 200-LBS PULL STRING. PROVIDE ALL

MOUNTING HARDWARE AND STAINLESS STEEL FASTENERS

AS REQUIRED. COORDINATE WITH EXISTING CONDITIONS

AND VA FOR EXACT INSTALLATION LOCATION.

PROVIDE (1) 1" CONDUIT WITH 200-LBS PULL STRING.

. WORK SHALL BE PERFORMED ONLY ON WEEKENDS; COORDINATE WITH VA FOR EXACT OUTAGE AND WORK PLANS. THE FOLLOWING PHASING STEPS MAY BE USED TO PERFORM THE WORK AS FOLLOWS:

PFCC PFCC-PMP02

012-P-01

012-P-02

PROVIDE REPLACEMENT CAPACITOR WITH ALL REQUIRED

MOUNTING HARDWARE AND SUPPORTS.

CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL THAT

THEIR PROPOSED EQUIPMENT SELECTION (I.E. PANELBOARD,

GENERATOR, ETC.) WILL FIT WITH ALL REQUIRED ELECTRICAL

CLEARANCES. CONTRACTOR SHALL PROVIDE STATEMENT

CONFIRMING THAT EQUIPMENT WILL FIT IN ALLOCATED SPACE ON

SUBMITTAL.

2.

EXISTING METERING ENCLOSURE MOUNTED TO SIDE OF

SWITCHBOARD ENCLOSURE. PROVIDE STAINLESS STEEL

MOUNTING HARDWARE AND SEALANT AS REQUIRED.

CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL

THAT THEIR PROPOSED EQUIPMENT SELECTION (I.E.

PANELBOARD, GENERATOR, ETC.) WILL FIT WITH ALL

REQUIRED ELECTRICAL CLEARANCES. CONTRACTOR SHALL

PROVIDE STATEMENT CONFIRMING THAT EQUIPMENT WILL FIT

IN ALLOCATED SPACE ON SUBMITTAL.

2.

SPDSSPD

CONTRACTOR SHALL FIELD VERIFY PRIOR TO SUBMITTAL

THAT THEIR PROPOSED EQUIPMENT SELECTION (I.E.

PANELBOARD, GENERATOR, ETC.) WILL FIT WITH ALL

REQUIRED ELECTRICAL CLEARANCES. CONTRACTOR SHALL

PROVIDE STATEMENT CONFIRMING THAT EQUIPMENT WILL FIT

IN ALLOCATED SPACE ON SUBMITTAL.

2.

SPDSPD

PROVIDE ALL MOUNTING AND FASTENING HARWARE

REQUIRED. HARDWARE SHALL BE STAINLESS STEEL.

6 6 6

02-

SHEET 024ED601