This is a Statement of Work for electrical infrastructure corrections and upgrades at the Vancouver VA medical center campus. The work encompasses facility-wide electrical system improvements across all buildings within scope, including replacement, modification, or upgrade of electrical power distribution equipment and associated components. Specific tasks include electrical equipment replacement/upgrade, replacing or adjusting overcurrent protective devices, and providing building lightning protection systems.

The SOW identifies three critical infrastructure projects: replacement of Building 11 Switchgear "MSB," replacement of Building 1 Switchgear "MSB," and replacement of the existing Building 11/CLC Generator. Additionally, contractors must perform facility-wide ground resistance testing in accordance with VHA Directive 1028-8.J(6)e and complete an arc-flash hazard risk assessment across the entire facility upon completion of all electrical work. The arc-flash assessment must include a detailed report and hazard labeling in accordance with specification 26 05 73. The solicitation is issued under Solicitation Number 36C26026R0040 by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20 for contract 648-20-116.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work 648-20-116 Correct Electrical FCA Deficiencies (Vancouver)

Perform the following electrical work on the Vancouver VA campus:

1. All buildings within scope: replace, modify, or upgrade existing electrical power distribution equipment or associated equipment. These tasks include the following examples:

a. Electrical equipment replacement/upgrade

b. Replacing/Adjusting overcurrent protective devices

c. Provide building lightning protection

2. Replace Building 11 Switchgear “MSB”

3. Replace Building 1 Switchgear “MSB”

4. Replace existing Building 11/CLC Generator

5. Facility wide ground resistance testing per VHA Directive 1028-8.J(6)e

6. Arc-Flash Hazard Risk Assessment: Once all above work has been completed, a facility wide arc-flash hazard risk assessment with report and labeling shall be performed in accordance with specification 26 05 73.